A low voltage area self-healing control system and method
By designing a self-healing control system in the low-voltage station area, using intelligent circuit breakers and serial bus technology to automatically identify the power network topology, locate faults and isolate them, the low-voltage station area can automatically restore power supply due to faults and solve the problem of long power outages. Improved power supply reliability and reduced operation and maintenance costs.
Patent Information
- Application Number
- CN202410420507.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-04-09
AI Technical Summary
When a fault occurs, the power outage in the low-voltage station area lasts too long, and there is no automatic power restoration scheme. It relies on operation and maintenance personnel to restore power manually, resulting in unreliable power supply.
Design a low-voltage platform self-healing control system. Through the self-healing control device, intelligent frame circuit breaker and intelligent molded case circuit breaker, the RS485 serial bus and MODBUS communication protocol are used to realize the collection and processing of electrical telemetry data and switch remote signaling data. , automatically identify the power network topology, locate faults and isolate them, and realize automatic restoration of power supply in non-faulty areas.
The power outage time is shortened to seconds, which improves the reliability of power supply in low-voltage station areas, reduces operation and maintenance costs, and does not increase electrical hardware equipment.
Smart Images

Figure CN118336639B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a low-voltage area self-healing control system and method, belonging to the application technology of power system automatic control. Background Art
[0002] With the development and growth of the economy, the rapid and refined development of industry and the improvement of people's quality of life, new requirements have been put forward for the automation level of the power industry and the reliability of power supply. There are many substations, distribution rooms and low-voltage areas of various voltage levels. While bringing convenience to people's work, production and life, they also put forward higher requirements for the reliability of power supply in transformation, distribution and power consumption. In the comprehensive automation system of the substation, the automatic input device of the backup power supply is mainly used to achieve rapid power restoration. In the distribution automation system, the main distribution line mainly uses the master station centralized control or distributed self-healing protection control to restore power supply. In the power consumption link, especially the key link of the low-voltage area, the low-voltage power supply equipment has no automatic power restoration plan. When a low-voltage line fails and causes a power outage in the non-fault area, it can only rely on the operation and maintenance personnel to manually restore the power supply on site, resulting in a long time for power restoration, generally measured in hours. Summary of the invention
[0003] Purpose of the invention: In order to shorten the power outage time in non-fault areas of an area caused by faults in the power supply and low-voltage area, the present invention provides a low-voltage area self-healing control system and method, which can automatically identify the power network topology, automatically locate and isolate faults, and restore power supply to non-fault areas without adding electrical quantity hardware acquisition equipment in the low-voltage area, thereby shortening the power outage time to seconds, greatly shortening the power outage time, and improving the power supply reliability of the low-voltage area.
[0004] Technical solution: To achieve the above purpose, the technical solution adopted by the present invention is:
[0005] A low-voltage substation self-healing control system includes a self-healing control device, a group of intelligent frame circuit breakers and a group of intelligent molded case circuit breakers. The self-healing control device is connected to the intelligent frame circuit breaker and the intelligent molded case circuit breaker through a multi-channel RS485 serial bus; the self-healing control device serves as a main control device, and the intelligent frame circuit breaker and the intelligent molded case circuit breaker are used to realize data acquisition and switch control of the low-voltage line; the intelligent frame circuit breaker and the intelligent molded case circuit breaker collect electrical telemetry data (voltage, current, etc.) and switch telesignal data (switch opening and closing status, fault tripping signal, etc.) of the line in real time, and the self-healing control device regularly and quickly reads the electrical telemetry data and switch telesignal data of each line through the RS485 serial bus; the self-healing control device completes the automatic identification of the power network topology in the substation through one-key start in the debugging stage, and quickly determines the fault area, isolates the fault point and restores the normal power supply to the non-fault area based on the electrical telemetry data and switch telesignal data of each line when a fault occurs in the power grid, so as to complete the self-healing of the power fault in the substation.
[0006] Generally speaking, the low-voltage substation self-healing control system must have at least 40 RS485 serial buses to meet the access needs of a large number of feeder intelligent molded case circuit breakers on site; in order to improve the real-time performance of self-healing control, the total number of intelligent frame circuit breakers and intelligent molded case circuit breakers connected to each RS485 serial bus shall not exceed 5, and data interaction between self-healing control devices, intelligent frame circuit breakers and intelligent molded case circuit breakers is achieved through the MODBUS communication protocol.
