A visual early warning system and method based on big data
Through big data technology and visualization technology, combined with time series feature analysis of temperature and current sensor data and bidirectional attention interactive coding, it solves the problem that traditional systems are difficult to adapt to environmental changes, achieves accurate judgment and visual display of the working status of charging piles, and improves safety and reliability.
Patent Information
- Application Number
- CN202410509645.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-04-26
AI Technical Summary
Traditional charging pile monitoring and early warning systems are based on static rules and thresholds, which are difficult to adapt to changes in different environments and scenarios, and cannot effectively distinguish between normal fluctuations and abnormal fluctuations, resulting in false positives or missed negatives.
A visual early warning system based on big data is used to collect data through temperature sensors and current sensors, conduct time series feature analysis and bidirectional attention feature interactive correlation coding, and generate current-temperature time series interactive fusion features, which are used to determine the working status of charging piles.
It achieves accurate judgment and visual display of the working status of charging piles, improves the safety and reliability of charging piles, and reduces the occurrence of false positives and false negatives.
Smart Images

Figure CN118254624B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of intelligent early warning technology, and more specifically, to a visual early warning system and method based on big data. Background Art
[0002] With the popularity of electric vehicles, the number and frequency of use of charging piles are also increasing, and the safety and stability of charging piles have become an important issue. However, during the operation of charging piles, abnormal conditions such as overtemperature and overcurrent may occur, which may cause damage to the charging piles or cause safety accidents such as fires. In order to detect and handle these abnormal conditions in a timely manner, real-time monitoring and early warning of charging piles are required.
[0003] However, traditional monitoring and early warning systems are usually based on rules or thresholds, and these methods have certain limitations. Specifically, traditional systems usually use pre-set rules or thresholds for monitoring and early warning, but these rules and thresholds are often static and cannot adapt to changes in different environments and scenarios. Charging piles may have different working conditions in different geographical locations, climatic conditions, and usage situations, and traditional methods are difficult to flexibly adapt to these changes. In addition, traditional early warning systems cannot effectively distinguish between normal fluctuations and abnormal fluctuations, resulting in false alarms or missed alarms.
[0004] Therefore, an optimized visual early warning system is desired. Summary of the invention
[0005] In order to solve the above technical problems, the present application is proposed. The embodiment of the present application provides a visual early warning system and method based on big data, which collects the temperature value and current value of the monitored charging pile at multiple predetermined time points within a predetermined time period through a temperature sensor and a current sensor; performs time series feature analysis on the temperature value and current value at multiple predetermined time points to obtain temperature time series features and current time series features; performs feature interactive correlation encoding based on bidirectional attention on the temperature time series features and the current time series features to obtain current-temperature time series interactive fusion features; based on the current-temperature time series interactive fusion features, determines whether the working status of the monitored charging pile is normal and displays it. In this way, the operator can promptly discover abnormal situations and take corresponding measures to ensure the normal operation of the charging pile.
[0006] In a first aspect, a visual early warning system based on big data is provided, which includes:
[0007] A charging pile data acquisition module is used to collect temperature values and current values of the monitored charging pile at multiple predetermined time points within a predetermined time period through a temperature sensor and a current sensor;
[0008] A charging pile data timing characteristic analysis module is used to perform timing characteristic analysis on temperature values and current values at multiple predetermined time points to obtain temperature timing characteristics and current timing characteristics;
[0009] A data time series feature interaction correlation analysis module, used for performing feature interaction correlation encoding based on bidirectional attention on the temperature time series feature and the current time series feature to obtain a current-temperature time series interaction fusion feature;
[0010] The charging pile working status detection and display module is used to determine whether the working status of the monitored charging pile is normal and display it based on the current-temperature time series interactive fusion characteristics.
[0011] In the second aspect, a visual early warning method based on big data is provided, which includes:
[0012] The temperature and current values of the monitored charging pile at multiple predetermined time points within a predetermined time period are collected by a temperature sensor and a current sensor;
[0013] Performing time series characteristic analysis on temperature values and current values at a plurality of predetermined time points to obtain temperature time series characteristics and current time series characteristics;
[0014] Performing feature interactive correlation encoding based on bidirectional attention on the temperature time series feature and the current time series feature to obtain a current-temperature time series interactive fusion feature;
[0015] Based on the current-temperature time series interactive fusion feature, it is determined whether the working status of the monitored charging pile is normal and displayed. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0017] Figure 1 It is a block diagram of a visual early warning system based on big data according to an embodiment of the present application.
[0018] Figure 2 The figure is a flowchart of a visual early warning method based on big data according to an embodiment of the present application.
