A method for preventing mis-verification of one-button sequential control in substation

Through the automated testing and verification method of the error-proof verification device, the problem of communication verification between the new intelligent error-proof host and the old system is solved, ensuring the correctness of the configuration, reducing the risk of equipment misoperation and system crash, and ensuring the safe and stable operation of the power grid. .

CN118336927BActive Publication Date: 2024-10-18STATE GRID JIANGXI ELECTRIC POWER CO LTD RES INST +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410750119.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-18
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

During the one-click sequence control transformation process of the substation, the communication and error prevention rules between the new intelligent error-proof host and the old system are difficult to fully verify, resulting in configuration errors or omissions, which may lead to equipment misoperation and system crash, affecting the security and stability of the power grid. run.

Method used

Use the error-proof verification device to conduct comprehensive and automated testing and verification. By importing the point table data of the monitoring host and the error-proof host, establish connection and signal verification, set reference permission conditions, conduct combined testing and verification, and verify that the configuration is correct. performance, and correct the configuration based on the error message.

Benefits of technology

Ensure the correctness of the configuration of the new intelligent error-proof host, reduce the risk of misoperation, ensure the safe and stable operation of the power grid, and provide detailed verification reports for later traceability and system optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118336927B_ABST
    Figure CN118336927B_ABST
Patent Text Reader

Abstract

The invention discloses a one-key sequential control error prevention verification method for a substation, comprising the following steps: using an error prevention verification device to import a point table for communication between a monitoring host and an error prevention host, establishing a connection and signal verification, connecting the error prevention verification device with an intelligent error prevention host, sending a test signal to the intelligent error prevention host through the error prevention verification device, observing a response signal prompted by an alarm box of the intelligent error prevention host and a corresponding signal photon sign movement, and verifying whether the sent signal is consistent with the signal responded by the intelligent error prevention host; the invention uses an error prevention verification device to import a point table for communication between a monitoring host and an error prevention host, which can ensure the accuracy and integrity of the point table data, lay a solid foundation for subsequent verification work, connect with the intelligent error prevention host through the error prevention verification device, and verify the consistency of the signal, thereby effectively ensuring the stability and real-time performance of data transmission.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of substations, and in particular to a one-key sequential control error-proof verification method for a substation. Background Art

[0002] With the rapid development of smart grids, substations, as key nodes in the power network, are achieving a qualitative leap in automation and intelligence. The one-button sequential control system, as a core component of substation automation, not only greatly improves operational efficiency, but also plays a vital role in ensuring the safe and stable operation of the power grid. In the architecture of the smart grid, the one-button sequential control system achieves precise control and optimized scheduling of various equipment in the substation through a highly integrated control strategy.

[0003] In the wave of one-button sequential control transformation of substations, the anti-error host in the station is facing the upgrade from the old anti-error system to the advanced intelligent anti-error host. In this process, the traditional anti-error host is often directly retired and replaced by a new anti-error host with more powerful functions and higher intelligence. However, such a replacement is not achieved overnight, and it involves many complex links and challenges. The communication point table between the new intelligent anti-error host and the sequential control host often needs to be completely reconfigured. This is because with the advancement of technology and the upgrade of the system, the communication method and data structure between the new intelligent anti-error host and the old system are often different. In order to ensure that the new system can communicate smoothly with the sequential control host or other background hosts, the point table must be accurately configured and debugged. Since the substation is a key node in the power network, its operating status has an important impact on the safe and stable operation of the power grid. Therefore, when replacing In the process of installing the new intelligent anti-error host, it is necessary to ensure seamless switching between the new system and the old system, while ensuring the stability and reliability of the new system. However, in actual operation, the communication and anti-error rules between the new intelligent anti-error host and the sequential control host or background host are often difficult to be fully verified. This is because the substation, as an operating station, has many devices and complex systems, and needs to operate continuously and stably to meet the needs of the power grid. Therefore, it is difficult to fully verify all functions and rules of the new intelligent anti-error host without affecting the normal operation of the power grid. In this case, if there are errors or omissions in the configuration of the new intelligent anti-error host, it may lead to serious consequences such as equipment misoperation and system crash, which will bring huge risks to the safe and stable operation of the power grid. Therefore, how to comprehensively and effectively verify and test the new intelligent anti-error host during its replacement process has become an urgent problem to be solved in the one-key sequential control transformation of the substation. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a one-key sequential control anti-error verification method for a substation, which aims to ensure the correctness of the configuration of the new intelligent anti-error host through comprehensive and automated testing and verification, and avoid the risks of equipment misoperation and system crash due to configuration errors or omissions.

[0005] To achieve the above object, the present invention provides the following technical solution: a one-key sequential control error prevention verification method for a substation, comprising the following steps:

[0006] S1: Preliminary preparation; use the anti-error verification device to import the point table data required for the communication between the monitoring host and the anti-error host;

[0007] S2: Establish connection and signal verification; connect the anti-error verification device to the intelligent anti-error host, send a test signal to the intelligent anti-error host through the anti-error verification device, observe the response signal prompted by the alarm box of the intelligent anti-error host and the action of the corresponding signal photon card, and verify whether the sent test signal is consistent with the response signal prompted by the alarm box of the intelligent anti-error host;

[0008] S3: Set reference permissible conditions; select the circuit breaker or switch operation that needs to be verified as needed, and set reference permissible conditions for the selected circuit breaker or switch operation that needs to be verified according to the five-defense logic file that has passed the review and verification;

[0009] S4: Perform combined test and verification; the error prevention verification device performs combined test according to the set reference allowable conditions, sends remote control command request to the intelligent error prevention host, simulates the real operation scene, and combines the feedback of the intelligent error prevention host, so that the error prevention verification device automatically verifies the actual allowable conditions of the operation;

[0010] S5: Verify the correctness of the configuration; compare the set reference permission conditions with the actual permission conditions fed back by the intelligent anti-error host. When the reference permission conditions and the actual permission conditions are consistent, it is confirmed that the configuration of the intelligent anti-error host is correct. When there is a difference, an error message is recorded and it is prompted that there is a problem with the configuration of the intelligent anti-error host.

