A method and system for predicting and warning step-type landslide disasters based on rainfall

By constructing the rainfall displacement threshold curve and angle, combining the relationship between rainfall and displacement, the problem of inaccurate prediction of step-type landslides in the existing technology is solved, scientific prediction and hierarchical warning of landslide disasters are realized, and the credibility of early warnings is improved. accuracy.

CN118379861BActive Publication Date: 2024-11-08YUNNAN TRAFFIC PLANNING DESIGN RESEARCH INSTITUTE CO LTD
View PDF 0 Cites -1 Cited by

Patent Information

Application Number
CN202410807459.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-11-08
Estimated Expiration
2044-06-21

Smart Images

  • Figure CN118379861B_ABST
    Figure CN118379861B_ABST
Patent Text Reader

Abstract

The present invention relates to a method and system for predicting and warning a step-type landslide disaster based on rainfall, and belongs to the technical field of landslide disaster prediction, warning and prevention and control. The method deploys rainfall and displacement monitoring devices, collects multi-period rainfall and periodic displacement data in the landslide area, statistically calculates the maximum rainless interval time, forms rainfall that causes periodic displacement and rainfall that does not cause periodic displacement, and constructs a rainfall displacement threshold curve; then draws a rainfall intensity-time-day displacement rate curve, connects the starting and ending points of the rainfall time period with the corresponding periodic displacement starting and ending points, measures the angle between the connecting line and the horizontal direction, and calculates the rainfall displacement angle; finally, the rainfall displacement threshold curve and the rainfall displacement angle are used to realize step-type landslide disaster prediction and multi-level warning. The method constructed by the present invention can improve the accuracy and precision of step-type landslide disaster warning prediction, and has the advantages of clear mechanism, low investment, high credibility, and simple operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of landslide disaster monitoring, prediction, early warning and prevention and control, and in particular relates to a rainfall-based step-type landslide disaster prediction and early warning method and system. Background Art

[0002] Complex geological environments can breed landslide disasters. In addition, engineering activities supported by technical and economic conditions have caused strong disturbances to the hydrological, ecological and geological environment, as well as frequent extreme climatic conditions. These have resulted in increasingly serious landslide disasters and an increasingly severe situation for disaster prevention and mitigation.

[0003] According to the characteristics of the displacement-time series curve, landslides can be divided into oscillating and step types. After being affected by factors such as rainfall, the displacement of the step-type landslide shows step-increasing and fluctuating characteristics. The displacement in the displacement-time series curve shows a staged fluctuation increase, that is, the displacement increases linearly, accelerates, and decelerates with time in the fluctuation stage. This feature is often mistaken for the landslide body entering the accelerated deformation stage, which leads to false alarms. This type of landslide is more harmful, more hidden, and more difficult to predict and warn. Therefore, accurate prediction and warning of step-type landslide disasters is conducive to reducing or even avoiding landslide disaster losses, and is of greater significance for the implementation of disaster prevention and mitigation strategies.

[0004] In view of the difficulty of predicting step-type landslide disasters, there is currently little data on the prediction of step-type landslides. Mathematical decomposition methods such as exponential smoothing, empirical mode decomposition, ensemble empirical mode decomposition, and variational mode decomposition are mainly used to decompose the trend term and periodic term of the displacement curve, and then machine learning algorithms such as support vector machines, artificial neural networks, and extreme learning machines are used to predict the displacement of periodic terms.

[0005] For example, "A method for predicting the cumulative displacement of step-type reservoir landslides based on the optimal time scale of the EEMD-GRP model" proposes to use the ensemble empirical mode decomposition algorithm to decompose the periodic term and trend term of the displacement, and then use the fitting method to predict the displacement of the trend term, and use the gated recurrent unit neural network to predict the periodic term displacement. Finally, the periodic term displacement and the trend term displacement are superimposed to predict the cumulative displacement; "A method for predicting the displacement of step-type landslides based on gradient boosting machine and quadratic programming" uses the exponential smoothing method to decompose the cumulative displacement into the trend term displacement and the periodic term displacement, and uses the least squares algorithm to fit the trend The term displacement curve is obtained by using the gradient boosting machine-quadratic programming model to obtain the periodic term displacement curve, and the two curves are superimposed to obtain the landslide displacement prediction curve; the existing technology "step landslide prediction based on deformation rate decomposition - taking the Jiapa landslide as an example" decomposes the deformation rate data into small-scale fluctuation terms determined by external induced factors and large-scale trend terms determined by internal control factors based on the step motion characteristics of the landslide through differential and discrete wavelet transform smoothing methods. The displacement of the trend term is predicted by the inverse logistic function model (ILF) with an oscillation function added, and the displacement of the fluctuation term is predicted using a long short-term memory neural network (LSTM); "step landslide displacement rate prediction method based on the LS0-RF model" proposes an LS0-RF model combining supervised learning and the extended window method to realize the prediction of the displacement rate of the step landslide.