[0007] Preferably, the self-healing control device is installed as a main control device in a self-healing control cabinet, and the self-healing control cabinet is installed in a panel group or on a wall.
[0008] Preferably, the self-healing control device is powered by a dual-circuit AC220V power supply and uses a battery as a backup power supply to ensure normal operation within 10 minutes after AC power failure.
[0009] Preferably, the number of the intelligent frame circuit breakers is three, two of which are respectively installed in two low-voltage power receiving cabinets, and the other is installed in a connecting cabinet; the three intelligent frame circuit breakers are connected to one RS485 serial bus, and no intelligent molded case circuit breaker is installed on the RS485 serial bus; the dual-channel AC220V AC power supply of the self-healing control device is respectively taken from the upper ports of the intelligent frame circuit breakers in the two low-voltage power receiving cabinets, and the output power is normal when any one of the power receiving lines is energized, and the dual-channel AC220V AC power supply can achieve seamless switching to ensure the normal operation of the self-healing control device; the intelligent frame circuit breaker in the connecting cabinet serves as a connecting switch between bus I and bus II.
[0010] Preferably, the self-healing control device is connected to the intelligent fusion terminal via Ethernet, and the electrical telemetry data, switch telesignaling data and substation power fault self-healing process data are uploaded to the distribution master station through the 4G or 5G communication module of the distribution transformer terminal or the intelligent fusion terminal, or sent directly to the mobile phone of the operation and maintenance personnel via SMS to notify them to perform equipment inspection and maintenance.
[0011] A low voltage area self-healing control method, wherein the self-healing control device automatically identifies the power network topology in the area through one-key start during the debugging phase, and comprises the following steps:
[0012] S1: manually configure the communication addresses of the intelligent frame circuit breaker DL1 of the receiving line 1, the intelligent frame circuit breaker DL3 of the receiving line 2, and the intelligent frame circuit breaker DL2 as the tie switch between the busbars I and II on the self-healing control device, so as to identify the three intelligent frame circuit breakers;
[0013] S2: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close;
[0014] S3: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL2 to disconnect;
[0015] S4: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close;
[0016] S5: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers according to the communication address, and verifies that the self-healing control device communicates normally with all intelligent molded case circuit breakers;
[0017] S6: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL3 to disconnect. At this time, the bus I connected to the power receiving line 1 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus I are energized;
[0018] S7: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus I and powered by power receiving line 1. The communication address of the intelligent molded case circuit breaker powered by power receiving line 1 is stored in the topology setting file.
[0019] S8: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL1 to disconnect;
[0020] S9: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close. At this time, the bus II connected to the power receiving line 2 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus II are energized;
[0021] S10: The self-healing control device sends a command to read the electrical telemetry data and the switch telesignaling data to all the intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus II and powered by the receiving line 2. The communication address of the intelligent molded case circuit breaker powered by the receiving line 2 is stored in the topology setting file.
[0022] S11: Verify whether the communication address and number of the intelligent molded case circuit breakers obtained in step S5 are compatible with the communication address and number of the intelligent molded case circuit breakers obtained in steps S7 and S10. If the verification is successful, the topology identification is successful.
