A test device and test method for simulating tunnel segment misalignment under actual working conditions
By designing a test device containing jacks and water tanks, combined with monitoring components, to simulate earth pressure and water pressure, the real simulation and monitoring of tunnel segment staggering is achieved, solving the problem of single simulation conditions in the existing technology, and providing a more comprehensive for accurate test results.
Patent Information
- Application Number
- CN202410855364.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-06-28
AI Technical Summary
The existing tunnel segment simulation device has single conditions and cannot truly simulate the stress of the segments, resulting in the inability to effectively simulate and test the actual working conditions of staggered segments in shield tunnels.
A test device was designed to simulate the staggered position of tunnel segments under actual working conditions, including an outer box, an inner box filled with soil, and a cast-in-place tunnel segment model. Earth pressure and water pressure were simulated through jacks and water tanks, combined with monitoring The components monitor segment misalignment in real time, and the data acquisition component and image acquisition component are used for data and image acquisition.
It realizes the real simulation and monitoring of the staggered position of tunnel segments, can more accurately analyze and calculate the displacement changes of the segments, provides more realistic test conditions, and helps solve the problem of single simulation conditions in the existing technology.
Smart Images

Figure CN118464632B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel segment simulation, and in particular to a test device and a test method for simulating tunnel segment misalignment under actual working conditions. Background Art
[0002] With the development of shield tunnel construction technology and the resolution of many problems, problems such as segment cracking and waterproofing hazards caused by misalignment have begun to become more prominent in terms of their impact on construction and operation. Segment misalignment is a common hazard of shield tunnels, which seriously endangers the safety and durability of tunnels. Therefore, it is very necessary to study the misalignment of tunnel segments.
[0003] The misalignment of shield tunnel segments has always been a technical problem that has plagued shield tunnel construction and maintenance, and has not received enough attention for a long time. With the development of shield tunnel construction technology and the improvement of technical standards, the impact of misalignment on construction and operation, such as segment cracking, assembly difficulties and waterproofing risks, has begun to be taken seriously.
[0004] In the prior art, there are many factors that cause shield tunnel segments to misalign, such as uneven jacking force of the segments, incorrect manufacturing dimensions, improper assembly, uneven grouting, and shield attitude control. The main reason is that after the segments are assembled, they are directly subjected to the jacking force of the shield jack, forcing them to compress the elastic sealing gasket backwards. Due to the uneven jacking force of the entire ring, the sealing gasket is differentially compressed and deformed, which further causes differential longitudinal displacement between the segments, i.e., misalignment. The actual impact of the uneven jacking force factor on the assembled segments of the shield tunnel during the construction process will eventually lead to uneven circumferential and circumferential force of the assembled segments, which will then cause the misalignment of the shield tunnel segments.
[0005] At present, the underground environment where shield tunnels are located is complex. The existing simulation devices generally have single simulation conditions and cannot fully and truly simulate the stress conditions of the segments. For example, Chinese Patent Publication No. CN114166442A discloses "a test device for simulating the initial misalignment of shield tunnel segments under earthquake loads based on a vibration table", which includes a vibration table, a model box, a loading system, a shield tunnel model and a model soil. The simulation of the misalignment of the segments is achieved by placing model soil in the model box and using a jack to squeeze it. The above patent has single simulation conditions and cannot simulate the actual stress conditions of the segments.
[0006] In view of this, the existing technology still needs to be improved and developed. Summary of the invention
[0007] In view of the above-mentioned deficiencies in the prior art, the purpose of the present invention is to provide a test device and a test method for simulating tunnel segment misalignment under actual working conditions, aiming to solve the problem that the existing tunnel segment misalignment simulation device has a single simulation condition and cannot simulate the actual stress condition of the segment.
