Material requirement planning method, device, system and computer readable storage medium

By prioritizing the allocation of supply volume and demand time of this demand site in the material demand planning method, the problem of inaccuracy and inefficiency of traditional MRP systems in the cross-factory supply chain is solved, and more reasonable production planning and supply chain management are achieved. .

CN118411006BActive Publication Date: 2024-11-19INDUSTICS COM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410890450.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-19
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

Traditional Material Requirement Planning (MRP) systems are difficult to accurately consider complexity and consumption priorities in cross-factory supply chains, resulting in production planning deviations and affecting the execution of factory daily production plans.

Method used

By using the material demand planning method, by establishing a product bill of materials (BOM), obtaining demand information and supply in the top-down order of material levels, giving priority to the supply of this demand site, only hysteresis is allocated, and in the shortage In the case, a procurement plan is generated and the demand time is given priority.

Benefits of technology

It improves the accuracy and rationality of production plans, standardizes the internal supply chain management of the enterprise, reduces the time and risks of supply chain demand transmission, reduces supply and demand oscillations, and ensures coordinated development of upstream and downstream.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118411006B_ABST
    Figure CN118411006B_ABST
Patent Text Reader

Abstract

The present invention provides a material requirement planning method, device, system and computer-readable storage medium. The material requirement planning method includes the following steps: establishing a product BOM of a demand product; a supply and demand adjustment step: obtaining the demand information of each demand site corresponding to the material in each material level in the product BOM and the supply quantity of each demand site in sequence from top to bottom of the material level, and allocating the supply quantity of each demand site to obtain the allocation information and shortage information of the material at each demand site, wherein the first priority for allocating the supply quantity of each demand site is: this demand site>cross-demand site; the production plan sheet of each demand site finally generated by the material requirement planning method can be made more reasonable and accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production management, and in particular to a material requirement planning method, a material requirement planning device, a material requirement planning system and a computer-readable storage medium. Background Art

[0002] In modern industrial production and supply chain management, material requirement planning (MRP) systems are widely used in the production and manufacturing process to ensure that all kinds of materials can be supplied in the right time and quantity. The MRP system calculates the quantity of each material required at each stage by analyzing the bill of materials (BOM) of the demand product, the demand time, demand quantity, and supply quantity of each factory (demand site), and generates a purchase plan and a production plan. However, the traditional MRP system mainly focuses on the global supply and demand balance, and fails to fully consider the complexity of the cross-factory supply chain and the priority order of consumption, resulting in deviations in the actual execution of the production plan, resulting in the incorrect factory to which the final production plan belongs (for example, the factory with a larger supply has a smaller production plan quantity, while the factory with a smaller supply has a larger production plan quantity), which affects the execution of the daily production plan of each factory.

[0003] Under the existing technology framework, the production plan derived from the MRP system is generally manually redistributed according to the factory dimension, which is inefficient and difficult to ensure the accuracy and timeliness of the plan when faced with a complex cross-factory supply chain. Summary of the invention

[0004] The object of the present invention is to provide a material requirement planning method, a material requirement planning device, a material requirement planning system and a computer-readable storage medium, which can make the production plan of each demand site more reasonable and accurate.

[0005] To achieve the above-mentioned purpose, the present invention adopts the following technical solution: a material requirement planning method, comprising the following steps:

[0006] Establish a product BOM for the required product, wherein the product BOM includes all materials required to manufacture the required product;

[0007] Supply and demand adjustment steps: Obtain the demand information of each demand site corresponding to the material in each material level in the product BOM and the supply quantity of each demand site in sequence from top to bottom of the material level, and allocate the supply quantity of each demand site to obtain the allocation information and shortage information of the material at each demand site. When the material with shortage information does not exist in the next material level, generate a purchase plan for the material according to the shortage information; when the material with shortage information exists in the next material level, obtain the demand information of the material in the next material level according to the shortage information, wherein the first priority for allocating the supply quantity to each demand site is: current demand site > cross-demand site.

[0008] As a further improved technical solution of the present invention, the demand information includes demand quantity. After obtaining the demand information of each demand site corresponding to the material in the material hierarchy and the supply quantity of each demand site, and before allocating the supply quantity of each demand site, the material requirement planning method further includes the following steps:

[0009] The sluggish quantity of the material at each demand site is calculated based on the demand quantity of each demand site corresponding to the material in the material hierarchy and the supply quantity of each demand site.

[0010] As a further improved technical solution of the present invention, the demand information includes demand time; the second priority for allocating the supply quantity to each demand site is: the earlier the demand time, the higher the priority.

[0011] As a further improved technical solution of the present invention, the first priority for allocating the supply quantity to each demand site is: current demand site>designated supply site>cross-demand site.

