Photovoltaic external template laying equipment

Through the automated hanging laying and anchoring technology of photovoltaic external formwork laying equipment, the problems of low installation efficiency and safety hazards on the side of the photovoltaic panel wall are solved, and stable installation and efficient construction are achieved.

CN118361045BActive Publication Date: 2024-10-11济南四建建设发展有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410611108.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2024-10-11
Estimated Expiration
2044-05-16

AI Technical Summary

Technical Problem

The existing photovoltaic panel wall side installation technology has problems such as low construction efficiency, high safety hazards and insufficient connection strength, especially when pre-installing rectangular combination frames on the roof takes a long time and has fewer connection points.

Method used

A photovoltaic external formwork laying equipment is designed. It uses suspended laying components and guide components to realize automatic continuous laying through anchors and anchoring agents. It combines electric cylinders and photovoltaic components to improve construction efficiency and safety. The interwoven steel structure of the formwork splicing parts enhances stability. sex.

Benefits of technology

It achieves stable installation of photovoltaic panels on the side of the wall, reduces construction preparation time and resource investment, improves construction safety and equipment stability, and enhances the strength and firmness of the formwork splices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118361045B_ABST
    Figure CN118361045B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of photovoltaic panel installation and laying, and specifically to a photovoltaic outer template laying device; it comprises a hanging laying component, a guiding component and a photovoltaic component, the hanging laying component is installed on the side of the outer template, the outer template is formed by stacking and splicing a plurality of template splicing parts formed by concrete pouring, the template splicing parts are provided with anchor sockets, and anchors are arranged in the anchor sockets; the present application utilizes the outer template to support the photovoltaic panel, so that the photovoltaic panel is not easily blown off by strong winds and has good stability, the equipment realizes the automatic continuous laying of the photovoltaic outer template by climbing and suspending on the outside of a plurality of stacked outer templates, ensures the construction efficiency and construction safety, and combines the use of anchors and anchoring agents to make the outer template firmly installed on the side of the wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of photovoltaic panel installation and laying, in particular to photovoltaic outer template laying equipment. Background Art

[0002] The combination of photovoltaic panels and buildings is an innovative application method that integrates solar power generation technology into buildings. Photovoltaic panels can be integrated into multiple parts of buildings, such as roofs, wall sides and ceilings;

[0003] Compared with the traditional roof installation method, the side wall installation of photovoltaic modules can place more photovoltaic panels on the side wall, which increases the power generation because the wall area is larger than the roof. In addition, the surface of the photovoltaic panels installed on the side wall is not easy to adhere to snow and dust, which can reduce the maintenance pressure and ensure the stable operation of the photovoltaic system. The combination of photovoltaic panels and buildings can reduce the material usage of the traditional side wall external formwork, thus achieving energy conservation and environmental protection.

[0004] The existing application number is CN202211115483.0, which is a photovoltaic panel roof laying device. The patent document discloses a method of using an end angle clamp to detachably connect with a rectangular combination frame preset on the roof to achieve rapid installation of photovoltaic panels on the roof. Specifically: in a single rectangular combination frame, when the quick-install frame bar is fixed to the fixed frame bar, one of the fixed frame bars is first fixed on the roof vertically and parallel to the roof, and then the quick-install frame bar is placed in a state perpendicular to the current fixed frame bar. At this time, the two spring pieces are retracted inward and inserted into the No. 1 rectangular socket. The two spring pieces will bounce outward and conflict with the hole wall of the No. 1 rectangular socket. The spring pieces on one end of each spring piece are The blocking strips will all be located inside the fixed frame strip and will conflict with the inner walls of the fixed frame strip on both sides of the No. 1 rectangular socket. At this point, the quick-install frame strip is connected to the fixed frame strip through the first quick-install plug-in. When connecting the fixed frame strip to the other end of the current quick-install frame strip, the fixed frame strip is first connected to the quick-install frame strip through the first quick-install plug-in, and then the fixed frame strip is fixed to the roof for laying. However, the laying of photovoltaic panels in the above-mentioned patent document requires the pre-installation of a rectangular combination frame at the roof position, which requires a long preparation time, and there are fewer connection points between the end corner clamp and the rectangular combination frame, which affects the connection strength between the photovoltaic panel and the building. When installed on the side of the wall for use, this operation will increase safety hazards. Summary of the invention

[0005] In order to solve the deficiencies in the above-mentioned prior art, the purpose of the present invention is to provide a photovoltaic outer formwork laying equipment, which uses the outer formwork to support the photovoltaic panels, so that the photovoltaic panels are not easily blown down by strong winds and have good stability. The equipment realizes the automatic and continuous laying of the photovoltaic outer formwork by climbing and hanging on the outside of multiple stacked outer formworks, thereby ensuring construction efficiency and construction safety. The outer formwork is firmly installed on the side of the wall by combining the use of anchors and anchoring agents.

