A precast beam inspection system, inspection method, device and medium
By combining laser positioning and machine learning models, the problem of template positioning error in traditional precast beam manufacturing has been solved, achieving efficient and accurate precast beam production and improving both quality and efficiency.
Patent Information
- Application Number
- CN202410303708.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-23
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-10-23
AI Technical Summary
Traditional precast beam manufacturing processes suffer from issues such as the base occupying a large amount of temporary land, resource waste, and quality problems caused by template positioning errors, which affect precast efficiency and quality control.
A laser positioning device is used to monitor the position of the prefabricated template, and a machine learning model is used to determine the re-inspection cycle, so as to achieve precise positioning and real-time monitoring of the template and generate alarm information to ensure the accurate positioning of the template.
This improved the positioning accuracy and production efficiency of precast beams, reduced costs and risks, and ensured the quality and stability of the beams.
Smart Images

Figure CN118181497B_ABST
Abstract
Description
[0001] Case Analysis
[0002] This application is a divisional application of Chinese application filed on October 23, 2023, with application number 202311371955.3, entitled "A prefabrication control system, control method, device and medium for beams". Technical Field
[0003] This specification relates to the field of precast component preparation technology, and in particular to a precast beam inspection system, inspection method, device and medium. Background Technology
[0004] Traditional precast beam manufacturing processes involve significant temporary land use for base construction, leading to resource waste and environmental pressure. Furthermore, traditional methods have limitations in terms of beam precasting efficiency and quality control. Reuse of formwork and imprecise management result in positioning errors at different locations within the precast beam. These positioning errors further affect the quality of the precast beam during concrete vibration.
[0005] To address the problems of traditional construction methods, such as the need for large amounts of temporary land, long turnaround times, and poor curing effects, CN110658790A proposes a precast beam production management system based on 3D visualization process management. This system allows for customized assembly process routes and, by combining information modeling technology and IoT technology, uploads dynamic data of the on-site production process to the platform in real time, achieving a 3D visualization of the precast beam production process. However, this method still lacks effective technical means for template positioning at different locations on the precast beam.
[0006] Therefore, it is desirable to provide a precast beam inspection system, inspection method, device and medium to achieve precise positioning of precast beams, improve precast efficiency, and ensure the quality and stability of the beam body. Summary of the Invention
[0007] This specification provides one or more embodiments of a precast beam inspection system. The system includes a precast platform, a rebar installation component, a vibration component, a formwork positioning component, sensors, and a processor. The precast platform is configured to support a precast beam. The rebar installation component is configured to place precast rebar at designated positions on the precast platform. The vibration component is configured to vibrate the concrete during the precast beam pouring process. The formwork positioning component is configured to monitor the position of the precast formwork. The sensors are configured to monitor temperature change data and vibration data of the precast formwork. The processor is configured to perform a positioning check on the precast formwork, including: determining whether the formwork position of the precast formwork is correct based on the positioning sequence of the precast formwork obtained by the formwork positioning component; generating an alarm message in response to an incorrect position of the precast formwork, and sending the alarm message to a user terminal, the alarm message including the number of the precast formwork with an incorrect position; wherein the node performing the positioning check includes responding to receiving a positioning request, or in a first re-inspection cycle, or in a second re-inspection. The first re-inspection cycle refers to the cycle during which the precast templates are re-inspected during installation, and the second re-inspection cycle refers to the cycle during which the precast templates are re-inspected during vibration processing. The processor is further configured to determine the second re-inspection cycle before performing the positioning check, including: processing the template structure diagram using a second model to determine offset data; the second model is a machine learning model, the template structure diagram includes nodes and edges, each node corresponding to one precast template; there is an edge between the nodes of two adjacent precast templates; node features include candidate second re-inspection frequency, historical positioning data, vibration position, template parameters, concrete pouring progress, vibrator power, temperature change data, and vibration data; edge features include the distance between two connected nodes; the candidate second re-inspection frequency is determined based on the template parameter sequence, the concrete pouring progress, and the first re-inspection frequency; the second re-inspection frequency of the precast template is determined based on the offset data, and the second re-inspection cycle is determined based on the second re-inspection frequency.
[0008] This specification provides one or more embodiments of a precast beam inspection method, executed by a processor, comprising: performing a positioning check on a precast template, including: determining whether the template position of the precast template is correct based on the positioning sequence of the precast template; generating an alarm message in response to an incorrect position of the precast template, and sending the alarm message to a user terminal, the alarm message including the number of the precast template with the incorrect position; wherein, the node performing the positioning check includes responding to receiving a positioning request or in a first re-inspection cycle or a second re-inspection cycle; the first re-inspection cycle refers to the cycle for re-inspecting the installed precast template during the installation process, and the second re-inspection cycle refers to the re-inspection cycle for the precast template during the vibration treatment process; and performing the inspection in the second re-inspection cycle. Determining the second re-inspection cycle before the positioning inspection includes: processing the template structure diagram using a second model to determine the offset degree data; the second model is a machine learning model, the template structure diagram includes nodes and edges, each node corresponds to one precast template; there is an edge between the nodes of two adjacent precast templates; node features include candidate second re-inspection frequency, historical positioning data, vibration position, template parameters, concrete pouring progress, vibrator power, temperature change data, and vibration data; edge features include the distance between two connected nodes; the candidate second re-inspection frequency is determined based on the template parameter sequence, the concrete pouring progress, and the first re-inspection frequency; based on the offset degree data, the second re-inspection frequency of the precast template is determined, and the second re-inspection cycle is determined based on the second re-inspection frequency.
[0009] This specification provides one or more embodiments of a beam inspection device, the device including at least one memory and at least one processor; the at least one memory is used to store computer instructions; the at least one processor is used to execute at least some of the computer instructions to implement the aforementioned beam prefabrication inspection method.
[0010] This specification provides one or more embodiments of a computer-readable storage medium that stores computer instructions. When a computer reads the computer instructions in the storage medium, the computer executes the aforementioned beam prefabrication detection method. Attached Figure Description
[0011] This specification will be further described by way of exemplary embodiments, which will be described in detail with reference to the accompanying drawings. These embodiments are not limiting; in these embodiments, the same reference numerals denote the same structures, wherein:
[0012] Figure 1 This is a system block diagram of a beam prefabrication control system according to some embodiments of this specification;
[0013] Figure 2 This is an exemplary flowchart of a beam prefabrication control method according to some embodiments of this specification;
[0014] Figure 3 This is an exemplary schematic diagram illustrating the determination of the first re-inspection cycle according to some embodiments of this specification;
[0015] Figure 4 This is an exemplary schematic diagram illustrating the determination of the second re-inspection cycle according to some embodiments of this specification;
[0016] Figure 5 This is an exemplary flowchart illustrating the generation of offset information according to some embodiments of this specification. Detailed Implementation
[0017] The accompanying drawings used in the description of the embodiments will be briefly introduced below. The drawings do not represent all embodiments.