[0011] S6: Subsequent processing: When there is a problem with the intelligent anti-error host configuration, correct the configuration of the intelligent anti-error host according to the error information, and after correction, repeat the above verification process.

[0012] Furthermore, the specific process of S1 is as follows:

[0013] S101, confirm the point table data and configuration information required for the communication between the monitoring host and the anti-error host, and check the integrity and accuracy of the point table data;

[0014] S102, according to the operation manual or guide of the anti-error verification device, start the anti-error verification device, find and select the point table import function on the operation interface of the anti-error verification device, and use the file management system or file import function of the anti-error verification device to connect to the device storing the point table data;

[0015] S103, select the point table data to be imported, and confirm the file path. After confirming that the file is correct, start the point table import. During the import process, monitor the display screen or status indicator of the anti-error verification device to ensure that the import process proceeds smoothly. If an error or abnormality occurs during the import process, stop the import process and check the cause of the error.

[0016] S104. After the point table data is imported, the consistency of the manual start signal of the anti-error verification device is verified by comparing the imported point table data with the configuration information of the monitoring host and the anti-error host (the settings and parameters required for communication between the monitoring host and the anti-error host). If inconsistency or error is found, the error information is recorded and corrected.

[0017] Furthermore, the specific process of S2 is as follows:

[0018] S201, according to the connection guide or manual provided by the anti-error verification device, use a connecting line to physically connect the anti-error verification device to the intelligent anti-error host;

[0019] S202, configuring communication parameters on the anti-error verification device and the intelligent anti-error host respectively, and communicating the anti-error verification device and the intelligent anti-error host;

[0020] S203, select a test signal on the anti-error verification device, configure relevant parameters of the test signal, send the test signal to the intelligent anti-error host, monitor the alarm box or display screen of the intelligent anti-error host, check whether there is a response signal, and at the same time, observe whether the corresponding signal photon card acts as expected;

[0021] S204, verify whether the test signal sent by the error prevention verification device is consistent with the response signal of the intelligent error prevention host, check whether the parameters of the test signal and the response signal match, and whether the timing and logic of the test signal and the response signal are correct;

[0022] S205. When the test signal and response signal are verified, record the success information and continue with the subsequent operation. When the test signal and response signal are verified, record the error information and check whether the connection, communication parameters or the anti-error verification device and the intelligent anti-error host configuration are correct. Adjust or repair as needed and re-verify.

[0023] Furthermore, the specific process of S3 is as follows:

[0024] S301. On the error prevention verification device, select the circuit breaker or switch operation to be verified, consult the five-prevention logic file that has been reviewed and verified, and operate the selected circuit breaker or switch; the five-prevention logic file includes the permissible conditions that need to be met for the circuit breaker or switch operation;

[0025] S302. The permissible conditions to be met involve the status of the equipment; the equipment includes a circuit breaker or a knife switch, other associated equipment, a protective device and auxiliary equipment; wherein the other associated equipment includes an isolating switch and a grounding switch, the protective device includes a relay and an overcurrent protector, and the auxiliary equipment includes an indicator light, a sensor and a control switch;

[0026] S303. In the system of the error-proof verification device, according to the required permissive conditions, a reference permissive condition is set for the selected circuit breaker or switch operation, and it is ensured that the set reference permissive condition is consistent with the required permissive condition;

[0027] S304: After setting the reference permission conditions, use the simulation test function provided by the error-proof verification device to verify whether the set reference permission conditions can prevent erroneous operations that do not meet the reference permission conditions.

[0028] Furthermore, the permissible conditions that need to be met for the operation of circuit breakers or knife switches include: preventing accidental opening or closing of circuit breakers; preventing pulling or closing of disconnectors under load; preventing hanging or closing grounding switches under power; preventing closing circuit breakers or disconnectors with grounding switches on; and preventing accidental entry into live intervals.

[0029] Furthermore, the specific process of S4 is as follows:

[0030] S401, the number of reference permissible conditions is preset to n, and the error-proof verification device generates 2n-th power combination test cases, each combination test case represents a set of specific permissible condition combinations;

[0031] S402, for each combined test case, the error prevention verification device sends a remote control command request to the intelligent error prevention host to simulate the real operation process;

[0032] S403, combining the feedback of the intelligent error prevention host, the error prevention verification device simulates the real operation scenario;

[0033] S404, the error prevention verification device receives the response and feedback of the intelligent error prevention host to each remote control command request and analyzes it to determine whether the intelligent error prevention host responds to the remote control command correctly and whether it follows the preset error prevention logic; the preset error prevention logic includes device status detection, operation sequence verification and five-error prevention logic file verification;

[0034] S405, the error-proof verification device tests the actual permissible condition according to the received feedback and the preset reference permissible condition;

[0035] S406. Record the test results in relevant documents.

