A passage structure and method for repairing sewage valve in bottom pier of bulk carrier

By designing the top-side ballast compartment, double bottom ballast compartment, vertical communication structure and small cavity passage structure, the problem of bulk cargo ships not being able to repair the bottom pier sewage valve during loading and navigation is solved, and the installation in the cargo compartment is realized Maintenance during goods avoids cost and space occupation, and small changes in quantity.

CN118457797BActive Publication Date: 2024-11-22NANTONG COSCO KHI SHIP ENG
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410721300.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-11-22
Estimated Expiration
2044-06-05

AI Technical Summary

Technical Problem

The existing technology cannot repair the sewage valves in the bottom pier during the loading process of the cargo hold during the loading of bulk carriers. The repairs can be carried out after the ship reaches the port. The existing solutions increase costs and occupancy. Cargo hold or ballast hold space.

Method used

Design a passage structure including a top-edge ballast tank, a double bottom ballast tank, a vertical communication structure and a small cavity. Enter the vertical communication structure through the top-edge ballast tank on the deck, and enter the double communication structure along the communication structure. The bottom ballast tank is installed and enters the bottom pier through the watertight manhole of the small cavity for maintenance. The existing structure is only slightly adjusted, and the bottom pier sewage valve repair is realized when loading the cargo hold.

Benefits of technology

It is possible to enter the bottom pier for sewage valve repair when loading the cargo hold, and it has little increase in cost and space influence of the cargo hold or ballast hold. The quantity changes are small and the cost changes are small.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118457797B_ABST
    Figure CN118457797B_ABST
Patent Text Reader

Abstract

The present invention discloses a passage structure and method for repairing a sewage valve in a bottom pier of a bulk carrier, comprising a top ballast tank, a double-bottom ballast tank, a vertical connecting structure and a small cavity, wherein the top ballast tank is arranged on the top side of the hull, the top ballast tank is connected with the double-bottom ballast tank through the vertical connecting structure, the small cavity is arranged in the double-bottom ballast tank and the upper end of the small cavity is connected with the bottom pier, a watertight manhole is arranged on one side of the small cavity, and a watertight manhole cover is arranged on the watertight manhole. The present invention utilizes the existing ship structure, only makes a small adjustment, and designs and provides a cavity structure connected with the bottom pier, realizing a passage scheme for repairing the sewage valve of the bottom pier when the cargo hold is loaded.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a sewage valve maintenance passage structure and method, in particular to a sewage valve maintenance passage structure and method in a bottom pier of a bulk carrier, belonging to the technical field of ships. Background Art

[0002] According to ship regulations, sewage pipelines are usually required to treat sewage in the hull to prevent the retention of sewage and affect the cargo and stability of the ship.

[0003] For bulk carriers (Ultramax, Kamasamax, Capsize, etc.), sewage pipelines are usually arranged in the double bottom ballast tank area of ​​the ship and connected to the engine room. However, since the sewage valves on these pipelines may leak at the joints, regulations do not allow the valves to be arranged in the double bottom ballast tanks. Figure 5 As shown, the conventional design is that the valve is arranged in the void space of the bottom pier of the ship.

[0004] According to the conventional design, the valve is arranged in the pier, and there is no direct passage leading to the pier on the upper deck. When it is necessary to enter the pier, it is necessary to open the watertight manhole cover on the pier from the cargo hold and then enter the pier.

[0005] The problem with the existing design is that if the valve is damaged during the cargo hold loading and sailing, it is impossible to enter the pier for repair. It is necessary to wait until the ship docks and completes unloading before entering the pier from the cargo hold to repair the valve.

[0006] If maintenance of sewage valves is to be achieved during cargo voyage, the prior art has two solutions.

[0007] Option 1: Provide pipes in the double bottom ballast tanks. Figure 6 As shown, a continuous steel structure tunnel is provided from the bow to the stern inside the double bottom ballast tank, the entrance of the tunnel is located in the engine room, and the valve of the sewage pipe is no longer arranged at the bottom pier of the cargo hold, but is arranged in the tunnel instead.

