A remote monitoring and control system for solar photovoltaic components
Through the adaptive light chasing control and comprehensive operation evaluation of the remote monitoring and control system, the problems of low efficiency and low intelligence of traditional solar photovoltaic module management methods are solved, efficient power generation and timely maintenance are achieved, and the difficulty of management and control is reduced.
Patent Information
- Application Number
- CN202410438994.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-04-12
AI Technical Summary
The traditional management method of solar photovoltaic modules is inefficient and cannot achieve automatic light tracking control and accurate feedback. It cannot perform timely inspection, maintenance and surface cleaning. It has low intelligence and difficult management and control.
Design a remote monitoring and control system, including an adaptive light chasing control module, a light chasing operation monitoring module, a comprehensive operation evaluation module and a remote management and control terminal. Through the adaptive light chasing control module, the solar panels are always perpendicular to the light, and the light chasing operation The monitoring module monitors the entire process, runs the comprehensive assessment module to perform periodic assessments and generates abnormal signals, and the remote control terminal issues early warnings.
It significantly improves the efficiency of solar power generation, enables accurate feedback on the performance of each light chasing control operation, reminds remote managers to perform timely inspections, maintenance and surface cleaning, and improves the degree of intelligence and convenience of management and control.
Smart Images

Figure CN118353351B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of solar photovoltaic assembly supervision, and in particular to a remote monitoring and control system applied to solar photovoltaic assemblies. Background Art
[0002] Solar photovoltaic modules are electronic components that use the photovoltaic effect to convert solar energy into electrical energy. They are composed of multiple solar cells, which are connected in series or in parallel to form an integrated solar panel with a certain voltage, current and power output. These solar cells are usually made of semiconductor materials. When sunlight shines on them, electrons are excited to form current.
[0003] With the continuous development of solar photovoltaic technology, solar photovoltaic modules are increasingly used in the energy field. However, the traditional management method of photovoltaic modules is mostly on-site inspection, which is inefficient and difficult to grasp the operating status of photovoltaic modules in real time. It is impossible to realize the automatic light tracking of solar photovoltaic modules and accurately feedback the performance of light tracking control operations, and it is impossible to inspect, repair and clean the surface of solar photovoltaic modules in time. The degree of intelligence is low and the management and control is difficult.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a remote monitoring and control system for solar photovoltaic modules, which solves the problems that the prior art cannot realize automatic light chasing of solar photovoltaic modules and accurately feedback the performance of light chasing control operation, and cannot timely perform inspection, maintenance and surface cleaning of solar photovoltaic modules, has a low degree of intelligence and is difficult to control.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A remote monitoring and control system for solar photovoltaic components, comprising a server, an adaptive light-chasing control module, a light-chasing operation monitoring module, an operation comprehensive evaluation module and a remote control terminal; the adaptive light-chasing control module adaptively controls the direction and tilt of the solar photovoltaic component, so that the solar panels in the solar photovoltaic component are always perpendicular to the light; the light-chasing operation monitoring module monitors the entire process of the corresponding light-chasing control operation, generates a light-chasing operation optimization signal or a light-chasing operation abnormality signal through light-chasing efficiency and stability analysis, and sends the light-chasing operation optimization signal or the light-chasing operation abnormality signal to the server;
[0008] The operation comprehensive evaluation module is used to set an evaluation cycle with the number of days as T1. When the number of days reaches T1, the operation comprehensive evaluation and analysis of the solar photovoltaic components is carried out to determine their operation performance in the evaluation cycle, and an operation comprehensive evaluation abnormal signal or an operation comprehensive evaluation normal signal is generated. The operation comprehensive evaluation abnormal signal or the operation comprehensive evaluation normal signal is sent to the remote control terminal via the server. When the remote control terminal receives the operation comprehensive evaluation abnormal signal, it issues a corresponding warning.
[0009] Furthermore, the specific analysis process of the light tracking effect stability analysis is as follows:
[0010] When the corresponding light-chasing control operation is completed, the azimuth angle data and the elevation angle data of the solar panel are collected, the azimuth angle data is calculated to be different from the preset standard azimuth angle data currently matched, and the absolute value is taken to obtain the azimuth angle condition value, and the elevation angle data is calculated to be different from the preset standard elevation angle data currently matched, and the absolute value is taken to obtain the elevation angle condition value;
[0011] The azimuth angle value and the elevation angle value are numerically calculated to obtain a position adjustment detection deviation value, and the position adjustment detection deviation value is numerically compared with a preset position adjustment detection deviation threshold. If the position adjustment detection deviation value exceeds the preset position adjustment detection deviation threshold, a light chasing abnormality signal is generated.