[0036] Furthermore, the specific process of S5 is as follows:

[0037] S501, collect all the reference permission conditions set, and obtain the actual permission conditions from the intelligent error prevention host;

[0038] S502, comparing the collected reference permission conditions with the actual permission conditions obtained from the intelligent error prevention host, and judging whether the reference permission conditions are consistent with the actual permission conditions according to the comparison result;

[0039] S503. When the reference permission condition and the actual permission condition are consistent, it is confirmed that the intelligent anti-error host configuration is correct. When there is a difference, the error information is recorded. According to the recorded error information, it is prompted that there is a problem with the intelligent anti-error host configuration, and further inspection and correction are performed. The correction process includes adjusting the configuration settings of the intelligent anti-error host and updating the intelligent anti-error host driver.

[0040] Furthermore, before changing or testing the configuration settings of the intelligent anti-error host, first back up the current configuration settings of the intelligent anti-error host, in addition to recording error information, record the information on the changes to the configuration settings of the intelligent anti-error host, retain documents related to the configuration settings of the intelligent anti-error host, test the intelligent anti-error host after the configuration settings are changed in the actual application environment, monitor the operating status and performance of the intelligent anti-error host after the configuration settings of the intelligent anti-error host are changed, and regularly check and record the key performance indicators of the intelligent anti-error host.

[0041] Furthermore, the specific process of S6 is as follows:

[0042] S601, according to the error information, determine the configuration items that need to be corrected for the intelligent anti-error host, enter the configuration setting interface of the intelligent anti-error host, and correct the corresponding configuration settings;

[0043] S602, after correcting the configuration settings of the intelligent anti-error host, repeat the test process to ensure that the configuration settings of the corrected intelligent anti-error host are consistent with the reference allowable conditions, and that the corrected intelligent anti-error host responds and operates correctly;

[0044] S603, recording the corrected test result. When the test result is successful, the configuration setting of the intelligent anti-error host is correct;

[0045] S604. Write a test report to record the entire test process, test results and measures to correct the configuration settings of the intelligent anti-error host.

[0046] Furthermore, after completing the writing of the verification report, the report will be submitted to the relevant person in charge or team for review and evaluation. After the configuration settings of the intelligent anti-error host are confirmed to be correct, the operating status and performance of the intelligent anti-error host will be continuously monitored through regular inspections, use of monitoring tools or setting alarms. When an abnormal situation or performance degradation is found in the intelligent anti-error host, the intelligent anti-error host will be evaluated and action will be taken.

[0047] Compared with the existing technology, the present invention has the following beneficial effects:

[0048] (1) The present invention uses an anti-error verification device to import the point table for communication between the monitoring host and the intelligent anti-error host, which can ensure the accuracy and completeness of the point table data and lay a solid foundation for subsequent verification work. The anti-error verification device is connected to the intelligent anti-error host and verifies the consistency of the signal, which effectively guarantees the stability and real-time performance of data transmission.

[0049] (2) The present invention sets reference permission conditions for operations according to the five-prevention logic file and performs 2n-power combination tests, which can fully simulate real operation scenarios and verify whether the anti-error logic of the intelligent anti-error host is comprehensive and correct. By comparing the reference permission conditions with the actual permission conditions, the present invention can accurately discover problems in the configuration of the new intelligent anti-error host, and ensure the correctness of the configuration by making corrections and repeated verifications, thereby greatly reducing the risk of misoperation.

[0050] (3) The present invention records the entire verification process, results and necessary corrective measures in detail by writing a verification report, which not only facilitates the tracing and resolution of later problems, but also provides an important reference basis for subsequent system optimization and improvement. Overall, this method ensures the stability and reliability of the new intelligent anti-error host through comprehensive and effective verification and testing, thereby ensuring the safe and stable operation of the power grid and reducing the risks caused by equipment misoperation or system collapse. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 The present invention is a flow chart of the method. DETAILED DESCRIPTION

[0052] like Figure 1 As shown, the present invention provides a technical solution: a substation one-key sequential control anti-error verification method, comprising the following steps:

[0053] S1: Preliminary preparation, use the anti-error verification device to import the point table data required for communication between the monitoring host and the anti-error host to ensure the accuracy and completeness of the point table data;

[0054] S101. Confirm the point table data and configuration information required for communication between the monitoring host and the anti-error host, including key data such as status information, control commands, and communication addresses, and check the integrity and accuracy of the point table data to ensure that there are no missing or erroneous data items;

[0055] S102, according to the operation manual or guide of the anti-error verification device, correctly start the anti-error verification device and ensure that the anti-error verification device is in normal working state, find and select the point table import function on the operation interface of the anti-error verification device, use the file management system or file import function of the anti-error verification device to connect to the storage device storing the point table data, such as a USB flash drive, etc.;

[0056] S103, select the point table data to be imported, and confirm the file path. After confirming that the file is correct, start the point table import. During the import process, monitor the display screen or status indicator of the anti-error verification device to ensure that the import process proceeds smoothly. If an error or abnormality occurs during the import process, stop the import process in time and check the cause of the error.