[0019] Figure 3 It is a schematic diagram of the architecture of a visual early warning method based on big data according to an embodiment of the present application.
[0020] Figure 4This is an application scenario diagram of a visual early warning system based on big data according to an embodiment of the present application. DETAILED DESCRIPTION
[0021] The following will describe the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0022] Unless otherwise specified, all technical and scientific terms used in the embodiments of the present application have the same meaning as those commonly understood by those skilled in the art of the present application. The terms used in this application are only for the purpose of describing specific embodiments and are not intended to limit the scope of this application.
[0023] In the embodiments of the present application, it should be noted that, unless otherwise specified and limited, the term "connection" should be understood in a broad sense. For example, it can be an electrical connection or a connection between two components. It can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to the specific circumstances.
[0024] It should be noted that the terms "first\second\third" involved in the embodiments of the present application are only used to distinguish similar objects, and do not represent a specific order for the objects. It is understandable that the specific order or sequence of "first\second\third" can be interchanged where permitted. It should be understood that the objects distinguished by "first\second\third" can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.
[0025] After introducing the basic principles of the present application, various non-limiting embodiments of the present application will be described in detail with reference to the accompanying drawings.
[0026] With the popularity of electric vehicles, the number and frequency of use of charging piles are increasing rapidly. As the main charging facilities for electric vehicles, the safety and stability of charging piles are crucial to the safety of users and the public. Therefore, ensuring the safety and stability of charging piles has become an important issue.
[0027] First of all, the safety of charging piles refers to the ability to effectively prevent fire, electric shock and other safety accidents during use. Charging piles need to comply with relevant safety standards and specifications, including electrical safety, mechanical safety and lightning protection safety. The design and manufacture of charging piles must follow these standards to ensure that they will not pose a safety threat to users and the surrounding environment under normal use. Secondly, the stability of charging piles refers to the ability to maintain stable charging performance and operating status during operation. Charging piles need to be able to provide stable charging current and voltage output to ensure that electric vehicles can be charged safely and efficiently. In addition, charging piles also need to have good anti-interference capabilities and be able to operate normally under various environmental conditions without being affected by external interference.
[0028] In order to ensure the safety and stability of charging piles, a series of measures need to be taken: formulate and implement relevant charging pile safety standards and specifications to ensure that the design, manufacture and installation of charging piles meet safety requirements. Establish a strict quality control system to conduct comprehensive quality inspection and testing of charging piles to ensure that they meet relevant technical specifications and performance requirements. Establish a monitoring and maintenance system for charging piles to monitor and remotely manage the working status of charging piles in real time. The monitoring system can promptly detect abnormal conditions of charging piles and take corresponding repair and maintenance measures. Provide necessary safety education and training for users and operators of charging piles to make them understand the correct use of charging piles and safety precautions. Organize safety drills regularly to improve emergency response capabilities. Formulate emergency plans for charging pile safety to ensure timely and effective response in the event of safety accidents.
[0029] However, during operation, the charging pile may experience abnormal conditions such as over-temperature and over-current, which may pose safety risks to the charging pile itself and the surrounding environment. In order to detect and handle these abnormal conditions in a timely manner, the charging pile needs to be monitored and warned in real time. Real-time monitoring is to obtain the working status and parameters of the charging pile in real time by installing sensors and monitoring equipment. Common monitoring parameters include the temperature, current, voltage, power, etc. of the charging pile. These parameters can be collected in real time by sensors, and the data can be transmitted to the monitoring system for processing and analysis through data transmission technology.
[0030] The monitoring system will process and analyze the monitoring data of the charging pile in real time to detect abnormal situations in time. The system can use data mining and machine learning algorithms to analyze historical data and real-time data to find abnormal patterns and abnormal behaviors. For example, the system can establish the normal working mode and parameter range of the charging pile, and when the real-time data exceeds these ranges, the system will issue an alarm. Early warning is to send alarm information to relevant personnel when the monitoring system detects an abnormal situation so that timely measures can be taken. Early warning can be carried out in a variety of ways, such as sound alarms, flashing warning lights, mobile phone text messages, email notifications, etc. Operators can take corresponding measures based on the early warning information, such as stopping charging, reporting repairs, notifying maintenance personnel, etc., to prevent further safety accidents. In addition, the early warning system can be integrated with other management systems, such as charging station management systems or safety monitoring systems, so that centralized monitoring and management of multiple charging piles can be achieved, improving overall safety and stability.
