A method and system for allocating airport landside traffic demand based on flight waves

By zoning the airport and fitting flight wave data, screening and allocating landside personnel, the problem of landside traffic collection and distribution at the airport is solved, improving the utilization rate of public transportation and the coordination of the transportation system, reducing congestion, and improving passenger satisfaction.

CN118378860BActive Publication Date: 2024-10-18CIVIL AVIATION AIRPORT PLANNING & DESIGN RES INST CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410813657.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-18
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

The landside traffic collection and distribution problems of large domestic airports are serious. Public transportation resources are insufficient to cope with the growing passenger flow demand, resulting in landside traffic congestion. It is necessary to improve airport public transportation services and guide passengers to transfer to intensive travel methods.

Method used

The airport landside traffic demand allocation method based on flight waves is used to partition the target airport to determine the maximum number of carries in the processing area, obtain and fit historical flight and user signaling data, filter out the airport landside personnel data, and Based on this allocation, optimize the allocation of transportation resources.

Benefits of technology

It improves the rationality of the flow of people on the landside of the airport, increases the proportion of public transportation, reduces congestion, and improves passenger satisfaction and the coordination level of the transportation system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118378860B_ABST
    Figure CN118378860B_ABST
Patent Text Reader

Abstract

This invention relates to the field of airport personnel allocation and discloses a method for allocating airport landside traffic demand based on flight waves. The method includes: partitioning the target airport landside into at least two processing areas, and determining the maximum capacity of each processing area; acquiring historical arrival and departure flight numbers and planned seat data for the target airport, and performing data fitting on these data to obtain flight wave data; acquiring user signaling data for the target airport area, preprocessing this data to obtain valid signaling data, and filtering users based on this data to obtain airport staff data, welcoming / farewell personnel data, or passenger data; performing data fitting on the flight wave data based on the passenger data to obtain airport landside personnel data; and allocating personnel based on the airport landside personnel data and the maximum capacity of each processing area. This invention partitions the airport landside and matches demand with the capacity threshold of each processing area based on flight waves, improving the coordination level of the airport transportation system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of airport personnel allocation, and in particular to a method and system for allocating airport landside traffic demand based on flight waves. Background Art

[0002] As the hub of the domestic route network, large airports carry most of the domestic aviation demand, and the landside of large airport hubs is the gateway for airport passengers to enter and leave the city. At present, airport landside transportation can be divided into two categories, namely, public transportation that reflects large capacity and resource intensiveness, and non-public transportation that meets personalized needs and has a high service level, mainly traditional taxis and recently popular online ride-hailing. The two modes have their own strengths and play different roles in the airport landside transportation system and complement each other. Under certain traffic environments and conditions, the two modes can maintain a coordinated proportion to play a positive role in the healthy and sustainable development of the airport landside transportation system. The domestic airport collection and distribution system is still dominated by non-public transportation, supplemented by public transportation, and road resources are no longer sufficient to cope with the growing passenger flow demand. With the rapid growth of passenger volume, major domestic large airports have encountered landside transportation collection and distribution problems to varying degrees. It is urgent to improve airport public transportation services, guide passengers to shift to intensive travel modes, and improve the utilization rate of airport landside resources. Summary of the invention

[0003] The purpose of the present invention is to overcome one or more of the above-mentioned existing technical problems and to provide a method and system for allocating airport landside traffic demand based on flight waves.

[0004] To achieve the above object, the present invention provides a method for allocating airport landside traffic demand based on flight waves, comprising:

[0005] The landside of the target airport is processed by zoning so that the landside of the target airport includes at least two processing areas, and each processing area includes at least one public transportation stop area, one non-public transportation stop area and one guide route;

[0006] Determine the maximum carrying capacity of each processing area corresponding to each processing area;

[0007] Obtain the historical data of the number of inbound and outbound flights and the historical planned seats of the target airport, and perform data fitting on the historical data of the number of inbound and outbound flights and the historical planned seats of the target airport to obtain the flight wave data;

[0008] Acquire user signaling data in the target airport area, pre-process the user signaling data in the target airport area to obtain valid signaling data, screen users based on the valid signaling data, and obtain airport staff data, welcoming and seeing-off personnel data, or passenger data;

[0009] Based on the passenger data, the flight wave data is fitted to obtain the airport landside personnel data;

[0010] Allocation is based on airport landside personnel data and the maximum capacity of the handling area.

[0011] In some embodiments, the pre-processing of the target airport area user signaling data to obtain valid signaling data includes:

[0012] Based on the user signaling data in the target airport area, missing data, error data and failure data are removed to obtain a first signaling data set;

[0013] Removing duplicate data based on the first signaling data set to obtain a second signaling data set;

[0014] Removing ping-pong data from the second signaling data set to obtain a third signaling data set;

[0015] The drift data is removed based on the third signaling data set to obtain valid signaling data.

