Scheduling method and device for battery-swapping mining truck system based on charging and swapping separation mode
Through the battery replacement mining card system scheduling method based on the charging and swapping separation mode, the data of the mining card and battery transfer vehicle are collected and processed in real time, and scheduling instructions are generated, which solves the problem of low efficiency in the traditional scheduling method and realizes the transfer of mining cards and batteries. The efficient coordinated operation of the trucks ensures that the mining cards always have batteries available.
Patent Information
- Application Number
- CN202410189852.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-20
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-02-20
AI Technical Summary
In mining operations, the traditional battery replacement mining card scheduling method cannot adapt to rapid movement conditions, resulting in low operating efficiency, and manual scheduling is prone to errors, affecting the efficient operation of mining trucks and battery transfer vehicles.
The battery-replacement mining card system scheduling method based on the charging and swapping separation mode is adopted, and the operating data of the mining card and the battery transfer truck are collected in real time through the data processing platform, and scheduling instructions are generated to realize the efficient coordinated operation of the mining card and the battery transfer truck and ensure the mining card There are always batteries available.
It improves the efficiency of mining operations, reduces the waiting time for battery replacement and the time spent on the way back and forth, ensures the efficient operation of mining trucks and battery transfer vehicles, and avoids manual scheduling errors.
Smart Images

Figure CN118144626B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of battery-swap mining trucks, and in particular to a method and device for scheduling a battery-swap mining truck system based on a charging-and-swap separation mode. Background Art
[0002] New energy vehicle-related technologies are developing rapidly, and new energy vehicles are gradually becoming popular. In the field of commercial vehicles used for mining operations, battery-swap mining trucks are one of the important branches. However, under the demand for continuous mining operations, the waiting time for battery swapping will affect the operating efficiency, as will the time and power consumption on the way to and from the battery swapping station. In related technologies, traditional scheduling is only performed manually for battery-swap mining trucks, which cannot adapt to efficient operations under the condition of rapid movement of the working face. When the number of operating equipment is large and includes the demand for battery swapping, manual scheduling is inefficient and prone to incorrect scheduling. Summary of the invention
[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0004] To this end, the first purpose of the present invention is to propose a scheduling method for a battery-swap mining truck system based on a charging and swapping separation mode, so as to realize efficient coordinated operation of battery-swap mining trucks and battery transfer vehicles on two lines, and ensure that the battery-swap mining trucks have available batteries.
[0005] The second object of the present invention is to propose a battery-swapping mining truck system scheduling device based on a charging and swapping separation mode.
[0006] A third objective of the present invention is to provide an electronic device.
[0007] A fourth object of the present invention is to provide a non-transitory computer-readable storage medium storing computer instructions.
[0008] To achieve the above-mentioned purpose, the first embodiment of the present invention proposes a scheduling method for a battery swap mining card system based on a charging and swapping separation mode, wherein the battery swap mining card system based on the charging and swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery swap mining card, a battery transfer vehicle, a mobile battery swap station and a centralized charging station, and the mobile battery swap station and the centralized charging station are respectively arranged in and outside the mining area, and the method includes:
[0009] Obtaining first real-time operating data of the battery swap mining truck, and second real-time operating data of the mobile battery swap station and its parked battery transporter;
[0010] Obtaining third real-time operation data of the battery transfer vehicle during electricity transportation, and fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there;
[0011] Based on the data processing platform, the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed to obtain scheduling data, and the scheduling data is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery-swapping mining truck and / or a second real-time scheduling instruction for the battery transfer vehicle;
[0012] The first real-time scheduling instruction is sent to the battery-exchanging mining card, and the second real-time scheduling instruction is sent to the battery transfer vehicle to schedule the operation of the battery-exchanging mining card and the battery transfer vehicle.
[0013] To achieve the above-mentioned purpose, the second embodiment of the present invention proposes a scheduling device for a battery-swapping mining card system based on a charging-swapping separation mode, wherein the battery-swapping mining card system based on a charging-swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery-swapping mining card, a battery transport vehicle, a mobile battery-swapping station and a centralized charging station, and the mobile battery-swapping station and the centralized charging station are respectively arranged in and outside the mining area, and the device includes:
[0014] A first acquisition module is used to acquire first real-time operating data of the battery swap mining truck and second real-time operating data of the mobile battery swap station and its parked battery transporter;
[0015] The second acquisition module is used to acquire the third real-time operation data of the battery transfer vehicle during the transportation of electricity, and the fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there;
[0016] A processing module, for processing the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data based on a data processing platform to obtain scheduling data, and sending the scheduling data to a scheduling instruction generator to generate a first real-time scheduling instruction applicable to a battery-swapping mining truck and / or a second real-time scheduling instruction for a battery transfer vehicle;
[0017] The first scheduling module is used to send the first real-time scheduling instruction to the battery-swapping mining card, and send the second real-time scheduling instruction to the battery transfer vehicle, so as to schedule the operation of the battery-swapping mining card and the battery transfer vehicle.