[0012] Furthermore, if the position adjustment detection bias value does not exceed the preset position adjustment detection bias threshold, the average direction adjustment speed and the average tilt adjustment speed in the corresponding light chasing control operation are collected, and the deviation value of the direction adjustment average speed compared to the preset standard direction adjustment speed is marked as the direction speed adjustment value, and the deviation value of the tilt adjustment average speed compared to the preset standard tilt adjustment speed is marked as the tilt speed adjustment value;
[0013] and collecting the speed fluctuation curve in the corresponding direction adjustment process and the speed fluctuation curve in the corresponding tilt adjustment process and marking them as the direction speed fluctuation curve and the tilt speed fluctuation curve respectively, marking a number of analysis points in the direction speed fluctuation curve, the interval between two adjacent groups of analysis points is the same, and marking the speed difference between the two adjacent groups of analysis points as the direction speed wave value, and similarly obtaining the tilt speed wave value; obtaining the number ratio of the direction speed wave values exceeding the preset direction speed wave threshold in the corresponding direction adjustment process and marking them as the direction speed difference value, and similarly obtaining the tilt speed difference value;
[0014] The light chasing stabilization value is obtained by numerically calculating the direction speed control value, the tilt speed control value, the direction speed wave value and the tilt speed wave value. The light chasing stabilization value is numerically compared with the preset light chasing stabilization threshold. If the light chasing stabilization value exceeds the preset light chasing stabilization threshold, a light chasing abnormality signal is generated.
[0015] Furthermore, if the light-chasing stabilization value does not exceed the preset light-chasing stabilization threshold, several detection moments are set during the corresponding light-chasing control operation, the noise decibel value and the vibration frequency amplitude of the solar panel generated at the corresponding detection moment are collected, and the noise decibel value and the vibration frequency amplitude are numerically compared with the preset noise decibel threshold and the preset vibration frequency amplitude threshold, respectively. If the noise decibel value or the vibration frequency amplitude exceeds the corresponding preset threshold, the corresponding detection moment is marked as an abnormal moment;
[0016] The number of abnormal moments in the corresponding light chasing control operation process is obtained and the ratio is calculated with the number of detection moments to obtain the abnormal time share value, and the noise decibel values of all detection moments are averaged to obtain the noise detection value, and the vibration frequency amplitude values of all detection moments are averaged to obtain the vibration detection value. The light chasing operation value is obtained by numerically calculating the abnormal time share value, the noise detection value and the vibration detection value. The light chasing operation value is numerically compared with the preset light chasing operation threshold. If the light chasing operation value exceeds the preset light chasing operation threshold, a light chasing operation abnormal signal is generated; if the light chasing operation value does not exceed the preset light chasing operation threshold, a light chasing operation superior signal is generated.
[0017] Furthermore, the specific analysis process of running the comprehensive evaluation analysis is as follows:
[0018] The sunshine intensity of the solar photovoltaic components during the evaluation period is collected in real time, and the sunshine intensity is numerically compared with the preset sunshine intensity threshold. If the sunshine intensity exceeds the preset sunshine intensity threshold, it is judged that the solar photovoltaic components are in an efficient power generation state; the power generation of the solar photovoltaic components on the corresponding date during the evaluation period is collected and marked as the daily power generation value, and the time when the solar photovoltaic components are in an efficient power generation state on the corresponding date during the evaluation period is collected and marked as the efficient power generation condition value, and the total sunshine time on the corresponding date is collected, and the operating daily efficiency value is obtained by numerically calculating the daily power generation value, the efficient power generation condition value and the total sunshine time;
[0019] The daily operating condition value is obtained by averaging all the daily operating efficiency values within the evaluation period, and the daily operating efficiency value is numerically compared with the preset daily operating efficiency threshold. If the daily operating efficiency value exceeds the preset daily operating efficiency threshold, the corresponding date is marked as a day with excellent power generation efficiency, and the number of days with excellent power generation efficiency within the evaluation period is ratio-calculated with the value T1 to obtain the excellent efficiency occupancy value;
[0020] The number of times the light-chasing operation optimization signal and the number of times the light-chasing operation abnormal signal are generated within the evaluation period are collected and marked as the light-chasing operation optimization analysis value and the light-chasing operation abnormal analysis value respectively, and the ratio of the light-chasing operation abnormal analysis value to the light-chasing operation optimization analysis value is marked as the light-chasing adaptive control condition value; the power generation comprehensive condition value is obtained by numerically calculating the light-chasing adaptive control condition value, the operating daily condition value and the efficiency optimization condition value, and the power generation comprehensive condition value is numerically compared with the preset power generation comprehensive condition threshold value. If the power generation comprehensive condition value exceeds the preset power generation comprehensive condition threshold value, a normal operation comprehensive evaluation signal is generated; if the power generation comprehensive condition value does not exceed the preset power generation comprehensive condition threshold, an abnormal operation comprehensive evaluation signal is generated.