[0008] The technical solution adopted by the present invention to solve the technical problem is as follows:
[0009] A test device for simulating tunnel segment misalignment under actual working conditions, comprising:
[0010] outer box;
[0011] An inner box body is arranged inside the outer box body; the interior of the inner box body is filled with soil, and a cast-in-place tunnel segment model is arranged inside the soil;
[0012] A plurality of jacks are respectively arranged on the inner wall of the outer box; a side of the jack away from the outer box is arranged on the outer surface of the inner box;
[0013] A water tank is disposed outside the outer box and is connected to the interior of the inner box through a pipeline, and is used to apply water pressure to the interior of the inner box;
[0014] A monitoring component is arranged inside the cast-in-place tunnel segment model and is used to monitor the misalignment of the pipe segments in the cast-in-place tunnel segment model.
[0015] Furthermore, the inner box includes:
[0016] Six pressure plates, respectively corresponding to the inner side walls of the outer box body, and connected to the inner side walls of the outer box body through the jack;
[0017] The pressure plates at the front and rear sides of the inner box are respectively provided with through holes for placing the cast-in-place tunnel segment model.
[0018] Furthermore, the pressure plate includes:
[0019] A plurality of transparent acrylic plates; an elastic waterproof sealing rubber film is arranged between two adjacent transparent acrylic plates, and a gap is fitted between the two adjacent transparent acrylic plates.
[0020] Furthermore, the monitoring component includes:
[0021] A main rod; a turntable is provided at the bottom of the main rod;
[0022] Two support rods are rotatably arranged on the rotating disk; a first suction cup is rotatably arranged on one end of the support rod away from the rotating disk;
[0023] A fixed block is arranged at one end of the main rod; a sliding hole is arranged inside the fixed block;
[0024] A lifting rod, slidably disposed in the sliding hole;
[0025] The second suction cup is arranged inside the cast-in-place tunnel segment model and is located at the bottom of the fixed block; a flat plate is arranged on the top of the second suction cup, and the bottom of the lifting rod is slidably matched with the flat plate.
[0026] Furthermore, a slide groove is provided on the surface of the flat plate, and the lifting rod is slidably arranged in the slide groove.
[0027] Furthermore, the test device for simulating tunnel segment misalignment under actual working conditions also includes:
[0028] A data acquisition component is arranged inside the inner box and is used to collect the soil pressure of the soil and the water pressure inside the inner box;
[0029] The image acquisition component is arranged on the outer box body and is used to photograph the changes of the soil when the pipe segments are misaligned.
[0030] Furthermore, the data acquisition component includes:
[0031] A water pressure gauge, disposed inside the soil body, for monitoring water pressure changes in the inner box;
[0032] The soil pressure gauge is arranged inside the soil body and is used to monitor the pressure change of the soil body.
[0033] Furthermore, the image acquisition component includes:
[0034] A slide rail is arranged on the inner top wall of the outer box body;
[0035] A first camera is disposed on the slide rail and can slide along the slide rail;
[0036] The second camera is arranged on the outer box and located outside the outer box and corresponds to the inner box.
[0037] Furthermore, a strain sensor is arranged on the outside of the jack.
[0038] A test method based on the test device simulating tunnel segment misalignment under actual working conditions comprises the following steps:
[0039] Start the jack and apply a preset pressure to the soil;
[0040] Start the water tank and fill the inner box with water;
[0041] The displacement of the pipe segments is monitored by monitoring components, and analyzed to obtain the results.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] In the present invention, an inner box is arranged inside the outer box, the inner box is filled with soil, and a cast-in-place tunnel segment model is arranged inside the soil, a jack is arranged between corresponding surfaces of the outer box and the inner box, a water tank is also arranged outside the outer box, the water tank is connected with the inside of the inner box through a pipeline, and a monitoring component is arranged inside the cast-in-place tunnel segment model for monitoring the misalignment of the cast-in-place tunnel segment model; the soil inside the inner box can be pressurized by the jack to increase the soil pressure, and water can be filled into the inner box by the water tank to apply water pressure to the cast-in-place tunnel segment model, and the water pressure and soil pressure can be applied to simulate the scene of tunnel segment misalignment under real conditions, and the misalignment of the cast-in-place tunnel segment model under soil pressure and water pressure can be monitored by the monitoring component. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0045] Figure 2 It is a schematic diagram of the structure of the outer box and the inner box of the present invention.