[0018] In order to achieve the above-mentioned purpose, the fourth aspect of the present invention proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the method described in the first aspect.
[0019] The embodiments of the present invention provide a scheduling method, device, electronic device and storage medium for a battery-swapping mining card system based on a charging-and-swapping separation mode, wherein the battery-swapping mining card system in the charging-and-swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery-swapping mining card, a battery transfer vehicle, a mobile battery-swapping station and a centralized charging station. The method includes: collecting the first real-time operating data of the battery-swapping mining card, the second real-time operating data of the mobile battery-swapping station and the battery transfer vehicle parked thereat, the third real-time operating data of the battery transfer vehicle on the way to transport electricity, and the fourth real-time operating data of the centralized charging station and the battery transfer vehicle parked thereat in real time, and after integration and calculation by the data processing platform, the calculated scheduling data is sent to the scheduling instruction generator to generate a scheduling instruction, and the scheduling instruction is issued to the mining card and / or the battery transfer vehicle, so as to realize the efficient collaborative operation of the battery-swapping mining card and the battery transfer vehicle on two lines, and ensure that the battery-swapping mining card has batteries available.
[0020] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0022] Figure 1 A flow chart of a method for scheduling a battery-swapping mining truck system based on a charging-swapping separation mode provided by an embodiment of the present invention;
[0023] Figure 2 An example diagram of data flow in a battery-swapping mining card system based on a charging-swapping separation mode provided by an embodiment of the present invention;
[0024] Figure 3 A flow chart of another method for scheduling a battery-swapping mining truck system based on a charging-swapping separation mode provided by an embodiment of the present invention;
[0025] Figure 4 A schematic diagram of the execution of the scheduling logic and required data types of a battery-swapping mining card provided by an embodiment of the present invention;
[0026] Figure 5 A schematic diagram of the execution of the scheduling logic and required data types of a battery transport vehicle provided by an embodiment of the present invention;
[0027] Figure 6 A schematic structural diagram of a battery-swapping mining truck system scheduling device based on a charging-and-swapping separation mode provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0028] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0029] It should be noted that the acquisition, storage, use, and processing of data in the technical solution of the present invention are in compliance with the relevant provisions of national laws and regulations.
[0030] The following describes a method and device for scheduling a battery-swapping mining truck system based on a charging-and-swapping separation mode according to an embodiment of the present invention with reference to the accompanying drawings.
[0031] Figure 1 A flow chart of a method for scheduling a battery-swap mining truck system based on a charging-and-swapping separation mode provided in an embodiment of the present invention, wherein the battery-swap mining truck system based on a charging-and-swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery-swap mining truck, a battery transfer vehicle, a mobile battery-swap station and a centralized charging station, and the mobile battery-swap station and the centralized charging station are respectively arranged in and outside the mining area.
[0032] like Figure 1 As shown, the method comprises the following steps:
[0033] Step 101, obtain the first real-time operating data of the battery-swapping mining truck, and the second real-time operating data of the mobile battery-swapping station and the battery transfer vehicle parked there.
[0034] In some embodiments, the first real-time operating data includes the mining card ID of the battery-swapping mining card, the mining card speed, the mining card latitude and longitude, the first mileage after the most recent battery swap, and the ID, temperature, state of charge, voltage, current, and power of the battery pack carried by the battery-swapping mining card; the second real-time operating data includes the mobile battery swap station ID, the battery transfer vehicle ID for battery swapping, all battery pack IDs on the battery transfer vehicle and the storage status information corresponding to the battery packs, and the number of remaining available battery packs.
[0035] Among them, the battery transport vehicle may include a tractor and a trailer, and the battery packs are stored on the tractor and the trailer.
[0036] Among them, battery swapping: electric vehicles continue to operate by replacing batteries instead of charging the batteries.
[0037] Mining truck: A mining truck, specifically referring to a battery-swap mining truck in this invention, which is mainly used for earthwork and rockwork power transportation operations in coal mining areas (stripping off the earthwork can expose the covered coal seam for mining), and can also be used in other operation scenarios.
[0038] Battery Pack: A replaceable battery assembly that provides energy for the battery-swap mining card.
[0039] Battery swap station: a functional facility that provides battery pack replacement for vehicles that need battery swapping.
[0040] Mobile battery swap station: a complete set of mobile battery swap station equipment for replacing battery packs for mining trucks.
[0041] Centralized charging station: a fixed facility for charging battery packs, located slightly away from the mining area and with access to the power grid.
[0042] Trailer: An unpowered flatbed truck pulled by a tractor, equipped with n battery pack positions and n-1 battery packs, compatible with battery replacement and charging scenarios.
[0043] Tractor: A towing vehicle used to pull a trailer to and from a centralized charging station and a mobile battery swap station. Together with the trailer, it is called a battery transporter.
[0044] Electricity transportation: The process in which a tractor pulls a trailer between a centralized charging station and a mobile battery swap station.