[0021] Furthermore, the server is communicatively connected with the surface cleaning timeliness decision module, and the server sends the normal operation comprehensive evaluation signal to the surface cleaning timeliness decision module. When the surface cleaning timeliness decision module receives the normal operation comprehensive evaluation signal, it performs surface cleaning timeliness decision analysis on the solar photovoltaic components to generate a surface cleaning high emergency signal or a surface cleaning low emergency signal, and sends the surface cleaning high emergency signal or the surface cleaning low emergency signal to the remote management and control terminal via the server. When the remote management and control terminal receives the surface cleaning high emergency signal, it issues a corresponding warning.
[0022] Furthermore, the specific analysis process of the surface cleaning timeliness decision analysis is as follows:
[0023] Collect the end time of the last adjacent surface cleaning of the solar photovoltaic module, calculate the time difference between the current time and the end time of the last adjacent surface cleaning of the solar photovoltaic module to obtain the surface cleaning interval length, compare the surface cleaning interval length with the preset surface cleaning interval length threshold, and generate a surface cleaning high emergency signal if the surface cleaning interval length exceeds the preset surface cleaning interval length threshold;
[0024] If the meter clearing interval does not exceed the preset meter clearing interval threshold, the rainfall information of the environment in which the solar photovoltaic module is located within the meter clearing interval is obtained, and the rainfall information includes the time and amount of the last rainfall, and the time difference between the current time and the last rainfall time is calculated to obtain the rainfall interval;
[0025] and collecting dust data of the environment in which the solar photovoltaic module is located, comparing the dust data with a preset dust data threshold, and if the dust data exceeds the preset dust data threshold, determining that the solar photovoltaic module is in a high pollution state;
[0026] The total duration of the solar photovoltaic components in a high pollution state within the meter clearing interval is obtained and marked as the high pollution condition value, and the meter clearing decision value is obtained by numerically calculating the meter clearing interval, rainfall interval, rainfall and high pollution condition value. The meter clearing decision value is numerically compared with the preset meter clearing decision threshold. If the meter clearing decision value exceeds the preset meter clearing decision threshold, a surface cleaning high emergency signal is generated; if the meter clearing decision value does not exceed the preset meter clearing decision threshold, a surface cleaning low emergency signal is generated.
[0027] Compared with the prior art, the present invention has the following beneficial effects:
[0028] 1. In the present invention, the direction and tilt of the solar photovoltaic module are adaptively controlled by the adaptive light-chasing control module, so that the solar panels in the solar photovoltaic module are always perpendicular to the light, which significantly improves the power generation efficiency of the solar power generation module. The light-chasing operation monitoring module monitors the corresponding light-chasing control operation throughout the whole process, and generates a light-chasing operation optimization signal or a light-chasing operation error signal through light-chasing efficiency and stability analysis, which can accurately feedback the performance of each light-chasing control operation;
[0029] 2. In the present invention, a comprehensive evaluation module is used to perform a comprehensive evaluation and analysis on the operation of solar photovoltaic components to determine their operation performance during the evaluation period. When an abnormal operation comprehensive evaluation signal is generated, the remote management and control terminal issues a corresponding warning. When a normal operation comprehensive evaluation signal is generated, the surface cleaning timeliness decision module is used to perform a surface cleaning timeliness decision analysis on the solar photovoltaic components. When a surface cleaning high emergency signal is generated, the remote management and control terminal issues a corresponding warning, which can remind remote management personnel to inspect, repair and clean the surface of the solar photovoltaic components in a timely manner. The system has a high degree of intelligence and low management and control difficulty. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0031] Figure 1 This is a system block diagram of Embodiment 1 of the present invention;
[0032] Figure 2 This is a system block diagram of Embodiment 2 of the present invention. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Embodiment 1: Figure 1 As shown, the present invention proposes a remote monitoring and control system for solar photovoltaic components, including a server, an adaptive light-chasing control module, a light-chasing operation monitoring module, an operation comprehensive evaluation module and a remote control terminal;
[0035] Among them, the adaptive light-chasing control module adaptively controls the direction and tilt of the solar photovoltaic module, so that the solar panels in the solar photovoltaic module are always perpendicular to the light, and sends the corresponding control information to the server, which can enable the solar photovoltaic module to receive solar energy to the maximum extent, significantly improve the power generation efficiency of the solar power generation module, and enhance its intelligence and automation.
