Device operation status prediction method, electronic device and storage medium

By acquiring and analyzing enterprise operation data, combined with the impact estimation model, the demand and busyness of the equipment are predicted, which solves the problem of inaccurate equipment operating status in the existing technology and achieves more accurate resource scheduling.

CN118313568BActive Publication Date: 2024-10-18江苏中天互联科技有限公司
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410738054.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-18
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

Existing technology cannot accurately determine the operating status of equipment, resulting in improper resource scheduling.

Method used

By obtaining enterprise operation data, including historical orders and promotion information, combined with the pre-trained impact estimation model, we determine the demand trend change value and promotion impact, predict the demand, and calculate the busyness based on the frequency of failure and the length of time to resolve the failure. Finally, the running status is determined based on the busyness level and the baseline busyness indicator.

Benefits of technology

It improves the prediction accuracy of equipment operating status and ensures the scientificity and effectiveness of resource scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118313568B_ABST
    Figure CN118313568B_ABST
Patent Text Reader

Abstract

The present application belongs to the field of artificial intelligence, and provides a method for predicting the operation status of equipment, an electronic device, and a storage medium. The method obtains the operation data of the enterprise, and the operation data includes the historical orders and promotion information of the product; determines the demand trend change value of the product based on the historical orders; determines the promotion influence of the product based on the promotion information and the pre-trained influence estimation model; predicts the demand for the product based on the demand trend change value and the promotion influence; determines the fault frequency and fault clearance time of the operating equipment based on the historical fault information of the operating equipment of the product; calculates the busyness of the operating equipment based on the demand, fault frequency, and fault clearance time; determines the baseline busyness index of the operating equipment based on the allowable fault frequency corresponding to the operating equipment; determines the operating status of the operating equipment based on the busyness and the baseline busyness index. The above method can improve the accuracy of the operating status.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of artificial intelligence technology, and in particular relates to a method for predicting the operating status of a device, an electronic device, and a storage medium. Background Art

[0002] At present, in order to better schedule equipment resources, the prediction of the equipment's operating status is very important. In the current prediction scheme, the equipment's operating status is usually determined directly based on existing orders. However, this method is limited by existing orders, resulting in an inability to accurately determine the equipment's operating status. Summary of the invention

[0003] The present application provides a device operating status prediction method, an electronic device and a storage medium to solve the technical problem that the operating status of a device cannot be accurately determined.

[0004] A first aspect of an embodiment of the present application provides a method for predicting the operating status of an equipment, the method comprising: acquiring the operating data of an enterprise, the operating data comprising historical orders and promotion information of a product; determining a demand trend change value of the product based on the historical orders; determining the promotion influence of the product based on the promotion information and a pre-trained influence prediction model; predicting the demand for the product based on the demand trend change value and the promotion influence; determining the fault frequency and fault clearing time of the operating equipment based on historical fault information of the operating equipment of the product; calculating the busyness of the operating equipment based on the demand, the fault frequency and the fault clearing time; determining a baseline busy index of the operating equipment based on the allowable fault frequency corresponding to the operating equipment; and determining the operating status of the operating equipment based on the busyness and the baseline busy index.

[0005] According to an embodiment of the present application, determining the demand trend change value of the product based on the historical orders includes: determining the order quantity of the historical orders and the order time of the historical orders; determining the target ratio corresponding to the order quantity based on a preset mapping table; the preset mapping table includes multiple preset ratios and quantity intervals corresponding to each preset ratio; determining the number of windows based on the order quantity and the target ratio; dividing the order time based on the number of windows to obtain multiple time windows; based on the historical orders, determining the total amount of the product shipped out of the warehouse in each of the time windows as a feature value; sorting the multiple feature values ​​according to the time sequence of each time window to obtain a feature queue; calculating the feature change value of any two adjacent feature values ​​in the feature queue; and determining the demand trend change value based on the multiple feature change values.

[0006] According to an embodiment of the present application, determining the demand trend change value based on multiple feature change values ​​includes: determining the average change value of the multiple feature change values, and determining the standard deviation of the multiple feature change values; determining the change value interval based on the average change value and the standard deviation; counting the number of feature change values ​​within the change value interval as a first number, and counting the total number of the multiple feature change values ​​as a second number; if the ratio of the first number to the second number is greater than or equal to a preset threshold, determining the average change value as the demand trend change value; if the ratio is less than the preset threshold, determining the demand trend change value based on the feature change value corresponding to the last feature change value sorted in the feature queue, the feature change value corresponding to the first feature change value sorted in the feature queue, and the second number.

[0007] According to an embodiment of the present application, predicting the demand for the product based on the demand trend change value and the promotion influence includes: determining the time window corresponding to the last feature value sorted in the feature queue as the first window; dividing the state prediction time into windows according to the window length of the first window to obtain a prediction window; determining the time length from the latest time in each of the prediction windows to the latest time in the first window; and calculating the demand for the product in each of the prediction windows according to the ratio of the time length to the window length, the last feature value sorted, the demand trend change value and the promotion influence.

