A sewage illegal discharge emergency response system and method

Through dynamic frequency monitoring and recursive adjustment, combined with the rate of change of emissions and indicator data, sewage abnormalities are discovered in a timely manner and emergency measures are implemented, which solves the problem of lagging response to sewage illegal emission incidents caused by fixed monitoring frequency in the existing technology, and achieves rapid Effective emergency response.

CN118411085BActive Publication Date: 2024-11-01台州市污染防治技术中心有限公司
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202410876477.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-01
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

The existing emergency response system for illegal sewage discharge is difficult to detect illegal sewage discharge incidents in a timely manner when the monitoring frequency is fixed, affecting rapid emergency response.

Method used

Dynamic frequency is used to obtain the actual emission data of the factory's sewage discharge port, and recursively adjust the monitoring frequency based on the emission volume, indicator data and rate of change, determine the abnormal level and select corresponding emergency measures, including warning prompts, work suspension and rectification, and on-site closed investigation.

Benefits of technology

It realizes flexible monitoring of sewage discharge data and timely discovers abnormalities, quickly implements emergency measures, and effectively avoids sewage spread.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118411085B_ABST
    Figure CN118411085B_ABST
Patent Text Reader

Abstract

The present invention relates to an emergency response system and method for illegal sewage discharge, the method comprising: obtaining actual discharge data of a factory sewage outlet based on a dynamic frequency, wherein the actual discharge data comprises discharge volume and index data, wherein the index data comprises suspended matter content, chemical oxygen demand, pH value and temperature; determining an abnormality level according to the actual discharge data, wherein the abnormality level comprises level 0, level 1 and level 2; recursively adjusting the dynamic frequency according to the actual discharge data; selecting emergency measures according to the abnormality level, wherein the emergency measures comprise level 1 emergency measures and level 2 emergency measures; in the present invention, the dynamic frequency is adjusted in real time according to the discharge volume, index data and the change rate of the index data, so that the discharge data of the sewage outlet can be fully and flexibly monitored, and whether the sewage is abnormal can be discovered in time, so as to quickly execute emergency measures and effectively avoid sewage spreading.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of sewage discharge, and in particular to an emergency response system and method for illegal sewage discharge. Background Art

[0002] With the continuous development of information technology, Internet of Things technology and sensor technology, more technical support has been provided for the monitoring and emergency response of illegal sewage discharge. These technologies make real-time monitoring and remote management of sewage discharge possible, improving the efficiency of emergency response. However, the existing emergency response system for illegal sewage discharge has certain limitations. When monitoring wastewater, its monitoring frequency is usually relatively fixed, making it difficult to detect illegal sewage discharge incidents in a timely manner, which is not conducive to rapid emergency response. Summary of the invention

[0003] In view of the above-mentioned problems, the present invention proposes an emergency response system and method for illegal sewage discharge.

[0004] To achieve the above object, the present invention provides the following technical solutions:

[0005] A method for emergency response to illegal sewage discharge, the method comprising the following steps:

[0006] Acquire actual discharge data of the factory sewage outlet based on the dynamic frequency, wherein the actual discharge data includes discharge volume and index data, wherein the index data includes several items such as suspended solids content, chemical oxygen demand, pH value, temperature, etc., including n items in total;

[0007] Determine the level of anomalies based on actual emissions data;

[0008] recursively adjusting the dynamic frequency according to actual emission data;

[0009] An emergency measure is selected according to the abnormality level, wherein the emergency measure includes a first-level emergency measure and a second-level emergency measure.

[0010] As a further technical solution of the present invention, the step of determining the abnormal level according to the actual emission data includes:

[0011] Read various indicator data in the actual emission data, and sort the indicator data in chronological order;

[0012] Taking the current moment as the end point and the preset second time length as the interval length, a determination interval is constructed, and the determination interval is a time period;

[0013] Read the data of each indicator within the determination interval, and obtain the mean and maximum value of each indicator data within the determination interval;

[0014] The abnormality level is determined according to the mean and maximum value of each indicator data in the determination interval, and the abnormality level includes level 0, level 1 and level 2.