[0016] In some embodiments, removing duplicate data based on the first signaling data set to obtain the second signaling data set includes:

[0017] Based on the first signaling data set, the mobile phone signaling data of each user is arranged in chronological order. If the base stations connected to two adjacent trajectory points in the same time sequence are the same, the first and last signaling data of the continuous identical data are retained, and the duplicate data in the middle are removed to obtain the second signaling data set.

[0018] In some embodiments, removing the ping-pong data based on the second signaling data set to obtain the third signaling data set includes:

[0019] Based on the second signaling data set, the user's continuous trajectory points Pi, Pi+1...Pi+k are obtained. If the base station location information of the user at the trajectory points Pi and Pi+k is the same, and the adjacent middle trajectory points correspond to different base stations, and Ti+k-Ti is less than the preset time threshold, only the data of the first trajectory point Pi and the data of the last trajectory point Pi+k are retained to obtain the third signaling data;

[0020] Among them, Ti is the time corresponding to the user at the trajectory point Pi; Ti+k is the time corresponding to the user at the trajectory point Pi+k.

[0021] In some embodiments, removing drift data based on the third signaling data set to obtain valid signaling data includes:

[0022] Obtaining trajectory point data of the user based on the third signaling data set;

[0023] Based on the trajectory point data of the user, determine the distance and time interval between adjacent trajectory point data, and obtain the speed between any adjacent trajectory points; wherein the speeds corresponding to the same user have a sequential relationship;

[0024] If there are two adjacent speeds that are greater than the preset speed threshold at the same time, the middle track point among the three adjacent track points corresponding to the two adjacent speeds is the drift point, and the data corresponding to the drift point is the drift data;

[0025] The drift data in the third signaling data set is removed to obtain valid signaling data.

[0026] In some embodiments, the public transportation stop area includes at least one preset public transportation mode; the preset public transportation mode includes: traveling by subway and traveling by bus;

[0027] The maximum carrying capacity of the processing area includes: the maximum carrying capacity of subway trips, the maximum carrying capacity of public transportation trips, and the maximum carrying capacity of non-public transportation trips.

[0028] The maximum number of passengers traveling by subway is obtained based on the historical passenger data and airport staff data of the same period through the subway sharing rate, passenger reception ratio and passenger drop-off ratio;

[0029] The maximum number of passengers traveling by subway is obtained based on the historical passenger data and airport staff data of the same period through the public transportation share rate, passenger pick-up ratio and passenger drop-off ratio;

[0030] The maximum carrying capacity of non-public transportation is obtained based on the historical passenger data and airport staff data of the same period through the non-public transportation share rate.

[0031] In some embodiments, determining the maximum load capacity of each processing area corresponding to each processing area includes:

[0032] Based on the GBDT model, we get the subway share rate, bus share rate, and non-public transportation share rate.

[0033] The input of the GBDT model is the characteristic data of the airport; the characteristic data includes one or more of historical flight wave passenger data, the number of subway passengers at the same time as the flight wave data, the number of bus passengers at the same time as the flight wave data, the number of non-public transportation passengers at the same time as the flight wave data, ticket prices, urban economic indicators, the distance between the airport and the city center, and the urban population density;

[0034] Based on the subway sharing rate, bus sharing rate, and non-public transportation sharing rate, the maximum carrying capacity of the processing area is determined.

[0035] In some embodiments, the method for obtaining airport landside personnel data by performing data fitting on flight wave data based on passenger data includes:

[0036] ;

[0037] in, Indicates Airport landside personnel data by time period;

[0038] Indicates Flight wave data under time period;

[0039] It indicates the ratio of welcoming and seeing off personnel;

[0040] Indicates staff ratio;

[0041] Indicates The planned number of seats for the time period;

[0042] Indicates The average load factor of flights during the time period;

[0043] Indicates Passenger transfer rate during the time period.

[0044] In some embodiments, it also includes:

[0045] Real-time monitoring of airport landside traffic status;

[0046] Report the landside traffic status of the airport.

[0047] The present invention also provides an airport landside traffic demand allocation system based on flight waves, comprising:

[0048] The airport zoning processing unit is used to perform zoning processing on the land side of the target airport, so that the land side of the target airport includes at least two processing areas, each processing area includes at least one public transportation stop area, one non-public transportation stop area and one guide route; and determine the maximum carrying capacity of each processing area corresponding to each processing area;

[0049] A flight wave data acquisition unit is used to acquire the historical number of inbound and outbound flights and historical planned seat data of the target airport, and perform data fitting on the historical number of inbound and outbound flights and historical planned seat data of the target airport to obtain flight wave data;

[0050] A data screening unit is used to obtain user signaling data in the target airport area, pre-process the user signaling data in the target airport area to obtain valid signaling data, and screen users based on the valid signaling data to obtain airport staff data, welcoming and seeing-off personnel data or passenger data;

[0051] An airport landside personnel data acquisition unit, used to obtain airport landside personnel data by performing data fitting on flight wave data based on passenger data;

[0052] Allocation unit, used for allocation based on airport landside personnel data and maximum handling area capacity.

