An apparatus for preparing SMA and FRP composite materials

By designing a preparation device for SMA and FRP composite materials, the problems of complex construction of prestressed FRP sheet reinforcement technology and easy peeling of FRP materials were solved. The device achieved uniform pre-strain application and standardized adhesive layer thickness of SMA/FRP composite materials, thereby improving the seismic resistance and construction efficiency of bridge piers.

CN118454978BActive Publication Date: 2026-11-17GUILIN UNIVERSITY OF TECHNOLOGY
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410375488.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2026-11-17
Estimated Expiration
2044-03-29

AI Technical Summary

Technical Problem

In existing technologies, the construction process of prestressed FRP sheet reinforcement technology is complicated, ordinary FRP materials are easy to peel off, making it difficult to effectively improve the seismic resistance of bridge piers, and existing devices cannot effectively prepare SMA/FRP composite materials.

Method used

A preparation device for SMA and FRP composite materials was designed, including a fixing mechanism, a displacement mechanism, a clamp-type anchor mechanism, an adhesive layer application mechanism, a platform mechanism, and a tensioning and testing mechanism. Through the cooperation of these mechanisms, the effective bonding of SMA filaments and FRP sheets and the introduction of prestress are achieved.

Benefits of technology

Uniform pre-strain application of SMA/FRP composite materials and preparation of different types of composite materials were achieved. Sample data were accumulated, adhesive layer thickness was standardized, and the seismic resistance and construction efficiency of bridge piers were improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118454978B_ABST
    Figure CN118454978B_ABST
Patent Text Reader

Abstract

This invention relates to a preparation apparatus for SMA and FRP composite materials, belonging to the field of civil engineering composite material preparation technology. It includes: a fixing mechanism, a displacement mechanism, multiple clamp-type anchor mechanisms, multiple adhesive layer mechanisms, a pedestal mechanism, a tension testing mechanism, multiple SMA filaments, and multiple FRP sheets. The displacement mechanism is movably mounted on the pedestal mechanism and connected to the tension testing mechanism, positioned between the fixing and tension testing mechanisms. The clamp-type anchor mechanisms are positioned between the fixing and displacement mechanisms and detachably connected to the pedestal mechanism. The FRP sheets are connected to the clamp-type anchor mechanisms. The adhesive layer mechanisms are positioned between two adjacent FRP sheets. The SMA filaments pass through the adhesive layer mechanisms and the clamp-type anchor mechanisms, with each end correspondingly connected to the fixing and displacement mechanisms. This invention facilitates the combination of different types of FRP materials with SMA materials and the preparation of different types of self-prestressed SMA / FRP composite materials.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of civil engineering composite material preparation technology, and in particular to an apparatus for preparing SMA and FRP composite materials. Background Technology

[0002] Bridges are a crucial component of infrastructure and are considered the most critical link in road networks. For bridges built in earthquake-prone areas, the piers are vital load-bearing structures. Extensive investigations into earthquake-damaged structures have shown that piers are prone to failure under seismic loads. These failures are primarily due to poor design and construction practices, resulting in insufficient flexural ductility and shear strength, rendering them unable to withstand seismic loads. Severe pier damage can render the entire bridge unusable, as dilapidated piers pose a significant risk of collapse under earthquake conditions. Considering increasing traffic pressure, economic costs, and energy conservation and emission reduction considerations, complete demolition and reconstruction of existing dilapidated pier structures is not feasible. After an earthquake, appropriate reinforcement and renovation of damaged piers is generally more economical and effective than replacement.

[0003] FRP (Fiber Reinforced Polymer) materials possess advantages such as lightweight, high strength, ease of construction, and good durability, making them widely used in structural repair and reinforcement projects. However, applying ordinary FRP materials externally results in low utilization rates and a tendency for delamination failure during structural reinforcement, failing to effectively improve the normal performance of the reinforced components. Therefore, some researchers have proposed prestressed FRP sheet reinforcement technology. However, this technology requires specially designed mechanical tensioning and anchoring devices to introduce prestress into the FRP sheet, and the construction process is cumbersome. To overcome these shortcomings, some researchers have combined shape memory alloy (SMA) filaments with FRP sheets to form SMA / FRP composite materials. Utilizing the shape memory effect of SMA, heating it generates restoring stress, introducing prestress into the FRP sheet, thus preparing SMA / FRP self-prestressed materials. To promote the application of this novel composite material, SMA / FRP, a specially designed preparation device is needed. Summary of the Invention

[0004] The technical problem to be solved by the present invention is to provide an apparatus for preparing SMA and FRP composite materials, so as to solve the above-mentioned problem.

[0005] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: A preparation device for SMA and FRP composite materials, comprising: a fixing mechanism, a displacement mechanism, multiple clamp-type anchor mechanisms, multiple adhesive layer mechanisms, a pedestal mechanism, a tension testing mechanism, multiple SMA filaments, and multiple FRP sheets; the fixing mechanism and the tension testing mechanism are respectively disposed at both ends of the pedestal mechanism; the displacement mechanism is movably disposed on the pedestal mechanism and connected to the tension testing mechanism; the displacement mechanism is disposed between the fixing mechanism and the tension testing mechanism; the clamp-type anchor mechanism is disposed between the fixing mechanism and the displacement mechanism and is detachably connected to the pedestal mechanism; the FRP sheet is connected to the clamp-type anchor mechanism; the adhesive layer mechanism is disposed between two adjacent FRP sheets; the SMA filaments pass through the adhesive layer mechanism and the clamp-type anchor mechanism, and both ends are respectively connected to the fixing mechanism and the displacement mechanism.