[0045] Step 102, obtaining third real-time operation data of the battery transfer vehicle during electricity transportation, and fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there.
[0046] In some embodiments, the third real-time operation data includes the battery transport vehicle ID of the battery transport vehicle, the speed of the battery transport vehicle, the latitude and longitude of the battery transport vehicle, the battery pack ID on the battery transport vehicle, and the second driving mileage after starting from the charging station; the fourth real-time operation data includes the charging station ID of the centralized charging station, the charging battery transport vehicle ID, the IDs of all battery packs on the battery transport vehicle and the storage position status information corresponding to the battery packs, the ID of the battery pack in each charging state, the charge state, voltage, current, power, temperature, the number of fully charged battery packs, the fully charged battery pack ID and the storage position status information.
[0047] It is understandable that by equipping the battery-swapping mining truck, battery transfer vehicle (tractor, trailer), mobile battery-swapping station, centralized charging station) with a signal transceiver to collect the key parameter signals of each device, the first real-time operating data, the second real-time operating data, the third real-time operating data, and the fourth real-time operating data can be obtained.
[0048] Step 103, based on the data processing platform, the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed to obtain scheduling data, and the scheduling data is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery-swapping mining truck and / or a second real-time scheduling instruction for the battery transfer vehicle.
[0049] In some embodiments, for battery transporter dispatch data, the battery transporter dispatch data is collected for behavior prediction. The predicted quantities include but are not limited to: the full charging time of each charging station, the time it takes for the battery transporter to travel to each battery swap station, which mobile battery swap stations need to replenish battery packs in a certain period of time in the future, and which mobile battery swap stations have special needs in a certain period of time in the future, that is, based on the instruction set of the mining truck dispatch system, a comprehensive judgment is made on whether priority delivery is required.
[0050] Furthermore, for the dispatch of battery transport vehicles, each battery transport vehicle is not bound to a mobile swap station, that is, it will be dispatched to the mobile swap station with the least remaining available batteries. However, when the number of remaining available battery packs at a mobile swap station is not the least but is most likely to be exhausted in the short term, the battery swap mining card system based on the charging and swapping separation mode will issue a dispatch instruction to go to the mobile swap station with special needs for replenishment to ensure the global optimality.
[0051] In some embodiments, for the battery swap mining truck scheduling data, the battery swap mining truck scheduling data data collection is used for behavior prediction. The predicted quantities include but are not limited to: when a battery swap mining truck needs to swap batteries, the time required for a battery swap mining truck to travel from the dumping area to the corresponding swap station, which battery swap mining trucks need to swap batteries within the range of a mobile swap station in a certain period of time in the future, which battery swap mining trucks need to swap batteries globally in a certain period of time in the future, whether cross-station swapping is required, etc.
[0052] Furthermore, for the scheduling of battery swapping mining trucks, each battery swapping mining truck has a corresponding mobile swapping station that it will normally go to by default. However, this correspondence is not strict. When the current mobile swapping station cannot meet the battery swapping demand, the battery swapping mining truck system based on the charging and swapping separation mode will order to go to the most suitable other mobile swapping station nearby for battery swapping to ensure the global optimality.
[0053] Therefore, by monitoring the data of all relevant equipment through the data processing platform, the goal of efficient and orderly deployment of all battery packs in any target mine can be achieved, so that each battery-swapping mining truck has electricity available at any time.
[0054] Among them, the battery-swapping mining card system based on the charging and swapping separation mode is robust. No matter what the reason is that the first and second real-time scheduling instructions are not effectively executed, it will not affect the generation and issuance of new real-time scheduling instructions.
[0055] Step 104, the first real-time scheduling instruction is sent to the battery-swapping mining truck, and the second real-time scheduling instruction is sent to the battery transfer vehicle to schedule the operation of the battery-swapping mining truck and the battery transfer vehicle.
[0056] In some embodiments, after the first real-time scheduling instruction is sent to the battery swap mining card, the battery swap mining card is scheduled to run to one side of the mobile battery swap station, and after the second real-time scheduling instruction is sent to the battery transfer vehicle, the battery transfer vehicle is scheduled to run to the other side of the mobile battery swap station; based on the mechanical gripper of the mobile battery swap station, the battery packs on the battery swap mining card and the battery transfer vehicle are swapped with each other.
[0057] Furthermore, for each mobile battery swap station, the battery transfer vehicle is located on one side of the mobile battery swap station, and the mining truck that needs to swap batteries drives into the passage on the other side of the mobile battery swap station. At the mobile battery swap station, the mechanical gripper in the battery swap station places the exhausted battery pack on the battery transfer vehicle on the other side. The mechanical gripper then grabs the fully charged battery pack on the battery transfer vehicle and places it on the battery swap mining truck. When all the fully charged battery packs on the battery transfer vehicle are replaced with empty battery packs, it will leave the mobile battery swap station and go to the centralized charging station. The fully charged battery transfer vehicle that has completed charging will go to the mobile battery swap station in need to complete the battery pack replenishment. This reciprocating cycle is the operating method of the charging and swapping separation mode.
