An intelligent security monitoring method and system based on the Internet of Things
By deploying IoT intelligent security systems at construction sites, combined with sensors and face recognition technology, real-time monitoring and assessment of safety risks is solved, the problem of imperfect safety management at construction sites is solved, safety awareness and management efficiency are improved, and material theft and accidents are prevented. .
Patent Information
- Application Number
- CN202410553816.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-05-06
AI Technical Summary
The construction site has problems such as weak walls, a mixed crowd of people entering and exiting, scattered patrol personnel and chaotic management, and an imperfect security monitoring system, which makes it difficult to ensure material safety.
Adopting an intelligent security monitoring method based on the Internet of Things, by placing sensors and high-definition camera equipment in various functional areas of the construction site, combined with the face recognition system, real-time monitoring of personnel flow data and safety values of material storage areas is established to establish a safe data Internet of Things network. It also sends real-time management suggestions to the security management office to dynamically adjust security patrol forces and drone patrols.
It has achieved comprehensive safety risk assessment and management of construction sites, improved safety awareness and management efficiency, prevented material theft and accidents, optimized human resource deployment, and improved construction and management efficiency.
Smart Images

Figure CN118400494B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of video security monitoring, and is an intelligent security monitoring method and system based on the Internet of Things. Background Art
[0002] In traditional construction sites, traditional construction site management often lacks comprehensive safety management measures, and the mixed mobile personnel lead to the theft of materials. At the same time, traditional site patrol management usually relies on manual patrols, with scattered personnel and chaotic management, resulting in low patrol efficiency and increased supervision loopholes, making it difficult to ensure the safety risks of materials. With the continuous development and popularization of technologies such as the Internet of Things and artificial intelligence, smart security systems have become an important trend in modern construction site management. In addition, the application of smart security systems is not only a focus on site safety management, but also a commitment and guarantee to investors, owners and contractors.
[0003] In the existing disclosed invention technology, for example, the patent with application publication number CN116229656A discloses an intelligent perimeter protection system, method, and electronic device for construction sites. According to the size of the construction site, the number and position of the video surveillance poles are calculated, and the video surveillance poles are installed, and protective devices are installed between each video surveillance pole to form a fence of the construction site; the strength of the network signal in the construction site is obtained, and the central gateway and the edge computing terminal are set up at the position with the maximum network signal strength; each video surveillance pole, the central gateway, and the edge computing terminal are powered on, and after powering on, each video surveillance pole, the central gateway, and the edge computing terminal are configured to perform network parameter configuration so that each video surveillance pole, the central gateway, and the edge computing terminal are in the same local area network; the orientation and focal length of the camera device on each video surveillance pole are adjusted through the mobile terminal, and after the adjustment, video data of different positions of the construction site are obtained; the identity and / or behavior of personnel are detected through the detection model of the edge computing terminal, and an alarm is issued when abnormal behavior and / or abnormal personnel are detected, and an alarm information is generated.
[0004] The above patents mainly focus on the construction and use of video surveillance systems, as well as the detection and alarm of personnel identity and behavior. They lack comprehensive perception of construction sites and material safety data processing, and have the problems described in the background technology. Summary of the invention
[0005] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0006] The technical problem to be solved by the present invention is that in the prior art, there are problems such as weak walls at construction sites, a mixed crowd of people entering and leaving, scattered patrol personnel and chaotic management, an imperfect and untimely security monitoring system, and internal personnel stealing materials by taking advantage of their work. An intelligent security monitoring method and system based on the Internet of Things is proposed.
[0007] In order to achieve the above object, the technical solution of an intelligent security monitoring method based on the Internet of Things of the present invention comprises the following steps:
[0008] S1: Covering each functional area of the construction site with sensor equipment and high-definition camera equipment to collect real-time video streams of each functional area of the construction site;
[0009] S2: Extract and count personnel flow data at the construction site through the facial recognition security system at the entrance and exit of the construction site;
[0010] S3: Based on the personnel flow data, the mobile personnel are classified to monitor the abnormal movement paths, and the dynamic personnel flow rate of the construction site is evaluated and calculated every hour;
[0011] S4: Calculate the safety value of each material storage area in real time according to the dynamic personnel flow, establish a safety data IoT data network for construction site materials, and visualize the safety value of each material storage area to the safety data IoT data network for construction site materials;
[0012] S5: Update the material safety data of the construction site through the IoT data network to the construction site security management office in real time, and send security management suggestions to the management background of the construction site security management office in real time.
[0013] Specifically, in S1, the functional areas of the construction site include: construction area, material storage areas at all levels, office area, living area, equipment area, and waste treatment area;
[0014] The material storage area is classified by the material management department of each construction site according to the material value. The importance coefficient of each material storage area is ε i , i is a subscript, indicating that the importance level of the material storage area is i.