[0012] As a further improved technical solution of the present invention, the demand information includes demand time; wherein the demand time t of the material in the next material level n+1 is the demand time t of the material in the previous material level n The difference from the item's lead time.

[0013] As a further improved technical solution of the present invention, the shortage information includes shortage quantity and demand time.

[0014] As a further improved technical solution of the present invention, after establishing the product BOM of the required product and before the supply and demand adjustment step, the material requirement planning method also includes the following steps: traversing the product BOM to determine whether the same material is located at different material levels, and if so, defining the largest material level corresponding to the material as the material level of the material.

[0015] As a further improved technical solution of the present invention, after establishing the product BOM of the required product and before the supply and demand adjustment step, the material requirement planning method further includes the following steps:

[0016] Obtain the demand information of each demand site for the demand product and the supply quantity of each material;

[0017] Based on the demand information of each demand site for the demand products and the supply quantity of each material, MRP pre-calculation is performed to obtain the initial production plan and initial procurement plan for each demand site.

[0018] In order to achieve the above-mentioned object of the invention, the present invention also provides a material requirement planning device, which comprises:

[0019] A BOM creation module, wherein the BOM creation module is used to create a product BOM for a required product;

[0020] A supply and demand adjustment module, which is used to obtain the demand information of each demand site corresponding to the material in each material level in the product BOM and the supply quantity of each demand site in order from top to bottom of the material level, and allocate the supply quantity of each demand site to obtain the allocation information and shortage information of the material at each demand site, wherein the first priority of allocating the supply quantity of each demand site is: current demand site>cross-demand site;

[0021] A plan sheet generation module generates a purchase plan sheet and a production plan sheet according to the calculation of the supply and demand adjustment module.

[0022] As a further improved technical solution of the present invention, the material requirement planning device also includes an MRP pre-calculation module located between the BOM establishment module and the supply and demand adjustment module. The MRP pre-calculation module is used to perform MRP pre-calculation based on the demand information of each demand site on the demand product and the supply quantity of each material to obtain the initial production plan and initial procurement plan of each demand site.

[0023] To achieve the above-mentioned purpose of the invention, the present invention also provides a material requirement planning system, including a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the computer program is loaded and executed by the processor to implement the steps of the above-mentioned material requirement planning method.

[0024] To achieve the above-mentioned purpose of the invention, the present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed, it is used to implement the steps of the above-mentioned material requirement planning method.

[0025] The beneficial effects of the present invention are as follows: in the material requirement planning method of the present invention, the supply and demand adjustment step is calculated based on the LLC theory, and the dimension of the production plant (demand site) is added to the supply and demand adjustment step. The supply of each demand site is supplied to the current demand site first, that is, the supply of the current demand site gives priority to meeting the demand of the current demand site, and only the sluggish quantity of the current demand site is allocated, which can make the production plan sheets of each demand site finally generated by the material requirement planning method more reasonable and accurate, make the supply chain management within the enterprise more standardized, guide the enterprise to prepare materials in an orderly manner, make the upstream and downstream coordination of the supply chain of the entire industry more reasonable and controllable, reduce the bullwhip effect caused by the supply chain demand transmission time and transmission links, reduce the amplitude and risk of supply and demand oscillations in the industrial chain, and make the upstream and downstream of the production line develop more balanced and orderly; and the production plan sheet and procurement plan sheet calculated by the material requirement planning method can be traced, so that the supply and demand consumption of each demand site can be displayed more clearly and transparently, which is convenient for production planners to manage production plans. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is a flow chart of the material requirement planning method in the present invention;

[0027] Figure 2 This is the product BOM of the product in one specific embodiment of the present invention. DETAILED DESCRIPTION

[0028] The present invention will be described in detail below in conjunction with the various embodiments shown in the accompanying drawings. Figure 1-Figure 2 It is shown as a preferred embodiment of the present invention. However, the following embodiments are only used to illustrate the present invention but are not used to limit the scope of the present invention.

[0029] Please refer to Figure 1 As shown, the present invention provides a material requirement planning method, which is used to manage and control the relevant materials of the enterprise's demand products, so as to formulate a more reasonable and accurate daily production plan for each demand site in the enterprise, so as to facilitate production planners to arrange production tasks according to the more accurate daily production plans of each demand site.

[0030] Specifically, each demand site in the above-mentioned enterprise can be understood as each production plant of the enterprise.