[0031] Traditional monitoring and early warning systems are usually based on rule or threshold methods, which do have certain limitations in practical applications. Traditional methods usually use fixed rules and thresholds to judge abnormal situations. These rules and thresholds are often static and cannot adapt to changes in different charging piles and different working environments. Therefore, when the working conditions of the charging piles change, these rules may not accurately detect potential abnormal situations. Traditional methods can usually only handle simple abnormal situations, such as excessive temperature or excessive current. However, the working status of the charging pile may be affected by multiple factors, and there may be complex correlations between these factors. It is difficult for traditional methods to capture and analyze such complex situations, so they may not accurately predict and warn potential safety issues. With the continuous development and innovation of technology, new abnormal situations may appear, and traditional methods may not be able to predefine and identify these new abnormalities, which requires continuous updating and adjustment of rules and thresholds, increasing the maintenance and management costs of the system.
[0032] In order to overcome the limitations of traditional methods, some new monitoring and early warning technologies are being developed and applied. For example, using technologies such as machine learning and data mining, the normal behavior patterns of charging piles are learned from a large amount of historical data in order to detect abnormal situations. These methods can automatically learn and adapt to different working conditions and environmental changes, and improve the accuracy and flexibility of abnormal detection. In addition to the monitoring of a single parameter, the monitoring of multiple parameters can provide more comprehensive charging pile status information. By analyzing the correlation between multiple parameters, abnormal situations can be judged more accurately and the accuracy of early warning can be improved. Combined with artificial intelligence technology, an intelligent early warning system can be realized. Through real-time monitoring and analysis, the system can automatically identify and predict potential safety issues, and issue early warnings in a timely manner, provide operational suggestions and emergency measures, and help reduce safety risks.
[0033] In one embodiment of the present application, Figure 1 FIG. 1 is a block diagram of a visual early warning system based on big data according to an embodiment of the present application. Figure 1 As shown, according to the embodiment of the present application, the visual early warning system 100 based on big data includes: a charging pile data acquisition module 110, which is used to collect the temperature value and current value of the monitored charging pile at multiple predetermined time points within a predetermined time period through a temperature sensor and a current sensor; a charging pile data timing feature analysis module 120, which is used to perform timing feature analysis on the temperature value and current value at multiple predetermined time points to obtain temperature timing features and current timing features; a data timing feature interaction correlation analysis module 130, which is used to perform feature interaction correlation encoding based on bidirectional attention on the temperature timing features and the current timing features to obtain current-temperature timing interaction fusion features; a charging pile working status detection and display module 140, which is used to determine whether the working status of the monitored charging pile is normal based on the current-temperature timing interaction fusion features and display it.
[0034] In response to the above technical problems, a visual early warning system based on big data is proposed in the technical solution of this application. It should be understood that the application of big data and visualization technology provides strong support for the charging pile early warning monitoring system. Specifically, big data technology can help collect, store and process a large amount of charging pile monitoring data, including sensor data such as temperature and current. By analyzing and mining these data, valuable information and patterns can be extracted to judge the working status of the charging pile and predict potential failures. Visualization technology can convert complex data into intuitive and easy-to-understand graphics and images, so that operators can intuitively understand the status and trends of the charging pile. Through the visual early warning system, operators can detect abnormal situations in time and take appropriate measures to ensure the normal operation of the charging pile.
[0035] Based on this, the technical concept of the present application is to collect the temperature and current values of the charging pile in real time through temperature sensors and current sensors, and introduce big data technology and data processing algorithms at the back end to perform time-series collaborative interactive analysis of the temperature and current of the charging pile, so as to judge the working status of the charging pile and predict potential faults, and use visualization technology to display the working status and change trends of the charging pile. In this way, accurate judgment and visual display of the working status of the charging pile can be achieved, which improves the safety and reliability of the charging pile and provides users with a better charging experience.
[0036] Specifically, in the technical solution of the present application, first, the temperature value and current value of the monitored charging pile at multiple predetermined time points within a predetermined time period collected by the temperature sensor and the current sensor are obtained. In particular, in a specific example of the present application, various parameters of the charging pile, such as current and humidity parameters, can be collected by a smart device installed on the charging pile, and the data can be transmitted to a cloud platform via a wireless network, so that the data can be processed and analyzed on the cloud platform to evaluate and judge the operating status of the charging pile.
[0037] Next, considering that the temperature value and the current value have a dynamic change law of time series in the time dimension, that is, the temperature values and current values at the multiple predetermined time points have a time series correlation relationship in the time dimension. Therefore, in the technical solution of the present application, it is necessary to arrange the temperature values and current values at the multiple predetermined time points into a temperature time series input vector and a current time series input vector according to the time dimension, so as to respectively integrate the distribution information of the temperature value and the current value in the time series.