[0006] The above-mentioned step-type landslide displacement prediction methods based on mathematical decomposition method and machine learning method are essentially the same, with only differences in mathematical decomposition method and machine learning algorithm. Only displacement is used to predict the displacement of the landslide body, ignoring the formation mechanism of displacement and the step-like characteristics of the displacement time curve, and the disadvantages that the trend term displacement is difficult to characterize the development trend of the landslide. In addition, the geological composition of different landslide bodies has its own particularity, which leads to problems such as unreasonable prediction results, low warning precision, and poor accuracy. Summary of the invention

[0007] In order to solve the drawbacks and problems of the above-mentioned step-type landslide disaster prediction technology, the present invention proposes a step-type landslide disaster prediction and early warning method and system based on rainfall, which utilizes the mechanism relationship between rainfall and displacement of step-type landslide formed by recent research. The present invention realizes step-type landslide disaster prediction by constructing rainfall displacement threshold curve and rainfall displacement angle on the basis of collecting multi-period rainfall and displacement monitoring data. It does not involve complicated mathematical decomposition methods and machine learning algorithms, and gives the landslide prediction and early warning method the essential idea, which has the advantages of clear mechanism, low investment, simple operation and high accuracy.

[0008] The invention firstly arranges rainfall and displacement monitoring devices, collects multi-period rainfall and periodic displacement data in a landslide area, statistically calculates the maximum rainless interval time, forms rainfall that causes periodic displacement and rainfall that does not cause periodic displacement, and constructs a rainfall displacement threshold curve; then draws a rainfall intensity-time-daily displacement rate curve, connects the start and end points of a rainfall time period with the start and end points of corresponding periodic displacement, measures the angle between the connecting line and the horizontal direction, and calculates the rainfall displacement angle; finally, comprehensively utilizes the rainfall displacement threshold curve and the rainfall displacement angle to realize step-type landslide disaster prediction and multi-level early warning.

[0009] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0010] A step-type landslide disaster prediction and early warning method based on rainfall, comprising:

[0011] Install rainfall monitoring devices and displacement monitoring devices to collect multi-period rainfall and periodic displacement data in the landslide area, calculate the maximum rain-free interval, form rainfall that causes periodic displacement and rainfall that does not cause periodic displacement, and construct a rainfall displacement threshold curve;

[0012] Draw a rainfall intensity-time-daily displacement rate curve, connect the start and end points of the rainfall time period with the start and end points of the corresponding periodic displacement, measure the angle between the connecting line and the horizontal direction, and calculate the rainfall displacement angle;

[0013] When the monitored rainfall is not greater than the rainfall displacement threshold curve, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold curve, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point intersects with the displacement rate curve, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures must be taken.

[0014] Further, the following steps are included:

[0015] Step (1) Install a rainfall monitoring device and a displacement monitoring device to perform high-frequency monitoring of rainfall and displacement of the landslide body.

[0016] Step (2) Process the displacement data collected by monitoring, using the day as the time scale, and calculate the daily displacement rate by subtracting the cumulative displacement at the beginning of the day from the cumulative displacement at the end of the day. V si -time T siv Sequence, statistical periodic item displacement time period.

[0017] Step (3) processes the rainfall data collected by monitoring, taking hours as the time scale, and statistically generates rainfall intensity-time series that cause periodic item displacement and rainfall intensity-time series that do not cause periodic item displacement through the correspondence between periodic item displacement time periods.

[0018] Step (4) collects and monitors the rainfall data, counts all rain-free intervals in the rainfall intensity-time series that cause the periodic term to shift, and obtains the maximum rain-free interval.

[0019] Step (5) takes the maximum rain-free interval as the standard and re-statistically forms the rainfall intensity-time series that causes the periodic term displacement and the rainfall intensity-time series that does not cause the periodic term displacement through the corresponding relationship between the periodic term displacement time periods.

[0020] Step (6) Process the rainfall intensity-time series data according to equations (1) to (4) to form an average rainfall intensity-rainfall duration series;

[0021] (1)

[0022] (2)

[0023] (3)

[0024] (4)

[0025] In the formula, D Li is the end time of the i-th rainfall period that causes the periodic term displacement With start time difference, D uLi is the end time of the i-th rainfall period that does not cause the periodic term displacement With start time The time scale is hours; n si is the duration of the i-th rainfall period that causes the periodic term shift, n usi is the duration of the ith rainfall period that does not cause the displacement of the periodic term, and the time scale is hours; I Li is the average rainfall intensity of the ith rainfall period that causes the periodic term shift, I uLi is the average rainfall intensity of the ith rainfall period that does not cause periodic term displacement, in mm / h; N s is the total number of rainfall periods that cause the periodic term to shift, N us is the total number of rainfall periods that did not cause displacement of the periodic term; represents the cumulative rainfall of the ith rainfall process that causes the displacement of the periodic term; It represents the cumulative rainfall of the i-th rainfall process that does not cause the displacement of periodic terms.

