Method, system and storage medium for generating project construction acceptance sheet
By splitting and encoding construction tasks and acceptance information, flexible acceptance forms are generated, which solves the problems of poor adaptability and low preparation efficiency of existing acceptance forms, and achieves an efficient and accurate acceptance process.
Patent Information
- Application Number
- CN202410869163.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-01
AI Technical Summary
The existing building construction acceptance form has poor adaptability, low preparation efficiency, and difficulty in reuse. It also requires high knowledge reserves of the preparation personnel, making it difficult to guarantee the quality of the acceptance.
By splitting the task characteristic information and acceptance information of the engineering project into atomic levels, the task characteristic atomic library and the acceptance atomic library are constructed, and the acceptance form is generated based on the correlation between these atomic libraries, realizing the flexible generation and automatic preparation of the acceptance form.
It improves the adaptability and preparation efficiency of the acceptance form, reduces the requirements for preparation personnel, ensures the consistency and accuracy of the acceptance information, reduces the influence of human factors, and improves the traceability of the acceptance quality and process.
Smart Images

Figure CN118411128B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of construction management, and in particular to a method, system and storage medium for generating a construction acceptance form. Background Art
[0002] In construction management, acceptance issues have always been the main focus. In order to ensure the quality of construction, the method of prior briefing and post-acceptance is usually adopted. Conventional acceptance is usually presented in the form of an overall document such as an acceptance form, which makes it only suitable for specific projects, specific construction areas, specific construction stages and specific construction tasks. It has poor adaptability, low compilation efficiency, and requires high knowledge reserves of the compilers. For example, when compiling an acceptance form, it is necessary to rely on a large number of documents and materials, and it is reviewed and stamped by multiple departments. The process is cumbersome and lengthy, resulting in low efficiency; at the same time, when the project, construction area, stage or task changes, the existing acceptance form is often difficult to reuse directly, making it difficult to effectively inherit and accumulate knowledge and experience; in addition, the personnel who compile the acceptance form need to have a deep understanding of the requirements of various specifications and drawings, and the requirements for knowledge reserves are high, which increases the difficulty of personnel training and management. These have reduced the efficiency and accuracy of the acceptance work and made it difficult to ensure the quality of acceptance.
[0003] Therefore, it is hoped to provide a method, system and storage medium for generating a construction acceptance form to improve the accuracy and efficiency of the acceptance. Summary of the invention
[0004] One of the embodiments of this specification provides a method for generating a construction acceptance form. The method includes: obtaining a task form, wherein the task form includes at least one task item; based on the task form, determining the target task feature atom corresponding to each task item in the at least one task item; based on the first association relationship between the target task feature atom and the task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library, determining the target acceptance atom of each task item, wherein the target acceptance atom includes a target acceptance item atom, a target construction process atom, and a target acceptance standard atom; obtaining a second association relationship between the acceptance atoms in the acceptance atom library; based on the target acceptance item atom and the second association relationship, matching the target construction process atom and the target acceptance standard atom to generate a target acceptance form.
[0005] In some embodiments, the task feature atom library can be constructed by: obtaining historical task orders; obtaining task feature points based on the historical task orders; determining the task feature atoms based on the task feature points; and obtaining the task feature atom library based on the task feature atoms.
[0006] In some embodiments, the task feature points may include at least one of: project category, construction task item, construction location, construction cost, and construction material.
[0007] In some embodiments, the acceptance atom may include acceptance item atoms, construction process atoms and acceptance standard atoms. The second association relationship may be the relationship between the acceptance item atoms, the construction process atoms and the acceptance standard atoms. The acceptance atom and the second association relationship may be obtained in the following manner: obtaining acceptance reference materials; obtaining acceptance item atoms based on the acceptance reference materials; determining the construction process atoms corresponding to each of the acceptance item atoms, and the acceptance standard atoms corresponding to each of the construction process atoms; obtaining the acceptance atom library and the second association relationship based on the acceptance item atoms, the construction process atoms and the acceptance standard atoms.
[0008] In some embodiments, the first association relationship may be established in the following manner: matching the task feature atoms in the task feature atom library and the acceptance atoms in the acceptance atom library through a preset model to establish the first association relationship.
[0009] In some embodiments, the task feature atoms in the task feature atom library and the acceptance atoms in the acceptance atom library can be a tree structure; the matching process can be to match the atom to be queried with the query atom, when the atom to be queried is the task feature atom, the query atom can be the acceptance atom, or when the atom to be queried is the acceptance atom, the query atom can be the task feature atom, and the first association relationship can be established in the following manner: during the matching process, for any query atom, in response to matching the parent node of the tree structure of the atom to be queried, all the atoms to be queried under the parent node are associated with the query atom.
[0010] In some embodiments, for each task item, multiple acceptance atom sets can be obtained in the following manner: for each task feature point in each task item, the target task feature atom of the task feature point is determined based on the task item; the target task feature atom of the task feature point is matched to an acceptance atom set. The acceptance atoms that exist in each of the multiple acceptance atom sets at the same time can be extracted as the target acceptance atom of the task item.
[0011] In some embodiments, an initial acceptance form may be generated based on the target acceptance item atoms; and the target acceptance form may be generated based on user input information on the initial acceptance form.
[0012] In some embodiments, the input information may include that the user deletes part of the target acceptance item atoms, and the target acceptance form may be generated based on the target acceptance item atoms remaining after the deletion and the second association relationship.
[0013] In some embodiments, the input information may include a newly added acceptance item atom, which can be matched in the target construction process atom and the target acceptance standard atom based on the newly added acceptance item atom and the second association relationship; in response to a successful match, the target acceptance form is generated based on the matching result; in response to a failed match, a prompt message is output.
[0014] In some embodiments, the method may further include: obtaining an acceptance result based on the target acceptance form; and automatically generating an acceptance conclusion and a rectification form based on the acceptance result.
[0015] One of the embodiments of the present specification provides a system for generating a construction acceptance form, comprising a first acquisition module, a first determination module, a second determination module, a second acquisition module and a first generation module; the first acquisition module is used to acquire a task form, wherein the task form includes at least one task item; the first determination module is used to determine, based on the task form, a target task feature atom corresponding to each task item in the at least one task item; the second determination module is used to determine the target acceptance atom of each task item based on a first association relationship between the target task feature atom and the task feature atom in a task feature atom library and the acceptance atom in an acceptance atom library, wherein the target acceptance atom includes a target acceptance item atom, a target construction process atom and a target acceptance standard atom; the second acquisition module is used to acquire a second association relationship within the acceptance atom library; the first generation module is used to match the target construction process atom and the target acceptance standard atom based on the target acceptance item atom and the second association relationship to generate a target acceptance form.
[0016] One of the embodiments of the present specification provides a computer-readable storage medium, wherein the storage medium stores computer instructions. When a computer reads the computer instructions in the storage medium, the computer executes the method for generating a construction acceptance form.