[0031] Furthermore, the material requirement planning method comprises the following steps:

[0032] Establish a product BOM for the required product, wherein the product BOM includes all materials required to manufacture the required product;

[0033] Supply and demand adjustment steps: Obtain the demand information of each demand site corresponding to the material in each material level in the product BOM and the supply quantity of each demand site in sequence from top to bottom of the material level, and allocate the supply quantity of each demand site to obtain the allocation information and shortage information of the material at each demand site. When the material with shortage information does not exist in the next material level, generate a purchase plan for the material according to the shortage information; when the material with shortage information exists in the next material level, obtain the demand information of the material in the next material level according to the shortage information, wherein the first priority for allocating the supply quantity to each demand site is: current demand site > cross-demand site.

[0034] In the material requirement planning method of the present invention, the dimension of production plant (demand site) is added, and the supply of each demand site is supplied to the current demand site first, that is, the supply of the current demand site gives priority to meeting the demand of the current demand site, and only the stagnant quantity of the current demand site is allocated, which can make the production plan sheets of each demand site finally generated by the material requirement planning method more reasonable and accurate, make the supply chain management within the enterprise more standardized, guide the enterprise to prepare materials in an orderly manner, make the upstream and downstream coordination of the supply chain of the entire industry more reasonable and controllable, reduce the bullwhip effect caused by the transmission time and transmission links of the supply chain demand, reduce the amplitude and risk of supply and demand oscillations in the industrial chain, and make the upstream and downstream of the production line develop more balanced and orderly; moreover, the production plan sheet and procurement plan sheet calculated by the material requirement planning method can be traced, so that the supply and demand consumption of each demand site can be displayed more clearly and transparently, which is convenient for production planners to manage production plans.

[0035] It should be noted that the supply volume of each demand site mentioned above includes the inventory in stock and inventory in transit of each demand site, and may also include the expected material production volume.

[0036] Specifically, the product BOM refers to a list of all materials required to manufacture the required product, listed in terms of material hierarchy. Figure 2As shown, the product BOM of a mobile phone is a demand product in a specific embodiment of the present invention, wherein the product BOM includes the following in order from top to bottom according to the material level: the first material level, the material corresponding to the first material level is the mobile phone as a finished product; the second material level, the second material level corresponds to the material that can be assembled to form the mobile phone, that is, the bare machine and the packaging box; the third material level, the third material level corresponds to the material that can be assembled to form the bare machine, that is, the motherboard (PCBA), the screen, and the shell; the fourth material level, the fourth material level corresponds to the material that can be assembled to form the motherboard (PCBA), that is, the PCB board and the resistor and capacitor. By establishing a more detailed product BOM, it is possible to fully understand the types of materials required to produce the demand product and the hierarchical relationship between the materials.

[0037] It is known that the quantity of the product BOM (Bill of Materials) corresponds one-to-one to the quantity of the required products, that is, one required product corresponds to one product BOM (Bill of Materials).

[0038] Further, after establishing the product BOM of the demand product and before the supply and demand adjustment step, the material requirement planning method further includes the following steps: traversing the product BOM, determining whether the same material is located at different material levels, if so, defining the maximum material level corresponding to the material as the material level of the material; if not, performing the next supply and demand adjustment step according to the material level in the original product BOM. That is, before performing the supply and demand adjustment step, first confirm the material level of all materials, if the same material is located at different material levels, then update the material level of the material to the maximum material level among the different material levels, and in the subsequent supply and demand adjustment step, the material will be allocated only when the material level corresponding to the updated material is traversed. That is, between establishing the product BOM of the demand product and the supply and demand adjustment step, the product BOM will be traversed to obtain the material level of each material in the updated product BOM, and in the subsequent supply and demand adjustment step, the material level of each material in the updated product BOM will be processed in sequence. Repeated calculations and unnecessary waste of resources are avoided, and unreasonable allocation is avoided.

[0039] For example, for a material a, if the second material level includes the material a and the third material level also includes the material a, the material level of the material a is updated to the third material level. In the subsequent supply and demand adjustment step, the material a will be allocated only when the third material level is traversed.

[0040] Specifically, when there are multiple required products, that is, multiple product BOMs, multiple product BOMs will be traversed. If the same material is at different material levels in different product BOMs, the largest material level corresponding to the material will also be defined as the material level of the material.

[0041] Preferably, if the enterprise has a designated supply site, then in the supply and demand adjustment step, the first priority for allocating the supply quantity to each demand site is: current demand site>designated supply site>cross-demand site.

[0042] Specifically, the designated supply site is generally a central storage site of the enterprise. Of course, it is not limited to this.

[0043] It is known that for cross-demand sites, users can also specify priorities, such as specifying priorities based on the distances between the demand sites, such as selecting a cross-demand site that is closer to the current demand site as the priority supply site for the current demand site.

[0044] The above-mentioned cross-demand sites refer to other demand sites except the current demand site.