[0057] S104, after the point table data is imported, the consistency of the manual start signal of the anti-error verification device is verified by comparing the imported point table data with the configuration information of the monitoring host and the anti-error host. If inconsistency or error is found, the error information is recorded and correction is prepared;

[0058] Before any operation, always ensure that all equipment is properly turned off and follow all relevant safety regulations and operating manuals. When handling point table data, be particularly careful because these files contain critical data and any errors may cause system problems. When connecting the anti-error verification device and the storage device storing the point table data, such as a USB flash drive, ensure that the storage device storing the point table data has been properly formatted and has no viruses or malware. When importing point table data, ensure that the power supply is stable to avoid data loss or equipment damage caused by power outages. Before importing new point table data, you can back up the original data so that if any problems occur during the import process, you can restore it to the original data. Original state. Before importing the point table data, check whether the format of the file is compatible with the anti-error verification device. If the file format is incorrect, it may need to be converted. Ensure that only authorized personnel can access and modify the point table data by setting password protection, access control list ACL or other security measures. If an error or abnormality occurs during the import process, the anti-error verification device can automatically record the error code and detailed information. This information is crucial for subsequent problem diagnosis and resolution. Regularly check the firmware or software updates of the anti-error verification device and install any available patches or upgrades to ensure that the anti-error verification device is always in the best condition and fix possible security vulnerabilities or errors.

[0059] S2, establish connection and signal verification, connect the anti-error verification device with the intelligent anti-error host, ensure the stability and real-time performance of data transmission, send a test signal to the intelligent anti-error host through the anti-error verification device, observe the response signal and the corresponding signal photon card prompted by the alarm box of the intelligent anti-error host, and verify whether the sent test signal is consistent with the response signal prompted by the alarm box of the intelligent anti-error host;

[0060] S201. According to the connection guide or manual provided by the error prevention verification device, use appropriate connection cables such as network cables, serial cables, etc. to physically connect the error prevention verification device to the intelligent error prevention host, and ensure that the connection is firm and there is no looseness or poor contact.

[0061] S202, respectively configure communication parameters on the anti-error verification device and the intelligent anti-error host, such as IP address, port number, communication protocol, etc., to ensure that both parties can communicate correctly, start the communication connection with the intelligent anti-error host on the anti-error verification device, monitor the connection status indicator or the connection status information on the display screen, and ensure that the connection is successfully established;

[0062] S203, select an appropriate test signal on the error prevention verification device, and configure the relevant parameters of the signal such as the signal opening and closing position, send the test signal to the intelligent error prevention host, monitor the alarm box or display screen of the intelligent error prevention host, check whether there is a response signal, and at the same time, observe whether the corresponding signal photon card performs the expected action such as lighting, extinguishing, flashing, etc.;

[0063] S204, verify whether the test signal sent by the error prevention verification device is consistent with the response signal of the intelligent error prevention host, check whether the parameters of the test signal and the response signal, such as the opening and closing positions, match, and whether the timing and logic of the test signal and the response signal are correct;

[0064] S205. If the test signal and the response signal are verified, record the success information and continue the subsequent operation. If the test signal and the response signal are verified, record the error information and check whether the connection, communication parameters or the anti-error verification device and the intelligent anti-error host configuration are correct. Adjust or repair as needed and re-verify.

[0065] When making physical connections, pay special attention to the type, length and quality of the connection lines, as well as the compatibility of the connection interfaces, and avoid using incompatible or damaged connection lines. When configuring communication parameters, ensure that the parameter settings of the anti-error verification device and the intelligent anti-error host are consistent and meet the requirements of the communication protocol. When sending test signals, select appropriate signal types and parameters to ensure that the response of the intelligent anti-error host can be triggered. When performing signal verification, carefully observe the response of the intelligent anti-error host and compare whether the signal parameters sent and received are consistent. During the signal verification process, detailed log information can be recorded, including the test signals sent, the response signals received, and the time and date of the test signals. Signal, verification results, etc. This information is very helpful for subsequent troubleshooting and fault analysis. During the communication process, security mechanisms such as encryption and authentication can be added to improve the security of communication, which can ensure that data is not illegally accessed or tampered with during transmission. When configuring communication parameters or performing other key operations, you can back up relevant settings and data in advance. If problems or errors occur, you can use the backup to restore and avoid unnecessary losses. In the signal verification stage, different test modes or scenarios can be set to comprehensively test the functions and performance of the intelligent anti-error host, which helps to discover potential problems or defects and repair and optimize them in advance.

[0066] S3. Set reference permissible conditions. Select the circuit breaker or switch operation that needs to be verified as needed. Set reference permissible conditions for the selected circuit breaker or switch operation that needs to be verified according to the five-defense logic file that has passed the review and verification;

[0067] S301. On the error prevention verification device, select the circuit breaker or switch operation to be verified, consult the five-prevention logic file that has been reviewed and verified, and operate the selected circuit breaker or switch; the five-prevention logic file includes the permissible conditions that need to be met for the circuit breaker or switch operation;

[0068] S302. Carefully read and understand the permissible conditions that must be met for the operation of circuit breakers or switch in the five-protection logic file. These permissible conditions may involve the status of the equipment, such as opening and closing. The equipment includes circuit breakers or switch, other associated equipment, protection devices and auxiliary equipment. Among them, other associated equipment includes disconnectors and earthing switches, protection devices include relays and overcurrent protectors, and auxiliary equipment includes indicator lights, sensors and control switches.