[0026] Step (7) Calculate the curve parameters in formula (5) based on the data sequence that causes the periodic term displacement and the data sequence that does not cause the periodic term displacement α , β , construct a rainfall displacement threshold curve;

[0027] (5)

[0028] Where I is the rainfall intensity, D is the duration of rainfall, and α and β are curve parameters.

[0029] Step (8) draws the daily rainfall intensity-time series curve and the daily displacement rate-time series curve that cause the displacement of the periodic term in the rainfall intensity-time-daily displacement rate coordinate system to form a rainfall intensity-time-daily displacement rate curve.

[0030] Step (9) In the curve graph of step (8), connect the starting point of the periodic rainfall time with the starting point of the periodic item daily displacement rate, and connect the ending point of the periodic rainfall time with the ending point of the periodic item daily displacement rate to obtain 2N s A connection.

[0031] Step (10) measures the angles between all connecting lines and the horizontal direction, and takes the average value as the rainfall displacement angle.

[0032] Step (11): When the monitored rainfall is not greater than the rainfall displacement threshold curve, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold curve, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point and the displacement rate curve intersects, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures should be taken.

[0033] Furthermore, in step (1), a rainfall monitoring device is installed in an unobstructed open location in the step-type landslide area, and a displacement monitoring device is installed in the main sliding section of the step-type landslide body.

[0034] Furthermore, in step (1), the monitoring frequency is not less than once per hour, and the monitoring should be carried out in a remote automated manner, and the monitored displacement includes surface displacement or underground displacement;

[0035] The monitoring rainfall data shall be at least 3 periods and the periodic displacement data shall be at least 2 periods. If the requirements are not met, continue to collect monitoring data.

[0036] Furthermore, in step (4), the rain-free interval time refers to the duration of no rainfall between two adjacent rainfall processes. When the rain-free interval time between two adjacent rainfall processes is less than the maximum rain-free interval time, it is regarded as one rainfall cycle, otherwise it is regarded as two rainfall cycles.

[0037] Furthermore, in step (7), the rainfall displacement threshold curve can distinguish the rainfall that causes the periodic term displacement from the rainfall that does not cause the periodic term displacement. When the rainfall intensity-rainfall duration is above the threshold curve, the rainfall is greater than the threshold, otherwise it is less than the threshold.

[0038] Furthermore, in step (8), the rainfall intensity-time-daily displacement rate curve has daily rainfall intensity and daily displacement rate as ordinates and time as abscissa, the daily rainfall intensity-time series curve is a bar graph, and the daily displacement rate-time series curve is a data point line graph, and the time abscissas of the daily rainfall intensity-time series curve and the daily displacement rate-time series curve correspond to each other and overlap.

[0039] Furthermore, in step (9), the duration of the periodic term daily displacement rate is the same as the duration of the rainfall cycle.

[0040] Furthermore, in step (11), when the monitored rainfall is not greater than the rainfall displacement threshold, it is predicted that the landslide body will not undergo periodic displacement, and a yellow warning level is issued in advance; when the monitored rainfall is greater than the rainfall displacement threshold, it is predicted that the landslide body will undergo periodic displacement, and an orange warning level is issued in advance; when a straight line drawn from the rainfall end time point as the starting point and the displacement rate curve intersects, and the displacement rate at the intersection does not decrease but continues to increase, it is predicted that the landslide body will enter the accelerated deformation stage, and a red warning level is issued in advance.

[0041] The present invention also relates to a rainfall-based step-type landslide disaster prediction and early warning system, comprising a processor, a rainfall monitoring device, a displacement monitoring device and an alarm module connected to the processor, the rainfall monitoring device and the displacement monitoring device perform high-frequency monitoring of rainfall and displacement of the landslide body, the processor collects monitoring data from the rainfall monitoring device and the displacement monitoring device, and processes them according to the above method, and the alarm module performs landslide disaster prediction and early warning based on the processing results.

[0042] When the monitored rainfall is greater than the rainfall displacement threshold curve, the landslide body is predicted to undergo periodic displacement and an orange warning level is issued in advance;

[0043] The straight line drawn according to the rainfall displacement angle with the end time of rainfall as the starting point intersects with the displacement rate curve. The displacement rate at the intersection has not decreased but continues to increase. It is predicted that the landslide body has entered the accelerated deformation stage, and the red warning level is issued in advance.