[0006] The beneficial effects of this invention are as follows: the fixing mechanism, combined with the displacement mechanism and the tensioning detection mechanism, facilitates the uniform application of pre-strain to the SMA filaments; the pedestal mechanism, combined with multiple clamp-type anchor mechanisms and the adhesive layer mechanism, facilitates the preparation of different types of new SMA / FRP composite materials, and can accumulate rich sample data; the adhesive layer mechanism facilitates the standardized preparation of new SMA / FRP composite materials with different aspect ratios and adhesive layer thicknesses, which is conducive to further promoting the combination of different types of FRP materials with SMA materials and the preparation of different types of self-prestressed SMA / FRP composite materials, and facilitates the standardized production of new SMA / FRP composite materials, thus better promoting the application of SMA / FRP composite materials in civil engineering reinforcement and repair.

[0007] Based on the above technical solution, the present invention can be further improved as follows.

[0008] Furthermore, the pedestal mechanism includes: a base plate, multiple support columns, multiple bolt sliding holes, two steel pipes, four limiting pads, and multiple limiting anchors. The multiple support columns are disposed at the bottom end of the base plate. The four limiting pads are disposed one-to-one at the top of the base plate in the form of rectangular vertices. The two steel pipes are arranged in parallel, with both ends disposed within the limiting pads. The multiple limiting anchors are respectively disposed at the top of the four limiting pads and abut against the steel pipes. The multiple bolt sliding holes are arranged in two rows between the two steel pipes, and the bolt sliding holes are strip-shaped through holes.

[0009] The beneficial effects of adopting the above-mentioned further solutions are: the bolt sliding holes facilitate the formation of a detachable connection between the wedge-type anchor mechanism and the base plate, which is convenient for the preparation of different types of SMA / FRP composite materials; the limiting pads and limiting anchors are beneficial for limiting the two steel pipes, so that the displacement mechanism can move along the steel pipes, avoid displacement deviation, and improve the accuracy of the tension testing mechanism in data detection.

[0010] Furthermore, the fixing mechanism includes: a fixed end pad, a fixed end anchor, a plurality of fixed end first anchors, a plurality of fixed end second anchors, and a plurality of fixed end third anchors. The fixed end anchor is disposed at the top of the fixed end pad, the plurality of fixed end first anchors are respectively disposed at both ends of the top of the fixed end anchor, the fixed end first anchors penetrate the fixed end anchor and are threadedly connected to the fixed end pad, the plurality of fixed end second anchors are respectively disposed at both ends of the top of the fixed end pad, and the plurality of fixed end third anchors are disposed at the top of the fixed end anchor.

[0011] The beneficial effects of adopting the above-mentioned further scheme are: the first anchor bolt at the fixed end is conducive to fixing the anchor at the fixed end to the top of the fixed end pad; the second anchor bolt at the fixed end is conducive to further fixing the steel pipe; and the third anchor bolt at the fixed end is conducive to fixing the end of the SMA wire close to the fixing mechanism.

[0012] Furthermore, each of the two sidewalls of the fixed end pad is provided with a fixed end steel pipe through hole, the fixed end steel pipe through hole is a through hole, and two steel pipes pass through the two fixed end steel pipe through holes one by one, and the fixed end second anchor bolt abuts against the steel pipe; the sidewall of the fixed end anchor is provided with a plurality of fixed end SMA wire through holes, the fixed end SMA wire through holes is a through hole, the plurality of SMA wires pass through the plurality of fixed end SMA wire through holes one by one, and the plurality of fixed end third anchor bolts abut against the plurality of SMA wires one by one.

[0013] The beneficial effects of adopting the above-mentioned further scheme are: the perforation of the fixed end steel pipe facilitates the passage of the steel pipe and, together with the second anchor bolt at the fixed end, fixes the steel pipe; the perforation of the fixed end SMA wire facilitates the passage of the SMA wire and, together with the third anchor bolt at the fixed end, fixes the SMA wire.

[0014] Furthermore, the displacement mechanism includes: a displacement end pad, a displacement end anchor, a plurality of first displacement end anchors, and a plurality of second displacement end anchors. The displacement end anchor is disposed at the top of the displacement end pad, and the plurality of first displacement end anchors are respectively disposed at the top two ends of the displacement end anchor. The first displacement end anchors penetrate the displacement end anchor and are threadedly connected to the displacement end pad. The plurality of second displacement end anchors are disposed at the top of the displacement end anchor. The tensioning detection mechanism is connected to the displacement end pad.

[0015] The beneficial effects of adopting the above-mentioned further scheme are: the first anchor bolt at the displacement end is conducive to fixing the displacement end anchor to the top of the displacement end pad, and the second anchor bolt at the displacement end is conducive to fixing the end of the SMA wire close to the displacement mechanism.

[0016] Furthermore, each of the two sidewalls of the displacement end pad is provided with a displacement end steel pipe through hole, and the displacement end steel pipe through hole is a through hole, with two steel pipes passing through the two displacement end steel pipe through holes in a one-to-one correspondence; the sidewall of the displacement end anchor is provided with a plurality of displacement end SMA wire through holes, the displacement end SMA wire through holes is a through hole, and a plurality of SMA wires pass through the plurality of displacement end SMA wire through holes in a one-to-one correspondence, and a plurality of displacement end second anchors abut against the plurality of SMA wires in a one-to-one correspondence.

[0017] The beneficial effects of adopting the above-mentioned further scheme are: the perforation of the steel pipe at the displacement end facilitates the passage of the steel pipe; the perforation of the SMA wire at the displacement end facilitates the passage of the SMA wire, and, together with the second anchor bolt at the displacement end, fixes the SMA wire.