[0023] A low voltage area self-healing control method, a self-healing control device regularly reads the electrical telemetry data and switch telesignaling data of all intelligent frame circuit breakers and intelligent molded case circuit breakers, and performs data processing and analysis, determines whether a power grid fault occurs according to the following conditions, and completes the area power fault self-healing:
[0024] Case ①: If the switch position state of any intelligent molded case circuit breaker A connected to bus I changes from closed to open, and the overcurrent fault trip signal of intelligent molded case circuit breaker A is valid, it is determined that the rear-end line of intelligent molded case circuit breaker A has a fault F1; the fault is automatically isolated without other control operations; the topology setting file is queried through the communication address of intelligent molded case circuit breaker A to determine that the feeder on bus I has a fault, and the fault is located;
[0025] Case ②: If the switch position state of any intelligent molded case circuit breaker B connected to bus II changes from closed to open, and the overcurrent fault trip signal of intelligent molded case circuit breaker B is valid, it is determined that the rear-end line of intelligent molded case circuit breaker B has a fault F2; the fault is automatically isolated without other control operations; the topology setting file is queried through the communication address of the intelligent molded case circuit breaker B to determine that the feeder on bus II has a fault, and the fault is located;
[0026] Case ③: If in a stable operation state, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when only the switch position state of the intelligent frame circuit breaker DL1 changes from closed to open, and the overcurrent fault tripping signal of the intelligent frame circuit breaker DL1 is valid, it is determined that the bus I has a fault F3, and the fault is located; the fault is automatically isolated, and no other control operation is required;
[0027] Case ④: If in stable operation, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when only the switch position state of the intelligent frame circuit breaker DL3 changes from closed to open, and the overcurrent fault trip signal of the intelligent frame circuit breaker DL3 is valid, it is determined that the bus II has a fault F4, and the fault is located; the fault is automatically isolated, and no other control operation is required;
[0028] Case ⑤: If in stable operation, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when the intelligent frame circuit breaker DL1 and the intelligent molded case circuit breakers of all feeders on bus I have communication abnormalities, it is determined that the power supply P1 has a fault F5. At this time, the intelligent frame circuit breaker DL1 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL2 to close, and the bus I is powered by the power supply P2, thereby realizing the power supply recovery of all feeders on bus I;
[0029] Case ⑥: If in a stable operating state, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when the intelligent frame circuit breaker DL3 and the intelligent molded case circuit breakers of all feeders on bus II have communication abnormalities, it is determined that the power supply P2 has a fault F6. At this time, the intelligent frame circuit breaker DL3 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL2 to close, and the bus II is powered by the power supply P1, thereby realizing the power supply recovery of all feeders on bus II;
[0030] Case ⑦: If in the stable operation state, the switch position state of the intelligent frame circuit breaker DL1 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltages of the intelligent frame circuit breaker DL1 and the intelligent frame circuit breaker DL3 are all voltage, it is determined that the power supply P1 has returned to normal; the self-healing control device first sends an opening command to control the intelligent frame circuit breaker DL2 to open, and then sends a closing command to control the intelligent frame circuit breaker DL1 to close, and the bus I is restored to be powered by the power supply P1, thereby restoring the normal power supply of all feeders on the bus I;
[0031] Case ⑧: If in the stable operation state, the switch position state of the intelligent frame circuit breaker DL3 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltages of the intelligent frame circuit breakers DL1 and DL3 are all voltage, it is determined that the power source P2 has returned to normal; the self-healing control device first sends an opening command to control the intelligent frame circuit breaker DL2 to disconnect, and then sends a closing command to control the intelligent frame circuit breaker DL3 to close, and the bus II is restored to be powered by the power source P2, thereby restoring the normal power supply of all feeders on the bus II;
[0032] Case ⑨: If in a stable operating state, the switch position state of the intelligent frame circuit breaker DL1 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltage of the intelligent frame circuit breaker DL1 has voltage, and the intelligent frame circuit breaker DL3 and the intelligent molded case circuit breakers of all feeders on bus II have communication abnormalities, it is determined that the power supply P1 has returned to normal and the power supply P2 has failed. At this time, the intelligent frame circuit breaker DL3 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close, and both bus I and bus II are powered by power supply P1, thereby restoring the power supply of all feeders on bus I and bus II;
[0033] Case ⑩: If in the stable operating state, the switch position state of the intelligent frame circuit breaker DL3 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltage of the intelligent frame circuit breaker DL3 has voltage, and the intelligent frame circuit breaker DL1 and the intelligent molded case circuit breakers of all feeders on bus I have communication abnormalities, it is determined that the power supply P2 has returned to normal and the power supply P1 has failed. At this time, the intelligent frame circuit breaker DL1 has tripped due to loss of pressure, realizing fault location and fault isolation; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close, and bus I and bus II are both powered by power supply P2, thereby restoring the power supply to all feeders on bus I and bus II.