[0044] Compared with the prior art, the present invention has the following beneficial effects:

[0045] (1) Based on rainfall, a step-type landslide inducing factor, and the relationship between rainfall and periodic displacement, the present invention constructs a prediction method for periodic displacement and accelerated deformation stage, giving the landslide prediction and early warning method the essential idea, thereby achieving graded early warning with a clear mechanism, scientific reliability and high credibility.

[0046] (2) The present invention determines the rainfall displacement threshold curve and rainfall displacement angle based on the monitoring and collection of a small amount of rainfall and displacement data, and can predict the displacement of step-type landslides and provide graded early warnings based on rainfall alone. There is no need to deploy and install displacement monitoring devices, and the calculation amount and investment are small.

[0047] (3) The present invention provides a step-type landslide prediction method, which can achieve early warning and facilitate disaster prevention and control personnel to take emergency measures in advance. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 It is a flow chart of a step-type landslide disaster prediction method based on rainfall monitoring according to an embodiment of the present invention;

[0049] Figure 2 A plan layout diagram of rainfall and displacement monitoring of a landslide body according to an embodiment of the present invention;

[0050] Figure 3 The average rainfall intensity-rainfall duration curve and rainfall displacement threshold of a landslide body according to an embodiment of the present invention;

[0051] Figure 4 The daily rainfall intensity-time-daily displacement rate curve and the rainfall displacement angle of an embodiment of the present invention;

[0052] Figure 5 A periodic term displacement prediction model based on rainfall monitoring according to an embodiment of the present invention;

[0053] Figure 6 A landslide disaster early warning model based on rainfall monitoring according to an embodiment of the present invention;

[0054] Figure 7 A system block diagram of an embodiment of the present invention. DETAILED DESCRIPTION

[0055] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0056] Example 1

[0057] The rainfall-based step-type landslide disaster prediction and early warning method of this embodiment includes:

[0058] Install rainfall monitoring devices and displacement monitoring devices, collect multi-period rainfall and periodic displacement data in the landslide area, statistically calculate the maximum rain-free interval time, form the rainfall that causes periodic displacement and does not cause periodic displacement, and construct a rainfall-displacement threshold curve.

[0059] Draw the rainfall intensity-time-daily displacement rate curve, connect the starting and ending points of the rainfall time period with the starting and ending points of the corresponding periodic displacement, measure the angle between the connecting line and the horizontal direction, and calculate the rainfall displacement angle.

[0060] When the monitored rainfall is not greater than the rainfall displacement threshold curve, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold curve, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point intersects with the displacement rate curve, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures must be taken.

[0061] Example 2

[0062] The rainfall-based step-type landslide disaster prediction and early warning method of this embodiment is characterized by comprising the following steps:

[0063] Step (1) Install a rainfall monitoring device and a displacement monitoring device to perform high-frequency monitoring of rainfall and displacement of the landslide body.

[0064] Step (2) processes the displacement data collected by monitoring, taking the day as the time scale, and calculates the daily displacement rate-time series by subtracting the cumulative displacement at the beginning of each day from the cumulative displacement at the end of each day, and statistically calculates the displacement time period of the periodic term.

[0065] Step (3) processes the rainfall data collected by monitoring, taking hours as the time scale, and statistically generates rainfall intensity-time series that cause periodic item displacement and rainfall intensity-time series that do not cause periodic item displacement through the correspondence between periodic item displacement time periods.

[0066] Step (4) collects and monitors the rainfall data, counts all rain-free intervals in the rainfall intensity-time series that cause the periodic term to shift, and obtains the maximum rain-free interval.

[0067] Step (5) takes the maximum rain-free interval as the standard and re-statistically forms the rainfall intensity-time series that causes the periodic item displacement and the rainfall intensity-time series that does not cause the periodic item displacement through the corresponding relationship between the periodic item displacement time periods.

[0068] Step (6) Process the rainfall intensity-time series data according to equations (1) to (4) to form an average rainfall intensity-rainfall duration series;

[0069] (1)

[0070] (2)

[0071] (3)

[0072] (4)

[0073] In the formula, D Li is the end time of the i-th rainfall period that causes the periodic term displacement With start time difference, D uLi is the end time of the i-th rainfall period that does not cause the periodic term displacement With start time The time scale is hours; n si is the duration of the i-th rainfall period that causes the periodic term shift, n usi is the duration of the ith rainfall period that does not cause the displacement of the periodic term, and the time scale is hours; I Li is the average rainfall intensity of the ith rainfall period that causes the periodic term shift, I uLi is the average rainfall intensity of the ith rainfall period that does not cause periodic term displacement, in mm / h; N s is the total number of rainfall periods that cause the periodic term to shift, N us is the total number of rainfall periods that did not cause displacement of the periodic term; represents the cumulative rainfall of the ith rainfall process that causes the displacement of the periodic term; It represents the cumulative rainfall of the i-th rainfall process that does not cause the displacement of periodic terms.

