New energy coordinated control method and system under power supply guarantee
Using deep learning algorithms to predict electricity consumption and energy supply, and calculate the collaborative supplementary demand for new energy, it solves the problems of power system stability and economy under the rapid development of new energy, achieves accurate matching of electricity demand and supply, and ensures improve the reliability of the power system.
Patent Information
- Application Number
- CN202410672649.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-05-28
AI Technical Summary
In the context of the rapid development of new energy, how to efficiently utilize renewable energy such as wind energy and solar energy while ensuring the stability and economy of the power system has become a key issue that needs to be solved urgently in the power industry.
By obtaining historical data on regional electricity consumption and traditional energy supply, deep learning algorithms are used to predict electricity demand and energy supply, calculate new energy collaborative supplementary needs, determine new energy power supply supplementary amounts, and ensure guaranteed power supply.
It achieves precise matching of power demand and supply, improves the stability and economy of the power system, and ensures the reliability of the power system.
Smart Images

Figure CN118365474B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of power supply security, and specifically to a method and system for coordinated regulation of new energy under power supply security. Background Art
[0002] Power supply security, that is, guaranteed power supply, refers to ensuring that the power system can continuously, stably and reliably provide users with the required electricity under various circumstances.
[0003] In today's global energy transformation, the issue of power supply has become increasingly prominent. Especially in today's rapid development of new energy, how to efficiently utilize renewable energy such as wind and solar energy while ensuring the stability and economy of the power system has become a key issue that needs to be urgently addressed in the power industry.
[0004] Therefore, a method and system for coordinated regulation of new energy sources under guaranteed power supply is expected. Summary of the invention
[0005] The present disclosure is made in consideration of the above problems. One purpose of the present disclosure is to provide a method and system for coordinated regulation of new energy under power supply guarantee.
[0006] An embodiment of the present disclosure provides a method for coordinated regulation of new energy under power supply guarantee, which includes: obtaining historical data of regional electricity consumption and historical data of traditional energy power supply; arranging the historical data of regional electricity consumption and the historical data of traditional energy power supply into vectors according to the time dimension respectively, and then vector segmenting the obtained vectors to obtain a sequence of local time series input vectors of regional electricity consumption and a sequence of local time series input vectors of traditional energy power supply; performing information transmission and electricity supply and demand prediction on the sequence of local time series input vectors of regional electricity consumption and the sequence of local time series input vectors of traditional energy power supply respectively to obtain a predicted regional electricity consumption time series associated implicit feature vector and a predicted traditional energy power supply time series associated implicit feature vector; calculating a new energy coordinated supplementary demand time series associated expression feature vector between the predicted regional electricity consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; and determining the new energy power supply supplement amount based on the new energy coordinated supplementary demand time series associated expression feature vector.
[0007] For example, according to the method for coordinated regulation of new energy under power supply guarantee according to an embodiment of the present disclosure, information transmission and power supply and demand prediction are performed on the sequence of the local time series input vectors of the regional power consumption and the sequence of the local time series input vectors of the traditional energy power supply respectively to obtain the implicit feature vector associated with the predicted regional power consumption time series and the implicit feature vector associated with the predicted traditional energy power supply time series, including: taking the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector as the current regional power consumption local time series input vector, and based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector The input vector performs information transfer optimization on the local time series input vector of the current regional electricity consumption to obtain the implicit feature vector associated with the timing of the predicted regional electricity consumption; and the last local time series input vector of the traditional energy power supply in the sequence of the local time series input vector of the traditional energy power supply is used as the current local time series input vector of the traditional energy power supply, and based on all other local time series input vectors of the traditional energy power supply in the sequence of the local time series input vector of the traditional energy power supply, the current local time series input vector of the traditional energy power supply is optimized for information transfer to obtain the implicit feature vector associated with the timing of the predicted traditional energy power supply.
[0008] For example, according to the method for coordinated regulation of new energy under power supply guarantee of an embodiment of the present disclosure, the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector, including: using all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to perform information transfer optimization on the current regional power consumption local time series input vector to obtain a sequence of the current regional power consumption local time series input vector after transfer; and taking the positional mean vector of the sequence of the current regional power consumption local time series input vector after the transfer to obtain the predicted regional power consumption time series associated implicit feature vector.
[0009] For example, according to the method for coordinated regulation of new energy under power supply guarantee of an embodiment of the present disclosure, the information transmission optimization of the current regional power consumption local time series input vector is performed using all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain a sequence of the current regional power consumption local time series input vector after the transmission, including: constructing a double correlation transfer weight based on the relationship between other regional power consumption local time series input vectors and the current regional power consumption local time series input vector to obtain a first correlation transfer weight and a second correlation transfer weight; and performing point multiplication on the first correlation transfer weight, the second correlation transfer weight and the current regional power consumption local time series input vector to obtain the current regional power consumption local time series input vector after the transmission.