[0034] Beneficial effects: The present invention aims at application scenarios in which there are a large number of low-voltage substations, long fault power outage processing time, data islands and other problems that lead to high operation and maintenance costs and low user satisfaction. The system provides a low-voltage substation self-healing control system and method. The system does not add any electrical quantity hardware acquisition equipment to the low-voltage substation. By adding a low-voltage substation self-healing control device, the system adopts a serial communication method with on-site intelligent frame circuit breakers and intelligent molded case circuit breakers to form a substation self-healing control system to realize telemetry and telesignaling data acquisition. It has the functions of automatic identification of power network topology, automatic fault location and isolation, and restoration of power supply to non-fault areas. It shortens the power outage time to seconds, greatly shortens the power outage time, improves the power supply reliability of the low-voltage substation, and saves operation and maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the circuit architecture of the present invention;
[0036] Figure 2 A schematic diagram of the communication architecture of the present invention;
[0037] Figure 3 It is a flow chart of the method for automatically identifying the topology of the power network in the station area of the present invention;
[0038] Figure 4 The present invention is a flow chart of the self-healing method for power failure in an electric substation area. DETAILED DESCRIPTION
[0039] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0040] like Figure 1 The figure shows the circuit architecture diagram of the low-voltage area self-healing control system of the present invention. The low-voltage area equipment in the power distribution room includes the receiving line intelligent frame circuit breaker DL1 and the receiving line intelligent frame circuit breaker DL3, the liaison intelligent frame circuit breaker DL2, several feeder intelligent molded case circuit breakers DL4-DL7, busbar I and busbar II, power supply P1 and power supply P2, distribution transformer T1 and distribution transformer T2; the low-voltage area self-healing control system consists of a self-healing control device ZYU, three intelligent frame circuit breakers DL1-DL3, and several intelligent molded case circuit breakers DL4-DL7.
[0041] like Figure 2 The figure shows a schematic diagram of the communication architecture of the low-voltage substation self-healing control system of the present invention. The self-healing control device ZYU connects the intelligent frame circuit breaker and the intelligent molded case circuit breaker through a multi-channel RS485 serial bus. The self-healing control device ZYU is connected to the intelligent fusion terminal TTU through Ethernet, and the electrical telemetry data, switch telesignaling data and substation power fault self-healing process data are uploaded to the monitoring platform DMS through the 4G or 5G communication module of the intelligent fusion terminal TTU; in order to improve the real-time performance, the total number of intelligent molded case circuit breakers connected to each RS485 serial bus does not exceed 5, and the self-healing control device, the intelligent frame circuit breaker and the intelligent molded case circuit breaker are used to realize data interaction through the MODBUS communication protocol.
[0042] The self-healing control device is installed in the self-healing control cabinet as the main control device. The self-healing control cabinet adopts a panel installation or a wall installation, adopts a dual-channel AC220V AC power supply, and uses a battery as a backup power supply to ensure normal operation within 10 minutes after AC power failure. The dual-channel AC220V AC power supply of the self-healing control device is respectively taken from the upper ports of the intelligent frame circuit breakers in the two low-voltage power receiving cabinets. When any one of the power receiving lines is powered, the output power is normal. The dual-channel AC220V AC power supply can achieve seamless switching to ensure the normal operation of the self-healing control device; the intelligent frame circuit breaker in the contact cabinet serves as a contact switch between bus I and bus II. Generally speaking, the low-voltage substation self-healing control system has at least 40 RS485 serial buses to meet the access of a large number of feeder intelligent molded case circuit breakers on site. The intelligent molded case circuit breaker is installed in the feeder cabinet. The number of intelligent molded case circuit breakers installed in each substation generally ranges from dozens to more than one hundred.
[0043] Intelligent frame circuit breakers and intelligent molded case circuit breakers collect electrical telemetry data (voltage, current, etc.) and switch telemetering data (switch opening and closing status, fault tripping signals, etc.) of the lines in real time. The self-healing control device reads the electrical telemetry data and switch telemetering data of each line through the RS485 serial bus. During the debugging stage, the self-healing control device can automatically identify the power network topology in the substation through one-key start. When a power grid fault occurs, the fault area is quickly determined based on the electrical telemetry data and switch telemetering data of each line, the fault point is isolated, and normal power supply to the non-fault area is restored, completing the self-healing of the power fault in the substation.
[0044] like Figure 3 As shown, the self-healing control device automatically identifies the power network topology in the substation area through one-key startup during the debugging phase, including the following steps:
[0045] S1: manually configure the communication addresses of the intelligent frame circuit breaker DL1 of the receiving line 1, the intelligent frame circuit breaker DL3 of the receiving line 2, and the intelligent frame circuit breaker DL2 as the tie switch between the busbars I and II on the self-healing control device, so as to identify the three intelligent frame circuit breakers;
[0046] S2: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close;
[0047] S3: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL2 to disconnect;
[0048] S4: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close;
[0049] S5: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers according to the communication address, and verifies that the self-healing control device communicates normally with all intelligent molded case circuit breakers;
[0050] S6: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL3 to disconnect. At this time, the bus I connected to the power receiving line 1 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus I are energized;
[0051] S7: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus I and powered by power receiving line 1. The communication address of the intelligent molded case circuit breaker powered by power receiving line 1 is stored in the topology setting file.