[0006] The technical solution adopted by the present invention to solve the technical problem is:

[0007] A photovoltaic outer formwork laying device is provided, comprising a hanging laying component and a guiding component, wherein the hanging laying component is installed on the side of the outer formwork, the outer formwork is formed by stacking and splicing a plurality of formwork splicing pieces formed by concrete pouring, a photovoltaic panel and an anchor socket are provided on the formwork splicing piece, the photovoltaic panel is installed in the formwork splicing piece through a frame, the frame is embedded in a groove installed on the side of the formwork splicing piece, the outer surface of the photovoltaic panel is in contact with the side of the formwork splicing piece or is recessed in the side plane of the formwork splicing piece, and an anchor is provided in the anchor socket.

[0008] The anchor comprises a sleeve body and an embedded sleeve slidably mounted on the inner side of the sleeve body, an elastic limiting sleeve is installed between the sleeve body and the embedded sleeve, the outer wall of the elastic limiting sleeve abuts against the inner wall of the anchor socket, a limiting disk is arranged at the end of the sleeve body, one side of the limiting disk can abut against and fit with the end of the ejection end, and the other side of the limiting disk can abut against and fit with the transition surface of the stepped structure inside the anchor socket; the end of the embedded sleeve corresponds to the prefabricated hole on the wall.

[0009] Anchoring agent is stored in the embedded sleeve, and the sleeve body and the side of the embedded sleeve are respectively provided with flow holes I and flow holes II, and the plurality of flow holes I and flow holes II can be connected to each other.

[0010] The hanging laying assembly includes a first laying platform and a second laying platform, the second laying platform is slidably installed on the upper side of the first laying platform, and the sides of the first laying platform and the second laying platform are both slidably installed with multiple ejection ends, which can be inserted into the anchor sockets to push the ends of the anchors into the prefabricated holes in the wall, and the sides of the ejection ends are symmetrically slidably installed with two clamping heads, which can abut and fit against the inner walls of the anchor sockets.

[0011] The guide assembly is provided with a containing bucket, which is installed on the upper side of the second laying platform.

[0012] In this application, the power supply method can be cable power supply or photovoltaic module power supply;

[0013] The scheme of using photovoltaic components for power supply is: installing the photovoltaic components on the side of the guide component away from the outer template, and the photovoltaic components include a photovoltaic power supply panel, an inverter, a controller and a battery connected to each other through a wire I.

[0014] Furthermore, a plurality of pouring insertion holes are provided on the template splicing piece, and the steel bars in two adjacent template splicing pieces are staggered and inserted in the corresponding pouring insertion holes.

[0015] Furthermore, a plurality of steel bars are provided in the template assembly, and the plurality of steel bars are welded together horizontally and vertically and interlaced, the horizontal steel bars are embedded in the template assembly, and the vertical steel bars are located in the pouring holes; the number of the vertical steel bars is only half of the number of the pouring holes, and they are installed at intervals between the plurality of pouring holes, so that the vertical steel bars on adjacent template assembly pieces can be plugged into each other in the pouring holes corresponding to their respective positions, thereby increasing the stability of the initial stacking assembly of the template assembly pieces.

[0016] Furthermore, a guide column is installed on the second laying platform, and the guide column is slidably connected to the first laying platform. A first linear electric cylinder for controlling the second laying platform to slide relative to the first laying platform is installed on the first laying platform.

[0017] Furthermore, a plurality of second linear electric cylinders for individually controlling the movement of the ejection end heads are respectively installed on the first laying table and the second laying table.

[0018] In the present application, an optional technical solution for controlling the movement of the clamping head is: micro linear electric cylinders are respectively provided on both sides of the interior of the ejection end, and the movable ends of the micro linear electric cylinders are connected to the clamping head; the telescopic state of the clamping head on the side of the ejection end is actively adjusted.

[0019] In the present application, for the movement control method of the clamping head, another optional technical solution is: the clamping head is slidably connected to the ejection end head through two T-shaped columns, and a spring is fixedly installed between the T-shaped column and the limit ring on the ejection end head; a C-shaped arm is arranged in the clamping head, and one end of the C-shaped arm is slidably connected in the first sliding cavity of the clamping head, and the arc surface of the end edge of the C-shaped arm abuts and fits with the inclined surface on the ejection end head, and a plurality of second sliding cavities are respectively arranged in the first laying table and the second laying table, and the other end of the C-shaped arm is slidably connected in the second sliding cavity; the telescopic state of the clamping head on the side of the ejection end head is automatically adjusted.

[0020] Furthermore, a horizontal column is fixedly installed on the second laying platform, a connecting arm is slidably installed on the horizontal column, the connecting arm is fixedly installed on the outside of the containing bucket, a motor I is fixedly installed on the connecting arm, a gear is installed on the output shaft of the motor I, and the gear is connected to the tooth groove on the horizontal column through meshing transmission.