[0008] With this design, if the valve needs to be repaired during the loading and sailing of the ship, the valve can be repaired by entering the pipe tunnel through the engine room.

[0009] Although this solution solves the problem of valve maintenance, it also has the following disadvantages:

[0010] 1. The pipes are installed in the double-bottom ballast tanks, which occupies part of the space originally belonging to the ballast tanks, reducing the capacity of the ballast tanks and thus reducing the ballast capacity of the ship.

[0011] 2. The pipe tunnel is usually set from the stern to the bow, which requires two additional tight steel structures, and the amount of steel used increases by about 15 t to 30 t, which increases the cost significantly.

[0012] 3. After the pipes are set up, the enclosed space formed is relatively narrow and long, which is not conducive to natural ventilation. Mechanical ventilation is usually required, which increases costs.

[0013] Option 2: Add a dedicated passage from the cargo hold to the bottom pier. Figure 7 and Figure 8 As shown, a trunk is provided in each cargo hold through the corrugated bulkhead and a small hatch cover is provided on the upper deck for access.

[0014] The valve of the sewage pipe is arranged in the bottom pier under the transverse bulkhead of the cargo hold. When the valve needs to be repaired during the loading and sailing of the ship, it can be entered from the small hatch cover on the upper deck, through the passage trunk on the trough tank in the cargo hold, and enter the bottom pier with the help of a vertical ladder to repair the valve.

[0015] Although this solution provides an access solution for loading cargo at the bottom pier and solves the problem of valve maintenance during cargo hold loading, it also has the following disadvantages:

[0016] 1. Adding a closed passage trunk between the corrugated bulkheads of each cargo hold will occupy the space of the cargo hold, resulting in a reduction in the cargo capacity of the cargo hold.

[0017] 2. Each cabin is equipped with a trunk. Depending on the size of the ship, the amount of steel used increases by about 30 t to 50 t, which increases the cost significantly.

[0018] Existing solutions add significant costs and require cargo hold space or ballast tank space. Summary of the invention

[0019] The technical problem to be solved by the present invention is to provide a passage structure and method for repairing a sewage valve in the bottom pier of a bulk carrier, which can achieve access to the bottom pier and maintenance of the valve while the cargo hold is being loaded, while minimizing costs and reducing the impact on other areas.

[0020] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0021] A passage structure for repairing a sewage valve in a bottom pier of a bulk carrier comprises a top ballast tank, a double-bottom ballast tank, a vertical connecting structure and a small cavity. The top ballast tank is arranged on the top side of the hull, the top ballast tank is connected with the double-bottom ballast tank through the vertical connecting structure, the small cavity is arranged in the double-bottom ballast tank and the upper end of the small cavity is connected with the bottom pier, a watertight manhole is arranged on one side of the small cavity, and a watertight manhole cover is arranged on the watertight manhole.

[0022] A passage structure for repairing a sewage valve in a bottom pier of a bulk carrier comprises a top ballast tank, a double-bottom ballast tank, a vertical connecting structure and a small cavity. The top ballast tank is arranged on the top side of the hull, the top ballast tank is connected with the double-bottom ballast tank through the vertical connecting structure, the small cavity is arranged in the bottom pier and the lower end of the small cavity is connected with the double-bottom ballast tank, a watertight manhole is arranged on one side of the small cavity, and a watertight manhole cover is arranged on the watertight manhole.

[0023] Furthermore, an upper passage hole is opened at the bottom of the top ballast tank, and the upper end of the vertical connecting structure is fixed on the upper passage hole.

[0024] Furthermore, a lower passage hole is opened on the top of the double-bottom ballast tank, and the lower end of the vertical connecting structure is fixed on the lower passage hole.

[0025] Furthermore, the vertical communication structure is arranged on the side of the hull.

[0026] Furthermore, the bottom pier is arranged on the upper side of the double bottom ballast tank.