[0052] S8: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL1 to disconnect;
[0053] S9: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close. At this time, the bus II connected to the power receiving line 2 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus II are energized;
[0054] S10: The self-healing control device sends a command to read the electrical telemetry data and the switch telesignaling data to all the intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus II and powered by the receiving line 2. The communication address of the intelligent molded case circuit breaker powered by the receiving line 2 is stored in the topology setting file.
[0055] S11: Verify whether the communication address and number of the intelligent molded case circuit breakers obtained in step S5 are compatible with the communication address and number of the intelligent molded case circuit breakers obtained in steps S7 and S10. If the verification is successful, the topology identification is successful.
[0056] like Figure 4 As shown, the self-healing control device regularly reads the electrical telemetry data and switch telesignal data of all intelligent frame circuit breakers and intelligent molded case circuit breakers, and processes and analyzes the data, determines whether a fault occurs in the power grid according to the following conditions, and completes the self-healing of the power fault in the substation area:
[0057] Case ①: If the switch position state of any intelligent molded case circuit breaker A connected to bus I changes from closed to open, and the overcurrent fault trip signal of intelligent molded case circuit breaker A is valid, it is determined that the rear-end line of intelligent molded case circuit breaker A has a fault F1; the fault is automatically isolated without other control operations; the topology setting file is queried through the communication address of intelligent molded case circuit breaker A to determine that the feeder on bus I has a fault, and the fault is located;
[0058] Case ②: If the switch position state of any intelligent molded case circuit breaker B connected to bus II changes from closed to open, and the overcurrent fault trip signal of intelligent molded case circuit breaker B is valid, it is determined that the rear-end line of intelligent molded case circuit breaker B has a fault F2; the fault is automatically isolated without other control operations; the topology setting file is queried through the communication address of the intelligent molded case circuit breaker B to determine that the feeder on bus II has a fault, and the fault is located;
[0059] Case ③: If in a stable operation state, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when only the switch position state of the intelligent frame circuit breaker DL1 changes from closed to open, and the overcurrent fault tripping signal of the intelligent frame circuit breaker DL1 is valid, it is determined that the bus I has a fault F3, and the fault is located; the fault is automatically isolated, and no other control operation is required;
[0060] Case ④: If in stable operation, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when only the switch position state of the intelligent frame circuit breaker DL3 changes from closed to open, and the overcurrent fault trip signal of the intelligent frame circuit breaker DL3 is valid, it is determined that the bus II has a fault F4, and the fault is located; the fault is automatically isolated, and no other control operation is required;
[0061] Case ⑤: If in stable operation, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when the intelligent frame circuit breaker DL1 and the intelligent molded case circuit breakers of all feeders on bus I have communication abnormalities, it is determined that the power supply P1 has a fault F5. At this time, the intelligent frame circuit breaker DL1 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL2 to close, and the bus I is powered by the power supply P2, thereby realizing the power supply recovery of all feeders on bus I;
[0062] Case ⑥: If in a stable operating state, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when the intelligent frame circuit breaker DL3 and the intelligent molded case circuit breakers of all feeders on bus II have communication abnormalities, it is determined that the power supply P2 has a fault F6. At this time, the intelligent frame circuit breaker DL3 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL2 to close, and the bus II is powered by the power supply P1, thereby realizing the power supply recovery of all feeders on bus II;
[0063] Case ⑦: If in the stable operation state, the switch position state of the intelligent frame circuit breaker DL1 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltages of the intelligent frame circuit breaker DL1 and the intelligent frame circuit breaker DL3 are all voltage, it is determined that the power supply P1 has returned to normal; the self-healing control device first sends an opening command to control the intelligent frame circuit breaker DL2 to open, and then sends a closing command to control the intelligent frame circuit breaker DL1 to close, and the bus I is restored to be powered by the power supply P1, thereby restoring the normal power supply of all feeders on the bus I;
[0064] Case ⑧: If in the stable operation state, the switch position state of the intelligent frame circuit breaker DL3 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltages of the intelligent frame circuit breakers DL1 and DL3 are all voltage, it is determined that the power source P2 has returned to normal; the self-healing control device first sends an opening command to control the intelligent frame circuit breaker DL2 to disconnect, and then sends a closing command to control the intelligent frame circuit breaker DL3 to close, and the bus II is restored to be powered by the power source P2, thereby restoring the normal power supply of all feeders on the bus II;