[0010] For example, according to the method for coordinated regulation of new energy under power supply guarantee according to an embodiment of the present disclosure, the first association transfer weight is the cosine similarity between the local time series input vector of the current regional power consumption and the local time series input vector of the other regional power consumption.
[0011] For example, according to the method for coordinated regulation of new energy under power supply guarantee according to an embodiment of the present disclosure, the second associated transfer weight is the number of characteristic vectors between the local time series input vector of the current regional power consumption and the local time series input vectors of the other regional power consumption.
[0012] For example, according to the method for coordinated regulation of new energy under power supply guarantee of an embodiment of the present disclosure, the timing-related expression feature vector of coordinated new energy supplement demand between the predicted regional power consumption timing-related implicit feature vector and the predicted traditional energy power supply timing-related implicit feature vector is calculated, including: calculating the positional difference between the predicted regional power consumption timing-related implicit feature vector and the predicted traditional energy power supply timing-related implicit feature vector to obtain the timing-related expression feature vector of coordinated new energy supplement demand.
[0013] For example, according to the method for coordinated regulation of new energy under power supply guarantee of an embodiment of the present disclosure, the amount of new energy power supply supplement is determined based on the time-series correlation expression feature vector of the new energy coordinated supplement demand, including: passing the time-series correlation expression feature vector of the new energy coordinated supplement demand through a new energy power supply supplement amount predictor based on a decoder to obtain a predicted value, and the predicted value is the new energy power supply supplement amount.
[0014] The embodiment of the present disclosure also provides a new energy coordinated control system under power supply guarantee, which includes: a historical data acquisition module, which is used to acquire the historical data of regional power consumption and the historical data of traditional energy power supply; a vectorization and vector segmentation module, which is used to arrange the historical data of regional power consumption and the historical data of traditional energy power supply into vectors according to the time dimension, respectively, and then perform vector segmentation on the obtained vectors to obtain a sequence of local time series input vectors of regional power consumption and a sequence of local time series input vectors of traditional energy power supply; a transfer prediction module, which is used to perform vector segmentation on the local time series input vectors of regional power consumption; The sequence of quantities and the sequence of local time series input vectors of traditional energy power supply are respectively subjected to information transmission and power supply and demand prediction to obtain the implicit feature vector of predicted regional power consumption time series association and the implicit feature vector of predicted traditional energy power supply time series association; a collaborative calculation module is used to calculate the new energy collaborative supplement demand time series association expression feature vector between the predicted regional power consumption time series association implicit feature vector and the predicted traditional energy power supply time series association implicit feature vector; and a supplement quantity determination module is used to determine the new energy power supply supplement quantity based on the new energy collaborative supplement demand time series association expression feature vector.
[0015] For example, according to the embodiment of the present disclosure, the new energy coordinated control system under the power supply guarantee, wherein the transmission prediction module includes: a regional power consumption information transmission optimization unit, which is used to take the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector as the current regional power consumption local time series input vector, and optimize the current regional power consumption local time series input vector for information transmission based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector; and an energy supply information transmission optimization unit, which is used to take the last traditional energy power supply local time series input vector in the sequence of the traditional energy power supply local time series input vector as the current traditional energy power supply local time series input vector, and optimize the current traditional energy power supply local time series input vector for information transmission based on all other traditional energy power supply local time series input vectors in the sequence of the traditional energy power supply local time series input vector to obtain the predicted traditional energy power supply time series associated implicit feature vector.
[0016] According to the method and system for coordinated regulation of new energy under power supply security in the embodiments of the present invention, a deep learning algorithm is used to predict power demand based on historical data of regional power consumption, and to predict power supply of traditional energy based on historical data of power supply of traditional energy. The difference between the two is used as the recommended value for coordinated supply of new energy to ensure power supply security. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the following briefly introduces the drawings of the embodiments of the present disclosure. Obviously, the drawings described below only relate to some embodiments of the present disclosure, and are not intended to limit the present disclosure.
[0018] Figure 1 A schematic diagram of the application architecture of the method for coordinated regulation of new energy under power supply guarantee in an embodiment of the present disclosure is shown.
[0019] Figure 2 A flow chart of a method for coordinated regulation of new energy sources under power supply security in an embodiment of the present disclosure is shown.
[0020] Figure 3 A flowchart of sub-step S530 of the method for coordinated regulation of new energy under power supply guarantee in an embodiment of the present disclosure is shown.
[0021] Figure 4 A structural schematic diagram of a new energy coordinated control system under power supply guarantee in an embodiment of the present disclosure is shown.
[0022] Figure 5 An application scenario diagram of the method for coordinated regulation of new energy under power supply guarantee in an embodiment of the present disclosure is shown.
[0023] Figure 6 A schematic diagram of a storage medium according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present disclosure will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present disclosure, rather than all embodiments. Based on the embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work also fall within the scope of protection of the present disclosure.
