A deformation field reconstruction and forecasting method for high arch dam construction period
Through the flexible inclinometer and finite element simulation model, the deformation and stress field during the construction period of the high arch dam can be monitored and analyzed in real time, which solves the problem of lack of self-weight deformation measurement in the existing technology and realizes the deformation field during the construction period of the high arch dam. Accurate forecasting and early warning of stress fields improves the reliability of construction safety management.
Patent Information
- Application Number
- CN202410511581.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-04-26
AI Technical Summary
Existing technology makes it difficult to accurately monitor and analyze dam body deformation during the construction period of high arch dams, especially self-weight deformation, resulting in the inability to fully understand the stress state and early warning, and the risk of quality problems such as cracks.
Using a flexible inclinometer and finite element simulation model, through the measurement system, transmission system and data post-processing system, real-time monitoring of dam body deformation is performed, water pressure, air temperature and time-dependent deformation components are separated, thermal and mechanical parameters are inverted, and the stress field is calculated , and provide early warning.
It achieves accurate prediction of the deformation field and stress field during the construction period of high arch dams, can issue early warnings in time, avoid quality problems, and improve the reliability of construction safety management and design.
Smart Images

Figure CN118310582B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of deformation monitoring during arch dam construction, and in particular to a deformation field reconstruction and forecasting and early warning method during the construction period of a high arch dam. Background Art
[0002] High arch dams are generally cast in a way that sets transverse joints in the arch direction and passes through the chamber along the river. When the dam section reaches a certain height, the joint grouting method is used to connect the single dam section into a whole. In this process, the poured concrete is divided into the whole part below the joint grouting elevation and the independent cantilever part of each dam section. The loads are the influence of the concrete deadweight and temperature stress.
[0003] Among them, since the extra-high arch dam is a hyperbolic arch dam, in order to better play the bidirectional arch effect in the arch direction and the beam direction, the dam has a certain degree of overhang in the beam direction. Generally, the overhang increases with the increase of the pouring height from the dam foundation. When it reaches 2 / 3 of the dam height, the overhang reaches the maximum value, and then the overhang will gradually decrease. In this process, the coupling effect of the self-weight overhang and the pouring and arch sealing grouting pressure will bring three problems:
[0004] 1. Overhang stress problem: The overhang effect will cause an increase in tensile stress at the toe of the dam. When the overhang stress increases to a certain extent, it will be superimposed with the temperature stress to produce normal tensile stress on the foundation surface at the dam site. In severe cases, cracks will be caused along the foundation surface.
[0005] 2. The extrusion deformation of the steep slope dam section toward the river valley causes cracks in the lower part of the steep slope dam section: the steep slope dam section has a tendency to deform toward the river valley under the action of its own weight, which in turn forms an extrusion on the riverbed dam section. When the riverbed dam section deforms upside down upstream, it makes room for the downward and inward deformation of the steep slope dam section, further increasing the deformation of the dam in the upstream direction and the river valley direction, causing the upper side of the dam section foundation to be pulled. In severe cases, cracks will form at the bottom of the steep slope dam section.
[0006] 3. The problem of increasing the opening of grouted transverse joints: The inverted deformation of the dam body will cause the entire dam to deform upstream, increasing the arc length and causing tensile stress in the arch direction of the cast dam body. The grouted transverse joints generally have only a small tensile strength, and the tensile stress in the arch direction caused by the inverted deformation can easily cause the transverse joints to reopen.
[0007] The above-mentioned problems have been mentioned many times in relevant existing literature. For example, the literature "Study on Overhang Deformation of High Arch Dams during Construction Period Before and After Treatment of Complex Geological Conditions" points out that the overhang deformation of high arch dams during construction period is large, so it is very necessary to carry out deformation monitoring and data inversion during construction period. The literature "Study on the Accuracy of Overhang Deformation Monitoring during Construction Period of High Arch Dams" points out that the overhang problem in the construction process of ultra-high arch dams is one of the main reasons for the occurrence of cracks during construction period.
[0008] Therefore, monitoring and analyzing the deformation of the dam during the construction period can grasp the working state of the dam in real time, such as the inverted deformation, lateral tilt deformation, opening and closing of the transverse joints and dislocation, and further grasp the stress state of the dam, and timely warn and regulate possible problems to avoid quality problems such as harmful cracks. By obtaining the self-weight deformation of the dam and improving the deformation observation of the dam during operation, the working state of the dam during the construction period can be fully grasped, which is conducive to the safety management of the dam during operation, and the design and safety evaluation theory of ultra-high arch dams can be improved to promote technological progress in the industry.