[0018] The terms “system,” “device,” “unit,” and / or “module” as used herein are a method of distinguishing different components, elements, parts, sections, or assemblies at different levels. If other terms can achieve the same purpose, they may be replaced with other expressions.
[0019] As indicated in this specification, unless the context clearly indicates otherwise, the words "a," "an," "an," and / or "the" do not specifically refer to the singular and may also include the plural. Generally speaking, the terms "comprising" and "including" only indicate the inclusion of explicitly identified steps and elements, which do not constitute an exclusive list, and the method or apparatus may also include other steps or elements.
[0020] In the embodiments described in this specification, the order of the steps is interchangeable unless otherwise specified, and steps may be omitted. Other steps may also be included in the operation process.
[0021] To address the environmental pressure caused by the large amount of temporary land occupied during the construction of traditional precast plant foundations, and the low efficiency of beam precasting, CN110658790A utilizes a precast beam production management system based on 3D visualization process management. This system provides a 3D visualization of the precast beam production process, enabling comprehensive control and collaborative construction. However, it does not resolve the technical issues related to template positioning at different locations on the precast beam. The accuracy of template positioning is crucial for ensuring the quality of the precast beam. During the precasting process, the reuse of templates and lax installation management lead to inconsistent template positioning accuracy at different locations on the precast beam, posing significant quality risks.
[0022] In view of this, some embodiments of this specification provide a prefabrication control system, control method, device, and medium for beams. During the positioning process, a laser emitting component is placed at a preset position to emit a laser to the other end, thereby detecting whether a laser reflecting component at a designated position on the prefabricated template can reflect the laser emitted by the emitting component back, thus determining whether the prefabricated template positioning is accurate. A first re-inspection cycle is determined based on a first model, and a second re-inspection cycle is determined based on a second model. This effectively achieves accurate template positioning and allows for re-inspection during installation, further ensuring the stability of template positioning.
[0023] Figure 1 This is a system block diagram of a beam prefabrication control system according to some embodiments of this specification.
[0024] like Figure 1 As shown, the beam prefabrication control system 100 may include a prefabrication platform 110, a rebar installation component 120, a vibration component 130, a formwork positioning component 140, a sensor 150, and a processor 160. In some embodiments, the beam prefabrication control system 100 may also include a tensioning and grouting system (not shown), a transport and transfer system (not shown), and an image acquisition device 170.
[0025] The precast platform 110 is configured to support the precast beams. It supports various materials required during the precast beam fabrication process, such as concrete, reinforcing steel, and the precast beam body itself. A precast beam refers to a beam-shaped component prefabricated in a factory or on-site. The precasting of the beams involves tying reinforcing steel bars on the precast platform or directly moving a pre-tied reinforcing cage to a designated position on the platform, installing precast formwork around the platform, and pouring concrete into the formwork in layers or sections.
[0026] The rebar placement component 120 is configured to place precast rebars in designated positions on a precast pedestal. This component is a device or tool for placing rebars or rebar members in specific positions, typically including clamps, fixing devices, or other mechanical equipment for accurately positioning and securing the rebars in predetermined locations.
[0027] The vibratory compaction unit 130 is configured to compact the concrete during the casting of precast beams. Vibration compaction is a crucial step in concrete construction, using low-amplitude, high-frequency vibrations to force vibrations in the particles within the compaction area. The vibratory compaction unit includes at least one vibrator, which applies vibrational force to the concrete.
[0028] The template positioning component 140 is configured to monitor the position of the precast template. The template positioning component includes at least one set of laser positioning devices, which may include a laser emitting component and multiple laser reflecting components. The laser emitting component is deployed on the support frame of the precast platform. This component uses infrared laser or other types of laser technology to generate a highly focused beam of light, emitting a positioning laser towards the other side of the platform. The laser reflecting components are deployed at a first preset position on the precast template. When the laser beam is directed towards the laser reflecting component and is correctly positioned, it is reflected back to the laser positioning device.
[0029] Precast formwork refers to the formwork used for precast beams. In some embodiments, the formwork used to manufacture the entire precast beam may include multiple different precast formworks. These different precast formworks need to be accurately positioned; inaccurate positioning will lead to grout leakage during concrete pouring, poor surface quality of the precast beam after molding, and affect subsequent processes. Therefore, a laser emitting component needs to be placed at a preset position to emit a laser beam to the other end. If the laser reflecting component successfully reflects the laser, it indicates that the precast formwork is accurately positioned; otherwise, it indicates that the precast formwork is inaccurately positioned. Based on the laser positioning results, the locations where precast formwork positioning errors are likely to occur are determined, and these locations are re-inspected. For more information on re-inspection, see [link to relevant documentation]. Figures 3-4 And related explanations.
[0030] In some embodiments, the laser reflective components can be directly mounted on a prefabricated template, and the fixing method can include threaded connection or magnetic connection. By marking the position of each laser reflective component on the prefabricated template, mutual obstruction between laser reflective components can be avoided. Furthermore, the spacing between laser emitting components and the length of different laser components can be different.
[0031] In some embodiments, after the prefabricated template at a local location is installed, the laser emitting component emits a laser, and the laser reflecting component on the prefabricated template reflects the laser signal. The laser emitting component can receive the laser signal reflected by the laser reflecting component. If at least one set of laser reflecting components on the prefabricated template fails to reflect the laser signal back, the processor will issue a warning, indicating to the user that the prefabricated template has shifted. Considering cost issues and the need for recycling, the laser reflecting components on the prefabricated template can be removed and installed on the prefabricated template as needed.
[0032] In some embodiments, the laser emitting component is fixed to the support frame by means of clamping, snapping, or other methods.
[0033] In some embodiments, the support frame is configured to move the laser emitting component to a second preset position based on control commands, which can be generated by a processor or a user terminal. The processor adjusts the position of the laser emitting component to locate the laser reflecting components on different prefabricated templates. For example, after measuring the first prefabricated template, the laser emitting component is moved forward to locate the laser reflecting component on the second prefabricated template.
