Piercing method and device for driving stakes
By designing and adjusting the borehole set in the hard, thin soil layer to match the bearing capacity of the soft, thick soil layer, the puncture problem of the pile shoe of the self-elevating drilling platform at the junction of the hard, thin soil layer and the soft, thick soil layer was solved, achieving stable and smooth pile insertion and structural safety.
Patent Information
- Application Number
- CN202410349842.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-03-26
AI Technical Summary
During the pile driving process of a jack-up drilling platform, the pile shoe is prone to puncture accidents at the junction of hard thin soil layers and soft thick soil layers, causing the platform to tilt and sink. Existing technologies make it difficult to achieve stable and smooth pile driving.
By designing a set of multiple adjustment boreholes in the hard, thin soil layer to reduce its area and match the bearing capacity of the soft, thick soil layer, simulation analysis is used to determine the number and arrangement of boreholes to ensure the stability of the bearing capacity of the pile shoe during the pile insertion process.
This technology ensures the stability of the load-bearing capacity of the pile shoe during pile driving, avoids problems such as cracking of the thin hard slab and sudden sinking of the pile shoe, and improves the stability and safety of the pile driving process.
Smart Images

Figure CN118273650B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of drilling platform technology, and in particular to a method and apparatus for piercing a stake. Background Technology
[0002] The description in this section provides only background information related to the disclosure of this invention and does not constitute prior art.
[0003] In the field of drilling platform technology, shallow seabed conditions often present a layered soil structure where the upper layer is a thin, hard soil layer, and the lower layer is a thick, soft soil layer. This is commonly referred to as an "eggshell stratum." When a jack-up drilling platform (JLP) is setting up its support shoes in an "eggshell stratum," it inserts multiple support shoes downwards into the soil to secure itself. Due to the characteristics of the "eggshell stratum," the thin, hard soil layer is prone to cracking as the support shoes are driven deeper and the bearing capacity of the penetrated strata changes. This can cause a single support shoe to penetrate the thin, hard soil layer and enter the thick, soft soil layer, where it sinks rapidly. This type of accident is known as a puncture accident. A puncture of a single support shoe can cause the drilling platform to tilt, and uncontrolled sinking can severely compromise the support shoe structure and even the structural safety of the entire drilling platform.
[0004] Existing technologies have proposed various solutions, but all have problems and shortcomings. For example, methods to passively increase the ultimate bearing capacity of the shallow seabed soil for pile shoe placement include modifying the pile shoe structure to increase the bearing area, and also using pile shoe structure modifications to reinforce the soil strength of soft, thick soil layers. Due to the instability of "eggshell strata," in actual pile driving operations, it is necessary to carefully control the ballast rate under low air gap ballast conditions, resulting in low operational efficiency. Furthermore, while similar technologies involving modifying the pile shoe structure and reinforcing soft, thick soil layers can prevent the drilling platform's pile shoes from suddenly piercing hard, thin layers, significant control difficulties remain in ensuring the smooth descent of the drilling platform's pile shoes, making stable and gradual sinking impossible.
[0005] It should be noted that the above description of the technical background is only for the purpose of providing a clear and complete explanation of the technical solutions of the present invention and facilitating understanding by those skilled in the art. It should not be assumed that the above technical solutions are known to those skilled in the art simply because they have been described in the background section of this invention. Summary of the Invention
[0006] The purpose of this invention is to provide a method and apparatus for driving piles, which solves the problem that the pile shoe cannot drive the piles smoothly and stably when actively breaking hard and thin strata.
[0007] The above-mentioned objectives of this invention are mainly achieved by the following technical solutions:
[0008] This invention provides a method for driving piles, used to drive piles into a first stratum and a second stratum that are stacked vertically, wherein the penetration bearing capacity of the first stratum is greater than that of the second stratum. The method for driving piles includes:
[0009] Designed boreholes are drilled into the first stratum to form a borehole set with multiple adjustment boreholes, the area of which is the sum of the areas of the multiple adjustment boreholes;
[0010] Based on the puncture bearing capacity of the second stratum, the safe bearing capacity range of the first stratum after drilling is obtained, and based on the safe bearing capacity range, the area of the adjustment borehole drilled in the first stratum is obtained;
[0011] Based on the area of the borehole set and the area of the adjustment borehole, the number of adjustment boreholes is obtained, and the drilling operation in the first formation is completed.