[0009] There are some technical solutions to the above problems in the prior art, such as the published Chinese patent CN114279422B, which discloses a deformation monitoring method and system for high arch dams during construction. It specifically discloses the establishment of a high arch dam model according to the dam design parameters, and the calculation of the actual displacement of each point of the dam body at different elevations through the revised high arch dam model, and the comparison with the design standard of the high arch dam to determine whether the deformation of the high arch dam is within the allowable range. However, this solution fails to comprehensively consider the various factors affecting the deformation during the construction period, and cannot obtain an accurate overall finite element model considering complex foundation conditions. The use of a single factor deformation and design allowance is far less comprehensive, direct and accurate than the construction of deformation field and stress field.
[0010] Another example is the published Chinese patent CN213180042U, which discloses a device for butt-jointing and positioning the vertical and inverted pipes in the dam body. It specifically discloses that it can achieve the purpose of forcing the two pipes to be coaxial when they are butt-jointed, thereby reducing the repeated adjustment of the verticality during the installation of the pipes and shortening the installation time. The combined installation and positioning device has a compact structure, is light and small, and is easy to operate. Although the device in this scheme optimizes certain problems existing in vertical and inverted pipes, it must be installed after the dam is built to a certain elevation, generally more than 2 / 3 of the dam casting elevation, and before the initial water storage. This causes most of the self-weight deformation to be missing in the dam deformation observation data, making it difficult to verify the calculated dam deformation and the measured dam deformation.
[0011] With the development of measuring instruments and measuring technology, a large number of measuring technologies that can continuously observe the horizontal and vertical displacements of deformation points on the dam surface in real time have been widely used. Since the three-dimensional displacement value of the deformation point is measured, it is called "three-dimensional displacement monitoring". Among them, the flexible inclinometer is a new type of inclinometer developed based on a high-precision and high-stability acceleration sensor and using advanced electronic technology. It has the characteristics of high measurement accuracy and good stability. With the use of advanced electronic technology, displacement data can be measured in real time, and the measurement results can be sent to a designated computer to provide data support for slope stability and geological engineering safety monitoring. However, the prior art does not have specific application steps and methods for comparing the deformation of the dam body of a high arch dam using the above-mentioned measurement technology to provide early warning.
[0012] Therefore, it is necessary to design a method for reconstructing the deformation field and predicting and warning during the construction period of a high arch dam. The method can measure the deformation of the dam body during the construction period of a high concrete arch dam, analyze the deformation field and stress field during the construction period, and predict the stress of the dam. It can also be compared with the design value of the specification for disaster warning, thereby solving the problem of the lack of measurement of the self-weight deformation during the construction period by the existing dam deformation observation vertical line method. Summary of the invention
[0013] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for reconstruction and forecasting of deformation field during the construction period of a high arch dam. The method can measure the deformation of the dam body during the construction period of a high concrete arch dam, analyze the deformation field and stress field during the construction period to predict the stress of the dam, and compare with the standard design value to give a disaster warning, thereby solving the problem that the existing vertical line method for observing dam deformation is missing for measuring the self-weight deformation during the construction period.
[0014] In order to achieve the above object, the present invention provides a method for reconstruction and forecasting of deformation field during construction of a high arch dam:
[0015] It includes a measuring system, a transmission system, an acquisition system and a data post-processing system. The measuring system is a flexible inclinometer. The transmission system includes a supporting steel frame and an inclinometer tube. The input end of the acquisition system is connected to the flexible inclinometer, and the output end of the acquisition system is connected to the data post-processing system. The supporting steel frame and the inclinometer tube are pre-buried in the dam. When the starting point of the flexible inclinometer is determined, the supporting steel frame is built to fix the position of the inclinometer tube. The flexible inclinometer and the signal line are installed and protected in the inclinometer tube. The flexible inclinometer is provided with multiple sections. Each section of the flexible inclinometer is fixed with at least two positioning pulleys. The positioning pulleys are located at both ends of each section of the flexible inclinometer in a cross shape.