[0034] In some embodiments of this specification, the laser reflecting components on different prefabricated templates are positioned by changing the position of the laser emitting component, which helps users adjust the equipment more flexibly and reduce costs. Furthermore, by using control commands generated by a processor or user terminal to drive at least one laser emitting component to a designated position, the equipment operates more smoothly and efficiently.
[0035] In some embodiments, the laser emitting component and the laser reflecting component further include a monitoring module. The monitoring module is used to monitor the position information of the laser emitting component and the laser reflecting component, and may include sensors, detectors, or other types of devices.
[0036] In some embodiments, the monitoring module is configured to monitor the positions of the laser emitting component and the laser reflecting component. If the laser reflecting component is not firmly fixed to the precast template, it is prone to displacement during vibration. Even if the precast template does not shift, the laser reflecting component will not be able to reflect the laser correctly, leading to misjudgment. Therefore, it is necessary to monitor and position the laser reflecting component. Similarly, the laser emitting component also needs to be monitored for its position. If the laser emitting component shifts, causing an incorrect laser emission direction, it will affect the accuracy of positioning the precast template. In some embodiments, the processor monitors the position information of the laser emitting component and the laser reflecting component in real time through the monitoring module. When it senses that the position of the laser emitting component and / or the laser reflecting component exceeds a preset offset threshold, it issues an early warning.
[0037] In some embodiments of this specification, the processor can detect the positions of the laser emitting component and the laser reflecting component in a timely manner through the operation of the monitoring module, thereby improving the accuracy and reliability of positioning.
[0038] The tensioning and grouting system is used to tension and grout the reinforcing steel strands within the holes after precast beams have been formed. The system consists of a tensioning device and a grouting device. The tensioning device applies tension force to bring the reinforcing steel strands to the designed prestressed state within the precast beam. The grouting device injects grouting material into the reinforcing steel strands within the holes to fill voids and improve the bond between the reinforcing steel strands and the concrete.
[0039] The transport and transfer system is used to transport materials and components required for the precast beam fabrication process, as well as to transfer precast beams. This system can move materials and beams from one location to another, for example, transporting precast beams to a curing workshop. The system includes components such as guide rails, wheel sets, and drive motors. The guide rails are the track structure that supports and guides the transport device; the wheel sets are a set of wheels mounted on the bottom of the transport device and matched to the guide rails; and the drive motor provides power to propel the transport device along the guide rails.
[0040] Sensor 150 is configured to monitor temperature and vibration data of the precast template.
[0041] Processor 160 is configured to perform a location check in response to receiving a location request. For more information on processor execution, see [link to relevant documentation]. Figures 2-5 And related explanations.
[0042] Image acquisition device 170 is used to acquire image data, such as from a camera or scanner. The image acquisition device captures an image of the laser reflective component using a camera and sends the image data to a processor. For more information on image acquisition devices, see [link to relevant documentation]. Figure 5 And related explanations.
[0043] It should be understood that Figure 1 The system and its modules shown can be implemented in various ways. In some embodiments of this specification, through the synergistic effect between modules, the system can provide accurate, efficient, and real-time positioning and monitoring of precast beams, improving the quality and production efficiency of precast beams, and reducing costs and risks.
[0044] It should be noted that the above description of the precast control system and its modules for beams is for convenience only and should not limit this specification to the scope of the embodiments described. It is understood that those skilled in the art, after understanding the principle of the system, may arbitrarily combine the various modules or construct subsystems connected to other modules without departing from this principle. In some embodiments, Figure 1 The precast platform, rebar installation components, vibrating components, formwork positioning components, tensioning and grouting system, transportation and transfer system, sensors, processors, and image acquisition devices disclosed herein can be different modules within a single system, or a single module can perform the functions of two or more of the aforementioned modules. For example, modules can share a single storage module, or each module can have its own separate storage module. Such variations are all within the scope of protection of this specification.
[0045] Figure 2 This is an exemplary flowchart illustrating a method for controlling the prefabrication of beams according to some embodiments of this specification. Figure 2As shown, process 200 includes the following steps. In some embodiments, process 200 may be executed by a processor.
[0046] Step 210: In response to receiving a location request, perform a location check.
[0047] A location request is a request to locate the prefabricated template. Location requests can be issued by operators using their portable terminal devices.
[0048] Positioning inspection refers to checking the positional deviation of the precast template.
[0049] In some embodiments, the location check may include steps 211 and 212.
[0050] Step 211: Based on the positioning sequence of the prefabricated template obtained by the template positioning component, determine whether the template position of the prefabricated template is correct. For example, the processor can determine whether the template position of the prefabricated template is correct based on the value of the positioning sequence of the prefabricated template.
[0051] A positioning sequence refers to a sequence of positioning data from different precast templates. In some embodiments, the positioning data of the precast templates can be determined by the reflection of the laser, which is used to indicate whether the position of the precast template is correct. For example, 1 can be used to represent correct and 0 to represent incorrect. When the template of the entire precast beam includes 4 precast templates and all of them are in the correct position, the positioning sequence of the precast templates can be represented as [1,1,1,1].
[0052] In some embodiments, the positioning sequence can be obtained by a template positioning component; for a description of the template positioning component, please refer to [link to relevant documentation]. Figure 1 Related descriptions.
[0053] In some embodiments, the processor can determine the value of the positioning sequence of the prefabricated template by observing laser reflection. For example, when the laser emitted by the laser emitting component for positioning the prefabricated template is reflected by the laser reflecting component at the corresponding first preset position, it indicates that the prefabricated template is correctly positioned, and the corresponding positioning sequence value is 1. If at least one laser reflecting component fails to reflect the laser, it indicates that the prefabricated template is incorrectly positioned, and the corresponding positioning sequence value is 0. The first preset position refers to the location on the prefabricated template where the laser reflecting component is installed. For more information on laser emitting components and laser reflecting components, please refer to [link to relevant documentation]. Figure 1 Related explanations.
[0054] Step 212: In response to the incorrect position of the prefabricated template, generate an alarm message and send the alarm message to the user terminal.
[0055] Alarm information refers to information indicating that the prefabricated template is incorrectly positioned. In some embodiments, alarm information may include the number of the incorrectly positioned prefabricated template; for example, alarm information may state: Prefabricated template number 01 has been offset. In some embodiments, alarm information may also include offset information; for the definition and related explanations of offset information, please refer to [link to relevant documentation]. Figure 5 And its related descriptions.