[0018] Furthermore, the tensioning detection mechanism includes: a tensioning anchor rod, a handwheel, a pressure sensor pad, a pressure sensor, a pressure display, a displacement gauge, and a data acquisition instrument. The tensioning anchor rod passes sequentially through the handwheel, the pressure sensor, and the pressure sensor pad, and is fixedly connected to the side wall of the displacement end pad. The pressure sensor pad is fixedly installed on the top of the base plate. Both ends of the pressure sensor abut against the pressure sensor pad and the handwheel respectively. The pressure display is connected to the pressure sensor. The displacement gauge is fixedly installed on the top of the base plate and abuts against the side wall of the displacement end pad. The displacement gauge is connected to the data acquisition instrument.

[0019] The beneficial effects of adopting the above-mentioned further scheme are as follows: the handwheel is threadedly connected to the tensioning anchor rod, which facilitates the rotation of the handwheel and the tensioning anchor rod. Under the resistance of the pressure sensor pad, the tensioning anchor rod and the displacement end pad fixedly connected to the tensioning anchor rod are displaced along the steel pipe towards the pressure sensor pad. During this displacement process, the pressure display and pressure sensor are conducive to detecting and displaying the pressure value applied to the pressure sensor pad by the handwheel, and the displacement gauge and data acquisition instrument are conducive to detecting the displacement of the displacement end pad, thereby obtaining the relationship curve between the tensile force and the displacement of the stretched SMA wire.

[0020] Furthermore, the clamp-type anchor mechanism includes two clamp-type anchors and two anchor bolts. The two clamp-type anchors are stacked one on top of the other, and the two anchor bolts pass through the two ends of the clamp-type anchors in a corresponding manner. The anchor bolts pass through the bolt sliding holes and are detachably connected to the base plate. Both ends of the FRP sheet are wound around the clamp-type anchors, and the SMA wire passes through the gap between the two clamp-type anchors.

[0021] The beneficial effects of adopting the above-mentioned further scheme are: different numbers of clamp-type anchor mechanisms can be detachably connected on the base plate, and with different numbers of FRP sheets, it is beneficial to realize the preparation of different types of SMA / FRP composite materials.

[0022] Furthermore, the adhesive layer mechanism includes four magnetic strips and two threading silicone molds. The two threading silicone molds are arranged in parallel between two adjacent FRP sheets. The four magnetic strips are divided into two groups, and the two groups of magnetic strips and the two threading silicone molds form a rectangle. The two magnetic strips in each group are correspondingly arranged at the top and bottom of the FRP sheet. The threading silicone molds and magnetic strips on the four sides of the rectangle are at the same height, and the SMA filaments pass through the threading silicone molds.

[0023] The beneficial effects of adopting the above-mentioned further solution are: the magnetic strip combined with the threading silicone mold helps to create an area for applying adhesive to the SMA filament, thereby reasonably controlling the thickness of the adhesive layer and effectively avoiding the problem of too much adhesive overflow during the manufacturing process, which affects the quality of the finished product. This is conducive to the more standardized preparation of SMA / FRP composite materials with uniform adhesive layer thickness.

[0024] Furthermore, the side wall of the threading silicone mold is provided with a plurality of mold threading holes, which are through holes, and the plurality of SMA filaments pass through the plurality of mold threading holes one by one.

[0025] The beneficial effects of adopting the above-mentioned further solution are: the wire-passing hole of the mold is conducive to providing space for the SMA wire to pass through, and at the same time, it is convenient to apply glue to fix the SMA wire after applying prestress. Attached Figure Description

[0026] Figure 1 This is a schematic diagram of the overall structure provided in Embodiment 1 of the present invention;

[0027] Figure 2 This is a schematic diagram of the overall structure provided in Embodiment 2 of the present invention;

[0028] Figure 3 A schematic diagram of the fixing mechanism provided in an embodiment of the present invention;

[0029] Figure 4 This is a schematic diagram of the displacement mechanism and tension detection mechanism provided in an embodiment of the present invention;

[0030] Figure 5 This is a schematic diagram of the structure of the pedestal mechanism provided in an embodiment of the present invention;

[0031] Figure 6 This is a schematic diagram of the structure of the clamp-type anchor mechanism provided in an embodiment of the present invention;

[0032] Figure 7 This is a schematic diagram of the structure of the SMA filament passing through the adhesive layer provided in an embodiment of the present invention;

[0033] Figure 8 This is a schematic diagram of the structure of the silicone threading mold provided in an embodiment of the present invention.

[0034] The attached diagram lists the components represented by each number as follows:

[0035] 1. Fixing mechanism; 2. Displacement mechanism; 3. Clamp-type anchor mechanism; 4. Adhesive layer application mechanism; 5. Base mechanism; 6. Tensioning and testing mechanism; 7. SMA wire; 8. FRP sheet; 11. Fixed end pad; 12. Fixed end anchor; 13. First fixed end anchor bolt; 14. Second fixed end anchor bolt; 15. Third fixed end anchor bolt; 21. Displacement end pad; 22. Displacement end anchor; 23. First displacement end anchor bolt; 24. Second displacement end anchor bolt; 31. Clamp-type anchor; 32. Anchor bolt; 41. Magnetic 42. Strip; 51. Silicone die for threading; 52. Base plate; 53. Support column; 54. Bolt sliding hole; 55. Steel pipe; 56. Limiting pad; 67. Limiting anchor bolt; 68. Tensioning anchor rod; 69. Handwheel; 60. Pressure sensor pad; 61. Pressure sensor; 62. Pressure display; 63. Displacement gauge; 64. Data acquisition instrument; 15. Fixed end steel pipe through hole; 16. Fixed end SMA wire through hole; 27. Displacement end steel pipe through hole; 28. Displacement end SMA wire through hole; 49. Die threading hole. Detailed Implementation

[0036] The principles and features of the present invention are described below. The examples given are only for explaining the present invention and are not intended to limit the scope of the present invention.