[0058] Among them, multiple battery-swap mining trucks correspond to the same mobile battery-swap station.
[0059] The embodiment of the present invention provides a scheduling method for a battery swapping mining card system based on a charging and swapping separation mode, wherein the battery swapping mining card system in the charging and swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery swapping mining card, a battery transfer vehicle, a mobile battery swapping station and a centralized charging station, and the method includes: collecting in real time the first real-time operating data of the battery swapping mining card, the second real-time operating data of the mobile battery swapping station and the battery transfer vehicle parked thereat, the third real-time operating data of the battery transfer vehicle on the way to transport electricity, and the fourth real-time operating data of the centralized charging station and the battery transfer vehicle parked thereat, and after integration and calculation by the data processing platform, the calculated scheduling data is sent to the scheduling instruction generator to generate a scheduling instruction, and the scheduling instruction is issued to the mining card and / or the battery transfer vehicle, so as to realize the efficient coordinated operation of the battery swapping mining card and the battery transfer vehicle on two lines, and ensure that the battery swapping mining card has batteries available.
[0060] In addition, in order to better understand the present invention, the present invention also provides an example diagram of data flow in a battery replacement mining card system based on a charging and replacement separation mode, such as Figure 2As shown, specifically, the battery swapping mining card system based on the charging and swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery swapping mining card, a battery transfer vehicle, a mobile battery swapping station and a centralized charging station. The battery swapping mining card, the battery transfer vehicle (tractor, trailer), the mobile battery swapping station, and the centralized charging station) are equipped with a signal transceiver (data transceiver) to collect data, and the key parameter signals of each device collected by the data are sent to the data processing platform for data processing to obtain scheduling data, and the scheduling data is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery swapping mining card and / or a second real-time scheduling instruction for the battery transfer vehicle, and then the first real-time scheduling instruction is sent to the battery swapping mining card, and the second real-time scheduling instruction is sent to the battery transfer vehicle to schedule the operation of the battery swapping mining card and the battery transfer vehicle.
[0061] In order to clearly explain the above embodiment, Figure 3 A flow chart of another method for scheduling a battery-swapping mining truck system based on a charging-and-swapping separation mode provided in an embodiment of the present invention.
[0062] Step 301, obtain the first real-time operating data of the battery-swapping mining truck, and the second real-time operating data of the mobile battery-swapping station and the battery transfer vehicle parked there.
[0063] Step 302, obtaining third real-time operation data of the battery transfer vehicle during electricity transportation, and fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there.
[0064] It should be noted that the specific implementation of step 301 to step 302 can be found in the description of the relevant embodiments of the present invention, and will not be repeated here.
[0065] Step 303, based on the data processing platform, the first real-time operation data and the second real-time operation data are processed to obtain the scheduling data of the battery-swapping mining card, and the scheduling data of the battery-swapping mining card is sent to the scheduling instruction generator to generate a first real-time scheduling instruction suitable for the battery-swapping mining card.
[0066] In some embodiments, the scheduling logic of the battery replacement mining card and the execution diagram of the required data type are as follows: Figure 4As shown in the figure, after the mining card ID, mining card speed, mining card latitude and longitude, the first mileage after the last battery swap, and the ID, temperature, state of charge, voltage, current, and power of the battery pack carried by the mining card, the battery transfer vehicle ID required by the battery transfer vehicle, the battery pack IDs and the corresponding storage status information of the battery packs, and the number of remaining available battery packs, and the mobile battery transfer station ID required by the mobile battery transfer station are all sent to the data processing platform, the data processing platform predicts the power consumption trend of the global battery swap mining card and the battery pack supply on the battery transfer vehicle within the future t time through calculation. The data processing platform then sends the predicted situation to the dispatch instruction generator to generate a suitable first real-time dispatch instruction to the battery swap mining card.
[0067] Example 1: There is an existing mobile battery swap station A and battery swap mining trucks a, b, and c. After collecting the first real-time operation data and the second real-time operation data and predicting through the data processing platform, it is found that vehicles a, b, and c will all be low on power in about half an hour, and vehicle a will be the first to reach the low power threshold, followed by vehicle b, and finally vehicle c. Assume that the battery swap time for each battery swap mining truck is n minutes. In order to avoid queuing and waiting due to simultaneous battery swaps and reduce operating efficiency, the dispatch instruction generator sends a first real-time dispatch instruction to make vehicle a go to the battery swap station A 2n minutes in advance for battery swap; n minutes after sending the first real-time dispatch instruction, continue to send the first real-time dispatch instruction for battery swap to vehicle b, and send the first real-time dispatch instruction to vehicle c 2n minutes later.
[0068] Example 2: There are mobile battery swap stations A and B and a battery swapping mining truck a. After collecting the first real-time operation data and the second real-time operation data and predicting through the data combing platform, it is found that although mobile battery swap station A serves mining truck a by default, mobile battery swap station A is already full of vehicles that are about to swap batteries for mining trucks and cannot provide battery swap services for mining truck a in a timely manner. Mobile battery swap station B is idle. When a needs to swap batteries, a battery swap command is issued to make a go to B for battery swap.