[0056] In some embodiments, the processor can generate alarm information based on the positioning sequence. For example, assuming that the template of the entire precast beam includes four precast templates, numbered 01, 02, 03, and 04, and the positioning sequence of the precast templates is [0,1,0,1], then the alarm information could be: the precast templates numbered 01 and 03 have shifted.
[0057] In some embodiments, the processor can send the generated alarm information to the user terminal that issued the location request.
[0058] In some embodiments of this specification, laser reflection is used to locate and inspect the precast template, and an alarm message is sent when the position of the precast template is detected to be incorrect. The characteristics of laser can be used to accurately locate the precast template without contacting it, and the positional deviation of the precast template can be detected in time, thereby improving the efficiency of beam prefabrication.
[0059] It should be noted that the above description of process 200 is for illustrative purposes only and does not limit the scope of this specification. Those skilled in the art can make various modifications and changes to process 200 under the guidance of this specification. However, these modifications and changes remain within the scope of this specification.
[0060] Figure 3 This is an exemplary schematic diagram illustrating the determination of the first re-inspection cycle according to some embodiments of this specification.
[0061] In some embodiments, the processor may be configured to perform a positioning check in the first re-examination cycle. For example... Figure 3 As shown, the processor can determine the first re-inspection cycle 380 based on the precast beam parameters 310, template parameters 320, historical positioning sequence 330, and template installation progress 340.
[0062] The first re-inspection cycle 380 refers to the cycle during which the installed precast formwork is re-inspected during the precast formwork installation process. In some embodiments, the first re-inspection cycle 380 can be determined by the reciprocal of the first re-inspection frequency. The first re-inspection frequency refers to the frequency at which the installed precast formwork is re-inspected during the precast formwork installation process.
[0063] In some embodiments, the processor can determine a first re-inspection cycle 380 based on a problem probability sequence 370 of the installed templates. For example, the processor can construct a first preset table based on the historical occurrence of problems, their frequency, and the corresponding historical problem probability sequence. Based on the current problem probability sequence 370, the processor can determine the first re-inspection frequency of each installed prefabricated template by querying the first preset table, thereby determining the first re-inspection cycle 380.
[0064] The problem probability sequence 370 refers to the sequence consisting of the probabilities of problems occurring in each prefabricated template. For example, the problem probability sequence 370 can be [0.5, 0.7, ...], which indicates that the probability of prefabricated template 1 being misaligned is 0.5, the probability of prefabricated template 2 being misaligned is 0.7, and so on. In some embodiments, the problem probability sequence may include the probabilities of problems occurring in the installed prefabricated templates.
[0065] In some embodiments, the larger the value of the element represented by the problem probability sequence 370, the greater the probability that the prefabricated template corresponding to the element has a problem, the higher the first re-inspection frequency corresponding to the prefabricated template, and the shorter the corresponding first re-inspection cycle.
[0066] In some embodiments, the processor can determine the problem probability sequence 370 in a variety of ways based on the precast beam parameters 310, template parameters 320, historical positioning sequence 330, and template installation progress 340.
[0067] In some embodiments, the processor can obtain a problem probability sequence 370 based on the precast beam parameters 310, template parameters 320, historical positioning sequence 330, and template installation progress 340 through the first model 360.
[0068] Precast beam parameters refer to parameters related to the shape of a precast beam. In some embodiments, precast beam parameters may include the dimensions of the precast beam.
[0069] Template parameters refer to the relevant parameters of the prefabricated template. In some embodiments, template parameters may include the dimensions, weight, etc. of the prefabricated template.
[0070] Historical positioning sequence refers to the positioning sequence of each precast module from the completion of installation to the current time point. For a definition of positioning sequence, please refer to [link to definition]. Figure 1 Related explanations.
[0071] Template installation progress refers to the installation status of each prefabricated template. In some embodiments, template installation progress can be the percentage of prefabricated templates that have been installed.
[0072] Precast beam parameters, formwork parameters, historical positioning sequences, and formwork installation progress can be obtained through relevant construction documents and historical construction records.
[0073] In some embodiments, the first model 360 can be a machine learning model, for example, a recurrent neural network (RNN) model.
[0074] In some embodiments, the input to the first model 360 may further include a temperature change sequence 350.
[0075] The temperature change sequence refers to the sequence of temperature changes of each prefabricated template from the completion of installation to the current time point.
[0076] In some embodiments of this specification, the more drastic the temperature change, the more likely the precast template will deform due to the large temperature difference. By considering the temperature changes of each precast template, the input of the first model can be more comprehensive, and the output problem probability sequence can be more consistent with reality.
[0077] In some embodiments, the first model 360 can be trained based on a large number of first training samples with first labels, for example, using gradient descent. In some embodiments, the first training samples can be sample precast beam parameters, sample historical positioning sequences, sample template installation progress, and sample template parameters from historical data. The first label can indicate whether there is a problem with each precast template corresponding to the first training sample; for example, if there is a problem, the first label is set to 1, otherwise it is set to 0. The existence of a problem can refer to issues such as offset or gaps between templates.
[0078] In some embodiments, the first training sample may also include a sequence of historical temperature changes.
[0079] In some embodiments of this specification, training a first model using first training samples with a first label can improve model accuracy. Obtaining the problem probability sequence through the trained first model can make the obtained problem probability sequence more accurate, further making the determined first re-inspection cycle more reasonable.
[0080] In some embodiments, different prefabricated templates have different first re-inspection frequencies, which are related to historical installation offset frequencies and influence distances. For example, the processor can determine a correction ratio based on the historical installation offset frequencies and influence distances of the prefabricated templates, and then determine the corrected first re-inspection frequency.
[0081] The correction ratio refers to the adjustment ratio of the first re-inspection frequency. In some embodiments, the processor can determine the correction ratio by weighted summation based on the historical installation offset frequency and the influence distance. The higher the historical installation offset frequency and the shorter the influence distance, the larger the correction ratio. For example, the correction ratio R can be determined based on the following formula (1):
[0082] R=k1*h+k2 / d (1)
[0083] Among them, k1 and k2 are weighting coefficients, which can be set manually based on experience, h is the historical installation offset frequency, and d is the influence distance.
[0084] The historical installation offset frequency of precast formwork refers to the frequency at which the precast formwork has shifted after installation in the past.