[0012] In one specific embodiment, based on the puncture bearing capacity of the second stratum, the safe bearing capacity range of the first stratum after drilling is obtained, and based on the safe bearing capacity range, the area of the adjustment borehole drilled in the first stratum is obtained, including:
[0013] Multiple simulated boreholes of different areas were selected to obtain multiple simulated curves of the pile shoe's insertion depth in the first stratum and its corresponding first puncture bearing capacity.
[0014] Select at least one simulation curve of the first puncture bearing capacity within the safe bearing capacity range from the multiple simulation curves;
[0015] The area of the simulated borehole corresponding to the simulation curve is set as the area of the adjusted borehole.
[0016] In one specific embodiment, the number of adjustment boreholes is obtained based on the area of the borehole set and the area of the adjustment boreholes, and the drilling operation in the first formation is completed, including:
[0017] Multiple rows of boreholes are arranged at intervals along the radial direction of the pile positions in the first stratum;
[0018] Based on the number of adjustable boreholes, the number of adjustable boreholes in each layer of the borehole column is set;
[0019] Starting from the center of the stake location and moving radially outward, the adjustment holes are drilled sequentially at the stake locations.
[0020] In one specific embodiment, a design borehole is drilled into the first formation to form a borehole set with multiple adjustment boreholes, wherein the area of the borehole set is the sum of the areas of the multiple adjustment boreholes, including:
[0021] The area of the hole set is obtained based on the equivalent diameter of the pile shoe, the puncture bearing capacity of the first stratum, and the puncture bearing capacity of the second stratum; wherein, the puncture bearing capacity of the first stratum and the puncture bearing capacity of the second stratum are the ultimate bearing caps corresponding to the equivalent diameter of the pile shoe.
[0022] In one specific embodiment, the puncture bearing capacity of the first stratum is determined based on the bearing capacity coefficient of the first stratum, the equivalent diameter of the pile shoe, the average buoyant unit weight of the soil at the equivalent diameter position of the pile shoe, the overlying soil pressure at the equivalent diameter position of the pile shoe, and the bearing capacity coefficient of the overlying soil.
[0023] In one specific embodiment, the puncture bearing capacity of the second stratum is determined based on the shear strength of the second stratum and the bearing capacity coefficient of the second stratum.
[0024] In one specific embodiment, the depth of the borehole in the first formation exceeds the thickness of the first formation and extends into the second formation.
[0025] In one specific embodiment, the depth of the borehole in the first formation is 1.2 times the thickness of the first formation.
[0026] In one specific embodiment, the diameter of the adjusted borehole is 0.06 to 0.075 times the equivalent diameter of the pile shoe.
[0027] The present invention also provides a piercing device for driving piles, comprising: a device for piercing a first stratum and a second stratum stacked vertically, wherein the piercing bearing capacity of the first stratum is greater than the piercing bearing capacity of the second stratum, and the piercing device for driving piles comprises:
[0028] The design unit drills boreholes in the first stratum to form a set of boreholes with multiple adjustment boreholes, the area of which is the sum of the areas of the multiple adjustment boreholes;
[0029] The verification unit obtains the safe bearing capacity range of the first stratum after drilling based on the puncture bearing capacity of the second stratum, and obtains the area of the adjustment borehole drilled in the first stratum based on the safe bearing capacity range.
[0030] The operating unit, based on the area of the borehole set and the area of the adjustment borehole, obtains the number of adjustment boreholes and completes the drilling operation in the first formation.
[0031] Compared with the prior art, the technical solution of the present invention has the following characteristics and advantages:
[0032] The present invention provides a method and apparatus for driving piles, which solves the problem of stable and smooth pile driving in "eggshell strata" environments where the use of devices or methods to actively disrupt hard and thin strata is insufficient. By designing the drilling sequence in a certain order and reducing the drilling area of the first stratum in the early stage, the bearing capacity of the first stratum after drilling is made to be approximately equal to that of the second stratum. This achieves the goal of ensuring that the bearing capacity provided by the strata to the pile shoe of the drilling platform is approximately stable during the pile driving process. Attached Figure Description
[0033] Figure 1 This is a flowchart of the puncture method for the insertion of the stake according to the present invention;
[0034] Figure 2 This is a flowchart of step S2 of the stake insertion method of the present invention;
[0035] Figure 3 This is a flowchart of step S3 of the stake insertion method of the present invention;
[0036] Figure 4 This is a cross-sectional view of the construction environment for the pile driving method of the present invention;
[0037] Figure 5 This is a top view of the construction environment for the pile driving method of the present invention;
[0038] Figure 6 This is a block diagram of the puncture device for inserting stakes according to the present invention.