[0015] Specifically, S2 includes the following specific steps:
[0016] S21: Real-time extraction of facial recognition security systems at the entrance of construction sites
[0017] Facial information of mobile personnel entering the construction site every hour;
[0018] S22: searching for identity category information matching the floating personnel in the worker identity information database of the construction unit; the identity category information includes: outsiders and construction workers;
[0019] When the identity category information of the mobile personnel is a foreigner, executing step S23;
[0020] When the identity category information of the mobile personnel is a construction worker, executing step S24;
[0021] S23: directly marking the outsider as a risk person, and at the same time, synchronously extracting the number of visits a of the outsider to the construction site within 24 hours;
[0022] When the number of visits a≤1, the outsider is tracked in real time by using sensor equipment and high-definition camera equipment, wherein the risk level of the outsider is level 1, and the risk level coefficient is α1;
[0023] When the number of visits is 1<a≤3, the facial information of the outsider and the movement data after entering the construction site are directly sent to the security management room of the construction site, and video surveillance is continued. The risk level of the outsider is level 2, and the risk level coefficient is α2;
[0024] When the number of visits a>3, a risk warning is issued to the security management office of the construction site, and the security personnel are notified to conduct offline inquiries about the purpose of the visit of the outsider and revoke the outsider's right to leave the construction site freely. The risk level of the outsider is level three, and the risk level coefficient is α3;
[0025] S24: searching the worker employment information database of the construction unit for the type of work information and the working hours information matching the construction worker, and executing step S3;
[0026] Among them, in S24, the job category information includes: temporary workers and contract workers; the working time information includes: specific employment date information of construction workers whose job category is temporary workers in the worker employment information database of the construction unit and specific employment time period information of construction workers whose job category is contract workers in the worker employment information database of the construction unit.
[0027] Specifically, in S3, the abnormal movement path monitoring of mobile personnel by category includes:
[0028] S31: Classify mobile personnel according to personnel flow data;
[0029] When the job type information of the mobile worker is a temporary worker, the specific employment date information of the temporary worker is retrieved to verify whether the time when the temporary worker enters the construction site entrance is the employment date;
[0030] When the verification result is output as "False", the temporary worker is directly marked as a risky person, the risk level of the temporary worker is level one, and the risk level coefficient is α1;
[0031] When the verification result is output as "True", execute step S32;
[0032] When the job type information of the mobile worker is a contract worker, the specific employment date information of the temporary worker is retrieved to verify whether the time when the temporary worker enters the construction site entrance is within the employment period;
[0033] When the verification result is output as "False", the contract worker is directly marked as a risky person, the risk level of the temporary worker is level one, and the risk level coefficient is α1;
[0034] When the verification result output is "True", execute step S33;
[0035] S32: Perform full-path monitoring on the temporary worker, continuously collect the movement data of the temporary worker from the entrance of the construction site to the work area through the sensor equipment, reconstruct the movement trajectory of the object through the collected movement data, use the monitoring algorithm to detect abnormal movement deviation on the reconstructed trajectory, and identify the point set of abnormal movement offset position points as:
[0036] {(b1, c1), (b2, c2)...(b x , c x )...(b X , c X )};
[0037] Among them, (b x , c x ) is the coordinates of the position point where the temporary worker is identified as having abnormal movement and displacement for the xth time during his movement within the construction site;
[0038] The monitoring algorithms include: distance algorithm, speed and acceleration algorithm, trajectory shape algorithm and statistical algorithm;
[0039] S33: Perform sampling monitoring of the path monitoring points of the contract workers, collect the movement data of the contract workers from the entrance of the construction site to the fork in the route of the work area through the sensor equipment, use the machine learning model to detect abnormal movement deviations of the historical movement data and the movement data of the actual route fork, and identify the movement distance data set of abnormal movement as:
[0040] {g1, g2...g k ...c K};
[0041] Among them, g k is the moving distance of the contract worker during the kth time of being identified as abnormally moving during the movement of the contract worker in the construction site;
[0042] S34: Calculate the material safety cumulative threat value of the construction worker during the movement of the construction site according to the point set of the abnormal movement offset coordinate point and the abnormal movement distance data set, and make a real-time risk level judgment of the construction worker;
[0043] The material safety cumulative threat value includes: the material safety cumulative threat value γ of the temporary worker during the movement in the construction site c The cumulative threat value of material safety during the movement of the contract workers in the construction site γ b ;
[0044] The cumulative threat value of material safety during the movement of the temporary workers in the construction site γ c The calculation strategy is as follows:
[0045]
[0046] Where, ln is the natural logarithm;
[0047] (b i , c i ) is the center coordinate of the i-th level material storage area;
[0048] D x The estimated straight-line distance between the planned moving route and the center of the material storage area when the temporary worker is identified as having an abnormal movement deviation for the xth time during the movement within the construction site;
[0049] The cumulative threat value of material safety during the movement of the contract workers in the construction site γ b The calculation strategy is as follows:
[0050]
[0051] Among them, D k is the average of the straight-line distances between the historical moving route and the center position of the material storage area when the contract worker is identified as having an abnormal movement deviation for the kth time during his movement within the construction site;
[0052] The cumulative threat value of material safety when the temporary workers move in the construction site is γ c ≥q lWhen the temporary worker is marked as a risky person, the risk level of the temporary worker is level 2, and the risk level coefficient is α2;
[0053] The cumulative threat value of material safety when the contract workers move within the construction site is γ b ≥q h When the contract worker is marked as a risky person, the risk level of the contract worker is level 2, and the risk level coefficient is α3;
[0054] Among them, q l ,q h They are the risk judgment thresholds for the temporary workers and the risk judgment thresholds for the contract workers respectively.