[0085] The influence distance of a precast formwork refers to the distance between that precast formwork and the precast formwork being installed. For example, when installing the 10th precast formwork, the influence distance for the 9th precast formwork can be the distance between the center of the 9th precast formwork and the center of the 10th precast formwork.
[0086] The historical installation offset frequency and affected distance of precast formwork can be obtained based on historical construction records.
[0087] In some embodiments, the processor may adjust the determined first re-examination frequency based on a correction ratio. For example, the correction ratio may be directly multiplied by the first re-examination frequency to determine the corrected first re-examination frequency.
[0088] In some embodiments of this specification, the correction ratio is determined based on the historical installation offset frequency and influence distance of the prefabricated template. The first re-inspection frequency can be corrected according to historical experience and actual conditions, making the first re-inspection frequency more reasonable and helping to determine a more realistic first re-inspection cycle.
[0089] In some embodiments of this specification, the first re-inspection cycle 380 is determined by various methods based on the precast beam parameters 310, template parameters 320, historical positioning sequence 330, and template installation progress 340. This takes into account the inherent parameters of the precast beam size, template parameters, and the impact of actual historical positioning and installation conditions on the precast template, and determines a reasonable first re-inspection cycle so that the position of the precast template can be re-inspected in a timely manner, and adjustments can be made promptly when problems occur.
[0090] Figure 4 This is an exemplary schematic diagram illustrating the determination of a second re-inspection cycle according to some embodiments of this specification.
[0091] In some embodiments, the processor can be configured to perform a positioning check in the second re-examination cycle. For example... Figure 4 As shown, the processor can determine the second re-examination cycle 450 based on the second re-examination frequency 440.
[0092] The second re-inspection cycle 450 refers to the re-inspection cycle of the precast formwork during the vibration treatment. In some embodiments, the second re-inspection cycle 450 can be determined based on the reciprocal of the second re-inspection frequency 440.
[0093] The second re-inspection frequency 440 refers to the frequency of re-inspection of the precast formwork during the vibration process. In some embodiments, the processor can determine the second re-inspection frequency 440 based on candidate second re-inspection frequencies, historical positioning sequences, vibration locations, formwork parameters, concrete pouring progress, and temperature change data. For explanations of historical positioning sequences and formwork parameters, please refer to [link to relevant documentation]. Figure 3 Related descriptions.
[0094] The candidate second re-inspection frequency refers to the second re-inspection frequency of each prefabricated template that is a candidate. In some embodiments, the candidate second re-inspection frequencies can be in groups, and each group of candidate second re-inspection frequencies includes the candidate second re-inspection frequencies corresponding to each prefabricated template.
[0095] In some embodiments, the processor may randomly generate multiple sets of candidate second re-examination frequencies based on a preset algorithm. For example, the preset algorithm may be the Monte Carlo method.
[0096] The vibration position refers to the location of the vibrator in operation within the preset area corresponding to the precast template during the vibration process. The preset area can be pre-defined. For example, the vibration position can be represented by coordinates; if a vibrator near a precast template is not in operation, the vibration position corresponding to that precast template can be recorded as 0.
[0097] Concrete pouring progress refers to the progress of concrete pouring within a pre-defined area corresponding to the precast formwork during the vibration process. In some embodiments, the concrete pouring progress can be expressed as a percentage based on the average height of the concrete poured within the area.
[0098] Temperature change data refers to the temperature change of the precast formwork from the start of vibration to the present.
[0099] In some embodiments, the processor can determine the offset degree data 430 through various methods based on candidate second re-inspection frequency, historical positioning sequence, vibration position, template parameters, concrete pouring progress, and temperature change data, and then determine the second re-inspection frequency 440. The offset degree data refers to the average offset degree of each precast template during each second re-inspection from the previous second re-inspection (or from the start of vibration if it is the first second re-inspection).
[0100] In some embodiments, the processor can construct a reference vector based on multiple sets of second re-inspection frequencies, historical positioning sequences, vibration positions, template parameters, concrete pouring progress, and temperature change data from historical data. This reference vector is stored in a vector database, which may include multiple reference vectors. Each reference vector corresponds to the offset degree data of the precast template in the second re-inspection cycle from historical data. The candidate vector generated from each set of candidate second re-inspection frequencies and its corresponding historical positioning sequences, vibration positions, template parameters, concrete pouring progress, and temperature change data is matched with the reference vectors in the vector database. Vectors in the vector database with a similarity greater than a similarity threshold are used as matching vectors for these candidate vectors. The second re-inspection frequency corresponding to the vector with the smallest offset degree data among the matching vectors is determined as the second re-inspection frequency 440. The similarity threshold can be preset manually.
[0101] In some embodiments, the processor may also determine the offset degree data 430 based on the template structure map 410 and the second model 420, thereby determining the second re-inspection frequency 440.
[0102] The template structure map 410 is a map reflecting the structural conditions of each precast template location. The template structure map consists of nodes and edges. In some embodiments, the processor can construct the template structure map 410 based on a set of candidate second re-inspection frequencies, historical positioning sequences, vibration locations, template parameters, concrete pouring progress, vibrator power, temperature change data, and vibration data of the precast template; that is, each set of candidate second re-inspection frequencies can correspond to one template structure map.
[0103] like Figure 4 As shown, each node (e.g., 410-1) in the template structure diagram 410 corresponds to a precast template. In some embodiments, node features may include candidate second re-inspection frequency, historical positioning data, vibration location, template parameters, concrete pouring progress, vibrator power, temperature change data, and vibration data.
[0104] The vibrator power refers to the power of the vibrator within the preset area corresponding to the precast template. If the vibrator at the location of the precast template is not turned on, the vibrator power is 0.
[0105] Vibration data refers to vibration-related data monitored on the precast template. In some embodiments, vibration data may include vibration frequency, vibration amplitude, etc.
[0106] In the template structure diagram 410, there are edges between the nodes of two adjacent precast templates (such as 410-2), and the edges can reflect the position of the adjacent precast templates. In some embodiments, the edge features may include the distance between the two connected nodes. For example, the distance may be determined by the actual distance between the center points of the two precast templates corresponding to the node.
[0107] In some embodiments, the second model 420 can be a machine learning model. For example, the second model 420 can be a graph neural network (GNN) model.
[0108] In some embodiments, the input to the second model 420 can be a template structure map 410, and the output can be the corresponding offset data 430 based on the nodes in the template structure map 410.