[0053] In the scheme provided by the present application, the land side of the target airport is partitioned and processed, so that the land side of the target airport includes at least two processing areas, each of which includes at least one public transportation stop area, one non-public transportation stop area and one guide route; the maximum carrying capacity of the processing area corresponding to each processing area is determined respectively; the historical number of inbound and outbound flights and the historical planned seat data of the target airport are obtained, and the historical number of inbound and outbound flights and the historical planned seat data of the target airport are fitted to obtain flight wave data; the user signaling data of the target airport area is obtained, and the user signaling data of the target airport area is pre-processed to obtain valid signaling data, and the user is screened based on the valid signaling data to obtain airport staff data, welcoming and sending personnel data or passenger data; the flight wave data is fitted based on the passenger data to obtain airport land side personnel data; allocation is performed based on the airport land side personnel data and the maximum carrying capacity of the processing area. With such a setting, the scheme provided by the present application can be allocated based on the airport land side personnel data and the maximum carrying capacity of the processing area, so that the flow of airport land side personnel is more reasonable, so that the airport can accommodate more people. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 is a flow chart of a method for allocating airport landside traffic demand based on flight waves according to an exemplary embodiment;

[0055] Figure 2 It is a schematic diagram of the structure of an airport landside traffic demand allocation system based on flight waves according to an exemplary embodiment. DETAILED DESCRIPTION

[0056] The present invention will now be discussed with reference to exemplary embodiments. It should be understood that the embodiments discussed are only for enabling those skilled in the art to better understand and thereby implement the present invention, rather than implying any limitation on the scope of the present invention.

[0057] As used herein, the term “including” and variations thereof are to be interpreted as open-ended terms meaning “including but not limited to.” The term “based on” is to be interpreted as “based, at least in part, on,” and the terms “one embodiment” and “an embodiment” are to be interpreted as “at least one embodiment.”

[0058] According to one embodiment of the present invention, Figure 1 is a flow chart of a method for allocating airport landside traffic demand based on flight waves according to an exemplary embodiment. Figure 1 As shown, in order to achieve the above-mentioned purpose, the present invention provides a method for allocating airport landside traffic demand based on flight waves, comprising:

[0059] Step S110, zoning the landside of the target airport so that the landside of the target airport includes at least two processing areas, each processing area includes at least one public transportation stop area, one non-public transportation stop area and one guide route;

[0060] Specifically, this step involves dividing the landside area of ​​the target airport into at least two processing areas. The design of each processing area must meet the following conditions: Public transportation docking area: set up a special area for public transportation such as subways and buses to dock and for passengers to get on and off. Non-public transportation docking area: a docking area for non-public transportation such as private cars, taxis and online ride-hailing vehicles. Guidance route: set up clear sign routes to guide the flow of different types of transportation and pedestrians in the landside area of ​​the airport.

[0061] Step S120, determining the maximum carrying capacity of each processing area corresponding to each processing area;

[0062] Specifically, the maximum traffic volume that each processing area can accommodate is evaluated and determined. This includes: calculating the number of passengers that each area can handle at different time periods. Considering the physical space, traffic flow and safety standards of the area. Ensuring that reasonable service levels and passenger experience can be maintained during peak hours.

[0063] Step S130, obtaining the historical number of inbound and outbound flights and historical planned seat data of the target airport, and performing data fitting on the historical number of inbound and outbound flights and historical planned seat data of the target airport to obtain flight wave data;

[0064] Specifically, the historical data of the number of flights arriving and departing from the target airport and the historical planned seats are collected. These data are used for statistical analysis and data fitting to form a flight wave data model. This model can reflect the peak hours of flight arrival and departure at the airport in different time periods.

[0065] Step S140, obtaining the signaling data of users in the target airport area, pre-processing the signaling data of users in the target airport area to obtain valid signaling data, screening users based on the valid signaling data, and obtaining airport staff data, welcoming and seeing-off staff data, or passenger data;

[0066] Specifically, collect mobile phone signaling data of users in the airport area, which may include user movement tracks, timestamps and other information. Pre-process the collected signaling data to remove missing, erroneous and failed data. Filter users through valid signaling data to distinguish between airport staff, welcoming and seeing-off personnel and passengers.

[0067] Step S150, performing data fitting on the flight wave data based on the passenger data to obtain airport landside personnel data;

[0068] Specifically, the screened passenger data is matched and fitted with the flight wave data. The travel patterns and peak hours of passengers are analyzed to predict the flow of people in the airport landside area. The airport landside personnel data model is formed to provide a basis for subsequent resource allocation.

[0069] Step S160: Allocate based on the airport landside personnel data and the maximum carrying capacity of the processing area.

[0070] Specifically, by combining the airport landside personnel data and the maximum carrying capacity of each processing area, we can rationally allocate transportation resources and space to meet the needs of different passenger groups, ensure efficient operation of airport landside transportation, reduce congestion, and improve passenger satisfaction.