[0036] The light-chasing operation monitoring module monitors the entire process of the corresponding light-chasing control operation (including the direction adjustment process and the tilt adjustment process), generates a light-chasing operation optimization signal or a light-chasing operation error signal through light-chasing efficiency and stability analysis, and sends the light-chasing operation optimization signal or the light-chasing operation error signal to the server. The server records the operation status of each light-chasing control operation, adds one to the number of times it is generated when receiving a light-chasing operation optimization signal, and adds one to the number of times it is generated when receiving an error signal. The specific analysis process of the light-chasing efficiency and stability analysis is as follows:
[0037] When the corresponding light-chasing control operation is completed, the azimuth angle data and the elevation angle data of the solar panel are collected, and the azimuth angle data is calculated to be different from the currently matched preset standard azimuth angle data and the absolute value is taken to obtain the azimuth angle condition value, and the elevation angle data is calculated to be different from the currently matched preset standard elevation angle data and the absolute value is taken to obtain the elevation angle condition value; wherein, the larger the values of the azimuth angle condition value and the elevation angle condition value are, the worse the corresponding control is, and the solar panel cannot be placed in the best light receiving state;
[0038] The azimuth angle condition value WS and the elevation angle condition value WY are numerically calculated through the formula WP=(ty1*WS+ty2*WY) / 2 to obtain the position adjustment detection bias value WP, wherein ty1 and ty2 are preset proportional coefficients, and the values of ty1 and ty2 are both greater than zero; and the larger the value of the position adjustment detection bias value WP is, the worse the corresponding control accuracy is; the position adjustment detection bias value WP is numerically compared with the preset position adjustment detection bias threshold value, if the position adjustment detection bias value WP exceeds the preset position adjustment detection bias threshold value, it indicates that the corresponding control accuracy is poor, and a light chasing abnormality signal is generated.
[0039] Furthermore, if the position adjustment detection bias value WP does not exceed the preset position adjustment detection bias threshold, the average speed of direction adjustment and the average speed of tilt adjustment in the corresponding light chasing control operation are collected, and the deviation value of the average speed of direction adjustment compared with the preset standard direction adjustment speed is marked as the direction speed adjustment value, and the deviation value of the average speed of tilt adjustment compared with the preset standard tilt adjustment speed is marked as the tilt speed adjustment value; wherein, the larger the values of the direction speed adjustment value and the tilt speed adjustment value are, the worse the speed control effect is;
[0040] and collecting the speed fluctuation curve in the corresponding direction adjustment process and the speed fluctuation curve in the corresponding tilt adjustment process and marking them as the direction speed fluctuation curve and the tilt speed fluctuation curve respectively, marking a number of analysis points in the direction speed fluctuation curve, the interval between two adjacent groups of analysis points is the same, and marking the speed difference between the two adjacent groups of analysis points as the direction speed wave value, and similarly obtaining the tilt speed wave value; comparing the direction speed wave value with the preset direction speed wave threshold, obtaining the number ratio of the direction speed wave values exceeding the preset direction speed wave threshold in the corresponding direction adjustment process and marking them as the direction speed difference value, and similarly obtaining the tilt speed difference value;
[0041] By formula The direction speed control value ZS, the tilt speed control value ZY, the direction speed wave value ZL and the tilt speed wave value ZK are numerically calculated to obtain the light chasing stabilization value ZP, wherein a1, a2, a3, and a4 are preset proportional coefficients, and the values of a1, a2, a3, and a4 are all positive numbers; and, the larger the value of the light chasing stabilization value ZP is, the worse the control speed performance of the corresponding light chasing control operation is; the light chasing stabilization value ZP is numerically compared with the preset light chasing stabilization threshold value, if the light chasing stabilization value ZP exceeds the preset light chasing stabilization threshold value, indicating that the control speed performance of the corresponding light chasing control operation is poor, then a light chasing operation abnormality signal is generated.