[0046] Figure 3 It is a schematic diagram of the inner box structure of the present invention.
[0047] Figure 4 It is a schematic diagram of the cast-in-place tunnel segment model and soil structure of the present invention.
[0048] Figure 5 This is a schematic diagram of the structure of the first transparent acrylic plate of the present invention.
[0049] Figure 6 It is a schematic diagram of the structure of the monitoring component of the present invention.
[0050] Figure 7 It is a schematic diagram of the slide rail structure of the present invention.
[0051] Figure 8 It is a schematic diagram of the structure of the cast-in-situ tunnel segment model of the present invention.
[0052] Fig. 9 Flow chart of the sample method of the present invention.
[0053] The numbers in the figure are as follows: 1. outer box; 2. inner box; 21. pressure plate; 22. through hole; 23. first transparent acrylic plate; 24. elastic waterproof sealing rubber membrane; 3. cast-in-place tunnel segment model; 4. jack; 5. water tank; 6. monitoring component; 61. main rod; 611. turntable; 62. support rod; 621. first suction cup; 63. fixing block; 64. lifting rod; 65. second suction cup; 66. flat plate; 67. slide groove; 7. slide rail; 71. slider; 72. first camera; 73. second camera. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and effect of the present invention clearer and more specific, the present invention is further described in detail with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0055] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0056] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0057] In view of the shortcomings of the prior art, this embodiment provides a test device and test method for simulating tunnel segment misalignment under actual working conditions, which can be specifically referred to as follows:
[0058] As attached Figure 1 , Attachment Figure 2 , Attachment Figure 3 and attached Figure 4As shown, a test device simulating the misalignment of tunnel segments under actual working conditions comprises an outer box 1, an inner box 2, a plurality of jacks 4, a water tank 5 and a monitoring component 6. The outer box 1 is composed of a plurality of second transparent acrylic plates to facilitate observation of changes in the soil inside the inner box 2 and the cast-in-place tunnel segment model 3. The inner box 2 is arranged inside the outer box 1, and the inner box 2 is filled with soil, and the cast-in-place tunnel segment model 3 (as shown in the attached figure) is arranged inside the soil. Figure 4 As shown in the figure, the cast-in-place tunnel segment model 3 is assembled from shield tunnel segments of reduced size cast in concrete, which penetrates the test soil to simulate a shield tunnel at a certain buried depth. The six outer side surfaces of the inner box body 2 correspond one to one with the six inner side surfaces of the outer box body 1, and a plurality of jacks 4 are arranged between the two corresponding side surfaces of the inner box body 2 and the outer box body 1. The jacks 4 are used to fix the inner box body 2 and to apply pressure to the soil in the inner box body 2, so that the soil applies earth pressure to the cast-in-place tunnel segment model 3. A water tank 5 is also arranged on the outside of the outer box body 1. The water tank 5 is connected to the inside of the inner box body 2 through a pipeline, and is used to fill water into the inside of the inner box body 2 and apply water pressure to the cast-in-place tunnel segment model 3 to simulate the change in earth pressure caused by the change in the groundwater level of the soil layer where the tunnel is located. A monitoring component 6 is arranged inside the cast-in-place tunnel segment model 3, and the monitoring component 6 is used to monitor the misalignment of the segments in the cast-in-place tunnel segment model 3.
[0059] Pressure is applied to the soil inside the inner box 2 through the jack 4, and the soil applies earth pressure to the cast-in-place tunnel segment model 3. Water is filled into the inner box 2 through the water tank 5, and water pressure is applied to the cast-in-place tunnel segment model 3 to simulate the change in earth pressure caused by the change in the groundwater level of the soil layer where the tunnel is located. The two are coordinated to simulate the scene of tunnel segment misalignment under real conditions. At the same time, by changing the earth pressure and water pressure, the occurrence of misalignment of the cast-in-place tunnel segment model 3 can be simulated, and the displacement change of the misalignment of the cast-in-place tunnel segment model 3 can be monitored in real time through the monitoring component 6 to facilitate subsequent test analysis and calculation.