[0008] According to an embodiment of the present application, the calculation of the busyness of the operating equipment based on the demand, the fault frequency and the fault resolution time includes: determining the predicted fault time of the operating equipment based on the fault frequency and the historical fault time of the operating equipment; determining the prediction window in which the predicted fault time is located as the second window; for the second window, determining the processable time of the second window based on the window length of the second window and the fault resolution time; determining the target processing speed of the operating equipment for the product based on the demand corresponding to the second window and the processable time; and determining the busyness based on the target processing speed and the benchmark processing speed of the product.

[0009] According to an embodiment of the present application, before determining the promotional influence of the product based on the promotional information and the pre-trained influence estimation model, the method also includes: obtaining promotional training information and the annotated influence of the promotional training information and the annotated category of the annotated influence; obtaining a neural network structure, the neural network structure including a preset classification layer and a preset prediction layer; predicting the promotional training information based on the neural network structure to obtain an output result, the output result including the predicted influence and the influence category of the predicted influence; if the influence category is the same as the annotated category, determining the neural network structure according to the predicted influence and the annotated influence The network structure calculates the loss value of the publicity training information; if the influence category is different from the labeled category, the loss value is determined as a preset value; the number of loss values ​​greater than the preset loss threshold is counted as a third number, and the number of multiple loss values ​​is counted as a fourth number; if the proportion of the third number in the fourth number is less than or equal to the first preset proportion, the number of loss values ​​equal to the preset value is counted as a fifth number; if the proportion of the fifth number in the fourth number is greater than the second preset proportion, the network parameters of the preset classification layer are adjusted, and the influence estimation model is determined according to the adjusted preset classification layer and the preset prediction layer.

[0010] According to an embodiment of the present application, the influence prediction model includes a coding network layer, a classification network layer and a degree prediction network layer. The determination of the promotion influence of the product based on the promotion information and the pre-trained influence prediction model includes: encoding the promotion information into an information vector based on the coding network layer; classifying the information vector based on the classification network layer to obtain a feedback category of the promotion information; predicting the information vector based on the prediction network layer to obtain the degree of influence; and determining the promotion influence according to the feedback category and the degree of influence.

[0011] According to an embodiment of the present application, determining the operating status of the operating device based on the busy level and the benchmark busy indicator includes: comparing the busy level and the benchmark busy indicator; if the busy level is greater than the benchmark busy indicator, determining that the operating status is a busy state; if the busy level is equal to the benchmark busy indicator, determining that the operating status is a normal state; if the busy level is less than the benchmark busy indicator, determining that the operating status is an idle state.

[0012] According to a second aspect of an embodiment of the present application, there is provided an apparatus for predicting the operation status of an equipment, the apparatus comprising: an acquisition unit for acquiring the operation data of an enterprise, the operation data comprising historical orders and promotion information of a product; a determination unit for determining a demand trend change value of the product based on the historical orders; the determination unit for determining the promotion influence of the product based on the promotion information and a pre-trained influence estimation model; a prediction unit for predicting the demand for the product based on the demand trend change value and the promotion influence; the determination unit for determining the fault frequency and fault clearing time of the operating equipment based on historical fault information of the operating equipment of the product; a calculation unit for calculating the busyness of the operating equipment based on the demand, the fault frequency and the fault clearing time; the determination unit for determining a baseline busyness index of the operating equipment according to an allowable fault frequency corresponding to the operating equipment; the determination unit for determining the operating status of the operating equipment according to the busyness and the baseline busyness index.

[0013] A third aspect of an embodiment of the present application provides an electronic device, comprising: a memory storing computer-readable instructions; and a processor executing the computer-readable instructions stored in the memory to implement the device operating status prediction method.

[0014] A fourth aspect of an embodiment of the present application provides a computer-readable storage medium, in which computer-readable instructions are stored. The computer-readable instructions are executed by a processor in an electronic device to implement the device operating status prediction method.

[0015] In multiple embodiments of the present application, the embodiments of the present application can accurately predict the demand for a product by combining the demand trend change value and the promotion influence, and can estimate the fault frequency and fault resolution time of the operating equipment through the historical fault information of the operating equipment, and then combine the demand, the fault frequency and the fault resolution time to accurately predict the busyness of the operating equipment, and then through the busyness and the benchmark busyness index, the prediction accuracy of the operating status can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of an electronic device of a device operation status prediction method provided in an embodiment of the present application.

[0017] Figure 2 It is a flow chart of the device operating status prediction method provided in an embodiment of the present application.

[0018] Figure 3 It is a functional module diagram of the equipment operation status prediction device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0019] In order to make the objectives, technical solutions and advantages of the present application clearer, the present application is described in detail below with reference to the accompanying drawings and specific embodiments.

[0020] It should be noted that in this application, "at least one" means one or more, and "more than one" means two or more than two. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone, where A and B can be singular or plural. The terms "first", "second", "third", "fourth", etc. (if any) in the specification, claims and drawings of this application are used to distinguish similar objects, rather than to describe a specific order or sequence.