[0017] In some embodiments of the present specification, by splitting the task feature information and acceptance information of the project construction into atomic-level information, and encoding them into a task feature atomic library and an acceptance atomic library respectively, the atomic-level acceptance information is combined based on the target task feature information in the task list and the association between the atoms in the two atomic libraries to obtain an acceptance form. Different acceptance forms can be flexibly generated according to different tasks, thereby improving the adaptability and flexibility of the acceptance form and improving the efficiency of compiling and generating the acceptance form; it can be automatically generated by a computer, reducing the requirements for the acceptance form compiling personnel; by flexibly assembling the acceptance form based on feature coding, the consistency and accuracy of the acceptance information are guaranteed, the impact of human factors on the acceptance is reduced, the acceptance efficiency and accuracy are improved, and the acceptance quality is guaranteed and improved; because it is automatically generated by a computer, the transmission process and results of the acceptance information can be recorded and tracked, which is convenient for subsequent query and analysis, conducive to pre-control and preventive maintenance, and improves the traceability of the acceptance process. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] This specification will be further described in the form of exemplary embodiments, which will be described in detail by the accompanying drawings. These embodiments are not restrictive, and in these embodiments, the same number represents the same structure, wherein:
[0019] Figure 1 It is a schematic diagram of an application scenario of a system for generating a construction acceptance form according to some embodiments of this specification;
[0020] Figure 2 is a schematic diagram of a system for generating a construction acceptance form according to some embodiments of this specification;
[0021] Figure 3 is an exemplary flow chart of a method for generating a construction acceptance form according to some embodiments of this specification;
[0022] Figure 4 is an exemplary flow chart of a method for generating a task feature atom library according to some embodiments of this specification;
[0023] Figure 5 is an exemplary flow chart of a method for generating an acceptance atom library according to some embodiments of this specification;
[0024] Figure 6 is a schematic diagram of a task feature atom library according to some embodiments of this specification;
[0025] Figure 7 is a schematic diagram of an acceptance atom library according to some embodiments of this specification;
[0026] Figure 8is a schematic diagram of establishing a first association relationship according to some embodiments of this specification;
[0027] Fig. 9 It is a schematic diagram of generating an acceptance form according to some embodiments of this specification. DETAILED DESCRIPTION
[0028] In order to more clearly illustrate the technical solutions of the embodiments of this specification, the following is a brief introduction to the drawings required for the description of the embodiments. Obviously, the drawings described below are only some examples or embodiments of this specification. For ordinary technicians in this field, this specification can also be applied to other similar scenarios based on these drawings without creative work. Unless it is obvious from the language environment or otherwise explained, the same reference numerals in the figures represent the same structure or operation.
[0029] It should be understood that the "system", "device", "unit" and / or "module" used herein are a method for distinguishing different components, elements, parts, portions or assemblies at different levels. However, if other words can achieve the same purpose, the words can be replaced by other expressions.
[0030] As shown in this specification and claims, unless the context clearly indicates an exception, the words "a", "an", "an" and / or "the" do not refer to the singular and may also include the plural. Generally speaking, the terms "comprise" and "include" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.
[0031] Flowcharts are used in this specification to illustrate the operations performed by the system according to the embodiments of this specification. It should be understood that the preceding or following operations are not necessarily performed precisely in order. Instead, the steps may be processed in reverse order or simultaneously. At the same time, other operations may also be added to these processes, or one or more operations may be removed from these processes.
[0032] Figure 1 1 is a schematic diagram of an application scenario of a system for generating a construction acceptance form according to some embodiments of this specification. In this specification, the system for generating a construction acceptance form 100 is referred to as system 100. Figure 1 As shown, the system 100 may include a storage device 110 , a processing device 120 , a terminal 130 , and a network 140 .
[0033] The storage device 110 can store data or information. In some embodiments, the storage device 110 can store data and / or information related to the project construction acceptance, such as construction task orders, construction process methods, and construction specifications and standards. In some embodiments, the storage device 110 can store data and / or information processed by the processing device 120, such as a task feature atomic library, an acceptance atomic library, and an acceptance form. The storage device 110 may include one or more storage components, each of which may be an independent device or part of another device. The storage device may be local or implemented through the cloud.
[0034] The processing device 120 can process data and / or information obtained from other devices or system components, and execute the method for generating a construction acceptance form shown in some embodiments of this specification based on these data, information and / or processing results to complete one or more functions described in some embodiments of this specification. For example, the processing device 120 can pre-generate a task feature atom library and an acceptance atom library. For another example, the processing device 120 can generate an acceptance form based on a task list, a task feature atom library, and an acceptance atom library. In some embodiments, the processing device 120 can obtain pre-stored data and / or information, such as a task list, a task feature atom library, and an acceptance atom library, from the storage device 110 for executing the method for generating a construction acceptance form shown in some embodiments of this specification.
[0035] In some embodiments, the processing device 120 may include one or more sub-processing devices (e.g., a single-core processing device or a multi-core multi-core processing device). As an example only, the processing device 120 may include a central processing unit (CPU), a graphics processing unit (GPU), a reduced instruction set computer (RISC), a microprocessor, etc., or any combination thereof.
[0036] The terminal 130 can interact with the user. The user (e.g., a construction acceptance personnel, etc.) can issue an operation instruction to the processing device 120 through the terminal 130 so that the processing device 120 completes the specified operation, such as generating an acceptance form, etc. In some embodiments, the terminal 130 can receive the generated acceptance form from the processing device 120, and the user can edit and modify it. In some embodiments, the terminal 130 can be one of the mobile device 130-1, tablet computer 130-2, laptop computer 130-3, desktop computer, and other devices with input and / or output functions, or any combination thereof.
[0037] The network 140 can connect the components of the system and / or connect the system with external resources. The network 140 enables communication between the components and with other parts outside the system to facilitate the exchange of data and / or information. In some embodiments, one or more components in the system 100 (e.g., storage device 110, processing device 120, terminal 130) can send data and / or information to other components via the network 140. In some embodiments, the network 140 can be any one or more of a wired network or a wireless network.
[0038] It should be noted that the above description is provided for illustrative purposes only and is not intended to limit the scope of this specification. For those of ordinary skill in the art, various changes and modifications may be made under the guidance of the contents of this specification. The features, structures, methods and other features of the exemplary embodiments described in this specification may be combined in various ways to obtain additional and / or alternative exemplary embodiments. For example, the processing device 120 may be based on a cloud computing platform, such as a public cloud, a private cloud, a community and a hybrid cloud. However, these changes and modifications will not deviate from the scope of this specification.
[0039] Figure 2 Schematic diagram of a system for generating a construction acceptance form according to some embodiments of this specification. Figure 2 As shown, the system 200 for generating a construction acceptance form includes a first acquisition module 210, a first determination module 220, a second determination module 230, a second acquisition module 240 and a first generation module 250. In some embodiments, each module of the system 200 for generating a construction acceptance form can be implemented by the processing device 120.
[0040] In some embodiments, the first acquisition module 210 may be used to acquire a task list, wherein the task list includes at least one task item. For more descriptions on acquiring a task list, please refer to the descriptions elsewhere in this specification, for example, Figure 3 Step S310.
[0041] In some embodiments, the first determination module 220 may be used to determine the target task feature atom corresponding to each task item in the at least one task item based on the task list. For more descriptions on determining the target task feature atom corresponding to each task item in the at least one task item based on the task list, please refer to the description elsewhere in this specification, for example Figure 3 Step S320.
[0042] In some embodiments, the second determination module 230 can be used to determine the target acceptance atom for each task item based on the first association relationship between the target task feature atom and the task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library. The target acceptance atom includes the target acceptance item atom, the target construction process atom, and the target acceptance standard atom. For more descriptions on determining the target acceptance atom for each task item based on the first association relationship between the target task feature atom and the task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library, please refer to the description elsewhere in this specification, for example, Figure 3 Step S330.
[0043] In some embodiments, the second acquisition module 240 may be used to acquire the acceptance atom library and the second association relationship within the acceptance atom library. For more descriptions on acquiring the acceptance atom library and the second association relationship, please refer to the description elsewhere in this specification, for example, Figure 3 Step S340: Figure 5 .
[0044] In some embodiments, the second acquisition module 240 may also be used to acquire a task feature atom library, and a first association relationship between a task feature atom in the task feature atom library and an acceptance atom in the acceptance atom library. For more descriptions on acquiring the task feature atom library and the first association relationship, please refer to the description elsewhere in this specification, for example, Figure 3 Step S330: Figure 4 .
[0045] In some embodiments, the first generation module 250 can be used to match the target construction process atom and the target acceptance standard atom based on the target acceptance item atom and the second association relationship to generate a target acceptance form. For more descriptions on matching the target construction process atom and the target acceptance standard atom to generate a target acceptance form based on the target acceptance item atom and the second association relationship, please refer to the description elsewhere in this specification, for example, Figure 3 Step S350.