[0055] Specifically, in S3, the calculation strategy of the dynamic personnel flow rate of the construction site every hour is as follows:
[0056]
[0057] Among them, s t To monitor the dynamic personnel flow of the construction site at time point t;
[0058] J is the total number of people marked as risk personnel at the monitoring time point t; j is a superscript;
[0059] α j is the risk level coefficient corresponding to the j-th risk person; α j ∈{α1,α2,α3};
[0060] W t-1 is the total number of people in the construction site at the monitoring time point t-1;
[0061] q in,t ,q out,t They are the number of people entering and leaving the construction site identified by the face recognition security system at the entrance and exit of the construction site at the monitoring time point t.
[0062] Specifically, in S4, the calculation strategy of the safety value of each material storage area is as follows:
[0063]
[0064] Among them, ε i is the importance level coefficient of the materials stored in the i-th level material storage area;
[0065] R t,i It is the safety value of the i-th level material storage area at the monitoring time point t.
[0066] In addition, the present invention provides an intelligent security monitoring system based on the Internet of Things, which includes the following modules:
[0067] Video stream acquisition module, personnel flow data statistics module, dynamic personnel flow calculation module, security data IoT data network, security management module;
[0068] The video stream acquisition module is used to cover the various functional areas of the construction site with sensor equipment and high-definition camera equipment, and to collect real-time video streams of the various functional areas of the construction site;
[0069] The personnel flow data statistics module extracts and counts the personnel flow data of the construction site through the face recognition security system at the entrance and exit of the construction site;
[0070] The dynamic personnel flow calculation module classifies the mobile personnel according to the personnel flow data, monitors the abnormal movement paths, and evaluates and calculates the dynamic personnel flow of the construction site every hour;
[0071] The safety data IoT data network is used to calculate the safety value of each material storage area in real time according to the dynamic personnel flow, establish a safety data IoT data network for construction site materials, and visualize the safety value of each material storage area to the safety data IoT data network for construction site materials;
[0072] The security management module is used to update the material safety status data of the construction site from the cloud network to the construction site security management room in real time, and send security management suggestions to the management background of the construction site security management room in real time.
[0073] Specifically, the security management module also includes: a safety value retrieval unit, a safety status data updating unit and a security management suggestion output unit; the safety value retrieval unit is used to retrieve the safety value data of each material storage area; the safety status data updating unit is used to update the construction site material safety status data cloud network to the construction site security management room in real time; the security management suggestion output unit is used to send security management suggestions to the management background of the construction site security management room in real time.
[0074] The security management suggestion output unit also includes: a security patrol personnel number dynamic adjustment subunit, a drone fixed-point patrol subunit and an electronic fence alarm subunit;
[0075] The dynamic adjustment subunit for the number of security patrol personnel is used to dynamically adjust the number of security patrol personnel in each material storage area according to the security value data; the drone fixed-point patrol subunit is used to trigger drone fixed-point patrol monitoring and processing according to the security value data; the electronic fence alarm subunit is used to issue a deterrent alarm to mobile personnel who attempt to cross the regional fence of the material storage area.
[0076] A storage medium stores instructions, and when a computer reads the instructions, the computer executes the intelligent security monitoring method based on the Internet of Things.
[0077] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned intelligent security monitoring method based on the Internet of Things when executing the computer program.
[0078] Compared with the prior art, the technical effects of the present invention are as follows:
[0079] 1. The present invention can comprehensively manage material risks and personnel flow risks. By combining personnel flow data with the safety value of the material storage area, the safety risks of the construction site can be more comprehensively evaluated. Comprehensive consideration of personnel flow and the safety status of the material storage area helps managers to more accurately identify potential safety hazards.