[0042] Further, if the light-chasing stabilization value ZP does not exceed the preset light-chasing stabilization threshold, several detection moments are set during the corresponding light-chasing regulation operation, and the noise decibel value and the vibration frequency amplitude value of the solar panel generated when the solar photovoltaic component is regulated at the corresponding detection moment are collected, wherein the vibration frequency amplitude value is a data quantity value representing the sum of the vibration frequency and vibration amplitude of the solar panel; the noise decibel value and the vibration frequency amplitude value are numerically compared with the preset noise decibel threshold value and the preset vibration frequency amplitude threshold value respectively, and if the noise decibel value or the vibration frequency amplitude value exceeds the corresponding preset threshold value, the corresponding detection moment is marked as an abnormal moment;
[0043] The number of abnormal moments in the corresponding light chasing control operation process is obtained and the ratio of the abnormal moment to the number of detection moments is calculated to obtain the abnormal moment value, and the noise decibel values of all detection moments are averaged to obtain the noise detection value, and the vibration frequency amplitude values of all detection moments are averaged to obtain the vibration detection value, and the abnormal moment value CF, the noise detection value CY and the vibration detection value CK are numerically calculated by the formula CX=kp1*CF+(kp2*CY+kp3*CK) / (kp1+3.628) to obtain the light chasing operation value CX;
[0044] Among them, kp1, kp2, and kp3 are preset proportional coefficients, kp1>kp3>kp2>0; and, the larger the numerical value of the light chasing operation condition value CX, the more abnormal the corresponding light chasing control operation process is; the light chasing operation condition value CX is numerically compared with the preset light chasing operation condition threshold, if the light chasing operation condition value CX exceeds the preset light chasing operation condition threshold, indicating that the corresponding light chasing control operation process is relatively abnormal, then a light chasing operation error signal is generated; if the light chasing operation condition value CX does not exceed the preset light chasing operation condition threshold, indicating that the corresponding light chasing control operation process is relatively normal, then a light chasing operation optimization signal is generated.
[0045] The operation comprehensive evaluation module is used to set the evaluation cycle of days T1, preferably, T1 days is seven days; when the number of days reaches T1, the operation comprehensive evaluation analysis of the solar photovoltaic components is performed to determine its operation performance in the evaluation cycle, and an operation comprehensive evaluation abnormal signal or an operation comprehensive evaluation normal signal is generated, and the operation comprehensive evaluation abnormal signal or the operation comprehensive evaluation normal signal is sent to the remote control terminal via the server. When the remote control terminal receives the operation comprehensive evaluation abnormal signal, it issues a corresponding warning. When the remote management personnel receive the corresponding warning, they promptly inspect and repair the solar photovoltaic components to ensure the subsequent safe, stable and efficient operation of the solar photovoltaic components and increase their service life; the specific analysis process of the operation comprehensive evaluation analysis is as follows:
[0046] The sunshine intensity of the solar photovoltaic components during the evaluation period is collected in real time, and the sunshine intensity is compared with the preset sunshine intensity threshold. If the sunshine intensity exceeds the preset sunshine intensity threshold, it indicates that the current sunshine is strong, and the solar photovoltaic components are judged to be in an efficient power generation state; the power generation of the solar photovoltaic components on the corresponding date during the evaluation period is collected and marked as the daily power generation value, and the duration of the solar photovoltaic components in the efficient power generation state on the corresponding date during the evaluation period is collected and marked as the efficient power generation condition value, and the total sunshine duration on the corresponding date is collected;
[0047] The daily power generation value FX, the high-efficiency power generation condition value FS and the total sunshine duration FK are numerically calculated by the formula RX=ry1*FX / (ry2*FS+ry3*FK) to obtain the daily operation value RX; wherein ry1, ry2 and ry3 are preset proportional coefficients, ry1>ry2>ry3>0; and the smaller the value of the daily operation value RX, the lower the power generation efficiency of the solar photovoltaic module on the corresponding date, and the worse the operation performance;
[0048] The operating daily condition value is obtained by calculating the average of all the operating daily efficiency values RX within the evaluation period, and the operating daily efficiency value is numerically compared with the preset operating daily efficiency threshold. If the operating daily efficiency value exceeds the preset operating daily efficiency threshold, the corresponding date is marked as a power generation efficiency-optimal day, and the number of power generation efficiency-optimal days within the evaluation period is ratio-calculated with the value T1 to obtain the efficiency-optimal condition value; the number of times the light-chasing operation-optimal signal and the number of times the light-chasing operation-abnormal signal are generated within the evaluation period are collected and marked as the light-chasing operation-optimal analysis value and the light-chasing operation-abnormal analysis value, respectively, and the ratio of the light-chasing operation-abnormal analysis value to the light-chasing operation-optimal analysis value is marked as the light-chasing adaptive control condition value;
[0049] By formula The chasing adaptive control value YF, the operating day value YS and the efficiency occupancy value YL are numerically calculated to obtain the power generation comprehensive value YK, wherein ew1, ew2 and ew3 are preset proportional coefficients, and the values of ew1, ew2 and ew3 are all positive numbers; and the larger the value of the power generation comprehensive value YK is, the better the operating performance of the solar photovoltaic component during the evaluation period; the power generation comprehensive value YK is numerically compared with the preset power generation comprehensive threshold value, if the power generation comprehensive value YK exceeds the preset power generation comprehensive threshold value, indicating that the operating performance of the solar photovoltaic component during the evaluation period is good, then a normal operation comprehensive evaluation signal is generated; if the power generation comprehensive value YK does not exceed the preset power generation comprehensive threshold value, indicating that the operating performance of the solar photovoltaic component during the evaluation period is poor, then an abnormal operation comprehensive evaluation signal is generated.
