A bridge erection precast concrete beam assembly and splicing equipment

By designing an automated shovel and flip-over system, the problem of low installation efficiency caused by sealant overflow was solved, achieving efficient and automatic cleaning of sealant and improving the installation efficiency of precast beams.

CN118148022BActive Publication Date: 2026-11-10ZHONGSHENG ROAD & BRIDGE TECH GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410233508.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2026-11-10
Estimated Expiration
2044-03-01

AI Technical Summary

Technical Problem

During the assembly and splicing of precast beams, excessive sealant filling can cause overflow, affecting installation efficiency and requiring manual cleaning, thus reducing the installation efficiency of precast beams.

Method used

A bridge precast concrete beam assembly and splicing device was designed, comprising a shovel, a retention bin, a storage box, a transport component, and a control component. The device automatically collects and transfers overflowing sealant to the storage box via a motor-driven flap. A specially structured drive disc and connecting gears ensure that the flap stops at the highest point, achieving efficient removal of the sealant.

Benefits of technology

The system automates the cleaning of sealant, reduces manual intervention, and improves the installation efficiency and work efficiency of precast beams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118148022B_ABST
    Figure CN118148022B_ABST
Patent Text Reader

Abstract

This invention discloses a precast concrete beam assembly and splicing device for bridge erection, relating to the field of precast beam splicing technology. It includes a workbench and a transport component on the top of a storage bin for flipping sealant accumulated on top of the storage bin into a storage box. A control component is located on the side of the transport component away from the shovel plate to limit its working state. A connecting gear is constantly engaged with a drive cylinder, and in conjunction with a specially structured drive disc, the drive cylinder and the flipping plate have a stopping effect. The connecting gear, through contact with the top plate via a boss, provides braking force. When the drive disc rotates to the toothless side, it stops abruptly under the control of its own control component. The continuous engagement of the connecting gear with the drive cylinder causes the drive cylinder and the flipping plate to also stop suddenly. The flipping plate stops when it reaches its highest point, eliminating the need for personnel to constantly shovel sealant. This allows for the processing of a large amount of sealant at a time, resulting in high overall work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of precast beam splicing technology, specifically to a bridge erection concrete precast beam assembly and splicing equipment. Background Technology

[0002] When assembling and splicing precast beams, in order to prevent water seepage and leakage at the end joints between the precast beams after installation, it is usually necessary to insert a transversely long expansion-type water-stop rubber strip between the two precast beams, and then squeeze and fill the end joint above the rubber strip with two-component polysulfide sealant to connect the two precast beams to each other.

[0003] Regarding the aforementioned technologies, during the sealant filling process, excessive sealant often overflows from the end joint. Since a connecting device needs to be installed on the top surface of the joint between the two precast beams, the end joint needs to be kept flat to facilitate the installation of the connecting device. Therefore, workers need to remove the overflowing sealant from the end joint, which reduces the installation efficiency of the precast beams. It is necessary to improve the existing technology. To this end, we propose a bridge erection concrete precast beam assembly and splicing equipment to solve the above problems. Summary of the Invention

[0004] The purpose of this invention is to provide a bridge erection precast concrete beam assembly and splicing device to solve the problems mentioned in the background art.

[0005] To achieve the above-mentioned objectives, the present invention adopts the following technical solution:

[0006] This invention provides a bridge precast concrete beam assembly and splicing device, comprising a workbench, a shovel plate for removing excess sealant installed on the bottom of one side of the workbench, a retention bin fixedly connected to one side of the shovel plate, both the retention bin and the shovel plate being height-adjustable, a storage box for holding sealant provided on one side of the workbench, a transport component for flipping the sealant accumulated on the top of the retention bin into the storage box, a control component for limiting the working state of the transport component on the side away from the shovel plate, both the control component and the transport component being fixedly connected to the inner wall of the workbench, and a handle provided on the side of the workbench away from the shovel plate.

[0007] Preferably, the transport component includes a motor, a fixing ring is sleeved on the surface of the motor, the inner wall of the fixing ring is fixedly connected to the motor, the bottom of the fixing ring is fixedly connected to the inner wall of the worktable, a rotating roller is fixedly connected to the output end of the motor, a drive disk is fixedly connected to the end of the rotating roller away from the motor, and a plurality of teeth are fixedly connected around the drive disk, the plurality of teeth are evenly distributed along the edge of the drive disk, and the teeth are distributed at two-thirds of the perimeter of the drive disk.