[0015] As a further technical solution of the present invention, the step of determining the abnormal level according to the mean and maximum value of each indicator data in the determination interval includes:

[0016] Generate the actual judgment value of each indicator data according to the mean and maximum value of each indicator data in the judgment interval, , a is the mean weight coefficient, b is the maximum weight coefficient, S is the actual judgment value, E is the mean, MAX is the maximum value, where a+b=1, a and b are between 0 and 1;

[0017] When the actual judgment value of each indicator data is within the first preset threshold range, the abnormal level is judged to be level 0, and the sewage is discharged in compliance with the standards;

[0018] When the actual determination value of each indicator data item is within the second preset threshold interval set, and does not belong to or does not completely belong to the first preset threshold interval set, the abnormal level is determined to be level one;

[0019] When the actual determination value of each indicator data item is within the third preset threshold interval set and does not belong to or does not completely belong to the second preset threshold interval set, the abnormal level is determined to be level two.

[0020] As a further technical solution of the present invention, the step of recursively adjusting the dynamic frequency according to actual emission data includes:

[0021] Taking the current moment as the end point and the preset first duration as the interval length, a detection interval is constructed, wherein the detection interval is a time period, wherein the preset first duration is greater than the preset second duration;

[0022] Obtain the cumulative emissions within the detection interval;

[0023] Obtain the abnormality level in the detection interval, sort the abnormality levels in the detection interval according to their size, and obtain the highest abnormality level in the detection interval;

[0024] Get the change rate of each indicator data at the current moment;

[0025] The dynamic frequency is determined according to the cumulative emissions, the highest abnormal level and the change rate of each indicator data at the current moment, and the calculation formula is as follows:

[0026] ;

[0027] in, is the dynamic frequency, is the weight coefficient of cumulative emissions, is the cumulative emissions, is the weight coefficient of the highest abnormal level, The highest abnormal level. is the weight coefficient of the change rate of each indicator data, is the rate of change of each indicator data at the current moment, C is a constant, and C also refers to the dynamic frequency set at the initial moment, which can usually be set to monitor once per hour; , and The values ​​of each item are set according to the actual demand of each factory for sewage discharge. ,and .

[0028] As a further technical solution of the present invention, the step of selecting emergency measures according to the abnormality level includes:

[0029] When the abnormal level is level 0, the sewage meets the discharge standards and no emergency measures are required;

[0030] When the abnormal level is level one, the sewage is abnormal, and level one emergency measures are selected and executed, wherein the level one emergency measures include warning prompts and suspension of work for rectification;

[0031] When the abnormality level is level 2, the sewage is abnormal, and level 2 emergency measures are selected and executed, wherein the level 2 emergency measures include on-site closed investigation and pollution source treatment emergency instructions.

[0032] Another object of the present invention is to provide an emergency response system for illegal sewage discharge, the system comprising:

[0033] A data acquisition module, used for acquiring actual discharge data of the factory sewage outlet based on dynamic frequency, wherein the actual discharge data includes discharge volume and index data, wherein the index data includes several items such as suspended solids content, chemical oxygen demand, pH value, temperature, etc., including n items in total;

[0034] An abnormality determination module, used to determine the abnormality level according to the actual emission data;

[0035] A frequency adjustment module, used for recursively adjusting the dynamic frequency according to actual emission data;

[0036] The emergency response module is used to select emergency measures according to the abnormal level, wherein the emergency measures include primary emergency measures and secondary emergency measures.

[0037] As a further technical solution of the present invention, the abnormality determination module includes:

[0038] An indicator data sorting unit is used to read various indicator data in the actual emission data and sort the various indicator data according to the time sequence;

[0039] A determination interval construction unit, used to construct a determination interval with the current moment as the end point and a preset second time length as the interval length, wherein the determination interval is a time period;

[0040] The data analysis and calculation unit is used to read the various indicator data within the determination interval and obtain the mean and maximum value of each indicator data within the determination interval;

[0041] The abnormality level determination unit is used to determine the abnormality level according to the mean and maximum value of each indicator data in the determination interval, and the abnormality level includes level 0, level 1 and level 2.