[0109] In some embodiments, the second model 420 can be trained based on a second training sample with a second label. In some embodiments, the second training sample can be a sample template structure map generated from historical data, and the second label can be historically measured offset data corresponding to the sample template structure map. The offset data is positively correlated with the offset distance and offset angle; for example, the larger the offset distance and the larger the offset angle, the greater the offset. In some embodiments, the processor can train the second model based on the second training sample using various methods; for example, training can be terminated when a preset number of training iterations is reached.
[0110] In some embodiments, the processor selects the candidate second re-inspection frequency corresponding to the template structure diagram with the smallest offset data as the second re-inspection frequency of its corresponding prefabricated template.
[0111] In some embodiments, the processor may determine a second re-examination frequency 440 based on the offset data 430 using an evaluation function. The evaluation function is used to score candidate second re-examination frequencies in the template structure map node features. The candidate second re-examination frequencies correspond to the offset data 430.
[0112] In some embodiments, the candidate second re-examination frequency score can be correlated with offset data. For example, the score S of the candidate second re-examination frequency can be determined using the following evaluation function:
[0113] S = k1*c + k2*e
[0114] Wherein, k1 and k2 are evaluation coefficients, c represents the candidate second re-inspection frequency, and e represents offset degree data. In some embodiments, the processor may select the candidate second re-inspection frequency with the minimum score as the second re-inspection frequency 440. It can be understood that the larger the candidate second re-inspection frequency, the smaller the offset degree, but the use of a relatively large candidate second re-inspection frequency may sometimes cause waste of construction costs. By selecting the evaluation function with the minimum score, the second re-inspection frequency and the offset degree can be balanced, that is, while selecting smaller offset degree data, a relatively smaller second re-inspection frequency is selected.
[0115] In some embodiments of the present specification, determining the offset degree data through the second model can make the prediction of the offset degree data more accurate, and further make the calculated score of the candidate second re-inspection frequency more reasonable. The candidate second re-inspection frequency is scored through the evaluation function, so as to determine a more optimal second re-inspection frequency that is more in line with the actual situation.
[0116] In some embodiments, the processor may further determine the candidate second re-inspection frequency based on the template parameter sequence, the concrete pouring progress, and the first re-inspection frequency.
[0117] The template parameter sequence refers to a sequence composed of template parameters of each precast formwork.
[0118] In some embodiments, the processor may determine the candidate second re-inspection frequency through the following steps based on a clustering algorithm:
[0119] 1) Clustering each group of historical second re-inspection frequency groups with qualified precast formwork quality in historical situations based on the corresponding feature vectors [historical template parameter data sequence, historical concrete pouring progress, historical first re-inspection frequency] to obtain at least one cluster, acquiring each group of historical second re-inspection frequency groups in each cluster, selecting the historical second re-inspection frequency groups ranked top n (e.g., top 5) in terms of use times therein as n groups of representative second re-inspection frequency groups of the cluster. Wherein, the second re-inspection frequency group refers to the combination of the second re-inspection frequencies of all precast formworks of the precast beam, and the aforementioned use times refer to the number of times the second re-inspection frequency group was used in history. Wherein, the qualified precast formwork quality may mean that the offset degree is low after the precast formwork is used.
[0120] 2) Calculate the distance between the current feature vector and each of the above clusters, for example, it may be the distance from the feature vector to the cluster center, and use the n representative second re-inspection frequency groups of the cluster closest to the current feature vector as n candidate second re-inspection frequency groups.
[0121] In some embodiments, the above clustering algorithm may be K-means clustering.
[0122] In some embodiments of this specification, multiple candidate second re-examination frequency groups are generated by clustering historical data. Compared with randomly generated candidate second re-examination frequency groups, more reasonable candidate second re-examination frequencies can be generated, which can speed up the process of determining the second re-examination frequency to a certain extent, so as to determine a more reasonable second re-examination cycle.
[0123] In some embodiments of this specification, multiple candidate second re-inspection frequencies are generated, and then, based on the candidate second re-inspection frequencies, the corresponding historical positioning sequence, vibration position, template parameters, concrete pouring progress, and temperature change data are comprehensively considered to determine the second re-inspection frequency, and then the second re-inspection cycle is determined, making the determination of the second re-inspection cycle more reasonable to ensure the effectiveness of the second re-inspection.
[0124] Figure 5 This is an exemplary flowchart illustrating the generation of offset information according to some embodiments of this specification. Figure 5 As shown, process 500 includes the following steps. In some embodiments, process 500 may be executed by a processor.
[0125] Step 510: Acquire image data using an image acquisition device.
[0126] Image data refers to image information of a target laser-reflecting component on a prefabricated template that is misplaced, acquired by an image acquisition device. For more information on image acquisition devices, please refer to [link to relevant documentation]. Figure 1 And related explanations.
[0127] Step 520: Determine the correction position of the laser emitting component based on the image data.
[0128] The calibration position refers to the position where the target laser emitting component can correctly reflect the laser after the laser emitting component is moved.
[0129] In some embodiments, the processor uses image data to determine the current position of the laser reflecting component based on a template matching algorithm and a neural network-based target detection algorithm, generating candidate correction positions. The final correction position is determined by moving the laser emitting component to the candidate correction position and considering whether the laser reflecting component can reflect the laser beam. For example, if the laser reflecting component can reflect the laser beam, the candidate correction position of the laser emitting component is determined as the final correction position.
[0130] Step 530: Generate offset information based on the correction position and the initial preset position.
[0131] The initial preset position refers to the preset position of the laser emitting component, that is, the position that can be correctly reflected by the target laser reflecting component that has not undergone positional shift.
[0132] Offset information refers to the offset data of at least one prefabricated template that is misplaced.
[0133] Offset data includes the offset angle and offset distance of the prefabricated template, typically represented by a vector. In some embodiments, the offset distance is the distance by which the position of the laser reflector component shifts.
[0134] In some embodiments, the processor can determine the position of the laser reflecting component by looking up a table based on the position of the laser emitting component, the laser emission angle, and the reflection distance. Preliminary experiments can determine the information in the table, which includes the correspondence between the position of the laser reflecting component and the laser emission angle, and between the laser emitting component position and the reflection distance.