[0016] The forecast and warning method includes the following steps:
[0017] S1, support structure construction: determine the starting point of the flexible inclinometer and build a support steel frame here to fix the position of the flexible inclinometer. After each bin is poured, the support steel frame must be exposed on the bin surface to place the collection system of the flexible inclinometer. If the pouring height is higher than the steel frame height, the steel frame exposure requirement cannot be met after pouring, and the support steel frame needs to be extended on-site welding before the equipment is installed;
[0018] S2, distance adjustment of fixed bracket and flexible inclinometer: Use a tape measure to measure the distance from the center of the steel frame vertex to the upper, lower, left and right templates of the warehouse to ensure that the flexible inclinometer is located at the specified position, and use an angle ruler to measure the deflection angle of the inclinometer tube;
[0019] S3, installation of the flexible inclinometer and the inclinometer tube: align the X-MARK direction line calibrated by the factory on the flexible inclinometer with the guide groove of the main deformation direction to be monitored in the inclinometer tube, and put the flexible inclinometer (5) into the inclinometer tube (7) in sequence along the direction of the guide groove. During the lowering process, check whether the direction of each section of the flexible inclinometer is consistent. After lowering into place, it is necessary to keep the power on to collect data to ensure that the flexible inclinometer can be used normally. If there is any problem, it needs to be checked and replaced in time;
[0020] S4, after the pouring of concrete in one bin is completed, the new flexible inclinometer and inclinometer tube are installed; according to the planned installation trend of the monitoring equipment, the supporting steel frame is adjusted to the estimated equipment installation range, and the distance from the inclined tube to the left and right dam sections and the upstream and downstream dam surfaces is measured with a tape measure to assist in determining the position; if the actual installation position is inconsistent with the specified installation position, it is necessary to correct the deviation in the subsequent installation process, and at the same time check whether the flexible inclinometer to be installed can be used normally. If there is any problem, it needs to be checked and replaced in time; finally, the flexible inclinometer is introduced into the inclinometer tube;
[0021] S5. Conduct a detailed investigation of the geological conditions at the dam construction site: including studying the stratigraphic structure, rock type, fault distribution, and groundwater flow; taking into account the influence of topography, understanding and collecting the properties of the materials used for the dam and its foundation, including the inversion calculation of the thermal and mechanical parameters of the materials; analyzing the regional hydrological conditions to assess the impact on the dam;
[0022] S6, based on the data collected in S5, taking into account the specific construction process measures, temperature boundary conditions and water storage process, establish a detailed finite element simulation model of the entire dam section, and conduct feedback simulation analysis and calculation of the entire dam process:
[0023] The measured deformation δ of the dam during the construction period by the flexible inclinometer is composed of the water pressure after water storage and the surface load deformation component δ of the silt pressure. HW , deformation component δ caused by periodic temperature changes TW and the time-dependent deformation component δ TD Composition, namely:
[0024] Formula 1: δ=δ HW +δ TW +δ TD ;
[0025] Water pressure and silt pressure surface load deformation component δ HW Expressed as a quartic polynomial in hydraulic head:
[0026] Formula 2:
[0027] Among them, a Hi is the regression coefficient of the surface load component of water pressure and silt pressure, H is the water head; i is 1, 2, 3, 4;
[0028] Deformation component δ caused by periodic changes in temperature TW Take a periodic function:
[0029] Formula 3:
[0030] Where t is the cumulative number of days from the displacement observation day to the start monitoring day; b T1i and b T2i All are regression coefficients of temperature component;
[0031] Time-dependent deformation component δ TD Using an exponential function:
[0032] Formula 4:
[0033] Where t is the cumulative number of days from the displacement observation day to the start monitoring day; c1 and c2 are the regression coefficients of the time-dependent deformation component;
[0034] In summary, the regression formula of the measured deformation δ is:
[0035] Formula 5:
[0036] S7, thermal parameter inversion based on the numerical model of S6:
[0037] By performing statistical regression on the deformation monitoring data, the deformation component δ caused by periodic changes in temperature is separated. TW ;
[0038] The numerical model based on S6 only considers the influence of temperature load to perform simulation calculation and obtain the calculated value;
[0039] Compare the calculated value with the calculated value obtained in S7, and continuously adjust the model and thermodynamic parameters in S6 until the calculated value of each inclinometer buried position is consistent with the measured value δ TW The results are quite consistent, thus obtaining the accurate thermodynamic parameters of the model;
[0040] Thermodynamic parameters specifically refer to the linear expansion coefficient, thermal conductivity and specific heat of concrete.
[0041] S8, inversion of mechanical parameters based on S6 and S7:
[0042] The finite element mesh material properties are assigned according to the inverse values of the elastic modulus and creep properties of concrete and bedrock obtained from indoor tests. At this time, the temperature load, material deadweight and creep effect are considered for simulation calculation, and the material mechanical parameters are continuously adjusted until the calculated value of each measuring point is consistent with the measured deformation δ, so as to obtain the accurate mechanical parameters of the finite element simulation fine model of the entire dam section. The parameters here refer to the elastic modulus, creep and autogenous volume deformation.