[0021] In the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a concrete way. The following embodiments and features in the embodiments may be combined with each other without conflict.

[0022] like Figure 1 , is a schematic diagram of the structure of an electronic device of a device operation status prediction method provided in an embodiment of the present application.

[0023] In an embodiment of the present application, a device operation status prediction method is applied to one or more electronic devices 1, and the electronic device 1 includes but is not limited to: a memory 12, a processor 13, and computer-readable instructions stored in the memory 12 and executable on the processor 13, such as a device operation status prediction program.

[0024] Those skilled in the art will understand that the schematic diagram is merely an example of the electronic device 1 and does not constitute a limitation on the electronic device 1. The electronic device 1 may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the electronic device 1 may also include input and output devices, network access devices, buses, etc.

[0025] The processor 13 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or a processor or any conventional processor, etc. The processor 13 is the computing core and control center of the electronic device 1, and uses various interfaces and lines to connect various parts of the entire electronic device 1, and execute the operating system of the electronic device 1 and various installed applications, program codes, etc.

[0026] The memory 12 may be an external memory and / or an internal memory of the electronic device 1. Furthermore, the memory 12 may be a physical memory, such as a memory stick, a TF card (Trans-flash Card), and the like.

[0027] Combination Figure 2 The memory 12 in the electronic device 1 stores computer-readable instructions, and the processor 13 can execute the computer-readable instructions stored in the memory 12 to implement the following Figure 2 The multiple processes shown are used to implement the equipment operation status prediction method.

[0028] like Figure 2 , which is a flow chart of a device operation status prediction method provided by an embodiment of the present application. According to different requirements, the order of the steps in the flow chart can be changed, and some steps can be omitted. The device operation status prediction method includes the following steps.

[0029] S201, obtaining the enterprise's operational data.

[0030] In at least one embodiment of the present application, the operation data includes historical orders and promotion information of the product, wherein the product may be a production product of the enterprise or a sales product of the enterprise, and the historical order includes the delivery time and delivery quantity of the product, for example, the historical order includes that the delivery quantity of product A corresponding to 100 pieces at 10 o'clock. The promotion information includes information for promoting the product to potential customers, and specifically, the promotion information may include purchase activity information of the product, for example, the promotion information may include purchase activity information of buy two get one free, etc.

[0031] In at least one embodiment of the present application, the electronic device obtains operation data from a distributed system associated with the enterprise, wherein the distributed system includes systems corresponding to various channels, for example, the distributed system may include a platform system corresponding to a certain store, etc. This embodiment improves the comprehensiveness of the operation data by obtaining the operation data from the distributed system, and improves the accuracy of obtaining the operation data by obtaining the operation data through the distributed system associated with the enterprise.

[0032] S202, determining a demand trend change value of a product based on historical orders.

[0033] In at least one embodiment of the present application, the electronic device determines the demand trend change value of a product based on historical orders, including: determining the order quantity and order time of historical orders, and determining the target ratio corresponding to the order quantity based on a preset mapping table, and determining the number of windows according to the order quantity and the target ratio. The electronic device divides the order time based on the number of windows to obtain multiple time windows, and determines the total shipment of the product in each time window as a feature value based on historical orders. The electronic device sorts the multiple feature values ​​according to the time sequence of each time window to obtain a feature queue, calculates the feature change value of any two adjacent feature values ​​in the feature queue, and determines the demand trend change value according to the multiple feature change values.

[0034] Among them, the order quantity represents the number of historical orders. For example, if there are 100 historical orders, the order quantity is 100, and each historical order records the product shipment quantity. The order time can represent a time period. For example, the order time can represent the generation time of the earliest historical order to the generation time of the latest historical order. For example, the generation time of the earliest historical order is 9 o'clock on October 3, and the generation time of the latest historical order is 19 o'clock on October 3, then the order time can be 9 o'clock on October 3-19 o'clock on October 3. The preset mapping table includes multiple preset ratios and the quantity interval corresponding to each preset ratio. For example, the preset ratio corresponding to the quantity interval [1, 100) is 0.5, the preset ratio corresponding to the quantity interval [100, 200) is 1, and so on. For a historical order with an order quantity of 100, the corresponding target ratio is 1. The window quantity can be the product of the order quantity and the target ratio. The duration of any two time windows can be the same or different. For example, the order time can be from 9:00 on October 3rd to 19:00 on October 3rd. If the number of windows is 7, the duration of the divided time window can be 85 minutes or 86 minutes. Each time window can correspond to one or more historical orders, and any time window may not contain historical orders. The feature change value can be the difference between any two adjacent feature values, and the feature change value can also be the ratio of the difference between any two adjacent feature values ​​to the original feature value. The original feature value can be the feature value corresponding to the minimum time between any two adjacent feature values.