[0050] Embodiment 2: Figure 2 As shown, the difference between this embodiment and embodiment 1 is that the server is connected to the surface cleaning timeliness decision module for communication, and the server sends the normal operation comprehensive evaluation signal to the surface cleaning timeliness decision module. When the surface cleaning timeliness decision module receives the normal operation comprehensive evaluation signal, it performs surface cleaning timeliness decision analysis on the solar photovoltaic component to generate a surface cleaning high emergency signal or a surface cleaning low emergency signal, and sends the surface cleaning high emergency signal or the surface cleaning low emergency signal to the remote management and control terminal via the server. When the remote management and control terminal receives the surface cleaning high emergency signal, it issues a corresponding warning to remind the remote management personnel to check and clean the surface of the solar photovoltaic component in time, so as to ensure its power generation efficiency and safety in use; the specific analysis process of the surface cleaning timeliness decision analysis is as follows:
[0051] The end time of the last adjacent surface cleaning of the solar photovoltaic module is collected, and the time difference between the current time and the end time of the last adjacent surface cleaning of the solar photovoltaic module is calculated to obtain the surface cleaning interval duration, and the surface cleaning interval duration is numerically compared with the preset surface cleaning interval duration threshold. If the surface cleaning interval duration exceeds the preset surface cleaning interval duration threshold, it indicates that the surface of the solar photovoltaic module needs to be cleaned in time, and a surface cleaning high emergency signal is generated;
[0052] If the meter clearing interval does not exceed the preset meter clearing interval threshold, the rainfall information of the environment in which the solar photovoltaic module is located within the meter clearing interval is obtained, and the rainfall information includes the time and amount of the last rainfall, and the time difference between the current time and the last rainfall time is calculated to obtain the rainfall interval;
[0053] And collect dust data of the environment in which the solar photovoltaic module is located, wherein the dust data is a data value indicating the dust concentration of the environment in which the solar photovoltaic module is located; compare the dust data with a preset dust data threshold, and if the dust data exceeds the preset dust data threshold, it is determined that the solar photovoltaic module is in a high pollution state; obtain the total time duration of the solar photovoltaic module in a high pollution state within the meter clearing interval and mark it as a high pollution condition value;
[0054] The table clearing decision value QX is obtained by numerically calculating the table clearing interval time QF, the rainfall interval time QY, the rainfall amount QK and the high pollution condition value QP through the formula QX=(fq1*QF+fq2*QY+fq4*QP) / 3+fq3 / (QK+0.532), wherein fq1, fq2, fq3 and fq4 are preset proportional coefficients, and fq3>fq2>fq4>fq1>0; and the larger the value of the table clearing decision value QX is, the more it is necessary to perform surface cleaning operation on the solar photovoltaic component in time; the table clearing decision value QX is numerically compared with the preset table clearing decision threshold, if the table clearing decision value QX exceeds the preset table clearing decision threshold, it indicates that the surface cleaning operation of the solar photovoltaic component needs to be performed in time, and a surface cleaning high emergency signal is generated; if the table clearing decision value QX does not exceed the preset table clearing decision threshold, it indicates that the surface cleaning operation of the solar photovoltaic component does not need to be performed temporarily, and a surface cleaning low emergency signal is generated.