[0021] Furthermore, the edge of the accommodating bucket is provided with an outwardly extending outer edge, and the template assembly piece is hung to the upper side of the accommodating bucket by means of a clamp and a rope, and the template assembly piece is guided by the outer edge so that the template assembly piece and the accommodating bucket can be smoothly docked.

[0022] Furthermore, an insert is provided in the anchor socket, the sleeve body passes through the insert, and the side surface of the insert can abut against the limiting disk to improve the limiting performance.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. The photovoltaic outer template laying equipment of the example of the present invention, the outer template supports the photovoltaic panel, so that the photovoltaic panel is not easily blown down by strong wind and has good stability; the outer surface of the photovoltaic panel is in contact with the side of the template splicing part or is recessed in the side plane of the template splicing part, during the installation and laying of the photovoltaic outer template, it can prevent the equipment from scratching the photovoltaic panel; the photovoltaic panel is installed on the side of the wall, so it is not easy to adhere to snow and dust, reducing maintenance pressure and ensuring the stable operation of the photovoltaic system.

[0025] 2. The photovoltaic outer formwork laying equipment of the example of the present invention pushes the end of the anchor into the prefabricated hole in the wall. When the embedded sleeve abuts against the bottom of the prefabricated hole in the wall, an extrusion force is applied to the elastic limit sleeve, and a plurality of flow holes I and flow holes II are connected to each other. The anchoring agent enters between the outer side of the embedded sleeve and the inner wall of the prefabricated hole in the wall and solidifies, so that the photovoltaic outer formwork is firmly installed on the side of the wall. Compared with the solutions in the prior art, there is no need to pre-install a rectangular combination frame at the roof position, thereby reducing the preparation time before construction.

[0026] 3. The photovoltaic external formwork laying equipment of the example of the present invention controls the clamping heads on both sides of a part of the ejection end to extend so that the clamping heads are pressed against the inner wall of the anchor socket, and the equipment is suspended and positioned on the side of the formwork assembly. At the same time, the ejection end of the other part is controlled to push the anchor, and the above operations are alternated to ensure the stable construction operation of the suspended laying assembly, reduce the demand for manual laying operations, and have high construction safety.

[0027] 4. The photovoltaic exterior formwork laying equipment of the example of the present invention controls the vertical lifting and lowering of the second laying platform on the upper side of the first laying platform. During this process, the extension and retraction of the ejection ends on the first laying platform and the second laying platform are alternately controlled, and the corresponding clamping heads are tightly connected to the inner walls of the anchor sockets, thereby driving the entire equipment to climb and suspend on the outside of multiple stacked formwork components, and automatically and continuously laying photovoltaic exterior formwork, replacing the erection and use of scaffolding in the prior art, thereby reducing resource investment and time costs consumed in the construction preparation stage.

[0028] 5. In the photovoltaic external formwork laying equipment of the example of the present invention, the vertical steel bars on adjacent formwork components are plugged and connected to each other in the corresponding pouring holes at their respective positions, thereby increasing the stability of the initial stacking assembly of multiple formwork components and improving the climbing stability of the equipment on the outside of multiple stacked formwork components.

[0029] 6. In the photovoltaic external formwork laying equipment of the example of the present invention, the multiple steel bars in the formwork assembly are welded together horizontally and vertically to improve the use strength of a single formwork assembly; in addition, the pouring sockets of the multiple formwork assembly pieces stacked together are connected to each other, and cement is poured into the pouring sockets to increase the firmness of the formwork assembly pieces after being assembled and installed together.

[0030] 7. In the photovoltaic outer formwork laying equipment of the example of the present invention, the outer side walls of the elastic edge and the elastic limit sleeve can simultaneously abut against the inner side walls of the anchor insertion hole, so that the installation position of the anchor in the formwork assembly remains constant, avoiding the detachment of the anchor during the movement of the formwork assembly.

[0031] 8. The photovoltaic external formwork laying equipment of the example of the present invention uses photovoltaic components to provide energy for the first linear electric cylinder and the second linear electric cylinder, thereby reducing the need for laying power supply cables and alleviating the load during equipment climbing operations. The curing of the anchoring agent takes a long time, and during this waiting time, photovoltaic components are used for charging and energy storage, thereby reducing the need for laying complex power supply cables and ensuring stable construction efficiency.

[0032] 9. The photovoltaic external formwork laying equipment of the example of the present invention uses the extension edge to guide the formwork splicing parts, so that the formwork splicing parts hanging from the roof can be smoothly docked with the receiving bucket. In this process, the equipment does not need to consume too much energy to hold up the formwork splicing parts. The supporting force of the equipment is only provided by the ejection ends docked in multiple anchor sockets. The equipment adopts a lightweight design, which greatly reduces energy consumption.

[0033] 10. In the photovoltaic outer formwork laying equipment of the example of the present invention, adjacent formwork splicing parts are plugged together through corresponding convex edges and concave edges, which has a good positioning effect and facilitates the ejection end and the anchor socket to be quickly and smoothly connected together.