[0042] As a further technical solution of the present invention, the frequency adjustment module includes:

[0043] A detection interval construction unit, used to construct a detection interval with the current moment as the end point and a preset first duration as the interval length, wherein the detection interval is a time period, wherein the preset first duration is greater than the preset second duration;

[0044] An emission acquisition unit, used to acquire the cumulative emission within the detection interval;

[0045] An abnormality level acquisition unit, used to acquire the abnormality level in the detection interval, sort the abnormality levels in the detection interval according to their size, and acquire the highest abnormality level in the detection interval;

[0046] A change rate acquisition unit is used to obtain the change rate of each indicator data at the current moment;

[0047] The frequency determination unit is used to determine the dynamic frequency according to the cumulative emissions, the highest abnormal level and the change rate of each indicator data at the current moment, and the calculation formula is as follows:

[0048] ;

[0049] in, is the dynamic frequency, is the weight coefficient of cumulative emissions, is the cumulative emissions, is the weight coefficient of the highest abnormal level, The highest abnormal level. is the weight coefficient of the change rate of each indicator data, is the rate of change of each indicator data at the current moment, C is a constant, and C also refers to the dynamic frequency set at the initial moment, which can usually be set to monitor once per hour; , and The values ​​of each item are set according to the actual demand of each factory for sewage discharge. ,and .

[0050] As a further technical solution of the present invention, the emergency response module includes:

[0051] A safe discharge unit, used when the abnormal level is level 0, the sewage meets the discharge standards and no emergency measures are required;

[0052] A first-level emergency unit is used to select and execute first-level emergency measures when the abnormal level is level one and the sewage is abnormal, wherein the first-level emergency measures include warning prompts and suspension of work for rectification;

[0053] The secondary emergency unit is used to select and execute secondary emergency measures when the abnormal level is level 2 and the sewage is abnormal, wherein the secondary emergency measures include on-site closed investigation and pollution source treatment emergency instructions.

[0054] Compared with the prior art, the beneficial effects of the present invention are: the present invention provides an emergency response method for illegal sewage discharge, in which a dynamic frequency is used to obtain actual discharge data of a factory sewage outlet, and in the present invention, the dynamic frequency is adjusted in real time according to the discharge volume, index data and the rate of change of the index data, so that the discharge data of the sewage outlet can be fully and flexibly monitored, and it can be discovered in time whether the sewage is abnormal, so as to quickly implement emergency measures and effectively avoid the spread of sewage. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 The figure is a flowchart of an emergency response method for illegal sewage discharge.

[0056] Figure 2 The present invention is a flowchart of the step of determining abnormal level in a method for emergency response to wastewater discharge violations.

[0057] Figure 3 The present invention is a flowchart of the step of adjusting the dynamic frequency in a method for emergency response to wastewater discharge violations.

[0058] Figure 4 This is a structural block diagram of an emergency response system for illegal sewage discharge. DETAILED DESCRIPTION

[0059] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.

[0060] like Figure 1 As shown, an embodiment of the present invention provides an emergency response method for illegal sewage discharge, the method comprising the following steps:

[0061] Step S100, obtaining actual discharge data of the factory sewage outlet based on the dynamic frequency, wherein the actual discharge data includes discharge volume and index data, wherein the index data includes several items such as suspended solids content, chemical oxygen demand, pH value, temperature, etc., including n items in total;

[0062] Step S200, determining an abnormality level according to actual emission data; wherein the abnormality level includes level 0, level 1 and level 2, and the larger the level, the higher the pollution degree;

[0063] Step S300, recursively adjusting the dynamic frequency according to actual emission data;

[0064] Step S400: selecting emergency measures according to the abnormality level, wherein the emergency measures include primary emergency measures and secondary emergency measures.

[0065] In this embodiment, the dynamic frequency is recursively adjusted according to the actual discharge data, so that the discharge data of the sewage outlet can be fully and flexibly monitored, and whether the sewage is abnormal can be discovered in time, so that emergency measures can be quickly implemented to effectively avoid sewage spreading.

[0066] See also Figure 2 As a preferred embodiment of the present invention, the step of determining the abnormal level according to the actual emission data includes:

[0067] Step S201, reading various indicator data in the actual emission data, and sorting the various indicator data respectively according to the time sequence;

[0068] Step S202, taking the current moment as the end point and the preset second time length as the interval length to construct a determination interval, wherein the determination interval is a time period;

[0069] Step S203, reading each indicator data within the determination interval, and obtaining the mean and maximum value of each indicator data within the determination interval;

[0070] Step S204, determining the abnormality level according to the mean and maximum value of each indicator data in the determination interval, wherein the abnormality level includes level 0, level 1 and level 2.