[0071] According to one embodiment of the present invention, the basic format of the user signaling data in the target airport area includes several fields such as the mobile phone user's unique identification code IMSI number, timestamp, base station location area number LAC to which the signaling data belongs, base station cell number CeLL-ID, event type, etc. IMSI is a mobile user identification code, which is stored in the mobile phone SIM card and corresponds to the mobile phone number. It is unique and similar to the "ID number" of the mobile phone card, used to identify and distinguish users. LAC (location area code) and CI (cell identification code), LAC records an area covered by a certain base station, also called a large area or base station area, a base station area can contain one or more cells, and a cell corresponds to a cell identifier, that is, the base station cell number, i.e. CI (Cell Identity), and more accurate user location information can be determined through LAC and CI. Location update and periodic update. When a mobile phone user moves from one base station cell to another due to constant changes in location, the user's communication link will switch from the original base station to the current base station for communication due to the strength of the received signal. When a mobile phone learns that its current location area has changed, it will actively contact the wireless network and broadcast its location. When the location area has not changed for a long time (staying in one place for a long time, the phone is turned off, etc.), the network will require the mobile phone to periodically (at a certain time) report its current location information. Periodic location update events can increase the frequency of user signaling data generation and improve the positioning accuracy of its behavior trajectory. The timestamp records the occurrence time of each user's mobile trajectory point, which is also the time when a certain signaling event is triggered, accurate to seconds. The signaling event type records the user's mobile phone service type that triggers the mobile phone signaling data, such as power on and off, sending and receiving text messages, calling and being called, normal location update, periodic location update, access to the network, etc. The user's basic attribute information includes mobile phone number, age, gender, number location, etc. These data will be desensitized and used for model calculation.

[0072] According to an embodiment of the present invention, the method for obtaining effective signaling data after preprocessing the signaling data of users in the target airport area is:

[0073] The first signaling data set is obtained by removing missing data, erroneous data and failed data based on the user signaling data in the target airport area. Data with missing attribute values ​​due to poor network connection, equipment failure, etc. is called missing data, which will affect the validity of the results to a certain extent, but the total amount of this part of data is small, so the objects with missing key fields (such as IMSI, LAC, ID) and incorrect fields are directly deleted; erroneous data refers to data that is not within the scope of the study, such as signaling data with incorrect dates or beyond the study area. This part of data is relatively easy to delete; the event types that trigger signaling data failure mainly include: call failure (calling, called), failure to send and receive text messages, and location update failure (normal location update, periodic location update). Because the cause of the failure of the triggering event is unknown, the geographical longitude and latitude represented in the signaling data may not reflect the user's actual location. In order to reduce errors, this type of data is also deleted. After all deletions, the first signaling data set is obtained.

[0074] According to one embodiment of the present invention, a second signaling data set is obtained by removing duplicate data based on the first signaling data set. The generation of duplicate data is due to the fact that mobile phone users frequently perform communication activities such as surfing the Internet, making calls, or sending and receiving text messages in the same location area, generating continuous signaling data with the same location in a short period of time. On the other hand, it is due to periodic location updates. When a mobile phone is within the coverage area of ​​a certain base station for a long time and no other communication activities or cross-regional movement occurs to trigger signaling data, the network will require the mobile phone to report its location information every hour or so in order to understand the current status of the mobile phone. This type of data increases the amount of invalid samples and the workload of calculation, so it is eliminated to obtain the second signaling data set.

[0075] According to one embodiment of the present invention, the third signaling data set is obtained by removing the ping-pong data based on the second signaling data set. The data generated by the frequent switching of the mobile phone between the two base stations caused by the drastic change in the signal strength of the two base stations in a certain area is called "ping-pong" data. When the signal of base station A is weaker than that of base station B, the mobile phone will choose to communicate with base station B. If the signal of base station A suddenly becomes stronger within a short period of time, the mobile phone will immediately switch to communicate with base station A and then jump to communicate with base station B. The signaling data generated by the "ping-pong effect" superficially shows that the user's position has changed, but in fact, the user's position has not moved at all, so this type of data should be identified and eliminated to obtain the third signaling data set.

[0076] According to one embodiment of the present invention, effective signaling data is obtained by removing drift data based on the third signaling data set. The phenomenon that the mobile phone signal suddenly switches from a nearby base station to a relatively distant base station, and then switches back to the nearby base station cell after a certain period of time is called signal drift. Theoretically, when a mobile phone user is driving on a certain road, the switching order of the base station should be A-B-C-E-F, but the actual switching order caused by signal drift may be A-B-C-D-E-F, indicating that data drift has occurred at point D, and this path is not the user's true movement trajectory. The false positioning information provided by the drift data will have a greater impact on the travel feature analysis, so it must be identified and eliminated to obtain effective signaling data.

[0077] According to an embodiment of the present invention, the method for removing duplicate data based on the first signaling data set to obtain the second signaling data set is:

[0078] Based on the first signaling data set, the mobile phone signaling data of each user is arranged in chronological order. If the base stations connected to two adjacent trajectory points in the same time sequence are the same, the first and last signaling data of the continuous identical data are retained, and the duplicate data in the middle are removed to obtain the second signaling data set.