[0035] This embodiment can reasonably determine the number of windows by combining the order quantity and the target ratio, thereby improving the rationality of the division of time windows, and sorting the characteristic values ​​corresponding to each time window according to the time sequence of each time window, which is conducive to accurately determining the characteristic change value, thereby improving the accuracy of the demand trend change value.

[0036] In at least one embodiment of the present application, the electronic device divides the order time based on the number of windows, and obtaining multiple time windows includes: determining the order time of the order time, calculating the ratio of the order time to the number of windows as the window length, and if the window length is an integer, sliding the order time according to the window length to obtain multiple time windows. If the window length is not an integer, the window length is rounded, and the order time is slid according to the rounded window length to obtain multiple time windows. For example, if the window length is 6.67, the order time is 1-20 minutes, and the rounded window length is 7, then the order time is slid according to the rounded window length 7, and the obtained time windows include: 1-7 minutes, 8-14 minutes, and 15-20 minutes.

[0037] In at least one embodiment of the present application, the electronic device determines the demand trend change value according to multiple feature change values, including: the electronic device determines the average change value of the multiple feature change values, determines the standard deviation of the multiple feature change values, and determines the change value interval according to the average change value and the standard deviation. The electronic device counts the number of feature change values ​​in the change value interval as the first number, and counts the total number of multiple feature change values ​​as the second number. If the ratio of the first number to the second number is greater than or equal to the preset threshold, the electronic device determines the average change value as the demand trend change value. If the ratio is less than the preset threshold, the electronic device determines the demand trend change value according to the feature change value corresponding to the last feature in the feature queue, the feature change value corresponding to the first feature in the feature queue, and the second number. The calculation formula of the demand trend change value can be: y=(ab)*n, where y represents the demand trend change value, a represents the feature change value corresponding to the last feature in the order, b represents the feature change value corresponding to the first feature in the order, and n represents the second number.

[0038] The left interval of the change value interval may be the difference between the average change value and the multiple of the standard deviation, and the right interval of the change value interval may be the sum of the average change value and the multiple of the standard deviation. The preset threshold may be determined according to the accuracy requirement of the demand trend change value. The higher the accuracy requirement of the demand trend change value, the larger the preset threshold. For example, the preset threshold may be set to 0.7.

[0039] This embodiment can determine the demand trend change value in different ways through the relationship between the ratio of the first quantity to the second quantity and the preset threshold, thereby improving the accuracy of the demand trend change value.

[0040] S203, determining the promotion influence of the product based on the promotion information and the pre-trained influence estimation model.

[0041] In at least one embodiment of the present application, the impact prediction model includes an encoding network layer, a classification network layer and a degree prediction network layer. The encoding network layer is used to encode text information into vector information, the classification network layer is used to identify whether the text information belongs to positive information or negative information, and the degree prediction network layer is used to identify the degree of influence of the text information.

[0042] In at least one embodiment of the present application, before determining the promotion influence of the product based on the promotion information and the pre-trained influence estimation model, the method further includes: the electronic device obtains the promotion training information and the labeled influence of the promotion training information and the labeled category of the labeled influence, and obtains the neural network structure, the neural network structure including a preset classification layer and a preset prediction layer. The electronic device predicts the promotion training information based on the neural network structure to obtain an output result, and the output result includes the predicted influence and the influence category of the predicted influence. If the influence category is the same as the labeled category, the loss value of the neural network structure for the promotion training information is determined according to the predicted influence and the labeled influence, and the loss value can be the proportion of the absolute value of the difference between the predicted influence and the labeled influence in the labeled influence. If the influence category is different from the labeled category, the loss value is determined as a preset value. The electronic device counts the number of loss values ​​with a value greater than the preset loss threshold as a third number, and counts the number of multiple loss values ​​as a fourth number. If the proportion of the third number in the fourth number is less than or equal to the first preset proportion, the electronic device counts the number of loss values ​​with a value equal to the preset value as a fifth number. If the proportion of the fifth number to the fourth number is greater than the second preset proportion, the electronic device adjusts the network parameters of the preset classification layer, and determines the influence estimation model according to the adjusted preset classification layer and the preset prediction layer.

[0043] Among them, the labeled influence and predicted influence can indicate the degree of influence of the publicity and training information on the user, the labeled category and influence category can indicate whether the publicity and training information belongs to positive information or negative information, the labeled influence and labeled category can be the user's labeled information on the publicity and training information, and the predicted influence and influence category are the information predicted by the neural network structure on the publicity and training information. The preset value can be set to 1. The first preset proportion is greater than the second preset proportion. The preset loss threshold can be determined based on the training accuracy requirement of the influence prediction model, and the preset loss threshold is proportional to the training accuracy requirement. For example, the higher the training accuracy requirement for the influence prediction model, the larger the preset loss threshold.

[0044] This embodiment adopts different methods to determine the loss value according to the relationship between the influence category and the labeled category, so as to improve the accuracy of the loss value, and then by analyzing the third number of loss values ​​that are greater than the preset loss threshold, according to the quantitative relationship between the third number and the fourth number, it is determined to adjust the network parameters of the preset classification layer and / or the preset prediction layer, so as to improve the training efficiency of the influence estimation model.