[0008] Preferably, a connecting gear is provided at the bottom of the drive disk, and the drive disk is connected to the connecting gear by meshing teeth. The ends of the teeth are all provided with elliptical curved surfaces. A rotating rod is fixedly connected to the side of the connecting gear away from the motor. The rotating rod coincides with the axis of the connecting gear. A fixed platform is fixedly connected to the end of the rotating rod away from the connecting gear. Connecting platforms are fixedly connected to both sides of the fixed platform near the motor.

[0009] Preferably, the connecting platforms on both sides are symmetrically distributed along the axis of the fixed platform. The end of the connecting platform away from the fixed platform is fixedly connected to the surface of the motor. A drive cylinder is provided on the side of the connecting gear away from the drive disk. The drive cylinder is sleeved on the surface of the rotating disk, and the inner wall of the drive cylinder does not contact the rotating disk.

[0010] Preferably, the axes of the drive cylinder, the rotating disk, and the output end of the motor coincide. Multiple teeth are fixedly connected to the inner wall of the drive cylinder near the drive disk. The multiple teeth are evenly distributed around the axis of the drive cylinder. The drive cylinder is connected to the connecting gear through the teeth. An mounting cylinder is sleeved on the surface of the drive cylinder.

[0011] Preferably, the mounting cylinder is rotatably connected to the drive cylinder, the bottom of the mounting cylinder is fixedly connected to the inner wall of the workbench, and two flaps are sleeved on the surface of the drive cylinder away from the motor. The flaps are fixedly connected to the drive cylinder, and the two flaps are evenly distributed around the axis of the drive cylinder. The flaps are placed on the top of the retention chamber.

[0012] Preferably, the control component includes two support plates, one end of which is fixedly connected to both sides of the fixed platform near the connecting gear, the two support plates are symmetrically distributed along the axis of the fixed platform, and a fixed cylinder is fixedly connected to the end faces of the support plates that are close to each other.

[0013] Preferably, the fixed cylinder is located on the side of the connecting gear close to the motor and does not contact the connecting gear. The fixed cylinder contains a moving roller, and both ends of the moving roller are rotatably connected to the inner wall of the fixed cylinder. Torsion springs are sleeved on both ends of the moving roller, and the torsion springs at both ends are symmetrically distributed along the axis of the moving roller. The torsion springs are placed inside the fixed cylinder, and one end of the torsion spring is fixedly connected to the inner wall of the fixed cylinder.

[0014] Preferably, the other end of the torsion spring is fixedly connected to the surface of the motion roller, a top plate is sleeved on the surface of the motion roller, the top plate is fixedly connected to the motion roller, a connecting window is provided on the side of the fixed cylinder near the connecting gear to facilitate the passage of the top plate, multiple protrusions are provided at the bottom of the top plate, and an installation ring groove is provided on the top of the connecting gear around itself.

[0015] Preferably, the end of the protrusion near the connecting gear is fixedly connected to the bottom of the mounting ring groove, and a plurality of protrusions are evenly distributed around the axis of the connecting gear. The top of the protrusion contacts the top plate, and the end faces of the top of the protrusion and the top plate that are close to each other are provided with smooth triggering slopes. The end of the top plate away from the fixed cylinder is slidably connected to the protrusion.

[0016] Compared with existing technologies, one or more of the above technical solutions have the following beneficial effects:

[0017] In this invention, the connecting gear remains engaged with the drive cylinder, and in conjunction with the specially structured drive disc, the drive cylinder and the flapper achieve a stopping effect. The connecting gear, through contact with the top plate via a boss, possesses a certain braking force. When the drive disc rotates to the toothless side, the connecting gear loses power and abruptly stops under the constraint of its own control components. The continuous engagement of the connecting gear with the drive cylinder causes the drive cylinder and the flapper to stop abruptly as well. The flapper stops at its highest point, when the centrifugal force on the sealant on the flapper is at its maximum, allowing the sealant to move smoothly into the storage tank. The motor continues to operate, and when the drive disc engages with the connecting gear again, the next work cycle begins. This eliminates the need for personnel to constantly scoop up the sealant, allowing for the processing of a large amount of sealant at a time and resulting in high overall work efficiency. Attached Figure Description

[0018] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an improper limitation of the invention.