[0079] According to an embodiment of the present invention, the method for obtaining the third signaling data set by removing the ping-pong data from the second signaling data set is:

[0080] Based on the second signaling data set, the user's continuous trajectory points P are obtained i , P i+1 ...P i+k , if the user is at trajectory point P i and P i+k The base station location information is the same, the middle trajectory point appears only once and T i+k -T i When it is less than the preset time threshold, only the first trajectory point P is retained. i The data and the end trajectory point P i+k The data is used to obtain the third signaling data.

[0081] According to one embodiment of the present invention, the method for removing drift data based on the third signaling data set to obtain valid signaling data is: obtaining the user's trajectory point data based on the third signaling data set; based on the user's trajectory point data, determining the distance and time interval of adjacent trajectory point data, and obtaining the speed between any adjacent trajectory points; wherein, there is a sequential relationship between the speeds corresponding to the same user; if there are two adjacent speeds that are simultaneously greater than a preset speed threshold, then the middle trajectory point among the three adjacent trajectory points corresponding to the two adjacent speeds is a drift point, and the data corresponding to the drift point is the drift data; removing the drift data in the third signaling data set to obtain valid signaling data.

[0082] The user's trajectory point data is obtained based on the third signaling data set, and the adjacent speed V is obtained based on the distance and time interval of the adjacent trajectory point data. i,i+1 and V i+1,i+2 , if V i,i+1 and V i+1,i+2 When it is greater than the preset speed threshold, the data of the i+1th trajectory point is a drift point, and valid signaling data is obtained by traversing the trajectory point data. The setting of the speed threshold should be consistent with the spatiotemporal travel characteristics of the city's population.

[0083] According to one embodiment of the present invention, users are screened based on valid signaling data to determine whether they are airport staff data, welcoming staff data or passenger data. In the study area, if the user's mobile phone signaling appears at a high frequency during the night rest period, it is determined that the user is a nearby permanent resident. His travel behavior has certain regularities, which can be determined by setting the night time period, daily night stay duration and stay frequency. The night rest period of 0:00-6:00 is selected. If the number of days a user appears repeatedly in the study area is greater than 5 days within a week, and the average daily stay duration is the longest, then this mobile phone signaling data sample is marked as a nearby resident. Airport staff include airport operation command and management personnel, apron service personnel, passenger service personnel, loading and unloading service personnel, etc. Users whose mobile phone signaling appears in the study area most of the time on weekdays are determined to be employees working at the airport or nearby. Their travel behavior has certain regularities, which can be determined by setting the daytime period on weekdays, daytime stay duration and stay frequency. The users who appear in the study area for more than 5 days in a week and have the longest average daily stay time are selected, and the mobile phone signaling data sample is judged to be airport staff. If the user stays in the study area for a short time, he is judged to be a passer-by or a greeter. The time threshold is set to 30 minutes. If the user stays in the study area for less than 30 minutes, he is judged to be a passer-by or a greeter. The data obtained after excluding passers-by, greeters, nearby residents and airport staff is passenger data.

[0084] According to one embodiment of the present invention, the public transportation stop area includes at least one preset public transportation mode; the preset public transportation mode includes: traveling by subway and traveling by bus;

[0085] The method for processing the maximum carrying capacity of the area is:

[0086] The public transportation stop area includes two modes of public transportation, namely traveling by subway and by bus;

[0087] Based on the number of departing passengers, airport staff, and arriving passengers in the same period in history, the maximum number of passengers traveling by subway is obtained through the passenger subway sharing rate, employee commuting subway sharing rate, departure passenger sending ratio, and arrival passenger welcoming ratio. The formula is:

[0088] A=D d ·y A + S·y C + D d ·z Dd ·y B + D a ·z Da ·y A + D a ·y A ;

[0089] in, A Indicates the maximum number of passengers that can travel on the subway;

[0090] D d Indicates the number of passengers departing during the same period in history;

[0091] S represents the number of airport staff;

[0092] D a Indicates the number of passengers arriving during the same period in history;

[0093] y A represents the passenger subway share;

[0094] y C It represents the share of employees’ commuting subway;

[0095] z Dd Indicates the ratio of departure and arrival passengers;

[0096] z Da Indicates the arrival-to-welcome ratio.

[0097] Based on the number of departing passengers, airport staff, and arriving passengers in the same period in history, the maximum carrying capacity of public transportation is obtained through the passenger public transportation sharing rate, employee commuting public transportation sharing rate, departure passenger sending ratio, and arrival passenger welcoming ratio. The formula is:

[0098] B = D d ·y D + S·y F + D d ·z Dd ·y D + D a ·z Da ·y D + D a ·y D ;

[0099] in, B Indicates the maximum carrying capacity of public transportation;

[0100] y D represents the passenger public transport share ratio;

[0101] y F Indicates the employee commuting bus share ratio.