[0071] Step S204 specifically includes: generating an actual determination value of each indicator data item according to the mean value and the maximum value of each indicator data item within the determination interval, , where a is the mean weight coefficient, b is the maximum weight coefficient, S is the actual judgment value, E is the mean, MAX is the maximum value, a+b=1, a and b are between 0 and 1. In actual use, the values ​​of a and b are determined according to actual needs. Usually, a=0, b=1 or a=0.5, b=0.5 can be used;

[0072] When the actual judgment value of each indicator data is within the first preset threshold range, the abnormal level is judged to be level 0, and the sewage is discharged in compliance with the standards;

[0073] When the actual determination value of each indicator data item is within the second preset threshold interval set, and does not belong to or does not completely belong to the first preset threshold interval set, the abnormal level is determined to be level one;

[0074] When the actual judgment value of each indicator data is within the third preset threshold interval set and does not belong to or does not completely belong to the second preset threshold interval set, the abnormal level is judged to be level 2.

[0075] Among them, the first preset threshold interval set, the second preset threshold interval set and the third preset threshold interval set respectively include a number of threshold intervals corresponding to the number of items of indicator data, that is, the first preset threshold interval set includes a number of first preset threshold intervals, the second preset threshold interval set includes a number of second preset threshold intervals, and the third preset threshold interval set includes a number of third preset threshold intervals, wherein the range of the third preset threshold interval is larger than the third preset threshold interval, and the range of the second preset threshold interval is larger than the first preset threshold interval.

[0076] In this embodiment, a determination interval is set, and accurate and rapid determination of sewage abnormality is achieved by analyzing the index data within the determination interval.

[0077] See also Figure 3 As a preferred embodiment of the present invention, the step of recursively adjusting the dynamic frequency according to the actual emission data comprises:

[0078] Step S301, taking the current moment as the end point and a preset first duration as the interval length to construct a detection interval, wherein the detection interval is a time period, wherein the preset first duration is greater than the preset second duration;

[0079] Step S302, obtaining the cumulative emissions within the detection interval;

[0080] Step S303, obtaining the abnormality level in the detection interval, sorting the abnormality levels in the detection interval according to their size, and obtaining the highest abnormality level in the detection interval;

[0081] Step S304, obtaining the change rate of each indicator data at the current moment;

[0082] Among them, various indicator data are sorted in chronological order to generate change curves of various indicator data, and an indicator data function is established based on the change curve. The horizontal axis of the indicator data function is time, and the vertical axis is the indicator data, which can be suspended matter content, chemical oxygen demand, pH value and temperature. The change rate can be obtained by taking the partial derivative of the indicator data function;

[0083] Step S305, determining the dynamic frequency according to the cumulative emissions, the highest abnormal level and the change rate of each indicator data at the current moment, and the calculation formula is as follows:

[0084] ;

[0085] in, is the dynamic frequency, is the weight coefficient of cumulative emissions, is the cumulative emissions within the detection interval, is the weight coefficient of the highest abnormal level, is the highest abnormal level within the detection interval, is the weight coefficient of the change rate of each indicator data, is the rate of change of each indicator data at the current moment, C is a constant, and C also refers to the dynamic frequency set at the initial moment, which can usually be set to monitor once per hour; t is the time, where , and The values ​​of each item are set according to the actual demand of each factory for sewage discharge. ,and ,when When the calculation result is not an integer, remove the number after the decimal point and round down by default.

[0086] In this embodiment, the dynamic frequency is adjusted in real time according to the discharge volume, index data and the rate of change of the index data, so that the discharge data of the sewage outlet can be fully and flexibly monitored, and it can be discovered in time whether the sewage is abnormal, so as to quickly implement emergency measures and effectively avoid the spread of sewage.

[0087] As a preferred embodiment of the present invention, the step of selecting emergency measures according to the abnormality level includes:

[0088] When the abnormal level is level 0, the sewage meets the discharge standards and no emergency measures are required;

[0089] When the abnormal level is level one, the sewage is abnormal, and level one emergency measures are selected and implemented, wherein the level one emergency measures include warnings and suspension of work for rectification; specifically, warnings, immediate cessation of the discharge of substandard sewage, comprehensive inspection of sewage treatment facilities, and finding out the reasons for non-compliance. Possible reasons include equipment failure, improper operation, and excessive influent quality. According to the reasons found, formulate corresponding rectification plans. For equipment failure, the equipment should be repaired or replaced in time; for improper operation, training and guidance should be strengthened; for excessive influent quality, the production process should be optimized or pre-treatment measures should be taken.