[0065] Case ⑨: If in a stable operating state, the switch position state of the intelligent frame circuit breaker DL1 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltage of the intelligent frame circuit breaker DL1 has voltage, and the intelligent frame circuit breaker DL3 and the intelligent molded case circuit breakers of all feeders on bus II have communication abnormalities, it is determined that the power supply P1 has returned to normal and the power supply P2 has failed. At this time, the intelligent frame circuit breaker DL3 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close, and both bus I and bus II are powered by power supply P1, thereby restoring the power supply of all feeders on bus I and bus II;
[0066] Case ⑩: If in the stable operating state, the switch position state of the intelligent frame circuit breaker DL3 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltage of the intelligent frame circuit breaker DL3 has voltage, and the intelligent frame circuit breaker DL1 and the intelligent molded case circuit breakers of all feeders on bus I have communication abnormalities, it is determined that the power supply P2 has returned to normal and the power supply P1 has failed. At this time, the intelligent frame circuit breaker DL1 has tripped due to loss of pressure, realizing fault location and fault isolation; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close, and bus I and bus II are both powered by power supply P2, thereby restoring the power supply to all feeders on bus I and bus II.
[0067] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the above embodiments do not limit the present invention in any form, and any technical solution obtained by equivalent replacement or equivalent transformation falls within the protection scope of the present invention.
Claims
1. A low voltage area self-healing control system, characterized by: It includes a self-healing control device, a group of intelligent frame circuit breakers and a group of intelligent molded case circuit breakers. The self-healing control device is connected to the intelligent frame circuit breaker and the intelligent molded case circuit breaker through a multi-channel RS485 serial bus. The self-healing control device serves as the main control device, and the intelligent frame circuit breaker and the intelligent molded case circuit breaker are used to realize data acquisition and switch control of the low-voltage line. The intelligent frame circuit breaker and the intelligent molded case circuit breaker collect the electrical telemetry data and switch telesignal data of the line in real time, and the self-healing control device reads the electrical telemetry data and switch telesignal data of each line through the RS485 serial bus. During the debugging stage, the self-healing control device can automatically identify the power network topology in the substation area through one-key start. When a power grid fault occurs, the fault area is quickly determined based on the electrical telemetry data and switch telesignal data of each line, the fault point is isolated, and the normal power supply of the non-fault area is restored, completing the self-healing of the power fault in the substation area. The self-healing control device automatically identifies the power network topology in the substation area through one-key startup during the debugging phase, including the following steps: S1: manually configure the communication addresses of the intelligent frame circuit breaker DL1 of the receiving line 1, the intelligent frame circuit breaker DL3 of the receiving line 2, and the intelligent frame circuit breaker DL2 as the tie switch between the busbars I and II on the self-healing control device, so as to identify the three intelligent frame circuit breakers; S2: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close; S3: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL2 to disconnect; S4: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close; S5: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers according to the communication address, and verifies that the self-healing control device communicates normally with all intelligent molded case circuit breakers; S6: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL3 to disconnect. At this time, the bus I connected to the power receiving line 1 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus I are energized; S7: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus I and powered by power receiving line 1. The communication address of the intelligent molded case circuit breaker powered by power receiving line 1 is stored in the topology setting file. S8: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL1 to disconnect; S9: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close. At this time, the bus II connected to the power receiving line 2 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus II are energized; S10: The self-healing control device sends a command to read the electrical telemetry data and the switch telesignaling data to all the intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus II and powered by the receiving line 2. The communication address of the intelligent molded case circuit breaker powered by the receiving line 2 is stored in the topology setting file. S11: Verify whether the communication address and number of the intelligent molded case circuit breakers obtained in step S5 are compatible with the communication address and number of the intelligent molded case circuit breakers obtained in steps S7 and S10. If the verification is successful, the topology identification is successful.