[0046] In some embodiments, the construction acceptance form generation system 200 may further include a third acquisition module 260 and a second generation module 270. The third acquisition module 260 may be used to obtain an acceptance result based on the target acceptance form. For more descriptions on obtaining an acceptance result based on the target acceptance form, please refer to the description elsewhere in this specification, for example, Figure 3 Step S360. The second generation module 270 can be used to automatically generate an acceptance conclusion and a rectification sheet based on the acceptance result. For more descriptions on automatically generating an acceptance conclusion and a rectification sheet based on the acceptance result, please refer to the description elsewhere in this specification, for example, Figure 3 Step S370.
[0047] Figure 3 FIG. 1 is an exemplary flow chart of a method for generating a construction acceptance form according to some embodiments of this specification. Figure 3 As shown, the process 300 includes the following steps. In some embodiments, the process 300 may be executed by the processing device 120 .
[0048] Step S310 , obtaining a task list. In some embodiments, step S310 may be executed by the first obtaining module 210 .
[0049] A task list refers to a list of engineering construction tasks, such as a building construction task list, a road construction task list, etc. A task list may include at least one task item. A task item is a specific construction task in a task list. For example, for a residential community construction task list, a task item may be a construction task for one of the buildings. For another example, for a subway construction task list, a task item may be a construction task for one of the sections. The processing device 120 may obtain the task list in various ways, such as obtaining it from a storage device (e.g., storage device 110), manually inputting it, etc.
[0050] Step S320 , based on the task list, determining the target task feature atom corresponding to each task item in the at least one task item. In some embodiments, step S320 may be performed by the first determining module 220 .
[0051] The task feature atom is a task feature decomposed into atomic information, and the task feature is information that can represent the task. The target task feature atom is the task feature atom corresponding to the task feature of the task item in the task list. In some embodiments, the task feature atom may be included in a task feature atom library, wherein the task feature atom is in one-to-one correspondence with the task feature atom code, that is, the task feature atom code of each task feature atom is unique. The processing device 120 may search the task feature atom corresponding to the task feature in the query task item in the task feature atom library and use it as the target task feature atom.
[0052] In some embodiments, a task list may include multiple task feature points. Task feature points refer to the type of task features. In some embodiments, task feature points may include at least one of engineering categories, construction task items, construction locations, construction costs, and construction materials. In some embodiments, task feature points may include multiple subcategories, and subcategories may continue to be split in multiple rounds until the final level, that is, a specific level that cannot be further divided. Task feature points and their subcategories can be encoded and saved in a task feature atomic library. By classifying task feature points, task features can be refined, which facilitates the organization of task feature information, making subsequent task feature atomic libraries more organized and the organizational logic clearer.
[0053] In some embodiments, the task feature point may further include at least one of a construction area and a construction stage, etc. These feature types may provide more dimensions and perspectives for project management.
[0054] like Figure 6 The task feature atomic library 600 shown includes four task feature points: project category, construction task item, construction phase and construction area, which correspond to the project category code 610, construction task item code 620, construction phase code 630 and construction area code 640 respectively. These task feature points can be further subdivided to the atomic level, namely, task feature atoms. Figure 6 The engineering category coarse atom code n, construction task item coarse atom code n, construction stage coarse atom code n, and construction area coarse atom code n all correspond to the task feature atoms obtained by further subdividing the task feature points. These task feature atoms can be further subdivided. Taking the engineering category coarse atom code n as an example, the engineering category minimum atom code 001, the engineering category minimum atom code 002, …, the engineering category minimum atom code n (n>=2) are the task feature atom codes obtained by further subdividing them.
[0055] In some embodiments, a task item may correspond to one or more task feature atoms. In some embodiments, determining the task feature atom may include: determining at least one of the following: determining the engineering category atom based on the engineering category, determining the task item atom (also referred to as the construction task item atom) based on the construction task item, determining the construction site atom based on the construction site, determining the construction cost atom based on the construction cost, determining the construction material atom based on the construction material, determining the construction area atom based on the construction area, and determining the construction stage atom based on the construction stage. The engineering category atom, the task item atom, the construction site atom, the construction cost atom, the construction material atom, the construction area atom, and the construction stage atom are all task feature atoms corresponding to specific task feature points.
[0056] As an example, the engineering category may include subcategories such as housing construction engineering, power engineering, highway engineering, municipal utilities engineering, and electromechanical installation engineering. These subcategories can be further subdivided until they are divided into the final engineering category. For example, housing construction engineering can be subdivided into civil buildings, industrial buildings and structures, etc.; and civil buildings can be further subdivided into hospitals, office buildings, and teaching buildings, etc. Figure 6As shown, the engineering category code 610 of the task feature atom library 600 can be further divided into engineering category coarse atom code n, and the engineering category coarse atom code n is further subdivided into multiple final-level task feature atom codes: engineering category minimum atom code 001, engineering category minimum atom code 002, ..., engineering category minimum atom code n. If the project category is a housing construction project, the project category code 610 can be "FWJZ"; if the project category coarse atomic code n represents a civil building and the civil building code is "MYJZ", the project category coarse atomic code n can be "FWJZ-MYJZ"; if the project category minimum atomic code 001, the project category minimum atomic code 002, ..., the project category minimum atomic code n represent hospitals, office buildings and teaching buildings, etc., respectively, assuming n=3, the codes of hospitals, office buildings and teaching buildings are "YY", "BGL" and "JXL" respectively, then the project category minimum atomic code 001, the project category minimum atomic code 002, the project category minimum atomic code can be "FWJZ-MYJZ-YY", "FWJZ-MYJZ-BGL" and "FWJZ-MYJZ-JXL" respectively.
[0057] As an example only, a construction task item may include sub-categories such as sub-projects, sub-projects, construction processes, and procedures. The processing device 120 may gradually subdivide a construction task item into the lowest level tasks according to these sub-categories. In some embodiments, similar to the engineering category, for the sub-categories of the construction task item, corresponding task feature atomic codes may be formulated for them to facilitate management and tracking. For example, in a construction task item, if the sub-project code is "FBGC" and the masonry wall task code under it is "QZQT", then Figure 6 One of the construction task item minimum atomic code 001, the construction task item minimum atomic code 002, ..., the construction task item minimum atomic code n can be "FBGC-QZQT". In some embodiments, the processing device 120 can obtain the target task feature atoms corresponding to these tasks by querying the task feature atom library based on the tasks included in the construction task item.
[0058] As an example only, the construction site may include the basement, main structure, master plan, foundation, etc.; the main structure may be further divided into 1st floor, 2nd floor, etc.; 1st floor may be divided into room level, such as bedroom, bathroom, etc.; room level may be further divided into component level, such as wall, beam, plate, column, etc. For example, in the construction site, the basement may be coded as "DSX", the main structure as "ZTJG", the first floor as "F01", and the column as "Z", then one of the task atoms under the construction site in the task feature atom library may be coded as "DSX- ZTJG-F01-Z".
[0059] As an example only, the construction phase may include a foundation engineering phase and a main engineering phase, the foundation engineering phase may be coded as "JCGC", and the main engineering phase may be coded as "ZTGC". The construction area may include countries, provinces, and cities, etc. The construction area may be coded according to different geographical characteristics, such as tropical areas, desert areas, and water areas.
[0060] In some embodiments, the processing device 120 or the second acquisition module 240 can obtain the task feature atom library based on the disassembly and division of the historical task list content. For more information about the task feature atom library and how to generate the task feature atom library, please refer to Figure 4 The description will not be repeated here.
[0061] Step S330, based on the first association relationship between the target task feature atom and the task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library, determine the target acceptance atom for each task item. The target acceptance atom may include a target acceptance item atom, a target construction process atom, and a target acceptance standard atom. In some embodiments, step S330 may be performed by the second determination module 230.
[0062] The acceptance form refers to a list of task acceptance in engineering construction, such as a building construction acceptance form, a road construction acceptance form, etc. In some embodiments, the acceptance form may include at least one acceptance item, and the acceptance item is a specific acceptance task in the acceptance form. For example, for a residential construction acceptance form, an acceptance item may be an acceptance task for one of the buildings. For another example, for a subway construction acceptance form, an acceptance item may be an acceptance task for one of the bidding sections.