[0060] In one embodiment of the present application, as shown in the attached Figure 8 As shown, the cast-in-place tunnel segment model 3 is assembled from shield tunnel assembly segments of reduced size cast by multiple rings of concrete. After assembly, segment assembly joints are formed between adjacent tunnel segments, which will shift under the action of external forces to simulate the phenomenon of tunnel segment misalignment. The assembled entire cast-in-place tunnel segment model 3 is placed horizontally through the test soil to simulate the situation of a shield tunnel at a certain burial depth.
[0061] In one embodiment of the present application, multiple jacks 4 are numbered, and an external control device can control each jack 4 by corresponding to the number, and make it output a corresponding force, so as to achieve precise pressure on each surface of the inner box body 2; a strain sensor is arranged on the outside of the jack 4, and the jack 4 is electric, so as to facilitate the control of the start of the jack 4. The strain sensor can detect the supporting force of the jack 4 on the plate of the side wall of the inner box body 2. Its working principle is: 8 strain gauges are pasted on the outside of the jack 4 containing the strain sensor, forming a Wheatstone full-bridge circuit. With the jack 4, a certain electrical signal input will output the corresponding external force P. The electrical signal is proportional to the external force P, has good stability, and can achieve precise pressure; its design formula is:
[0062] ,
[0063] Wherein: S, output sensitivity coefficient; P, set force value; K, strain gauge sensitivity coefficient; G, shear modulus; L, strain gauge base length; B, strain gauge grid width; b, jack width; h, jack width; U, bridge supply voltage.
[0064] As attached Figure 3 and attached Figure 5 As shown, the inner box body 2 includes six pressure plates 21, and the six pressure plates 21 correspond to the six inner walls of the outer box body 1 respectively. The six pressure plates 21 are connected to the six inner walls of the outer box body 1 through the jacks 4, supported by the jacks 4, and pressure can be applied to the pressure plates 21. The pressure plates 21 squeeze the soil to simulate the external soil pressure changes; through holes 22 are respectively opened on the pressure plates 21 on the front and rear sides of the inner box body 2 for placing the cast-in-place tunnel segment model 3. Specifically, the cast-in-place tunnel segment model 3 can be placed in the inner box body 2 through the through holes 22, and the two ends of the cast-in-place tunnel segment model 3 can be overlapped in the through holes 22 to fix the cast-in-place tunnel segment model 3, so as to facilitate the filling of soil inside the inner box body 2.
[0065] In one embodiment of the present application, there is a certain gap between the side walls of the six pressure plates 21, and the gap is sealed by an elastic waterproof sealing rubber membrane 24. The six pressure plates 21 cooperate with the elastic waterproof sealing rubber membrane 24 to form an internal cavity for placing soil and a cast-in-place tunnel segment model 3, so that when the jack 4 drives the pressure plate 21, the pressure plate 21 can move as a whole, avoiding the pressure plate 21 that needs to be moved being blocked by the side walls of the other pressure plates 21 due to contact with the side walls of the pressure plates 21, and being unable to move, and unable to apply effective pressure to the soil.
[0066] In one embodiment of the present application, the pressure plate 21 at the bottom of the inner box 2 can be in contact with the inner bottom plate of the outer box 1, and the inner box 2 can be directly placed on the inner bottom plate of the outer box 1 to facilitate the installation and placement of the inner box 2; at the same time, it can ensure that the pressure plate 21 at the bottom of the inner box 2 is evenly stressed to prevent the edge of the pressure plate 21 from warping or bending when supported by the jack 4, causing the soil inside the inner box 2 to spill out, affecting the application of soil pressure, and thus affecting the final result of the test.