[0045] In another embodiment, if the proportion of the third number to the fourth number is greater than the first preset proportion, the electronic device adjusts the network parameters of the preset classification layer and the network parameters of the preset prediction layer, and determines the influence estimation model according to the adjusted preset classification layer and the adjusted preset prediction layer. If the proportion of the fifth number to the fourth number is less than or equal to the second preset proportion, the electronic device adjusts the network parameters of the preset prediction layer, and determines the influence estimation model according to the preset classification layer and the adjusted preset prediction layer.

[0046] In at least one embodiment of the present application, the electronic device determines the promotion influence of a product based on the promotion information and a pre-trained influence estimation model, including: the electronic device encodes the promotion information into an information vector based on the encoding network layer, classifies the information vector based on the classification network layer to obtain a feedback category of the promotion information, predicts the information vector based on the prediction network layer to obtain the influence degree, and determines the promotion influence according to the feedback category and the influence degree.

[0047] S204: predicting the demand for the product based on the demand trend change value and the promotion impact.

[0048] In at least one embodiment of the present application, the demand includes the demand of the product in each forecast window.

[0049] In at least one embodiment of the present application, the electronic device predicts the demand of the product based on the demand trend change value and the promotion influence, including: the electronic device determines the time window corresponding to the last feature value in the feature queue as the first window, and divides the state prediction time into windows according to the window length of the first window to obtain the prediction window. The electronic device determines the time length from the latest time in each prediction window to the latest time in the first window, and calculates the demand of the product in each prediction window according to the length ratio of the time length to the window length, the last feature value in the sorting, the demand trend change value and the promotion influence. The calculation formula of the demand can be: Q=L*M*P*(1+K), where Q represents the demand, L represents the length ratio, M represents the last feature value in the sorting, P represents the demand trend change value, and K represents the promotion influence. Among them, the method of obtaining the prediction window is similar to the method of obtaining the time window, and this application will not repeat it.

[0050] This embodiment combines the ratio of the time length to the window length, the last feature value in the sorting, the demand trend change value and the promotion influence, and can accurately calculate the demand for the product in each forecast window.

[0051] S205, determining the fault frequency and fault resolution time of the running equipment based on the historical fault information of the running equipment of the product.

[0052] In at least one embodiment of the present application, the operating equipment may be a production equipment for a product, such as a wire drawing machine, an extruder, or an automatic vending machine or other daily necessities equipment. The historical fault information indicates relevant information about the faults that occurred in the operating equipment at historical moments. For example, the historical fault information includes the type of fault that occurred in the operating equipment, the time when the fault occurred, and the time required to repair the fault. The frequency of fault occurrence may be determined based on the average value of the difference in fault time between any two fault types of the same type. For example, the difference in fault time between any two fault types of the same type includes 11 days, 12 days, and 13 days. The frequency of fault occurrence corresponding to the fault type may be (11+12+13) / 3=12 days / time. The frequency of fault occurrence may also be determined based on the average value of the difference in fault time between any two fault types. For example, 13 days after the operating equipment has a fault type A, the operating equipment has a fault type B. 15 days after the operating equipment has a fault type B, the operating equipment has a fault type A. The frequency of fault occurrence may be (13+15) / 2=14 days / time. The fault resolution time indicates the time required to repair the fault. If the fault frequency is the average of the difference between any two fault times of the same fault type, the fault resolution time is the average of the repair time of the corresponding fault type. If the fault frequency is the average of the difference between any two fault times of the same fault type, the fault resolution time is the average of the repair time of all faults.

[0053] S206, calculating the busyness of the operating equipment based on the demand, the frequency of fault occurrence and the duration of fault resolution.

[0054] In at least one embodiment of the present application, the busyness level is used to indicate the degree to which the operating device is in a busy state.

[0055] In at least one embodiment of the present application, the electronic device calculates the busyness of the running device based on the demand, the frequency of fault occurrence, and the duration of fault resolution, including: the electronic device determines the predicted fault time of the running device based on the frequency of fault occurrence and the historical fault time of the running device, and determines the prediction window in which the predicted fault time is located as the second window. For the second window, the electronic device determines the processable duration of the second window according to the window length of the second window and the duration of fault resolution, determines the target processing speed of the running device for the product according to the demand and the processable duration corresponding to the second window, and determines the busyness according to the target processing speed and the benchmark processing speed of the product.

[0056] Among them, the predicted fault time can be determined based on the fault frequency and the latest fault time in the historical fault time. For example, if the fault frequency is 10 days / time, and the latest fault time in the historical fault time is 3 o'clock on October 7, then the predicted fault time can be 3 o'clock on October 17. The processable time can be determined based on the difference between the window length of the second window and the fault relief time. The target processing speed can be determined based on the ratio of the demand corresponding to the second window to the processable time. The busyness can be determined based on the ratio of the target processing speed to the benchmark processing speed.