[0039] Explanation of icon numbers:
[0040] 1. First stratum;
[0041] 2. Second stratum;
[0042] 3. Hole set; 31. Adjusting the drill hole; 32. Drill hole row;
[0043] 4. Mud lines;
[0044] 5. Sea level. Detailed Implementation
[0045] To enable those skilled in the art to better understand the technical solutions of this invention, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of this invention.
[0046] It should be noted that when an element is referred to as being "set on" another element, it can be directly on the other element or there may be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or there may be an intervening element. The terms "vertical," "horizontal," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only embodiments.
[0047] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein in the specification of this invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0048] like Figure 1 , Figure 4 and Figure 5 As shown, the present invention provides a method for driving piles, used to drive a first stratum 1 and a second stratum 2 that are stacked vertically, wherein the driving bearing capacity of the first stratum 1 is greater than that of the second stratum 2, and the method for driving piles includes:
[0049] S1: Design drilling is performed on the first stratum 1 to form a hole set 3 with multiple adjustment holes 31. The area of the hole set 3 is the sum of the areas of the multiple adjustment holes 31.
[0050] S2: Based on the puncture bearing capacity of the second stratum 2, obtain the safe bearing capacity range of the first stratum 1 after drilling, and based on the safe bearing capacity range, obtain the area of the adjustment borehole 31 drilled in the first stratum 1.
[0051] S3: Based on the area of borehole set 3 and the area of adjustment borehole 31, obtain the number of adjustment boreholes 31, and complete the drilling operation in the first stratum 1.
[0052] The pile driving method provided by this invention is applicable to geological environments where the puncture bearing capacity of the first stratum 1 is greater than that of the second stratum 2. This method is based on the principle of reducing the bearing capacity of the first stratum 1 within a certain area to make it equal to the bearing capacity of the second stratum 2. That is, within the pile driving area, the total area of drilling required in the first stratum 1, i.e., the area of the hole set 3, is calculated, and the area and number of drilling holes 31 are adjusted so that the bearing capacity of the first stratum 1 after drilling is approximately equal to that of the second stratum 2. This achieves the goal of stabilizing the bearing capacity provided by the stratum to the pile driving of the drilling platform during the pile driving process, enabling the drilling platform to effectively control the pile driving speed and achieve a stable and smooth pile driving process. At the same time, the modified first stratum 1 can also avoid the problem of sudden settlement of the pile driving caused by the overall compaction and splitting of the stratum, thus improving the structural stability of the first stratum 1 during the pile driving process.
[0053] Specifically, in this embodiment, the puncture bearing capacity refers to the upward bearing capacity provided by the stratum per unit area to the punctured object. The puncture bearing capacity of the first stratum 1 is greater than that of the second stratum 2. That is, there is a difference between the magnitude of the puncture bearing capacity of the first stratum 1 and the magnitude of the puncture bearing capacity of the second stratum 2 per unit area. This phenomenon forms an "eggshell stratum" structure with a hard upper layer and a soft lower layer. Specifically, in this embodiment, the soil of the first stratum 1 is sandy soil, and the soil of the second stratum 2 is cohesive soil. In other embodiments, the soil of the first stratum 1 and the soil of the second stratum 2 can also be other soil types with a difference in puncture bearing capacity, and there are no application limitations.
[0054] In step S1, within the pile insertion area of the pile shoe, in order to make the bearing capacity of the first stratum 1 approximately equal to the bearing capacity of the second stratum 2, so as to achieve stable and smooth pile insertion, it is necessary to design and drill holes in the first stratum 1 to reduce the area of the first stratum 1, so that the bearing capacity provided by the first stratum 1 to the pile shoe after drilling is approximately equal to the bearing capacity provided by the second stratum 2 to the pile shoe. In this embodiment, the design and drilling of the first stratum 1 is a hole set 3 with multiple adjustment holes 31. The area of the hole set 3 is the total area of the first stratum 1 that needs to be drilled, and the area of the hole set 3 is the sum of the areas of the multiple adjustment holes 31.