[0063] The acceptance atom is an acceptance rule decomposed into atomic information. In some embodiments, the acceptance atom may be included in an acceptance atom library, wherein the acceptance atom is in one-to-one correspondence with the acceptance atom code, that is, the acceptance atom code of each acceptance atom is unique.
[0064] In some embodiments, the acceptance form may include multiple acceptance feature points. Acceptance feature points refer to the type of acceptance rules. In some embodiments, acceptance feature points may include at least one of acceptance items, construction processes (also referred to as acceptance processes), acceptance standards, and safety measures. In some embodiments, similar to task feature points, acceptance feature points may include multiple subcategories, and subcategories may be further split in multiple rounds until the final level. Acceptance feature points and their subcategories may be encoded and stored in the acceptance atomic library.
[0065] like Figure 7The acceptance atomic library 700 shown includes three acceptance feature points: acceptance items, acceptance standards and construction processes, which correspond to acceptance item codes 710, acceptance standard codes 720 and construction process codes 730 respectively. These acceptance feature points can be further subdivided into atomic levels, namely, acceptance atoms. Acceptance atoms can correspond to the types of acceptance feature points, namely, acceptance atoms can include acceptance item atoms, construction process atoms and acceptance standard atoms. Figure 7 The acceptance item coarse atom code n, acceptance standard coarse atom code n, and construction process coarse atom code n in the table all correspond to the acceptance atoms obtained by further subdividing the acceptance feature points. These acceptance atoms can be further subdivided. Taking the acceptance item coarse atom code n as an example, the acceptance item minimum atom code 001, the acceptance item minimum atom code 002, ..., and the acceptance item minimum atom code n (n>=2) are the acceptance atom codes obtained by further subdividing them. The encoding method in the acceptance atom library can be similar to the encoding method in the task feature atom library, which will not be repeated here.
[0066] It can be understood that specific task features correspond to specific acceptance rules. For example, the construction of concrete columns needs to be associated with the acceptance criteria for columns in the concrete construction specifications. In some embodiments, there is an association relationship between the task feature atoms in the task feature atom library and the acceptance atoms in the acceptance atom library, which is referred to as the first association relationship, and the target acceptance atom is the acceptance atom corresponding to the target task feature atom, which can include target acceptance item atoms, target construction process atoms, and target acceptance standard atoms.
[0067] In some embodiments, the processing device 120 or the second acquisition module 240 can establish the first association relationship in the following manner: match the task feature atoms in the task feature atom library and the acceptance atoms in the acceptance atom library through a preset model and a pattern matching algorithm to establish the first association relationship. Among them, the preset model may include various models such as a natural language processing (NLP) model, and this specification does not limit this. By using a machine learning model and a pattern matching algorithm to establish an association relationship between the task feature atoms in the task feature atom library and the acceptance atoms in the acceptance atom library, the correspondence between the task features and the acceptance rules can be established quickly and efficiently with high accuracy, which can well meet the requirements for subsequent generation of acceptance forms.
[0068] In some embodiments, the task feature atoms in the task feature atom library and the acceptance atoms in the acceptance atom library are in a tree structure. Figure 8As shown, the task feature atom library A, the task feature atom library B and the acceptance atom library C are all tree structures, wherein the task feature atoms in the task feature atom library A include A1.1, A1.2, A1.1.1, A1.2.1 and A1.2.2, the task feature atoms in the task feature atom library B include B1.1, B1.2, B1.1.1, B1.2.1 and B1.2.2, and the acceptance atoms in the acceptance atom library C include C1.1, C1.2, C1.1.1, C1.2.1 and C1.2.2.
[0069] In some embodiments, the process of matching task feature atoms in the task feature atom library and acceptance atoms in the acceptance atom library is to match query atoms with atoms to be queried, wherein both query atoms and atoms to be queried can be task feature atoms or acceptance atoms. Specifically, when the atom to be queried is a task feature atom, the query atom is the acceptance atom; when the atom to be queried is an acceptance atom, the query atom is the task feature atom. In the matching process, for any query atom, in response to matching the parent node of the tree structure of the atom to be queried, the processing device 120 can associate all atoms to be queried under the parent node with the query atom, thereby establishing a first association relationship. For example, Figure 8 As shown, the atom to be queried can be the task feature atoms in the task feature atom library A and the task feature atom library B, and the query atom can be the acceptance atom in the acceptance atom library C. Assuming that the atom to be queried is A1.2, which matches C1.1, then A1.2 is associated with C1.1. Since A1.2 is the parent node of A1.2.1 and A1.2.2, the processing device 120 can associate both A1.2.1 and A1.2.2 with C1.1. Similarly, A1.2 can also be associated with C1.1.1 and C1.1.2, and A1.2.1 and A1.2.2 can also be associated with C1.1.1 and C1.1.2.
[0070] In some embodiments of the present specification, task feature atoms and acceptance atoms are set to a tree structure to make the structure clear and easy to search and match; in the matching process, all child nodes of the query atom and the matched atom to be queried are associated, avoiding meaningless continued matching of child nodes, reducing the matching workload, improving the matching efficiency, and speeding up the process of establishing the relationship between task feature atoms and acceptance atoms.
[0071] In some embodiments, the processing device 120 can associate task features according to acceptance rules, and the association relationship is established on the child node, that is, between the acceptance atom and the task feature atom. For example, for concrete construction acceptance specifications, if matching is based on construction locations, it can be applied to concrete columns, concrete walls, and concrete beams, etc.; if matching is based on construction areas, the acceptance specifications of area M match area M.
[0072] In some embodiments, the processing device 120 may establish the first association relationship in the following manner: obtain a historical task list and a historical acceptance list corresponding to the historical task list, and determine the first association relationship based on the acceptance relationship between the historical task list and the historical acceptance list. It can be understood that the historical acceptance list is obtained based on the historical task list, so there is a definite acceptance relationship between the task feature and the acceptance rule therein, and the first association relationship can be obtained based on the relationship.
[0073] In some embodiments, the processing device 120 may also establish the first association relationship in other ways, such as manually establishing the first association relationship by a user.
[0074] In the database, one table may correspond to another table, or multiple tables may correspond to one or more tables. In some embodiments, one or more acceptance atomic libraries may correspond to one or more task feature atomic libraries. For example, for a task feature in a task feature atomic library such as "pillar", it can uniquely correspond to an acceptance criterion in an acceptance atomic library. For another example, for two task features such as "pillar" and "plastering", they may exist in one task feature atomic library or two different task feature atomic libraries, which correspond to different acceptance criteria respectively. Specifically, the verticality of the pillar needs to be controlled within 4mm, and the flatness of the plastering also needs to be within 4mm. These two acceptance criteria can exist in one acceptance atomic library or in two different acceptance atomic libraries. When "pillar" and "plastering" are superimposed, their acceptance criteria are two commonly associated acceptance criteria.
[0075] In some embodiments, for each task item, the processing device 120 can obtain multiple acceptance atom sets. Specifically, for each task feature point in each task item, the processing device 120 can determine the target task feature atom of the task feature point based on the task item. As mentioned above, one task feature point corresponds to one or more target task feature atoms; the target task feature atom of the task feature point is matched to an acceptance atom set, that is, each target task feature atom obtained is matched to one or more acceptance atoms, and the acceptance atoms matched to all target task feature atoms form the acceptance atom set. In some embodiments, after processing all the task feature points in the task item in the above manner, multiple acceptance atom sets are obtained.
[0076] In some embodiments, after obtaining multiple acceptance atom sets corresponding to all task feature points in the task item, the processing device 120 can extract the acceptance atoms that exist in each of the multiple acceptance atom sets as the target acceptance atom of the task item, that is, take the intersection of these acceptance atom sets, and take the acceptance atoms included in the intersection as the target acceptance atom of the task item. By first obtaining multiple acceptance atom sets corresponding to the task item, it is possible to avoid missing necessary task features; by taking the intersection of multiple acceptance atom sets to obtain the target acceptance atom corresponding to the task item, the obtained target acceptance atom can be made more accurate, thereby ensuring the accuracy and quality of the determined acceptance rules.
