A multi-axis multi-layer mutual shearing mixing drill for mixing continuous wall construction and use method thereof

Through the design of multi-axis and multi-layer mutual shear mixing drilling tools, the problem of reinforcement depth caused by the different lengths of mixing piles in the existing technology is solved, and the effective soil and water retaining effects of column-type continuous walls are achieved.

CN118360939BActive Publication Date: 2024-10-08浙江坤德创新岩土工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410788968.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-08
Estimated Expiration
2044-06-19

AI Technical Summary

Technical Problem

During the construction of the existing multi-axis one-way mixing drilling rig, there are problems such as mixing piles of different lengths, insufficient reinforcement depth or excessive length, resulting in soil and water leakage at the bottom of the wall.

Method used

Multi-axis multi-layer mutual shear mixing drilling tools are used, including power head, drill pipe, mutual shear mixing drill bit and conveying channel. The inner and outer drill pipes rotate at the same time, the inner and outer mixing wings are staggered, and the spray excavation and cutting wings cover the mutual shear area to ensure that the piles Body quality and overlap are consistent.

Benefits of technology

By covering the mutual shear area and the overlapping area, the quality of the single pile body and the overlapping area is ensured, forming an effective soil and water retaining effect, and avoiding soil and water leakage at the bottom of the wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118360939B_ABST
    Figure CN118360939B_ABST
Patent Text Reader

Abstract

The present invention relates to a multi-axis multi-layer mutual shearing mixing drill for the construction of continuous mixing wall and a method of using the multi-axis multi-layer mutual shearing mixing drill, comprising a power head, a drill rod, a feeding channel and a mutual shearing mixing drill bit; the mutual shearing mixing drill bit comprises an inner rod mixing wing, an outer rod mixing wing and a spraying excavation wing, the inner rod mixing wing and the outer rod mixing wing rotate in different directions with the inner and outer rods respectively, and produce a multi-layer mutual shearing effect inside the mixing pile and between adjacent piles. The spraying excavation wing is located at the end of the mutual shearing mixing drill bit, and comprises an excavation wing plate, an excavation tooth, and a spraying pipe; at least one feeding channel is located inside the drill rod and communicates with the corresponding spraying pipe. The spraying pipe is provided with a spraying port, and the area covered by the spraying port should be equal to the area swept by all the inner rod mixing wings and the outer rod mixing wings during rotation. The present invention can avoid structural interference of the multi-axis multi-layer mutual shearing mixing pile drill when constructing a continuous wall, and has the characteristics of consistent length of the mixing piles in the continuous wall, good construction quality, high work efficiency, and adjustable materials of the same mixing pile.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of geotechnical construction machinery and equipment, and in particular relates to a multi-axis multi-layer mutual shearing mixing drill for continuous mixing wall construction and a use method thereof. Background Art

[0002] As an economical and efficient construction technology in geotechnical engineering, column-type cement-soil continuous wall is often used in water-stop curtains, gravity retaining walls, SMW methods, etc. At present, most of the equipment used in the construction of column-type cement-soil continuous wall at home and abroad is a multi-axis unidirectional mixing drill, such as a two-, four-, and six-axis interchangeable cement-soil mixing pile device published in CN203080512U. Each mixing shaft is a unidirectional mixing shaft, which is mainly formed by overlapping the mixing wings on adjacent mixing shafts by horizontally staggered settings, thereby forming a continuous mixing pile wall. After verification in domestic and foreign markets, the two-way mixing pile technology can significantly improve the strength and uniformity of the mixing piles compared with the one-way mixing piles, especially the pile body quality of the multi-layer shearing type mixing piles has been significantly improved. However, when this mixing method is used for multi-axis mixing applications, the mixing wing assemblies on the adjacent mixing shafts will interfere seriously, resulting in technical difficulties in the overlap between the piles. A multi-axis two-way mixing pile drilling rig disclosed in CN116180723A needs to set a certain height difference between adjacent drill bit assemblies when a mixing continuous wall needs to be formed. This problem is solved by completely dislocating the drill bits. This method solves the problem of overlapping adjacent piles to a certain extent, but the adjacent mixing piles formed are of different lengths, which will cause the reinforcement depth to be partially insufficient or partially excessive. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a multi-axis, multi-layer, shearing mixing drill and a method of use for the construction of a continuous mixing wall. While greatly improving the quality of the mixing piles, the bottom elevations of the constructed columnar mixing pile walls can be made basically consistent and effective overlaps can be formed, thereby achieving the purpose of effective soil retaining and water stopping.