[0080] 2. The present invention can improve the safety awareness and management efficiency of construction site managers. By visualizing personnel flow data and material safety values on the construction site safety data IoT data network, safety managers can more intuitively understand the safety status of the construction site and improve safety awareness. At the same time, real-time updating of safety data and sending safety recommendations to the management background can help managers take timely measures to deal with safety risks and improve management efficiency.
[0081] 3. The present invention can prevent accidents and losses by real-time monitoring of the flow of personnel and the safety of material storage areas, and by calculating the safety value of material storage areas in real time based on the dynamic flow of personnel, thereby discovering potential safety risks in advance and taking preventive measures, thereby reducing the probability of accidents and losses.
[0082] 4. The subunit for dynamically adjusting the number of security patrol personnel provided in the present invention dynamically adjusts the number of security patrol personnel in each material storage area according to the safety value data, thereby optimizing the allocation of human resources on the construction site and improving the construction efficiency and the level of site management. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0084] in:
[0085] Figure 1A schematic diagram of a flow chart of an intelligent security monitoring method based on the Internet of Things of the present invention;
[0086] Figure 2 It is a structural schematic diagram of an intelligent security monitoring system based on the Internet of Things of the present invention; DETAILED DESCRIPTION
[0087] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0088] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0089] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0090] Embodiment 1:
[0091] like Figure 1 As shown, an intelligent security monitoring method based on the Internet of Things in an embodiment of the present invention is as follows: Figure 1 As shown, the specific steps are as follows:
[0092] S1: Covering each functional area of the construction site with sensor equipment and high-definition camera equipment to collect real-time video streams of each functional area of the construction site;
[0093] In S1, the functional areas of the construction site include: construction area, material storage areas at all levels, office area, living area, equipment area, and waste disposal area;
[0094] The material storage area is classified by the material management department of each construction site according to the material value. The importance coefficient of each material storage area is ε i , i is a subscript, indicating that the importance level of the material storage area is i;
[0095] Exemplarily, in this embodiment, there are five levels of importance of the material storage area of the construction site that is subject to security monitoring;
[0096] S2: Extract and count personnel flow data at the construction site through the facial recognition security system at the entrance and exit of the construction site;
[0097] S2 includes the following specific steps:
[0098] S21: Real-time extraction of facial recognition security systems at the entrance of construction sites
[0099] Facial information of mobile personnel entering the construction site every hour;
[0100] S22: searching for identity category information matching the floating personnel in the worker identity information database of the construction unit; the identity category information includes: outsiders and construction workers;
[0101] When the identity category information of the mobile personnel is a foreigner, executing step S23;
[0102] When the identity category information of the mobile personnel is a construction worker, executing step S24;
[0103] S23: directly marking the outsider as a risk person, and at the same time, synchronously extracting the number of visits a of the outsider to the construction site within 24 hours;
[0104] When the number of visits a≤1, the outsider is tracked in real time by using sensor equipment and high-definition camera equipment, wherein the risk level of the outsider is level 1, and the risk level coefficient is α1;
[0105] When the number of visits is 1<a≤3, the facial information of the outsider and the movement data after entering the construction site are directly sent to the security management room of the construction site, and video surveillance is continued. The risk level of the outsider is level 2, and the risk level coefficient is α2;
[0106] When the number of visits a>3, a risk warning is issued to the security management office of the construction site, and the security personnel are notified to conduct offline inquiries about the purpose of the visit of the outsider and revoke the outsider's right to leave the construction site freely. The risk level of the outsider is level three, and the risk level coefficient is α3;
[0107] S24: searching the worker employment information database of the construction unit for the type of work information and the working hours information matching the construction worker, and executing step S3;
[0108] Among them, in S24, the job category information includes: temporary workers and contract workers; the working time information includes: specific employment date information of construction workers whose job category is temporary workers in the worker employment information database of the construction unit and specific employment time period information of construction workers whose job category is contract workers in the worker employment information database of the construction unit.