[0037] like Figure 1 and Figure 2As shown, an apparatus for preparing SMA and FRP composite materials includes: a fixing mechanism 1, a displacement mechanism 2, multiple clamp-type anchor mechanisms 3, multiple adhesive layer mechanisms 4, a pedestal mechanism 5, a tension testing mechanism 6, multiple SMA filaments 7, and multiple FRP sheets 8. The fixing mechanism 1 and the tension testing mechanism 6 are respectively disposed at both ends of the pedestal mechanism 5. The displacement mechanism 2 is movably disposed on the pedestal mechanism 5 and connected to the tension testing mechanism 6. The displacement mechanism 2 is disposed between the fixing mechanism 1 and the tension testing mechanism 6. The clamp-type anchor mechanism 3 is disposed between the fixing mechanism 1 and the displacement mechanism 2 and is detachably connected to the pedestal mechanism 5. The FRP sheets 8 are connected to the clamp-type anchor mechanism 3. The adhesive layer mechanism 4 is disposed between two adjacent FRP sheets 8. The SMA filaments 7 pass through the adhesive layer mechanism 4 and the clamp-type anchor mechanism 3, and are respectively connected at both ends to the fixing mechanism 1 and the displacement mechanism 2.

[0038] It should be noted that the SMA filament 7 and FRP sheet 8 can be used to prepare various new SMA / FRP composite materials depending on the raw materials, such as NiTi-SMA / CFRP, Fe-SMA / GFRP, and NiTiNb-SMA / BFRP. The SMA filament 7 includes types such as iron-based shape memory alloy (Fe-SMA), nickel-titanium-based shape memory alloy (which can be divided into nickel-titanium shape memory alloy, NiTi-SMA, and nickel-titanium-niobium shape memory alloy, NiTiNb-SMA), and copper-based shape memory alloy (Cu-SMA). The FRP sheet 8 includes types such as CFRP (Carbon fiber reinforced polymer), GFRP (Glass fiber reinforced polymer), and BFRP (Basalt fiber reinforced polymer).

[0039] Furthermore, depending on the diameter and spacing of the SMA filaments 7, various new SMA / FRP composite materials with different SMA contents and different spacings can be prepared, such as a new SMA / FRP composite material with a diameter of 0.5 mm and a spacing of 1 mm, and a new SMA / FRP composite material with a diameter of 1 mm and a spacing of 2 mm.

[0040] The beneficial effects of this invention are as follows: the fixing mechanism, combined with the displacement mechanism and the tensioning detection mechanism, facilitates the uniform application of pre-strain to the SMA filaments; the pedestal mechanism, combined with multiple clamp-type anchor mechanisms and the adhesive layer mechanism, facilitates the preparation of different types of new SMA / FRP composite materials, and can accumulate rich sample data; the adhesive layer mechanism facilitates the standardized preparation of new SMA / FRP composite materials with different aspect ratios and adhesive layer thicknesses, which is conducive to further promoting the combination of different types of FRP materials with SMA materials and the preparation of different types of self-prestressed SMA / FRP composite materials, and facilitates the standardized production of new SMA / FRP composite materials, thus better promoting the application of SMA / FRP composite materials in civil engineering reinforcement and repair.

[0041] Preferred, such as Figure 5 As shown, the pedestal mechanism 5 includes: a base plate 51, multiple support columns 52, multiple bolt sliding holes 53, two steel pipes 54, four limiting pads 55, and multiple limiting anchors 56. The multiple support columns 52 are disposed at the bottom end of the base plate 51. The four limiting pads 55 are disposed one-to-one at the top of the base plate 51 in the form of rectangular vertices. The two steel pipes 54 are arranged in parallel, and both ends are disposed within the limiting pads 55. The multiple limiting anchors 56 are respectively disposed at the top of the four limiting pads 55 and abut against the steel pipes 54. The multiple bolt sliding holes 53 are arranged in two rows between the two steel pipes 54. The bolt sliding holes 53 are strip-shaped through holes.

[0042] It should be noted that, in a preferred embodiment of the present invention, the base plate 51 is a rectangular plate structure, and the four limiting pads 55 are respectively disposed at the top of the four vertices of the base plate 51, that is, the four limiting pads 55 form the four vertices of a rectangle at the top of the base plate 51.

[0043] The advantages of adopting the above-mentioned preferred scheme are: the bolt sliding hole facilitates the formation of a detachable connection between the clamp-type anchor mechanism and the base plate, which is convenient for the preparation of different types of SMA / FRP composite materials; the limiting pad and limiting anchor bolt are beneficial for limiting the two steel pipes, so that the displacement mechanism can move along the steel pipe, avoid displacement deviation, and improve the accuracy of the tension testing mechanism in data detection.

[0044] Preferred, such as Figures 1 to 3As shown, the fixing mechanism 1 includes: a fixing end pad 11, a fixing end anchor 12, a plurality of fixing end first anchors 13, a plurality of fixing end second anchors 14, and a plurality of fixing end third anchors 15. The fixing end anchor 12 is disposed at the top of the fixing end pad 11. The plurality of fixing end first anchors 13 are respectively disposed at both ends of the top of the fixing end anchor 12. The fixing end first anchors 13 penetrate the fixing end anchor 12 and are threadedly connected to the fixing end pad 11. The plurality of fixing end second anchors 14 are respectively disposed at both ends of the top of the fixing end pad 11. The plurality of fixing end third anchors 15 are disposed at the top of the fixing end anchor 12.