[0045] Specifically, in the supply and demand adjustment step, each material in each material level is traversed in order from top to bottom, that is, the supply and demand balance calculation is performed step by step according to the material level to ensure that each material demand in each material level can be met.

[0046] The demand information for each demand site includes the demand site, the demand quantity of the material at the demand site, and the demand time. The allocation information of the material at each demand site includes the demand site information that supplies the material and the allocatable quantity of the material at the demand site. The shortage information of the material at each demand site finally obtained includes the shortage demand site, the shortage quantity corresponding to the demand site, and the demand time.

[0047] Furthermore, after obtaining the demand information of each demand site corresponding to the material in the material hierarchy and the supply quantity of each demand site, and before allocating the supply quantity of each demand site, the material requirement planning method further includes the following steps:

[0048] The sluggish quantity of the material at each demand site is calculated based on the demand quantity of each demand site corresponding to the material in the material hierarchy and the supply quantity of each demand site.

[0049] In the present invention, the sluggishness of each material will be counted in the calculation of each material level, that is, before allocating the supply to each demand site, the demand information and supply of each demand site will be obtained, and the sluggishness of the corresponding material of each demand site will be calculated, and then this information will be integrated to form the basic data for the supply and demand adjustment step. Therefore, the supply strategy can be adjusted according to these basic data to ensure that the materials can reach the required demand sites in time.

[0050] Specifically, for a certain material, if the demand for the material at a demand site is greater than the supply of the material, the idle quantity of the material at the demand site is 0, that is, the supply of the material at the demand site can only be used to supply the demand of this demand site; if the demand for the material at the demand site is less than the supply of the material, the idle quantity of the material at the demand site is the difference between the supply and the demand, that is, in addition to meeting its own needs, the supply of the material at the demand site also has a certain idle quantity for supplying other demand sites.

[0051] It can be seen that the sluggish amount reflects the excess of materials at each demand site, which helps to further optimize supply chain management. By calculating the sluggish amount, the supply plan can be adjusted in time to avoid material backlog and resource waste.

[0052] Furthermore, the second priority for allocating the supply volume to each demand site is: the earlier the demand time, the higher the priority. That is, the allocation of sluggish volume to a demand site is based on the demand time of production orders from other demand sites. The earlier the demand time, the higher the priority to ensure the timeliness and accuracy of the production plan.

[0053] Furthermore, for materials in different material levels, the demand time t of materials in the next material level is n+1 is the demand time t of the material in the previous material level n The difference between the lead time of materials and the lead time of materials. This enables accurate time management.

[0054] When a material with shortage information exists in the next material level, the supply and demand balance calculation will continue. Specifically, the demand information of the material in the next material level is obtained based on the shortage information of the material: the shortage quantity in the shortage information of the material is the demand quantity of each material in the next material level, and the demand time t in the shortage information of the material is n The difference between the material lead time of each material in the next material level is the demand time t of each material in the next material level. n+1 . It can ensure the feasibility of production plan.

[0055] Specifically, the material lead time includes but is not limited to the material procurement lead time and the material production lead time. The material procurement lead time refers to the procurement time of the materials in the next material level, and the material production lead time refers to the production time required to produce the materials in the next material level into the materials in the previous material level.

[0056] Furthermore, after establishing the product BOM of the required product and before the supply and demand adjustment step, the material requirement planning method further includes the following steps:

[0057] Obtain the demand information of each demand site for the demand product and the supply quantity of each material;

[0058] Based on the demand information of each demand site for the demand products and the supply quantity of each material, MRP pre-calculation is performed to obtain the initial production plan and initial procurement plan for each demand site.

[0059] In the MRP pre-calculation process, the demand site dimension is not introduced. The supply quantity of each material at each demand site is allocated according to the order demand time to generate the initial production plan and initial purchase plan. This MRP pre-calculation can provide basic data for the subsequent supply and demand adjustment steps, reducing the workload of the later supply and demand adjustment steps.

[0060] In the material requirement planning method of the present invention, the material requirement planning is calculated based on the MRP theory, that is, after the MRP pre-calculation, the supply and demand adjustment step is calculated based on the LLC (Lowest Level Code) theory. In the supply and demand adjustment step, the supply of each demand site is reallocated according to the material level, and each demand site gives priority to using the supply of this demand site, which can more accurately meet the material needs of each demand site and reduce material waste. At the same time, it can make the production plan of each demand site finally generated more reasonable and accurate.

[0061] The material requirement planning method of the present invention is described below with a specific embodiment. In this embodiment, the demand product is a mobile phone, the demand sites are the Nanchang factory and the Wuhan factory, the material lead time of each material is 1 day, and the demand information and supply of each demand site are shown in Table 1 below:

[0062] Table 1

[0063]

[0064] The material requirement planning method comprises the following steps:

[0065] S1: Create a product BOM for a mobile phone. The product BOM is as follows: Figure 2 shown.