[0069] Step 304, based on the data processing platform, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed to obtain the scheduling data of the battery transfer vehicle, and the scheduling data of the battery transfer vehicle is sent to the scheduling instruction generator to generate a second real-time scheduling instruction suitable for the battery transfer vehicle.
[0070] In some embodiments, the scheduling logic of the battery transporter and the execution diagram of the required data types are as follows: Figure 5As shown, after the mobile battery swap station ID required for the mobile battery swap station and its parked battery transfer vehicle, the battery transfer vehicle ID for battery swapping, the ID of all battery packs on the battery transfer vehicle and the storage position status information corresponding to the battery packs, and the number of remaining available battery packs; the battery transfer vehicle ID of the battery transfer vehicle required for the battery transfer vehicle during transportation, the speed of the battery transfer vehicle, the longitude and latitude of the battery transfer vehicle, the ID of the battery packs on the battery transfer vehicle, and the second driving mileage after starting from the charging station; and the charging station ID of the centralized charging station required for the centralized charging station and its parked battery transfer vehicle, the battery transfer vehicle ID for charging, the ID of all battery packs on the battery transfer vehicle and the storage position status information corresponding to the battery packs, the ID of the battery pack in each charging state, the state of charge, the voltage, current, power, temperature, the number of fully charged battery packs, the ID of the fully charged battery pack and the storage position status information to which it belongs, are all sent to the data processing platform, the data processing platform predicts the charging status of the global battery packs and the battery pack consumption on the battery transfer vehicle at the mobile battery swap station within the future time t through calculation. The data processing platform then sends the prediction to the dispatch instruction generator, which generates a suitable second real-time dispatch instruction and sends it to the battery transporter at the centralized charging station. The battery transporter at the mobile battery swap station has a fixed dispatch method and can only return to the centralized charging station after the available battery packs are replaced.
[0071] Example 3: There is an existing mobile battery swap station A, a battery transfer vehicle a located at the mobile battery swap station A, and a fully charged battery transfer vehicle b located at a centralized charging station. It is predicted through historical records that the time required for battery transfer vehicle b to travel from the mobile charging station to the centralized battery swap station A is approximately t minutes. Among them, the remaining available battery packs of a are already at the critical value n, that is, it is calculated through the above data processing platform that the remaining available battery packs of a will be consumed in the future t time. At this time, a second real-time dispatch instruction is issued to b, ordering it to go to the mobile battery swap station A to ensure supply.
[0072] Example 4: There are mobile battery swap station A, battery transfer vehicle a located at mobile battery swap station A, mobile battery swap station B, battery transfer vehicle b located at mobile battery swap station B, and fully charged battery transfer vehicle c located at a centralized charging station. The two stations AB are far apart and cannot meet the conditions of Example 2 in the above logic. Among them, the number of battery packs that can be replaced by battery transfer vehicle a is the critical value n, but according to the prediction results of the above data processing platform, there are no battery replacement mining trucks that need to be replaced in the near future; and although the number of battery packs that can be replaced by battery transfer vehicle b is greater than the critical value n, there are many battery replacement queues that mobile battery swap station B needs to accept, and after a certain period of time, it will not be able to fully replace the battery demand. In this case, the battery transfer vehicle c will be issued a second real-time dispatch instruction to go to mobile battery swap station B to wait for the position of replacing battery transfer vehicle b, rather than going to station A, which is already at the critical inventory.
[0073] Step 305, the first real-time scheduling instruction is sent to the battery-swapping mining truck, and the second real-time scheduling instruction is sent to the battery transfer vehicle to schedule the operation of the battery-swapping mining truck and the battery transfer vehicle.
[0074] The embodiment of the present invention provides a scheduling method for a battery swapping mining card system based on a charging and swapping separation mode, wherein the battery swapping mining card system in the charging and swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery swapping mining card, a battery transfer vehicle, a mobile battery swapping station and a centralized charging station, and the method includes: collecting in real time the first real-time operating data of the battery swapping mining card, the second real-time operating data of the mobile battery swapping station and the battery transfer vehicle parked thereat, the third real-time operating data of the battery transfer vehicle on the way to transport electricity, and the fourth real-time operating data of the centralized charging station and the battery transfer vehicle parked thereat, and after integration and calculation by the data processing platform, the calculated scheduling data is sent to the scheduling instruction generator to generate a scheduling instruction, and the scheduling instruction is issued to the mining card and / or the battery transfer vehicle, so as to realize the efficient coordinated operation of the battery swapping mining card and the battery transfer vehicle on two lines, and ensure that the battery swapping mining card has batteries available.
[0075] In order to implement the above-mentioned embodiment, the present invention also proposes a scheduling device for a battery-swapping mining truck system based on a charging and swapping separation mode.