[0109] S3: Based on the personnel flow data, the mobile personnel are classified to monitor the abnormal movement paths, and the dynamic personnel flow rate of the construction site is evaluated and calculated every hour;
[0110] In S3, the abnormal movement path monitoring of mobile personnel by category includes:
[0111] S31: Classify mobile personnel according to personnel flow data;
[0112] When the job type information of the mobile worker is a temporary worker, the specific employment date information of the temporary worker is retrieved to verify whether the time when the temporary worker enters the construction site entrance is the employment date;
[0113] When the verification result is output as "False", the temporary worker is directly marked as a risky person, the risk level of the temporary worker is level one, and the risk level coefficient is α1;
[0114] When the verification result is output as "True", execute step S32;
[0115] When the job type information of the mobile worker is a contract worker, the specific employment date information of the temporary worker is retrieved to verify whether the time when the temporary worker enters the construction site entrance is within the employment period;
[0116] When the verification result is output as "False", the contract worker is directly marked as a risky person, the risk level of the temporary worker is level one, and the risk level coefficient is α1;
[0117] When the verification result output is "True", execute step S33;
[0118] S32: Perform full-path monitoring on the temporary worker, continuously collect the movement data of the temporary worker from the entrance of the construction site to the work area through the sensor equipment, reconstruct the movement trajectory of the object through the collected movement data, use the monitoring algorithm to detect abnormal movement deviation on the reconstructed trajectory, and identify the point set of abnormal movement offset position points as:
[0119] {(b1, c1), (b2, c2)...(b x , c x )...(b X , c X )};
[0120] Among them, (b x , c x ) is the coordinates of the position point where the temporary worker is identified as having abnormal movement and displacement for the xth time during his movement within the construction site;
[0121] Exemplarily, in this embodiment, the monitoring algorithm is a trajectory shape algorithm;
[0122] S33: Perform sampling monitoring of the path monitoring points of the contract workers, collect the movement data of the contract workers from the entrance of the construction site to the fork in the route of the work area through the sensor equipment, use the machine learning model to detect abnormal movement deviations of the historical movement data and the movement data of the actual route fork, and identify the movement distance data set of abnormal movement as:
[0123] {g1, g2...g k ...c K};
[0124] Among them, g k is the moving distance of the contract worker during the kth time of being identified as abnormally moving during the movement of the contract worker in the construction site;
[0125] Exemplarily, in this embodiment, a structural framework of a machine learning model is provided, specifically including: an input layer, a hidden layer, three convolutional layers, a pooling layer, a fully connected layer, and an output layer; wherein the convolutional layer Q1 and the convolutional layer Q2 are both provided with 6 10×10 convolutional kernels, and the convolutional layer Q3 is provided with 3 5×5 convolutional kernels;
[0126] S34: Calculate the material safety cumulative threat value of the construction worker during the movement of the construction site according to the point set of the abnormal movement offset coordinate point and the abnormal movement distance data set, and make a real-time risk level judgment of the construction worker;
[0127] The material safety cumulative threat value includes: the material safety cumulative threat value γ of the temporary worker during the movement in the construction site c The cumulative threat value of material safety during the movement of the contract workers in the construction site γ b ;
[0128] The cumulative threat value of material safety during the movement of the temporary workers in the construction site γ c The calculation strategy is as follows:
[0129]
[0130] Where, ln is the natural logarithm;
[0131] (b i , ci ) is the center coordinate of the i-th level material storage area;
[0132] D x The estimated straight-line distance between the planned moving route and the center of the material storage area when the temporary worker is identified as having an abnormal movement deviation for the xth time during the movement within the construction site;
[0133] The cumulative threat value of material safety during the movement of the contract workers in the construction site γ b The calculation strategy is as follows:
[0134]
[0135] Among them, D k is the average of the straight-line distances between the historical moving route and the center position of the material storage area when the contract worker is identified as having an abnormal movement deviation for the kth time during his movement within the construction site;
[0136] The cumulative threat value of material safety when the temporary workers move in the construction site is γ c ≥q l When the temporary worker is marked as a risky person, the risk level of the temporary worker is level 2, and the risk level coefficient is α2;
[0137] The cumulative threat value of material safety when the contract workers move within the construction site is γ b ≥q h When the contract worker is marked as a risky person, the risk level of the contract worker is level 2, and the risk level coefficient is α3;
[0138] Among them, q l ,q h They are the risk judgment thresholds for the temporary workers and the risk judgment thresholds for the contract workers respectively.
[0139] In S3, the calculation strategy of the dynamic personnel flow rate of the construction site every hour is as follows:
[0140]
[0141] Among them, s t To monitor the dynamic personnel flow of the construction site at time point t;
[0142] J is the total number of people marked as risk personnel at the monitoring time point t; j is a superscript;
[0143] α j is the risk level coefficient corresponding to the j-th risk person; α j ∈{α1,α2,α3};
[0144] W t-1 is the total number of people in the construction site at the monitoring time point t-1;
[0145] q in,t ,q out,t They are the number of people entering and leaving the construction site identified by the face recognition security system at the entrance and exit of the construction site at the monitoring time point t.
[0146] S4: Calculate the safety value of each material storage area in real time according to the dynamic personnel flow, establish a safety data IoT data network for construction site materials, and visualize the safety value of each material storage area to the safety data IoT data network for construction site materials;
[0147] In S4, the calculation strategy of the safety value of each material storage area is as follows:
[0148]
[0149] Among them, ε i is the importance level coefficient of the materials stored in the i-th level material storage area;
[0150] R t,i It is the safety value of the i-th level material storage area at the monitoring time point t.