[0004] The objective of the present invention is achieved through the following technical scheme: a multi-axis multi-layer mutual shearing mixing drill for continuous mixing wall construction and a method of using the same, comprising a power head, a drill rod, a mutual shearing mixing drill bit and a material feeding channel; the drill rod comprises an outer drill rod and an inner drill rod, the material feeding channel is arranged inside the inner drill rod, the power head is used to drive the outer drill rod and the inner drill rod to rotate in opposite directions; the mutual shearing mixing drill bit comprises an inner rod mixing wing, an outer rod mixing wing and a spraying excavation wing; the inner rod mixing wing is arranged on the side wall of the inner drill rod, and the inner rod mixing wing and the inner drill rod can rotate simultaneously, one end of the outer rod mixing wing is fixedly connected to the outer drill rod, and the other end is rotatably connected to the inner drill rod, and the spraying excavation wing is arranged at the end of the inner drill rod;

[0005] The outer rod stirring wing comprises an inner shear wing, an outer shear wing and a vertical wing plate, wherein the inner shear wing is arranged on the inner side of the vertical wing plate, the inner shear wing and the inner rod stirring wing are staggered in a vertical plane, the outer shear wing is arranged on the outer side of the vertical wing plate, and adjacent outer shear wing are staggered in a vertical plane;

[0006] The material spraying and excavating wing comprises an excavating wing plate, an excavating tooth, and a material spraying pipe, and the material conveying channel is communicated with the material spraying pipe.

[0007] Preferably, the excavation wing plate is located outside the inner drill rod, and the excavation teeth are arranged on the cutting side of the excavation wing plate; the injection pipe can be located under the same excavation wing plate or under different excavation wing plates.

[0008] Preferably, adjacent said spraying and excavating wings are staggered in a vertical plane.

[0009] Preferably, a spraying port is provided on the side wall or end of the spraying pipe, with the central axis of the inner drill rod as the rotation axis, and the radius of the spraying coverage circle of the spraying port is greater than or equal to the radius of the outer rod stirring wing.

[0010] A multi-axis multi-layer mutual shearing mixing drill for mixing continuous wall construction and a use method thereof, comprising the following steps:

[0011] S1. Start the power head to drive the shear mixing drill bit to rotate, check whether the internal staggered shearing of the shear mixing drill bit is normal, and adjust the rotation speed of the outer drill rod and the inner drill rod to the design value;

[0012] S2. When the internal staggered shearing of the shearing and stirring drill bit is normal, start the slurry supply background, supply slurry through the feeding channel, the slurry enters the injection pipe through the feeding channel, and is sprayed out through the injection port. Check whether the injection port is unobstructed, and adjust the injection flow rate of the injection port to the design value;

[0013] S3, sink the drill bit to dig the soil according to the designed construction parameters, and at the same time spray the slurry from the spray port to mix with the soil to form cement soil, and continue to sink until the inner rod stirring wing and the outer rod stirring wing sink into the soil for further mixing. When the bottom of the drill bit reaches the designed elevation of the pile bottom, stop sinking;

[0014] S4. The slurry supply is stopped at the backstage, the power head switches to power steering and is lifted according to the designed construction parameters. The cement soil is mixed again, and the single continuous wall construction is completed when the drill bit is completely lifted out of the ground.

[0015] The beneficial effects of the present invention are as follows: compared with the prior art, by adopting this drilling tool structure, the spraying and stirring can cover the internal shearing area of ​​each drill bit and the external shearing overlapping area, ensuring the pile body quality of the single pile body and the overlapping area, and the formed column-type continuous wall can effectively retain soil and water. The bottom elevations of the single mixing piles in the single continuous wall are almost equal, and a continuous wall of equal height can be formed, and there will be no leakage of soil and water at the bottom of the wall caused by insufficient reinforcement depth of some single piles. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of a double-axis multi-layer shearing and stirring drill tool of the present invention.

[0017] Figure 2 yes Figure 1 Schematic diagram of the structure of the middle injection excavation wing area viewed from above.

[0018] Figure 3 It is a schematic structural diagram of the first type of spraying and excavating wing of the present invention.

[0019] Figure 4 It is a schematic structural diagram of the second type of spraying and excavating wing of the present invention.

[0020] Figure 5 It is a schematic structural diagram of the third type of spraying and excavating wing of the present invention.

[0021] Figure 6 It is a structural schematic diagram of the three-axis multi-layer mutual shearing and stirring drilling tool of the present invention.

[0022] Figure 7 yes Figure 6 Schematic diagram of the structure of the middle injection excavation wing area viewed from above.

[0023] Figure 8 It is a schematic diagram of a top view of a continuous wall portion of a mixing pile constructed by a biaxial multi-layer mutual shear mixing method according to the present invention.

[0024] Fig. 9 It is a schematic diagram of a top view of a continuous wall portion of a mixing pile constructed by a three-axis multi-layer mutual shear mixing method according to the present invention.

[0025] Fig.10 It is a schematic diagram of a top view of a continuous wall portion of mixing piles constructed by a four-axis multi-layer mutual shear mixing method according to the present invention.

[0026] Fig.11 It is a schematic diagram of a top view of a continuous wall portion of a square four-axis multi-layer mutual shear mixing construction mixing pile according to the present invention.