[0038] It should be understood that in charging pile monitoring, temperature and current are important parameters that change over time. In order to better express and display the data timing characteristics of temperature and current, in the technical solution of the present application, the temperature timing input vector and the current timing input vector are further converted into a vector-image converter to obtain a temperature timing image and a current timing image. By converting the timing data of temperature and current into an image, the changes in these data in the time dimension can be presented in a visual way. This is because images are intuitive and easy to understand, which can help to better observe and analyze the timing change trends and patterns of temperature and current data.
[0039] Then, a time series feature extractor based on a convolutional neural network model with excellent performance in extracting implicit features of images is used to perform feature mining on the temperature time series image and the current time series image, respectively, so as to extract the time series feature distribution information about temperature and the time series feature distribution information about current in the temperature time series image and the current time series image, respectively, so as to obtain the temperature time series feature vector and the current time series feature vector.
[0040] In a specific embodiment of the present application, the charging pile data timing feature analysis module includes: a charging pile data timing arrangement unit, which is used to arrange the temperature values and current values of the multiple predetermined time points into a temperature timing input vector and a current timing input vector according to the time dimension; a charging pile data timing vector format conversion unit, which is used to pass the temperature timing input vector and the current timing input vector through a vector-image converter to obtain a temperature timing image and a current timing image; a multi-parameter timing feature extraction unit, which is used to perform feature extraction on the temperature timing image and the current timing image respectively through a timing feature extractor based on a deep neural network model to obtain a temperature timing feature vector as the temperature timing feature and a current timing feature vector as the current timing feature.
[0041] Among them, the deep neural network model is a convolutional neural network model.
[0042] In the actual monitoring of charging piles, temperature and current are often correlated, and there is a certain correlation between their changes. Therefore, in order to capture the correlation and mutual influence between the two, in the technical solution of the present application, a bidirectional attention interaction layer is further used to perform feature-level interactive fusion of the temperature timing feature vector and the current timing feature vector of the attention mechanism to obtain a current-temperature timing interactive fusion feature vector. Through the feature-level interactive fusion of the attention mechanism, the temperature timing features and the current timing features can be interactively analyzed to obtain a richer feature representation. Such a fusion can make full use of the timing-related feature information between the temperature and current of the charging pile, and provide a more comprehensive and accurate feature representation.
[0043] In a specific embodiment of the present application, the data timing feature interaction correlation analysis module is used to: use a bidirectional attention interaction layer to perform feature-level interactive fusion of the temperature timing feature vector and the current timing feature vector using an attention mechanism to obtain a current-temperature timing interaction fusion feature vector as the current-temperature timing interaction fusion feature.
[0044] Furthermore, the current-temperature time series interactive fusion feature vector is passed through a classifier to obtain a classification result, and the classification result is used to indicate whether the working state of the monitored charging pile is normal. In other words, the interactive fusion feature information between the temperature time series characteristics and the current time series characteristics of the charging pile is used for classification processing, so as to judge the working state of the charging pile and predict potential faults, and use visualization technology to display the working state and change trend of the charging pile.
[0045] In a specific embodiment of the present application, the charging pile working status detection and display module includes: a charging status working status detection unit, used to pass the current-temperature time series interactive fusion feature vector through a classifier to obtain a classification result, and the classification result is used to indicate whether the working status of the monitored charging pile is normal; a result display unit, used to display the temperature time series image, the current time series image and the classification result.
[0046] In one embodiment of the present application, the big data-based visual warning system also includes a training module for training the vector-image converter, the time series feature extractor based on the convolutional neural network model, the bidirectional attention interaction layer and the classifier. The training module includes: a training data acquisition unit for acquiring training data, the training data including training temperature values and training current values of the monitored charging pile at multiple predetermined time points within a predetermined time period, and a true value of whether the working state of the monitored charging pile is normal; a training data time series arrangement unit for arranging the training temperature values and training current values at the multiple predetermined time points into training temperature time series input vectors and training current time series input vectors according to the time dimension; a training vector-image conversion unit for passing the training temperature time series input vector and the training current time series input vector through the vector-image converter to obtain a training temperature time series image and a training current time series image; a training data time series feature extraction unit for passing the training temperature time series image and the training current time series image through the time series feature extractor based on the convolutional neural network model to obtain a training temperature time series image. A feature vector and a training current time series feature vector; a training data time series feature interactive association encoding unit, used to use the bidirectional attention interaction layer to perform feature-level interactive fusion of the training temperature time series feature vector and the training current time series feature vector to obtain a training current-temperature time series interactive fusion feature vector; a feature distribution optimization unit, used to perform feature distribution optimization on the training current-temperature time series interactive fusion feature vector to obtain an optimized training current-temperature time series interactive fusion feature vector; a classification loss unit, used to pass the optimized training current-temperature time series interactive fusion feature vector through the classifier to obtain a classification loss function value; a model training unit, used to train the vector-image converter, the time series feature extractor based on the convolutional neural network model, the bidirectional attention interaction layer and the classifier based on the classification loss function value and through the direction propagation of gradient descent.