[0067] In one embodiment of the present application, as shown in the attached Figure 5 As shown, the pressure plate 21 includes a plurality of first transparent acrylic plates 23, and the plurality of first transparent acrylic plates 23 are spliced to form the pressure plate 21. A plurality of jacks 4 are arranged on each first transparent acrylic plate 23, and an elastic waterproof sealing rubber membrane 24 is arranged between adjacent first transparent acrylic plates 23. The elastic waterproof sealing rubber membrane 24 not only has waterproof capability, but also has elasticity. Since the pressure plate 21 is composed of a plurality of first transparent acrylic plates 23, and a plurality of jacks 4 are arranged on each first transparent acrylic plate 23, when it is necessary to inject water into the soil, the pressure plate 21 is provided with a plurality of first transparent acrylic plates 23, and the plurality of jacks 4 are provided on each first transparent acrylic plate 23. When local pressure is applied, the jack 4 corresponding to the local area can be started. The jack 4 acts on the first transparent acrylic plate 23, and the first transparent acrylic plate 23 will be misaligned and displaced with the adjacent first transparent acrylic plate 23. At this time, the elastic waterproof sealing rubber film 24 can be stretched, and at the same time, the water in the outer box body 1 can be prevented from flowing out, that is, the elastic waterproof sealing rubber film 24 can be deformed with the movement of the first transparent acrylic plate 23, and the gap between the two first transparent acrylic plates 23 can be sealed while deforming.
[0068] In this embodiment, there is a gap fit between two adjacent first transparent acrylic plates 23, and there is a gap fit between multiple first transparent acrylic plates 23 on the same surface. The gap fit is to prevent the two first transparent acrylic plates 23 from interacting with each other or causing friction, etc., which may cause damage to the first transparent acrylic plates 23 and affect the simulation test.
[0069] As attached Figure 6As shown, the monitoring assembly 6 includes a main rod 61, two support rods 62, a fixing block 63, a lifting rod 64 and a second suction cup 65. A turntable 611 is arranged at the bottom of the main rod 61. The two support rods 62 are respectively located on both sides of the main rod 61 and are symmetrically arranged. The two support rods 62 are both arranged on the turntable 611 by rotation, and the rotation directions of the two support rods 62 are the same. The ends of the two support rods 62 away from the turntable 611 are provided with a first suction cup 621. The first suction cup 621 is used to be adsorbed on the pipe segment in the cast-in-place tunnel segment model 3. The two first suction cups 621 cooperate with the two support rods 62 to form a lifting rod 64 and a second suction cup 65. Rod 62 is used to fix the main rod 61, and it is necessary to ensure that the main rod 61 and the turntable 611 are set horizontally. A fixing block 63 is set at one end of the main rod 61. A sliding hole is set inside the fixing block 63. The sliding hole is set vertically. A lifting rod 64 is slidably set inside the sliding hole. A scale is set on the lifting rod 64 to facilitate checking the distance of the pipe segment misalignment. A second suction cup 65 is also set inside the cast-in-place tunnel segment model 3. The second suction cup 65 is located at the bottom of the fixing block 63. A flat plate 66 is set on the top of the second suction cup 65. The flat plate 66 is slidably matched with the lifting rod 64;
[0070] Specifically, the two first suction cups 621 are fixed on the pipe segment of the same cast-in-place tunnel segment model 3, and the second suction cup 65 is fixed on another pipe segment of the cast-in-place tunnel segment model 3. The two pipe segments are arranged adjacent to each other. By applying soil pressure and water pressure to the pipe segment where the second suction cup 65 is located, the pipe segment is misaligned with the adjacent pipe segment, and the second suction cup 65 can be tilted. At the same time, the flat plate 66 supports the lifting rod 64, and the lifting rod 64 slides upward in the sliding hole. The sliding distance of the lifting rod 64 is the size of the misalignment of the pipe segment. The moving distance of the lifting rod 64 is recorded to facilitate subsequent analysis and calculation.