[0027] The reference numerals in the accompanying drawings are:

[0028] 1. Power head; 2. Drill rod; 3. Shearing and mixing drill bit; 4. Material feeding channel;

[0029] 201, outer drill rod; 202, inner drill rod; 301, inner rod stirring wing; 302, outer rod stirring wing; 303, spray excavation wing;

[0030] 3021, outer shear wing; 3022, inner shear wing; 3023, vertical wing plate; 3031, excavation wing plate; 3032, excavation tooth; 3033, injection pipe; 3034 injection port. DETAILED DESCRIPTION

[0031] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0032] Embodiment 1:

[0033] As attached Figures 1 to 5 As shown, the present embodiment is a multi-axis multi-layer mutual shearing mixing drill tool for the construction of a continuous mixing wall and a method of using the same, comprising a power head 1, a drill rod 2, a mutual shearing mixing drill bit 3 and a material delivery channel 4; the drill rod 2 comprises an outer drill rod 201 and an inner drill rod 202, the material delivery channel 4 is arranged inside the inner drill rod 202, the power head 1 is used to drive the outer drill rod 201 and the inner drill rod 202 to rotate in opposite directions; the mutual shearing mixing drill bit 3 comprises an inner rod mixing wing 301, an outer rod mixing wing 302 and a spraying excavation wing 303; the inner rod mixing wing 301 is arranged on the side wall of the inner drill rod 202, and the inner rod mixing wing 301 and the inner drill rod 202 can rotate simultaneously, one end of the outer rod mixing wing 302 is fixedly connected to the outer drill rod 201, and the other end is rotatably connected to the inner drill rod 202, and the spraying excavation wing 303 is arranged at the end of the inner drill rod 202;

[0034] The outer rod stirring wing 302 includes an inner shear wing 3022, an outer shear wing 3021 and a vertical wing plate 3023, wherein the inner shear wing 3022 is arranged on the inner side of the vertical wing plate 3023, the inner shear wing 3022 and the inner rod stirring wing 301 are staggered in the vertical plane, the outer shear wing 3021 is arranged on the outer side of the vertical wing plate 3023, and adjacent outer shear wing 3021 are staggered in the vertical plane;

[0035] The material spraying and excavating wing 303 includes an excavating wing plate 3031 , an excavating tooth 3032 , and a material spraying pipe 3033 , and the material conveying channel 4 is connected to the material spraying pipe 3033 .

[0036] By adopting this drilling tool structure, the spraying and mixing can cover the internal shearing area of ​​each drill bit and the external shearing overlap area, ensuring the quality of the single pile body and the overlap area. The column-type continuous wall formed can effectively retain soil and water. The bottom elevations of the individual mixing piles in a single continuous wall are almost equal, forming a continuous wall of equal height, and there will be no soil or water leakage at the bottom of the wall caused by insufficient reinforcement depth of some single piles.

[0037] The excavation wing plate 3031 is located on the outer side of the inner drill rod 202 , and the excavation teeth 3032 are arranged on the cutting side of the excavation wing plate 3031 ; the injection pipe 3033 is arranged on both sides of the injection excavation wing 303 , and the injection pipe 3033 is located below the excavation wing plate 3031 .

[0038] The spraying pipe 3033 can be arranged below the excavation wing plate 3031 on one side, or multiple spraying pipes can be arranged below the excavation wing plates 3031 on both sides. The area covered by all spraying ports 3034 should be equal to the area swept by all inner rod stirring wings 301 and outer rod stirring wings 302 during rotation; it ensures that all stirring wings move within the range of the soil body that has been sprinkled with curing agent slurry or powder, ensures the quality of the pile body and further reduces the rotation stirring resistance. The design of multiple spraying pipes can divide the cross section of a single pile, and the spraying area controlled by different spraying pipes can be flexibly adjusted. At the same time, different spraying pipes 3033 are connected to different feeding channels 4, and the curing materials used in the same pile can be combined in different ways. At the same time, the spraying pipe 3033 can be selected for wet spraying of slurry or dry spraying of powder according to process requirements.

[0039] According to the above structural and functional characteristics, combined with the needs of actual projects, a multi-axis multi-layer mutual shear mixing drill for continuous mixing wall construction and a specific form of the use method can be set to odd axes and even axes, the odd axes are 3 axes, 5 axes, 7 axes, 9 axes, etc., and the even axes are 2 axes, 4 axes, 6 axes, 8 axes, etc. The multi-axis can be arranged in a straight line or in multiple rows, and the mixing piles formed by the mutual shear mixing drill bits on adjacent drill rods are overlapped.

[0040] The adjacent injection and excavation wings 303 are staggered in the vertical plane.

[0041] The side wall or end of the spraying pipe 3033 is provided with a spraying port 3034 , with the central axis of the inner drill rod 202 as the rotation axis, and the radius of the spraying coverage circle of the spraying port 3034 is greater than or equal to the radius of the outer rod stirring wing 302 .