[0025] The terms used in this specification are those general terms currently widely used in the art in consideration of the functions of the present disclosure, but these terms may vary according to the intention of a person of ordinary skill in the art, precedents, or new technologies in the art. In addition, specific terms may be selected by the applicant, and in this case, their detailed meanings will be described in the detailed description of the present disclosure. Therefore, the terms used in the specification should not be understood as simple names, but rather as an overall description based on the meaning of the terms and the present disclosure.
[0026] Although the present disclosure makes various references to certain modules in the system according to embodiments of the present disclosure, any number of different modules can be used and run on a user terminal and / or server. The modules are illustrative only, and different aspects of the systems and methods can use different modules.
[0027] Flowcharts are used in this disclosure to illustrate the operations performed by the system according to the embodiments of the present disclosure. It should be understood that the preceding or following operations are not necessarily performed precisely in order. On the contrary, various steps may be processed in reverse order or simultaneously as required. At the same time, other operations may also be added to these processes, or one or more operations may be removed from these processes.
[0028] Figure 1 A schematic diagram of the application architecture of the method for coordinated regulation of new energy under power supply guarantee in an embodiment of the present disclosure is shown, including a server 100 and a terminal device 200.
[0029] The terminal device 200 and the server 100 can be connected via the Internet to achieve mutual communication. Optionally, the above-mentioned Internet uses standard communication technology and / or protocol. The Internet is usually the Internet, but it can also be any network, including but not limited to any combination of a local area network (LAN), a metropolitan area network (MAN), a wide area network (WAN), a mobile, wired or wireless network, a private network or a virtual private network. In some embodiments, the data exchanged through the network can be represented by technologies and / or formats including Hyper Text Markup Language (HTML), Extensible Markup Language (XML), etc. In addition, conventional encryption technologies such as Secure Socket Layer (SSL), Transport Layer Security (TLS), Virtual Private Network (VPN), Internet Protocol Security (IPsec), etc. can be used to encrypt all or some links. In other embodiments, customized and / or dedicated data communication technologies can also be used to replace or supplement the above-mentioned data communication technologies.
[0030] The server 100 can provide various network services for the terminal device 200, wherein the server 100 can be a single server, a server cluster consisting of several servers, or a cloud computing center. Specifically, the server 100 may include a processor 110 (Center Processing Unit, CPU), a memory 120, an input device 130, and an output device 140, etc. The input device 130 may include a keyboard, a mouse, a touch screen, etc., and the output device 140 may include a display device, such as a liquid crystal display (Liquid Crystal Display, LCD), a cathode ray tube (Cathode Ray Tube, CRT), etc.
[0031] The memory 120 may include a read-only memory (ROM) and a random access memory (RAM), and provides the processor 110 with program instructions and data stored in the memory 120. In the embodiment of the present disclosure, the memory 120 may be used to store the program of the method for coordinated regulation of new energy under power supply guarantee in the embodiment of the present disclosure.
[0032] The processor 110 calls the program instructions stored in the memory 120, and the processor 110 is used to execute the steps of any method for coordinated regulation of new energy under power supply guarantee in the embodiments of the present disclosure according to the obtained program instructions.
[0033] In addition, the application architecture diagram in the embodiment of the present disclosure is intended to more clearly illustrate the technical solution in the embodiment of the present disclosure, and does not constitute a limitation on the technical solution provided in the embodiment of the present disclosure. Of course, for other application architectures and business applications, the technical solution provided in the embodiment of the present disclosure is also applicable to similar problems.
[0034] The following is a non-restrictive description of the method for coordinated regulation of new energy under power supply security provided by at least one embodiment of the present disclosure through several examples or embodiments. As described below, different features in these specific examples or embodiments can be combined with each other without conflicting with each other to obtain new examples or embodiments, and these new examples or embodiments also fall within the scope of protection of the present disclosure.
[0035] In response to the above technical problems, the technical concept of this application is to combine deep learning algorithms to predict electricity demand based on historical data of regional electricity consumption, and to predict traditional energy electricity supply based on historical data of traditional energy electricity supply. The difference between the two is used as a recommended value for the coordinated supply of new energy to ensure power supply.
[0036] Based on this, Figure 2 The flowchart of the method for coordinated regulation of new energy under power supply guarantee in the embodiment of the present disclosure is shown. For example, the method for coordinated regulation of new energy under power supply guarantee can be executed by a server, which can be Figure 1 The server 100 shown in FIG. Figure 2 As shown, according to the method for coordinated regulation of new energy under power supply guarantee according to the embodiment of the present disclosure, the steps include: S510, obtaining historical data of regional power consumption and historical data of traditional energy power supply; S520, arranging the historical data of regional power consumption and the historical data of traditional energy power supply into vectors according to the time dimension respectively, and performing vector segmentation on the obtained vectors to obtain a sequence of local time series input vectors of regional power consumption and a sequence of local time series input vectors of traditional energy power supply; S530, arranging the sequence of local time series input vectors of regional power consumption and the sequence of local time series input vectors of traditional energy power supply into vectors; The sequence of local time series input vectors of traditional energy power supply is respectively subjected to information transmission and power supply and demand forecasting to obtain the predicted regional power consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; S540, calculating the new energy collaborative supplement demand time series associated expression feature vector between the predicted regional power consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; and, S550, determining the new energy power supply supplement amount based on the new energy collaborative supplement demand time series associated expression feature vector.