[0074] Step (7) Calculate the curve parameters in formula (5) based on the data sequence that causes the periodic term displacement and the data sequence that does not cause the periodic term displacement α , β , construct a rainfall displacement threshold curve;

[0075] (5)

[0076] Where I is the rainfall intensity, D is the duration of rainfall, and α and β are curve parameters.

[0077] Step (8) draws the daily rainfall intensity-time series curve and the daily displacement rate-time series curve that cause the displacement of the periodic term in the rainfall intensity-time-daily displacement rate coordinate system to form a rainfall intensity-time-daily displacement rate curve.

[0078] Step (9) In the curve graph of step (8), connect the starting point of the periodic rainfall time with the starting point of the periodic item daily displacement rate, and connect the ending point of the periodic rainfall time with the ending point of the periodic item daily displacement rate to obtain 2N s A connection.

[0079] Step (10) measures the angles between all the connecting lines and the horizontal direction, and takes the average value as the rainfall displacement angle, which is used to predict whether the deformation of the landslide body has entered the accelerated deformation stage, and then determines whether a red warning needs to be issued.

[0080] Step (11): When the monitored rainfall is not greater than the rainfall displacement threshold, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point and the displacement rate curve intersects, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures should be taken.

[0081] Example 3

[0082] like Figure 1 As shown, the rainfall-based step-type landslide disaster prediction and early warning method of this embodiment includes the following steps:

[0083] Step (1) installing a rainfall monitoring device in an open area without shielding in the step-type landslide area, and installing a displacement monitoring device in the main sliding section of the step-type landslide body, so as to realize high-frequency monitoring of rainfall and displacement of the landslide body.

[0084] The rainfall monitoring device is an existing product that can accurately monitor rainfall, and generally requires a resolution of no less than 0.2 mm. The displacement monitoring device is an existing product that can accurately monitor displacement, and generally requires an accuracy of no less than 1 mm.

[0085] Among them, the monitoring frequency of landslide rainfall and displacement shall not be less than 1 time / hour, and remote automation should be used to achieve monitoring. The monitored displacement includes surface displacement or underground displacement.

[0086] The monitoring rainfall data shall be at least 3 periods and the periodic displacement data shall be at least 2 periods. If these conditions are not met, continue to collect monitoring data.

[0087] Step (2) Process the displacement data collected by monitoring, taking the day as the time scale, and calculate the daily displacement rate-time series (i=1, 2, 3, ..., N) by subtracting the cumulative displacement at the beginning of the day from the cumulative displacement at the end of the day. s ), the statistical periodic item displacement time period.

[0088] Step (3) processes the rainfall data collected by monitoring, taking hours as the time scale, and statistically generates rainfall intensity-time series that cause periodic item displacement and rainfall intensity-time series that do not cause periodic item displacement through the correspondence between periodic item displacement time periods.

[0089] Step (4) collects and monitors the rainfall data, counts all rain-free intervals in the rainfall intensity-time series that cause the periodic term to shift, and obtains the maximum rain-free interval.

[0090] The rain-free interval time refers to the duration of time without rainfall between two adjacent rainfall processes. When the rain-free interval time between two adjacent rainfall processes is less than the maximum rain-free interval time, it is regarded as one rainfall cycle, otherwise it is regarded as two rainfall cycles.

[0091] Step (5) takes the maximum rain-free interval as the standard, and re-statistically forms the rainfall intensity-time series (i=1, 2, 3, ..., N) that causes the periodic term displacement through the corresponding relationship between the periodic term displacement time periods. s ) and rainfall intensity-time series without periodic term displacement (i=1, 2, 3, …, N us ).

[0092] Step (6) Process the rainfall intensity-time series data according to equations (1) to (4) to form an average rainfall intensity-rainfall duration series;

[0093] (1)

[0094] (2)

[0095] (3)

[0096] (4)

[0097] In the formula, D Li is the end time of the i-th rainfall period that causes the periodic term displacement With start time difference, D uLi is the end time of the i-th rainfall period that does not cause the periodic term displacement With start time The time scale is hours; n si is the duration of the i-th rainfall period that causes the periodic term shift, n usi is the duration of the ith rainfall period that does not cause the displacement of the periodic term, and the time scale is hours; I Li is the average rainfall intensity of the ith rainfall period that causes the periodic term shift, I uLi is the average rainfall intensity of the ith rainfall period that does not cause periodic term displacement, in mm / h; N s is the total number of rainfall periods that cause the periodic term to shift, N us is the total number of rainfall periods that did not cause displacement of the periodic term; represents the cumulative rainfall of the ith rainfall process that causes the displacement of the periodic term; It represents the cumulative rainfall of the i-th rainfall process that does not cause the displacement of periodic terms.