[0066] S2: Perform MRP pre-calculation based on the demand information for mobile phones and the supply quantity of each material in Nanchang Factory and Wuhan Factory in Table 1. The traceability results of MRP pre-calculation are shown in Table 2 below. Finally, the initial production plan and initial purchase plan are obtained as shown in Table 3 below.

[0067] Table 2

[0068]

[0069] Table 3

[0070]

[0071] S3: traverse the product BOM to determine whether the same material is located at different material levels; if it is determined that the same material is not located at different material levels, the supply and demand adjustment step is performed according to the material level of each material in the original product BOM.

[0072] S4: Execute the supply and demand adjustment step, wherein the supply and demand adjustment step includes the following steps in sequence:

[0073] S41: First obtain the demand information and supply quantity of each demand site corresponding to the materials of the first material level in the product BOM in a top-down order, that is, obtain the demand information and supply quantity of mobile phones of Nanchang Factory and Wuhan Factory, and then calculate the sluggish quantity of mobile phones in Nanchang Factory and Wuhan Factory as shown in Table 4 below based on the demand information and supply quantity of mobile phones of Nanchang Factory and Wuhan Factory; then allocate the supply of Nanchang Factory and Wuhan Factory, the supply of Nanchang Factory is first supplied to Nanchang Factory, and the supply of Wuhan Factory is first supplied to Wuhan Factory. At the same time, the sluggish quantity of Nanchang Factory and Wuhan Factory is 0, and it is impossible to supply across demand sites. The allocation information and shortage information of mobile phones in Nanchang Factory and Wuhan Factory as shown in Table 5 below are obtained by tracing back. It can be seen from Table 5 that the shortage of mobile phones in the first material level of Nanchang Factory is 1000, and the demand time is May 20, 2024. The shortage of mobile phones in the first material level of Wuhan Factory is 800, and the demand time is May 25, 2024;

[0074] Table 4

[0075]

[0076] Table 5

[0077]

[0078] After judgment, the mobile phone with shortage information in step S41 exists in the next material level, that is, the second material level. The demand information of the materials in the second material level is obtained according to the shortage information, wherein the demand time of the materials in the second material level is the demand time of the mobile phone in the first material level minus the corresponding material lead time. The demand information of the materials in the second material level is shown in Table 6 below:

[0079] Table 6

[0080]

[0081] S42: First, obtain the demand information and supply quantity of each demand site corresponding to the materials of the second material level in the product BOM, that is, obtain the demand information and supply quantity of packaging boxes and bare metals of Nanchang Factory and Wuhan Factory, and then calculate the sluggish quantity of packaging boxes and bare metals in Nanchang Factory and Wuhan Factory as shown in Table 7 below based on the demand information and supply quantity of packaging boxes and bare metals of Nanchang Factory and Wuhan Factory; then allocate the supply quantity of packaging boxes and bare metals of Nanchang Factory and Wuhan Factory, with the supply quantity of Nanchang Factory being supplied to Nanchang Factory first, and the supply quantity of Wuhan Factory being supplied to Wuhan Factory first, and at the same time, the sluggish quantity of Wuhan Factory The quantity of each material in the Nanchang factory is 0, while the sluggish quantity in the Nanchang factory is greater than 0. The sluggish quantity of each material in the Nanchang factory can be supplied to the Wuhan factory across demand sites. The distribution information and shortage information of the packaging boxes and bare metals in the Nanchang factory and the Wuhan factory as shown in Table 8 below can be traced back. It can be seen from Table 8 that the packaging boxes and bare metals in the second material level of the Nanchang factory are not in short supply, that is, the Nanchang factory can complete its production orders on schedule with its own materials. The Wuhan factory can meet the demand by supplying the sluggish quantity of the Nanchang factory across demand sites in the second material level, while the shortage of bare metals is 400, and the demand time is May 24, 2024;

[0082] Table 7

[0083]

[0084] Table 8

[0085]

[0086] After judgment, the bare metal with shortage information in step S42 exists in the next material level, that is, the third material level. The demand information of the materials in the third material level is obtained according to the shortage information, wherein the demand time of the materials in the third material level is the demand time of the bare metal in the second material level minus the corresponding material lead time. The demand information of the materials in the third material level is shown in Table 9 below:

[0087] Table 9

[0088]