[0090] When the abnormal level is level 2, the sewage is abnormal, and level 2 emergency measures are selected and executed, wherein the level 2 emergency measures include on-site closure investigation and emergency instructions for pollution source treatment; specifically, they include: immediately stop the discharge of substandard sewage, close the pollution site, and set up warning signs to prevent people from entering by mistake. Investigate and record the pollution site, including information such as pollutant type, concentration, and discharge time. Combined with the test results and on-site investigation, analyze the reasons for excessive discharge, such as equipment failure, improper operation, excessive discharge, etc. For sewage with excessive discharge, use physical, chemical or biological methods to treat it, such as sedimentation, filtration, adsorption, oxidation, etc.

[0091] See also Figure 4 Another object of the present invention is to provide an emergency response system for illegal sewage discharge, the system comprising:

[0092] The data acquisition module 100 is used to acquire actual discharge data of the factory sewage outlet based on the dynamic frequency, wherein the actual discharge data includes discharge volume and index data, wherein the index data includes several items such as suspended solids content, chemical oxygen demand, pH value, temperature, etc., including n items in total;

[0093] An abnormality determination module 200, used to determine an abnormality level according to actual emission data;

[0094] A frequency adjustment module 300, for recursively adjusting the dynamic frequency according to actual emission data;

[0095] The emergency response module 400 is used to select emergency measures according to the abnormality level, wherein the emergency measures include primary emergency measures and secondary emergency measures.

[0096] As a preferred embodiment of the present invention, the abnormality determination module 200 includes:

[0097] An indicator data sorting unit is used to read various indicator data in the actual emission data and sort the various indicator data according to the time sequence;

[0098] A determination interval construction unit, used to construct a determination interval with the current moment as the end point and a preset second time length as the interval length, wherein the determination interval is a time period;

[0099] The data analysis and calculation unit is used to read the various indicator data within the determination interval and obtain the mean and maximum value of each indicator data within the determination interval;

[0100] The abnormality level determination unit is used to determine the abnormality level according to the mean and maximum value of each indicator data in the determination interval, and the abnormality level includes level 0, level 1 and level 2.

[0101] As a preferred embodiment of the present invention, the frequency adjustment module 300 includes:

[0102] A detection interval construction unit, used to construct a detection interval with the current moment as the end point and a preset first duration as the interval length, wherein the detection interval is a time period, wherein the preset first duration is greater than the preset second duration;

[0103] An emission acquisition unit, used to acquire the cumulative emission within the detection interval;

[0104] An abnormality level acquisition unit, used to acquire the abnormality level in the detection interval, sort the abnormality levels in the detection interval according to their size, and acquire the highest abnormality level in the detection interval;

[0105] A change rate acquisition unit is used to obtain the change rate of each indicator data at the current moment;

[0106] The frequency determination unit is used to determine the dynamic frequency according to the cumulative emissions, the highest abnormal level and the change rate of each indicator data at the current moment, and the calculation formula is as follows:

[0107] ;

[0108] in, is the dynamic frequency, is the weight coefficient of cumulative emissions, is the cumulative emissions, is the weight coefficient of the highest abnormal level, The highest abnormal level. is the weight coefficient of the change rate of each indicator data, is the rate of change of each indicator data at the current moment, C is a constant, and C also refers to the dynamic frequency set at the initial moment, which can usually be set to monitor once per hour; , and The values ​​of each item are set according to the actual demand of each factory for sewage discharge. ,and .

[0109] As a preferred embodiment of the present invention, the emergency response module 400 includes:

[0110] A safe discharge unit, used when the abnormal level is level 0, the sewage meets the discharge standards and no emergency measures are required;

[0111] A first-level emergency unit is used to select and execute first-level emergency measures when the abnormal level is level one and the sewage is abnormal, wherein the first-level emergency measures include warning prompts and suspension of work for rectification;

[0112] The secondary emergency unit is used to select and execute secondary emergency measures when the abnormal level is level 2 and the sewage is abnormal, wherein the secondary emergency measures include on-site closed investigation and pollution source treatment emergency instructions.

[0113] The functions that can be achieved by the emergency response method for illegal sewage discharge are all completed by a computer device, which includes one or more processors and one or more memories, and at least one program code is stored in the one or more memories. The program code is loaded and executed by the one or more processors to implement the emergency response method for illegal sewage discharge.