[0098] Step (7) Calculate the curve parameters in formula (5) based on the data sequence that causes the periodic term displacement and the data sequence that does not cause the periodic term displacement α , β , construct a rainfall displacement threshold curve;

[0099] (5)

[0100] Where I is the rainfall intensity, D is the duration of rainfall, and α and β are curve parameters.

[0101] The rainfall displacement threshold curve can distinguish the rainfall that causes the displacement of the periodic term from the rainfall that does not. When the rainfall intensity-rainfall duration (I, D) is above the threshold curve, the rainfall is greater than the threshold, otherwise it is less than the threshold.

[0102] Step (8) Plot the daily rainfall intensity-time series (i=1, 2, 3, ..., N) that causes the displacement of the periodic term in the rainfall intensity-time-daily displacement rate coordinate system. s ) curve and daily displacement rate-time series (i=1, 2, 3, ..., N s ) curve to form the rainfall intensity-time-daily displacement rate curve.

[0103] The rainfall intensity-time-daily displacement rate curve has daily rainfall intensity and daily displacement rate as the vertical coordinates and time as the horizontal coordinate. The daily rainfall intensity-time series curve is a bar graph, and the daily displacement rate-time series curve is a data point line graph. The time horizontal coordinates of the daily rainfall intensity-time series curve and the daily displacement rate-time series curve correspond to each other and overlap.

[0104] Step (9) In the curve graph, connect the starting point of the periodic rainfall time with the starting point of the periodic term daily displacement rate, and connect the ending point of the periodic rainfall time with the ending point of the periodic term daily displacement rate to obtain 2N s The duration of the periodic daily displacement rate is the same as the duration of the rainfall cycle.

[0105] Step (10) Measure the angles between all connecting lines and the horizontal direction, and take the average value as the rainfall displacement angle 。

[0106] Step (11): When the monitored rainfall is not greater than the rainfall displacement threshold, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point and the displacement rate curve intersects, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures should be taken.

[0107] When the monitored rainfall is not greater than the rainfall displacement threshold curve, it is predicted that the landslide body will not undergo periodic displacement, and a yellow warning level will be issued in advance.

[0108] Example 4

[0109] like Figure 7 As shown, the rainfall-based step-type landslide disaster prediction and early warning system of this embodiment includes a processor, a rainfall monitoring device and a displacement monitoring device connected to the processor, the rainfall monitoring device and the displacement monitoring device perform high-frequency monitoring of rainfall and displacement of the landslide body, the processor collects the results of the rainfall monitoring device and the displacement monitoring device, and performs landslide disaster prediction and early warning according to the above method.

[0110] The above-mentioned processor can be a general-purpose processor, including a central processing unit, etc.; it can also be a digital signal processor, an application-specific integrated circuit, a field programmable gate array or other programmable logic device, a discrete gate or transistor logic device, or a discrete hardware component.

[0111] Optionally, this embodiment may also be provided with an alarm module connected to the processor, and the alarm module performs landslide disaster prediction and warning according to the processing results. A display module may also be provided as required to display the collected data and the final warning results.

[0112] Optionally, an embodiment of the present application further provides a storage medium, in which instructions are stored, and when the storage medium is run on a computer, the computer executes the method of the embodiment shown above.

[0113] Optionally, an embodiment of the present application further provides a chip for running instructions, wherein the chip is used to execute the method of the embodiment shown above.

[0114] Application Examples

[0115] The step-type landslide disaster prediction and early warning method based on rainfall in this embodiment:

[0116] 1. A tipping bucket rainfall meter was set up in an open area with no obstructions on a step-type landslide, and a GNSS displacement monitoring point was set up in the main sliding section with more obvious macroscopic deformation traces. Figure 2 shown.

[0117] 2. After monitoring from May 30 to December 26, 2023, 21 rainfall processes and 5 periods of periodic displacement data were collected, with a monitoring frequency of 1 time / hour.

[0118] 3. Use Excel VBA to write a program to batch process a large amount of monitoring data. After processing, rainfall intensity-time series and displacement rate-time series (i=1, 2, 3, 4, 5) are formed; according to the corresponding time relationship of the periodic item displacement, the rainfall intensity-time series that causes the periodic item displacement and the rainfall intensity-time series that does not cause the periodic item displacement are preliminarily determined. Among them, there are 5 rainfall processes that cause the periodic item displacement, and 16 rainfall processes that do not cause the periodic item displacement.

[0119] 4. Based on the rainfall intensity-time series corresponding to the five rainfall processes, the maximum rain-free interval time calculated by writing an Excel VBA program is 141 hours.

[0120] 5. Taking 141 hours as the maximum rain-free interval, we recalculated the rainfall data by writing an Excel VBA program to obtain the rainfall intensity that caused the periodic term displacement in the five periods. R si -time T si Sequence (i=1, 2, 3, 4, 5), 10 periods of rainfall intensity that did not cause periodic term displacement R usi -time T usi sequence (i=1, 2, 3, 4, 5, 7, 8, 9, 10).