[0037] Specifically, in the technical solution of the present application, first, the historical data of regional electricity consumption and the historical data of traditional energy power supply are obtained. Here, the historical data of regional electricity consumption and the historical data of traditional energy power supply provide a basis for predicting future electricity demand and traditional energy power supply. It should be understood that by analyzing the historical data, the periodic patterns of electricity consumption and power supply can be identified, such as seasonal changes, differences between weekdays and weekends, and peaks and troughs of electricity consumption in different time periods of the day. More specifically, the historical data of regional electricity consumption records the electricity consumption of a specific area within a predetermined time period, which reflects the electricity demand pattern in different time periods, and plays an important role in predicting electricity demand. The historical data of traditional energy power supply involves the supply of traditional power generation resources, which may include data such as power generation, power generation efficiency, and equipment operating status of power plants. These data help to understand the operation and reliability of traditional energy power generation systems, as well as the contribution of their power generation resources to power supply. By combining the information from both, we can understand the fluctuation pattern of electricity demand and the changes in the supply rules of traditional energy, thereby providing a comprehensive perspective for power system operators and providing important data support for the prediction of renewable energy power supply replenishment, further achieving supply and demand balance.
[0038] Considering that the regional electricity demand and the supply of traditional energy fluctuate over time. In other words, the regional electricity demand and the supply of traditional energy have a complex temporal dependency in the time dimension. In the technical solution of the present application, it is expected that the historical data of the regional electricity consumption and the historical data of the traditional energy supply are arranged as vectors according to the time dimension, and then the obtained vectors are vector segmented to obtain a sequence of local time series input vectors of regional electricity consumption and a sequence of local time series input vectors of traditional energy supply. In this way, the historical data of regional electricity consumption and the historical data of traditional energy supply with discrete time series distribution can be converted into structured vector representations, and the long-distance time series can be split into vectors with local time spans by vector segmentation, so that the subsequent model can identify subtle change patterns.
[0039] It should be understood that in the technical solution of the present application, the estimation and prediction of the amount of supplementary power supply from new energy sources is based on the prediction of regional power consumption and the prediction of power supply from traditional energy sources. In the actual application scenario of the present application, considering that power demand and power supply from traditional energy sources are usually continuous and trendy, historical data can be used to predict power consumption and traditional energy supply in the technical solution of the present application. However, the prediction of regional power demand and the prediction of traditional energy supply are not easy. For example, in the historical data of regional power consumption, each local historical data has different importance for the prediction task, and the traditional information transfer model may ignore the long-term dependence in the time series data. To solve the above problems, specifically, in the technical solution of the present application, the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the implicit feature vector associated with the predicted regional power consumption time series. That is, the valuable time series behavior information contained in historical data is used to predict regional electricity consumption based on information transmission.
[0040] In a specific example of the present application, the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the process of optimizing the information transfer of the current regional power consumption local time series input vector based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the implicit feature vector associated with the predicted regional power consumption time series is: optimizing the information transfer of the current regional power consumption local time series input vector using all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the sequence of the current regional power consumption local time series input vector after the transfer, and then taking the position mean vector of the sequence of the current regional power consumption local time series input vector after the transfer to obtain the implicit feature vector associated with the predicted regional power consumption time series. In this way, different attention levels are applied based on the dependency relationship between all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector and the current regional power consumption local time series input vector, thereby achieving effective information transfer.
[0041] At the same time, the last local time series input vector of traditional energy power supply in the sequence of local time series input vectors of traditional energy power supply is used as the local time series input vector of current traditional energy power supply, and the information transmission optimization of the current local time series input vector of traditional energy power supply is performed based on all other local time series input vectors of traditional energy power supply in the sequence of local time series input vectors of traditional energy power supply to obtain the implicit feature vector associated with the time series of predicted traditional energy power supply. Similarly, different attention levels are applied based on the dependency relationship between all other local time series input vectors of traditional energy power supply in the sequence of local time series input vectors of traditional energy power supply and the current local time series input vector of traditional energy power supply, so as to realize the effective transmission of information and characterize the power supply prediction capability of traditional energy.
[0042] Accordingly, if Figure 3As shown, in step S530, the sequence of the local time series input vectors of the regional power consumption and the sequence of the local time series input vectors of the traditional energy power supply are respectively subjected to information transmission and power supply and demand prediction to obtain the implicit feature vector associated with the predicted regional power consumption time series and the implicit feature vector associated with the predicted traditional energy power supply time series, including: S531, taking the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector as the current regional power consumption local time series input vector, and based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector, the current regional power consumption local time series input vector is predicted. The local time series input vector of electricity consumption is optimized for information transmission to obtain the implicit feature vector associated with the time series of electricity consumption in the predicted area; and, S532, the last local time series input vector of traditional energy power supply in the sequence of local time series input vectors of traditional energy power supply is used as the current local time series input vector of traditional energy power supply, and based on all other local time series input vectors of traditional energy power supply in the sequence of local time series input vectors of traditional energy power supply, the current local time series input vector of traditional energy power supply is optimized for information transmission to obtain the implicit feature vector associated with the time series of predicted traditional energy power supply.