[0045] The advantages of adopting the above preferred scheme are: the first anchor bolt at the fixed end is conducive to fixing the anchor at the fixed end to the top of the fixed end pad; the second anchor bolt at the fixed end is conducive to further fixing the steel pipe; and the third anchor bolt at the fixed end is conducive to fixing the end of the SMA wire close to the fixing mechanism.

[0046] Preferred, such as Figures 1 to 3 As shown, fixed end pad 11 has fixed end steel pipe through holes 111 on both sides of its sidewalls. The fixed end steel pipe through holes 111 are through holes, and two steel pipes 54 pass through the two fixed end steel pipe through holes 111 in a one-to-one correspondence. The fixed end second anchor bolt 14 abuts against the steel pipe 54. The fixed end anchor 12 has multiple fixed end SMA wire through holes 121 on its sidewall. The fixed end SMA wire through holes 121 are through holes, and multiple SMA wires 7 pass through the multiple fixed end SMA wire through holes 121 in a one-to-one correspondence. Multiple fixed end third anchor bolts 15 abut against the multiple SMA wires 7 in a one-to-one correspondence.

[0047] It should be noted that, in a preferred embodiment of the present invention, the number of the fixed-end third anchor bolts 15 can be multiple times the number of the fixed-end SMA wire through holes 121, as long as the plurality of fixed-end third anchor bolts 15 can be evenly divided into the number of columns of the fixed-end SMA wire through holes 121, and the plurality of columns of fixed-end third anchor bolts 15 correspond one-to-one with the plurality of SMA wires 7, such as... Figures 1 to 3 As shown.

[0048] The advantages of adopting the above preferred scheme are: the perforation of the steel pipe at the fixed end facilitates the passage of the steel pipe and, together with the second anchor bolt at the fixed end, fixes the steel pipe; the perforation of the SMA wire at the fixed end facilitates the passage of the SMA wire and, together with the third anchor bolt at the fixed end, fixes the SMA wire.

[0049] Preferred, such as Figure 1 , Figure 2 and Figure 4As shown, the displacement mechanism 2 includes: a displacement end pad 21, a displacement end anchor 22, a plurality of displacement end first anchors 23 and a plurality of displacement end second anchors 24. The displacement end anchor 22 is disposed at the top of the displacement end pad 21. The plurality of displacement end first anchors 23 are respectively disposed at both ends of the top of the displacement end anchor 22. The displacement end first anchors 23 penetrate the displacement end anchor 22 and are threadedly connected to the displacement end pad 21. The plurality of displacement end second anchors 24 are disposed at the top of the displacement end anchor 22. The tension detection mechanism 6 is connected to the displacement end pad 21.

[0050] The advantages of adopting the above preferred scheme are: the first anchor bolt at the displacement end is conducive to fixing the displacement end anchor to the top of the displacement end pad, and the second anchor bolt at the displacement end is conducive to fixing the end of the SMA wire close to the displacement mechanism.

[0051] Preferred, such as Figure 1 , Figure 2 and Figure 4 As shown, displacement end pad 21 has displacement end steel pipe through holes 211 on both sides of its sidewalls. The displacement end steel pipe through holes 211 are through holes, and two steel pipes 54 pass through the two displacement end steel pipe through holes 211 one by one. The displacement end anchor 22 has multiple displacement end SMA wire through holes 221 on its sidewalls. The displacement end SMA wire through holes 221 are through holes, and multiple SMA wires 7 pass through the multiple displacement end SMA wire through holes 221 one by one. Multiple displacement end second anchors 24 abut against the multiple SMA wires 7 one by one.

[0052] It should be noted that, in a preferred embodiment of the present invention, the number of the second anchor bolts 24 at the displacement end can be multiple times the number of the SMA wire through holes 221 at the displacement end, as long as the plurality of second anchor bolts 24 at the displacement end can be evenly divided into columns equal to the number of SMA wire through holes 221 at the displacement end, and the plurality of columns of second anchor bolts 24 at the displacement end correspond one-to-one with the plurality of SMA wires 7, such as... Figure 1 , Figure 2 and Figure 4 As shown;

[0053] In the technical solution of the present invention, after the multiple SMA wires 7 pass through the multiple displacement end SMA wire through holes 221 one by one, they will pass through the multiple fixed end SMA wire through holes 121 one by one. The distance between the displacement end SMA wire through hole 221 and the base plate 51 is equal to the distance between the fixed end SMA wire through hole 121 and the base plate 51, so that the SMA wires 7 can be set horizontally.

[0054] The advantages of adopting the above preferred scheme are: the perforation of the steel pipe at the displacement end facilitates the passage of the steel pipe; the perforation of the SMA wire at the displacement end facilitates the passage of the SMA wire and, together with the second anchor bolt at the displacement end, fixes the SMA wire.

[0055] Preferred, such as Figure 1 , Figure 2 and Figure 4 As shown, the tensioning detection mechanism 6 includes: a tensioning anchor rod 61, a handwheel 62, a pressure sensor pad 63, a pressure sensor 64, a pressure display 65, a displacement gauge 66, and a data acquisition instrument 67. The tensioning anchor rod 61 passes sequentially through the handwheel 62, the pressure sensor 64, and the pressure sensor pad 63, and is fixedly connected to the side wall of the displacement end pad 21. The tensioning anchor rod 61 is threadedly connected to the handwheel 62. The pressure sensor pad 63 is fixedly installed on the top of the base plate 51. The two ends of the pressure sensor 64 abut against the pressure sensor pad 63 and the handwheel 62 respectively. The pressure display 65 is connected to the pressure sensor 64. The displacement gauge 66 is fixedly installed on the top of the base plate 51 and abuts against the side wall of the displacement end pad 21. The displacement gauge 66 is connected to the data acquisition instrument 67.