[0076] Figure 6 A schematic structural diagram of a battery-swapping mining truck system scheduling device based on a charging-and-swapping separation mode provided in an embodiment of the present invention.
[0077] like Figure 6 As shown, the battery-swapping mining truck system scheduling device 60 based on the charging-swapping separation mode includes: a first acquisition module 61, a second acquisition module 62, a processing module 63 and a first scheduling module 64.
[0078] The first acquisition module 61 is used to acquire the first real-time operation data of the battery swap mining truck and the second real-time operation data of the mobile battery swap station and the battery transfer vehicle parked there;
[0079] The second acquisition module 62 is used to acquire the third real-time operation data of the battery transfer vehicle during the electricity transportation, and the fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there;
[0080] The processing module 63 is used to process the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data based on the data processing platform to obtain the scheduling data, and send the scheduling data to the scheduling instruction generator to generate the first real-time scheduling instruction applicable to the battery-swapping mining truck and / or the second real-time scheduling instruction for the battery transfer vehicle;
[0081] The first scheduling module 64 is used to send the first real-time scheduling instruction to the battery-swapping mining truck and the second real-time scheduling instruction to the battery transfer vehicle, so as to schedule the operation of the battery-swapping mining truck and the battery transfer vehicle.
[0082] Furthermore, in a possible implementation of the embodiment of the present invention, the processing module 63 is specifically configured to:
[0083] The first real-time operation data and the second real-time operation data are processed based on the data processing platform to obtain the scheduling data of the battery-swapping mining card, and the scheduling data of the battery-swapping mining card is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery-swapping mining card;
[0084] The second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed based on the data processing platform to obtain the scheduling data of the battery transfer vehicle, and the scheduling data of the battery transfer vehicle is sent to the scheduling instruction generator to generate a second real-time scheduling instruction suitable for the battery transfer vehicle.
[0085] Furthermore, in a possible implementation of the embodiment of the present invention, wherein:
[0086] The first real-time operation data includes the mining card ID of the battery-swapping mining card, the mining card speed, the mining card latitude and longitude, the first mileage after the most recent battery swap, and the ID, temperature, state of charge, voltage, current, and power of the battery pack carried by the battery-swapping mining card;
[0087] The second real-time operation data includes the mobile battery swap station ID, the battery transfer vehicle ID for battery swapping, the IDs of all battery packs on the battery transfer vehicle and the storage status information corresponding to the battery packs, and the number of remaining available battery packs.
[0088] Furthermore, in a possible implementation of the embodiment of the present invention, wherein:
[0089] The third real-time operation data includes the battery transport vehicle ID, the battery transport vehicle speed, the longitude and latitude of the battery transport vehicle, the battery pack ID on the battery transport vehicle, and the second driving mileage after starting from the charging station;
[0090] The fourth real-time operation data includes the charging station ID of the centralized charging station, the ID of the charged battery transfer vehicle, the IDs of all battery packs on the battery transfer vehicle and the storage location status information corresponding to the battery packs, the ID, charge state, voltage, current, power, temperature, number of fully charged battery packs, IDs of fully charged battery packs and the storage location status information of the battery packs in each charging state.
[0091] Furthermore, in a possible implementation of the embodiment of the present invention, the device further includes:
[0092] The second scheduling module is used to schedule the battery swapping mining card to run to one side of the mobile battery swapping station after sending the first real-time scheduling instruction to the battery swapping mining card, and to schedule the battery swapping mining card to run to the other side of the mobile battery swapping station after sending the second real-time scheduling instruction to the battery transfer vehicle;
[0093] The exchange module is used to exchange the battery packs on the battery exchange mining truck and the battery transport vehicle based on the mechanical gripper of the mobile battery exchange station.
[0094] It should be noted that the above explanation of the method embodiment is also applicable to the device of this embodiment, and will not be repeated here.
[0095] The embodiment of the present invention provides a scheduling device for a battery swapping mining card system based on a charging and swapping separation mode, wherein the battery swapping mining card system in the charging and swapping separation mode includes a data processing platform, a scheduling instruction generator, a battery swapping mining card, a battery transfer vehicle, a mobile battery swapping station and a centralized charging station, and the method includes: collecting in real time the first real-time operating data of the battery swapping mining card, the second real-time operating data of the mobile battery swapping station and the battery transfer vehicle parked thereat, the third real-time operating data of the battery transfer vehicle on the way to transport electricity, and the fourth real-time operating data of the centralized charging station and the battery transfer vehicle parked thereat, and after integration and calculation by the data processing platform, the calculated scheduling data is sent to the scheduling instruction generator to generate a scheduling instruction, and the scheduling instruction is issued to the mining card and / or the battery transfer vehicle, so as to realize the efficient coordinated operation of the battery swapping mining card and the battery transfer vehicle on two lines, and ensure that the battery swapping mining card has batteries available.
[0096] In order to implement the above embodiment, the present invention further provides an electronic device, including:
[0097] at least one processor; and
[0098] a memory communicatively connected to the at least one processor; wherein,
[0099] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the aforementioned method.