[0019] Figure 1 This is a schematic diagram of the overall structure of the present invention.

[0020] Figure 2 This is a schematic diagram of the assembly structure of the toggle plate and the drive cylinder of the present invention.

[0021] Figure 3 This is a schematic diagram of the assembly structure of the mounting cylinder and the driving cylinder of the present invention.

[0022] Figure 4 This is a schematic diagram of the assembly structure of the drive disk and drive cylinder of the present invention.

[0023] Figure 5 This is a schematic diagram of the assembly structure of the drive disk and connecting gear of the present invention.

[0024] Figure 6 This is a schematic diagram of the assembly structure of the connecting gear and control component of the present invention.

[0025] Figure 7 This is a schematic diagram of the control component structure of the present invention.

[0026] In the picture:

[0027] 1. Workbench; 101. Handle; 102. Retention bin; 103. Shovel; 104. Storage box; 2. Transport assembly; 201. Motor; 202. Fixed ring; 203. Rotating roller; 204. Drive disc; 205. Gear; 206. Connecting gear; 207. Elliptical surface; 208. Rotating rod; 209. Fixed platform; 210. Connecting platform; 211. Drive cylinder; 212. Mounting cylinder; 213. Flip plate; 3. Control assembly; 301. Support plate; 302. Fixed cylinder; 303. Moving roller; 304. Torsion spring; 305. Top plate; 306. Connecting window; 307. Thrust; 308. Mounting ring groove; 309. Triggering slope. Detailed Implementation

[0028] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.

[0029] Please see Figures 1-7 This invention provides a bridge precast concrete beam assembly and splicing device, including a workbench 1. A shovel 103 for removing excess sealant is installed on the bottom of one side of the workbench 1. A retention bin 102 is fixedly connected to one side of the shovel 103. Both the retention bin 102 and the shovel 103 are height-adjustable. A storage box 104 for holding sealant is provided on one side of the workbench 1. A transport component 2 for flipping the sealant accumulated on the top of the retention bin 102 into the storage box 104 is provided on the top of the retention bin 102. The transport component 2 is located away from the shovel. A control component 3 for limiting its working state is provided on one side of the plate 103. The control component 3 and the transport component 2 are both fixedly connected to the inner wall of the workbench 1. A handle 101 is provided on the side of the workbench 1 away from the shovel plate 103. The handle 101 is used to adjust the height of the shovel plate 103 so that the bottom of the shovel plate 103 is in contact with the top of the precast beam. Then, the handle 101 is pushed, and the shovel plate 103 shovels up the sealant overflowing between the precast beams and accumulates it in the retention bin 102. The transport component 2 is activated to move the sealant into the storage box 104. After the work is completed, the sealant is cleaned up.