[0114] The processor takes out instructions from the memory one by one, analyzes the instructions, and then completes the corresponding operations according to the instruction requirements, generating a series of control commands, so that the various parts of the computer can automatically, continuously and coordinately move to become an organic whole, realize the input of programs, the input of data, and the calculation and output of results. The arithmetic operations or logical operations generated in this process are all completed by the operator; the memory includes a read-only memory (ROM), which is used to store computer programs, and a protection system is provided outside the memory.

[0115] Exemplarily, the computer program may be divided into one or more modules, one or more modules are stored in a memory and executed by a processor to implement the present invention. One or more modules may be a series of computer program instruction segments capable of implementing specific functions, and the instruction segments are used to describe the execution process of the computer program in a terminal device.

[0116] Those skilled in the art will understand that the description of the above service equipment is merely an example and does not constitute a limitation on the terminal equipment. It may include more or fewer components than described above, or a combination of certain components, or different components, for example, it may include input and output devices, network access devices, buses, etc.

[0117] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and uses various interfaces and lines to connect various parts of the entire staff terminal.

[0118] The above-mentioned memory can be used to store computer programs and / or modules. The above-mentioned processor realizes various functions of the above-mentioned terminal device by running or executing the computer programs and / or modules stored in the memory and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as an information collection template display function, a product information release function, etc.), etc.; the data storage area can store data created according to the use of the berth status display system (such as product information collection templates corresponding to different product types, product information that different product providers need to release, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0119] If the module / unit integrated in the terminal device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable medium. Based on this understanding, the present invention implements all or part of the modules / units in the above-mentioned embodiment system, and can also be completed by instructing the relevant hardware through a computer program. The above-mentioned computer program can be stored in a computer-readable medium, and the computer program can realize the functions of the above-mentioned various system embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or system that can carry computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electrical carrier signal, electrical signal and software distribution medium, etc.

[0120] It should be noted that, in this article, the term "comprises" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0121] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A method for emergency response to illegal sewage discharge, characterized in that: The method comprises the following steps: Acquire actual discharge data of the factory sewage outlet based on dynamic frequency, wherein the actual discharge data includes discharge volume and index data, wherein the index data includes suspended solids content, chemical oxygen demand, pH value and temperature; Determine an abnormality level according to actual emission data, wherein the abnormality level includes level 0, level 1 and level 2; recursively adjusting the dynamic frequency according to actual emission data; Selecting emergency measures according to the abnormality level, wherein the emergency measures include primary emergency measures and secondary emergency measures; The step of determining the abnormal level according to the actual emission data comprises: Read various indicator data in the actual emission data, and sort the indicator data in chronological order; Taking the current moment as the end point and the preset second time length as the interval length, a determination interval is constructed, and the determination interval is a time period; Read the data of each indicator within the determination interval, and obtain the mean and maximum value of each indicator data within the determination interval; Determine the abnormality level according to the mean and maximum value of each indicator data in the determination interval, and the abnormality level includes level 0, level 1 and level 2; The step of determining the abnormal level according to the mean and maximum value of each indicator data in the determination interval includes: Generate the actual judgment value of each indicator data according to the mean and maximum value of each indicator data in the judgment interval, S=a*E+b*MAX, a is the mean weight coefficient, b is the maximum weight coefficient, S is the actual judgment value, E is the mean, and MAX is the maximum value; When the actual judgment value of each indicator data is within the first preset threshold range, the abnormal level is judged to be level 0, and the sewage is discharged in compliance with the standards; When the actual determination value of each indicator data item is within the second preset threshold interval set, and does not belong to or does not completely belong to the first preset threshold interval set, the abnormal level is determined to be level one; When the actual determination value of each indicator data item is within the third preset threshold interval set, and does not belong to or does not completely belong to the second preset threshold interval set, the abnormal level is determined to be level 2; The step of recursively adjusting the dynamic frequency according to actual emission data comprises: Taking the current moment as the end point and the preset first duration as the interval length, a detection interval is constructed, wherein the detection interval is a time period, wherein the preset first duration is greater than the preset second duration; Obtain the cumulative emissions within the detection interval; Obtain the abnormality level in the detection interval, sort the abnormality levels in the detection interval according to their size, and obtain the highest abnormality level in the detection interval; Get the change rate of each indicator data at the current moment; The dynamic frequency is determined according to the cumulative emissions, the highest abnormal level and the change rate of each indicator data at the current moment, and the calculation formula is as follows: Where f is the dynamic frequency, is the weight coefficient of cumulative emissions, is the cumulative emissions within the detection interval, β is the weight coefficient of the highest abnormal level, is the highest abnormal level in the detection interval, δ1, δ2, ... n is the weight coefficient of the change rate of each indicator data, z1(t), z2(t)...z n (t) is the rate of change of each indicator data at the current moment, and C is a constant.