[0069] S303. In the system of the error-proof verification device, according to the required permissible conditions, a reference permissible condition is set for the selected circuit breaker or switch operation, and it is ensured that the set reference permissible condition is consistent with the required permissible condition;

[0070] S304. After setting the reference permissible conditions, carefully check and confirm whether all settings are correct, and use the simulation test function provided by the error prevention verification device to verify whether the set reference permissible conditions can effectively prevent erroneous operations that do not meet the reference permissible conditions;

[0071] Ensure that the five-defense logic file is the latest version and has been reviewed to avoid using outdated or erroneous information. When setting reference permission conditions, pay attention to the details of each parameter and logical relationship to ensure full compliance with the requirements of the five-defense logic file. When conducting simulation tests, try to cover all possible operating scenarios and abnormal situations to ensure the integrity of the verification. During the test, ensure that no damage or impact is caused to the actual equipment or system. Record the results of each simulation test, including successful operations and failed operations and their causes, which will help with subsequent troubleshooting and improvement. If problems or unexpected situations are found during the verification process, promptly feedback the problems to the relevant departments or personnel for timely repair and improvement. Regularly update and maintain the five-defense logic files and anti-error verification devices to ensure their accuracy and effectiveness. This includes checking whether new equipment has been added, changes in equipment status, and adjustments to the operating logic. Provide users with operational training and guidance to help them better understand the requirements of the five-defense logic files and how to use the anti-error verification device to improve the accuracy and efficiency of operations.

[0072] The permissible conditions that need to be met for circuit breaker or knife switch operation include: preventing accidental opening or closing of circuit breakers; preventing pulling or closing of disconnectors with load; preventing pulling or closing of grounding switches with power on; preventing closing of circuit breakers or disconnectors with grounding switches on; preventing accidental entry into live intervals. During the simulation test function, the set reference permissible conditions can also be recorded in relevant documents for subsequent reference and audit. If necessary, a report can be written to record the setting process, results and any necessary instructions.

[0073] Prevent the accidental opening and closing of circuit breakers: This requires the operating personnel to operate in strict accordance with the regulations and operation tickets to ensure that the circuit breakers are opened and closed at the correct time and under the correct conditions, and prevent the disconnector from being pulled and closed under load: The disconnector (knife switch) is opened and closed when there is voltage but no current. During the operation, it must be ensured that no load current passes through the disconnector to prevent equipment damage or personal injury, and prevent live and hanging the grounding switch: During the equipment inspection or maintenance, if the equipment is energized, it is prohibited to hang the grounding switch. This requires that before hanging the grounding switch, it must be ensured that the equipment has been powered off, and the corresponding detection means must be used to confirm that the equipment is powerless, and prevent the grounding switch from being carried out, closing the circuit breaker and disconnector: When the equipment grounding switch is in the closed state, it is prohibited to close the circuit breaker or disconnector. This requires that before closing the circuit breaker or disconnector, it must be ensured that the grounding switch has been disconnected to prevent equipment damage or personal injury, and prevent entering the live compartment by mistake: Only when it is confirmed that the compartment is not energized can the door be opened to enter the compartment. This requires that during operation or maintenance, the equipment must be The energized state is strictly inspected and confirmed to prevent personnel from mistakenly entering the energized interval, and to ensure that the set reference allowable conditions are completely consistent with the requirements in the five-defense logic file to avoid any deviation or error. The simulation test should cover all possible operation scenarios and abnormal situations as much as possible to ensure the integrity of the verification. During the test, it must be ensured that no damage or impact is caused to the actual equipment or system. Appropriate safety measures can be taken, such as isolating the test environment, limiting the test scope, etc. The results of each simulation test are recorded, including successful operations and failed operations and their reasons, which will help with subsequent troubleshooting and improvement. If necessary, a report can be written to record the setting process, results and any necessary explanations. The report should record in detail the test process, problems found, solutions taken, and improvement suggestions. If problems or unexpected situations are found during the test, the problems should be promptly fed back to the relevant departments or personnel for timely repair and improvement. At the same time, the five-defense logic file or anti-error verification device can also be optimized and improved as necessary based on the test results.

[0074] S4, perform combined test and verification, the anti-error verification device performs a 2n-power combined test according to the set reference allowable conditions, sends a remote control command request to the intelligent anti-error host, simulates the real operation scenario, and combines the feedback of the intelligent anti-error host. The anti-error verification device automatically verifies the actual allowable conditions of the operation;

[0075] S401, the number of reference permissible conditions is preset to n, and the error-proof verification device generates 2n-th power combination test cases, each combination test case represents a set of specific permissible condition combinations;

[0076] S402. For each combined test case, the error prevention verification device sends a remote control command request to the intelligent error prevention host. These remote control command requests will simulate the actual operation process, including closing and opening actions;

[0077] S403. Combined with the feedback from the intelligent anti-error host, the anti-error verification device will simulate the real operation scenario, which involves operations such as changing the device status, simulating the change of electrical quantity, and triggering protection action;

[0078] S404, the error prevention verification device receives and analyzes the response and feedback of the intelligent error prevention host to each remote control command request, and determines whether the intelligent error prevention host correctly responds to the remote control command and whether it follows the preset error prevention logic; the preset error prevention logic includes device status detection, operation sequence verification and five-error prevention logic file verification;

[0079] S405, the error prevention verification device will test all actual permission conditions of the operation according to the received feedback and the preset reference permission conditions, which will involve analyzing and comparing the results of each test case to verify the correctness and completeness of the error prevention logic;

[0080] S406. Record the test results in relevant documents, including the input conditions, output results, and analysis conclusions of each test case. These records will be used for subsequent analysis and evaluation to identify potential problems and make improvements.