[0056] The advantages of adopting the above-mentioned preferred scheme are as follows: the handwheel is threadedly connected to the tension anchor rod, which facilitates the rotation of the handwheel and the tension anchor rod. Under the resistance of the pressure sensor pad, the tension anchor rod and the displacement end pad fixedly connected to the tension anchor rod are displaced along the steel pipe towards the pressure sensor pad. During this displacement process, the pressure display and pressure sensor are conducive to detecting and displaying the pressure value applied to the pressure sensor pad by the handwheel, and the displacement gauge and data acquisition instrument are conducive to detecting the displacement of the displacement end pad, thereby obtaining the relationship curve between the tensile force and the displacement of the stretched SMA wire.

[0057] Preferred, such as Figure 1 , Figure 2 and Figure 6 As shown, the clamp-type anchor mechanism 3 includes two clamp-type anchors 31 and two anchor bolts 32. The two clamp-type anchors 31 are stacked one on top of the other, and the two anchor bolts 32 pass through the two ends of the clamp-type anchors 31 respectively. The anchor bolts 32 pass through the bolt sliding holes 53 and are detachably connected to the base plate 51. Both ends of the FRP sheet 8 are wound around the clamp-type anchors 31, and the SMA wire 7 passes through the gap between the two clamp-type anchors 31.

[0058] It should be noted that in the technical solution of the present invention, the clamp-type anchor 31 is the prior art. There is a gap between the two clamp-type anchors 31 stacked on top of each other, so that the FRP sheet 8 can be wound around and the SMA wire 7 can pass through.

[0059] The advantages of adopting the above preferred scheme are: different numbers of clamp-type anchor mechanisms can be detachably connected on the base plate, and with different numbers of FRP sheets, it is beneficial to realize the preparation of different types of SMA / FRP composite materials.

[0060] Preferred, such as Figure 1 , Figure 2 and Figure 7 As shown, the adhesive layer mechanism 4 includes four magnetic strips 41 and two threading silicone molds 42. The two threading silicone molds 42 are arranged in parallel between two adjacent FRP sheets 8. The four magnetic strips 41 are divided into two groups. The two groups of magnetic strips 41 and the two threading silicone molds 42 form a rectangle. Two magnetic strips 41 in each group are arranged one-to-one at the top and bottom of the FRP sheet 8. The threading silicone molds 42 and magnetic strips 41 on the four sides of the rectangle are of the same height. The SMA filament 7 passes through the threading silicone molds 42.

[0061] It should be noted that: Figure 1 As shown, taking the preparation of Type I SMA / FRP composite material as an example, two FRP sheets 8 and two clamp-type anchor mechanisms 3 are required. The two ends of one of the FRP sheets 8 are wrapped around the lower clamp-type anchor 31 of the two clamp-type anchor mechanisms 3, and the two ends of the other FRP sheet 8 are wrapped around the upper clamp-type anchor 31 of the two clamp-type anchor mechanisms 3. Then the two FRP sheets 8 will form an upper and lower relationship, and the two FRP sheets 8 are in a taut state. The two magnetic strips 41 in each group are set at the top and bottom of the lower FRP sheet 8. The two magnetic strips 41 at the top of the lower FRP sheet 8 and the two threading silicone molds 42 form a rectangle, and the two magnetic strips 41 at the top of the lower FRP sheet 8 and the two threading silicone molds 42 are of the same height.

[0062] In a preferred embodiment of the present invention, the threading silicone mold 42 is attached to the top of the FRP sheet 8 below by a strong mesh double-sided adhesive.

[0063] The advantages of adopting the above-mentioned preferred solution are: the magnetic strip combined with the threading silicone mold helps to create an area for applying adhesive to the SMA filament, thereby reasonably controlling the thickness of the adhesive layer and effectively avoiding the problem of too much adhesive overflow during the manufacturing process, which affects the quality of the finished product. This is conducive to the more standardized preparation of SMA / FRP composite materials with uniform adhesive layer thickness.

[0064] Preferred, such as Figure 7 and Figure 8 As shown, the side wall of the threading silicone mold 42 is provided with a plurality of mold threading holes 421. The mold threading holes 421 are through holes, and the plurality of SMA filaments 7 pass through the plurality of mold threading holes 421 one by one.

[0065] The advantages of adopting the above preferred solution are: the wire-passing hole of the mold provides space for the SMA wire to pass through, and at the same time facilitates the subsequent application of glue to fix the SMA wire after the prestress is applied.

[0066] It should be noted that, in the technical solution of this invention, except for the thread-threading silicone mold 42, the magnetic strip 41, the first fixed-end anchor 13, the second fixed-end anchor 14, the third fixed-end anchor 15, the first displacement-end anchor 23, the second displacement-end anchor 24, the tension anchor 61, the anchor bolt 32, the support column 52, and the pressure sensor 64, all other components are made of high-strength aluminum alloy. The fixed-end anchor 12 and the displacement-end anchor 22 are of equal height, and all other steel plates are required to have a thickness of at least 20 mm. The tension anchor 61 and the anchor bolt 32 are both high-strength anchors of grade 12.9, with a shear stress resistance of 12.9 GPa.

[0067] The preparation process of the present invention will be described below through two examples:

[0068] Example 1: Preparation of Type I SMA / FRP composite material.