[0135] In some embodiments, the position of the laser reflecting component can be positively correlated with the laser emission angle, the position of the laser reflecting component, and the reflection distance. As an example only, the processor can obtain the current position of the laser reflecting component based on the laser emission component position, the laser emission angle, and the reflection distance using a preset algorithm. This position includes an offset position and a correct position (i.e., the initial preset position of the laser reflecting component). The preset algorithm is calculated according to the exemplary formula (2):
[0136] t=a×x+b×y+c×z (2)
[0137] Where t is the position of the laser reflecting component, x is the laser emission angle, y is the position of the laser emitting component, and z is the reflection distance. a, b, and c are the coefficients corresponding to the laser emission angle, the position of the laser emitting component, and the reflection distance, respectively, which are determined through preliminary experiments. Specifically, the laser emission angle, the position of the emitting component, the reflection distance, and the position of the laser reflecting component are obtained through preliminary experiments, and the corresponding relationship of formula (2) is determined based on the data fitting algorithm.
[0138] When x is the initial emission angle, y is the preset initial position, and z is the initial distance, substituting these into formula (2) yields t, which is the initial position of the laser reflecting component. When y is the correction position and z is the correction distance, substituting these into formula (2) yields t, which is the offset position of the laser reflecting component. The offset distance and offset angle can then be determined based on the offset position and the preset initial position. Here, the reflection distance refers to the distance between the laser emitting component and the laser reflecting component; the initial distance is the initial distance between the laser emitting component and the laser reflecting component; the correction distance is the distance between the laser emitting component and the offset laser reflecting component after the laser emitting component reaches the correction position; the corrected laser emission angle is the same as the initial emission angle. Both the initial distance and the correction distance can be determined by measuring the time interval between the emitted laser and the received reflected laser, similar to the principle of a laser rangefinder.
[0139] In some embodiments, if at least one prefabricated template is offset, the offset information outputs the offset data of at least one prefabricated template; if no prefabricated template is offset, no output or output 0 is selected.
[0140] In some embodiments, the offset information also includes correction parameters.
[0141] In some embodiments, the correction parameters are generated based on offset data and template parameters.
[0142] Calibration parameters are a set of parameters used to guide the calibration process and provide accurate calibration suggestions to the user. For example, based on the calibration parameters, the user can move the template a certain distance in a certain direction to restore the template to its initial preset position.
[0143] In some embodiments, the processor can construct a matching vector p based on template parameter data, offset data, and the initial template position (x, y, z), where x represents the template parameter data, y represents the offset data, and z represents the initial template position. The processor can then search a vector database based on the matching vector p to obtain reference vectors whose vector distance to the matching vector is less than a distance threshold, and determine the historical correction parameters corresponding to these reference vectors as the currently required correction parameters. The vector database stores several historical vectors and their corresponding historical correction parameters. These historical vectors are constructed based on historical template parameter data, offset data, and the initial template position.
[0144] In some embodiments of this specification, the offset information includes correction parameters, allowing the user to move the precast template a certain distance in a specific direction to achieve precise correction of the precast template.
[0145] In some embodiments, during the vibration process, whether or not the correction parameters are generated is related to whether the offset data of the precast template meets preset conditions; the preset conditions are related to the template node correlation degree of the precast template.
[0146] Preset conditions refer to the conditions set during offset data analysis, such as offset angles in the offset data being greater than an angle threshold and / or offset distances being greater than an offset threshold.
[0147] Template node associativity refers to how many other nodes a template node is connected to. It describes the degree of association between each node and other nodes, i.e., how many nodes it is connected to or adjacent to. For example, a node with a higher template node associativity corresponds to a higher importance of the template, and when the template's position shifts, it is more likely to cause concrete leakage.
[0148] In some embodiments, the angle threshold and offset threshold are negatively correlated with the template node associativity. More information on template node associativity can be found in [link to relevant documentation]. Figure 4 And its related descriptions.
[0149] In some embodiments of this specification, during the vibration compaction process, it is determined whether to generate correction parameters based on preset conditions. Furthermore, by considering the correlation between template nodes, the offset of important nodes is identified. This helps improve the handling effect of precast template offset during vibration compaction, enhances the focus on important nodes, and makes the correction measures more targeted.
[0150] In some embodiments of this specification, the processor determines the corrected position of the laser emitting component based on image data and generates offset information based on the corrected position and an initial preset position. This offset information includes offset data describing the incorrectly positioned prefabricated template. Accurately identifying the positional offset of the prefabricated template through image acquisition and processing helps provide a basis for subsequent correction operations or alarm information.
[0151] It should be noted that the above description of process 500 is for illustrative purposes only and does not limit the scope of this specification. Those skilled in the art can make various modifications and changes to process 500 under the guidance of this specification. However, these modifications and changes remain within the scope of this specification.
[0152] The basic concepts have been described above. Obviously, for those skilled in the art, the detailed disclosure above is merely illustrative and does not constitute a limitation of this specification. Although not explicitly stated herein, those skilled in the art may make various modifications, improvements, and corrections to this specification. Such modifications, improvements, and corrections are suggested in this specification and therefore remain within the spirit and scope of the exemplary embodiments described herein.
[0153] Furthermore, this specification uses specific terms to describe embodiments thereof. For example, "an embodiment," "one embodiment," and / or "some embodiments" refer to a particular feature, structure, or characteristic associated with at least one embodiment of this specification. Therefore, it should be emphasized and noted that references to "an embodiment," "one embodiment," or "an alternative embodiment" in different locations throughout this specification do not necessarily refer to the same embodiment. Moreover, certain features, structures, or characteristics in one or more embodiments of this specification can be appropriately combined.
[0154] In some embodiments, numbers describing the quantity of components and attributes are used. It should be understood that such numbers used in the description of embodiments are modified in some examples with the terms "approximately," "approximately," or "generally." Unless otherwise stated, "approximately," "approximately," or "generally" indicates that the numbers are allowed to vary by ±20%. In some embodiments, numerical parameters should take into account specified significant digits and employ general methods of digit preservation. Although the numerical ranges and parameters used to confirm their breadth of range in some embodiments of this specification are approximate values, in specific embodiments, such values are set as precisely as feasible.
[0155] If there is any inconsistency or conflict between the descriptions, definitions, and / or terms used in the materials referenced in this specification and the content described in this specification, the descriptions, definitions, and / or terms used in this specification shall prevail.
[0156] Finally, it should be understood that the embodiments described in this specification are merely illustrative of the principles of the embodiments described herein. Other variations may also fall within the scope of this specification. Therefore, alternative configurations of the embodiments described herein are intended to be illustrative rather than limiting, and should be considered consistent with the teachings of this specification. Accordingly, the embodiments described herein are not limited to those explicitly introduced and described herein.