[0042] A multi-axis multi-layer mutual shearing mixing drill for mixing continuous wall construction and a use method thereof, comprising the following steps:

[0043] S1, start the power head 1 to drive the mutual shearing and stirring drill bit 3 to rotate, check whether the internal staggered mutual shearing of the mutual shearing and stirring drill bit 3 is normal, and adjust the rotation speed of the outer drill rod 201 and the inner drill rod 202 to the design value;

[0044] S2. When the internal staggered mutual shearing of the mutual shearing and stirring drill bit 3 is normal, the slurry supply background is started, and the slurry is supplied through the feeding channel 4. The slurry enters the injection pipe 3033 through the feeding channel 4 and is sprayed out through the injection port 3034. Check whether the injection port 3034 is unobstructed, and adjust the injection flow rate of the injection port 3034 to the designed value;

[0045] S3, sink the drill bit to dig the soil according to the designed construction parameters, and at the same time, spray the slurry from the spray port 3034 to mix with the soil to form cement soil, and continue to sink until the inner rod stirring wing 301 and the outer rod stirring wing 302 sink into the soil for further mixing. When the bottom of the drill bit reaches the designed elevation of the pile bottom, stop sinking;

[0046] S4, the slurry supply background stops supplying slurry, the power head 1 switches the power steering and is lifted according to the designed construction parameters, the cement soil is mixed again, and the continuous wall construction is completed when the drill bit is completely lifted out of the ground.

[0047] Embodiment 2:

[0048] As attached Figures 1 to 5 and Figure 8 As shown; this embodiment is a retaining structure using grid-type gravity cement soil retaining continuous wall technology, the retaining wall construction process uses a double-axis mixing process, two overlapping mixing piles are injected at a time (one section), the diameter of a single mixing pile is φ1000mm, the overlap distance H between piles is 300mm, and the overlap between sections is also 300mm. The diameter of the drill rod in the mixing drill is 180mm.

[0049] A double-axis multi-layer mutual shearing mixing drill tool for mixing continuous wall construction comprises a power head 1, a drill rod 2, a feed channel 4 and a mutual shearing mixing drill bit 3; the power head 1 can provide a driving force to drive two drill rods 2 to rotate simultaneously, each drill rod 2 comprises an outer drill rod 201 and an inner drill rod 202, and the two rotate in opposite directions under the drive of the power head 1; the mutual shearing mixing drill bit 3 comprises an inner rod mixing wing 301, an outer rod mixing wing 302 and a spraying excavation wing 303; the inner rod mixing wing 301 is distributed on the side wall of the inner drill rod 202, and rotates with the rotation of the inner drill rod 202, one end of the outer rod mixing wing 302 is fixedly connected to the outer drill rod 201, and the other end is rotatably connected to the inner drill rod 202, and rotates with the rotation of the outer drill rod 201. The outer rod stirring wing 302 includes an inner shearing wing 3022, an outer shearing wing 3021 and a vertical wing plate 3023. The inner shearing wing 3022 and the inner rod stirring wing 301 form internal staggered mutual shearing without interfering with each other when rotating. The outer shearing wing 3021 and the outer shearing wing 3021 on the adjacent mutual shearing stirring drill bit 3 form external staggered mutual shearing without interfering with each other when rotating. The spraying excavation wing 303 is located at the end of the mutual shearing stirring drill bit 3, including an excavation wing plate 3031, an excavation tooth 3032, and a spraying pipe 3033; two material delivery channels 4 are located inside the drill rod 2 and communicate with the corresponding spraying pipes 3033. Adjacent spraying excavation wings 303 are set with a certain height difference in the vertical plane.

[0050] The diameter of the rotation trajectory circle of the spraying and excavating wings 303 is 1050 mm, which is greater than or equal to the diameter of the rotation trajectory circle of the outer rod stirring wings 302 1000 mm.

[0051] The injection pipe 3033 is located below the excavation wing plate 3031 on one side. A injection port 3034 is provided on the side wall of the injection pipe 3033. The width of the injection port 3034 is set to 410 mm, which is equal to the radius of a single mixing pile 500 mm minus the radius of the inner drill rod 202 90 mm. The area covered by the injection is equal to the area swept by all the inner rod mixing wings 301 and the outer rod mixing wings 302 in rotation.

[0052] The method for using the biaxial multi-layer shearing mixing drill to construct a continuous mixing pile wall includes the following process steps:

[0053] S1, start the power head 1, rotate the shear mixing drill bits 3 on the two shafts, check whether the internal and external staggered shearing of the drill bits are normal, and adjust the rotation speeds of the inner drill rod 202 and the outer drill rod 201 to the designed values;

[0054] S2. If the above steps are normal, start the feeding backstage, feed the material through the feeding channel 4, and the slurry or powder is sprayed out from the spraying port 3034 through the feeding channel 4 and the spraying pipe 3033. Check whether the spraying of each spraying port 3034 is unobstructed, and adjust the spraying flow rate to the designed value.

[0055] S3, if the above steps are normal, sink the drill according to the designed construction parameters, dig the soil with the drill bit and spray slurry or powder to mix with it to form cement soil, continue to sink until the inner rod stirring wing 301 and the outer rod stirring wing 302 sink into the soil, further stir, and stop sinking when the bottom of the drill bit reaches the designed elevation of the pile bottom;

[0056] S4, the feeding background stops feeding, the power head switches to power steering and lifts according to the designed construction parameters, the cement soil is mixed again, and when the drill bit is completely lifted out of the ground, the single continuous wall construction is completed;

[0057] S5, the mixing pile machine is moved, and the center axis of the drill bit is aligned with the next adjacent pile position, so as to ensure that the center distance between the two overlapping piles in the two adjacent piles meets the design requirements, and the above steps S2 to S4 are repeated to complete the mixing pile construction;

[0058] S6. Repeat the above steps S5 and S2~S4 until the grid-type cement soil continuous wall is constructed.