[0027] A method for accessing a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier, comprising the following steps:

[0028] S1. When the cargo hold of a bulk carrier is loaded, the weight of the cargo causes the bulk carrier to sink, and the top ballast tanks and double ballast tanks are empty at this time;

[0029] S2, enter the top ballast tank through the manhole cover of the top ballast tank on the deck, and then enter the vertical connecting structure through the upper passage hole at the bottom of the top ballast tank;

[0030] S3, go downward along the vertical connecting structure and enter the double bottom ballast tank through the lower passage hole on the top of the double bottom ballast tank;

[0031] S4. Open the watertight manhole cover of the small cavity in the double-bottom ballast tank and enter the small cavity through the watertight manhole, then go up from the small cavity to the bottom pier to repair the sewage valve.

[0032] A method for accessing a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier, comprising the following steps:

[0033] S1. When the cargo hold of a bulk carrier is loaded, the weight of the cargo causes the bulk carrier to sink, and the top ballast tanks and double ballast tanks are empty at this time;

[0034] S2, enter the top ballast tank through the manhole cover of the top ballast tank on the deck, and then enter the vertical connecting structure through the upper passage hole at the bottom of the top ballast tank;

[0035] S3, go downward along the vertical connecting structure and enter the double bottom ballast tank through the lower passage hole on the top of the double bottom ballast tank;

[0036] S4. Enter the small cavity from the double-bottom ballast tank, then open the watertight manhole cover of the small cavity and enter the bottom pier through the watertight manhole to repair the sewage valve.

[0037] Compared with the prior art, the present invention has the following advantages and effects: the present invention provides a passage structure and method for repairing a sewage valve in the bottom pier of a bulk carrier, utilizes the existing ship structure, makes only a small adjustment, and designs a cavity structure connected to the bottom pier, thereby realizing a passage scheme for repairing the sewage valve in the bottom pier when the cargo hold is loaded; the present invention has a small change in volume, almost no change in cost, no additional impact on the cargo hold capacity, and almost no impact on the ballast tank capacity. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a schematic diagram of Embodiment 1 of a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier according to the present invention.

[0039] Figure 2 It is a partial side view of Embodiment 1 of a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier according to the present invention.

[0040] Figure 3 It is a schematic diagram of Embodiment 2 of a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier according to the present invention.

[0041] Figure 4 It is a partial side view of Embodiment 2 of a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier according to the present invention.

[0042] Figure 5 It is a reference diagram of the relative relationship of ship divisions in the prior art.

[0043] Figure 6 It is a schematic diagram of solution 1 of the prior art.

[0044] Figure 7 It is a side view of solution 2 of the prior art.

[0045] Figure 8 It is a top view of the second solution of the prior art. DETAILED DESCRIPTION

[0046] In order to elaborate on the technical scheme adopted by the present invention to achieve the predetermined technical purpose, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only partial embodiments of the present invention, rather than all embodiments, and the technical means or technical features in the embodiments of the present invention can be replaced without paying creative work. The present invention will be described in detail below with reference to the drawings and in conjunction with the embodiments. Example

[0047] like Figure 1 and Figure 2 As shown, a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier of the present invention comprises a top ballast tank 1, a double bottom ballast tank 2, a vertical connecting structure 3 and a small cavity 4. The top ballast tank 1 is arranged on the top side of the hull, and the top ballast tank 1 is connected with the double bottom ballast tank 2 through the vertical connecting structure 3. The small cavity 4 is arranged in the double bottom ballast tank 2 and the upper end of the small cavity 4 is connected with the bottom pier 5. A watertight manhole 6 is arranged on one side of the small cavity 4, and a watertight manhole cover is arranged on the watertight manhole 6.

[0048] An upper passage hole 7 is formed at the bottom of the top ballast tank 1, and the upper end of the vertical communication structure 3 is fixed to the upper passage hole 7. A lower passage hole 8 is formed at the top of the double bottom ballast tank 2, and the lower end of the vertical communication structure 3 is fixed to the lower passage hole 8. The vertical communication structure 3 is arranged on the side of the hull. This part of the structure is an existing structure of a bulk carrier, and this application applies this part of the structure.