2. The low voltage area self-healing control system according to claim 1 is characterized in that: The total number of intelligent frame circuit breakers and intelligent molded case circuit breakers connected to each RS485 serial bus shall not exceed 5, and data interaction among the self-healing control device, the intelligent frame circuit breaker and the intelligent molded case circuit breaker is achieved through the MODBUS communication protocol.
3. The low voltage area self-healing control system according to claim 1 is characterized in that: The self-healing control device is used as a main control device and is installed in a self-healing control cabinet. The self-healing control cabinet is installed in a panel group or on a wall.
4. The low voltage area self-healing control system according to claim 1 is characterized in that: The self-healing control device is powered by a dual-circuit AC220V alternating current power supply and uses a battery as a backup power supply.
5. The low voltage area self-healing control system according to claim 1 is characterized in that: There are three intelligent frame circuit breakers, two of which are installed in two low-voltage power receiving cabinets, and the other is installed in a connecting cabinet; the three intelligent frame circuit breakers are connected to one RS485 serial bus, and no intelligent molded case circuit breaker is installed on the RS485 serial bus; the dual-channel AC220V AC power supply of the self-healing control device is taken from the upper ports of the intelligent frame circuit breakers in the two low-voltage power receiving cabinets; the intelligent frame circuit breaker in the connecting cabinet serves as a connecting switch between bus I and bus II.
6. The low voltage area self-healing control system according to claim 1 is characterized by: The self-healing control device is connected to the intelligent fusion terminal via Ethernet, and uploads the electrical telemetry data, switch telesignaling data and the self-healing process data of the substation power fault to the distribution master station through the 4G or 5G communication module of the intelligent fusion terminal.
7. A low voltage area self-healing control method, characterized in that: During the debugging phase, the self-healing control device automatically identifies the power network topology in the substation area through one-key startup, including the following steps: S1: manually configure the communication addresses of the intelligent frame circuit breaker DL1 of the receiving line 1, the intelligent frame circuit breaker DL3 of the receiving line 2, and the intelligent frame circuit breaker DL2 as the tie switch between the busbars I and II on the self-healing control device, so as to identify the three intelligent frame circuit breakers; S2: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close; S3: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL2 to disconnect; S4: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close; S5: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers according to the communication address, and verifies that the self-healing control device communicates normally with all intelligent molded case circuit breakers; S6: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL3 to disconnect. At this time, the bus I connected to the power receiving line 1 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus I are energized; S7: The self-healing control device sends a command to read the electrical telemetry data and switch telesignaling data to all intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus I and powered by power receiving line 1. The communication address of the intelligent molded case circuit breaker powered by power receiving line 1 is stored in the topology setting file. S8: The self-healing control device sends a trip command to control the intelligent frame circuit breaker DL1 to disconnect; S9: The self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close. At this time, the bus II connected to the power receiving line 2 is energized, and the intelligent molded case circuit breakers on all feeders connected to the bus II are energized; S10: The self-healing control device sends a command to read the electrical telemetry data and the switch telesignaling data to all the intelligent molded case circuit breakers. The intelligent molded case circuit breakers with returned data are connected to bus II and powered by the receiving line 2. The communication address of the intelligent molded case circuit breaker powered by the receiving line 2 is stored in the topology setting file. S11: Verify whether the communication address and number of the intelligent molded case circuit breakers obtained in step S5 are compatible with the communication address and number of the intelligent molded case circuit breakers obtained in steps S7 and S10. If the verification is successful, the topology identification is successful.