[0069] like Figure 1 As shown, the Type I SMA / FRP composite material requires two FRP sheets 8 and two clamp-type anchor mechanisms 3. The two ends of one of the FRP sheets 8 are wrapped around the lower clamp-type anchor 31 of the two clamp-type anchor mechanisms 3, and the two ends of the other FRP sheet 8 are wrapped around the upper clamp-type anchor 31 of the two clamp-type anchor mechanisms 3. Then the two clamp-type anchor mechanisms 3 are installed on the base plate 51, and the surface of the lower FRP sheet 8 is kept smooth and taut.

[0070] A glue application mechanism 4 is provided on the surface of the lower FRP sheet 8, and the two magnetic strips 41 and two threading silicone molds 42 at the top of the lower FRP sheet 8 are at the same height. Multiple SMA wires 7 are passed through the multiple mold threading holes 421 and the gap between the two clamp-type anchors 31 in a corresponding manner. The two ends of multiple SMA wires 7 are passed through the fixed end SMA wire through hole 121 and the displacement end SMA wire through hole 221 in a corresponding manner. Then, the SMA wires 7 are fixed and locked by the fixed end third anchor bolt 15 and the displacement end second anchor bolt 24.

[0071] Rotating the handwheel 62, under the resistance of the pressure sensor pad 63, moves the tensioning anchor 61 and the displacement end pad 21 fixedly connected to the tensioning anchor 61 along the steel pipe 54 toward the pressure sensor pad 63. During this process, the SMA wire 7 is prestressed, the displacement end pad 21 is displaced and pushes the displacement gauge 66. The degree of deformation of the SMA wire 7 is determined by observing the value of the data acquisition instrument 67 connected to the displacement gauge 66, thereby ensuring accuracy. During the tensioning process, the test force value is recorded by the pressure sensor 64 and the pressure display 65 to obtain the relationship between the tension load and the tension displacement of the SMA / FRP composite material, and to establish the curve relationship between the tensile strain of the SMA wire 7 and the load, which facilitates the subsequent preparation of SMA wires with the same prestress and the creation of corresponding statistical laws.

[0072] After tensioning, apply adhesive to the rectangular space formed on the lower FRP sheet 8, so that the adhesive completely covers the surface of the SMA filament 7 and is evenly applied to achieve the target control height (the target control height here is the height of the two magnetic strips 41 and the two threading silicone molds 42 at the top of the lower FRP sheet 8). Then attach the upper FRP sheet 8 to the evenly applied adhesive.

[0073] Let it stand for one to two days to ensure that the colloid is completely solidified. Cut the SMA filaments 7 on the fixed end and the displacement end with wire cutters, and remove the adhesive layer mechanism 4. Take off the prepared sample and let it cure naturally for 2 days before use.

[0074] Example 2: Preparation of Type II SMA / FRP composite material.

[0075] like Figure 2As shown, the preparation operation of Type II SMA / FRP composite material is roughly the same as that of Type I SMA / FRP composite material. The difference is that four FRP sheets 8, four clamp-type anchor mechanisms 3, and two adhesive layer mechanisms 4 are used. Two FRP sheets 8, one adhesive layer mechanism 4, and the two clamp-type anchor mechanisms 3 on the left form the connection relationship between the components of the above-mentioned Type I SMA / FRP composite material. Similarly, the other two FRP sheets 8, the other adhesive layer mechanism 4, and the two clamp-type anchor mechanisms 3 on the right form the connection relationship between the components of the above-mentioned Type I SMA / FRP composite material.

[0076] The SMA wire 7 passes through four clip-type anchor mechanisms 3 and two adhesive layer mechanisms 4, and the two ends of the SMA wire 7 are fixed and locked to the fixed end anchor 12 and the displacement end anchor 22 by the fixed end third anchor 15 and the displacement end second anchor 24. Among the four clip-type anchor mechanisms 3, the SMA wire 7 between the two adjacent clip-type anchor mechanisms 3 in the middle is not coated with adhesive, but is used as an SMA wire segment for heat activation.

[0077] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0078] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of that feature. In the description of this invention, "a plurality of" means at least two, such as two, three, etc., unless otherwise explicitly specified.

[0079] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0080] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0081] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0082] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.

Claims

1. An apparatus for preparing SMA and FRP composite materials, characterized in that, include: Fixing mechanism (1), displacement mechanism (2), multiple clamp-type anchor mechanism (3), multiple adhesive layer mechanism (4), pedestal mechanism (5), tensioning and testing mechanism (6), multiple SMA wires (7) and multiple FRP sheets (8); The fixing mechanism (1) and the tensioning detection mechanism (6) are respectively arranged at both ends of the pedestal mechanism (5). The displacement mechanism (2) is movably arranged on the pedestal mechanism (5) and connected to the tensioning detection mechanism (6). The displacement mechanism (2) is arranged between the fixing mechanism (1) and the tensioning detection mechanism (6). The clamp-type anchor mechanism (3) is arranged between the fixing mechanism (1) and the displacement mechanism (2) and is detachably connected to the pedestal mechanism (5). The FRP sheet (8) is connected to the clamp-type anchor mechanism (3). The adhesive layer mechanism (4) is arranged between two adjacent FRP sheets (8). The SMA wire (7) passes through the adhesive layer mechanism (4) and the clamp-type anchor mechanism (3), and its two ends are respectively connected to the fixing mechanism (1) and the displacement mechanism (2). The adhesive layer mechanism (4) includes four magnetic strips (41) and two threading silicone molds (42). The two threading silicone molds (42) are arranged in parallel between two adjacent FRP sheets (8). The four magnetic strips (41) are divided into two groups. The two groups of magnetic strips (41) and the two threading silicone molds (42) form a rectangle. The two magnetic strips (41) in each group are arranged one-to-one at the top and bottom of the FRP sheet (8). The threading silicone molds (42) and the magnetic strips (41) on the four sides of the rectangle are at the same height. The SMA filament (7) passes through the threading silicone molds (42).