[0077] by Fig. 9Take an example to illustrate, assuming that it is necessary to determine the target acceptance atom of a task item X in the minimum atomic construction task order 910, and determine the target task feature atom (the task feature atom in the dotted box) corresponding to each task feature point in the task feature atom library 920, that is, the engineering category minimum atom code 001 in the engineering category code 921, the construction area minimum atom code 002 in the construction area code 922, the construction stage minimum atom code 002 in the construction stage code 923, and the task item minimum atom code 002 in the construction task item code 924. Match the acceptance atoms in the acceptance atom library 930 with the obtained target task feature atoms. Assuming that the acceptance atoms matched by the engineering category minimum atom code 001 include: the acceptance standard minimum atom code 001 and the acceptance standard minimum atom code 012 in the acceptance standard code 931, the construction process minimum atom code 001, the construction process minimum atom code 005, the construction process minimum atom code 007, the construction process minimum atom code 021, the construction process minimum atom code 042 in the construction process code 932, and the safety measures minimum atom code 001, the safety measures minimum atom code 002, the safety measures minimum atom code 021, the safety measures minimum atom code 005 and the safety measures minimum atom code 031 in the safety measures code 933, then these acceptance atoms can constitute the acceptance atom set corresponding to the task feature point of the engineering category. Similarly, the acceptance atom set corresponding to the task feature point of the construction area in the minimum atomic construction task order 910, the acceptance atom set corresponding to the task feature point of the construction phase, and the acceptance atom set corresponding to the task feature point of the construction task item (i.e., task item) can be obtained. The acceptance atoms contained in any of these sets may be different from those in other acceptance atom sets. For example, the acceptance atom set corresponding to the task feature point of the construction area may not include the acceptance standard minimum atom code 001; the acceptance atom set corresponding to the task feature point of the construction phase may include the construction process minimum atom code 002, but not the construction process minimum atom code 001. Taking the intersection of these acceptance atom sets, the resulting intersection (acceptance atoms in the dotted box) includes: acceptance standard minimum atom code 012, construction process minimum atom code 005, construction process minimum atom code 007, construction process minimum atom code 021, construction process minimum atom code 042, safety measure minimum atom code 002, safety measure minimum atom code 021, safety measure minimum atom code 005 and safety measure minimum atom code 031. The target acceptance atom of task item X in the minimum atomic construction task order 910 is the acceptance atom in the intersection.
[0078] Step S340 , obtaining a second association relationship between acceptance atoms in the acceptance atom library. In some embodiments, step S340 may be performed by the second obtaining module 240 .
[0079] In some embodiments, there is an association relationship between different types of acceptance atoms within the acceptance atom library, which is referred to as a second association relationship. It is understandable that there is an association relationship between acceptance feature points such as acceptance items, construction processes, acceptance standards, and safety measures. Therefore, the same association relationship also exists between their corresponding acceptance atoms. In some embodiments, the second association relationship can be obtained in the process of building the acceptance atom library. For more information on how to build the acceptance atom library and obtain the second association relationship, please refer to Figure 5 The relevant description will not be repeated here.
[0080] In some embodiments, the processing device 120 may obtain the second association relationship in other ways, such as by acquiring it from a storage device (eg, the storage device 110 ).
[0081] In some embodiments, at least one of the task feature atom library, the acceptance atom library, the first association relationship, and the second association relationship may be pre-constructed and generated, and after being generated, may be stored in a storage device (e.g., storage device 110). For example, the task feature atom library, the acceptance atom library, the first association relationship, and the second association relationship may be pre-constructed, generated, and stored before step S310 or step S330. For another example, the task feature atom library, the acceptance atom library, and the first association relationship may be constructed, generated, and stored before step S330, and the second association relationship may be generated and stored before step S340.
[0082] Step S350 , based on the target acceptance item atom and the second association relationship, matching the target construction process atom and the target acceptance standard atom to generate a target acceptance form. In some embodiments, step S350 may be performed by the first generation module 250 .
[0083] In some embodiments, the processing device 120 can obtain the target acceptance item atom from the target acceptance atom determined in step S330, and generate an initial acceptance form based on the target acceptance item atom. Specifically, the processing device 120 can determine the target construction process atom, target acceptance standard atom, target safety measure atom, etc. that match the target acceptance item atom based on the target acceptance item atom and the second association relationship, and write the information corresponding to these target acceptance atoms into the preset acceptance form framework, thereby obtaining an initial acceptance form. The preset acceptance form framework may include the layout and format of elements such as headers, chapters, paragraphs, charts, weather, acceptance conclusions, and acceptance opinions. For example, Fig. 9As shown, after determining the target acceptance atoms including the acceptance standard minimum atomic code 012, the construction process minimum atomic code 005, the construction process minimum atomic code 007, the construction process minimum atomic code 021, the construction process minimum atomic code 042, the safety measure minimum atomic code 002, the safety measure minimum atomic code 021, the safety measure minimum atomic code 005 and the safety measure minimum atomic code 031, the processing device 120 can write the information corresponding to these codes into the preset acceptance form framework, thereby obtaining the acceptance form 940 as the initial acceptance form, which corresponds to the minimum atomic construction task order 910.
[0084] In some embodiments, the preset acceptance form framework may include items such as task information, process methods, and acceptance criteria, which may correspond to target task feature atoms and target acceptance atoms, and the target task feature atoms and target acceptance atoms correspond to their respective codes. For example, task information may correspond to target task feature atoms and their codes, process methods may correspond to target construction process atoms and their codes, and acceptance criteria may correspond to target acceptance criteria atoms and their codes. The processing device 120 may identify the target task feature atom code and the target acceptance atom code, and write the corresponding information into the corresponding items of the preset acceptance form framework. For example, for the template project of the 1st floor of the 1st unit of Building 1 of a project in Y City, X Province on February 6, 2024, the weather is fine, the processing device 120 may obtain relevant information such as Article 6.3 of the "Certain Template Construction Process", Article 5.2.4 of the "Certain Template Safety Measures", and Article 5.3.7 of the "Certain Template Acceptance Criteria" according to the target task feature atom code and the target acceptance atom code corresponding to the task, and assemble the corresponding acceptance content according to this information.
[0085] In some embodiments, the processing device 120 can also obtain basic information such as the acceptance project name, acceptor and acceptance date in the task order, and fill this basic information back into the preset acceptance order framework to form a complete initial acceptance order.
[0086] In some embodiments, the processing device 120 may directly use the initial acceptance form as the target acceptance form.
[0087] In some embodiments, the user can edit the initial acceptance form, and the processing device 120 can generate a target acceptance form based on the user's input information on the initial acceptance form, wherein the input information can be a modification log, etc., including information edited by the user, such as information modified by the user such as insertion, deletion, etc. By first generating the initial acceptance form and then determining the target acceptance form based on the user's input information, the user can modify the items in the acceptance form that do not meet his requirements, meet the user's diverse requirements, and improve the adaptability and flexibility of the acceptance form.
[0088] In some embodiments, the acceptance items (which may be referred to as target acceptance items) included in the acceptance form may correspond to acceptance item atoms. Therefore, it can be considered that the acceptance items in the acceptance form are equivalent to acceptance item atoms. Similarly, the acceptance items included in the initial acceptance form may be equivalent to target acceptance item atoms. In some embodiments, the user may delete some acceptance items in the initial acceptance form, and it can be considered that the input information includes target acceptance item atoms corresponding to the acceptance items deleted by the user. The processing device 120 may generate a target acceptance form based on the target acceptance item atoms remaining after the deletion in the initial acceptance form and the second association relationship. Specifically, the processing device 120 may determine the target construction process atoms, target acceptance standard atoms, and target safety measures atoms that match these target acceptance item atoms based on the remaining target acceptance item atoms and the second association relationship, rewrite the information corresponding to these target acceptance atoms into the preset acceptance form framework, or modify the information in the initial acceptance form according to the information corresponding to these target acceptance atoms, thereby obtaining the target acceptance form. The target acceptance form is generated based on the remaining acceptance items after the user deletes, thereby clearing the acceptance items that the user does not need in the acceptance form, so that the acceptance form can better meet the user's requirements.