[0102] Based on the number of departing passengers, the number of airport staff, and the number of arriving passengers in the same period in history, the maximum carrying capacity of non-public transportation is obtained through the passenger non-public transportation share rate, employee commuting bus share rate, departure passenger sending ratio, and arrival passenger welcoming ratio. The formula is:

[0103] U = D d ·y G + S·y H + D d ·z Dd ·y G + D a ·z Da ·y G + D a ·y G ;

[0104] in, U It indicates the maximum number of passengers that can be carried by non-public transportation.

[0105] y G represents the passenger non-public transport share;

[0106] y H It represents the share of employees’ commuting by non-public transportation.

[0107] According to one embodiment of the present invention, a subway share rate, a bus share rate, and a non-public transportation share rate are obtained based on a GBDT model, and the input of the GBDT model is characteristic data of the airport, including historical flight wave passenger data, the number of subway passengers at the same time as the flight wave data, the number of bus passengers at the same time as the flight wave data, the number of non-public transportation passengers at the same time as the flight wave data, ticket prices, urban economic indicators, the distance between the airport and the city center, and one or more of the urban population density, wherein the standard for judging whether the share rate obtained by the GBDT model meets the requirements is the airport landside traffic congestion rate of different values, wherein the expression of the share rate obtained by the GBDT model is,

[0108] ;

[0109] in, Indicates the sharing rate;

[0110] Indicates that the function is minimized;

[0111] represents the real label data of the Nth airport, that is, the sharing data under the current congestion rate;

[0112] Indicates the minimum loss between the model's predicted value and the true label;

[0113] Indicates the number of iterations;

[0114] Indicates the number of leaf nodes of the decision tree;

[0115] represents the loss function;

[0116] Represents the sample set in iteration;

[0117] Indicates the output value of the current node;

[0118] Represents an indicator function, whose value is 0 or 1;

[0119] Represents input data.

[0120] The training set is ,in, is the input data, which is the characteristic data of the Nth airport, including one or more of the historical flight wave passenger data, the number of subway passengers at the same time as the flight wave data, the number of bus passengers at the same time as the flight wave data, the number of non-public transportation passengers at the same time as the flight wave data, ticket prices, urban economic indicators, the distance between the airport and the city center, and the urban population density. It represents the subway share rate, bus share rate, and non-public transportation share rate of the Nth airport in the training data set. The final share rate needs to be gradually fitted according to the training set to obtain the optimal share rate value for the target airport of this application.

[0121] According to one embodiment of the present invention, the method for obtaining airport landside personnel data by performing data fitting on flight wave data based on passenger data is as follows:

[0122] ;

[0123] ;

[0124] in, Indicates Airport landside personnel data by time period;

[0125] Indicates Flight wave data under time period;

[0126] It indicates the ratio of welcoming and seeing off personnel;

[0127] Indicates staff ratio;

[0128] Indicates The planned number of seats for the time period;

[0129] Indicates The average load factor of flights during the time period;

[0130] Indicates Passenger transfer rate during the time period.

[0131] According to one embodiment of the present invention, when the historical inbound and outbound flight numbers and the historical planned seat data form a line graph, the data bands are similar and the changing rules are consistent. It is only necessary to fit the two data to make their bands consistent to form preliminary data and form flight wave data with time period coordinates.

[0132] According to one embodiment of the present invention, it also includes: real-time monitoring of the airport landside traffic status; broadcasting the airport landside traffic status. Evacuate and guide personnel according to the carrying capacity of the allocation area and the current airport landside personnel data. The application can also be connected to a mobile terminal to inform the user of the congestion rate of the allocation area at the current moment in real time, allowing the user to choose whether to change the allocation area. Each target airport should also set a third allocation area as an alternative area. When the congestion rate of the basic allocation area reaches 60%, the third allocation area can be enabled for sharing to ensure the reasonable allocation of airport landside traffic. When the airport traffic is reasonably allocated, the corresponding overall road section will also remain relatively unobstructed. It can also set up a corresponding background management platform to optimize the allocation in real time based on the current flight operation status combined with the airport landside personnel data.

[0133] According to an embodiment of the present invention, the allocation area can be further divided, the first allocation area takes the inbound passengers as the main carrying area, and the second allocation area takes the outbound passengers as the main carrying area.

[0134] According to one embodiment of the present invention, public transportation is not a strictly defined concept. In different application scenarios, its connotation and boundaries will vary. Airport landside public transportation is the transportation between the airport and the city. According to the needs of traffic coordination in this application, the concept of public transportation here should emphasize its intensive transportation attributes.