[0047] Among them, the feature distribution optimization unit includes: a correction subunit, used to calculate a correction feature vector based on the training temperature timing feature vector and the training current timing feature vector; and a correction fusion subunit, used to correct the training current-temperature timing interaction fusion feature vector with the correction feature vector to obtain the optimized training current-temperature timing interaction fusion feature vector.
[0048] In particular, in the technical solution of the present application, the training temperature time series feature vector and the training current time series feature vector are used to express the local time domain semantic association features of the charging temperature of the charging pile and the local time domain semantic association features of the charging current of the charging pile, respectively, and by using a bidirectional attention interaction layer to interactively fuse the training temperature time series feature vector and the training current time series feature vector based on the attention mechanism, the fusion of the local time domain semantic association features of the charging temperature of the charging pile and the local time domain semantic association features of the charging current of the charging pile based on the semantic feature interaction of the bidirectional attention mechanism can be achieved. However, the present application takes into account the distribution differences of the training temperature time series input vector and the training current time series input vector in the data source domain. Therefore, when the training current-temperature time series interaction fusion feature vector is obtained by the fusion of semantic feature interaction based on the bidirectional attention mechanism, the expression of the training current-temperature time series interaction fusion feature vector may be unbalanced, affecting the expression effect of the training current-temperature time series interaction fusion feature vector.
[0049] Based on this, the present application calculates a correction feature vector based on the training temperature timing feature vector, for example, recorded as V1, and the training current timing feature vector, for example, recorded as V2 at each model iteration, which is specifically expressed as: the correction feature vector is calculated based on the training temperature timing feature vector and the training current timing feature vector using the following correction formula; wherein the correction formula is:
[0050]
[0051] in, is the mean feature vector of the temperature time series feature vector V1 and the current time series feature vector V2, M1 and M2 are weight matrices of the classifier for the temperature time series feature vector V1 and the current time series feature vector V2, T represents the transpose of the vector, represents matrix multiplication, represents addition by position, and V′ is the corrected feature vector.
[0052] That is, in order to learn the high-order fusion representation of the regression-specific features on the model parallel branch pipeline of the training temperature time series feature vector V1 and the training current time series feature vector V2 while maintaining their distinguishability, the mean vector between the training temperature time series feature vector V1 and the training current time series feature vector V2 is used as the intermediate vector to perform query-support matching on the weight matrices M1 and M2 of the classifier, thereby strengthening the distinguishability learning of the time series correlation feature correspondence enrichment under the model parallel branch structure through the class regression association of features under different representation dimensions. Then, the training current-temperature time series interactive fusion feature vector is corrected with the correction feature vector V′, which can improve the generalization of the training current-temperature time series interactive fusion feature vector during classification regression, thereby improving the accuracy of the classification results during model inference. In this way, the working status of the charging pile can be judged and potential faults can be predicted based on the time series changes of the actual monitoring data of the charging pile, and visualization technology can be used to display the working status and change trends of the charging pile. In this way, the working status of the charging pile can be accurately judged and visualized, which improves the safety and reliability of the charging pile and provides users with a better charging experience.
[0053] Further, the classification loss unit is used for: the classifier processes the optimized training current-temperature timing interaction fusion feature vector with the following classification formula to generate a training classification result, wherein the classification formula is:
[0054] softmax{(W n , B n ):...:(W1,B1)|X}, where X represents the optimized training current-temperature timing interaction fusion feature vector, W1 to W n is the weight matrix, B1 to B n represents a bias matrix; and calculating a cross entropy value between the training classification result and the true value as the classification loss function value.
[0055] In one embodiment of the present application, a charging pile early warning monitoring system is provided, which mainly includes several functional modules:
[0056] Data collection: mainly collects the operation status of the installed charging piles, such as whether there are any broken ones or those that do not meet the operation standards. This collection is mainly done manually and has been running for two or three years. Therefore, the original database of the existing charging piles in Shenzhen has been prepared. Now it only needs to be collected and inspected every month.
[0057] When manually collecting and verifying on-site inspections, the operating conditions of the equipment and whether it still meets the standards are collected in accordance with industry standards and national standards. The collected content is not innovative or self-designed.