[0089] In some embodiments, the user can add acceptance items to the initial acceptance form, and the input information can be considered to include the new acceptance item atoms corresponding to these new acceptance items. The processing device 120 can match the target construction process atoms and the target acceptance standard atoms based on these new acceptance item atoms and the second association relationship.
[0090] In some embodiments, the processing device 120 can determine the target construction process atoms, target acceptance standard atoms, target safety measures atoms, etc. that match these newly added acceptance item atoms based on the newly added acceptance item atoms and the second association relationship. If the match is successful, the information corresponding to the target acceptance atom in the matching result is rewritten into the preset acceptance form framework, or the information in the initial acceptance form is modified according to the information corresponding to the target acceptance atom in the matching result, so as to obtain the target acceptance form. If the match fails, it means that the target construction process atoms, target acceptance standard atoms, target safety measures atoms, etc. that match these newly added acceptance item atoms are not found, then the processing device 120 outputs a prompt message to the user. For example, "No acceptance criteria matching the newly added acceptance items are found, and the acceptance form will not be modified." The target acceptance form is generated based on the acceptance items added by the user, so that the items required by the user are supplemented in the acceptance form, so that the acceptance form can better meet the user's requirements.
[0091] In some embodiments, the user can modify specific acceptance items in the initial acceptance form. For example, the floor thickness of a certain acceptance standard is modified from the original value of [10, -10] to the modified value of [8, -8]. The processing device 120 can regenerate the acceptance form based on the modified information and the preset acceptance form framework, or update the corresponding item information in the initial acceptance form to the modified information, thereby obtaining the target acceptance form.
[0092] In some embodiments of the present specification, atomic-level acceptance information is combined based on the task feature information in the task order and the association between atoms in the task feature atom library and the acceptance atom library to obtain an acceptance form. This improves the flexibility of preparing the acceptance form, reduces the requirements for the preparers, improves the accuracy and efficiency of the acceptance, and ensures and improves the quality of acceptance.
[0093] In some embodiments, after step S350, the processing device 120 may further execute steps S360 and S370 to accept the engineering project based on the target acceptance form.
[0094] Step S360 , obtaining the acceptance result based on the target acceptance form. In some embodiments, step S360 may be performed by the third obtaining module 260 .
[0095] In some embodiments, the user may accept the project according to the target acceptance form, and the processing device 120 may obtain the acceptance result from the user. The acceptance result may include the acceptance result of each acceptance item in the target acceptance form.
[0096] Step S370 , automatically generating an acceptance conclusion and a rectification form based on the acceptance result. In some embodiments, step S370 may be performed by the second generation module 270 .
[0097] In some embodiments, the processing device 120 can automatically generate an acceptance conclusion based on the acceptance results, and fill the acceptance conclusion into the target acceptance form, thereby obtaining a final complete acceptance form. As an example only, after the user has completed the acceptance of each acceptance item, he can fill in the acceptance data (for example, measured quantity data, concrete rebound data, etc.) in the electronic target acceptance form. The processing device 120 can automatically identify these acceptance data in real time or after all acceptances are completed, and generate acceptance points according to the corresponding acceptance standards, acceptance items and acceptance rules in the target acceptance form, and automatically generate acceptance conclusions according to the acceptance points and fill them into the acceptance conclusion of the target acceptance form. For example, the actual measured data of the thickness of the floor slab of a building on the first floor of a certain project in a certain city is 5 points, and the actual measured data (acceptance data) is: [5, 7, 9, -5, 7]. The actual measured thickness of 4 points is qualified, and 1 point is unqualified. The actual measured score is 80 points, and the acceptance conclusion is that the quality acceptance of the floor slab thickness is qualified.
[0098] In some embodiments, the processing device 120 may generate a rectification sheet based on the complete acceptance sheet, wherein the rectification sheet may include rectification items, reasons for non-conformity, and rectification opinions.
[0099] In some embodiments, the processing device 120 may perform version control management on the acceptance forms at each stage to track and compare the changes of different versions. For example, the initial acceptance form may be version v1.0, the target acceptance form may be version v2.0, and the complete acceptance form may be version v3.0.
[0100] In some embodiments of the present specification, by obtaining acceptance results based on the acceptance form, and automatically generating acceptance conclusions and rectification forms according to the acceptance results, the automation level of the entire acceptance process is improved, the time consumed in acceptance is reduced, the interference of human factors in the acceptance process is reduced, the accuracy of acceptance is improved, and the efficiency and quality of acceptance are improved.
[0101] Figure 4 FIG. 1 is an exemplary flow chart of a method for generating a task feature atom library as shown in some embodiments of this specification. Figure 4 As shown, the process 400 may include the following steps. In some embodiments, before step S310 or step S330, the processing device 120 or the second acquisition module 240 may generate a task feature atom library by executing the method shown in the process 400.
[0102] Step S410, obtaining historical task orders.
[0103] In some embodiments, the processing device 120 may obtain the historical task list in various ways, such as obtaining from a storage device (eg, the storage device 110 ).
[0104] Step S420, obtaining task feature points based on the historical task list.
[0105] In some embodiments, the processing device 120 may obtain the task feature points in the historical task list by traversing the information in the historical task list according to the type of the task feature points, for example, the project category, construction task item, construction location, and construction stage.
[0106] In some embodiments, when traversing the information of the historical task list, the processing device 120 may match it with the above-mentioned task feature point types, and the matching may be performed by a pattern matching algorithm or a machine learning model, etc. For example, when the historical task list only involves construction task items and construction locations, matching may be performed based only on the two task feature points of construction task items and construction locations to ensure the accuracy and consistency of the information.
[0107] In some embodiments, after obtaining the matching result, the processing device 120 can obtain the characteristic information of the task list according to the matching result. For example, there are 3 construction task items, namely R1, R2 and R3, and there are 2 construction sites, namely W1 and W2. Figure 6 By traversing the historical task list, four task feature points, namely, project category, construction task item, construction stage and construction area, are obtained, which correspond to the project category code 610, the construction task item code 620, the construction stage code 630 and the construction area code 640 respectively.
[0108] Step S430: determining task feature atoms based on the task feature points.
[0109] In some embodiments, the processing device 120 can disassemble the acquired task feature points, and the disassembly can be performed by pattern matching algorithms or machine learning models. The task feature points are disassembled into finer levels, and the disassembly can be repeated for multiple rounds. The level of the task features obtained in each round is finer than the task features in the previous round, and the task features obtained in each round can be used as task feature atoms. For example, the engineering category can be disassembled into subcategories such as housing construction engineering, power engineering, highway engineering, municipal public engineering, and electromechanical installation engineering. Housing construction engineering can be further disassembled into civil buildings, industrial buildings and structures, etc. Civil buildings can also be further disassembled into hospitals, office buildings, teaching buildings, etc.
[0110] In some embodiments, the processing device 120 may obtain the task feature atoms by other means. For example, the task feature atoms may be deduced layer by layer based on prior knowledge. Prior knowledge may include various existing knowledge related to construction acceptance. For example, relevant knowledge such as the classification of task features, an existing task feature atom library, etc. As an example only, the processing device 120 may disassemble the task list based on prior knowledge such as the classification of task features, wherein the prior knowledge such as the classification of task features may exist in advance or be derived from an existing task feature atom library.
[0111] In some embodiments, the processing device 120 may encode each task feature atom. The encoding rules may include provisions on the length, character set, and encoding structure of the encoding to ensure the uniqueness and readability of the encoding. For example, the engineering category may be encoded as "FWJZ" civil building, the civil building may be encoded as "FWJZ -MYJZ", and the hospital may be encoded as "FWJZ -MYJZ -YY".
[0112] Figure 6In the figure, the task feature points such as project category, construction task item, construction stage and construction area have undergone two rounds of decomposition. Taking the project category as an example, the project category code 610 is decomposed into the project category coarse atom code n, and then the project category coarse atom code n is further decomposed to obtain the project category minimum atom code 001, the project category minimum atom code 002, ..., the project category minimum atom code n, which is the final level of task feature atom.