[0055] Specifically, the formula for approximately equal bearing capacity of the first stratum 1 and the second stratum 2 is as follows:
[0056]
[0057]
[0058] Where R is the remaining area after drilling the first stratum 1, in m 2D is the equivalent diameter of the pile shoe (used to express the range of the pile insertion area of the pile shoe), in meters; I y The puncture bearing capacity of the first stratum 1 is kN; I s P represents the puncture bearing capacity of the second stratum 2, in kN; P represents the area of borehole set 3, in m². 2 .
[0059] In step S2, based on the area of the hole set 3 determined in the previous steps, the area of a single adjustment borehole 31 is further obtained; that is, the area of a single adjustment borehole 31 is first assumed, and then the number of adjustment boreholes 31 corresponding to that area is determined. Within the pile shoe's insertion area, a model of the first stratum 1 after multiple boreholes with different borehole arrangements is constructed, and the force analysis is performed using the bearing capacity provided by the first stratum 1 and the insertion progress of the pile shoe during the insertion process as the coordinate system; furthermore, based on the puncture bearing capacity of the second stratum 2 and the insertion area of the pile shoe, the bearing capacity provided by the second stratum 2 during the insertion process of the pile shoe is obtained, and based on the bearing capacity provided by the second stratum 2 during the insertion process of the pile shoe, a... A certain bearing capacity fluctuation is set to establish a safe bearing capacity range for the first stratum 1 after drilling. Finally, the safe bearing capacity range of the first stratum 1 is compared with the bearing capacity provided by the first stratum 1 to the pile shoe during pile driving, as determined by stress analysis. It is determined whether the bearing capacity provided by the first stratum 1 exceeds the safe bearing capacity range of the first stratum 1. If it does not exceed the range, the area of the adjusted borehole 31 and the corresponding borehole arrangement are the design boreholes used in subsequent construction. In other embodiments, multiple different areas of the adjusted borehole 31 can be selected to obtain a range of usable areas for the adjusted borehole 31. Within this range, the area of the adjusted borehole 31 can achieve the goal of approximately stabilizing the bearing capacity provided by the stratum to the pile shoe during pile driving. In this embodiment, the stress analysis of the bearing capacity of the pile shoe supported by the first stratum 1 during pile driving is obtained using simulation analysis. In other embodiments, other calculation methods can also be used, and no specific limitations are imposed.
[0060] In step S3, based on the area of the hole set 3 obtained in the above steps and the area of the adjustment borehole 31, the number of adjustment boreholes 31 is obtained. Based on the number of adjustment boreholes 31 and the borehole arrangement corresponding to the area of the adjustment boreholes 31, the drilling operation is completed in the first stratum 1 to achieve stable and smooth pile insertion of the pile shoe.
[0061] In one specific implementation, such as Figure 2 As shown, based on the puncture bearing capacity of the second stratum 2, the safe bearing capacity range of the first stratum 1 after drilling is obtained. Based on the safe bearing capacity range, the area of the adjustment borehole 31 drilled in the first stratum 1 is obtained, including:
[0062] S21: Select multiple simulated boreholes with different areas to obtain multiple simulated curves of the pile shoe's insertion depth in the first stratum 1 and its corresponding first puncture bearing capacity.
[0063] S22: Select at least one simulation curve from multiple simulation curves where the first puncture bearing capacity is within the safe bearing capacity range;
[0064] S23: Set the area of the simulated borehole corresponding to the simulation curve to the area of the adjusted borehole 31.
[0065] The pile driving method provided in this embodiment can construct the first stratum 1 after drilling in a simulated state by setting up a simulated borehole, and can use simulation software to deduce the process of the simulated pile shoe driving the pile in the simulated first stratum 1 after drilling, and complete the stress analysis. Through simulation, the area range that can be used to adjust the borehole 31 can be quickly obtained, avoiding the problem of low construction efficiency caused by overly complicated calculations.
[0066] Specifically, in step S21, the area of a simulated borehole is selected. Based on the area of the borehole set 3 determined in step S1, the number of simulated boreholes of that area can be obtained. Further, based on the number and area of the simulated boreholes, the arrangement of the simulated boreholes is set within the insertion area of the simulated pile shoe, and a simulation model of the first stratum 1 after drilling is constructed. Using simulation software, the simulation curve of the insertion depth of the simulated pile shoe in the first stratum 1 and its corresponding first puncture bearing capacity is obtained. In this embodiment, the first puncture bearing capacity is the bearing capacity provided by the simulated first stratum 1 after drilling to the simulated pile shoe at different insertion depths. In this embodiment, the simulation software is ABAQUS. In other embodiments, other multiphysics finite element simulation analysis software can also be used, without limitation. In this embodiment, the insertion depth is represented by the insertion time, i.e., a certain insertion rate is set. Based on the known thickness of the first stratum 1, the insertion time combined with the insertion rate reflects the insertion depth of the simulated pile shoe in the first stratum 1 after the simulated borehole. In this step, multiple simulated boreholes with different areas are selected to obtain multiple different simulated curves.