[0049] The bottom pier 5 is arranged on the upper side of the double bottom ballast tank 2 .

[0050] A method for accessing a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier, comprising the following steps:

[0051] S1. When the cargo hold of a bulk carrier is loaded, the weight of the cargo causes the bulk carrier to sink, and the top ballast tanks and double ballast tanks are empty at this time.

[0052] S2. Enter the top ballast tank through the manhole cover of the top ballast tank on the deck, and then enter the vertical connecting structure through the upper passage hole at the bottom of the top ballast tank.

[0053] S3. Go downward along the vertical connecting structure and enter the double bottom ballast tank through the lower passage hole on the top of the double bottom ballast tank.

[0054] S4. Open the watertight manhole cover of the small cavity in the double-bottom ballast tank and enter the small cavity through the watertight manhole, then go up from the small cavity to the bottom pier to repair the sewage valve.

[0055] The present invention does not consider providing an additional dedicated passage in the cargo hold, so it does not affect the cargo hold capacity and the cargo loading capacity. It only provides a small cavity structure in the ballast water tank, which has almost no effect on the ballast tank capacity. The amount of material involved is only the amount of the cavity structure, which uses very little material and involves almost no increase in cost. Example

[0056] like Figure 3 and Figure 4 As shown, a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier comprises a top ballast tank 1, a double bottom ballast tank 2, a vertical connecting structure 3 and a small cavity 4. The top ballast tank 1 is arranged on the top side of the hull, and the top ballast tank 1 is connected with the double bottom ballast tank 2 through the vertical connecting structure 3. The small cavity 4 is arranged in the bottom pier 5 and the lower end of the small cavity 4 is connected with the double bottom ballast tank 2. A watertight manhole 6 is arranged on one side of the small cavity 4, and a watertight manhole cover is arranged on the watertight manhole 6.

[0057] An upper passage hole 7 is formed at the bottom of the top ballast tank 1, and the upper end of the vertical communication structure 3 is fixed to the upper passage hole 7. A lower passage hole 8 is formed at the top of the double bottom ballast tank 2, and the lower end of the vertical communication structure 3 is fixed to the lower passage hole 8. The vertical communication structure 3 is arranged on the side of the hull. This part of the structure is an existing structure of a bulk carrier, and this application applies this part of the structure.

[0058] The bottom pier 5 is arranged on the upper side of the double bottom ballast tank 2 .

[0059] A method for accessing a passage structure for repairing a sewage valve in a bottom pier of a bulk carrier, comprising the following steps:

[0060] S1. When the cargo hold of a bulk carrier is loaded, the weight of the cargo causes the bulk carrier to sink, and the top ballast tanks and double ballast tanks are empty at this time;

[0061] S2, enter the top ballast tank through the manhole cover of the top ballast tank on the deck, and then enter the vertical connecting structure through the upper passage hole at the bottom of the top ballast tank;

[0062] S3, go downward along the vertical connecting structure and enter the double bottom ballast tank through the lower passage hole on the top of the double bottom ballast tank;

[0063] S4. Enter the small cavity from the double-bottom ballast tank, then open the watertight manhole cover of the small cavity and enter the bottom pier through the watertight manhole to repair the sewage valve.

[0064] The present invention provides a passage structure and method for repairing sewage valves in the bottom pier of a bulk carrier. The existing ship structure is utilized with only minor adjustments, and a cavity structure connected to the bottom pier is designed to realize a passage scheme for repairing sewage valves in the bottom pier when the cargo hold is loaded. The present invention has a small change in volume, almost no change in cost, no additional impact on the cargo hold capacity, and almost no impact on the ballast tank capacity.

[0065] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent replacement and improvement made to the above embodiments without departing from the content of the technical solution of the present invention, based on the technical essence of the present invention, within the spirit and principles of the present invention, still fall within the protection scope of the technical solution of the present invention.