[0113] For more information about how to decompose task feature points and encode task feature atoms, please refer to the relevant description of step S320, which will not be repeated here.
[0114] Step S440, obtaining a task feature atom library based on the task feature atoms.
[0115] In some embodiments, the processing device 120 may organize all the task feature atoms obtained in step S430 into a tree structure according to their levels, thereby obtaining a task feature atom library. Figure 6 The task feature atom library 600 shown, Figure 8 The task feature atomic library A and the task feature atomic library B in Fig. 9 The task feature atom library 920 in .
[0116] In some embodiments, the task feature atoms in the task feature atom library may exist in the form of task feature atom codes, and the codes of each task feature atom may be stored separately, and the codes may be superimposed to form a task feature atom library. Figure 6 The task feature atom library 600 shown, Fig. 9 The task feature atom library 920 in .
[0117] In some embodiments of the present specification, by parsing historical task order information layer by layer, refined task feature information is obtained, and the task feature information is atomized and organized into a task feature atomic library, so that the task feature information is structured and organized, and can be easily processed by a computer, thereby facilitating the subsequent generation of acceptance forms based on the task feature atomic library, improving the efficiency of generating acceptance forms, reducing the requirements for compilers, and improving acceptance efficiency.
[0118] Figure 5 FIG. 1 is an exemplary flow chart of a method for generating an acceptance atom library as shown in some embodiments of this specification. Figure 5 As shown, the process 500 may include the following steps. In some embodiments, before step S310 or step S330, the processing device 120 or the second acquisition module 240 may generate an acceptance atom library by executing the method shown in the process 500.
[0119] Step S510, obtaining acceptance reference materials.
[0120] Acceptance reference materials refer to materials related to acceptance rules, such as acceptance standards, construction technology, safety measures and other related (national and enterprise standards) documents, historical acceptance forms, etc.
[0121] In some embodiments, the processing device 120 may obtain the acceptance reference data in various ways, such as obtaining from a storage device (eg, the storage device 110 ).
[0122] Step S520, obtaining acceptance item atoms based on the acceptance reference data.
[0123] In some embodiments, the processing device 120 can disassemble the content of the acceptance reference material by means of a pattern matching algorithm or a machine learning model, disassemble it into acceptance feature points such as acceptance items, construction technology, and acceptance standards, and obtain the corresponding acceptance atoms, namely, acceptance item atoms, construction technology atoms, and acceptance standard atoms. For example, the content of the historical acceptance form can be disassembled to disassemble the main content into acceptance items, construction technology, and acceptance standards. For another example, the national standard for construction technology can be disassembled to obtain multiple acceptance items and corresponding construction technologies.
[0124] In some embodiments, the processing device 120 may obtain corresponding construction specifications, construction drawings, construction manuals and other materials based on the acquired acceptance feature points, and classify these materials according to the types of the acceptance feature points.
[0125] Step S530, determining the construction process atom corresponding to each acceptance item atom, and the acceptance standard atom corresponding to each construction process atom.
[0126] It can be understood that each acceptance item corresponds to a specific construction process, and each construction process corresponds to a specific acceptance standard. In some embodiments, the processing device 120 can further disassemble the classified acceptance feature point related data obtained in step S520 to obtain the relationship between different types of acceptance feature points. For example, the relationship between the acceptance item and the construction process, the relationship between the construction process and the acceptance standard, etc.
[0127] In some embodiments, the processing device 120 may determine the construction process atom corresponding to each acceptance item atom and the acceptance standard atom corresponding to each construction process atom based on the relationship between different types of acceptance feature points.
[0128] In some embodiments, the processing device 120 may encode acceptance atoms such as acceptance item atoms, construction process atoms, and acceptance standard atoms, wherein the encoding rules may be similar to the encoding rules of task feature atoms.
[0129] Step S540, obtaining an acceptance atom library and a second association relationship based on the acceptance item atom, the construction process atom and the acceptance standard atom.
[0130] In some embodiments, the processing device 120 may organize the acceptance item atoms, construction process atoms, and acceptance standard atoms into a tree structure according to their levels, thereby obtaining an acceptance atom library. Figure 7 The acceptance atom library 700 shown, Figure 8 Accepted atomic library C in Fig. 9 In some embodiments, while constructing the acceptance atom library, the processing device 120 may determine the relationship between the acceptance item atom, the construction process atom, and the acceptance standard atom determined in step S530 as a second association relationship.
[0131] In some embodiments, the processing device 120 can obtain a second association relationship based on the constructed acceptance atom library. Specifically, the processing device 120 can determine the acceptance items, construction processes, acceptance standards, etc. corresponding to the acceptance item atoms, construction process atoms, and acceptance standard atoms in the acceptance atom library, and then match the acceptance items, construction processes, acceptance standards, etc. to obtain a second association relationship based on the matching results.
[0132] In some embodiments of the present specification, by parsing the acceptance reference information layer by layer, detailed acceptance information is obtained, and the acceptance information is atomized and organized into an acceptance atomic library, so that the acceptance information is structured and organized, and can be easily processed by a computer, thereby facilitating the subsequent generation of acceptance forms based on the acceptance atomic library, improving the efficiency of accepting form generation, reducing the requirements for compilers, and improving acceptance efficiency.
[0133] It should be noted that the above description of processes 300, 400 and 500 is only for example and explanation, and does not limit the scope of application of this specification. For those skilled in the art, various modifications and changes can be made to processes 300, 400 and 500 under the guidance of this specification. However, these modifications and changes are still within the scope of this specification. For example, processes 400 and 500 can be performed simultaneously or successively.
[0134] The beneficial effects that may be brought about by the embodiments of this specification include but are not limited to: (1) By splitting the task feature information and acceptance information of the construction project into atomic-level information and encoding them into a task feature atomic library and an acceptance atomic library respectively, the atomic-level acceptance information is combined based on the target task feature information in the task list and the relationship between atoms in the two atomic libraries to obtain an acceptance list. The atomic-level acceptance information has high accuracy and can be accurately matched with the actual acceptance requirements after combination. In addition, the logic and hierarchy of the relationship between atomic-level information are clear. Matching is performed through the relationship between atoms, with fast matching speed and high accuracy, thereby improving the accuracy and efficiency of acceptance and ensuring and improving the quality of acceptance; (2) The acceptance list is automatically generated by a computer, which can record and track the transmission process and results of the acceptance information, facilitate subsequent query and analysis, improve the traceability of the acceptance process, and reduce the requirements for the acceptance list compiler; (3) By flexibly assembling the acceptance list based on feature coding, the flexibility of acceptance list compilation is improved, the impact of human factors on acceptance is reduced, and the consistency and accuracy of acceptance information are guaranteed. It should be noted that different embodiments may produce different beneficial effects. In different embodiments, the beneficial effects that may be produced may be any one or a combination of the above, or any other beneficial effects that may be obtained.
[0135] The basic concepts have been described above. Obviously, for those skilled in the art, the above detailed disclosure is only for example and does not constitute a limitation of this specification. Although not explicitly stated here, those skilled in the art may make various modifications, improvements and corrections to this specification. Such modifications, improvements and corrections are suggested in this specification, so such modifications, improvements and corrections still belong to the spirit and scope of the exemplary embodiments of this specification.
[0136] At the same time, this specification uses specific words to describe the embodiments of this specification. For example, "one embodiment", "an embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of this specification. Therefore, it should be emphasized and noted that "one embodiment" or "an embodiment" or "an alternative embodiment" mentioned twice or more in different positions in this specification does not necessarily refer to the same embodiment. In addition, certain features, structures or characteristics in one or more embodiments of this specification can be appropriately combined.
[0137] In addition, unless explicitly stated in the claims, the order of the processing elements and sequences described in this specification, the use of alphanumeric characters, or the use of other names are not intended to limit the order of the processes and methods of this specification. Although the above disclosure discusses some invention embodiments that are currently considered useful through various examples, it should be understood that such details are only for illustrative purposes, and the attached claims are not limited to the disclosed embodiments. On the contrary, the claims are intended to cover all modifications and equivalent combinations that are consistent with the essence and scope of the embodiments of this specification. For example, although the system components described above can be implemented by hardware devices, they can also be implemented only by software solutions, such as installing the described system on an existing server or mobile device.