[0121] 6. The daily rainfall intensity-time series is processed to form the average rainfall intensity-rainfall duration series, as shown in Table 1.

[0122] Table 1 Average rainfall intensity-rainfall duration series

[0123]

[0124] 7. According to the invention patent "Multi-level early warning method for landslides in local areas (patent number: ZL20221101417.2)", the rainfall displacement threshold curve is constructed, where the curve parameters α and β are 7.19 and 1.93 respectively, see Figure 3 shown.

[0125] 8. Compile and form a rainfall intensity-time-daily displacement rate curve, where the daily rainfall intensity-time series curve is a bar graph, and the daily displacement rate-time series curve is a point line graph. For details, see Figure 4 .

[0126] 9. Connect the starting points of the five rainfall processes with the starting points of the daily displacement rate of the periodic item, and connect the end points of the five rainfall processes with the end points of the daily displacement rate of the periodic item. Ten lines are obtained, one of which overlaps. See Figure 4 shown.

[0127] 10. The angles between the connecting line and the horizontal direction are 80 o , 80 o , 78 o , 79 o , 79 o , 78 o , 78 o , 79 o , 78 o The calculated average value is 78.78 o , as the rainfall displacement angle of the landslide body.

[0128] 11. Process the monitored rainfall data to form rainfall duration-average rainfall intensity (D, I), where the rainfall process ( t 0 ~ t 1 ) satisfies formula (6), it is predicted that the landslide body will undergo periodic displacement; otherwise, it is predicted that no periodic displacement will occur. Figure 5 shown.

[0129] (6)

[0130] 12. When the monitored rainfall duration-average rainfall intensity (D, I) satisfies the condition of formula (6), the end point of the periodic rainfall is taken as the starting point, and the horizontal angle is 78.78 o The daily displacement rate at the intersection of the extended connection line and the displacement rate curve did not decrease. At this time, the landslide body entered the accelerated deformation stage, and emergency measures for closing the landslide body were taken. For details, see Figure 6 shown.

[0131] 13. The application in the prediction and early warning of a step-type landslide disaster shows that the present invention is scientific and reliable, highly credible, requires little investment, and has a significant early warning success effect.

[0132] Compared with the prior art, the results are shown in Table 2.

[0133] Table 2 Technical comparison analysis

[0134]

[0135] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A step-type landslide disaster prediction and early warning method based on rainfall, characterized by: include: Install rainfall monitoring devices and displacement monitoring devices to collect multi-period rainfall and periodic displacement data in the landslide area, calculate the maximum rain-free interval, form rainfall that causes periodic displacement and rainfall that does not cause periodic displacement, and construct a rainfall displacement threshold curve; Draw a rainfall intensity-time-daily displacement rate curve, connect the start and end points of the rainfall time period with the start and end points of the corresponding periodic displacement, measure the angle between the connecting line and the horizontal direction, and calculate the rainfall displacement angle; When the monitored rainfall is not greater than the rainfall displacement threshold curve, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold curve, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point intersects with the displacement rate curve, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures should be taken; The rainfall-based step-type landslide disaster prediction and early warning method comprises the following steps: Step (1) installing a rainfall monitoring device and a displacement monitoring device to perform high-frequency monitoring of rainfall and displacement of the landslide body; Step (2) processing the displacement data collected by monitoring, taking the day as the time scale, calculating the displacement rate curve by subtracting the cumulative displacement at the beginning of the day from the cumulative displacement at the end of the day, and calculating the displacement time period of the periodic item; Step (3) processing the rainfall data collected by monitoring, taking hours as the time scale, and statistically forming a rainfall intensity-time series that causes the periodic item displacement and a rainfall intensity-time series that does not cause the periodic item displacement through the correspondence between the periodic item displacement time periods; Step (4) by monitoring the collected rainfall data, counting all rainless intervals in the rainfall intensity-time series that cause the periodic term displacement, and obtaining the maximum rainless interval; Step (5) takes the maximum rain-free interval as the standard, and re-statistically forms a rainfall intensity-time series that causes the periodic item displacement and a rainfall intensity-time series that does not cause the periodic item displacement through the corresponding relationship between the periodic item displacement time periods; Step (6) Process the rainfall intensity-time series data according to equations (1) to (4) to form an average rainfall intensity-rainfall duration series; Where D Li is the end time of the i-th rainfall period that causes the periodic term displacement With the start time T si1 The difference, D uLi is the end time of the i-th rainfall period that does not cause the periodic term displacement With the start time T usi1 The time scale is hours; n si is the duration of the ith rainfall period that causes the periodic term shift, n usi is the duration of the ith rainfall period that does not cause the displacement of the periodic term, and the time scale is hours; I Li is the average rainfall intensity of the ith rainfall period that causes the periodic term shift, I uLi is the average rainfall intensity of the ith rainfall period that does not cause periodic term displacement, in mm / h; N s is the total number of rainfall periods that cause the periodic term to shift, N us is the total number of rainfall periods that did not cause displacement of the periodic term; represents the cumulative rainfall of the ith rainfall process that causes the displacement of the periodic term; represents the cumulative rainfall of the ith rainfall process that does not cause the displacement of the periodic term; Step (7) calculates the curve parameters α and β in formula (5) according to the data sequence that causes the periodic term displacement and the data sequence that does not cause the periodic term displacement, and constructs a rainfall displacement threshold curve; I=αD -β (5) In the formula, I is the rainfall intensity, D is the duration of rainfall, and α and β are curve parameters; Step (8) draws a daily rainfall intensity-time series curve and a daily displacement rate-time series curve that cause the periodic term displacement in a rainfall intensity-time-daily displacement rate coordinate system to form a rainfall intensity-time-daily displacement rate curve; Step (9) In the curve graph of step (8), connect the starting point of the periodic rainfall time with the starting point of the periodic item daily displacement rate, and connect the ending point of the periodic rainfall time with the ending point of the periodic item daily displacement rate to obtain 2N s Connections Step (10) measuring the angles between all the connecting lines and the horizontal direction, and taking the average value as the rainfall displacement angle; Step (11): When the monitored rainfall is not greater than the rainfall displacement threshold curve, the landslide body will not undergo periodic displacement; when the monitored rainfall is greater than the rainfall displacement threshold curve, the landslide body will undergo periodic displacement; when a straight line drawn from the rainfall end time point as the starting point and the displacement rate curve intersects, and the displacement rate at the intersection does not decrease but continues to increase, the landslide body enters the accelerated deformation stage, a landslide disaster will occur, and emergency response measures should be taken.

2. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized in that: In step (1), a rainfall monitoring device is installed in an unobstructed open location in the step-type landslide area, and a displacement monitoring device is installed in the main sliding section of the step-type landslide body.

3. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized in that: In step (1), the monitoring frequency is not less than once per hour, and the monitoring should be carried out in a remote automated manner, and the monitored displacement includes surface displacement or underground displacement; The monitoring rainfall data shall be at least 3 periods and the periodic displacement data shall be at least 2 periods. If the requirements are not met, continue to collect monitoring data.

4. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized in that: In step (4), the rain-free interval time refers to the duration of no rainfall between two adjacent rainfall processes. When the rain-free interval time between two adjacent rainfall processes is less than the maximum rain-free interval time, it is regarded as one rainfall cycle, otherwise it is regarded as two rainfall cycles.

5. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized in that: In step (7), the rainfall displacement threshold curve can distinguish the rainfall that causes the periodic term displacement from the rainfall that does not cause the periodic term displacement. When the rainfall intensity-rainfall duration is above the threshold curve, the rainfall is greater than the threshold, otherwise it is less than the threshold.

6. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized by: In step (8), the rainfall intensity-time-daily displacement rate curve has daily rainfall intensity and daily displacement rate as ordinates and time as abscissa. The daily rainfall intensity-time series curve is a bar graph, and the daily displacement rate-time series curve is a data point line graph. The time abscissas of the daily rainfall intensity-time series curve and the daily displacement rate-time series curve correspond to each other and overlap.

7. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized by: In step (9), the duration of the periodic daily displacement rate is the same as the duration of the rainfall cycle.

8. The method for predicting and warning step-type landslide disasters based on rainfall according to claim 1 is characterized by: In step (11), when the monitored rainfall is not greater than the rainfall displacement threshold, it is predicted that the landslide body will not undergo periodic displacement, and a yellow warning level is issued in advance; when the monitored rainfall is greater than the rainfall displacement threshold, it is predicted that the landslide body will undergo periodic displacement, and an orange warning level is issued in advance; The straight line drawn according to the rainfall displacement angle with the end time of rainfall as the starting point intersects with the displacement rate curve. The displacement rate at the intersection has not decreased but continues to increase. It is predicted that the landslide body has entered the accelerated deformation stage, and the red warning level is issued in advance.

9. A rainfall-based step-type landslide disaster prediction and early warning system, characterized in that: The invention comprises a processor, a rainfall monitoring device, a displacement monitoring device and an alarm module connected to the processor, wherein the rainfall monitoring device and the displacement monitoring device perform high-frequency monitoring of rainfall and displacement of a landslide body, the processor collects monitoring data of the rainfall monitoring device and the displacement monitoring device, and processes the data according to the method described in any one of claims 1 to 8, and the alarm module performs landslide disaster prediction and early warning according to the processing results.