[0067] In step S22, as described in step S2, based on the bearing capacity provided by the second stratum 2 during the pile driving process, and considering a certain fluctuation in bearing capacity, a safe bearing capacity range for the first stratum 1 is established. In this embodiment, the first puncture bearing capacity in multiple different simulation curves is compared with the safe bearing capacity range of the first stratum 1 to determine whether the bearing capacity provided by the first stratum 1 after the simulated borehole in each simulation curve exceeds the safe bearing capacity range of the first stratum 1. If it does not exceed the safe bearing capacity range, the area of the simulated borehole corresponding to the simulation curve is the usable area of the simulated borehole. In other embodiments, the usable areas of the simulated boreholes corresponding to multiple simulation curves constitute the usable area range of the simulated borehole.
[0068] In step S23, the area of the usable simulated borehole corresponding to the simulation curve selected in step S22 is set as the area of the adjusted borehole 31. Specifically, in this embodiment, the area of the usable simulated borehole corresponding to multiple simulation curves constitutes the usable area range of the simulated borehole, that is, the usable area range of the adjusted borehole 31 is obtained.
[0069] In one specific embodiment, the diameter of the adjusted borehole 31 is 0.06 to 0.075 times the equivalent diameter of the pile shoe. This corresponds to the usable area range of the adjusted borehole 31. This avoids the problem of insufficient structural damage to the first stratum 1 due to an excessively small area of the adjusted borehole 31, which still carries a risk of puncture; and also avoids the problem of excessive structural damage to the first stratum 1 due to an excessively large area of the adjusted borehole 31, which makes the pile shoe prone to direct puncture.
[0070] Specifically, when the diameter of the borehole 31 is adjusted to be less than 0.06 times the equivalent diameter of the pile shoe, the bearing capacity of the first stratum 1 after drilling to the pile shoe exceeds the safe bearing capacity range, and there is still a risk of puncture. When the diameter of the borehole 31 is adjusted to be greater than 0.075 times the equivalent diameter of the pile shoe, the bearing capacity of the first stratum 1 after drilling to the pile shoe also exceeds the safe bearing capacity range, and there is still a risk of puncture. In this embodiment, the area of the adjusted borehole 31 is expressed using the diameter of the adjusted borehole 31, and the pile insertion area range of the pile shoe is expressed using the equivalent diameter of the pile shoe. In other embodiments, other equivalent units can also be used. In another specific embodiment, the area range that can be used for adjusting the borehole 31 is obtained using the force analysis method in step S2. In yet another specific embodiment, the area range that can be used for adjusting the borehole 31 is obtained using the simulation analysis method in step S2. No specific limitations are imposed on this.
[0071] In one specific implementation, such as Figures 3 to 5As shown, based on the borehole area and the area of the adjusted borehole 31, the number of adjusted boreholes 31 is obtained, and the drilling operation in the first stratum 1 is completed, including:
[0072] S31: Along the radial direction of the pile insertion position in the first stratum 1, multiple rows of boreholes 32 are arranged at intervals;
[0073] S32: Based on the number of adjustment holes 31, set the number of adjustment holes 31 in each layer of the drill column 32;
[0074] S33: Drill adjustment holes 31 in sequence at the pile insertion positions, radially outward from the center of the pile insertion position.
[0075] By setting this drilling arrangement, the drilling holes 31 can be evenly distributed and adjusted within the range of the pile shoe insertion, so that the first stratum 1 after drilling can provide uniform piercing bearing capacity to the pile shoe, avoiding the instability and unevenness of the pile shoe insertion process caused by changes in the direction of piercing bearing capacity or uneven distribution of bearing capacity.