[0058] The upload module supports uploading physical forms, on-site photos, punch-in photos, etc. The uploaded forms are automatically entered into the system. When entering the system, in addition to the form of equipment operation status, form fields are also set to facilitate internal management;
[0059] The data processing and analysis module determines whether there are any equipment abnormalities based on the data collected and inspected;
[0060] The early warning module summarizes and provides feedback on early warning information based on abnormal information;
[0061] The inspection and warning results export module can automatically export the inspection and warning results and automatically generate reports for supervision and management and law enforcement departments to use.
[0062] The Kanban module makes a Kanban board where you can view the conclusions of multiple modules in real time.
[0063] In the management backend, a series of fields and tags are set up to ensure that the entire project, except for on-site collection and inspection, is manually processed on-site. Other tasks are automated or semi-automated as much as possible, such as the management of imported data information, the generation of early warning information, the management of order placement, dispatch management, and the management of early warning information feedback.
[0064] In another embodiment of the present application, the charging pile early warning monitoring system is a system that uses Internet of Things technology and big data analysis to perform real-time monitoring and early warning of the operating status, fault information, safety risks, etc. of the charging pile. The system consists of the following parts:
[0065] Charging pile terminal: An intelligent device installed on the charging pile, responsible for collecting various parameters of the charging pile, such as voltage, current, temperature, humidity, smoke, etc., and transmitting the data to the cloud platform through a wireless network.
[0066] Cloud platform: responsible for receiving and storing data sent by charging pile terminals, as well as analyzing and processing the data. It evaluates and judges the operating status of the charging piles according to preset rules and algorithms. If any abnormality or failure is found, it will generate early warning information in a timely manner and notify relevant personnel via SMS, email, phone, etc.
[0067] Monitoring center: responsible for displaying and managing the monitoring data and warning information of charging piles, as well as providing remote control and maintenance functions. The monitoring center can be a physical place, or a webpage or mobile application.
[0068] Relevant personnel: including charging pile operators, maintenance personnel, users, etc., can view and process the monitoring data and early warning information of the charging piles, as well as perform remote control and maintenance according to different roles and permissions.
[0069] In summary, the big data-based visual early warning system 100 based on the embodiment of the present application is explained, and its big data technology can help collect, store and process a large amount of charging pile monitoring data, including sensor data such as temperature and current. By analyzing and mining these data, valuable information and patterns can be extracted to judge the working status of the charging pile and predict potential failures. Visualization technology can convert complex data into intuitive and easy-to-understand graphics and images, so that operators can intuitively understand the status and trends of the charging pile. Through the visual early warning system, operators can detect abnormal situations in time and take appropriate measures to ensure the normal operation of the charging pile.
[0070] As described above, the visual warning system 100 based on big data according to the embodiment of the present application can be implemented in various terminal devices, such as a server for visual warning based on big data. In one example, the visual warning system 100 based on big data according to the embodiment of the present application can be integrated into the terminal device as a software module and / or a hardware module. For example, the visual warning system 100 based on big data can be a software module in the operating system of the terminal device, or can be an application developed for the terminal device; of course, the visual warning system 100 based on big data can also be one of the many hardware modules of the terminal device.
[0071] Alternatively, in another example, the big data-based visual warning system 100 and the terminal device may also be separate devices, and the big data-based visual warning system 100 may be connected to the terminal device via a wired and / or wireless network and transmit interactive information in accordance with an agreed data format.
[0072] In one embodiment of the present application, Figure 2 The figure is a flowchart of a visual early warning method based on big data according to an embodiment of the present application. Figure 3 Schematic diagram of the architecture of a visual early warning method based on big data according to an embodiment of the present application. Figure 2 and Figure 3 As shown, the visual early warning method based on big data includes: 210, collecting the temperature value and current value of the monitored charging pile at multiple predetermined time points within a predetermined time period through a temperature sensor and a current sensor; 220, performing time series feature analysis on the temperature values and current values at multiple predetermined time points to obtain temperature time series features and current time series features; 230, performing feature interactive correlation encoding based on bidirectional attention on the temperature time series features and the current time series features to obtain current-temperature time series interactive fusion features; 240, based on the current-temperature time series interactive fusion features, determining whether the working status of the monitored charging pile is normal and displaying it.
[0073] Those skilled in the art will appreciate that the specific operations of each step in the above-mentioned visual early warning method based on big data have been described in detail above. Figure 1 It has been introduced in detail in the description of the big data-based visual early warning system, and therefore, its repeated description will be omitted.