[0059] Embodiment three:

[0060] As attached Figures 1 to 7 and Fig. 9 As shown, the background of this embodiment is that the foundation pit design adopts SMW method continuous wall technology as a two-in-one structure of water stop and retaining. The continuous wall construction process adopts three-axis mixing, and three overlapping mixing piles are injected at one time. The diameter φ of a single pile is 1000mm, the overlap distance H between piles is 250mm, and the overlap between spans is also 250mm. The mixing piles are implanted with steel in the form of "inserting two and jumping one" to increase the bending stiffness of the continuous wall.

[0061] The three-axis multi-layer mutual shearing mixing drill tool for mixing continuous wall construction comprises a power head 1, a drill rod 2, a material feeding channel 4 and a mutual shearing mixing drill bit 3; the power head 1 can provide driving force to drive the three drill rods 2 to rotate simultaneously, each drill rod 2 comprises an outer drill rod 201 and an inner drill rod 202, and the two rotate in opposite directions under the drive of the power head 1; the mutual shearing mixing drill bit 3 comprises an inner rod mixing wing 301, an outer rod mixing wing 302 and a spraying excavation wing 303; the inner rod mixing wing 301 is distributed on the side wall of the inner drill rod 202, and rotates with the rotation of the inner drill rod 202, one end of the outer rod mixing wing 302 is fixedly connected to the outer drill rod 201, and the other end is rotatably connected to the inner drill rod 202, and rotates with the rotation of the outer drill rod 201; the outer rod mixing wing 302 comprises an inner shear wing piece 3022, The outer shear wing 3021 and the vertical wing plate 3023, the inner shear wing 3022 and the inner rod stirring wing 301 form internal staggered shearing without interfering with each other when rotating; the outer shear wing 3021 and the outer shear wing 3021 on the adjacent shear stirring drill bit 3 form external staggered shearing without interfering with each other when rotating; the spraying and excavating wing 303 is located at the end of the shear stirring drill bit 3, including an excavating wing plate 3031, an excavating tooth 3032, and a spraying pipe 3033; a material conveying channel 4 is set inside the drill rod 2, and is connected to the corresponding spraying pipe 3033. The spraying and excavating wing 303 on the middle shaft and the spraying and excavating wing 303 on the left and right side shafts are set with a certain height difference to prevent interference during rotation, and the spraying and excavating wings 303 on the left and right side shafts can be set at the same height.

[0062] The diameter of the rotation trajectory circle of the spraying and excavating wings 303 is greater than or equal to the diameter of the rotation trajectory circle of the outer rod stirring wings 302.

[0063] The injection pipe 3033 is located below the excavation wing plate 3031 on one side, and a injection port 3034 is provided on the side wall of the injection pipe 3033; the width of the injection port 3034 is approximately equal to the radius of a single mixing pile minus the radius of the inner drill rod 202, and the area covered by the injection is equal to the area swept by all the inner rod mixing wings 301 and the outer rod mixing wings 302 in rotation.

[0064] The method for using the three-axis multi-layer shearing mixing drill to construct a continuous mixing pile wall includes the following process steps:

[0065] S1, start the power head 1, rotate the shear mixing drill bit 3 on the three shafts, check whether the internal and external staggered shearing of the drill bit are normal, and adjust the rotation speed of all the inner drill rods 202 and the outer drill rods 201 to the designed value;

[0066] S2. If the above steps are normal, start the feeding backstage, feed the material through the feeding channel 4, and the slurry or powder is sprayed out from the spraying port 3034 through the feeding channel 4 and the spraying pipe 3033. Check whether the spraying of each spraying port 3034 is unobstructed, and adjust the spraying flow rate to the designed value.

[0067] S3, if the above steps are normal, sink the drill according to the designed construction parameters, dig the soil with the drill bit and spray slurry or powder to mix with it to form cement soil, continue to sink until the inner rod stirring wing 301 and the outer rod stirring wing 302 sink into the soil for further mixing, and stop sinking when the bottom of the drill bit reaches the designed elevation of the pile bottom;

[0068] S4, the feeding background stops feeding, the power head 1 switches the power steering and lifts according to the designed construction parameters, the cement soil is mixed again, and the continuous wall construction is completed when the drill bit is completely lifted out of the ground;

[0069] S5, the mixing pile machine is moved, and the center axis of the drill bit is aligned with the next designed pile position, and the net distance from the first pile is the single pile diameter minus twice the overlap distance, to ensure that the overlapped sleeve of the third pile to be constructed later meets the design requirements, and the above steps S2 to S4 are repeated to complete the construction of the second mixing pile;

[0070] S6, the pile mixing machine continues to move to the middle position between the first and second piles, and repeats the above steps S2 to S4 to complete the overlapping of the third pile with the first and second piles;

[0071] S7. The mixing piles continue to move to the fourth and fifth positions in sequence, and the above steps S2 to S4 are repeated in this way until the grid-type cement soil continuous wall is constructed.