8. A low voltage area self-healing control method, characterized in that: The self-healing control device regularly reads the electrical telemetry data and switch telesignaling data of all intelligent frame circuit breakers and intelligent molded case circuit breakers, processes and analyzes the data, determines whether a fault has occurred in the power grid according to the following conditions, and completes the self-healing of the power fault in the substation area: Case ①: If the switch position state of any intelligent molded case circuit breaker A connected to the bus I changes from closed to open, and the overcurrent fault trip signal of the intelligent molded case circuit breaker A is valid, it is determined that the rear-end line of the intelligent molded case circuit breaker A has a fault F1; The fault is automatically isolated without other control operations. The topology setting file is queried through the communication address of the intelligent molded case circuit breaker A to determine that the feeder on the bus I is faulty, thus locating the fault. Case ②: If the switch position state of any intelligent molded case circuit breaker B connected to bus II changes from closed to open, and the overcurrent fault trip signal of the intelligent molded case circuit breaker B is valid, it is determined that the rear-end line of the intelligent molded case circuit breaker B has a fault F2; The fault is automatically isolated without other control operations. The topology setting file is queried through the communication address of the intelligent molded case circuit breaker B to determine that the feeder on bus II is faulty, thus locating the fault. Case ③: If in a stable operation state, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when only the switch position state of the intelligent frame circuit breaker DL1 changes from closed to open, and the overcurrent fault tripping signal of the intelligent frame circuit breaker DL1 is valid, it is determined that the bus I has a fault F3, and the fault is located; the fault is automatically isolated, and no other control operation is required; Case ④: If in stable operation, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when only the switch position state of the intelligent frame circuit breaker DL3 changes from closed to open, and the overcurrent fault trip signal of the intelligent frame circuit breaker DL3 is valid, it is determined that the bus II has a fault F4, and the fault is located; the fault is automatically isolated, and no other control operation is required; Case ⑤: If in stable operation, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when the intelligent frame circuit breaker DL1 and the intelligent molded case circuit breakers of all feeders on bus I have communication abnormalities, it is determined that the power supply P1 has a fault F5. At this time, the intelligent frame circuit breaker DL1 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL2 to close, and the bus I is powered by the power supply P2, thereby realizing the power supply recovery of all feeders on bus I; Case ⑥: If in a stable operating state, the switch position states of the intelligent frame circuit breakers DL1 and DL3 are closed, and the switch position state of the intelligent frame circuit breaker DL2 is open; when the intelligent frame circuit breaker DL3 and the intelligent molded case circuit breakers of all feeders on bus II have communication abnormalities, it is determined that the power supply P2 has a fault F6. At this time, the intelligent frame circuit breaker DL3 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL2 to close, and the bus II is powered by the power supply P1, thereby realizing the power supply recovery of all feeders on bus II; Case ⑦: If in the stable operation state, the switch position state of the intelligent frame circuit breaker DL1 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltages of the intelligent frame circuit breaker DL1 and the intelligent frame circuit breaker DL3 are all voltage, it is determined that the power supply P1 has returned to normal; the self-healing control device first sends an opening command to control the intelligent frame circuit breaker DL2 to open, and then sends a closing command to control the intelligent frame circuit breaker DL1 to close, and the bus I is restored to be powered by the power supply P1, thereby restoring the normal power supply of all feeders on the bus I; Case ⑧: If in the stable operation state, the switch position state of the intelligent frame circuit breaker DL3 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltages of the intelligent frame circuit breakers DL1 and DL3 are all voltage, it is determined that the power source P2 has returned to normal; the self-healing control device first sends an opening command to control the intelligent frame circuit breaker DL2 to disconnect, and then sends a closing command to control the intelligent frame circuit breaker DL3 to close, and the bus II is restored to be powered by the power source P2, thereby restoring the normal power supply of all feeders on the bus II; Case ⑨: If in a stable operating state, the switch position state of the intelligent frame circuit breaker DL1 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltage of the intelligent frame circuit breaker DL1 has voltage, and the intelligent frame circuit breaker DL3 and the intelligent molded case circuit breakers of all feeders on bus II have communication abnormalities, it is determined that the power supply P1 has returned to normal and the power supply P2 has failed. At this time, the intelligent frame circuit breaker DL3 has tripped due to loss of pressure, and the fault location and fault isolation are achieved; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL1 to close, and both bus I and bus II are powered by power supply P1, thereby restoring the power supply of all feeders on bus I and bus II; Case ⑩: If in the stable operating state, the switch position state of the intelligent frame circuit breaker DL3 is open, and the switch position state of the intelligent frame circuit breaker DL2 is closed; when the three-phase voltage of the intelligent frame circuit breaker DL3 has voltage, and the intelligent frame circuit breaker DL1 and the intelligent molded case circuit breakers of all feeders on bus I have communication abnormalities, it is determined that the power supply P2 has returned to normal and the power supply P1 has failed. At this time, the intelligent frame circuit breaker DL1 has tripped due to loss of pressure, realizing fault location and fault isolation; the self-healing control device sends a closing command to control the intelligent frame circuit breaker DL3 to close, and bus I and bus II are both powered by power supply P2, thereby restoring the power supply to all feeders on bus I and bus II.