[0034] 11. In the photovoltaic external formwork laying equipment of the example of the present invention, multiple formwork splicing parts are stacked and spliced ​​together, and the corresponding positions of the upper formwork splicing parts and the wall sides are carried out with reference to the lower formwork splicing parts. Therefore, only the degree of fit between the bottom formwork splicing part and the wall side and the installation position need to be adjusted to limit the installation position of subsequent formwork splicing parts, which is highly convenient to operate.

[0035] 12. The photovoltaic external formwork laying equipment of the example of the present invention controls the connecting arm to slide back and forth on the horizontal column for a short distance, so that the containing bucket applies a shaking force to the formwork assembly at the top, so that adjacent formwork assembly parts can be butted together.

[0036] 13. The photovoltaic outer formwork laying equipment of the example of the present invention adds a C-shaped arm between the ejection end and the first laying platform or the second laying platform. After the ejection end is extended to the specified position, it drives the two clamping heads to automatically extend from both sides of the ejection end, thereby reducing the number of driving components and reducing the weight of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:

[0038] Figure 1 The overall structure of the photovoltaic outer template laying equipment provided by the embodiment of the present invention is schematically shown. Figure 1 ;

[0039] Figure 2 The overall structure of the photovoltaic outer template laying equipment provided by the embodiment of the present invention is schematically shown. Figure 2 ;

[0040] Figure 3 A schematic diagram of the structure of the template assembly and the containing bucket provided in an embodiment of the present invention;

[0041] Figure 4 A schematic diagram of the structure of a first laying platform, a second laying platform and a containing bucket provided in an embodiment of the present invention;

[0042] Figure 5 A schematic diagram of the structure of the ejector terminal and the cross column provided in an embodiment of the present invention;

[0043] Figure 6 A cross-sectional view of the structure of the ejector head, the clamping head and the C-shaped arm provided in an embodiment of the present invention;

[0044] Figure 7 A schematic diagram of the structure of placing the anchor provided by an embodiment of the present invention in a template assembly;

[0045] Figure 8 A schematic diagram of a structure in which an anchor provided by an embodiment of the present invention extends from a side of a template splicing piece;

[0046] Fig. 9 A schematic diagram of the structure of multiple template assembly parts in a disassembled state provided by an embodiment of the present invention;

[0047] Fig.10 A schematic diagram of the structure of steel bars within multiple template splicing parts provided in an embodiment of the present invention.

[0048] In the figure: 1 outer template, 11 template splicing part, 111 photovoltaic panel, 12 pouring socket, 13 steel bar, 14 anchor socket, 15 convex edge, 16 concave edge, 17 insert, 2 anchor, 21 sleeve body, 22 limit plate, 23 elastic edge, 24 embedded sleeve, 25 elastic limit sleeve, 3 suspension laying assembly, 31 first laying platform, 32 second laying platform, 33 guide column, 34 first linear electric cylinder, 35 second linear electric cylinder, 36 ejection end, 361 clamping head, 362 T-shaped column, 363 limit ring, 364 first sliding cavity, 365 C-shaped arm, 366 inclined surface, 367 second sliding cavity, 37 cross column, 38 tooth groove, 4 guide assembly, 41 accommodating bucket, 42 extension edge, 43 connecting arm, 44 motor I, 45 gear, 5 photovoltaic assembly. DETAILED DESCRIPTION

[0049] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0050] The components of the embodiments of the present invention generally described and shown in the drawings herein may be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention.

[0051] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present invention.

[0052] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0053] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0054] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings.

[0055] Embodiment 1:

[0056] like Figure 1-3 As shown, this embodiment provides a photovoltaic outer formwork laying device, including a hanging laying component 3, a guiding component 4 and a photovoltaic component 5, wherein the hanging laying component 3 is installed on the side of the outer formwork 1, and the outer formwork 1 is formed by stacking and splicing a plurality of formwork splicing parts 11 formed by pouring concrete, and a photovoltaic panel 111 and an anchor socket 14 are arranged in the formwork splicing part 11, and the photovoltaic panel 111 is installed in the formwork splicing part 11 through a frame, and the frame is embedded in a groove on the side of the formwork splicing part 11, and the outer surface of the photovoltaic panel 111 is in contact with the side of the formwork splicing part 11 or is recessed in the side plane of the formwork splicing part 11; an anchor 2 is arranged in the anchor socket 14.

[0057] The photovoltaic panel 111 is installed on the side of the wall, so it is not easy to adhere to snow and dust, reducing maintenance pressure and ensuring the stable operation of the photovoltaic system. Compared with the traditional roof installation method, since the area of ​​the wall is larger than the roof, more photovoltaic panels can be placed on the side of the wall to increase energy utilization efficiency.

[0058] Among them, the top and bottom of the template splicing piece 11 are respectively provided with a convex edge 15 and a concave edge 16, and the adjacent template splicing pieces 11 are plugged and connected together through the corresponding convex edges 15 and concave edges 16, which has a good positioning effect and facilitates the ejection end and the anchor socket to be quickly and smoothly connected together.