[0043] In one example, in step S531, the last regional electricity consumption local time series input vector in the sequence of the regional electricity consumption local time series input vector is used as the current regional electricity consumption local time series input vector, and the current regional electricity consumption local time series input vector is optimized for information transfer based on all other regional electricity consumption local time series input vectors in the sequence of the regional electricity consumption local time series input vector to obtain the predicted regional electricity consumption time series associated implicit feature vector, including: using all other regional electricity consumption local time series input vectors in the sequence of the regional electricity consumption local time series input vector to perform information transfer optimization on the current regional electricity consumption local time series input vector to obtain a sequence of current regional electricity consumption local time series input vectors after transfer; and taking the positional mean vector of the sequence of the current regional electricity consumption local time series input vector after transfer to obtain the predicted regional electricity consumption time series associated implicit feature vector.
[0044] Specifically, all other regional electricity consumption local timing input vectors in the sequence of regional electricity consumption local timing input vectors are used to perform information transmission optimization on the current regional electricity consumption local timing input vector to obtain a sequence of current regional electricity consumption local timing input vectors after transmission, including: constructing a double association transmission weight based on the relationship between other regional electricity consumption local timing input vectors and the current regional electricity consumption local timing input vector to obtain a first association transmission weight and a second association transmission weight; and performing point multiplication on the first association transmission weight, the second association transmission weight and the current regional electricity consumption local timing input vector to obtain the current regional electricity consumption local timing input vector after transmission.
[0045] The first association transfer weight is the cosine similarity between the local time series input vector of the current regional power consumption and the local time series input vector of the other regional power consumption. The second association transfer weight is the number of feature vectors between the local time series input vector of the current regional power consumption and the local time series input vector of the other regional power consumption.
[0046] Specifically, the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector, including: the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector; wherein the optimization formula is: ;in, is the local time series input vector of the current regional power consumption, is the total number of local time series input vectors of regional power consumption in the sequence of local time series input vectors of regional power consumption, The first one in the sequence of the local time series input vector of the regional power consumption The local time series input vector of regional power consumption, The value range is from 1 to Minus one, The local time sequence input vector of the current area power consumption and the The cosine similarity between the local time series input vectors of regional electricity consumption, Represents the local time series input vector of the current area power consumption and the The number of characteristic vectors between the local time series input vectors of regional electricity consumption, is the implicit feature vector associated with the time series of the predicted regional electricity consumption, Represents dot product.
[0047] Subsequently, the time series correlation expression feature vector of the new energy coordinated supplementary demand between the predicted regional electricity consumption time series correlation implicit feature vector and the predicted traditional energy power supply time series correlation implicit feature vector is calculated.
[0048] Correspondingly, in step S540, the new energy collaborative supplement demand time series correlation expression feature vector between the predicted regional electricity consumption time series correlation implicit feature vector and the predicted traditional energy electricity supply time series correlation implicit feature vector is calculated, including: calculating the positional difference between the predicted regional electricity consumption time series correlation implicit feature vector and the predicted traditional energy electricity supply time series correlation implicit feature vector to obtain the new energy collaborative supplement demand time series correlation expression feature vector.
[0049] Then, the time series correlation expression feature vector of the new energy collaborative supplement demand is passed through the new energy power supply supplement quantity predictor based on the decoder to obtain a predicted value, and the predicted value is the new energy power supply supplement quantity. In this way, the power gap that new energy needs to fill is accurately determined, and accurate matching between supply and demand is achieved.
[0050] Accordingly, in step S550, the new energy power supply supplement amount is determined based on the new energy collaborative supplement demand time series correlation expression feature vector, including: passing the new energy collaborative supplement demand time series correlation expression feature vector through a decoder-based new energy power supply supplement amount predictor to obtain a predicted value, and the predicted value is the new energy power supply supplement amount.