[0055] The working principle of the present invention is as follows: when in use, the direction and inclination of the solar photovoltaic module are adaptively controlled through the adaptive light-chasing control module, so that the solar panels in the solar photovoltaic module are always perpendicular to the light, which significantly improves the power generation efficiency of the solar power generation module. The light-chasing operation monitoring module monitors the corresponding light-chasing control operation throughout the entire process, and generates a light-chasing operation optimization signal or a light-chasing operation abnormality signal through light-chasing efficiency and stability analysis, which can accurately feedback the performance status of each light-chasing control operation, and performs a comprehensive operation evaluation analysis on the solar photovoltaic module through the operation comprehensive evaluation module to determine its operation performance during the evaluation period, and generates an operation comprehensive evaluation abnormality signal or an operation comprehensive evaluation normal signal. When the operation comprehensive evaluation abnormality signal is generated, the remote management terminal issues a corresponding warning. When the remote management personnel receive the corresponding warning, they promptly inspect and repair the solar photovoltaic module to ensure the subsequent safe, stable and efficient operation of the solar photovoltaic module and improve its service life. The intelligent degree is high and the control difficulty is small.
[0056] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.
Claims
1. A remote monitoring and control system for solar photovoltaic modules, characterized in that: It includes a server, an adaptive light-chasing control module, a light-chasing operation monitoring module, an operation comprehensive evaluation module and a remote control terminal; the adaptive light-chasing control module adaptively controls the direction and tilt of the solar photovoltaic module, so that the solar panels in the solar photovoltaic module are always perpendicular to the light; the light-chasing operation monitoring module monitors the corresponding light-chasing control operation throughout the entire process, generates a light-chasing operation optimization signal or a light-chasing operation error signal through light-chasing efficiency and stability analysis, and sends the light-chasing operation optimization signal or the light-chasing operation error signal to the server; The operation comprehensive evaluation module is used to set the evaluation cycle with the number of days as T1. When the number of days reaches T1, the operation comprehensive evaluation analysis of the solar photovoltaic components is carried out to determine its operation performance in the evaluation cycle, and an operation comprehensive evaluation abnormal signal or an operation comprehensive evaluation normal signal is generated. The operation comprehensive evaluation abnormal signal or the operation comprehensive evaluation normal signal is sent to the remote control terminal via the server. When the remote control terminal receives the operation comprehensive evaluation abnormal signal, it issues a corresponding warning; The specific analysis process of the light tracking effect stability analysis is as follows: When the corresponding light-chasing control operation is completed, the azimuth data and the elevation data of the solar panel are collected, the azimuth data is calculated to be different from the currently matched preset standard azimuth data and the absolute value is taken to obtain the azimuth condition value, and the elevation data is calculated to be different from the currently matched preset standard elevation data and the absolute value is taken to obtain the elevation condition value; the azimuth condition value and the elevation condition value are numerically calculated to obtain the position adjustment detection deviation value, and if the position adjustment detection deviation value exceeds the preset position adjustment detection deviation threshold, a light-chasing abnormal signal is generated; If the position adjustment detection bias value does not exceed the preset position adjustment detection bias threshold, the average direction adjustment speed and the average tilt adjustment speed during the corresponding light chasing control operation are collected, and the deviation value of the direction adjustment average speed compared to the preset standard direction adjustment speed is marked as the direction speed adjustment value, and the deviation value of the tilt adjustment average speed compared to the preset standard tilt adjustment speed is marked as the tilt speed adjustment value; and collecting the speed fluctuation curve in the corresponding direction adjustment process and the speed fluctuation curve in the corresponding tilt adjustment process and marking them as the direction speed fluctuation curve and the tilt speed fluctuation curve respectively, marking a number of analysis points in the direction speed fluctuation curve, the interval between two adjacent groups of analysis points is the same, and marking the speed difference between the two adjacent groups of analysis points as the direction speed wave value, and similarly obtaining the tilt speed wave value; obtaining the number ratio of the direction speed wave values exceeding the preset direction speed wave threshold in the corresponding direction adjustment process and marking them as the direction speed difference value, and similarly obtaining the tilt speed difference value; The light-chasing stabilization value is obtained by numerically calculating the direction speed adjustment value, the tilt speed adjustment value, the direction speed wave value and the tilt speed wave value. If the light-chasing stabilization value exceeds the preset light-chasing stabilization threshold, a light-chasing abnormal operation signal is generated. If the light chasing stabilization value does not exceed the preset light chasing stabilization threshold, the number of abnormal conditions in the corresponding light chasing control operation process is obtained and the ratio is calculated with the number of detection moments to obtain the abnormal condition time share value, and the light chasing operation condition value is obtained by numerically calculating the abnormal condition time share value, the noise detection condition value and the vibration detection condition value. If the light chasing operation condition value exceeds the preset light chasing operation condition threshold, a light chasing operation abnormal signal is generated; if the light chasing operation condition value does not exceed the preset light chasing operation condition threshold, a light chasing operation excellent signal is generated.