[0059] like Figure 2-3 and Figure 7-8As shown, the anchor 2 includes a sleeve body 21 and an embedded sleeve 24 slidably installed on the inner side of the sleeve body 21, an elastic limiting sleeve 25 is installed between the sleeve body 21 and the embedded sleeve 24, the outer wall of the elastic limiting sleeve 25 abuts against the inner wall of the anchor socket 14, and a limiting disk 22 is provided at the end of the sleeve body 21, one side of the limiting disk 22 can abut and fit with the end of the ejection end 36, and the other side of the limiting disk 22 can abut and fit with the transition surface of the stepped structure inside the anchor socket 14; the end of the embedded sleeve 24 corresponds to the prefabricated hole on the wall.

[0060] like Figure 7-8 As shown, an anchor is stored in the embedded sleeve 24, and the anchor is a chemical anchor, specifically, it can be a resin anchor that can be purchased on the market. The sleeve body 21 and the side of the embedded sleeve 24 are respectively provided with flow holes I and flow holes II. The multiple flow holes I and flow holes II can be connected to each other to form a channel for the anchor to flow out, so that it can enter between the outside of the embedded sleeve 24 and the inner wall of the prefabricated hole in the wall.

[0061] like Figure 1 and Figure 4-5 As shown, the suspended laying assembly 3 includes a first laying platform 31 and a second laying platform 32. The second laying platform 32 is slidably installed on the upper side of the first laying platform 31. A guide column 33 is installed on the second laying platform 32. The guide column 33 is slidably connected to the first laying platform 31. The first laying platform 31 is installed with a first linear electric cylinder 34 for controlling the second laying platform 32 to slide relative to the first laying platform 31; safety ropes are respectively arranged on both sides of the first laying platform 31, and the top of the safety rope is tied to the roof. The safety rope is only used for equipment anti-falling and recovery, but not for mobile positioning of the first laying platform 31.

[0062] like Figure 1-2 , Figure 4-5 and Figure 8 As shown, a plurality of ejector ends 36 are slidably installed on the sides of the first laying platform 31 and the second laying platform 32, and a plurality of second linear electric cylinders 35 for individually controlling the movement of the ejector ends 36 are respectively installed on the first laying platform 31 and the second laying platform 32. The ejector ends 36 can be inserted into the anchor socket 14 to push the end of the anchor 2 into the prefabricated hole on the wall. Two clamping heads 361 are symmetrically slidably installed on the sides of the ejector ends 36. The clamping heads 361 can abut and fit against the inner wall of the anchor socket 14 to realize the suspension of the hanging laying component 3 on the side of the template splicing part 11.

[0063] like Figure 1-3As shown, the guide assembly 4 is provided with a accommodating bucket 41, and the accommodating bucket 41 is connected to the second laying platform 32 through a connecting arm 43, and the two ends of the connecting arm 43 are fixedly connected to the accommodating bucket 41 and the second laying platform 32 respectively;

[0064] In this application, the power supply method can be cable power supply or photovoltaic module power supply;

[0065] The scheme of using photovoltaic components for power supply is: installing photovoltaic components 5 on the side of the guide component 4 away from the outer template 1, and the photovoltaic components 5 include a photovoltaic power supply panel, an inverter, a controller and a battery installed on the outside of the containing bucket 41 and connected to each other through a wire I. The first linear electric cylinder 34 is connected to the battery through a wire II, and the second linear electric cylinder 35 is connected to the battery through a wire III. Before the equipment is used, a certain amount of electricity can be charged in the battery to cope with low light intensity conditions.

[0066] In order to improve the smoothness of the docking between the template assembly 11 and the receiving bucket 41, as shown in FIG. Figure 1-3 As shown, an outwardly extending extension edge 42 is provided on the edge of the containing bucket 41, and the extension edge 42 is used to guide the template assembly 11, so that the template assembly 11 hanging from the roof can be smoothly docked with the containing bucket 41. In this process, the equipment does not need to consume too much energy to hold up the template assembly 11, and the supporting force of the equipment is only provided by the ejection end 36 docked in a plurality of anchor sockets 14. The equipment adopts a lightweight design, which greatly reduces energy consumption and increases compatibility with the photovoltaic module 5.

[0067] In order to increase the working efficiency of photovoltaic power supply panels, such as Figure 2 As shown, the photovoltaic power supply panel is rotatably installed at the lower end of the outer side of the extension edge 42, and a motor II is installed on the containing bucket 41 for driving the photovoltaic power supply panel to rotate at the side of the containing bucket 41. The motor II is connected to the battery through the wire IV. The motor II is started to control the photovoltaic power supply panel to rotate at the side of the containing bucket 41, so that the photovoltaic power supply panel can face the direction of sunlight, thereby increasing the solar energy conversion efficiency.