Claims
1. A precast beam inspection system, the system comprising a precast platform, a rebar installation component, a vibration component, a formwork positioning component, a sensor, and a processor; the formwork positioning component includes a laser positioning device, the laser positioning device comprising a laser emitting component and a laser reflecting component; wherein, The laser emitting component is deployed on the support frame of the prefabricated platform, and the laser reflecting component is deployed at the first preset position of the prefabricated template; The precast platform is configured to support the precast beams; The steel reinforcement mounting component is configured to place the precast steel reinforcement at a designated position on the precast platform; The vibrating component is configured to vibrate the concrete during the pouring of the precast beam. The template positioning component is configured to monitor the position of the prefabricated template; The sensor is configured to monitor temperature change data and vibration data of the precast template; The processor is configured to perform a positioning check on the prefabricated template, including: Based on the positioning sequence of the prefabricated template obtained by the template positioning component, it is determined whether the template position of the prefabricated template is correct; In response to the incorrect position of the prefabricated template, an alarm message is generated and sent to the user terminal. The alarm message includes the number of the prefabricated template that is incorrectly positioned. The node performing the positioning check includes responding to a positioning request or in a first re-inspection cycle or a second re-inspection cycle; the first re-inspection cycle refers to the cycle for re-inspecting the installed precast templates during the precast template installation process, and the second re-inspection cycle refers to the cycle for re-inspecting the precast templates during the vibration treatment process. The processor is further configured to determine the second re-inspection cycle before performing the positioning check in the second re-inspection cycle, including: The template structure diagram is processed by a second model to determine the degree of offset. The second model is a machine learning model. The template structure diagram includes nodes and edges, with each node corresponding to a precast template. An edge exists between the nodes of two adjacent precast templates. Node features include candidate second re-inspection frequency, historical positioning data, vibration location, template parameters, concrete pouring progress, vibrator power, temperature change data, and vibration data. Edge features include the distance between two connected nodes. The candidate second re-inspection frequency is determined based on the template parameter sequence, the concrete pouring progress, and the first re-inspection frequency. Based on the offset data, a second re-inspection frequency for the prefabricated template is determined, and a second re-inspection cycle is determined based on the second re-inspection frequency. The system also includes an image acquisition device, the alarm information also includes offset information, and the processor is further configured to: Image data is acquired through the image acquisition device; wherein the image data comes from the target laser reflective component on the incorrectly positioned prefabricated template; Based on the image data, the correction position of the laser emitting component is determined; The offset information is generated based on the correction position and the initial preset position; wherein, the offset information includes the offset data of the prefabricated template whose position is incorrect.
2. The system according to claim 1, characterized in that, The laser emitting component is fixed to the support frame by clamping and / or snapping, and the support frame is configured to move the laser emitting component to a second preset position based on control commands. The laser emitting component and the laser reflecting component include a monitoring module, which is configured to monitor the position information of the laser emitting component and the laser reflecting component.
3. The system according to claim 2, characterized in that, The processor is further configured to: Before performing the positioning check in the first re-inspection cycle. The first re-inspection frequency is determined based on the problem probability sequence of the installed template; The first re-inspection cycle is determined based on the first re-inspection frequency; The problem probability sequence is obtained through a first model based on the precast beam parameters, the template parameters, the historical positioning sequence, the template installation progress, and the temperature change sequence. The problem probability sequence includes the problem probability of the installed template. The first model is a machine learning model.
4. The system according to claim 3, characterized in that, Different prefabricated templates have different first inspection frequencies, which are also related to historical installation offset frequencies and influence distances.
5. The system according to claim 4, characterized in that, The offset information also includes correction parameters, which are generated based on the offset data and the template parameters.
6. The system according to claim 5, characterized in that, During the vibration process, whether the correction parameters are generated depends on whether the offset data of the precast template meets the preset conditions; the preset conditions are related to the template node correlation degree of the precast template, and the template node correlation degree reflects how many other nodes the node corresponding to the precast template is connected to.
7. A method for prefabricated beam inspection, applied to the system as described in claim 6, characterized in that, The method is executed by a processor and includes: Perform positioning checks on the precast formwork, including: Based on the positioning sequence of the prefabricated template, determine whether the template position of the prefabricated template is correct; In response to the incorrect position of the prefabricated template, an alarm message is generated and sent to the user terminal. The alarm message includes the number of the prefabricated template that is incorrectly positioned. The node performing the positioning check includes responding to a positioning request or in a first re-inspection cycle or a second re-inspection cycle; the first re-inspection cycle refers to the cycle for re-inspecting the installed precast templates during the precast template installation process, and the second re-inspection cycle refers to the cycle for re-inspecting the precast templates during the vibration treatment process. And determining the second re-inspection cycle before performing the positioning check in the second re-inspection cycle, including: The template structure diagram is processed by a second model to determine the degree of offset. The second model is a machine learning model. The template structure diagram includes nodes and edges, with each node corresponding to a precast template. An edge exists between the nodes of two adjacent precast templates. Node features include candidate second re-inspection frequency, historical positioning data, vibration location, template parameters, concrete pouring progress, vibrator power, temperature change data, and vibration data. Edge features include the distance between two connected nodes. The candidate second re-inspection frequency is determined based on the template parameter sequence, the concrete pouring progress, and the first re-inspection frequency. Based on the offset data, a second re-inspection frequency for the prefabricated template is determined, and a second re-inspection cycle is determined based on the second re-inspection frequency. The alarm information also includes offset information, and the method further includes: Image data is acquired through an image acquisition device; wherein the image data comes from a target laser reflective component on the incorrectly positioned prefabricated template; Based on the image data, the correction position of the laser emitting component is determined; The offset information is generated based on the correction position and the initial preset position; wherein, the offset information includes the offset data of the prefabricated template whose position is incorrect.
8. A prefabrication inspection device for beams, characterized in that, The device includes at least one memory and at least one processor; The at least one memory is used to store computer instructions; The at least one processor is configured to execute at least a portion of the computer instructions to implement the prefabrication inspection method for beams as described in claim 7.
9. A computer-readable storage medium, characterized in that, The storage medium stores computer instructions. When the computer reads the computer instructions in the storage medium, the computer runs the prefabrication detection method for beams as described in claim 7.
Citation Information
Patent Citations
Construction method for prefabricated box girder
CN108638324A
Special-shaped column formwork precise manufacturing, installing and constructing method based on BIM technology
CN115525954A