[0081] During the test process, the operating status and performance of the intelligent anti-error host are continuously monitored to ensure that it remains stable and reliable during the test process. If problems or unexpected situations are found during the test process, the problems should be tracked and recorded in a timely manner for subsequent analysis and resolution. According to the test results and problem tracking, relevant documents and materials should be updated in a timely manner to reflect the latest test progress and results. The test process requires collaboration and communication between multiple departments and personnel to ensure the smooth progress of the test and the accuracy of the results. During the entire test process, safety factors should always be considered to ensure that the test process does not cause damage or impact on the actual equipment or system.

[0082] S5. Verify the correctness of the configuration, compare the set reference permission conditions with the actual permission conditions fed back by the intelligent anti-error host, and when the reference permission conditions and the actual permission conditions are consistent, confirm that the configuration of the intelligent anti-error host is correct. When there is a difference, record the error information and prompt that there is a problem with the configuration of the intelligent anti-error host, which needs further inspection and correction;

[0083] S501, collect all reference permission conditions of the settings, which are from equipment specifications, operation manuals, safety regulations or other relevant documents, and obtain actual permission conditions from the intelligent anti-error host, which can be completed by querying the configuration settings of the intelligent anti-error host, reading real-time data or running a specific diagnostic program;

[0084] S502, comparing the collected reference permission conditions with the actual permission conditions obtained from the intelligent error prevention host. This comparison process needs to be careful and accurate to ensure that there are no omissions or misunderstandings. According to the comparison results, it is determined whether the reference permission conditions are consistent with the actual permission conditions.

[0085] S503. When the reference permission condition and the actual permission condition are consistent, it is confirmed that the intelligent anti-error host configuration is correct. When there is a difference, the error information is recorded. According to the recorded error information, it is prompted that there is a problem with the intelligent anti-error host configuration, and further inspection and correction are performed. The correction process includes adjusting the configuration settings of the intelligent anti-error host and updating the intelligent anti-error host driver.

[0086] During the collection and comparison process, ensure the accuracy and completeness of the data. Any errors or omissions may affect the final verification results. If problems are found or further information is needed during the comparison process, communicate with the relevant personnel or departments in a timely manner to ensure that the problems can be solved in a timely manner. During the entire verification process, record each step and result in detail. This will not only help with subsequent problem troubleshooting and correction, but also serve as a basis for auditing and evaluation. After correcting the problem, repeat the verification to ensure that the problem has been resolved. This can be done by re-executing the steps in S5. If the problem involves technical operations or configuration adjustments, provide necessary training and guidance to relevant personnel to ensure that they can correctly understand and implement corrective measures. During the entire verification process, always consider safety factors to ensure that no damage or impact is caused to the actual equipment or system. If actual operations or tests are required, relevant safety specifications and operating guidelines should be followed.

[0087] Before making any changes or verifications to the configuration settings of the smart anti-error host, back up the current configuration settings of the smart anti-error host first. This can quickly restore to the previous state when a problem occurs. In addition to recording error information, detailed information on all changes to the configuration settings of the smart anti-error host should also be recorded, including the time of change, the person who changed it, the content of the change, and the reason for the change. All documents related to the configuration of the smart anti-error host, such as equipment specifications, operating manuals, safety regulations, etc., should be retained. The smart anti-error host with modified configuration settings should be tested in the actual application environment to ensure its effectiveness in actual operation. The test can use simulated fault tests to verify the response and processing capabilities of the smart anti-error host under abnormal conditions. After the configuration settings are changed, the operating status and performance of the smart anti-error host should be continuously monitored to ensure its stability and reliability. The key performance indicators of the smart anti-error host should be regularly checked and recorded to promptly identify potential problems and deal with them.

[0088] The configuration setting change and verification process requires collaboration and communication between multiple departments and personnel to ensure the accuracy and consistency of information. Security factors should always be considered throughout the process to ensure that new security risks are not introduced due to configuration changes. The configuration and performance of the intelligent anti-error host should be audited regularly to ensure that it continues to meet business needs and security requirements. Necessary training and support should be provided to relevant personnel to ensure that they can understand the new configuration and perform related operations correctly.

[0089] S6. Subsequent processing: When there is a problem with the configuration of the intelligent anti-error host, correct the configuration of the intelligent anti-error host according to the error information. After correction, repeat the above verification process to ensure that the configuration of the intelligent anti-error host is correct. Write a verification report to record the verification process, results and any necessary corrective measures.

[0090] S601, according to the error information, determine the configuration items that need to be corrected for the intelligent anti-error host, enter the configuration setting interface of the intelligent anti-error host, and correct the corresponding configuration settings, which may involve changing parameter values, adjusting logical relationships, updating drivers or software versions, etc.;

[0091] S602, after the configuration settings of the intelligent anti-error host are corrected, repeat the previous test process, including collecting reference permission conditions, obtaining actual permission conditions from the intelligent anti-error host, comparing the two, and analyzing the comparison results, to ensure that the configuration settings of the corrected intelligent anti-error host are consistent with the reference permission conditions, and that the corrected intelligent anti-error host can respond and operate correctly;

[0092] S603, record the corrected test results, including which configuration settings were corrected, what the actual allowed conditions were after the correction, whether new problems were found during the verification process, etc. If the verification is successful, it means that the corrective measures are effective and the configuration settings of the intelligent anti-error host are correct;

[0093] S604. Write a detailed verification report to record the entire verification process, test results and any necessary measures to correct the configuration settings of the intelligent anti-error host. The report should include the following: the purpose and steps of the verification, the tools and methods used, the comparison results of the reference allowable conditions and the actual allowable conditions, the problems found and the corrective measures, the corrected verification results, etc. The report should be clear and accurate to facilitate the understanding and reference of relevant personnel.