[0068] The steps for laying the template assembly 11 using the photovoltaic external template laying equipment of the present application are as follows:

[0069] 1. Use manual labor or a combination of manual labor and hanging laying components 3 to lay and install the template assembly 11 located at the lower end of the wall side, determine the degree of fit between the template assembly 11 and the wall side and the installation position; ensure that the subsequent stacked template assembly 11 refers to the installed template assembly 11 to determine the relative position with the wall side, thereby increasing the convenience of operation.

[0070] Second, start the second linear electric cylinder 35, control the ejector end 36 to move toward the depth of the anchor insertion hole 14, push the end of the anchor 2 into the prefabricated hole on the wall, and when the embedded sleeve 24 abuts against the bottom of the prefabricated hole on the wall, apply extrusion force to the elastic limit sleeve 25, control the embedded sleeve 24 to shrink toward the inside of the sleeve body 21, compress the anchoring agent therein, and make the originally staggered multiple flow holes I and flow holes II connected to each other, the anchoring agent enters between the outside of the embedded sleeve 24 and the inner wall of the prefabricated hole on the wall and solidifies, completing the installation operation of the template assembly 11 with the built-in photovoltaic panel 111 on the side of the wall.

[0071] 3. Use a clamp and a rope to vertically place the template assembly 11 on the upper side of the receiving bucket 41 , and use the outer edge 42 to guide the template assembly 11 so that the template assembly 11 and the receiving bucket 41 can be smoothly docked.

[0072] 4. Control the second laying platform 32 to vertically rise and fall on the upper side of the first laying platform 31. During this process, alternately control the extension and retraction of the ejection ends 36 on the first laying platform 31 and the second laying platform 32, and the corresponding clamping heads 361 are tightly connected to the inner wall of the anchor socket 14, driving the entire equipment to climb and suspend on the outside of multiple stacked template splicing parts, and automatically and continuously lay the photovoltaic outer template, replacing the scaffolding erection and use in the prior art, reducing resource investment and time costs consumed in the construction preparation stage.

[0073] In step 4, the movement control method for the clamping head 361 is to respectively set micro linear electric cylinders on both sides of the inside of the ejection end 36, and the movable ends of the micro linear electric cylinders are connected to the clamping head 361; and actively adjust the telescopic state of the clamping head 361 on the side of the ejection end 36.

[0074] While implementing the above operations, the photovoltaic component 5 is used to provide energy for the first linear electric cylinder 34 and the second linear electric cylinder 35, reducing the need for laying power supply cables and alleviating the load during equipment climbing operations. The curing of the anchoring agent takes a long time, and during this waiting time, the photovoltaic component 5 is used to charge and store energy, thereby ensuring stable construction efficiency while reducing the need for laying complex power supply cables.

[0075] In order to improve the positioning performance of the anchor member 2 in the template assembly 11, as Figure 7-8 As shown, an elastic edge 23 is fixedly installed on the outer side of the limit plate 22, so that the outer wall of the elastic edge 23 abuts against the inner wall of the anchor hole 14; the elastic edge 23 with elastic deformation ability and the outer wall of the elastic limit sleeve 25 are simultaneously abutted against the inner wall of the anchor hole 14, so that the installation position of the anchor 2 in the template assembly 11 remains constant, thereby preventing the anchor 2 from detaching during the movement of the template assembly 11.

[0076] In order to improve the stability of the initial stacking and assembly of multiple template splicing parts 11, as Fig. 9 As shown, a plurality of pouring sockets 12 are provided on the formwork splicing parts 11, and the steel bars 13 in two adjacent formwork splicing parts 11 are installed by staggered plugging in the corresponding pouring sockets 12, and the vertical steel bars 13 on the adjacent formwork splicing parts 11 are plugged and connected to each other in the corresponding pouring sockets 12 at their respective positions, thereby increasing the stability of the initial stacking assembly of the plurality of formwork splicing parts 11 and improving the climbing stability of the equipment on the outside of the plurality of stacked formwork splicing parts 11.

[0077] Among them, the pouring sockets 12 of the multiple stacked formwork splicing pieces 11 are connected to each other. After the multiple formwork splicing pieces are spliced ​​together, cement mortar is poured into the pouring sockets located at the top. The cement mortar enters the pouring sockets of the multiple formwork splicing pieces in turn and solidifies, thereby increasing the firmness of the formwork splicing pieces 11 after they are assembled and installed together.

[0078] In order to improve the use strength of a single template assembly 11, Figure 1-2 and Fig. 9 As shown, a plurality of steel bars 13 are arranged in the formwork assembly 11, and the plurality of steel bars 13 are welded together by being interlaced horizontally and vertically. The horizontal steel bars 13 are embedded in the formwork assembly 11 to improve the service strength of a single formwork assembly 11, and the vertical steel bars 13 are located in the pouring sockets 12; the number of the vertical steel bars 13 is only half of the number of the pouring sockets 12, and they are installed at intervals between the plurality of pouring sockets 12, so that the vertical steel bars 13 on adjacent formwork assembly 11 can be plugged into each other in the pouring sockets 12 corresponding to their respective positions, thereby increasing the stability of the initial stacking assembly of the formwork assembly 11.