[0071] In one embodiment of the present application, a camera is provided on one side of the fixing hole, and the camera corresponds to the scale of the lifting rod 64 and takes pictures in real time; the camera transmits the data to an external computer device through a wire, and after the test is carried out, a fixed time t (s) is set to take readings, and the time elapsed is recorded as L 1 , L 2 , L 3 ...etc., when the segment joint is misaligned, the lifting rod 64 with displacement scale on one side of the monitoring device will be displaced, and the scale number is read to obtain L 1 , L 2 , L 3 ...and other scale data, the real-time segment misalignment is calculated by the following formula:
[0072] ,
[0073] in: t x Real-time misalignment of lower pipe segment; Lx L1, L2, L3... and other scale data; L 0 is the initial scale data.
[0074] In one embodiment of the present application, the pipe segments fixed by the first suction cup 621 and the second suction cup 65 may not be in an adjacent state, that is, multiple pipe segments may be spaced between the pipe segments fixed by the first suction cup 621 and the second suction cup 65. The pipe segments fixed by the first suction cup 621 and the second suction cup 65 can be changed by changing the length of the main rod 61; when the interval between the two pipe segments is relatively long, the pipe segment fixed by the second suction cup 65 can be prevented from being misaligned and affecting the pipe segment fixed by the first suction cup 621, thereby ensuring that the misalignment data of the pipe segment fixed by the second suction cup 65 is accurate.
[0075] In one embodiment of the present application, a slide groove 67 is provided on the flat plate 66, and the direction of the slide groove 67 is the same as the length direction of the main rod 61. The bottom of the lifting rod 64 is a spherical surface, and the bottom of the lifting rod 64 is slidably arranged in the slide groove 67. When the pipe segment fixed by the second suction cup 65 is misaligned up and down, the flat plate 66 supports the lifting rod 64 to lift and lower, and the lifting rod 64 slides in the slide groove 67, and the position of the lifting rod 64 remains unchanged; when the pipe segment fixed by the second suction cup 65 is misaligned left and right, the lifting rod 64 slides in the slide groove 67, and the flat plate 66 can drive the main rod 61 to rotate on the turntable 611, thereby avoiding the resistance effect on the misalignment of the pipe segment.
[0076] In this embodiment, a scale is provided on the turntable 611. When the flat plate 66 drives the main rod 61 to rotate, the angle of the misalignment of the pipe segment can be understood through the scale corresponding to the main rod 61, and the distance of the misalignment can be calculated through the angle and the length of the main rod 61.
[0077] In one embodiment of the present application, four monitoring components 6 are arranged on the circumferential surface of the cast-in-place tunnel segment model 3, respectively located in the four directions of up, down, left and right. By setting up four monitoring components 6, the direction and distance of the segment misalignment can be accurately measured.
[0078] In one embodiment of the present application, a test device for simulating tunnel segment misalignment under actual working conditions also includes a data acquisition component and an image acquisition component. The data acquisition component is arranged inside the inner box 2, and is used to collect the soil pressure of the soil and the water pressure in the inner box 2. By collecting the water pressure and soil pressure in real time, the jack 4 can be started and the water tank 5 can be filled with water to ensure the stress condition of the cast-in-place tunnel segment model 3 under the simulated actual working conditions; the image acquisition component is arranged on the outer box 1, and is used to shoot the changes in the soil when the segment is misaligned.
[0079] In this embodiment, the data acquisition component includes a water pressure gauge and a soil pressure gauge. Both the water pressure gauge and the soil pressure gauge are existing technologies and are arranged inside the soil. The water pressure gauge is used to monitor the water pressure changes in the inner box 2, and the soil pressure gauge is used to monitor the pressure changes of the soil.
[0080] In this embodiment, a plurality of water pressure gauges and a plurality of earth pressure gauges may be arranged inside the soil body, and the plurality of water pressure gauges and the plurality of earth pressure gauges are evenly distributed inside the soil body to achieve all-round monitoring.