[0076] Specifically, in step S31, the pile insertion position of the first stratum 1 in this embodiment is roughly circular, that is, the pile shoe is inserted at the pile insertion position of the first stratum 1. The drill row 32 composed of multiple adjustment drill holes 31 is also roughly circular. The multi-layer drill row 32 is arranged at intervals along the radial direction of the pile insertion position of the first stratum 1. The center of each layer of drill row 32 is the same and the diameter of each layer of drill row 32 is different. In other embodiments, the shape of the drill row 32 and the shape of the pile insertion position of the first stratum 1 can also be rectangular or irregular, and there is no specific limitation on this. There is also no specific limitation on the arrangement of the multi-layer drill row 32.
[0077] In step S32, based on the area of the hole set 3 obtained in step S1 and the area of the adjustment borehole 31 obtained in step S2, the number of adjustment boreholes 31 can be obtained. The number of adjustment boreholes 31 is arranged according to the arrangement method in step S31 or other arrangement methods to achieve smooth pile insertion during the pile shoe insertion process.
[0078] Specifically, the formula for calculating the number of boreholes 31 is as follows:
[0079]
[0080] Where d is the diameter of the adjustment borehole 31, in meters; D is the equivalent diameter of the pile shoe, in meters; I y The puncture bearing capacity of the first stratum 1 is kN; I s The puncture bearing capacity of the second stratum 2 is kN.
[0081] In step S33, using drilling tools, adjustment holes 31 are drilled radially outward from the center of the pile insertion position. In this embodiment, the adjustment holes 31 are drilled clockwise from the center outward. In other embodiments, other drilling sequences may be used, and there are no specific restrictions on this.
[0082] In one specific implementation, such as Figure 4 and Figure 5 As shown, boreholes are drilled into the first stratum 1 to form a borehole set 3 with multiple adjustable boreholes 31. The area of the borehole set 3 is the sum of the areas of the multiple adjustable boreholes 31, including:
[0083] Based on the equivalent diameter of the pile shoe, the puncture bearing capacity of the first stratum 1, and the puncture bearing capacity of the second stratum 2, the area of the hole set 3 is obtained; wherein, the puncture bearing capacity of the first stratum 1 and the puncture bearing capacity of the second stratum 2 are the ultimate bearing capacities corresponding to the equivalent diameter of the pile shoe.
[0084] The pile driving method of the present invention can obtain the area of the hole set 3 by using the puncture bearing capacity of the first stratum 1, the puncture bearing capacity of the second stratum 2, and the equivalent diameter of the pile shoe, that is, directly obtain the total area of the boreholes drilled in the first stratum 1; specifically, the calculation formula is as follows:
[0085]
[0086] Where P is the area of hole set 3, m 2 D is the equivalent diameter of the pile shoe, in meters; I y The puncture bearing capacity of the first stratum 1 is kN; I s The puncture bearing capacity of the second stratum 2 is kN.
[0087] In one specific embodiment, the puncture bearing capacity of the first stratum 1 is determined based on the bearing capacity coefficient of the first stratum 1, the equivalent diameter of the pile shoe, the average buoyant unit weight of the soil at the equivalent diameter position of the pile shoe, and the overlying soil pressure at the equivalent diameter position of the pile shoe. In this embodiment, these parameters obtained from previous geological surveys can be directly used to calculate the puncture bearing capacity of the first stratum 1 within a unit area, as shown in the following formula:
[0088] I y =0.3γ1BN r +P0(N q -1)
[0089] Where γ1 is the average buoyant unit weight of the soil within a range of B / 2 at a position with a unit diameter B, in t / m³. 3 B is the unit diameter, in meters; I y The puncture bearing capacity of the first stratum 1 is kN; N rN is the first bearing capacity coefficient of the first stratum 1; q P0 is the second bearing capacity coefficient of the first stratum 1; P0 is the overlying soil pressure, N / m 2 .
[0090] In this embodiment, the average buoyant unit weight of the soil within a range of B / 2 below the unit diameter B is determined using existing geological survey instruments. Simultaneously, the internal friction angle of the soil in the first stratum 1 is obtained using existing geological survey instruments. Then, the first bearing capacity coefficient and the second bearing capacity coefficient of the first stratum 1 are obtained by referring to industry standard SY / T 10030. In other embodiments, the first bearing capacity coefficient and the second bearing capacity coefficient of the first stratum 1 can also be obtained based on the internal friction angle of the first stratum 1, as shown in the following formula:
[0091]
[0092]
[0093] Where, N r N is the first bearing capacity coefficient of the first stratum 1. q The second bearing capacity coefficient of the first stratum 1 The internal friction angle of the first stratum 1 is °.