[0057] This embodiment can accurately determine the processable time by combining the window length and the fault clearance time, thereby determining the target processing speed based on the demand and the processable time, and improving the accuracy of determining the busyness according to the target processing speed and the benchmark processing speed of the product.

[0058] In another embodiment, for prediction windows other than the second window, the window lengths of the prediction windows are used as processable durations.

[0059] S207: Determine a baseline busy index of the operating device according to the tolerable failure frequency corresponding to the operating device.

[0060] In at least one embodiment of the present application, the baseline busy index is positively correlated with the tolerable failure frequency.

[0061] S208, determining the operating status of the operating device according to the busyness and the benchmark busyness index.

[0062] In at least one embodiment of the present application, the operating state may include a busy state, a normal state, an idle state, and the like.

[0063] In at least one embodiment of the present application, the electronic device determines the operating state of the operating device according to the busyness and the benchmark busy index, including: comparing the busyness and the benchmark busy index, if the busyness is greater than the benchmark busy index, determining the operating state to be a busy state. If the busyness is equal to the benchmark busy index, determining the operating state to be a normal state. If the busyness is less than the benchmark busy index, determining the operating state to be an idle state.

[0064] This embodiment can accurately determine the running status by comparing the busyness with the benchmark busyness index.

[0065] In multiple embodiments of the present application, the embodiments of the present application can accurately predict the demand for a product by combining the demand trend change value and the promotion influence, and can estimate the fault frequency and fault resolution time of the operating equipment through the historical fault information of the operating equipment, and then combine the demand, fault frequency and fault resolution time to accurately predict the busyness of the operating equipment, and then through the busyness and benchmark busyness indicators, the prediction accuracy of the operating status can be improved.

[0066] like Figure 3 , which is a functional module diagram of the device operation status prediction device provided in an embodiment of the present application. The device operation status prediction device 11 includes an acquisition unit 110, a determination unit 111, a prediction unit 112, a calculation unit 113 and a statistics unit 114. The module / unit referred to in the present application refers to a series of computer-readable instruction segments that can be acquired by the processor 13 and can perform fixed functions, which are stored in the memory 12.

[0067] In one embodiment, an acquisition unit 110 is used to acquire the operation data of an enterprise, and the operation data includes historical orders and promotion information of a product; a determination unit 111 is used to determine a demand trend change value of a product based on historical orders; the determination unit 111 is also used to determine the promotion influence of a product based on promotion information and a pre-trained influence estimation model; a prediction unit 112 is used to predict the demand for a product based on the demand trend change value and the promotion influence; the determination unit 111 is also used to determine the fault frequency and fault clearing time of the operating equipment based on historical fault information of the operating equipment of the product; a calculation unit 113 is used to calculate the busyness of the operating equipment based on the demand, fault frequency and fault clearing time; the determination unit 111 is also used to determine a baseline busyness index of the operating equipment according to the allowable fault frequency corresponding to the operating equipment; the determination unit 111 is also used to determine the operating status of the operating equipment according to the busyness and the baseline busyness index.

[0068] In one embodiment, the determination unit 111 is specifically used to: determine the order quantity and order time of historical orders; determine the target ratio corresponding to the order quantity based on a preset mapping table; the preset mapping table includes multiple preset ratios and quantity intervals corresponding to each preset ratio; determine the number of windows according to the order quantity and the target ratio; divide the order time based on the number of windows to obtain multiple time windows; based on historical orders, determine the total amount of products shipped out in each time window as a feature value; sort multiple feature values ​​according to the time sequence of each time window to obtain a feature queue; calculate the feature change value of any two adjacent feature values ​​in the feature queue; determine the demand trend change value based on multiple feature change values.

[0069] In one embodiment, the determination unit 111 is further specifically used to: determine the average change value of multiple feature change values, and determine the standard deviation of the multiple feature change values; determine the change value interval based on the average change value and the standard deviation; count the number of feature change values ​​within the change value interval as the first number, and count the total number of multiple feature change values ​​as the second number; if the ratio of the first number to the second number is greater than or equal to a preset threshold, determine the average change value as the demand trend change value; if the ratio is less than the preset threshold, determine the demand trend change value based on the feature change value corresponding to the last feature in the feature queue, the feature change value corresponding to the first feature in the feature queue, and the second number.

[0070] In one embodiment, the prediction unit 112 is specifically used to: determine the time window corresponding to the last feature value sorted in the feature queue as the first window; divide the state prediction time into windows according to the window length of the first window to obtain the prediction window; determine the time length from the latest time in each prediction window to the latest time in the first window; calculate the demand for the product in each prediction window according to the ratio of the time length to the window length, the last feature value sorted, the demand trend change value and the promotion influence.