[0079] It should be noted that the end of the transverse reinforcement 13 of the present application is hidden inside the edge of the template splicing piece 11. Figure 1-2 and Fig. 9 The exposure of the transverse reinforcement 13 at the end of the template splicing piece 11 is only used as a schematic representation of the existence of the transverse reinforcement 13.

[0080] Embodiment 2:

[0081] The features of this embodiment that are the same as those of the first embodiment are not described in detail. The difference between this embodiment and the first embodiment is that: Figure 7-8 As shown, in this embodiment, an insert 17 is provided in the anchor insertion hole 14 , the sleeve body 21 passes through the insert 17 , and the side surface of the insert 17 can abut against the limiting plate 22 .

[0082] During the molding and preparation process of the template assembly 11, the steel bars 13 and the inserts 17 are installed in the mold. As the concrete is solidified and formed in the mold, the installation operation of the steel bars 13 and the inserts 17 in the template assembly 11 is completed, and the concave-convex structure on the mold is used to form the pouring holes 12 and the anchor holes 14 in the template assembly 11.

[0083] Embodiment three:

[0084] The features of this embodiment that are the same as those of the first embodiment are not described in detail. The difference between this embodiment and the first embodiment is that: Figure 4 As shown, in this embodiment, a horizontal column 37 is fixedly installed on the second laying platform 32, a connecting arm 43 is slidably installed on the horizontal column 37, the connecting arm 43 is fixedly installed on the outside of the accommodating bucket 41, a motor Ⅰ44 is fixedly installed on the connecting arm 43, the motor Ⅰ44 is connected to the battery through the wire Ⅳ, a gear 45 is installed on the output shaft of the motor Ⅰ44, and the gear 45 is connected to the tooth groove 38 on the horizontal column 37 through meshing transmission.

[0085] Start the motor I 44 and control the connecting arm 43 to slide back and forth on the cross column 37 for a short distance, so that the accommodating bucket 41 applies a shaking force to the template assembly 11 at the top, so that the adjacent template assembly 11 can be plugged and docked together through the corresponding convex edges 15 and concave edges 16 to avoid small gaps from not docking, and the ejection end 36 can be smoothly inserted into the corresponding anchor socket 14.

[0086] Embodiment 4:

[0087] The features of this embodiment that are the same as those of the first embodiment are not described in detail. The difference between this embodiment and the first embodiment is that: Figure 6 As shown, in this embodiment, the clamping head 361 is slidably connected to the ejection end head 36 through two T-shaped columns 362, and a spring is fixedly installed between the T-shaped column 362 and the limit ring 363 on the ejection end head 36, which is used for automatically resetting and retracting on both sides of the ejection end head 36 when the clamping head 361 loses its pushing force.

[0088] A C-shaped arm 365 is provided in the clamping head 361, and one end of the C-shaped arm 365 is slidably connected in the first sliding cavity 364 on the clamping head 361. The arc surface of the end edge of the C-shaped arm 365 abuts and fits with the inclined surface 366 on the ejection end head 36. A plurality of second sliding cavities 367 are respectively provided in the first laying platform 31 and the second laying platform 32, and the other end of the C-shaped arm 365 is slidably connected in the second sliding cavity 367.

[0089] When the second linear electric cylinder 35 is started to drive the ejection end 36 to extend, the second sliding cavity 367 limits the C-shaped arm 365, so that the C-shaped arm 365 slides in the first sliding cavity 364 and gradually moves away from the clamping head 361 until the limit position. Since the arc surface of the end edge of the C-shaped arm 365 abuts and fits with the inclined surface 366 on the ejection end 36, when the ejection end 36 continues to extend, the clamping head 361 and the C-shaped arm 365 are automatically moved in the direction away from the ejection end 36, so that the clamping head 361 is pressed against the inner wall of the anchor socket 14.

[0090] Using the above-mentioned solution of this embodiment instead of the micro linear electric cylinder in the first embodiment can reduce the number of driving components, reduce the weight of the equipment, and increase the lightweight use effect of the equipment.

[0091] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.

[0092] Except for the technical features described in the specification, the remaining technical features are known technologies to those skilled in the art. In order to highlight the innovative features of the present invention, the remaining technical features will not be described here in detail.