[0100] In order to implement the above embodiment, the present invention further proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the above method.
[0101] In order to implement the above embodiments, the present invention further provides a computer program product, including a computer program, wherein the computer program implements the above method when executed by a processor.
[0102] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0103] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0104] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0105] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0106] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0107] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0108] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0109] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A method for dispatching a battery-swapping mining truck system based on a charging-swapping separation mode, characterized in that: in, The battery swap mining card system based on the charging and swapping separation mode includes a data processing platform, a dispatching instruction generator, a battery swap mining card, a battery transfer vehicle, a mobile battery swapping station and a centralized charging station, and the mobile battery swapping station and the centralized charging station are respectively arranged in and outside the mining area. The method includes: Obtaining first real-time operating data of the battery swap mining truck, and second real-time operating data of the mobile battery swap station and its parked battery transporter; Obtaining third real-time operation data of the battery transfer vehicle during electricity transportation, and fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there; Based on the data processing platform, the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed to obtain scheduling data, and the scheduling data is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery-swapping mining truck and / or a second real-time scheduling instruction for the battery transfer vehicle; The first real-time dispatching instruction is sent to the battery-swapping mining card, and the second real-time dispatching instruction is sent to the battery transfer vehicle to dispatch the operation of the battery-swapping mining card and the battery transfer vehicle; The method further comprises: A mobile battery swap station A and battery swap mining trucks a, b, and c are preset. After collecting the first real-time operation data and the second real-time operation data and predicting through the data processing platform, it is found that the three vehicles a, b, and c will all be low on power in about half an hour, and vehicle a is the first to reach the low power threshold, followed by vehicle b, and finally vehicle c; assuming that the battery swap time of each battery swap mining truck is n minutes, the dispatch instruction generator sends the first real-time dispatch instruction to make vehicle a go to the battery swap station A 2n minutes in advance for battery swap; n minutes after sending the first real-time dispatch instruction, continue to send the first real-time dispatch instruction for battery swap to vehicle b, and send the first real-time dispatch instruction to vehicle c 2n minutes later; Preset mobile battery swap station A, battery transfer vehicle a located at mobile battery swap station A, mobile battery swap station B, battery transfer vehicle b located at mobile battery swap station B, and fully charged battery transfer vehicle c located at a centralized charging station. The number of replaceable battery packs of battery transfer vehicle a is a critical value n. According to the prediction results of the data processing platform, there are no mining trucks that need to replace batteries in the near future. Although the number of replaceable battery packs of battery transfer vehicle b is greater than the critical value n, mobile battery swap station B needs to accept more battery swap queues, and after a certain period of time, it will not be able to fully meet the battery swap demand. In this case, the battery transfer vehicle c will be issued a second real-time dispatch instruction to go to mobile battery swap station B to wait for the position to replace battery transfer vehicle b, rather than going to station A which is already at critical inventory.
2. The method according to claim 1, characterized in that The data processing platform processes the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data to obtain scheduling data, and sends the scheduling data to a scheduling instruction generator to generate a first real-time scheduling instruction applicable to a battery-swapping mining truck and / or a second real-time scheduling instruction for a battery transfer vehicle, including: The first real-time operation data and the second real-time operation data are processed based on the data processing platform to obtain the scheduling data of the battery-swapping mining card, and the scheduling data of the battery-swapping mining card is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery-swapping mining card; The second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed based on the data processing platform to obtain the scheduling data of the battery transfer vehicle, and the scheduling data of the battery transfer vehicle is sent to the scheduling instruction generator to generate a second real-time scheduling instruction suitable for the battery transfer vehicle.
3. The method according to claim 2, characterized in that in: The first real-time operation data includes the mining card ID of the battery-swapping mining card, the mining card speed, the mining card latitude and longitude, the first mileage after the most recent battery swap, and the ID, temperature, state of charge, voltage, current, and power of the battery pack carried by the battery-swapping mining card; The second real-time operation data includes the mobile battery swap station ID, the battery transfer vehicle ID for battery swapping, the IDs of all battery packs on the battery transfer vehicle and the storage status information corresponding to the battery packs, and the number of remaining available battery packs.
4. The method according to claim 2, characterized in that: in: The third real-time operation data includes the battery transport vehicle ID, the battery transport vehicle speed, the longitude and latitude of the battery transport vehicle, the battery pack ID on the battery transport vehicle, and the second driving mileage after starting from the charging station; The fourth real-time operation data includes the charging station ID of the centralized charging station, the ID of the charged battery transfer vehicle, the IDs of all battery packs on the battery transfer vehicle and the storage location status information corresponding to the battery packs, the ID, charge state, voltage, current, power, temperature, number of fully charged battery packs, IDs of fully charged battery packs and the storage location status information of the battery packs in each charging state.