[0051] In a preferred embodiment, the new energy collaborative supplement demand timing correlation expression feature vector is passed through a decoder-based new energy power supply supplement quantity predictor to obtain a predicted value, including the following steps: calculating the point sum of the new energy collaborative supplement demand timing correlation expression feature vector and the square root of the length of the new energy collaborative supplement demand timing correlation expression feature vector and the reciprocal of the square root of the second norm of the new energy collaborative supplement demand timing correlation expression feature vector to obtain a new energy collaborative supplement demand timing correlation offset feature vector; calculating the exponential function of the new energy collaborative supplement demand timing correlation offset feature vector with a natural constant as the base to obtain the new energy collaborative supplement demand timing correlation offset feature vector. Demand time series correlation prediction feature vector; calculate the product of the new energy collaborative supplement demand time series correlation expression feature vector and the norm of the new energy collaborative supplement demand time series correlation expression feature vector and the weight hyperparameter to obtain the new energy collaborative supplement demand time series correlation constraint feature vector; calculate the point sum of the new energy collaborative supplement demand time series correlation prediction feature vector and the new energy collaborative supplement demand time series correlation constraint feature vector to obtain the optimized new energy collaborative supplement demand time series correlation expression feature vector; and, pass the optimized new energy collaborative supplement demand time series correlation expression feature vector through a decoder-based new energy power supply supplement quantity predictor to obtain a predicted value.
[0052] Specifically, taking into account the local time domain time information transmission characteristics of the local time domain source time series distribution based on the historical data of regional electricity consumption and the historical data of traditional energy electricity supply in the global time domain, the time series fusion distribution of the new energy collaborative supplement demand time series correlation expression feature vector in the local time domain-global time domain has the overall decoding distribution regression constraint based on the decoder. In the above preferred example, the structured norm representation of the new energy collaborative supplement demand time series correlation expression feature vector is used as the local canonical coordinates for each eigenvalue of the new energy collaborative supplement demand time series correlation expression feature vector to determine the new energy collaborative supplement demand. The vector overall distribution of the time series association expression feature vector represents the rotation offset relative to the eigenvalue, and the offset prediction direction of each eigenvalue of the market electricity price-enterprise electricity consumption time series interactive fusion representation vector as the center is obtained, and the eigenvalue constraint is performed using the bounding box of the vector eigenvalue distribution of the new energy collaborative supplementary demand time series association expression feature vector to improve the constraint of the new energy collaborative supplementary demand time series association expression feature vector under the overall decoding regression distribution, thereby improving the training speed of the model and the accuracy of the predicted value obtained by the decoder-based new energy power supply supplement quantity predictor of the new energy collaborative supplementary demand time series association expression feature vector.
[0053] Based on the above embodiments, see Figure 4As shown, it is a structural schematic diagram of a new energy coordinated control system 800 under power supply guarantee in an embodiment of the present disclosure. The new energy coordinated control system 800 under power supply guarantee includes: a historical data acquisition module 810, which is used to acquire the historical data of regional power consumption and the historical data of traditional energy power supply; a vectorization and vector segmentation module 820, which is used to arrange the historical data of regional power consumption and the historical data of traditional energy power supply into vectors according to the time dimension, respectively, and then perform vector segmentation on the obtained vectors to obtain a sequence of local time series input vectors of regional power consumption and a sequence of local time series input vectors of traditional energy power supply; a transfer prediction module 830, which is used to perform vector segmentation on the sequence of local time series input vectors of regional power consumption. and the sequence of the local time series input vectors of the traditional energy power supply respectively perform information transmission and power supply and demand prediction to obtain the predicted regional power consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; a collaborative calculation module 840 is used to calculate the new energy collaborative supplement demand time series associated expression feature vector between the predicted regional power consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; and a supplement quantity determination module 850 is used to determine the new energy power supply supplement quantity based on the new energy collaborative supplement demand time series associated expression feature vector.
[0054] In one example, in the above-mentioned new energy coordinated control system 800 under power supply guarantee, the transmission prediction module 830 includes: a regional power consumption information transmission optimization unit, which is used to take the last regional power consumption local timing input vector in the sequence of the regional power consumption local timing input vector as the current regional power consumption local timing input vector, and optimize the current regional power consumption local timing input vector based on all other regional power consumption local timing input vectors in the sequence of the regional power consumption local timing input vector to obtain the predicted regional power consumption timing-related implicit feature vector; and, an energy supply information transmission optimization unit, which is used to take the last traditional energy power supply local timing input vector in the sequence of the traditional energy power supply local timing input vector as the current traditional energy power supply local timing input vector, and optimize the current traditional energy power supply local timing input vector based on all other traditional energy power supply local timing input vectors in the sequence of the traditional energy power supply local timing input vector to obtain the predicted traditional energy power supply timing-related implicit feature vector.
[0055] Here, those skilled in the art can understand that the specific functions and operations of each module in the above-mentioned new energy coordinated control system 800 under power supply guarantee have been referred to above. Figure 2 to Figure 3It has been introduced in detail in the description of the coordinated regulation method of new energy under the power supply guarantee, and therefore, its repeated description will be omitted.
[0056] Figure 5 FIG. 1 is an application scenario diagram of the method for coordinated regulation of new energy under power supply guarantee according to an embodiment of the present disclosure. Figure 5 As shown, in this application scenario, first, historical data of regional electricity consumption is obtained (for example, Figure 5 D1 as shown in the figure) and historical data on electricity supply from traditional energy sources (e.g. Figure 5 Then, the historical data of regional power consumption and the historical data of traditional energy power supply are input into a server (for example, Figure 5 In S), the server is able to use the new energy coordinated control algorithm under power supply guarantee to process the historical data of regional power consumption and the historical data of traditional energy power supply to obtain a predicted value for representing the new energy power supply supplement amount.