Claims

1. A photovoltaic external template laying device, characterized in that: include: A hanging laying assembly (3) capable of being hung on the side of an outer template (1); the outer template (1) is composed of a plurality of template splicing pieces (11) stacked and assembled, and the template splicing pieces (11) have built-in photovoltaic panels (111) and anchor sockets (14); The hanging laying assembly (3) comprises a first laying platform (31) and a second laying platform (32) slidably mounted on the upper side of the first laying platform (31); a plurality of ejection ends (36) capable of being inserted into the anchor insertion hole (14) are slidably mounted on the sides of the first laying platform (31) and the second laying platform (32); clamping heads (361) capable of being pressed against the inner side wall of the anchor insertion hole (14) are slidably mounted on both sides of the ejection ends (36); An anchor (2) is arranged in the anchor insertion hole (14); the anchor (2) comprises a sleeve body (21) and an embedded sleeve (24) slidably mounted inside the sleeve body (21); an elastic limiting sleeve (25) is mounted between the sleeve body (21) and the embedded sleeve (24); an outer wall of the elastic limiting sleeve (25) abuts against an inner wall of the anchor insertion hole (14); A limiting plate (22) is provided at the end of the sleeve body (21), one side of the limiting plate (22) being capable of abutting and fitting with the end of the ejection end head (36), and the other side of the limiting plate (22) being capable of abutting and fitting with the transition surface of the stepped structure inside the anchor insertion hole (14); the end of the embedded sleeve (24) corresponds to the prefabricated hole on the wall surface; An anchoring agent is stored in the embedded sleeve (24), and the sleeve body (21) and the side of the embedded sleeve (24) are respectively provided with a flow hole I and a flow hole II; When the elastic limiting sleeve (25) is in a relaxed state, the plurality of flow holes I and flow holes II are staggered with each other; When the elastic limiting sleeve (25) is under pressure, the plurality of flow holes I and flow holes II are connected to each other, and the anchoring agent flows through the flow holes I and flow holes II into the space between the outer side of the anchor member (2) and the inner wall of the prefabricated hole on the wall; A guide assembly (4) connected to the upper side of the hanging laying assembly (3); the guide assembly (4) comprises a receiving bucket (41) with an extension edge (42) at the top, the receiving bucket (41) being used to receive and guide the template assembly (11) hanging from the roof; The clamping head (361) is slidably connected to the ejection end head (36) via two T-shaped columns (362); a C-shaped arm (365) is provided in the clamping head (361), one end of the C-shaped arm (365) is slidably connected to a first sliding cavity (364) on the clamping head (361), the arc surface of the end edge of the C-shaped arm (365) is in abutment with the inclined surface (366) on the ejection end head (36), and a plurality of second sliding cavities (367) are respectively provided in the first laying platform (31) and the second laying platform (32), and the other end of the C-shaped arm (365) is slidably connected to the second sliding cavity (367); A spring is fixedly installed between the T-shaped column (362) and the limiting ring (363) on the ejection end head (36); A guide column (33) is installed on the second laying platform (32), the guide column (33) is slidably connected to the first laying platform (31), and a first linear electric cylinder (34) for controlling the second laying platform (32) to slide relative to the first laying platform (31) is installed on the first laying platform (31); A plurality of second linear electric cylinders (35) for independently controlling the movement of the ejection end head (36) are respectively installed on the first laying platform (31) and the second laying platform (32); A horizontal column (37) is fixedly mounted on the second laying platform (32), a connecting arm (43) is slidably mounted on the horizontal column (37), the connecting arm (43) is fixedly mounted on the outside of the containing bucket (41), a motor I (44) is fixedly mounted on the connecting arm (43), a gear (45) is mounted on the output shaft of the motor I (44), and the gear (45) is connected to the tooth groove (38) on the horizontal column (37) through meshing transmission.

2. The photovoltaic outer formwork laying equipment according to claim 1, characterized in that: The photovoltaic panel (111) is installed in the template assembly piece (11) via a frame, and the frame is embedded in a groove on the side of the template assembly piece (11). The outer surface of the photovoltaic panel (111) is in contact with the side of the template assembly piece (11) or is recessed in the side plane of the template assembly piece (11).

3. The photovoltaic outer formwork laying equipment according to claim 1, characterized in that: The template assembly piece (11) is provided with a plurality of pouring insertion holes (12), and the steel bars (13) in two adjacent template assembly pieces (11) are staggered and inserted in the corresponding pouring insertion holes (12) for installation.

4. The photovoltaic outer formwork laying equipment according to claim 1, characterized in that: A plurality of steel bars (13) are provided in the template splicing piece (11), and the plurality of steel bars (13) are welded together horizontally and vertically, the horizontal steel bars (13) are embedded in the template splicing piece (11), and the vertical steel bars (13) are located in the pouring socket (12).

5. The photovoltaic outer formwork laying equipment according to claim 1, characterized in that: The top and bottom of the template assembly piece (11) are respectively provided with a convex edge (15) and a concave edge (16), and adjacent template assembly pieces (11) are plugged and butted together via the corresponding convex edges (15) and concave edges (16).

6. The photovoltaic outer formwork laying equipment according to claim 1, characterized in that: An insert (17) is disposed in the anchor insertion hole (14), the sleeve body (21) passes through the insert (17), and the side surface of the insert (17) can abut against the limit plate (22).