[0151] S5: Update the material safety data of the construction site through the IoT data network to the construction site security management office in real time, and send security management suggestions to the management background of the construction site security management office in real time.
[0152] Embodiment 2:
[0153] like Figure 2 As shown, an intelligent security monitoring system based on the Internet of Things in an embodiment of the present invention is as follows: Figure 2 As shown, it includes the following modules:
[0154] Video stream acquisition module, personnel flow data statistics module, dynamic personnel flow calculation module, security data IoT data network, security management module;
[0155] The video stream acquisition module is used to cover the various functional areas of the construction site with sensor equipment and high-definition camera equipment, and to collect real-time video streams of the various functional areas of the construction site;
[0156] The personnel flow data statistics module extracts and counts the personnel flow data of the construction site through the face recognition security system at the entrance and exit of the construction site;
[0157] The dynamic personnel flow calculation module classifies the mobile personnel according to the personnel flow data, monitors the abnormal movement paths, and evaluates and calculates the dynamic personnel flow of the construction site every hour;
[0158] The safety data IoT data network is used to calculate the safety value of each material storage area in real time according to the dynamic personnel flow, establish a safety data IoT data network for construction site materials, and visualize the safety value of each material storage area to the safety data IoT data network for construction site materials;
[0159] The security management module is used to update the material safety status data of the construction site from the cloud network to the construction site security management room in real time, and send security management suggestions to the management background of the construction site security management room in real time.
[0160] The security management module also includes: a safety value retrieval unit, a safety status data updating unit and a security management suggestion output unit; the safety value retrieval unit is used to retrieve the safety value data of each material storage area; the safety status data updating unit is used to update the construction site material safety status data cloud network to the construction site security management room in real time; the security management suggestion output unit is used to send security management suggestions to the management background of the construction site security management room in real time.
[0161] The security management suggestion output unit also includes: a security patrol personnel number dynamic adjustment subunit, a drone fixed-point patrol subunit and an electronic fence alarm subunit;
[0162] The dynamic adjustment subunit for the number of security patrol personnel is used to dynamically adjust the number of security patrol personnel in each material storage area according to the security value data; the drone fixed-point patrol subunit is used to trigger drone fixed-point patrol monitoring and processing according to the security value data; the electronic fence alarm subunit is used to issue a deterrent alarm to mobile personnel who attempt to cross the regional fence of the material storage area.
[0163] Embodiment three:
[0164] This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0165] The processor executes the above-mentioned intelligent security monitoring method based on the Internet of Things by calling the computer program stored in the memory.
[0166] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein the memory stores at least one computer program, and the computer program is loaded and executed by the processor to implement an intelligent security monitoring method based on the Internet of Things provided by the above method embodiment. The electronic device may also include other components for implementing the functions of the device, for example, the electronic device may also have components such as a wired or wireless network interface and an input and output interface to input and output data. This embodiment will not be described in detail here.
[0167] Embodiment 4:
[0168] This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;
[0169] When the computer program runs on a computer device, the computer device executes the above-mentioned intelligent security monitoring method based on the Internet of Things.
[0170] For example, the computer readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, and an optical data storage device, etc.
[0171] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0172] It should be understood that determining B based on A does not mean determining B only based on A. B can also be determined based on A and / or other information.
[0173] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. Computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center through a wired network or / and a wireless network. The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0174] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0175] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0176] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only one, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0177] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0178] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0179] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0180] In summary, compared with the prior art, the technical effects of the present invention are as follows:
[0181] 1. The present invention can comprehensively manage material risks and personnel flow risks. By combining personnel flow data with the safety value of the material storage area, the safety risks of the construction site can be more comprehensively evaluated. Comprehensive consideration of personnel flow and the safety status of the material storage area helps managers to more accurately identify potential safety hazards.
[0182] 2. The present invention can improve the safety awareness and management efficiency of construction site managers. By visualizing personnel flow data and material safety values on the construction site safety data IoT data network, safety managers can more intuitively understand the safety status of the construction site and improve safety awareness. At the same time, real-time updating of safety data and sending safety recommendations to the management background can help managers take timely measures to deal with safety risks and improve management efficiency.
[0183] 3. The present invention can prevent accidents and losses by real-time monitoring of the flow of personnel and the safety of material storage areas, and by calculating the safety value of material storage areas in real time based on the dynamic flow of personnel, thereby discovering potential safety risks in advance and taking preventive measures, thereby reducing the probability of accidents and losses.
[0184] 4. The subunit for dynamically adjusting the number of security patrol personnel provided in the present invention dynamically adjusts the number of security patrol personnel in each material storage area according to the safety value data, thereby optimizing the allocation of human resources on the construction site and improving the construction efficiency and the level of site management.