[0135] Furthermore, in order to achieve the above-mentioned purpose, the present invention also provides an airport landside traffic demand allocation system based on flight waves. Figure 2 is a schematic diagram of a structure of an airport landside traffic demand allocation system based on flight waves according to an exemplary embodiment. Figure 2 As shown, a flight wave-based airport landside traffic demand allocation system in the present invention includes:

[0136] The airport partition processing unit 21 is used to partition the land side of the target airport so that the land side of the target airport includes at least two processing areas, each processing area includes at least one public transportation stop area, one non-public transportation stop area and one guide route; and determine the maximum carrying capacity of each processing area corresponding to each processing area;

[0137] The flight wave data acquisition unit 22 is used to acquire the historical number of inbound and outbound flights and the historical planned seat data of the target airport, and perform data fitting on the historical number of inbound and outbound flights and the historical planned seat data of the target airport to obtain the flight wave data;

[0138] The data screening unit 23 is used to obtain the signaling data of users in the target airport area, pre-process the signaling data of users in the target airport area to obtain valid signaling data, and screen the users based on the valid signaling data to obtain airport staff data, welcoming and seeing-off personnel data or passenger data;

[0139] An airport landside personnel data acquisition unit 24 is used to obtain airport landside personnel data by performing data fitting on the flight wave data based on the passenger data;

[0140] The allocation unit 25 is used to allocate based on the airport landside personnel data and the maximum carrying capacity of the processing area.

[0141] Based on this, the beneficial effect of the present invention lies in that the present invention performs zoning processing on the land side of the airport, matches the demand with the carrying threshold of the processing area based on the flight wave, increases the proportion of passengers arriving at and departing from the airport by public transportation, improves the coordination level of the airport transportation system, deepens the passengers' recognition of the airport transportation system, and provides a complete solution for the improvement of the airport transportation system.

[0142] Those of ordinary skill in the art will appreciate that the modules and algorithm steps described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0143] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described devices and equipment can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0144] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the modules is only a logical function division. There may be other division methods in actual implementation, such as multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or modules, which can be electrical, mechanical or other forms.

[0145] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, that is, they may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the embodiments of the present invention.

[0146] In addition, each functional module in the embodiment of the present invention may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.

[0147] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the energy-saving signal sending / receiving method of each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a ROM, a RAM, a magnetic disk, or an optical disk.

[0148] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the inventive concept. For example, the above features are replaced with (but not limited to) technical features with similar functions disclosed in the present application.

[0149] It should be understood that the size of the serial numbers of each step in the content of the invention and the embodiments of the present invention does not absolutely mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

Claims

1. A method for allocating airport landside traffic demand based on flight waves, characterized in that: include: The landside of the target airport is processed by zoning so that the landside of the target airport includes at least two processing areas, and each processing area includes at least one public transportation stop area, one non-public transportation stop area and one guide route; Determine the maximum carrying capacity of each processing area corresponding to each processing area; Obtain the historical data of the number of inbound and outbound flights and the historical planned seats of the target airport, and perform data fitting on the historical data of the number of inbound and outbound flights and the historical planned seats of the target airport to obtain the flight wave data; Acquire user signaling data in the target airport area, pre-process the user signaling data in the target airport area to obtain valid signaling data, screen users based on the valid signaling data, and obtain airport staff data, welcoming and seeing-off personnel data, or passenger data; Based on the passenger data, the flight wave data is fitted to obtain the airport landside personnel data; Allocation is based on airport landside personnel data and the maximum capacity of the handling area; The method for obtaining airport landside personnel data by performing data fitting on flight wave data based on passenger data includes: ; in, Indicates Airport landside personnel data by time period; Indicates Flight wave data under time period; It indicates the ratio of welcoming and seeing off personnel; Indicates staff ratio; Indicates The planned number of seats for the time period; Indicates The average load factor of flights during the time period; Indicates Passenger transfer rate during the time period; The method of preprocessing the target airport area user signaling data to obtain valid signaling data includes: Based on the user signaling data in the target airport area, missing data, error data and failure data are removed to obtain a first signaling data set; Removing duplicate data based on the first signaling data set to obtain a second signaling data set; Removing ping-pong data from the second signaling data set to obtain a third signaling data set; Removing drift data based on the third signaling data set to obtain valid signaling data; The removing the ping-pong data based on the second signaling data set to obtain the third signaling data set includes: Based on the second signaling data set, the user's continuous trajectory points P are obtained i , P i+1 ...P i+k , if the user is at trajectory point P i and P i+k The base station location information is the same, and the adjacent middle trajectory points correspond to different base stations, and T i+k -T i When it is less than the preset time threshold, only the first trajectory point P is retained. i The data and the end trajectory point P i+k The data is used to obtain the third signaling data; Among them, T i For the user at trajectory point P i Corresponding time; T i+k For the user at trajectory point P i+k The corresponding time.

2. The method for allocating airport landside traffic demand based on flight waves as claimed in claim 1, characterized in that: The removing duplicate data based on the first signaling data set to obtain the second signaling data set includes: Based on the first signaling data set, the mobile phone signaling data of each user is arranged in chronological order. If the base stations connected to two adjacent trajectory points in the same time sequence are the same, the first and last signaling data of the continuous identical data are retained, and the duplicate data in the middle are removed to obtain the second signaling data set.