[0030] To facilitate the timely removal and transfer of accumulated sealant to the storage box 104, a motor 201 is installed in the transport assembly 2. A retaining ring 202 is fitted onto the surface of the motor 201, with its inner wall fixedly connected to the motor 201 and its bottom fixedly connected to the inner wall of the workbench 1. A rotating roller 203 is fixedly connected to the output end of the motor 201, and a drive disk 204 is fixedly connected to the end of the rotating roller 203 away from the motor 201. Multiple teeth 205 are fixedly connected around the drive disk 204, evenly distributed along its edge and located at approximately two-thirds of the perimeter. A connecting gear 206 is provided at the bottom of the drive disk 204, and the drive disk 204 is connected via the teeth... Gear 205 meshes with connecting gear 206. Each tooth 205 has an elliptical curved surface 207 at its end. A rotating rod 208 is fixedly connected to the side of connecting gear 206 away from motor 201. The axis of rotating rod 208 coincides with that of connecting gear 206. A fixed platform 209 is fixedly connected to the end of rotating rod 208 away from connecting gear 206. Connecting platforms 210 are fixedly connected to both sides of the fixed platform 209 near motor 201. The connecting platforms 210 are symmetrically distributed along the axis of fixed platform 209. The end of connecting platform 210 away from fixed platform 209 is fixedly connected to the surface of motor 201. A drive cylinder 211 is provided on the side of connecting gear 206 away from drive disk 204. The drive cylinder 211 is sleeved on the surface of the rotating disk, and the inner wall of the drive cylinder 211 is not... The drive cylinder 211, the rotating disk, and the output axis of the motor 201 are aligned with the rotating disk. Multiple teeth 205 are fixedly connected to the inner wall of the drive cylinder 211 near the drive disk 204. These teeth 205 are evenly distributed around the axis of the drive cylinder 211. The drive cylinder 211 is connected to the connecting gear 206 via the teeth 205. A mounting cylinder 212 is sleeved on the surface of the drive cylinder 211 and rotatably connected to it. The bottom of the mounting cylinder 212 is fixedly connected to the inner wall of the worktable 1. Two flaps 213 are sleeved on the surface of the drive cylinder 211 away from the motor 201. These flaps 213 are fixedly connected to the drive cylinder 211 and are evenly distributed around the axis of the drive cylinder 211. The flaps 213 are positioned on top of the retention chamber 102. In this unit, the electric motor 201 drives the rotating roller 203 and the drive disk 204 to rotate around their own axis. The drive disk 204 drives the connecting gear 206 and the drive cylinder 211. Because the distribution range of the teeth 205 on the surface of the drive disk 204 is limited, when the drive disk 204 rotates to the side without teeth 205, the connecting gear 206 will lose power and cannot drive the drive cylinder 211. In other words, the two flaps 213 at one end of the drive cylinder 211 cannot operate. When the flaps 213 lift the sealant, the sealant enters the flaps 213. If the flaps 213 reach a certain speed, the sealant will not be able to detach from the flaps 213 into the storage tank 104. Therefore, the flaps 213 need to stop moving when they reach their highest point.At this moment, due to the centrifugal force exerted by the flap 213, the sealant will detach from the flap 213 and enter the storage tank 104. The sealant used for the precast beam assembly has low viscosity in its initial state and will not adhere to the flap 213. Due to its special structure, the rotational linear speed of the drive disc 204 is consistent with that of the drive cylinder 211. Because the diameters of the drive disc 204 and the drive cylinder 211 are different, when the drive disc 204 rotates two revolutions, the drive cylinder 211 only rotates one revolution. The drive cylinder 211 itself has only two fixed flaps 213, so that each time the drive disc 204 rotates one revolution, one flap 213 can transport the sealant at the top of the retention bin 102 once.

[0031] To allow the flip plate 213 to stop abruptly and expel the sealant, two support plates 301 are provided in the control component 3. The end of each support plate 301 near the connecting gear 206 is fixedly connected to both sides of the fixed platform 209. The two support plates 301 are symmetrically distributed along the axis of the fixed platform 209. A fixed cylinder 302 is fixedly connected to the end faces of the support plates 301 that are close to each other. The fixed cylinder 302 is located on the side of the connecting gear 206 near the motor 201 but does not contact the connecting gear 206. A moving roller 303 is built into the fixed cylinder 302, and both ends of the moving roller 303 rotate against the inner wall of the fixed cylinder 302. The moving roller 303 is connected to a fixed cylinder 302. Torsion springs 304 are sleeved at both ends of the moving roller 303, symmetrically distributed along the axis of the moving roller 303. The torsion springs 304 are fixedly connected to the inner wall of the fixed cylinder 302, and the other end is fixedly connected to the surface of the moving roller 303. A top plate 305 is sleeved on the surface of the moving roller 303 and fixedly connected to it. A connecting window 306 is provided on the side of the fixed cylinder 302 near the connecting gear 206 to facilitate the passage of the top plate 305. Multiple protrusions 307 are provided at the bottom of the top plate 305. The connecting gear 206 has a mounting ring groove 308 that surrounds itself on its top. One end of the boss 307 near the connecting gear 206 is fixedly connected to the bottom of the mounting ring groove 308. Multiple bosses 307 are evenly distributed around the axis of the connecting gear 206. The top of the bosses 307 contacts the top plate 305. Smooth triggering inclined surfaces 309 are provided on the end faces of the bosses 307 and the top plate 305 that are close to each other. The end of the top plate 305 away from the fixed cylinder 302 is slidably connected to the bosses 307. When the drive disc 204 drives the drive cylinder 211 to operate via the connecting gear 206, its connecting gear 206... 06 has a certain braking force through the contact between the boss 307 and the top plate 305. When the drive disk 204 rotates to the side without teeth 205, the connecting gear 206 loses power and will stop suddenly under the restriction of its own control component 3. Its connecting gear 206 keeps meshing with the drive cylinder 211, so that the drive cylinder 211 and the flip plate 213 will also stop suddenly. The position where the flip plate 213 stops is set when it flips to the highest point. At this time, the centrifugal force on the sealant on the flip plate 213 is also the greatest, and the sealant can move smoothly into the storage box 104.