[0081] In this embodiment, as shown in the attached Figure 1 and attached Figure 7 As shown, the image acquisition component includes a slide rail 7, a first camera 72 and a second camera 73. The slide rail 7 is arranged on the inner top wall of the outer box body 1. The direction of the slide rail 7 is the same as the length direction of the cast-in-place tunnel segment model 3. The first camera 72 is arranged on the slide rail 7 and can slide along the slide rail 7. The slide rail 7 can be provided with a motor and a screw rod. The screw rod cooperates with the slider 71 on the slide rail 7. The output shaft of the motor is connected to the screw rod. The slider 71 of the slide rail 7 can be driven to move by the motor, and the first camera 72 is arranged on the slider 71. The first camera 72 can be driven to move by the motor to facilitate the shooting of soil changes in the inner box body 2; the second camera 73 is arranged on the outer box body 1. The second camera 73 can be arranged on the inner wall of the outer box body 1 and corresponds to the side of the inner box body 2 where the through hole 22 is arranged, which is used to shoot the changes of the soil from the front, while the first camera 72 shoots the changes of the soil from the top.
[0082] Furthermore, a bracket may be provided on the outside of the outer box body 1 , and the second camera 73 may be provided on the bracket. Since the outer box body 1 is composed of a second transparent acrylic plate, the second camera 73 may capture soil changes in the inner box body 2 .
[0083] In one embodiment of the present application, the image acquisition component is connected to an external computer device, and the image acquisition component sends the acquired image to the computer device. The computer device is provided with an image processing system. The image processing system is a prior art and can process the images taken by the first camera 72 and the second camera 73 of the image acquisition system. Since the image taken by the image acquisition component includes the facades of the inner box 2 and the outer box 1 in the main test device, it has a certain obstruction to the direct observation of soil changes. Therefore, its main function is to extract image pixel points other than the target observation points, and save this part of information in the image processing software. After the image taken during the test is imported into the software, this part of information is compared and analyzed, and the same information points in the container and the imported image are subtracted, that is, the image of the facade of the device is deleted, so as to achieve the effect of separating the container information from the sample information, thereby obtaining a clear sample image.
[0084] The installation and connection steps of the test device simulating tunnel segment misalignment under actual working conditions are as follows:
[0085] (1) After the cast-in-place tunnel segment model 3 is cast, segment misalignment monitoring components 6 are installed on both sides of the segment joints of two adjacent tunnel segments inside the cast-in-place tunnel segment model 3. For a full ring of segments, four segment misalignment monitoring components 6 are installed inside two adjacent tunnel segments, respectively at four positions, upper, lower, left, and right, and the wires of the cameras on the fixing blocks 63 are connected to external computer equipment;
[0086] (2) The cast-in-place tunnel segment model 3 installed in the previous step is placed from the upper part of the inner box 2. The cast-in-place tunnel segment model 3 passes through the inner box 2 and the outer box 1. The position of the end of the cast-in-place tunnel segment model 3 is set. Then, a pore water pressure gauge and an earth pressure gauge are installed around the cast-in-place tunnel segment model 3 and in the inner box 2. Test soil is added into the inner box 2, and the pressure plate 21 on the upper part of the inner box 2 is covered;
[0087] (3) Install the jack 4 containing the strain sensor on the pressure plate 21 outside the inner box 2 according to the number, and connect it to the external computer equipment through the wire; connect the pressurized water tanks 5 on both sides through the water inlet pipe through the outer box 1 and the inner box 2;
[0088] (4) The first camera 72 is mounted and fixed on the slide rail 7 of the second transparent acrylic plate on the upper part of the outer box body 1, and the first camera 72 is connected to an external computer device. At the same time, the external second camera 73 is placed at a position with a suitable viewing angle and connected to the external computer device.
[0089] As attached Fig. 9 As shown, the present application also provides a test method based on a test device simulating tunnel segment misalignment under actual working conditions, comprising the following steps:
[0090] S100, start the jack and apply a preset pressure to the soil;
[0091] By starting the jack 4, the jack 4 is extended and supported on the side wall of the inner box body 2, and a preset pressure is applied to the soil to facilitate subsequent analysis and calculation.