[0094] In one specific embodiment, the puncture bearing capacity of the second stratum 2 is determined based on the shear strength and bearing capacity coefficient of the second stratum 2. These parameters, obtained from previous geological surveys, can be directly used to calculate the puncture bearing capacity of the second stratum 2 within a unit area, as shown in the following formula:
[0095] I s =N c S u
[0096] Among them, S u The shear strength of the second stratum, 2 soil particles, is given in t / m. 2 N c This is the bearing capacity coefficient of the second stratum, 2.
[0097] In this embodiment, the shear strength of the second stratum 2 soil is determined using existing geological survey instruments, and the bearing capacity coefficient of the second stratum 2 is determined by referring to a table based on industry standards. In other embodiments, the bearing capacity coefficient of the second stratum 2 can also be determined based on the foundation depth and foundation dimensions, as shown in the following formula:
[0098]
[0099] Where, N cdenoted as the bearing capacity coefficient of the second stratum 2, D is the equivalent diameter of the pile shoe, in meters; H0 is the depth from the mudline 4 to the first stratum 1, in meters.
[0100] In one specific implementation, such as Figure 4 and Figure 5 As shown, the drilling depth in the first stratum 1 exceeds the thickness of the first stratum 1 and extends into the second stratum 2. Through ultra-deep drilling operations, it is possible to avoid incomplete drilling due to sea level rise 5, that is, failure to complete drilling to the designed depth; it is also possible to avoid sudden changes in the bearing capacity of the first stratum 1 on the pile shoe after drilling during the pile shoe insertion process, thus ensuring the safety of the drilling platform during drilling.
[0101] In a specific embodiment, the drilling depth in the first stratum 1 is 1.2 times the thickness of the first stratum 1. By setting an ultra-deep drilling range, the bearing capacity of the second stratum 2 on the pile shoe during the pile shoe insertion process, which would be caused by excessive drilling depth, can be avoided, thus ensuring the smooth pile insertion operation of the drilling platform.
[0102] Based on the same inventive concept, such as Figure 6 As shown, the present invention also provides a piercing device for pile driving, as described in the above embodiment, specifically including: a device for piercing a first stratum 1 and a second stratum 2 that are stacked vertically, wherein the piercing bearing capacity of the first stratum 1 is greater than the piercing bearing capacity of the second stratum 2, and the piercing device for pile driving includes:
[0103] The design unit drilled holes in the first stratum 1 to form a hole set 3 with multiple adjustment holes 31. The area of the hole set 3 is the sum of the areas of the multiple adjustment holes 31.
[0104] The verification unit obtains the safe bearing capacity range of the first stratum 1 after drilling based on the puncture bearing capacity of the second stratum 2, and obtains the area of the adjustment borehole 31 drilled in the first stratum 1 based on the safe bearing capacity range.
[0105] The operating unit, based on the borehole area and the area of the adjusted borehole 31, obtains the number of adjusted boreholes 31 and completes the drilling operation in the first stratum 1.
[0106] The pile driving device provided by this invention is suitable for geological environments where the puncture bearing capacity of the first stratum 1 is greater than that of the second stratum 2. This device is based on the principle of reducing the bearing capacity of the first stratum 1 within a certain area to make it equal to the bearing capacity of the second stratum 2. That is, within the pile driving area, the total area of drilling required in the first stratum 1, i.e., the area of the hole set 3, is calculated, and the area and number of drilling holes 31 are adjusted so that the bearing capacity of the first stratum 1 after drilling is approximately equal to that of the second stratum 2. This achieves the goal of stabilizing the bearing capacity provided by the stratum to the pile driving of the drilling platform during the pile driving process, enabling the drilling platform to effectively control the pile driving speed and achieve a stable and smooth pile driving process. At the same time, the modified first stratum 1 can also avoid the problem of sudden settlement of the pile driving caused by the overall hardening and splitting of the stratum, thus improving the structural stability of the first stratum 1 during the pile driving process.
[0107] Since the principle by which this device solves the problem is similar to the puncture method of stake insertion, the implementation of this device can be referred to the implementation of the puncture method of stake insertion, and the repeated parts will not be described again.
[0108] It should be understood that in the various embodiments of this document, the sequence number of each process does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this document.
[0109] It should also be understood that, in the embodiments herein, the term "and / or" is merely a description of the relationship between associated objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this document generally indicates that the preceding and following associated objects have an "or" relationship.