5. The method according to claim 1, characterized in that The method further comprises: After the first real-time dispatching instruction is sent to the battery swapping mining card, the battery swapping mining card is dispatched to run to one side of the mobile battery swapping station, and after the second real-time dispatching instruction is sent to the battery transfer vehicle, the battery transfer vehicle is dispatched to run to the other side of the mobile battery swapping station; Based on the mechanical gripper of the mobile battery swap station, the battery packs on the battery swap mining truck and the battery transport vehicle are swapped with each other.
6. A dispatching device for a battery-swapping mining truck system based on a charging and swapping separation mode, characterized in that: in, The battery-swapping mining truck system based on the charging-swapping separation mode includes a data processing platform, a dispatching instruction generator, a battery-swapping mining truck, a battery transfer vehicle, a mobile battery-swapping station and a centralized charging station, and the mobile battery-swapping station and the centralized charging station are respectively arranged in and outside the mining area, and the device includes: A first acquisition module is used to acquire first real-time operating data of the battery swap mining truck and second real-time operating data of the mobile battery swap station and its parked battery transporter; The second acquisition module is used to acquire the third real-time operation data of the battery transfer vehicle during the transportation of electricity, and the fourth real-time operation data of the centralized charging station and the battery transfer vehicle parked there; A processing module, for processing the first real-time operation data, the second real-time operation data, the third real-time operation data, and the fourth real-time operation data based on a data processing platform to obtain scheduling data, and sending the scheduling data to a scheduling instruction generator to generate a first real-time scheduling instruction applicable to a battery-swapping mining truck and / or a second real-time scheduling instruction for a battery transfer vehicle; A first scheduling module is used to send the first real-time scheduling instruction to the battery-swapping mining truck, and send the second real-time scheduling instruction to the battery transfer vehicle, so as to schedule the operation of the battery-swapping mining truck and the battery transfer vehicle; Also includes: A mobile battery swap station A and battery swap mining trucks a, b, and c are preset. After collecting the first real-time operation data and the second real-time operation data and predicting through the data processing platform, it is found that the three vehicles a, b, and c will all be low on power in about half an hour, and vehicle a is the first to reach the low power threshold, followed by vehicle b, and finally vehicle c; assuming that the battery swap time of each battery swap mining truck is n minutes, the dispatch instruction generator sends the first real-time dispatch instruction to make vehicle a go to the battery swap station A 2n minutes in advance for battery swap; n minutes after sending the first real-time dispatch instruction, continue to send the first real-time dispatch instruction for battery swap to vehicle b, and send the first real-time dispatch instruction to vehicle c 2n minutes later; Preset mobile battery swap station A, battery transfer vehicle a located at mobile battery swap station A, mobile battery swap station B, battery transfer vehicle b located at mobile battery swap station B, and fully charged battery transfer vehicle c located at a centralized charging station. The number of replaceable battery packs of battery transfer vehicle a is a critical value n. According to the prediction results of the data processing platform, there are no mining trucks that need to replace batteries in the near future. Although the number of replaceable battery packs of battery transfer vehicle b is greater than the critical value n, mobile battery swap station B needs to accept more battery swap queues, and after a certain period of time, it will not be able to fully meet the battery swap demand. In this case, the battery transfer vehicle c will be issued a second real-time dispatch instruction to go to mobile battery swap station B to wait for the position to replace battery transfer vehicle b, rather than going to station A which is already at critical inventory.
7. The device according to claim 6, characterized in that The processing module is specifically used for: The first real-time operation data and the second real-time operation data are processed based on the data processing platform to obtain the scheduling data of the battery-swapping mining card, and the scheduling data of the battery-swapping mining card is sent to the scheduling instruction generator to generate a first real-time scheduling instruction applicable to the battery-swapping mining card; The second real-time operation data, the third real-time operation data, and the fourth real-time operation data are processed based on the data processing platform to obtain the scheduling data of the battery transfer vehicle, and the scheduling data of the battery transfer vehicle is sent to the scheduling instruction generator to generate a second real-time scheduling instruction suitable for the battery transfer vehicle.
8. The device according to claim 6, characterized in that The device also includes: The second scheduling module is used to schedule the battery swapping mining card to run to one side of the mobile battery swapping station after sending the first real-time scheduling instruction to the battery swapping mining card, and to schedule the battery swapping mining card to run to the other side of the mobile battery swapping station after sending the second real-time scheduling instruction to the battery transfer vehicle; The exchange module is used to exchange the battery packs on the battery exchange mining truck and the battery transport vehicle based on the mechanical gripper of the mobile battery exchange station.
9. An electronic device, characterized in that: include: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 5.
10. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to cause the computer to execute the method according to any one of claims 1-5.
Citation Information
Patent Citations
Intelligent power transmission method and system for mobile power transmission vehicle
CN113928172A
Mobile battery charging and replacing system
CN115257453A
Battery replacement management system and method
CN116485342A
Battery replacement system and battery replacement method for electric truck
CN117507929A
System, apparatus and methods of electricity generation to end-use for fast charging of electric vehicle
US20180264955A1