2. The method for emergency response to illegal sewage discharge according to claim 1, characterized in that: The step of selecting emergency measures according to the abnormal level includes: When the abnormal level is level 0, the sewage meets the discharge standards and no emergency measures are required; When the abnormal level is level one, the sewage is abnormal, and level one emergency measures are selected and executed, wherein the level one emergency measures include warning prompts and suspension of work for rectification; When the abnormality level is level 2, the sewage is abnormal, and level 2 emergency measures are selected and executed, wherein the level 2 emergency measures include on-site closed investigation and pollution source treatment emergency instructions.

3. A sewage illegal discharge emergency response system, characterized in that: The system comprises: A data acquisition module, used for acquiring actual discharge data of the factory sewage outlet based on dynamic frequency, wherein the actual discharge data includes discharge volume and index data, wherein the index data includes suspended solids content, chemical oxygen demand, pH value and temperature; An abnormality determination module, used to determine the abnormality level according to the actual emission data; wherein the abnormality level includes level 0, level 1 and level 2; A frequency adjustment module, used for recursively adjusting the dynamic frequency according to actual emission data; An emergency response module, used for selecting emergency measures according to the abnormal level, wherein the emergency measures include primary emergency measures and secondary emergency measures; The abnormality determination module comprises: An indicator data sorting unit is used to read various indicator data in the actual emission data and sort the various indicator data according to the time sequence; A determination interval construction unit, used to construct a determination interval with the current moment as the end point and a preset second time length as the interval length, wherein the determination interval is a time period; The data analysis and calculation unit is used to read the various indicator data within the determination interval and obtain the mean and maximum value of each indicator data within the determination interval; An abnormality level determination unit, used to determine the abnormality level according to the mean and maximum value of each indicator data in the determination interval, wherein the abnormality level includes level 0, level 1 and level 2; The content of determining the abnormal level according to the mean and maximum value of each indicator data in the determination interval includes: Generate the actual judgment value of each indicator data according to the mean and maximum value of each indicator data in the judgment interval, S=a*E+b*MAX, a is the mean weight coefficient, b is the maximum weight coefficient, S is the actual judgment value, E is the mean, and MAX is the maximum value; When the actual judgment value of each indicator data is within the first preset threshold range, the abnormal level is judged to be level 0, and the sewage is discharged in compliance with the standards; When the actual determination value of each indicator data item is within the second preset threshold interval set, and does not belong to or does not completely belong to the first preset threshold interval set, the abnormal level is determined to be level one; When the actual determination value of each indicator data item is within the third preset threshold interval set, and does not belong to or does not completely belong to the second preset threshold interval set, the abnormal level is determined to be level 2; The frequency adjustment module comprises: A detection interval construction unit, used to construct a detection interval with the current moment as the end point and a preset first duration as the interval length, wherein the detection interval is a time period, wherein the preset first duration is greater than the preset second duration; An emission acquisition unit, used to acquire the cumulative emission within the detection interval; An abnormality level acquisition unit, used to acquire the abnormality level in the detection interval, sort the abnormality levels in the detection interval according to their size, and acquire the highest abnormality level in the detection interval; A change rate acquisition unit is used to obtain the change rate of each indicator data at the current moment; The frequency determination unit is used to determine the dynamic frequency according to the cumulative emissions, the highest abnormal level and the change rate of each indicator data at the current moment, and the calculation formula is as follows: Where f is the dynamic frequency, is the weight coefficient of cumulative emissions, is the cumulative emission, β is the weight coefficient of the highest abnormal level, is the highest abnormal level, δ1, δ2...δ n is the weight coefficient of the change rate of each indicator data, z1(t), z2(t)...z n (t) is the rate of change of each indicator data at the current moment, and C is a constant.

Citation Information

Patent Citations

  • Dynamic variable-frequency data collection method for monitoring wind-PV-ES hybrid power generation status

    CN104065168A

  • Wastewater treatment effect quantification method and apparatus

    CN105844081A

  • Data transmission optimization method and device, computer equipment and storage medium

    CN110661727A

  • Emergency response system and method for illegal sewage discharge

    CN111832909A

  • Road wastewater recycling and adjusting system

    CN114997709A