[0071] In one embodiment, the calculation unit 113 is specifically used to: determine the predicted failure time of the operating equipment based on the failure frequency and the historical failure time of the operating equipment; determine the prediction window in which the predicted failure time is located as the second window; for the second window, determine the processable time of the second window according to the window length of the second window and the failure relief time; determine the target processing speed of the operating equipment for the product according to the demand corresponding to the second window and the processable time; determine the busyness according to the target processing speed and the benchmark processing speed of the product.

[0072] In one embodiment, before determining the promotional influence of a product based on the promotional information and the pre-trained influence prediction model, the acquisition unit 110 is further used to obtain the promotional training information and the annotated influence of the promotional training information and the annotated category of the annotated influence; the acquisition unit 110 is further used to obtain a neural network structure, the neural network structure includes a preset classification layer and a preset prediction layer; the prediction unit 112 is further used to predict the promotional training information based on the neural network structure to obtain an output result, the output result includes a predicted influence and an influence category of the predicted influence; the determination unit 111 is further used to determine the neural network structure for the promotional training information according to the predicted influence and the annotated influence if the influence category is the same as the annotated category. The loss value of the training information; the determination unit 111 is also used to determine the loss value as a preset value if the influence category is different from the labeled category; the statistical unit 114 is used to count the number of loss values ​​that are greater than a preset loss threshold as a third number, and to count the number of multiple loss values ​​as a fourth number; the statistical unit 114 is also used to count the number of loss values ​​that are equal to the preset value as a fifth number if the proportion of the third number to the fourth number is less than or equal to the first preset proportion; the determination unit 111 is also used to adjust the network parameters of the preset classification layer if the proportion of the fifth number to the fourth number is greater than the second preset proportion, and determine the influence estimation model according to the adjusted preset classification layer and the preset prediction layer.

[0073] In one embodiment, the impact estimation model includes a coding network layer, a classification network layer and a degree prediction network layer, and the determination unit 111 is specifically used to: encode the promotion information into an information vector based on the coding network layer; classify the information vector based on the classification network layer to obtain the feedback category of the promotion information; predict the information vector based on the prediction network layer to obtain the degree of influence; determine the promotion impact according to the feedback category and the degree of influence.

[0074] In one embodiment, the determination unit 111 is specifically used to: compare the busyness and the benchmark busy index; if the busyness is greater than the benchmark busy index, determine that the running state is a busy state; if the busyness is equal to the benchmark busy index, determine that the running state is a normal state; if the busyness is less than the benchmark busy index, determine that the running state is an idle state.

[0075] In multiple embodiments of the present application, the embodiments of the present application can accurately predict the demand for a product by combining the demand trend change value and the promotion influence, and can estimate the fault frequency and fault resolution time of the operating equipment through the historical fault information of the operating equipment, and then combine the demand, fault frequency and fault resolution time to accurately predict the busyness of the operating equipment, and then through the busyness and benchmark busyness indicators, the prediction accuracy of the operating status can be improved.

[0076] If the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, and can also instruct the relevant hardware to complete through computer-readable instructions. The computer-readable instructions can be stored in a computer-readable storage medium. When the computer-readable instructions are executed by the processor, the steps of each of the above-mentioned method embodiments can be implemented.

[0077] The computer-readable instructions include computer-readable instruction codes, which may be in source code form, object code form, executable files or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying computer-readable instruction codes, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM).

[0078] Specifically, the specific implementation method of the processor 13 for the above-mentioned computer readable instructions can refer to Figure 2 The description of the relevant steps in the corresponding embodiments will not be repeated here.

[0079] In the several embodiments provided in this application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules is only a logical function division, and there may be other division methods in actual implementation.

[0080] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0081] In addition, each functional module in each embodiment of the present application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above integrated unit can be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0082] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present application is limited by the appended claims rather than the above description, so it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present application. Any attached figure mark in the claims should not be regarded as limiting the claims involved.

[0083] In addition, it is clear that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple units or devices can also be implemented by one unit or device through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any particular order.

[0084] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person of ordinary skill in the art should understand that the technical solution of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present application.

Claims

1. A method for predicting equipment operating status, characterized in that: The method comprises: Obtaining the enterprise's operational data, including historical orders and promotion information of products; Determining the demand trend change value of the product based on the historical orders includes: determining the order quantity of the historical orders and the order time of the historical orders; determining the target ratio corresponding to the order quantity based on a preset mapping table; the preset mapping table includes multiple preset ratios and quantity intervals corresponding to each preset ratio; determining the number of windows according to the order quantity and the target ratio; dividing the order time based on the number of windows to obtain multiple time windows; determining the total shipment amount of the product in each time window as a feature value based on the historical orders; sorting the multiple feature values ​​according to the time sequence of each time window to obtain a feature queue; calculating the feature change value of any two adjacent feature values ​​in the feature queue; determining the demand trend change value according to the multiple feature change values; Determine the promotion impact of the product based on the promotion information and a pre-trained impact estimation model; Based on the demand trend change value and the promotion influence, predicting the demand for the product, including: determining the time window corresponding to the last feature value sorted in the feature queue as the first window; dividing the state prediction time into windows according to the window length of the first window to obtain a prediction window; determining the time length from the latest time in each prediction window to the latest time in the first window; calculating the demand for the product in each prediction window according to the ratio of the time length to the window length, the last feature value sorted, the demand trend change value and the promotion influence, the demand calculation formula of the demand is: Q = L*M*P*(1+K), wherein Q represents the demand, L represents the length ratio, M represents the last feature value sorted, P represents the demand trend change value, and K represents the promotion influence; Based on the historical fault information of the operating equipment of the product, determine the fault frequency and fault resolution time of the operating equipment; Based on the demand, the fault occurrence frequency and the fault resolution time, the busyness of the running device is calculated, where the busyness is used to indicate the degree to which the running device is in a busy state; Determining a baseline busy index of the operating device according to an allowable failure frequency corresponding to the operating device; The operating state of the operating device is determined according to the busyness and the benchmark busyness index.