[0185] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. An intelligent security monitoring method based on the Internet of Things, characterized in that: The method comprises the following specific steps: S1: Covering each functional area of the construction site with sensor equipment and high-definition camera equipment to collect real-time video streams of each functional area of the construction site; S2: Extract and count personnel flow data at the construction site through the facial recognition security system at the entrance and exit of the construction site; S3: Based on the personnel flow data, the mobile personnel are classified to monitor the abnormal movement paths, and the dynamic personnel flow rate of the construction site is evaluated and calculated every hour; S4: Calculate the safety value of each material storage area in real time according to the dynamic personnel flow, establish a safety data IoT data network for construction site materials, and visualize the safety value of each material storage area to the safety data IoT data network for construction site materials; S5: Update the material safety data of the construction site through the IoT data network to the security management office of the construction site in real time, and send security management suggestions to the management backend of the security management office of the construction site in real time; In S3, the abnormal movement path monitoring of mobile personnel by category includes: S31: Classify mobile personnel according to personnel flow data; When the job type information of the mobile worker is a temporary worker, the specific employment date information of the temporary worker is retrieved to verify whether the time when the temporary worker enters the construction site entrance is the employment date; When the verification result is output as "False", the temporary worker is directly marked as a risky person, the risk level of the temporary worker is level one, and the risk level coefficient is α1; When the verification result is output as "True", execute step S32; When the job type information of the mobile worker is a contract worker, the specific employment date information of the temporary worker is retrieved to verify whether the time when the temporary worker enters the construction site entrance is within the employment period; When the verification result is output as "False", the contract worker is directly marked as a risky person, the risk level of the temporary worker is level one, and the risk level coefficient is α1; When the verification result is output as "True", execute step S33; S32: Perform full-path monitoring on the temporary worker, continuously collect the movement data of the temporary worker from the entrance of the construction site to the work area through the sensor equipment, reconstruct the movement trajectory of the object through the collected movement data, use the monitoring algorithm to detect abnormal movement deviation on the reconstructed trajectory, and identify the point set of abnormal movement offset position points as: {(b1,c1),(b2,c2)...(b x ,c x )...(b X ,c X )}; Among them, (b x ,c x ) is the coordinates of the position point where the temporary worker is identified as having abnormal movement and displacement for the xth time during his movement within the construction site; S33: Perform sampling monitoring of the path monitoring points of the contract workers, collect the movement data of the contract workers from the entrance of the construction site to the fork in the route of the work area through the sensor equipment, use the machine learning model to detect abnormal movement deviations of the historical movement data and the movement data of the actual route fork, and identify the movement distance data set of abnormal movement as: {g1,g2...g k ...c K }; Among them, g k is the moving distance of the contract worker during the kth time of being identified as abnormally moving during the movement of the contract worker in the construction site; S34: Calculate the material safety cumulative threat value of the construction worker during the movement of the construction site according to the point set of the abnormal movement offset coordinate point and the abnormal movement distance data set, and make a real-time risk level judgment of the construction worker; The material safety cumulative threat value includes: the material safety cumulative threat value γ of the temporary worker during the movement in the construction site c The cumulative threat value of material safety during the movement of the contract workers in the construction site γ b ; The cumulative threat value of material safety during the movement of the temporary workers in the construction site γ c The calculation strategy is as follows: Where, ln is the natural logarithm; (b i ,c i ) is the center coordinate of the i-th level material storage area; D x The estimated straight-line distance between the planned moving route and the center of the material storage area when the temporary worker is identified as having an abnormal movement deviation for the xth time during the movement within the construction site; The cumulative threat value of material safety during the movement of the contract workers in the construction site γ b The calculation strategy is as follows: Among them, D k is the average of the straight-line distances between the historical moving route and the center position of the material storage area when the contract worker is identified as having an abnormal movement deviation for the kth time during his movement within the construction site; The cumulative threat value of material safety when the temporary workers move in the construction site is γ c ≥q l When the temporary worker is marked as a risky person, the risk level of the temporary worker is level 2, and the risk level coefficient is α2; The cumulative threat value of material safety when the contract workers move within the construction site is γ b ≥q h When the contract worker is marked as a risky person, the risk level of the contract worker is level 2, and the risk level coefficient is α3; Among them, q l ,q h They are respectively the risk judgment threshold for the temporary worker and the risk judgment threshold for the contract worker.
2. According to claim 1, the intelligent security monitoring method based on the Internet of Things is characterized in that: In S1, the functional areas of the construction site include: construction area, material storage areas at various levels, office area, living area, equipment area, and waste disposal area.