2. The apparatus for preparing SMA and FRP composite materials according to claim 1, characterized in that, The pedestal mechanism (5) includes: a base plate (51), multiple support columns (52), multiple bolt sliding holes (53), two steel pipes (54), four limiting pads (55) and multiple limiting anchors (56). The multiple support columns (52) are located at the bottom of the base plate (51). The four limiting pads (55) are arranged one-to-one at the top of the base plate (51) in the form of rectangular vertices. The two steel pipes (54) are arranged in parallel, and both ends are located inside the limiting pads (55). The multiple limiting anchors (56) are respectively located at the top of the four limiting pads (55) and abut against the steel pipes (54). The multiple bolt sliding holes (53) are arranged in two rows between the two steel pipes (54). The bolt sliding holes (53) are strip-shaped through holes.

3. The apparatus for preparing SMA and FRP composite materials according to claim 2, characterized in that, The fixing mechanism (1) includes: a fixed end pad (11), a fixed end anchor (12), a plurality of fixed end first anchors (13), a plurality of fixed end second anchors (14) and a plurality of fixed end third anchors (15). The fixed end anchor (12) is disposed at the top of the fixed end pad (11). The plurality of fixed end first anchors (13) are respectively disposed at the top two ends of the fixed end anchor (12). The fixed end first anchors (13) penetrate the fixed end anchor (12) and are threadedly connected to the fixed end pad (11). The plurality of fixed end second anchors (14) are respectively disposed at the top two ends of the fixed end pad (11). The plurality of fixed end third anchors (15) are disposed at the top of the fixed end anchor (12).

4. The apparatus for preparing SMA and FRP composite materials according to claim 3, characterized in that, Fixed end pad (11) has fixed end steel pipe through holes (111) on both sides of the fixed end pad (11). The fixed end steel pipe through holes (111) are through holes. The two steel pipes (54) pass through the two fixed end steel pipe through holes (111) one by one. The fixed end second anchor bolt (14) abuts against the steel pipe (54). The fixed end anchor (12) has multiple fixed end SMA wire through holes (121) on its side wall. The fixed end SMA wire through holes (121) are through holes. Multiple SMA wires (7) pass through the multiple fixed end SMA wire through holes (121) one by one. Multiple fixed end third anchors (15) abut against the multiple SMA wires (7) one by one.

5. The apparatus for preparing SMA and FRP composite materials according to claim 2, characterized in that, The displacement mechanism (2) includes: a displacement end pad (21), a displacement end anchor (22), a plurality of displacement end first anchors (23) and a plurality of displacement end second anchors (24). The displacement end anchor (22) is disposed at the top of the displacement end pad (21). The plurality of displacement end first anchors (23) are respectively disposed at the top two ends of the displacement end anchor (22). The displacement end first anchors (23) penetrate the displacement end anchor (22) and are threadedly connected to the displacement end pad (21). The plurality of displacement end second anchors (24) are disposed at the top of the displacement end anchor (22). The tension detection mechanism (6) is connected to the displacement end pad (21).

6. The apparatus for preparing SMA and FRP composite materials according to claim 5, characterized in that, The displacement end pad (21) has displacement end steel pipe through holes (211) on both sides of its sidewalls. The displacement end steel pipe through holes (211) are through holes, and two steel pipes (54) pass through the two displacement end steel pipe through holes (211) one by one. The displacement end anchor (22) has multiple displacement end SMA wire through holes (221) on its sidewalls. The displacement end SMA wire through holes (221) are through holes, and multiple SMA wires (7) pass through the multiple displacement end SMA wire through holes (221) one by one. Multiple displacement end second anchors (24) abut against the multiple SMA wires (7) one by one.

7. The apparatus for preparing SMA and FRP composite materials according to claim 5, characterized in that, The tensioning detection mechanism (6) includes: a tensioning anchor rod (61), a handwheel (62), a pressure sensor pad (63), a pressure sensor (64), a pressure display (65), a displacement gauge (66), and a data acquisition instrument (67). The tensioning anchor rod (61) passes through the handwheel (62), the pressure sensor (64), and the pressure sensor pad (63) in sequence, and is fixedly connected to the side wall of the displacement end pad (21). The pressure sensor pad (63) is fixedly installed on the top of the base plate (51). The two ends of the pressure sensor (64) are in contact with the pressure sensor pad (63) and the handwheel (62) respectively. The pressure display (65) is connected to the pressure sensor (64). The displacement gauge (66) is fixedly installed on the top of the base plate (51) and is in contact with the side wall of the displacement end pad (21). The displacement gauge (66) is connected to the data acquisition instrument (67).

8. The apparatus for preparing SMA and FRP composite materials according to claim 2, characterized in that, The clamp-type anchor mechanism (3) includes two clamp-type anchors (31) and two anchor bolts (32). The two clamp-type anchors (31) are stacked one on top of the other. The two anchor bolts (32) pass through the two ends of the clamp-type anchors (31) respectively. The anchor bolts (32) pass through the bolt sliding holes (53) and are detachably connected to the base plate (51). Both ends of the FRP sheet (8) are wrapped around the clamp-type anchors (31). The SMA wire (7) passes through the gap between the two clamp-type anchors (31).

9. The apparatus for preparing SMA and FRP composite materials according to claim 1, characterized in that, The silicone threading mold (42) has multiple threading holes (421) on its side wall. The threading holes (421) are through holes, and multiple SMA filaments (7) pass through the multiple threading holes (421) one by one.