[0057] Based on the above embodiments, another exemplary embodiment of an electronic device is also provided in the embodiments of the present disclosure. In some possible implementations, the electronic device in the embodiments of the present disclosure may include a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor can implement the steps of the method for coordinated regulation of new energy under power supply guarantee in the above embodiments when executing the program.
[0058] For example, the electronic device is disclosed in the present invention Figure 1 Taking the server 100 in the example as an example, the processor in the electronic device is the processor 110 in the server 100, and the memory in the electronic device is the memory 120 in the server 100.
[0059] An embodiment of the present disclosure also provides a computer-readable storage medium. Figure 6 FIG. 1 is a schematic diagram of a computer-readable storage medium 1000 according to an embodiment of the present disclosure. Figure 6 As shown, the computer-readable storage medium 1000 stores computer-executable instructions 1001. When the computer-executable instructions 1001 are executed by the processor, the method for coordinated regulation of new energy under power supply guarantee according to the embodiment of the present disclosure described with reference to the above figures can be executed. The computer-readable storage medium includes, but is not limited to, for example, volatile memory and / or non-volatile memory. The volatile memory may include, for example, a random access memory (RAM) and / or a cache memory (cache), etc. The non-volatile memory may include, for example, a read-only memory (ROM), a hard disk, a flash memory, etc.
[0060] The embodiments of the present disclosure also provide a computer program product or a computer program, which includes computer instructions stored in a computer-readable storage medium. The processor of the computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device executes the method for coordinated regulation of new energy under power supply guarantee according to the embodiments of the present disclosure.
[0061] Those skilled in the art will appreciate that the contents disclosed in this disclosure may be subject to various modifications and improvements. For example, the various devices or components described above may be implemented by hardware, or by software, firmware, or a combination of some or all of the three.
[0062] In addition, although the present disclosure makes various references to certain units in the system according to embodiments of the present disclosure, any number of different units can be used and run on the client and / or server. The units are only illustrative, and different aspects of the systems and methods can use different units.
[0063] Those skilled in the art will appreciate that all or part of the steps in the above method can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable storage medium, such as a read-only memory, a disk, or an optical disk. Optionally, all or part of the steps in the above embodiment can also be implemented using one or more integrated circuits. Accordingly, each module / unit in the above embodiment can be implemented in the form of hardware or in the form of a software functional module. The present disclosure is not limited to any particular form of combination of hardware and software.
[0064] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which the present disclosure belongs. It should also be understood that terms such as those defined in common dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant technology and should not be interpreted in an idealized or highly formal sense, unless explicitly defined as such herein.
[0065] The above is an explanation of the present disclosure and should not be considered as a limitation thereof. Although several exemplary embodiments of the present disclosure have been described, it will be readily understood by those skilled in the art that many modifications may be made to the exemplary embodiments without departing from the novel teachings and advantages of the present disclosure. Therefore, all such modifications are intended to be included within the scope of the present disclosure as defined in the claims. It should be understood that the above is an explanation of the present disclosure and should not be considered as being limited to the specific embodiments disclosed, and modifications to the disclosed embodiments and other embodiments are intended to be included within the scope of the appended claims. The present disclosure is defined by the claims and their equivalents.
Claims
1. A method for coordinated regulation of new energy under power supply guarantee, characterized in that: include: Obtain historical data on regional electricity consumption and historical data on traditional energy power supply; after arranging the historical data on regional electricity consumption and the historical data on traditional energy power supply into vectors according to the time dimension, respectively, perform vector segmentation on the obtained vectors to obtain a sequence of local time series input vectors of regional electricity consumption and a sequence of local time series input vectors of traditional energy power supply; perform information transmission and electricity supply and demand forecasting on the sequence of local time series input vectors of regional electricity consumption and the sequence of local time series input vectors of traditional energy power supply to obtain a predicted regional electricity consumption time series associated implicit feature vector and a predicted traditional energy power supply time series associated implicit feature vector; calculate a new energy coordinated supplementary demand time series associated expression feature vector between the predicted regional electricity consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; and determine the new energy power supply supplement amount based on the new energy coordinated supplementary demand time series associated expression feature vector; Among them, the sequence of the local time series input vectors of the regional electricity consumption and the sequence of the local time series input vectors of the traditional energy power supply are respectively subjected to information transmission and electricity supply and demand prediction to obtain the predicted regional electricity consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector, including: taking the last regional electricity consumption local time series input vector in the sequence of the regional electricity consumption local time series input vector as the current regional electricity consumption local time series input vector, based on all other regional electricity consumption local time series input vectors in the sequence of the regional electricity consumption local time series input vector The local time series input vector of the traditional energy supply is optimized for information transmission to obtain the implicit feature vector associated with the time series of the predicted regional power consumption; and the last local time series input vector of the traditional energy supply in the sequence of the local time series input vector of the traditional energy supply is used as the current local time series input vector of the traditional energy supply, and the local time series input vector of the current traditional energy supply is optimized for information transmission based on all other local time series input vectors of the traditional energy supply in the sequence of the local time series input vector of the traditional energy supply to obtain the implicit feature vector associated with the time series of the predicted traditional energy supply; Among them, the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector, including: the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector; wherein, the optimization formula is: ;in, is the local time series input vector of the current regional power consumption, is the total number of local time series input vectors of regional power consumption in the sequence of local time series input vectors of regional power consumption, The first one in the sequence of the local time series input vector of the regional power consumption The local time series input vector of regional power consumption, The value range is from 1 to Minus one, The local time sequence input vector of the current area power consumption and the The cosine similarity between the local time series input vectors of regional electricity consumption, Represents the local time series input vector of the current area power consumption and the The number of characteristic vectors between the local time series input vectors of regional electricity consumption, is the implicit feature vector associated with the time series of the predicted regional electricity consumption, Represents dot product.