[0089] S42: First, obtain the demand information and supply quantity of each demand site corresponding to the materials of the third material level in the product BOM, that is, obtain the demand information of the Wuhan factory for the screen, shell, and PCBA, and obtain the supply quantity of the screen, shell, and PCBA of the Wuhan factory and the Nanchang factory. Then, according to the demand information of the Wuhan factory for the screen, shell, and PCBA, and the supply quantity of the Wuhan factory and the Nanchang factory, calculate the sluggish quantity of the Wuhan factory and the Nanchang factory as shown in Table 10 below; then allocate the supply quantity of the screen, shell, and PCBA of the Nanchang factory and the Wuhan factory, but their supply quantities are all 0, that is, the demand site cannot supply, and trace back to obtain the shortage information of the screen, shell, and PCBA in the Wuhan factory as shown in Table 11 below. It can be seen from Table 11 that the shortage quantity of the screen, shell, and PCBA in the Wuhan factory at the third material level is 400, and the demand time is May 23, 2024;

[0090] Table 10

[0091]

[0092] Table 11

[0093]

[0094] After judgment, if the screen, shell, and PCBA with shortage information in step S43 do not have the next material level, then a purchase plan for the screen and shell is generated according to the shortage information of the screen and shell; and if the screen, shell, and PCBA with shortage information in step S43 do have the next material level, i.e., the fourth material level, then demand information of the material corresponding to PCBA in the fourth material level is obtained according to the shortage information of PCBA, wherein the demand time of the material in the fourth material level is the demand time of PCBA in the third material level minus the corresponding material lead time, and the demand information of the material corresponding to PCBA in the fourth material level is shown in Table 12 below:

[0095] Table 12

[0096]

[0097] S44: First, obtain the demand information of each demand site corresponding to the materials of the fourth material level in the product BOM and the supply of each demand site, that is, obtain the demand information of Wuhan factory for PCB boards, capacitors and resistors and the supply of PCB boards, capacitors and resistors of Wuhan factory and Nanchang factory, and then calculate the sluggish amount of Nanchang factory and Wuhan factory as shown in Table 13 below based on the demand information of Wuhan factory for PCB boards, capacitors and resistors and the supply of Wuhan factory and Nanchang factory; then allocate the supply of PCB boards, capacitors and resistors of Nanchang factory and Wuhan factory, but their supply is 0, that is, the demand site cannot supply, and trace back to obtain the shortage information of PCB boards, capacitors and resistors in Wuhan factory as shown in Table 14 below. It can be seen from Table 14 that the shortage of PCB boards, capacitors and resistors in Wuhan factory in the fourth material level is 400, and the demand time is May 22, 2024;

[0098] Table 13

[0099]

[0100] Table 14

[0101]

[0102] After judgment, the PCB board, capacitor and resistor with shortage information in step S44 do not exist in the next material level, then the purchase plan of the PCB board and capacitor and resistor is generated according to the shortage information of the PCB board and capacitor and resistor, and the production plan is generated according to all the traceability results of the supply and demand adjustment step. The adjusted production plan and purchase plan are shown in Table 15 below:

[0103] Table 15

[0104]

[0105] By comparing the traceability results in Table 2 and Table 14, it can be seen that a lot of unnecessary logistics costs are added in the material allocation process in Table 2. By comparing the initial production plan in Table 3 and the final production plan in Table 15, it can be found that the initial production plan in Table 3 is for the Wuhan factory to produce. In actual production, the production planner needs to re-divide the work according to the dimensions of each factory, while the final production plan in Table 15 is more reasonable. It can be seen that in the material requirement planning method of the present invention, by adding the supply and demand adjustment step, the dimension of the production plant (demand site) is increased, and the supply quantity of each demand site is supplied to the demand site first, which can make the production plan sheets of each demand site finally generated by the material requirement planning method more reasonable and accurate, make the supply chain management within the enterprise more standardized, and guide the enterprise to prepare materials in an orderly manner, so that the upstream and downstream coordination of the supply chain of the entire industry is more reasonable and controllable, reduce the bullwhip effect caused by the supply chain demand transmission time and transmission links, reduce the amplitude and risk of supply and demand oscillations in the industrial chain, and make the upstream and downstream of the production line develop more balanced and orderly; moreover, the production plan sheet and procurement plan sheet calculated by the material requirement planning method can be traced, so that the supply and demand consumption of each demand site can be displayed more clearly and transparently, which is convenient for production planners to manage production plans.

[0106] Furthermore, the present invention also provides a material requirement planning device, which at least includes a BOM establishment module, a supply and demand adjustment module, and a plan order generation module. The BOM establishment module is used to establish the product BOM of the demand product, and the supply and demand adjustment module is used to sequentially obtain the demand information of each demand site corresponding to the material in each material level in the product BOM and the supply quantity of each demand site in a top-down order of the material level, and allocate the supply quantity of each demand site to obtain the allocation information and shortage information of the material at each demand site, wherein the first priority for allocating the supply quantity of each demand site is: this demand site>cross-demand site; the plan order generation module generates a purchase plan and a production plan according to the calculation of the supply and demand adjustment module. The various functional modules in the material requirement planning device work together to realize each step of the material requirement planning method and ensure the efficient operation of the system.