3. The method for allocating airport landside traffic demand based on flight waves as claimed in claim 2, characterized in that: The removing drift data based on the third signaling data set to obtain valid signaling data includes: Obtaining trajectory point data of the user based on the third signaling data set; Based on the trajectory point data of the user, determine the distance and time interval between adjacent trajectory point data, and obtain the speed between any adjacent trajectory points; wherein the speeds corresponding to the same user have a sequential relationship; If there are two adjacent speeds that are greater than the preset speed threshold at the same time, the middle track point among the three adjacent track points corresponding to the two adjacent speeds is the drift point, and the data corresponding to the drift point is the drift data; The drift data in the third signaling data set is removed to obtain valid signaling data.

4. The method for allocating airport landside traffic demand based on flight waves as claimed in claim 3, characterized in that: The public transportation stop area includes at least one preset public transportation mode; The preset public transportation modes include: traveling by subway and traveling by bus; The maximum carrying capacity of the processing area includes: the maximum carrying capacity of subway trips, the maximum carrying capacity of public transportation trips, and the maximum carrying capacity of non-public transportation trips. The maximum number of passengers traveling by subway is obtained based on the historical passenger data and airport staff data of the same period through the subway sharing rate, passenger reception ratio and passenger drop-off ratio; The maximum number of passengers traveling by public transportation is obtained based on the historical passenger data and airport staff data of the same period through the public transportation share rate, passenger pick-up ratio and passenger drop-off ratio; The maximum carrying capacity of non-public transportation is obtained based on the historical passenger data and airport staff data of the same period through the non-public transportation share rate.

5. The method for allocating airport landside traffic demand based on flight waves as claimed in claim 4, characterized in that: Determine the maximum number of processing areas that can be loaded for each processing area, including: Based on the GBDT model, we get the subway share rate, bus share rate, and non-public transportation share rate. The input of the GBDT model is the characteristic data of the airport; the characteristic data includes one or more of historical flight wave passenger data, the number of subway passengers at the same time as the flight wave data, the number of bus passengers at the same time as the flight wave data, the number of non-public transportation passengers at the same time as the flight wave data, ticket prices, urban economic indicators, the distance between the airport and the city center, and the urban population density; Based on the subway sharing rate, bus sharing rate, and non-public transportation sharing rate, the maximum carrying capacity of the processing area is determined.

6. The method for allocating airport landside traffic demand based on flight waves as claimed in claim 5, characterized in that: Also includes: Real-time monitoring of airport landside traffic status; Report the landside traffic status of the airport.

7. An airport landside traffic demand allocation system based on flight waves, characterized in that: include: An airport zoning processing unit, used for zoning the landside of the target airport so that the landside of the target airport includes at least two processing areas, each of which includes at least one public transportation stop area, one non-public transportation stop area and one guide route; and respectively determine the maximum carrying capacity of each processing area corresponding to each processing area; A flight wave data acquisition unit is used to acquire the historical number of inbound and outbound flights and historical planned seat data of the target airport, and perform data fitting on the historical number of inbound and outbound flights and historical planned seat data of the target airport to obtain flight wave data; A data screening unit is used to obtain user signaling data in the target airport area, pre-process the user signaling data in the target airport area to obtain valid signaling data, and screen users based on the valid signaling data to obtain airport staff data, welcoming and seeing-off personnel data or passenger data; An airport landside personnel data acquisition unit, used to obtain airport landside personnel data by performing data fitting on flight wave data based on passenger data; An allocation unit for allocating based on the airport landside personnel data and the maximum carrying capacity of the handling area; The method for obtaining airport landside personnel data by performing data fitting on flight wave data based on passenger data includes: ; in, Indicates Airport landside personnel data by time period; Indicates Flight wave data under time period; It indicates the ratio of welcoming and seeing off personnel; Indicates staff ratio; Indicates The planned number of seats for the time period; Indicates The average load factor of flights during the time period; Indicates Passenger transfer rate during the time period; The method of preprocessing the target airport area user signaling data to obtain valid signaling data includes: Based on the user signaling data in the target airport area, missing data, error data and failure data are removed to obtain a first signaling data set; Removing duplicate data based on the first signaling data set to obtain a second signaling data set; Removing ping-pong data from the second signaling data set to obtain a third signaling data set; Removing drift data based on the third signaling data set to obtain valid signaling data; The removing the ping-pong data based on the second signaling data set to obtain the third signaling data set includes: Based on the second signaling data set, the user's continuous trajectory points P are obtained i , P i+1 ...P i+k , if the user is at trajectory point P i and P i+k The base station location information is the same, and the adjacent middle trajectory points correspond to different base stations, and T i+k -T i When it is less than the preset time threshold, only the first trajectory point P is retained. i The data and the end trajectory point P i+k The data is used to obtain the third signaling data; Among them, T i For the user at the trajectory point P i Corresponding time; T i+k For the user at trajectory point P i+k The corresponding time.

Citation Information

Patent Citations

  • Airport arrival and departure passenger identification and passenger condition analysis method based on mobile phone signaling data

    CN110020980A

  • Data processing method and system applied to flight reservation value

    CN115953185A

  • Method for predicting consecutive transfer time of resident passengers in passenger transport hub station

    CN116542404A