[0074] Figure 4 FIG. 1 is an application scenario diagram of a visual early warning system based on big data according to an embodiment of the present application. Figure 4 As shown, in this application scenario, first, the temperature value of the monitored charging pile at multiple predetermined time points within a predetermined time period is collected by a temperature sensor and a current sensor (for example, Figure 4 C1) and current values (e.g., Figure 4 Then, the obtained temperature value and current value are input to a server (for example, Figure 4 In the S) shown in , the server can process the temperature value and the current value based on a visual early warning algorithm based on big data to determine whether the working status of the monitored charging pile is normal and display it.
[0075] The basic principles of the present application are described above in conjunction with specific embodiments. However, it should be noted that the advantages, strengths, effects, etc. mentioned in the present application are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. are required by each embodiment of the present application. In addition, the specific details disclosed above are only for the purpose of illustration and ease of understanding, not for limitation, and the above details do not limit the present application to being implemented by adopting the above specific details.
[0076] The above description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present application. Various modifications to these aspects will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other aspects without departing from the scope of the present application. Therefore, the present application is not intended to be limited to the aspects shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0077] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.
[0078] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.
Claims
1. A visual early warning system based on big data, characterized in that: include: A charging pile data acquisition module is used to collect temperature values and current values of the monitored charging pile at multiple predetermined time points within a predetermined time period through a temperature sensor and a current sensor; The charging pile data timing characteristic analysis module is used to perform timing characteristic analysis on the temperature values and current values at multiple predetermined time points to obtain temperature timing characteristics and current timing characteristics; A data time series feature interactive correlation analysis module, used for performing feature interactive correlation encoding based on bidirectional attention on the temperature time series feature and the current time series feature to obtain a current-temperature time series interactive fusion feature; A charging pile working status detection and display module, used to determine whether the working status of the monitored charging pile is normal and display it based on the current-temperature time series interactive fusion characteristics; The system also includes a training module for training a vector-to-image converter, a temporal feature extractor based on a convolutional neural network model, a bidirectional attention interaction layer, and a classifier; The training module comprises: A training data acquisition unit, used to obtain training data, wherein the training data includes training temperature values and training current values of the monitored charging pile at multiple predetermined time points within a predetermined time period, and a real value of whether the working state of the monitored charging pile is normal; A training data time series arrangement unit, used for arranging the training temperature values and the training current values at the plurality of predetermined time points into a training temperature time series input vector and a training current time series input vector according to the time dimension respectively; A training vector-image conversion unit, used for respectively passing the training temperature timing input vector and the training current timing input vector through the vector-image converter to obtain a training temperature timing image and a training current timing image; A training data time series feature extraction unit, used for passing the training temperature time series image and the training current time series image through the time series feature extractor based on the convolutional neural network model to obtain a training temperature time series feature vector and a training current time series feature vector; A training data time series feature interactive correlation encoding unit, used to use the bidirectional attention interaction layer to perform feature-level interactive fusion of the training temperature time series feature vector and the training current time series feature vector to obtain a training current-temperature time series interactive fusion feature vector; A feature distribution optimization unit, used for performing feature distribution optimization on the training current-temperature timing interaction fusion feature vector to obtain an optimized training current-temperature timing interaction fusion feature vector; A classification loss unit, used for passing the optimized training current-temperature timing interaction fusion feature vector through the classifier to obtain a classification loss function value; A model training unit, configured to train the vector-to-image converter, the temporal feature extractor based on the convolutional neural network model, the bidirectional attention interaction layer, and the classifier based on the classification loss function value and by directional propagation of gradient descent; The feature distribution optimization unit comprises: a correction subunit, configured to calculate a correction feature vector based on the training temperature time series feature vector and the training current time series feature vector; and A correction fusion subunit, used for correcting the training current-temperature timing interaction fusion feature vector with the correction feature vector to obtain the optimized training current-temperature timing interaction fusion feature vector; The correction characteristic vector is calculated based on the training temperature time series characteristic vector and the training current time series characteristic vector using the following correction formula; wherein the correction formula is: in, is the temperature time series characteristic vector and the current timing characteristic vector The mean eigenvector of and The classifier is respectively for the temperature time series feature vector and the current timing characteristic vector The weight matrix of represents the transpose of a vector, represents matrix multiplication, It means adding by position. is the corrected feature vector.
2. The visual early warning system based on big data according to claim 1 is characterized in that: The charging pile data time series feature analysis module includes: A charging pile data timing arrangement unit, used to arrange the temperature values and current values at the plurality of predetermined time points into a temperature timing input vector and a current timing input vector according to the time dimension respectively; A charging pile data timing vector format conversion unit, used for converting the temperature timing input vector and the current timing input vector through a vector-image converter to obtain a temperature timing image and a current timing image respectively; A multi-parameter timing feature extraction unit is used to perform feature extraction on the temperature timing image and the current timing image respectively through a timing feature extractor based on a deep neural network model to obtain a temperature timing feature vector as the temperature timing feature and a current timing feature vector as the current timing feature.