[0072] Embodiment 4:

[0073] As attached Figures 1 to 5 , Fig.10 As shown, the background of this embodiment is that a foundation pit is located in silty soft soil with poor physical and mechanical properties. The design adopts cantilever double-row piles as the retaining support structure. The main process is to implant two rows of precast concrete piles or steel pipe piles in a mixing pile grid (i.e., a mixing pile continuous wall) composed of three rows of cement soil. The mixing pile construction method is "one hole sleeve connection", and the concrete precast pile or steel pipe pile construction method is "one insert and one jump". The diameter φ of a single mixing pile is 1000mm, and the diameter of the concrete precast pile or steel pipe pile is 500mm. The mixing pile grid construction process adopts a four-axis mixing process, and four overlapping mixing piles are injected at a time. The overlap distance H between the piles is 250mm, and the overlap between the spans is also 250mm. The diameter of the drill rod in the mixing pile is 180mm.

[0074] A four-axis multi-layer mutual shearing mixing drill tool for mixing continuous wall construction comprises a power head 1, a drill rod 2, a material feeding channel 4 and a mutual shearing mixing drill bit 3; the power head 1 can provide a driving force to drive four drill rods 2 to rotate simultaneously, each drill rod 2 comprises an outer drill rod 201 and an inner drill rod 202, and the two rotate in opposite directions under the drive of the power head 1; the mutual shearing mixing drill bit 3 comprises an inner rod mixing wing 301, an outer rod mixing wing 302 and a spraying excavation wing 303; the inner rod mixing wing 301 is distributed on the side wall of the inner drill rod 202, and rotates with the rotation of the inner drill rod 202, one end of the outer rod mixing wing 302 is fixedly connected to the outer drill rod 201, and the other end is rotatably connected to the inner drill rod 202, and rotates with the rotation of the outer drill rod 201. The outer rod stirring wing 302 includes an inner shear wing 3022, an outer shear wing 3021 and a vertical wing plate 3023. The inner shear wing 3022 and the inner rod stirring wing 301 form internal staggered mutual shearing without interfering with each other when rotating. The outer shear wing 3021 and the outer shear wing 3021 on the adjacent mutual shear stirring drill bit 3 form external staggered mutual shearing without interfering with each other when rotating. The spray excavation wing 303 is located at the end of the mutual shear stirring drill bit 3, including an excavation wing plate 3031, an excavation tooth 3032, and a spray pipe 3033; two feed channels 4 are set inside the drill rod 2, and are respectively connected to the corresponding spray pipes 3033. The spray excavation wings 303 on adjacent axes are set with a certain height difference to prevent interference during rotation, and the spray excavation wings 303 on the interval axis are set at the same height.

[0075] The diameter of the rotation trajectory circle of the spraying and excavating wings 303 is greater than or equal to the diameter of the rotation trajectory circle of the outer rod stirring wings 302.

[0076] Two injection pipes 3033 are located below the excavation wing plates 3031 on both sides. The side walls of the injection pipes 3033 are provided with injection ports of a certain length. One injection port is close to the inner drill rod and has a width of 285 mm, while the other injection port is far away from the inner drill rod and has a width of 125 mm. The sum of the widths of the injection ports on both sides is 410 mm, which is equal to the radius of a single mixing pile minus the radius of the inner drill rod 202. The area covered by the injection ports is just overlapped, and the total area is equal to the area swept by all the inner rod mixing wings 301 and the outer rod mixing wings 302. Since it is necessary to concentrically implant concrete precast piles or steel pipe piles in the mixing piles in this example, in order to reduce the implantation resistance and ensure smooth construction, the injection port 3034 close to the inner drill rod 202 is set to eject material B, which has slow setting properties, and the injection port 3034 far away from the inner drill rod 202 is set to eject material A, which has good anti-seepage performance.

[0077] The method for using the four-axis multi-layer mutual shearing mixing drill to construct a continuous mixing pile wall includes the following process steps:

[0078] S1, start the power head 1, rotate the shear mixing drill bits 3 on the four axes, check whether the internal and external staggered shearing of the drill bits are normal, and adjust the rotation speeds of all the inner drill rods 202 and the outer drill rods 201 to the designed values;

[0079] S2. If the above steps are normal, start the feeding backstage, feed the material through the feeding channel 4, and the slurry or powder is sprayed out from the spraying port 3034 through the feeding channel 4 and the spraying pipe 3033. Check whether the spraying of each spraying port 3034 is unobstructed, and adjust the spraying flow rate to the designed value.