[0032] Working principle

[0033] In actual use, adjust the height of the shovel plate 103 so that its bottom is flush with the top of the precast beam. Then push the handle 101. The shovel plate 103 will scrape up the overflowing sealant between the precast beams and accumulate it in the retention bin 102. Start the motor 201. The motor 201 drives the rotating roller 203 and the drive disc 204 to rotate around their own axis. The drive disc 204 drives the connecting gear 206 and the drive cylinder 211 to move. Because the distribution range of the teeth 205 on the surface of the drive disc 204 is limited, when the drive disc 204 rotates to the side without teeth 205, the connecting gear 206 will lose power and cannot drive the drive cylinder 211. It is impossible for the two flaps 213 at one end of the drive cylinder 211 to operate. When the flaps 213 lift the sealant, the sealant enters the flaps 213. If the flaps 213 reach a certain speed, the sealant will not be able to detach from the flaps 213 into the storage tank 104. The flaps 213 need to stop moving when they reach their highest point. At this moment, the sealant will detach from the flaps 213 and enter the storage tank 104 due to the centrifugal force of the flaps 213. The sealant used for precast beam assembly has low viscosity in the initial state and will not adhere to the flaps 213. Due to the special structure of the drive disc 204, The rotational linear speed is consistent with that of the drive cylinder 211. Because the diameters of the drive disc 204 and the drive cylinder 211 are different, when the drive disc 204 rotates two revolutions, the drive cylinder 211 only rotates one revolution. The drive cylinder 211 itself has only two fixed flaps 213, so that each time the drive disc 204 rotates one revolution, one flap 213 can transport the sealant on the top of the retention bin 102 once. When the drive disc 204 drives the drive cylinder 211 through the connecting gear 206, the connecting gear 206 contacts the top plate 305 through the boss 307, and it has a certain braking force. When the drive disc 204 rotates to the side without teeth 205... When the connecting gear 206 loses power, it will suddenly stop under the restriction of its own control component 3. The connecting gear 206 will always be engaged with the drive cylinder 211, so that the drive cylinder 211 and the flap 213 will also stop suddenly. The flap 213 stops when it is flipped to its highest position. At this time, the centrifugal force on the sealant on the flap 213 is also the greatest, and the sealant can be moved smoothly into the storage box 104. The motor 201 continues to work. When the drive disc 204 engages with the connecting gear 206 again, the next work cycle will begin. A large amount of sealant can be processed at one time. After the work is completed, the sealant is cleaned up, resulting in high overall work efficiency.

[0034] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.