[0110] Furthermore, the functional units in the various embodiments of this document can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.
[0111] This document uses specific embodiments to illustrate the principles and implementation methods of this document. The descriptions of the embodiments above are only for the purpose of helping to understand the methods and core ideas of this document. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of this document. Therefore, the content of this specification should not be construed as a limitation of this document.
Claims
1. A method for puncturing a stake, characterized in that, The method for driving piles into a first and second stratum, which are stacked vertically, wherein the bearing capacity of the first stratum is greater than that of the second stratum, includes: Designed boreholes are drilled into the first stratum to form a borehole set with multiple adjustment boreholes, the area of which is the sum of the areas of the multiple adjustment boreholes; Based on the puncture bearing capacity of the second stratum, the safe bearing capacity range of the first stratum after drilling is obtained, and based on the safe bearing capacity range, the area of the adjustment borehole drilled in the first stratum is obtained; Multiple simulated boreholes of different areas were selected to obtain multiple simulated curves of the pile shoe's insertion depth in the first stratum and its corresponding first puncture bearing capacity. Select at least one simulation curve of the first puncture bearing capacity within the safe bearing capacity range from the multiple simulation curves; The area of the simulated borehole corresponding to the simulation curve is set as the area of the adjusted borehole; Based on the area of the borehole set and the area of the adjustment borehole, the number of adjustment boreholes is obtained, and the drilling operation in the first formation is completed.
2. The method for piercing a stake according to claim 1, characterized in that, Based on the area of the borehole set and the area of the adjustment borehole, the number of adjustment boreholes is obtained, and the drilling operation in the first formation is completed, including: Multiple rows of boreholes are arranged at intervals along the radial direction of the pile positions in the first stratum; Based on the number of adjustable boreholes, the number of adjustable boreholes in each layer of the borehole column is set; Starting from the center of the stake location and moving radially outward, the adjustment holes are drilled sequentially at the stake locations.
3. The method for piercing a stake according to claim 1, characterized in that, Designed boreholes are drilled into the first stratum to form a borehole set with multiple adjustment boreholes. The area of the borehole set is the sum of the areas of the multiple adjustment boreholes, including: The area of the hole set is obtained based on the equivalent diameter of the pile shoe, the puncture bearing capacity of the first stratum, and the puncture bearing capacity of the second stratum; wherein, the puncture bearing capacity of the first stratum and the puncture bearing capacity of the second stratum are the ultimate bearing caps corresponding to the equivalent diameter of the pile shoe.
4. The method for piercing a stake according to claim 3, characterized in that, The puncture bearing capacity of the first stratum is determined based on the bearing capacity coefficient of the first stratum, the equivalent diameter of the pile shoe, the average buoyant unit weight of the soil at the equivalent diameter position of the pile shoe, the overlying soil pressure at the equivalent diameter position of the pile shoe, and the bearing capacity coefficient of the overlying soil.
5. The method for piercing a stake according to claim 3, characterized in that, The puncture bearing capacity of the second stratum is determined based on the shear strength and bearing capacity coefficient of the second stratum.
6. The method for piercing a stake according to claim 1, characterized in that, The drilling depth in the first formation exceeds the thickness of the first formation and extends into the second formation.
7. The method for piercing a stake according to claim 6, characterized in that, The drilling depth in the first formation is 1.2 times the thickness of the first formation.
8. The method for piercing a stake according to claim 1, characterized in that, The diameter of the adjusted borehole is 0.06 to 0.075 times the equivalent diameter of the pile shoe.
9. A puncture device for driving stakes, employing the puncture method for driving stakes as described in any one of claims 1 to 8, characterized in that, The pile driving device includes: a tool for piercing a first stratum and a second stratum that are stacked vertically, wherein the piercing bearing capacity of the first stratum is greater than that of the second stratum; the pile driving device includes: The design unit drills boreholes in the first stratum to form a set of boreholes with multiple adjustment boreholes, the area of which is the sum of the areas of the multiple adjustment boreholes; The verification unit obtains the safe bearing capacity range of the first stratum after drilling based on the puncture bearing capacity of the second stratum, and obtains the area of the adjustment borehole drilled in the first stratum based on the safe bearing capacity range. The operating unit, based on the area of the borehole set and the area of the adjustment borehole, obtains the number of adjustment boreholes and completes the drilling operation in the first formation.
Citation Information
Patent Citations
Pile shoe transformation method and transformed pile shoe
CN119021205A