[0080] S3, if the above steps are normal, sink the drill according to the designed construction parameters, dig the soil with the drill bit and spray slurry or powder to mix with it to form cement soil, continue to sink until the inner rod stirring wing 301 and the outer rod stirring wing 302 sink into the soil for further mixing, and stop sinking when the bottom of the drill bit reaches the designed elevation of the pile bottom;

[0081] S4, the feeding background stops feeding, the power head 1 switches the power steering and lifts according to the designed construction parameters, the cement soil is stirred again, and when the drill bit is completely lifted out of the ground, the construction of the first continuous wall is completed;

[0082] S5, the mixing pile machine is moved, the center axis of the drill rod at the edge of the drill bit is aligned with the center of the edge pile of the first continuous wall, a pile is connected, and the above steps S2 to S4 are repeated to complete the construction of the second mixing pile;

[0083] S6. The mixing piles continue to be moved to the third position in sequence to complete the sleeve construction of the third pile, and the above steps S2 to S4 are repeated in this way until the grid-type cement soil continuous wall is constructed.

[0084] Embodiment five:

[0085] As attached Figures 1 to 5 , Fig.11 As shown, the background of this embodiment is that the revetments on both sides of a river channel of a certain water system adopt cantilever retaining wall structure, and the foundation soil below the retaining wall is silty soft soil with high water content. In order to prevent the retaining wall structure from sliding and overturning as a whole, grid-type dry spraying mixing piles are used to reinforce the foundation soil. The mixing piles adopt a four-axis multi-layer mutual shear mixing process, and four overlapping mixing piles (one piece) are injected at a time. The diameter φ of a single mixing pile is 900mm, the overlapping distance H between piles is 150mm, the overlapping distance between pieces is also 150mm, and the diameter of the drill rod in the mixing pile is 180mm.

[0086] The square four-axis multi-layer mutual shearing mixing drill tool for mixing continuous wall construction comprises a power head 1, a drill rod 2, a material feeding channel 4 and a mutual shearing mixing drill bit 3; the power head 1 can provide a driving force to drive four drill rods 2 to rotate simultaneously, each drill rod 2 comprises an outer drill rod 201 and an inner drill rod 202, and the two rotate in opposite directions under the drive of the power head 1; the mutual shearing mixing drill bit 3 comprises an inner rod mixing wing 301, an outer rod mixing wing 302 and a spraying excavation wing 303; the inner rod mixing wing 301 is distributed on the side wall of the inner drill rod 202, and rotates with the rotation of the inner drill rod 202, one end of the outer rod mixing wing 302 is fixedly connected to the outer drill rod 201, and the other end is rotatably connected to the inner drill rod 202, and rotates with the rotation of the outer drill rod 201, and the outer rod mixing wing 302 comprises Inner shear wing 3022, outer shear wing 3021 and vertical wing plate 3023, the inner shear wing 3022 and the inner rod stirring wing 301 form internal staggered shearing without interfering with each other during rotation, the outer shear wing 3021 and the outer shear wing 3021 on the adjacent shear stirring drill bit 3 form external staggered shearing without interfering with each other during rotation, the spraying and excavating wing 303 is located at the end of the shear stirring drill bit 3, including an excavating wing plate 3031, an excavating tooth 3032, and a spraying pipe 3033; two feed channels 4 are set inside the drill rod 2, and are respectively connected to the corresponding spraying pipes 3033, the spraying and excavating wings 303 on adjacent axes are set with a certain height difference to prevent interference during rotation, and the spraying and excavating wings 303 on the interval axis are set at the same height.

[0087] The diameter of the rotation trajectory circle of the spraying and excavating wings 303 is set to 950 mm, which is greater than or equal to the diameter of the rotation trajectory circle of the outer rod stirring wings 302 900 mm.

[0088] Two injection pipes 3033 are located below the excavation wing plates 3031 on both sides. A injection port 3034 is provided at the end of the injection pipe 3033. The injection port 3034 on one side is close to the inner drill rod 202, and the distance between the powder injection starting point and the central axis of the inner drill rod 202 is 90 mm, that is, the outlet is located on the side wall of the inner drill rod 202. The injection port 3034 on one side is far away from the inner drill rod 202, and the distance between the powder injection starting point and the central axis of the inner drill rod 202 is 300 mm. The sum of the spray coverage widths of the injection ports 3034 on both sides is 410 mm, which is equal to the radius of a single mixing pile minus the radius of the inner drill rod 202, and the total area is equal to the area swept by all the inner rod mixing wings 301 and the outer rod mixing wings 302.

[0089] The method for using the square four-axis multi-layer mutual shear mixing drill to construct a continuous mixing pile wall includes the following process steps:

[0090] S1, start the power head 1, rotate the shear mixing drill bits 3 on the four axes, check whether the internal and external staggered shearing of the drill bits are normal, and adjust the rotation speeds of all the inner drill rods 202 and the outer drill rods 201 to the designed values;

[0091] S2. If the above steps are normal, start the feeding backstage, feed the material through the feeding channel 4, and the curing agent powder is sprayed out from the spraying port 3034 through the feeding channel 4 and the spraying pipe 3033. Check whether the spraying of each spraying port 3034 is unobstructed, and adjust the spraying flow rate to the designed value.