3. The method for intelligent security monitoring based on the Internet of Things according to claim 2 is characterized in that: S2 includes the following specific steps: S21: Real-time extraction of facial recognition security systems at the entrance of construction sites Facial information of mobile personnel entering the construction site every hour; S22: searching for identity category information matching the floating personnel in the worker identity information database of the construction unit; the identity category information includes: outsiders and construction workers; When the identity category information of the mobile personnel is a foreigner, executing step S23; When the identity category information of the mobile personnel is a construction worker, executing step S24; S23: directly marking the outsider as a risk person, and at the same time, synchronously extracting the number of visits a of the outsider to the construction site within 24 hours; When the number of visits a≤1, the outsider is tracked in real time by using sensor equipment and high-definition camera equipment, wherein the risk level of the outsider is level 1, and the risk level coefficient is α1; When the number of visits is 1<a≤3, the facial information of the outsider and the movement data after entering the construction site are directly sent to the security management room of the construction site, and video surveillance is continued. The risk level of the outsider is level 2, and the risk level coefficient is α2; When the number of visits a>3, a risk warning is issued to the security management office of the construction site, and the security personnel are notified to conduct offline inquiries about the purpose of the visit of the outsider and revoke the outsider's right to leave the construction site freely. The risk level of the outsider is level three, and the risk level coefficient is α3; S24: searching the worker employment information database of the construction unit for the type of work information and the working hours information that matches the construction worker, and executing step S3; Among them, in S24, the job category information includes: temporary workers and contract workers; the working time information includes: specific employment date information of construction workers whose job category is temporary workers in the worker employment information database of the construction unit and specific employment time period information of construction workers whose job category is contract workers in the worker employment information database of the construction unit.
4. The method for intelligent security monitoring based on the Internet of Things according to claim 3 is characterized in that: In S3, the calculation strategy of the dynamic personnel flow rate of the construction site every hour is as follows: Among them, s t To monitor the dynamic personnel flow of the construction site at time point t; J is the total number of people marked as risk personnel at the monitoring time point t; j is a superscript; α j is the risk level coefficient corresponding to the j-th risk person; α j ∈{α1,α2,α3}; W t-1 is the total number of people in the construction site at the monitoring time point t-1; q in,t ,q out,t They are the number of people entering and leaving the construction site identified by the face recognition security system at the entrance and exit of the construction site at the monitoring time point t.
5. The method for intelligent security monitoring based on the Internet of Things according to claim 4 is characterized in that: In S4, the calculation strategy of the safety value of each material storage area is as follows: Among them, ε i is the importance level coefficient of the materials stored in the i-th level material storage area; R t,i It is the safety value of the i-th level material storage area at the monitoring time point t.
6. An intelligent security monitoring system based on the Internet of Things, which is implemented based on an intelligent security monitoring method based on the Internet of Things as claimed in any one of claims 1 to 5, characterized in that: The system includes the following modules: Video stream acquisition module, personnel flow data statistics module, dynamic personnel flow calculation module, security data IoT data network, security management module; The video stream acquisition module is used to cover the various functional areas of the construction site with sensor equipment and high-definition camera equipment, and to collect real-time video streams of the various functional areas of the construction site; The personnel flow data statistics module extracts and counts the personnel flow data of the construction site through the face recognition security system at the entrance and exit of the construction site; The dynamic personnel flow calculation module classifies the mobile personnel and monitors abnormal movement paths according to the personnel flow data, and evaluates and calculates the dynamic personnel flow of the construction site every hour; The safety data IoT data network is used to calculate the safety value of each material storage area in real time according to the dynamic personnel flow, establish a safety data IoT data network for construction site materials, and visualize the safety value of each material storage area to the safety data IoT data network for construction site materials; The security management module is used to update the material safety status data of the construction site from the cloud network to the construction site security management room in real time, and send security management suggestions to the management background of the construction site security management room in real time.
7. The intelligent security monitoring system based on the Internet of Things according to claim 6 is characterized in that: The security management module also includes: a safety value retrieval unit, a safety status data updating unit and a security management suggestion output unit; the safety value retrieval unit is used to retrieve the safety value data of each material storage area; the safety status data updating unit is used to update the construction site material safety status data cloud network to the construction site security management room in real time; the security management suggestion output unit is used to send security management suggestions to the management background of the construction site security management room in real time.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, an intelligent security monitoring method based on the Internet of Things as described in any one of claims 1 to 5 is implemented.
9. An electronic device, characterized in that: include: A memory for storing instructions; A processor is used to execute the instruction so that the device performs the operation of implementing an intelligent security monitoring method based on the Internet of Things as described in any one of claims 1-5.
Citation Information
Patent Citations
Intelligent perimeter protection system and method for construction site and electronic equipment
CN116229656A
Data processing and analysis system and method of intelligent construction site monitoring system
CN117973705A