[0107] Furthermore, the material requirement planning device also includes an MRP pre-calculation module located between the BOM establishment module and the supply and demand adjustment module, and the MRP pre-calculation module is used to perform MRP pre-calculation based on the demand information of each demand site for the demand product and the supply of each material, and obtain the initial production plan and initial purchase plan of each demand site. The material requirement planning device in the present invention is based on the management and control of the relevant materials of the enterprise's demand products under the general theory of the material requirement planning system (MRP system), so as to formulate a more reasonable and accurate daily production plan for each demand site in the enterprise, so as to facilitate the production planner to arrange production tasks according to the more accurate daily production plan of each demand site.

[0108] The specific operation steps related to each functional module in the material requirement planning device can refer to the above-mentioned material requirement planning method, which will not be repeated here.

[0109] It should be noted that: when formulating the material requirement plan, the material requirement planning device in the present invention only uses the division of the above-mentioned functional modules as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the material requirement planning device is divided into different functional modules to complete all or part of the functions described above. In addition, the material requirement planning device and the material requirement planning method in the present invention belong to the same concept, and the specific implementation process can be found in the description of the material requirement planning method above, which will not be repeated here.

[0110] Specifically, the material requirement planning device can be a computing device such as a desktop computer, a laptop computer, a palm computer, a cloud server, etc. Of course, it is not limited thereto.

[0111] Furthermore, the present invention also provides a material requirement planning system, and the material requirement planning device is equipped with the material requirement planning system. Specifically, the material requirement planning system includes a processor, a memory, and a computer program stored in the memory and executable on the processor, and the computer program is loaded and executed by the processor to implement the steps of the material requirement planning method described above. Or when the processor executes the computer program, the functions of each functional module in the material requirement planning device described above are implemented.

[0112] Specifically, the computer program can be divided into one or more functional modules, and the one or more modules are stored in the memory and executed by the processor. Among them, the one or more modules can be a series of computer program instruction segments that can complete specific functions, and the instruction segments are used to describe the execution process of the computer program in the material pre-allocation device. For example, the computer program can be divided into a BOM establishment module, a supply and demand adjustment module, an MRP pre-calculation module, and a plan order generation module. The specific functions of each functional module are as described in the material requirement planning device above, and will not be repeated here.

[0113] The processor is the control center of the material requirement planning device / material requirement planning system, and uses various interfaces and lines to connect various parts of the entire material requirement planning device / material requirement planning system. The processor may include one or more processing cores, such as: a 4-core processor, a 6-core processor, etc. The processor may be implemented in at least one hardware form of DSP (Digital Signal Processing), FPGA (Field-Programmable Gate Array), and PLA (Programmable Logic Array). The processor may also include a main processor and a coprocessor. The main processor is a processor used to process data in the awake state, also known as a CPU (Central Processing Unit); the coprocessor is a low-power processor used to process data in the standby state.

[0114] The memory may be used to store the computer program and / or functional module, and the processor implements various functions of the material pre-distribution device by running or executing the computer program and / or functional module stored in the memory, and calling the data stored in the memory.

[0115] It is known that the material requirement planning device / material requirement planning system is not limited to the above-mentioned components, but may also include other components, such as input and output devices, network access devices, buses, etc. Among them, the processor, memory and peripheral device interface may be connected through a bus or a signal line, and each peripheral device may be connected to the peripheral device interface through a bus, a signal line or a circuit board. The peripheral devices include but are not limited to: a radio frequency circuit, a touch display screen, an audio circuit, and a power supply, etc.

[0116] Furthermore, the present invention also provides a computer-readable storage medium, wherein the computer-readable storage medium stores the above-mentioned computer program, and when the computer program is executed by a processor, it is used to implement each step in the above-mentioned material requirement planning method. By storing the computer program in the computer-readable storage medium, it can be conveniently executed on different computing devices, thereby improving the versatility and portability of the system.