[0092] S3, if the above steps are normal, sink the drill according to the designed construction parameters, dig the soil with the drill bit and spray powder to mix it to form cement soil, continue to sink until the inner rod stirring wing 301 and the outer rod stirring wing 302 sink into the soil for further mixing, and stop sinking when the bottom of the drill bit reaches the designed elevation of the pile bottom;

[0093] S4, the feeding background stops feeding, the power head 1 switches the power steering and lifts according to the designed construction parameters, the cement soil is mixed again, and when the drill bit is completely lifted out of the ground, the construction of the first continuous wall is completed;

[0094] S5, the mixing pile machine is moved, and the center axis of the drill bit is aligned with the next adjacent pile position, so as to ensure that the center distance between the two overlapping piles in the two adjacent piles meets the design requirements, and the above steps S2 to S4 are repeated to complete the construction of the second mixing pile;

[0095] S6. The mixing piles continue to be moved to the third position in sequence to complete the sleeve construction of the third pile. Repeat the above steps S2 to S4 until the grid-type cement soil continuous wall construction is completed.

[0096] The present invention is not limited to the above-mentioned embodiments. As long as it is based on the above-mentioned structural principle, no matter any changes are made in its shape or material composition, any structural design provided by the present invention is a variation of the present invention and should be considered to be within the scope of protection of the present invention.

Claims

1. A multi-axis multi-layer shearing mixing drill for continuous mixing wall construction, characterized in that: The invention comprises a power head (1), a drill rod (2), a shearing and stirring drill bit (3) and a material conveying channel (4); the drill rod (2) comprises an outer drill rod (201) and an inner drill rod (202); the material conveying channel (4) is arranged inside the inner drill rod (202); the power head (1) is used to drive the outer drill rod (201) and the inner drill rod (202) to rotate in opposite directions; the shearing and stirring drill bit (3) comprises an inner rod stirring wing (301), an outer rod A stirring wing (302) and a spraying and excavating wing (303); the inner rod stirring wing (301) is arranged on the side wall of the inner drill rod (202), and the inner rod stirring wing (301) and the inner drill rod (202) can rotate simultaneously; one end of the outer rod stirring wing (302) is fixedly connected to the outer drill rod (201), and the other end is rotatably connected to the inner drill rod (202); the spraying and excavating wing (303) is arranged at the end of the inner drill rod (202); The outer rod stirring wing (302) comprises an inner shear wing (3022), an outer shear wing (3021) and a vertical wing plate (3023), wherein the inner shear wing (3022) is arranged on the inner side of the vertical wing plate (3023), the inner shear wing (3022) and the inner rod stirring wing (301) are staggered in a vertical plane, the outer shear wing (3021) is arranged on the outer side of the vertical wing plate (3023), and adjacent outer shear wing (3021) are staggered in a vertical plane; The material spraying excavation wing (303) comprises an excavation wing plate (3031), an excavation tooth (3032), and a material spraying pipe (3033), and the material delivery channel (4) is connected to the material spraying pipe (3033); The side wall or end of the spraying pipe (3033) is provided with a spraying port (3034), with the central axis of the inner drill rod (202) as the rotation axis, and the radius of the spraying coverage circle of the spraying port (3034) is greater than or equal to the radius of the outer rod stirring wing (302).

2. According to claim 1, a multi-axis multi-layer shearing mixing drill for continuous mixing wall construction, characterized in that: The excavation wing plate (3031) is located on the outer side of the inner drill rod (202), and the excavation teeth (3032) are arranged on the cutting side of the excavation wing plate (3031); the injection pipe (3033) can be located under the same excavation wing plate (3031) or under different excavation wing plates (3031).

3. According to claim 2, a multi-axis multi-layer shearing mixing drill for continuous mixing wall construction, characterized in that: Adjacent injection and excavation wings (303) are staggered in a vertical plane.

4. A method for using a multi-axis multi-layer shearing mixing drill for continuous mixing wall construction according to any one of claims 1 to 3, characterized in that: The steps include: S1, starting the power head (1) to drive the mutual shearing and stirring drill bit (3) to rotate, checking whether the internal staggered mutual shearing of the mutual shearing and stirring drill bit (3) is normal, and adjusting the rotation speed of the outer drill rod (201) and the inner drill rod (202) to the design value; S2. When the internal staggered shearing of the shearing and stirring drill bit (3) is normal, the slurry supply backstage is started, and slurry is supplied through the feeding channel (4). The slurry enters the injection pipe (3033) through the feeding channel (4) and is sprayed out through the injection port (3034). Check whether the injection port (3034) is unobstructed, and adjust the injection flow rate of the injection port (3034) to the designed value. S3, sinking the drill bit to dig the soil according to the designed construction parameters, while spraying slurry from the spray port (3034) to mix with the soil to form cement soil, and continuing to sink until the inner rod stirring wing (301) and the outer rod stirring wing (302) sink into the soil for further mixing, and stopping sinking when the bottom of the drill bit reaches the designed elevation of the pile bottom; S4. The slurry supply backstage stops supplying slurry, the power head (1) switches the power steering and is lifted according to the designed construction parameters, the cement soil is stirred again, and when the drill bit is completely lifted out of the ground, the construction of the single continuous wall is completed.