[0094] During the test process, the operating status and performance of the intelligent anti-error host are continuously monitored to ensure that it remains stable and reliable during the test process. If problems or unexpected situations are found during the test process, the problems should be tracked and recorded in a timely manner for subsequent analysis and resolution. According to the test results and problem tracking, relevant documents and materials should be updated in a timely manner to reflect the latest test progress and results. The test process requires collaboration and communication between multiple departments and personnel to ensure the smooth progress of the test and the accuracy of the results. During the entire test process, safety factors should always be considered to ensure that the test process does not cause damage or impact on the actual equipment or system.

[0095] After completing the verification report, submit the report to the relevant person in charge or team for review and evaluation. After the configuration settings of the intelligent anti-error host are confirmed to be correct, the operating status and performance of the intelligent anti-error host are continuously monitored through regular inspections, use of monitoring tools or setting alarms. When abnormal conditions or performance degradation are found in the intelligent anti-error host, the intelligent anti-error host is evaluated and action is taken.

[0096] During the continuous monitoring process, the configuration and data of the intelligent anti-error host are backed up regularly, which can quickly restore to the previous state when a problem occurs, reducing downtime and the risk of data loss. According to the equipment supplier's recommendations and best practices, the drivers, software and operating systems of the intelligent anti-error host are regularly updated. This can ensure that the system has the latest security patches and functional improvements. Provide necessary training and support for relevant personnel to ensure that they can understand the configuration, monitoring and maintenance process of the new intelligent anti-error host, which can improve work efficiency and reduce operational risks. Throughout the verification, monitoring and maintenance process, detailed records of key operations, configuration changes and abnormal situations are maintained, which will help with subsequent troubleshooting, performance analysis and auditing.

[0097] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A one-key sequential control error prevention verification method for a substation, characterized in that: The steps include: S1: Preliminary preparation: Use the error prevention verification device to import the point table data required for communication between the monitoring host and the intelligent error prevention host; S2: Establish connection and signal verification: Connect the anti-error verification device to the intelligent anti-error host, send a test signal to the intelligent anti-error host through the anti-error verification device, observe the response signal prompted by the alarm box of the intelligent anti-error host and the action of the corresponding signal photon card, and verify whether the sent test signal is consistent with the response signal prompted by the alarm box of the intelligent anti-error host; S3: Set reference permission conditions: Select the circuit breaker or switch operation that needs to be verified, and set reference permission conditions for the selected circuit breaker or switch operation that needs to be verified according to the five-defense logic file that has passed the review and verification; S4: Perform combined test and verification: The error prevention verification device performs combined test according to the set reference allowable conditions, sends remote control command request to the intelligent error prevention host, simulates the real operation scene, and combines the feedback of the intelligent error prevention host, so that the error prevention verification device automatically verifies the actual allowable conditions; S5: Verify configuration correctness: Compare the set reference permission conditions with the actual permission conditions fed back by the intelligent anti-error host. When the reference permission conditions and the actual permission conditions are consistent, it is confirmed that the configuration of the intelligent anti-error host is correct. When there is a difference, an error message is recorded and a prompt is given that there is a problem with the configuration of the intelligent anti-error host. S6: Subsequent processing: When there is a problem with the intelligent anti-mistake host configuration, correct the configuration of the intelligent anti-mistake host according to the error information. After correction, repeat the S5 verification process; The specific process of S1 is: S101, confirm the point table data and configuration information required for the communication between the monitoring host and the anti-error host, and check the integrity and accuracy of the point table data; S102, according to the operation manual or guide of the anti-error verification device, start the anti-error verification device, find and select the point table import function on the operation interface of the anti-error verification device, and use the file management system or file import function of the anti-error verification device to connect to the device storing the point table data; S103, select the point table data to be imported, and confirm the file path. After confirming that the file is correct, start the point table import. During the import process, monitor the display screen or status indicator of the anti-error verification device to ensure that the import process proceeds smoothly. If an error or abnormality occurs during the import process, stop the import process and check the cause of the error. S104, after the point table data is imported, the consistency of the manual start signal of the anti-error verification device is verified by comparing the imported point table data with the configuration information of the monitoring host and the anti-error host, that is, the settings and parameters required for communication between the monitoring host and the anti-error host. When inconsistency or error is found, the error information is recorded and corrected.

2. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 1, characterized in that: The specific process of S2 is: S201, according to the connection guide or manual provided by the anti-error verification device, use a connecting line to physically connect the anti-error verification device to the intelligent anti-error host; S202, configuring communication parameters on the anti-error verification device and the intelligent anti-error host respectively, and communicating the anti-error verification device and the intelligent anti-error host; S203, select a test signal on the anti-error verification device, configure relevant parameters of the test signal, send the test signal to the intelligent anti-error host, monitor the alarm box or display screen of the intelligent anti-error host, check whether a response signal appears, and at the same time, observe whether the corresponding signal photon card is in action; S204, verify whether the test signal sent by the error prevention verification device is consistent with the response signal of the intelligent error prevention host, check whether the parameters of the test signal and the response signal match, and whether the timing and logic of the test signal and the response signal are correct; S205. When the test signal and response signal are verified, record the success information and continue with the subsequent operation. When the test signal and response signal are verified, record the error information and check whether the connection, communication parameters or the anti-error verification device and the intelligent anti-error host configuration are correct. Adjust or repair as needed and re-verify.

3. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 2, characterized in that: The specific process of S3 is as follows: S301. On the error prevention verification device, select the circuit breaker or switch operation to be verified, consult the five-prevention logic file that has been reviewed and verified, and operate the selected circuit breaker or switch; the five-prevention logic file includes the permissible conditions that need to be met for the circuit breaker or switch operation; S302. The permissible conditions to be met involve the status of the equipment; the equipment includes a circuit breaker or a knife switch, other associated equipment, a protective device and auxiliary equipment; wherein the other associated equipment includes an isolating switch and a grounding switch, the protective device includes a relay and an overcurrent protector, and the auxiliary equipment includes an indicator light, a sensor and a control switch; S303. In the system of the error-proof verification device, according to the required permissive conditions, a reference permissive condition is set for the selected circuit breaker or switch operation, and it is ensured that the set reference permissive condition is consistent with the required permissive condition; S304. After setting the reference permission conditions, use the simulation test function provided by the error-proof verification device to verify whether the set reference permission conditions can prevent erroneous operations that do not meet the reference permission conditions.

4. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 3, characterized in that: The permissible conditions that need to be met for circuit breaker or knife switch operation include: preventing accidental opening or closing of circuit breakers; preventing pulling or closing of disconnectors under load; preventing hanging or closing grounding switches with power on; preventing closing circuit breakers or disconnectors with grounding switches on; and preventing accidental entry into live intervals.

5. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 4, characterized in that: The specific process of S4 is as follows: S401, the number of reference allowable conditions is preset to n, and the error-proof verification device generates 2n-th power combination test cases, each combination test case represents a set of allowable condition combinations; S402, for each combined test case, the error prevention verification device sends a remote control command request to the intelligent error prevention host to simulate the real operation process; S403, combining the feedback of the intelligent error prevention host, the error prevention verification device simulates the real operation scenario; S404, the error prevention verification device receives and analyzes the response and feedback of the intelligent error prevention host to each remote control command request, and determines whether the intelligent error prevention host responds to the remote control command correctly and whether it follows the preset error prevention logic; The preset error prevention logic includes equipment status detection, operation sequence verification and five-defense logic file verification; S405, the error-proof verification device tests the actual permissible condition according to the received feedback and the preset reference permissible condition; S406. Record the test results in relevant documents.

6. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 5, characterized in that: The specific process of S5 is as follows: S501, collect all the reference permission conditions set, and obtain the actual permission conditions from the intelligent error prevention host; S502, comparing the collected reference permission conditions with the actual permission conditions obtained from the intelligent error prevention host, and judging whether the reference permission conditions are consistent with the actual permission conditions according to the comparison result; S503. When the reference permission condition and the actual permission condition are consistent, it is confirmed that the intelligent anti-error host configuration is correct. When there is a difference, the error information is recorded. According to the recorded error information, it is prompted that there is a problem with the intelligent anti-error host configuration, and further inspection and correction are performed. The correction process includes adjusting the configuration settings of the intelligent anti-error host and updating the intelligent anti-error host driver.

7. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 6, characterized in that: Before changing or testing the configuration settings of the smart anti-error host, first back up the current configuration settings of the smart anti-error host, record error information, record information about changes to the configuration settings of the smart anti-error host, retain documents related to the configuration settings of the smart anti-error host, test the smart anti-error host after the configuration settings are changed in the actual application environment, monitor the operating status and performance of the smart anti-error host after the configuration settings of the smart anti-error host are changed, and regularly check and record the key performance indicators of the smart anti-error host.

8. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 7, characterized in that: The specific process of S6 is as follows: S601, according to the error information, determine the configuration items that need to be corrected for the intelligent anti-error host, enter the configuration setting interface of the intelligent anti-error host, and correct the corresponding configuration settings; S602, after correcting the configuration settings of the intelligent anti-error host, repeat the test process to ensure that the configuration settings of the corrected intelligent anti-error host are consistent with the reference allowable conditions, and that the corrected intelligent anti-error host responds and operates correctly; S603, recording the corrected test result. When the test result is successful, the configuration setting of the intelligent anti-error host is correct; S604. Write a test report to record the entire test process, test results and measures to correct the configuration settings of the intelligent anti-error host.

9. A method for preventing mis-verification of a one-key sequential control of a substation according to claim 8, characterized in that: After completing the verification report, submit the report to the relevant person in charge or team for review and evaluation. After the configuration settings of the intelligent anti-error host are confirmed to be correct, the operating status and performance of the intelligent anti-error host are continuously monitored through regular inspections, use of monitoring tools or setting alarms. When abnormal conditions or performance degradation are found in the intelligent anti-error host, the intelligent anti-error host is evaluated and action is taken.

Citation Information

Patent Citations

  • Detection method and system for one-key sequential control system of intelligent substation