[0043] S9, using mechanical analysis methods based on numerical simulation to predict and analyze dam disasters:
[0044] The deformation field during the construction period is reconstructed according to the parameters of S7 and S8, and the stress field during the entire construction period is calculated, with attention paid to the changes in tensile stress in the inverted parts of the arch dam and the strong constraint parts. If the stress distribution changes significantly and exceeds the design or monitoring limit, the system will issue an early warning.
[0045] The acquisition system is a data collector, and the data post-processing system is a cloud server.
[0046] The terrain effects in S5 include the shape and slope of the valley.
[0047] The specific construction process measures in S6 include construction pouring layer thickness, pouring temperature, intermittent time, warehouse surface protection and water pipe cooling.
[0048] The distance between the S1 middle warehouse surface and the steel frame should be 0.5m to 1m.
[0049] The height of the supporting steel frame in S1 is 3.5m to 4.0m.
[0050] The diameter of the vertical main reinforcement of the supporting steel frame is 35mm national standard steel bar, and the diameter of the transverse reinforcement is greater than 20mm national standard steel bar.
[0051] The allowable range of the distance difference between the supporting steel frame and each bin template in S2 is 20cm; the allowable range of the distance difference between the top of the inclinometer tube and each bin template is 10cm; the allowable range of the deflection angle is 2. If it is not met, the position of the inclinometer tube needs to be corrected and adjusted until the requirements are met.
[0052] The splicing interface of the flexible inclinometer in S3 needs to extend 0.5m to 1m outside the inclinometer tube for the next splicing of the flexible inclinometer.
[0053] Compared with the prior art, the present invention has the following beneficial effects:
[0054] The present invention can reconstruct the deformation field of a high arch dam during construction and the forecast and early warning method can measure the deformation of the dam body during the construction period of a high concrete arch dam, analyze the deformation field and stress field during the construction period to predict the stress of the dam, and can also compare with the standard design value to give a disaster early warning, thereby solving the problem that the existing dam deformation observation vertical line method lacks measurement of self-weight deformation during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0056] Figure 2 This is a schematic diagram of the supporting steel frame structure of the present invention;
[0057] Figure 3It is a schematic diagram of the transmission system layout of the present invention;
[0058] Figure 4 It is a schematic diagram of a fine model of finite element simulation of the whole dam section of the present invention;
[0059] Figure 5 It is the thermal parameter inversion regression curve diagram of the present invention;
[0060] Figure 6 It is the inversion regression curve diagram of the mechanical parameters of the present invention.
[0061] Description of reference numerals:
[0062] 1 is the measurement system, 2 is the transmission system, 3 is the acquisition system, 4 is the data post-processing system, 5 is the flexible inclinometer, 6 is the supporting steel frame, and 7 is the inclinometer tube. DETAILED DESCRIPTION
[0063] The present invention will now be further described with reference to the accompanying drawings.
[0064] See also Figures 1 to 6 The present invention provides a method for reconstruction and forecasting of deformation field during construction of a high arch dam:
[0065] like Figure 1-2 As shown, it includes a measuring system 1, a transmission system 2, a collection system 3 and a data post-processing system 4, the measuring system 1 is a flexible inclinometer 5, the transmission system 2 includes a supporting steel frame 6 and an inclinometer tube 7; the input end of the collection system 3 is connected to the flexible inclinometer 5, and the output end of the collection system 3 is connected to the data post-processing system 4; the supporting steel frame 6 and the inclinometer tube 7 are pre-buried in the dam, and when the starting point of the flexible inclinometer 5 is determined, the supporting steel frame 6 is built to fix the position of the inclinometer tube 7, the flexible inclinometer 5 and the signal line are installed and protected in the inclinometer tube 7, the flexible inclinometer 5 is provided with multiple sections, each section of the flexible inclinometer 5 is fixed with at least two positioning pulleys, and the positioning pulleys are located at both ends of each section of the flexible inclinometer 5 in a cross shape;
[0066] The forecast and warning method includes the following steps:
[0067] S1, support structure construction: determine the starting point of the flexible inclinometer 5 and build a support steel frame 6 here to fix the position of the flexible inclinometer 5. After each bin is poured, the support steel frame 6 must be exposed on the bin surface to place the collection system 3 of the flexible inclinometer 5. If the pouring height is higher than the steel frame height, the steel frame exposure requirement cannot be met after the pouring is completed, and the support steel frame 6 needs to be extended by on-site welding before the equipment is installed;