[0138] Similarly, it should be noted that in order to simplify the description disclosed in this specification and thus help understand one or more embodiments of the invention, in the above description of the embodiments of this specification, multiple features are sometimes combined into one embodiment, figure or description thereof. However, this disclosure method does not mean that the features required by the subject matter of this specification are more than the features mentioned in the claims. In fact, the features of the embodiments are less than all the features of the single embodiment disclosed above.
[0139] In some embodiments, numbers describing the number of components and attributes are used. It should be understood that such numbers used in the description of the embodiments are modified by the modifiers "about", "approximately" or "substantially" in some examples. Unless otherwise specified, "about", "approximately" or "substantially" indicate that the numbers are allowed to vary by ±20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximate values, which may change according to the required features of individual embodiments. In some embodiments, the numerical parameters should take into account the specified significant digits and adopt the general method of retaining the digits. Although the numerical domains and parameters used to confirm the breadth of the range in some embodiments of this specification are approximate values, in specific embodiments, the setting of such numerical values is as accurate as possible within the feasible range.
[0140] Each patent, patent application, patent application publication, and other materials, such as articles, books, specifications, publications, documents, etc., cited in this specification is hereby incorporated by reference in its entirety. Except for application history documents that are inconsistent with or conflicting with the contents of this specification, documents that limit the broadest scope of the claims of this specification (currently or later attached to this specification) are also excluded. It should be noted that if the descriptions, definitions, and / or use of terms in the materials attached to this specification are inconsistent or conflicting with the contents described in this specification, the descriptions, definitions, and / or use of terms in this specification shall prevail.
[0141] Finally, it should be understood that the embodiments described in this specification are only used to illustrate the principles of the embodiments of this specification. Other variations may also fall within the scope of this specification. Therefore, as an example and not a limitation, alternative configurations of the embodiments of this specification may be considered consistent with the teachings of this specification. Accordingly, the embodiments of this specification are not limited to the embodiments explicitly introduced and described in this specification.
Claims
1. A method for generating a construction acceptance form, comprising: Acquire a task list, wherein the task list includes at least one task item; Based on the task list, determining a target task feature atom corresponding to each task item in the at least one task item, wherein the target task feature atom is a task feature atom corresponding to the task feature of the task item, and the task feature atom includes an engineering category atom, a task item atom, a construction location atom, a construction cost atom, a construction material atom, a construction area atom, and a construction phase atom; The task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library are matched by a preset model to establish a first association relationship, wherein the task feature atom library is constructed in the following manner: Get historical task orders; Obtaining task feature points based on the historical task list; Determining the task feature atom based on the task feature point; Obtaining the task feature atom library based on the task feature atom; Based on the target task feature atom and the first association relationship, determine the target acceptance atom of each task item, wherein the target acceptance atom includes a target acceptance item atom, a target construction process atom and a target acceptance standard atom; The second association relationship between the acceptance atoms in the acceptance atom library is obtained, wherein the acceptance atoms include acceptance item atoms, construction process atoms, and acceptance standard atoms, and the second association relationship is the relationship between the acceptance item atoms, the construction process atoms, and the acceptance standard atoms. The acceptance atom library and the second association relationship are obtained in the following manner: Obtain acceptance references; Obtaining acceptance item atoms based on the acceptance reference material; Determine the construction process atom corresponding to each of the acceptance item atoms, and the acceptance standard atom corresponding to each of the construction process atoms; Obtaining the acceptance atom library and the second association relationship based on the acceptance item atom, the construction process atom and the acceptance standard atom; Based on the target acceptance item atom and the second association relationship, the target construction process atom and the target acceptance standard atom are matched to generate a target acceptance form.
2. The method according to claim 1, wherein the task feature points include: At least one of project category, construction task item, construction location, construction cost and construction material.
3. The method according to claim 1, wherein the task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library are in a tree structure, and the matching process is to match the atom to be queried with the query atom, and when the atom to be queried is the task feature atom, the query atom is the acceptance atom, or when the atom to be queried is the acceptance atom, the query atom is the task feature atom, and the first association relationship is established in the following manner: During the matching process, for any query atom, in response to matching the parent node of the tree structure of the atom to be queried, all the atoms to be queried under the parent node are associated with the query atom.
4. The method according to claim 1, wherein determining the target acceptance atom of each task item based on the first association relationship between the target task feature atom and the task feature atom in the task feature atom library and the acceptance atom in the acceptance atom library comprises: For each of the task items, multiple acceptance atomic sets are obtained, including: For each task feature point in each task item, Determine the target task feature atom of the task feature point based on the task item; Matching the target task feature atom of the task feature point to an acceptance atom set; The acceptance atom simultaneously existing in each of the plurality of acceptance atom sets is extracted as the target acceptance atom of the task item.
5. The method according to claim 1, wherein the step of matching the target construction process atom and the target acceptance standard atom based on the target acceptance item atom and the second association relationship to generate a target acceptance form comprises: Generate an initial acceptance list based on the target acceptance item atoms; The target acceptance form is generated based on the user's input information on the initial acceptance form.
6. The method according to claim 5, wherein the input information includes deleting some of the target acceptance item atoms, and the step of generating the target acceptance form based on the user's input information on the initial acceptance form includes: The target acceptance list is generated based on the target acceptance item atoms remaining after the deletion and the second association relationship.
7. The method according to claim 5, wherein the input information includes a newly added acceptance item atom, and the step of generating the target acceptance form based on the user's input information on the initial acceptance form comprises: Matching the target construction process atom and the target acceptance standard atom based on the newly added acceptance item atom and the second association relationship; In response to a successful match, generating the target acceptance form based on the matching result; In response to a matching failure, a prompt message is output.
8. The method of claim 1, further comprising: Acquire the acceptance result based on the target acceptance form; An acceptance conclusion and a rectification sheet are automatically generated based on the acceptance results.
9. A system for generating a construction acceptance form, comprising a first acquisition module, a first determination module, a second determination module, a second acquisition module and a first generation module; The first acquisition module is used to acquire a task list, wherein the task list includes at least one task item; The first determination module is used to determine, based on the task list, a target task feature atom corresponding to each task item in the at least one task item, wherein the target task feature atom is a task feature atom corresponding to the task feature of the task item, and the task feature atom includes an engineering category atom, a task item atom, a construction location atom, a construction cost atom, a construction material atom, a construction area atom, and a construction phase atom; The second acquisition module is used to match the task feature atoms in the task feature atom library with the acceptance atoms in the acceptance atom library through a preset model to establish a first association relationship. The task feature atom library is constructed in the following manner: Get historical task orders; Obtaining task feature points based on the historical task list; Determining the task feature atom based on the task feature point; Obtaining the task feature atom library based on the task feature atom; The second acquisition module is further used to acquire a second association relationship within the acceptance atom library, wherein the acceptance atom includes an acceptance item atom, a construction process atom, and an acceptance standard atom, and the second association relationship is a relationship between the acceptance item atom, the construction process atom, and the acceptance standard atom. The acceptance atom library and the second association relationship are acquired in the following manner: Obtain acceptance references; Obtaining acceptance item atoms based on the acceptance reference material; Determine the construction process atom corresponding to each of the acceptance item atoms, and the acceptance standard atom corresponding to each of the construction process atoms; Obtaining the acceptance atom library and the second association relationship based on the acceptance item atom, the construction process atom and the acceptance standard atom; The second determination module is used to determine the target acceptance atom of each task item based on the target task feature atom and the first association relationship, wherein the target acceptance atom includes a target acceptance item atom, a target construction process atom and a target acceptance standard atom; The first generation module is used to match the target construction process atom and the target acceptance standard atom to generate a target acceptance form based on the target acceptance item atom and the second association relationship.
10. A computer-readable storage medium, wherein the storage medium stores computer instructions. When a computer reads the computer instructions in the storage medium, the computer executes the method according to any one of claims 1 to 8.