Claims

1. A passage structure for repairing sewage valves in the bottom pier of a bulk carrier. Features: It comprises a top side ballast tank, a double bottom ballast tank, a vertical connecting structure and a small cavity. The top side ballast tank is arranged on the top side of the hull. The top side ballast tank is connected with the double bottom ballast tank through the vertical connecting structure. The small cavity is arranged in the double bottom ballast tank and the upper end of the small cavity is connected with the bottom pier. A watertight manhole is arranged on one side of the small cavity, and a watertight manhole cover is arranged on the watertight manhole. An upper passage hole is opened at the bottom of the top ballast tank, and the upper end of the vertical connecting structure is fixed on the upper passage hole; a lower passage hole is opened at the top of the double bottom ballast tank, and the lower end of the vertical connecting structure is fixed on the lower passage hole; the vertical connecting structure is arranged on the side of the hull; the bottom pier is arranged on the upper side of the double bottom ballast tank.

2. A passage structure for repairing sewage valves in the bottom pier of a bulk carrier, Features: It comprises a top side ballast tank, a double bottom ballast tank, a vertical connecting structure and a small cavity. The top side ballast tank is arranged on the top side of the hull. The top side ballast tank is connected with the double bottom ballast tank through the vertical connecting structure. The small cavity is arranged in the bottom pier and the lower end of the small cavity is connected with the double bottom ballast tank. A watertight manhole is arranged on one side of the small cavity, and a watertight manhole cover is arranged on the watertight manhole. An upper passage hole is opened at the bottom of the top ballast tank, and the upper end of the vertical connecting structure is fixed on the upper passage hole; a lower passage hole is opened at the top of the double bottom ballast tank, and the lower end of the vertical connecting structure is fixed on the lower passage hole; the vertical connecting structure is arranged on the side of the hull; the bottom pier is arranged on the upper side of the double bottom ballast tank.

3. A method for passing through the passage structure for repairing the sewage valve in the bottom pier of a bulk carrier according to claim 1, Features The following steps are involved: S1. When the cargo hold of a bulk carrier is loaded, the weight of the cargo causes the bulk carrier to sink, and the top ballast tanks and double ballast tanks are empty at this time; S2, enter the top ballast tank through the manhole cover of the top ballast tank on the deck, and then enter the vertical connecting structure through the upper passage hole at the bottom of the top ballast tank; S3, go downward along the vertical connecting structure and enter the double bottom ballast tank through the lower passage hole on the top of the double bottom ballast tank; S4. Open the watertight manhole cover of the small cavity in the double-bottom ballast tank and enter the small cavity through the watertight manhole, then go up from the small cavity to the bottom pier to repair the sewage valve.

4. A method for passing through the passage structure for repairing the sewage valve in the bottom pier of a bulk carrier according to claim 2, Features The following steps are involved: S1. When the cargo hold of a bulk carrier is loaded, the weight of the cargo causes the bulk carrier to sink, and the top ballast tanks and double ballast tanks are empty at this time; S2, enter the top ballast tank through the manhole cover of the top ballast tank on the deck, and then enter the vertical connecting structure through the upper passage hole at the bottom of the top ballast tank; S3, go downward along the vertical connecting structure and enter the double bottom ballast tank through the lower passage hole on the top of the double bottom ballast tank; S4. Enter the small cavity from the double-bottom ballast tank, then open the watertight manhole cover of the small cavity and enter the bottom pier through the watertight manhole to repair the sewage valve.

Citation Information

Patent Citations

  • Ballast tank structure and ship

    CN111268048A

  • Typical cargo hold layout of large bulk carrier

    CN111634366A

  • Ship ballast water chamber structure and ship

    CN112249219A

  • Pipe tunnel-free cargo hold suitable for bulk cargo ship

    CN116279973A

  • Container ship methanol fuel storage cabin and isolation void cabin structure thereof

    CN117341889A