2. The device operation status prediction method according to claim 1, characterized in that: Determining the demand trend change value according to the plurality of characteristic change values ​​comprises: Determining an average change value of the plurality of feature change values, and determining a standard deviation of the plurality of feature change values; Determining a change value interval according to the average change value and the standard deviation; Counting the number of feature change values ​​in the change value interval as a first number, and counting the total amount of the plurality of feature change values ​​as a second number; If the ratio of the first quantity to the second quantity is greater than or equal to a preset threshold, determining the average change value as the demand trend change value; If the ratio is less than the preset threshold, the demand trend change value is determined according to the feature change value corresponding to the last feature in the feature queue, the feature change value corresponding to the first feature in the feature queue and the second quantity.

3. The device operation status prediction method according to claim 1, characterized in that: The calculating the busyness of the operating device based on the demand, the fault occurrence frequency and the fault resolution time includes: Determining a predicted failure time of the operating equipment based on the failure frequency and the historical failure time of the operating equipment; Determine a prediction window in which the predicted failure time is located as a second window; For the second window, determining a processable duration of the second window according to a window length of the second window and the fault removal duration; Determining a target processing speed of the product by the operating device according to the demand corresponding to the second window and the processing time; The busyness is determined according to the target processing speed and a reference processing speed of the product.

4. The device operation status prediction method according to claim 1, characterized in that: Before determining the promotion influence of the product based on the promotion information and the pre-trained influence estimation model, the method further includes: Obtaining publicity and training information, the annotated influence of the publicity and training information, and the annotated category of the annotated influence; Acquire a neural network structure, wherein the neural network structure includes a preset classification layer and a preset prediction layer; Predicting the publicity training information based on the neural network structure to obtain an output result, wherein the output result includes a predicted influence and an influence category of the predicted influence; If the influence category is the same as the marked category, the loss value of the neural network structure for the publicity training information is determined according to the predicted influence and the marked influence; if the influence category is different from the marked category, the loss value is determined as a preset value; Counting the number of loss values ​​greater than a preset loss threshold as a third number, and counting the number of multiple loss values ​​as a fourth number; If the proportion of the third quantity to the fourth quantity is less than or equal to the first preset proportion, the number of loss values ​​equal to the preset value is counted as the fifth quantity; If the proportion of the fifth number to the fourth number is greater than the second preset proportion, the network parameters of the preset classification layer are adjusted, and the influence estimation model is determined according to the adjusted preset classification layer and the preset prediction layer.

5. The device operation status prediction method according to claim 1, characterized in that: The influence estimation model includes a coding network layer, a classification network layer and a degree prediction network layer. The determining of the promotion influence of the product based on the promotion information and the pre-trained influence estimation model includes: encoding the generalized information into an information vector based on the coding network layer; Classifying the information vector based on the classification network layer to obtain a feedback category of the promotion information; Predicting the information vector based on the prediction network layer to obtain an impact degree; The promotion impact is determined according to the feedback category and the impact degree.

6. The device operation status prediction method according to claim 1, characterized in that: The determining the operating state of the operating device according to the busyness and the benchmark busyness index includes: comparing the busyness level with the benchmark busyness indicator; If the busyness is greater than the benchmark busyness index, determining that the running state is a busy state; If the busyness is equal to the benchmark busyness index, determining that the operating state is a normal state; If the busyness is less than the reference busyness indicator, it is determined that the running state is an idle state.

7. An electronic device, characterized in that: include: a memory storing computer-readable instructions; and A processor executes computer-readable instructions stored in the memory to implement the device operating status prediction method according to any one of claims 1 to 6.

8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-readable instructions, and the computer-readable instructions are executed by a processor in an electronic device to implement the device operating status prediction method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Method and device for optimizing marketing strategy based on marketing effect

    CN111160971A

  • Method and device for monitoring production equipment

    CN111813063A

  • Fault prediction method and device based on big data analysis, equipment and storage medium

    CN112465237A

  • Enterprise operation data prediction method and device based on dynamic quantity cost analysis

    CN117853158A