2. The method for coordinated regulation of new energy under power supply guarantee according to claim 1 is characterized in that: Calculate the new energy collaborative supplement demand time series correlation expression feature vector between the predicted regional electricity consumption time series correlation implicit feature vector and the predicted traditional energy electricity supply time series correlation implicit feature vector, including: calculate the position difference between the predicted regional electricity consumption time series correlation implicit feature vector and the predicted traditional energy electricity supply time series correlation implicit feature vector to obtain the new energy collaborative supplement demand time series correlation expression feature vector.
3. The method for coordinated regulation of new energy under power supply guarantee according to claim 2 is characterized in that: The method comprises: determining the new energy power supply supplement amount based on the time-series correlation expression feature vector of the new energy collaborative supplement demand, comprising: passing the new energy collaborative supplement demand time-series correlation expression feature vector through a decoder-based new energy power supply supplement amount predictor to obtain a predicted value, wherein the predicted value is the new energy power supply supplement amount.
4. A new energy coordinated control system under power supply guarantee, characterized in that: include: A historical data acquisition module, used to acquire historical data of regional electricity consumption and historical data of traditional energy power supply; a vectorization and vector segmentation module, used to arrange the historical data of regional electricity consumption and the historical data of traditional energy power supply into vectors according to the time dimension, and then perform vector segmentation on the obtained vectors to obtain a sequence of local time series input vectors of regional electricity consumption and a sequence of local time series input vectors of traditional energy power supply; a transmission prediction module, used to perform information transmission and electricity supply and demand prediction on the sequence of local time series input vectors of regional electricity consumption and the sequence of local time series input vectors of traditional energy power supply, respectively, to obtain a predicted regional electricity consumption time series associated implicit feature vector and a predicted traditional energy power supply time series associated implicit feature vector; a collaborative calculation module, used to calculate a new energy collaborative supplement demand time series associated expression feature vector between the predicted regional electricity consumption time series associated implicit feature vector and the predicted traditional energy power supply time series associated implicit feature vector; and a supplement quantity determination module, used to determine the new energy power supply supplement quantity based on the new energy collaborative supplement demand time series associated expression feature vector; Wherein, the transmission prediction module includes: a regional power consumption information transmission optimization unit, which is used to take the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector as the current regional power consumption local time series input vector, and perform information transmission optimization on the current regional power consumption local time series input vector based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector; and an electric energy supply information transmission optimization unit, which is used to take the last traditional energy power supply local time series input vector in the sequence of the traditional energy power supply local time series input vector as the current traditional energy power supply local time series input vector, and perform information transmission optimization on the current traditional energy power supply local time series input vector based on all other traditional energy power supply local time series input vectors in the sequence of the traditional energy power supply local time series input vector to obtain the predicted traditional energy power supply time series associated implicit feature vector; Among them, the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector, including: the last regional power consumption local time series input vector in the sequence of the regional power consumption local time series input vector is used as the current regional power consumption local time series input vector, and the current regional power consumption local time series input vector is optimized for information transfer based on all other regional power consumption local time series input vectors in the sequence of the regional power consumption local time series input vector to obtain the predicted regional power consumption time series associated implicit feature vector; wherein, the optimization formula is: ;in, is the local time series input vector of the current regional power consumption, is the total number of local time series input vectors of regional power consumption in the sequence of local time series input vectors of regional power consumption, The first one in the sequence of the local time series input vector of the regional power consumption The local time series input vector of regional power consumption, The value range is from 1 to Minus one, The local time sequence input vector of the current area power consumption and the The cosine similarity between the local time series input vectors of regional electricity consumption, Represents the local time series input vector of the current area power consumption and the The number of characteristic vectors between the local time series input vectors of regional electricity consumption, is the implicit feature vector associated with the time series of the predicted regional electricity consumption, Represents dot product.