Claims

1. A bridge erection equipment for assembling and splicing precast concrete beams, characterized in that, The system includes a workbench (1), on one side of which a shovel (103) for removing excess sealant is installed at the bottom. A retention bin (102) is fixedly connected to one side of the shovel (103). Both the retention bin (102) and the shovel (103) are height-adjustable. A storage box (104) for storing sealant is provided on one side of the workbench (1). A transport component (2) for lifting the sealant accumulated on the top of the retention bin (102) into the storage box (104) is provided on the top of the transport component (2). A control component (3) for limiting its working state is provided on the side of the transport component (2) away from the shovel (103). Both the control component (3) and the transport component (2) are fixedly connected to the inner wall of the workbench (1). A handle (101) is provided on the side of the workbench (1) away from the shovel (103). The transport component (2) includes a motor (201), a fixing ring (202) is sleeved on the surface of the motor (201), the inner wall of the fixing ring (202) is fixedly connected to the motor (201), the bottom of the fixing ring (202) is fixedly connected to the inner wall of the worktable (1), a rotating roller (203) is fixedly connected to the output end of the motor (201), a drive disk (204) is fixedly connected to the end of the rotating roller (203) away from the motor (201), a plurality of teeth (205) are fixedly connected around the drive disk (204), the plurality of teeth (205) are evenly distributed along the edge of the drive disk (204), and the teeth (205) are distributed at two-thirds of the perimeter of the drive disk (204); The drive disk (204) is provided with a connecting gear (206) at the bottom. The drive disk (204) is connected to the connecting gear (206) by teeth (205). The ends of the teeth (205) are provided with elliptical curved surfaces (207). A rotating rod (208) is fixedly connected to the side of the connecting gear (206) away from the motor (201). The axis of the rotating rod (208) coincides with that of the connecting gear (206). A fixed platform (209) is fixedly connected to the end of the rotating rod (208) away from the connecting gear (206). A connecting platform (210) is fixedly connected to both sides of the fixed platform (209) near the motor (201). The connecting platforms (210) on both sides are symmetrically distributed along the axis of the fixed platform (209). The end of the connecting platform (210) away from the fixed platform (209) is fixedly connected to the surface of the motor (201). The connecting gear (206) is provided with a drive cylinder (211) on the side away from the drive disk (204). The drive cylinder (211) is sleeved on the surface of the drive disk, and the inner wall of the drive cylinder (211) does not contact the drive disk. The drive cylinder (211), drive disk and motor (201) output axis are coincident. Multiple teeth (205) are fixedly connected to the inner wall of the drive cylinder (211) near the drive disk (204). The multiple teeth (205) are evenly distributed around the axis of the drive cylinder (211). The drive cylinder (211) is meshed with the connecting gear (206) through the teeth (205). An mounting cylinder (212) is sleeved on the surface of the drive cylinder (211). The mounting cylinder (212) is rotatably connected to the driving cylinder (211). The bottom of the mounting cylinder (212) is fixedly connected to the inner wall of the workbench (1). Two flaps (213) are sleeved on the end surface of the driving cylinder (211) away from the motor (201). The flaps (213) are fixedly connected to the driving cylinder (211). The two flaps (213) are evenly distributed around the axis of the driving cylinder (211). The flaps (213) are placed on the top of the retention chamber (102).

2. The bridge erection precast concrete beam assembly and splicing equipment according to claim 1, characterized in that, The control component (3) includes two support plates (301). One end of the support plate (301) near the connecting gear (206) is fixedly connected to both sides of the fixed platform (209). The two support plates (301) are symmetrically distributed along the axis of the fixed platform (209). Fixed cylinders (302) are fixedly connected to the end faces of the support plates (301) that are close to each other.

3. The bridge erection precast concrete beam assembly and splicing equipment according to claim 2, characterized in that, The fixed cylinder (302) is located on the side of the connecting gear (206) near the motor (201) and does not contact the connecting gear (206). The fixed cylinder (302) contains a motion roller (303). Both ends of the motion roller (303) are rotatably connected to the inner wall of the fixed cylinder (302). Both ends of the motion roller (303) are fitted with torsion springs (304). The torsion springs (304) at both ends are symmetrically distributed along the axis of the motion roller (303). The torsion springs (304) are placed inside the fixed cylinder (302), and one end of the torsion springs (304) is fixedly connected to the inner wall of the fixed cylinder (302).

4. The bridge erection precast concrete beam assembly and splicing equipment according to claim 3, characterized in that, The other end of the torsion spring (304) is fixedly connected to the surface of the motion roller (303). A top plate (305) is sleeved on the surface of the motion roller (303). The top plate (305) is fixedly connected to the motion roller (303). A connecting window (306) is provided on the side of the fixed cylinder (302) near the connecting gear (206) to facilitate the passage of the top plate (305). A plurality of protrusions (307) are provided at the bottom of the top plate (305). An installation ring groove (308) is provided on the top of the connecting gear (206) around itself.

5. The bridge erection precast concrete beam assembly and splicing equipment according to claim 4, characterized in that, One end of the protrusion (307) near the connecting gear (206) is fixedly connected to the bottom of the mounting ring groove (308). Multiple protrusions (307) are evenly distributed around the axis of the connecting gear (206). The top of the protrusion (307) is in contact with the top plate (305). The end faces of the top of the protrusion (307) and the top plate (305) that are close to each other are provided with smooth triggering inclined surfaces (309). The end of the top plate (305) away from the fixed cylinder (302) is slidably connected to the protrusion (307).

Citation Information

Patent Citations

  • Combined robot for transporting and grabbing materials

    CN114249089A

  • Sealing material filling equipment for precast beam splicing end seam

    CN115637647A