[0068] S2, distance adjustment between the fixed support and the flexible inclinometer 5: Use a tape measure to measure the distance from the top center of the steel frame to the upper, lower, left and right templates of the warehouse to ensure that the flexible inclinometer 5 is located at the specified position, and use an angle ruler to measure the deflection angle of the inclinometer tube 7;
[0069] S3, installation of flexible inclinometer 5 and inclinometer tube 7: align the X-MARK direction line of the flexible inclinometer 5 calibrated after leaving the factory with the guide groove in the main deformation direction to be monitored in the inclinometer tube 7, and put the flexible inclinometer 5 into the inclinometer tube 7 along the direction of the guide groove. During the lowering process, check whether the direction of each section of the flexible inclinometer 5 is consistent. After lowering into place, it is necessary to keep the power on to collect data to ensure that the flexible inclinometer 5 can be used normally. If there is any problem, it needs to be checked and replaced in time. Specifically:
[0070] Before the first section of the flexible inclinometer 5 is lowered to the inclinometer tube 7, check whether the guide groove of the inclinometer tube 7 is consistent with the main deformation direction to be monitored. If it is not consistent with the main deformation direction to be monitored, it is necessary to correct the initial deflection angle on site. The on-site angle measurement can be carried out using the mobile phone compass software or electronic compass, and the deflection angle is recorded to facilitate the angle conversion processing of the collected data to ensure the accuracy of the equipment monitoring direction value.
[0071] The first section of the flexible inclinometer 5 is aligned with the guide groove of the main deformation direction to be monitored in the inclinometer tube 7 according to the X-MARK line direction calibrated after the equipment leaves the factory. The equipment is placed in the inclinometer tube 7 in sequence along the direction of the guide groove. During the lowering process, pay attention to check whether the direction of each section of the equipment is consistent. After being lowered into place, it is necessary to keep the power on to collect data to ensure that the instrument can be used normally. If there is any problem, it needs to be checked and replaced in time. If the equipment collects data normally, fine-tune the inclinometer tube 7 to the specified position, and fix the inclinometer tube 7 and the supporting steel frame 6 with steel bars to reduce the deflection of the inclinometer tube caused by construction pouring. Then, the top of the inclinometer tube 7 is closed with a fixed cover, and waterproof measures are taken. After the installation is completed, the splicing interface of the flexible inclinometer 5 needs to extend 0.5m to 1m outside the inclinometer tube 7 to facilitate the next splicing of the flexible inclinometer 5. The equipment collection box is placed on the top layer of the steel frame, and the box body is waterproof. After the flexible inclinometer 5 and the inclinometer tube 7 are installed and connected, they need to be powered on to collect data to ensure that the instrument can be used normally. If there is any problem, it needs to be checked and replaced in time.
[0072] S4, such as Figure 3 As shown, after the pouring of one warehouse concrete is completed, the newly added flexible inclinometer 5 and inclinometer tube 7 are installed; according to the predetermined monitoring equipment installation trend, the support steel frame 6 is adjusted to the estimated equipment installation range, and the distance from the inclined tube 7 to the left and right dam sections and the upstream and downstream dam surfaces is measured with a tape measure to assist in determining the position; if the actual installation position is inconsistent with the specified installation position, it is necessary to correct the deviation in the subsequent installation process, and at the same time check whether the flexible inclinometer 5 to be installed can be used normally, and if there is a problem, it needs to be checked and replaced in time; finally, the flexible inclinometer 5 is introduced into the inclinometer tube 7;
[0073] S5. Conduct a detailed investigation of the geological conditions at the dam construction site: including studying the stratigraphic structure, rock type, fault distribution, and groundwater flow; taking into account the influence of topography, understanding and collecting the properties of the materials used for the dam and its foundation, including the inversion calculation of the thermal and mechanical parameters of the materials; analyzing the regional hydrological conditions to assess the impact on the dam;
[0074] S6, such as Figure 4 As shown in Figure 1, based on the data collected by S5, taking into account the specific construction process measures, temperature boundary conditions and water storage process, a finite element simulation fine model of the entire dam section is established, and the entire dam process feedback simulation analysis and calculation are carried out. During the construction period, the main factors affecting the deformation of the dam body are water head, temperature, and time (seepage, rock creep), etc.:
[0075] The measured deformation δ of the dam during the construction period by the flexible inclinometer 5 is composed of the water pressure after water storage and the silt pressure surface load deformation component δ HW , deformation component δ caused by periodic temperature changes TW and the time-dependent deformation component δ TD Composition, namely:
[0076] Formula 1: δ=δ HW +δ TW +δ TD ;
[0077] After the reservoir is filled with water, the hydrostatic pressure acting on the surface of the reservoir basin increases, causing deformation of the reservoir basin and the slopes on both sides. HW Expressed as a quartic polynomial in hydraulic head:
[0078] Formula 2:
[0079] Among them, a Hi is the regression coefficient of the surface load component of water pressure and silt pressure, H is the water head; i is 1, 2, 3, 4;
[0080] Temperature changes will affect valley deformation. The deformation component δ TW Take a periodic function:
[0081] Formula 3:
[0082] Where t is the cumulative number of days from the displacement observation day to the start monitoring day; b T1i and b T2i All are regression coefficients of temperature component;
[0083] The time-dependent deformation component δ of the reservoir bank slope caused by factors such as seepage and rheology TD Using an exponential function:
[0084] Formula 4:
[0085] Where t is the cumulative number of days from the displacement observation day to the start monitoring day; c1 and c2 are the regression coefficients of the time-dependent deformation component;
[0086] In summary, the regression formula of the measured deformation δ of the monitoring point during the dam construction period is:
[0087] Formula 5:
[0088] S7, such as Figure 5 As shown, the thermal parameter inversion is performed based on the numerical model of S6:
[0089] By performing statistical regression on the deformation monitoring data, the deformation component δ caused by periodic changes in temperature is separated. TW ;
[0090] The numerical model based on S6 only considers the influence of temperature load to perform simulation calculation and obtain the calculated value;
[0091] Compare the calculated value with the calculated value obtained in S7, and continuously adjust the thermodynamic parameters of the model in S6 until the calculated value at each inclinometer buried position is consistent with the measured value δ TW The results are quite consistent, thus obtaining the accurate thermodynamic parameters of the model;
[0092] The thermodynamic parameters here specifically refer to the linear expansion coefficient, thermal conductivity, and specific heat of concrete;
[0093] S8, such as Figure 6 As shown, the mechanical parameters are inverted based on S6 and S7:
[0094] The finite element mesh material properties are assigned according to the inverse values of the elastic modulus and creep properties of concrete and bedrock obtained from indoor tests. At this time, the temperature load, material deadweight and creep effect are considered for simulation calculation, and the material mechanical parameters are continuously adjusted until the calculated value of each measuring point is consistent with the measured deformation δ, so as to obtain the accurate mechanical parameters of the finite element simulation fine model of the entire dam section. The parameters here refer to the elastic modulus, creep and autogenous volume deformation.
[0095] S9, using mechanical analysis methods based on numerical simulation to predict and analyze dam disasters:
[0096] The deformation field during the construction period is reconstructed according to the parameters of S7 and S8, and the stress field during the entire construction period is calculated, with attention paid to the changes in tensile stress in the inverted parts of the arch dam and the strong constraint parts. If the stress distribution changes significantly and exceeds the design or monitoring limit, the system will issue an early warning.
[0097] The acquisition system 3 is a data collector, and the data post-processing system 4 is a cloud server.
[0098] The terrain effects in S5 include the shape and slope of the valley.
[0099] The specific construction process measures in S6 include construction pouring layer thickness, pouring temperature, intermittent time, warehouse surface protection and water pipe cooling.
[0100] The distance between the S1 middle warehouse surface and the steel frame should be 0.5m to 1m.
[0101] The height of the supporting steel frame (6) built in S1 is 3.5m to 4.0m.
[0102] The diameter of the vertical main reinforcement of the supporting steel frame 6 is a national standard steel bar of 35 mm, and the diameter of the transverse reinforcement is a national standard steel bar greater than 20 mm.
[0103] The allowable range of the distance difference between the supporting steel frame 6 and each warehouse template in S2 is 20 cm; the allowable range of the distance difference between the top end of the inclinometer tube 7 and each warehouse template is 10 cm; the allowable range of the deflection angle is 2. If it is not met, the position of the inclinometer tube 7 needs to be corrected and adjusted until the requirements are met.
[0104] The splicing interface of the flexible inclinometer 5 in S3 needs to extend out of the inclinometer tube 7 by 0.5 m to 1 m for the next splicing of the flexible inclinometer 5 .