[0117] To sum up, in the material requirement planning method of the present invention, after the MRP pre-calculation, the supply and demand adjustment step is calculated based on the LLC theory, and the dimension of the production plant (demand site) is added to the supply and demand adjustment step, and the supply quantity of each demand site is supplied to the current demand site first, that is, the supply quantity of the current demand site gives priority to meeting the demand of the current demand site, which can make the production plan sheets of each demand site finally generated by the material requirement planning method more reasonable and accurate, make the supply chain management within the enterprise more standardized, guide the enterprise to prepare materials in an orderly manner, make the upstream and downstream coordination of the supply chain of the entire industry more reasonable and controllable, reduce the bullwhip effect caused by the supply chain demand transmission time and transmission links, reduce the amplitude and risk of supply and demand oscillations in the industrial chain, and make the upstream and downstream of the production line develop more balanced and orderly; moreover, the production plan sheet and procurement plan sheet calculated by the material requirement planning method can be traced, so that the supply and demand consumption of each demand site can be displayed more clearly and transparently, which is convenient for production planners to manage production plans.

[0118] It should be understood that although this specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each implementation mode may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

[0119] The series of detailed descriptions listed above are only specific descriptions of feasible implementation methods of the present invention. They are not intended to limit the scope of protection of the present invention. Any equivalent implementation methods or changes that do not deviate from the technical spirit of the present invention should be included in the scope of protection of the present invention.

Claims

1. A material requirement planning method, characterized in that: The steps include: Establish a product BOM for the required product, wherein the product BOM includes all materials required to manufacture the required product; Supply and demand adjustment step: Obtain the demand information and supply quantity of each demand site corresponding to the material in each material level in the product BOM in order from top to bottom, and allocate the supply quantity of each demand site to obtain the allocation information and shortage information of the material at each demand site. If the material with shortage information does not exist in the next material level, generate a purchase plan for the material according to the shortage information; When the material with shortage information exists in the next material level, the demand information of the material in the next material level is obtained according to the shortage information, and the demand information includes the demand time; wherein, the first priority for allocating the supply quantity to each demand site is: current demand site > cross-demand site, and the second priority is: the earlier the demand time, the higher the priority.

2. The material requirement planning method according to claim 1, characterized in that: The demand information includes demand quantity. After acquiring the demand information of each demand site corresponding to the material in the material hierarchy and the supply quantity of each demand site, and before allocating the supply quantity of each demand site, the material requirement planning method further includes the following steps: The sluggish quantity of the material at each demand site is calculated based on the demand quantity of each demand site corresponding to the material in the material hierarchy and the supply quantity of each demand site.

3. The material requirement planning method according to claim 1, characterized in that: The first priority for allocating supply to each demand site is: current demand site > designated supply site > cross-demand site.

4. The material requirement planning method according to claim 1, characterized in that: The demand information includes the demand time; wherein the demand time t of the material in the next material level n+1 is the demand time t of the material in the previous material level n The difference from the item's lead time.

5. The material requirement planning method according to claim 1, characterized in that: The shortage information includes the shortage quantity and the demand time.

6. The material requirement planning method according to claim 1, characterized in that: After establishing the product BOM of the required product and before the supply and demand adjustment step, the material requirement planning method also includes the following steps: traversing the product BOM to determine whether the same material is located at different material levels, and if so, defining the largest material level corresponding to the material as the material level of the material.

7. The material requirement planning method according to claim 1, characterized in that: After establishing the product BOM of the required product and before the supply and demand adjustment step, the material requirement planning method further includes the following steps: Obtain the demand information of each demand site for the demand product and the supply quantity of each material; Based on the demand information of each demand site for the demand products and the supply quantity of each material, MRP pre-calculation is performed to obtain the initial production plan and initial procurement plan for each demand site.

8. A material requirement planning device, characterized in that: include: A BOM creation module, wherein the BOM creation module is used to create a product BOM for a required product; The supply and demand adjustment module is used to obtain the demand information of each demand site corresponding to the material in each material level in the product BOM and the supply quantity of each demand site in order from top to bottom of the material level, wherein the demand information includes the demand time, and the supply quantity of each demand site is allocated to obtain the allocation information and shortage information of the material at each demand site, wherein the first priority of allocating the supply quantity to each demand site is: current demand site>cross-demand site, and the second priority is: the earlier the demand time, the higher the priority; A plan sheet generation module generates a purchase plan sheet and a production plan sheet according to the calculation of the supply and demand adjustment module.

9. The material requirement planning device according to claim 8, characterized in that: The material lunch break planning device also includes an MRP pre-calculation module located between the BOM establishment module and the supply and demand adjustment module. The MRP pre-calculation module is used to perform MRP pre-calculation based on the demand information of each demand site on the demand product and the supply quantity of each material to obtain the initial production plan and initial procurement plan of each demand site.

10. A material requirement planning system, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, characterized in that: The computer program is loaded and executed by the processor to implement the steps of the material requirement planning method as described in any one of claims 1 to 7.

11. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed, it is used to implement the steps of the material requirement planning method described in any one of claims 1 to 7.