2. A remote monitoring and control system for solar photovoltaic components according to claim 1, characterized in that: The specific analysis process of running comprehensive assessment analysis is as follows: The sunshine intensity of the solar photovoltaic components during the evaluation period is collected in real time. If the sunshine intensity exceeds the preset sunshine intensity threshold, the solar photovoltaic components are judged to be in an efficient power generation state; the power generation of the solar photovoltaic components on the corresponding date during the evaluation period is collected and marked as the daily power generation value, and the duration of the solar photovoltaic components in the efficient power generation state on the corresponding date during the evaluation period is collected and marked as the efficient power generation condition value, and the total sunshine duration on the corresponding date is collected, and the operating daily efficiency value is obtained by numerically calculating the daily power generation value, the efficient power generation condition value and the total sunshine duration; The daily operating condition value is obtained by averaging all the daily operating efficiency values within the evaluation period, and the daily operating efficiency value is numerically compared with the preset daily operating efficiency threshold. If the daily operating efficiency value exceeds the preset daily operating efficiency threshold, the corresponding date is marked as a day with excellent power generation efficiency, and the number of days with excellent power generation efficiency within the evaluation period is ratio-calculated with the value T1 to obtain the excellent efficiency occupancy value; The number of times the light-chasing operation optimization signal and the number of times the light-chasing operation abnormal signal are generated within the evaluation period are collected and marked as the light-chasing operation optimization analysis value and the light-chasing operation abnormal analysis value respectively, and the ratio of the light-chasing operation abnormal analysis value to the light-chasing operation optimization analysis value is marked as the light-chasing adaptive control condition value; the power generation comprehensive condition value is obtained by numerically calculating the light-chasing adaptive control condition value, the operating daily condition value and the efficiency optimization condition value. If the power generation comprehensive condition value exceeds the preset power generation comprehensive condition threshold, a normal operation comprehensive evaluation signal is generated; if the power generation comprehensive condition value does not exceed the preset power generation comprehensive condition threshold, an abnormal operation comprehensive evaluation signal is generated.
3. A remote monitoring and control system for solar photovoltaic components according to claim 1, characterized in that: The server is communicatively connected with the surface cleaning timeliness decision module, and the server sends the normal operation comprehensive evaluation signal to the surface cleaning timeliness decision module. When the surface cleaning timeliness decision module receives the normal operation comprehensive evaluation signal, it performs surface cleaning timeliness decision analysis on the solar photovoltaic components to generate a surface cleaning high emergency signal or a surface cleaning low emergency signal, and sends the surface cleaning high emergency signal or the surface cleaning low emergency signal to the remote management and control terminal via the server. When the remote management and control terminal receives the surface cleaning high emergency signal, it issues a corresponding warning.
4. A remote monitoring and control system for solar photovoltaic components according to claim 3, characterized in that: The specific analysis process of surface cleaning timeliness decision analysis is as follows: The end time of the last surface cleaning of the solar photovoltaic module is collected, and the time difference between the current time and the end time of the last surface cleaning of the solar photovoltaic module is calculated to obtain the surface cleaning interval time. If the surface cleaning interval time exceeds the preset surface cleaning interval time threshold, a surface cleaning high emergency signal is generated; If the surface clearing interval duration does not exceed the preset surface clearing interval duration threshold, the surface clearing decision value is obtained by numerically calculating the surface clearing interval duration, the rainfall interval duration, the rainfall amount and the high pollution condition value. If the surface clearing decision value exceeds the preset surface clearing decision threshold, a surface clearing high emergency signal is generated; If the surface clear decision value does not exceed the preset surface clear decision threshold, a surface clear low urgency signal is generated.
Citation Information
Patent Citations
Automatic cleaning system and cleaning method for photovoltaic power station
CN109104152A
Photovoltaic power generation device
JP2004295688A