[0105] The above are only preferred embodiments of the present invention, which are only used to help understand the method and core idea of the present application. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the idea of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
[0106] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0107] The present invention solves the problem that the technology for monitoring and analyzing the deformation of the dam during the construction period in the prior art cannot grasp the working states of the dam's inverted deformation, lateral tilt deformation, opening and closing of transverse joints and dislocation, and does not comprehensively consider the factors affecting the deformation during the construction period and the limitations of use. By utilizing the characteristics of the flexible inclinometer with high precision and high stability, the displacement data can be measured in real time and the measurement results can be sent to a designated computer. A method for reconstructing the deformation field and predicting and warning the construction period of a high arch dam is designed. The accurate mechanical parameters of the model are obtained through mechanical parameter inversion calculation and simulation analysis calculation, and the dam body disaster is predicted and analyzed based on the mechanical analysis method of numerical simulation, thereby achieving the effect of forecasting and warning, providing guarantee for the safety of the high arch dam during the construction period, and having great practical application value.
Claims
1. A method for reconstruction and forecasting of deformation field during construction of high arch dams. It is characterized in that The invention comprises a measuring system (1), a transmission system (2), a collection system (3) and a data post-processing system (4), wherein the measuring system (1) is a flexible inclinometer (5), and the transmission system (2) comprises a supporting steel frame (6) and an inclinometer tube (7); the input end of the collection system (3) is connected to the flexible inclinometer (5), and the output end of the collection system (3) is connected to the data post-processing system (4); the supporting steel frame (6) and the inclinometer tube (7) are pre-buried in the dam, and when the starting point of the flexible inclinometer (5) is determined, the supporting steel frame (6) is constructed to fix the position of the inclinometer tube (7), and the flexible inclinometer (5) and the signal line are installed and protected in the inclinometer tube (7); the flexible inclinometer (5) is provided with a plurality of sections, and each section of the flexible inclinometer (5) is fixed with at least two positioning pulleys, and the positioning pulleys are located at both ends of each section of the flexible inclinometer (5) in a cross shape; The forecasting and early warning method comprises the following steps: S1, support structure construction: determine the starting point of the flexible inclinometer (5) and build a support steel frame (6) therein to fix the position of the flexible inclinometer (5). After the pouring of each bin is completed, the support steel frame (6) should be exposed on the bin surface for placing the collection system (3) of the flexible inclinometer (5). If the pouring height is higher than the steel frame height, the steel frame exposure requirement cannot be met after the pouring is completed, and the support steel frame (6) needs to be extended by on-site welding before the equipment is installed; S2, distance adjustment between the fixed support and the flexible inclinometer (5): using a tape measure to measure the distance from the center of the steel frame vertex to the upper, lower, left and right templates of the warehouse, ensuring that the flexible inclinometer (5) is located at the specified position, and at the same time using an angle ruler to measure the deflection angle of the inclinometer tube (7); S3, installation of the flexible inclinometer (5) and the inclinometer tube (7): align the X-MARK direction line of the flexible inclinometer (5) calibrated at the factory with the guide groove of the main deformation direction to be monitored in the inclinometer tube (7), and sequentially place the flexible inclinometer (5) into the inclinometer tube (7) along the direction of the guide groove. During the lowering process, check whether the direction of each section of the flexible inclinometer (5) is consistent. After lowering into place, it is necessary to keep the power on to collect data to ensure that the flexible inclinometer (5) can be used normally. If there is any problem, it needs to be checked and replaced in time; S4, after the pouring of concrete in one bin is completed, the flexible inclinometer (5) and the inclinometer tube (7) are newly installed; according to the predetermined monitoring equipment installation trend, the support steel frame (6) is adjusted to the estimated equipment installation range, and the distance from the inclinometer tube (7) to the left and right dam sections and the upstream and downstream dam surfaces is measured with a tape measure to assist in determining the position; if the actual installation position is inconsistent with the specified installation position, it is necessary to correct the deviation in the subsequent installation process, and at the same time check whether the flexible inclinometer (5) to be installed can be used normally, and if there is any problem, it is necessary to check and replace it in time; finally, the flexible inclinometer (5) is introduced into the inclinometer tube (7); S5. Conduct a detailed investigation of the geological conditions at the dam construction site: including studying the stratigraphic structure, rock type, fault distribution, and groundwater flow; taking into account the influence of topography, understanding and collecting the properties of the materials used for the dam and its foundation, including the inversion calculation of the thermal and mechanical parameters of the materials; analyzing the regional hydrological conditions to assess the impact on the dam; S6, based on the data collected in