3. The visual early warning system based on big data according to claim 2 is characterized in that: The deep neural network model is a convolutional neural network model.
4. The visual early warning system based on big data according to claim 3 is characterized in that: The data time series feature interactive correlation analysis module is used to: use a bidirectional attention interaction layer to perform feature-level interactive fusion of the temperature time series feature vector and the current time series feature vector with an attention mechanism to obtain a current-temperature time series interactive fusion feature vector as the current-temperature time series interactive fusion feature.
5. The visual early warning system based on big data according to claim 4 is characterized in that: The charging pile working status detection and display module includes: A charging state working state detection unit, used for passing the current-temperature time series interactive fusion feature vector through a classifier to obtain a classification result, wherein the classification result is used to indicate whether the working state of the monitored charging pile is normal; A result display unit is used to display the temperature time series image, the current time series image and the classification result.
6. The visual early warning system based on big data according to claim 5 is characterized in that: The classification loss unit is used to: The classifier processes the optimized training current-temperature timing interaction fusion feature vector using the following classification formula to generate a training classification result, wherein the classification formula is: ,in represents the optimized training current-temperature timing interaction fusion feature vector, to is the weight matrix, to represents the bias matrix; and The cross entropy value between the training classification result and the true value is calculated as the classification loss function value.
7. A visual early warning method based on big data, characterized in that: include: The temperature and current values of the monitored charging pile at multiple predetermined time points within a predetermined time period are collected by a temperature sensor and a current sensor; Performing time series characteristic analysis on temperature values and current values at a plurality of predetermined time points to obtain temperature time series characteristics and current time series characteristics; Performing feature interactive correlation encoding based on bidirectional attention on the temperature time series feature and the current time series feature to obtain a current-temperature time series interactive fusion feature; Based on the current-temperature time series interactive fusion feature, determine whether the working status of the monitored charging pile is normal and display it; The method also includes a training step for training a vector-to-image converter, a temporal feature extractor based on a convolutional neural network model, a bidirectional attention interaction layer, and a classifier; The training step comprises: Acquire training data, wherein the training data includes training temperature values and training current values of the monitored charging pile at multiple predetermined time points within a predetermined time period, and a real value of whether the working state of the monitored charging pile is normal; Arranging the training temperature values and the training current values at the plurality of predetermined time points into a training temperature timing input vector and a training current timing input vector according to the time dimension respectively; Passing the training temperature time series input vector and the training current time series input vector through the vector-image converter to obtain a training temperature time series image and a training current time series image respectively; Passing the training temperature time series image and the training current time series image through the time series feature extractor based on the convolutional neural network model to obtain a training temperature time series feature vector and a training current time series feature vector respectively; Use the bidirectional attention interaction layer to perform feature-level interactive fusion of the training temperature time series feature vector and the training current time series feature vector with an attention mechanism to obtain a training current-temperature time series interactive fusion feature vector; Performing feature distribution optimization on the training current-temperature timing interaction fusion feature vector to obtain an optimized training current-temperature timing interaction fusion feature vector; Passing the optimized training current-temperature timing interaction fusion feature vector through the classifier to obtain a classification loss function value; Training the vector-to-image converter, the temporal feature extractor based on the convolutional neural network model, the bidirectional attention interaction layer, and the classifier based on the classification loss function value and by directional propagation of gradient descent; The step of optimizing the feature distribution of the training current-temperature timing interaction fusion feature vector to obtain an optimized training current-temperature timing interaction fusion feature vector includes: Calculating a correction feature vector based on the training temperature time series feature vector and the training current time series feature vector; and Correcting the training current-temperature timing interaction fusion feature vector with the correction feature vector to obtain the optimized training current-temperature timing interaction fusion feature vector; The correction characteristic vector is calculated based on the training temperature time series characteristic vector and the training current time series characteristic vector using the following correction formula; wherein the correction formula is: in, is the temperature time series characteristic vector and the current timing characteristic vector The mean eigenvector of and The classifier is respectively for the temperature time series feature vector and the current timing characteristic vector The weight matrix of represents the transpose of a vector, represents matrix multiplication, It means adding by position. is the corrected feature vector.
Citation Information
Patent Citations
Intelligent control system and method of charging pile
CN116639010A
Visual data analysis system and method thereof
CN117113218A