S5, taking into account the specific construction process measures, temperature boundary conditions and water storage process, a finite element simulation fine model of the entire dam section is established, and a full-dam full-process feedback simulation analysis and calculation is performed: the measured deformation δ of the dam during the construction period by the flexible inclinometer (5) is composed of the water pressure after water storage and the silt pressure surface load deformation component δ HW , deformation component δ caused by periodic temperature changes TW and the time-dependent deformation component δ TD Composition, that is: Formula 1: δ=δ HW +δ TW +δ TD ; Water pressure and silt pressure surface load deformation component δ HW Expressed as a quartic polynomial in hydraulic head: Formula 2: Among them, a Hi is the regression coefficient of the surface load component of water pressure and silt pressure, H is the water head; i is 1, 2, 3, 4; Deformation component δ caused by periodic changes in temperature TW Take a periodic function: Formula 3: Where t is the cumulative number of days from the displacement observation day to the start monitoring day; b T1i and b T2i All are regression coefficients of temperature component; Time-dependent deformation component δ TD Using an exponential function: Formula 4: Where t is the cumulative number of days from the displacement observation day to the start monitoring day; c 1 and c 2 is the regression coefficient of the aging deformation component; in summary, the regression formula of the measured deformation δ is: Formula 5: S7, thermal parameter inversion based on the numerical model of S6: By performing statistical regression on the deformation monitoring data, the deformation component δ caused by periodic changes in temperature is separated. TW ; Based on the numerical model of S6, only the influence of temperature load is considered to perform simulation calculation to obtain the calculated value; The calculated value is compared with the calculated value obtained in S7, and the thermodynamic parameters of the model in S6 are continuously adjusted until the calculated value of each inclinometer buried position is consistent with the measured value δ TW The results are quite consistent, thus obtaining the accurate thermodynamic parameters of the model. The thermodynamic parameters here specifically refer to the linear expansion coefficient, thermal conductivity and specific heat of concrete. S8, performing mechanical parameter inversion based on S6 and S7: The finite element mesh material properties are assigned according to the inverse values of the elastic modulus and creep properties of concrete and bedrock obtained from the indoor test. At this time, the temperature load, material deadweight and creep effect are considered for simulation calculation, and the material mechanical parameters are continuously adjusted until the calculated value of each measuring point is consistent with the measured deformation δ, and the accurate mechanical parameters of the finite element simulation fine model of the entire dam section are obtained. The parameters here refer to the elastic modulus, creep and autogenous volume deformation; S9, using mechanical analysis methods based on numerical simulation to predict and analyze dam disasters: The deformation field during the construction period is reconstructed according to the parameters of S7 and S8, and the stress field during the entire construction period is calculated, with attention paid to the changes in tensile stress in the inverted parts of the arch dam and the strong constraint parts. If the stress distribution changes significantly and exceeds the design or monitoring limit, the system will issue an early warning.
2. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The acquisition system (3) is a data collector, and the data post-processing system (4) is a cloud server.
3. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The influence of the terrain in S5 includes the shape and slope of the valley.
4. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The specific construction process measures in S6 include construction pouring layer thickness, pouring temperature, intermittent time, warehouse surface protection and water pipe cooling.
5. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The distance that the S1 middle warehouse surface is exposed from the steel frame is 0.5m to 1m.
6. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The height of the supporting steel frame (6) constructed in S1 is 3.5m to 4.0m.
7. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 6, It is characterized in that The vertical main reinforcement of the support steel frame (6) has a diameter of 35 mm and a diameter of more than 20 mm, which is a national standard reinforcement.
8. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The allowable range of the distance difference between the supporting steel frame (6) and each bin template in S2 is 20 cm; the allowable range of the distance difference between the top end of the inclinometer tube (7) and each bin template is 10 cm; the allowable range of the deflection angle is 2. If it is not satisfied, the position of the inclinometer tube (7) needs to be corrected and adjusted until the requirements are met.
9. The method for reconstruction and forecasting of deformation field during construction of a high arch dam according to claim 1, It is characterized in that The splicing interface of the flexible inclinometer (5) in S3 needs to extend 0.5m to 1m outside the inclinometer tube (7) for the next splicing of the flexible inclinometer (5).
Citation Information
Patent Citations
Deformation monitoring methods and systems for high arch dams during construction
CN114279422B
Positive and inverted vertical pipe butt joint installation positioning device in dam body
CN213180042U
Dam safety intelligent monitoring and pre-warning system based on full life circle and method thereof
CN104678954A
Complex foundation extra-high arch dam overall crack resistance design method
CN110263355A
Method for evaluating long-term safety of arch dam under action of valley width shrinkage deformation
CN112417720A