[0092] S200, starting the water tank and filling water into the inner box;
[0093] Open the water inlet valves of the pressurized water tanks 5 on both sides of the main test device, and add water to the test soil inside the inner box 2 so that the test soil reaches the target water level. At the same time, by controlling the water levels in the pressurized water tanks 5 on both sides, the target water pressure is applied to the test soil.
[0094] S300, monitoring the displacement of the pipe segment through the monitoring component, and analyzing it to obtain the result.
[0095] Record the initial reading of the displacement scale on the lifting rod 64 transmitted by the camera on the fixed block 63 of each segment misalignment on the computer device, and start the calculation of the misalignment amount development in the computer device;
[0096] At the same time, the first camera 72 on the slide rail 7 of the second transparent acrylic plate on the upper part of the outer box body 1 is opened, and adjusted to the best observation position by moving on the slide rail 7; the second camera 73 on the outer side of the outer box body 1 is opened, and the timed interval shooting is set; and the pore water pressure gauge and earth pressure gauge installed around the cast-in-place tunnel segment model 3 and in the inner box body 2 are opened, and the computer equipment starts to receive their monitoring data;
[0097] The built-in image processing system in the computer device is turned on to prepare to receive and process the images taken by the first camera 72 and the outer second camera 73;
[0098] On the computer equipment, the target force is set for the jack 4 containing the strain sensor according to the set number, so as to realize accurate pressure application on each pressure plate 21, and the pressure plate 21 will apply earth pressure to each contact part of the test soil, so as to simulate the earth pressure received by the shield tunnel segment with a certain buried depth under actual working conditions;
[0099] After the test is carried out for a certain period of time t, the test ends, the test data is analyzed and the conclusion is inferred.
[0100] The test device of the present invention has been applied through the above-mentioned research test on the misalignment of shield tunnel segments under changes in water and soil pressure in combination with the accompanying drawings, but the present invention is not limited to the above test cases, and the above-mentioned specific embodiments are only illustrative, and the present device is not limited. Therefore, many forms of experimental research can be carried out without departing from the scope of protection of the present invention and the claims, which all fall within the scope of protection of the present invention.
[0101] Those skilled in the art will readily appreciate other embodiments of the present invention after considering the specification and practicing the schemes disclosed herein. The present invention is intended to cover any variations, uses or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art that are not disclosed in this scheme. The description and examples are to be regarded as exemplary only, and the true scope and spirit of the present invention are indicated by the claims.
Claims
1. A test device for simulating tunnel segment misalignment under actual working conditions, characterized in that: include: outer box; An inner box body is arranged inside the outer box body; the interior of the inner box body is filled with soil, and a cast-in-place tunnel segment model is arranged inside the soil; A plurality of jacks are respectively arranged on the inner wall of the outer box; a side of the jack away from the outer box is arranged on the outer surface of the inner box; A water tank is disposed outside the outer box and is connected to the interior of the inner box through a pipeline, and is used to apply water pressure to the interior of the inner box; A monitoring component is arranged inside the cast-in-place tunnel segment model and is used to monitor the misalignment of the pipe segments in the cast-in-place tunnel segment model; The inner box comprises: Six pressure plates respectively correspond to the inner side walls of the outer box body and are connected to the inner side walls of the outer box body through the jack; a gap is set between two adjacent pressure plates and sealed by an elastic waterproof sealing rubber film; The pressure plates on the front and rear sides of the inner box are respectively provided with through holes for placing the cast-in-place tunnel segment model; The pressure plate comprises: A plurality of transparent acrylic plates; an elastic waterproof sealing rubber film is arranged between two adjacent transparent acrylic plates, and a gap is fitted between the two adjacent transparent acrylic plates; The monitoring components include: A main rod; a turntable is provided at the bottom of the main rod, and a scale is provided on the surface of the turntable; Two support rods are rotatably arranged on the turntable; the two support rods are symmetrically arranged on both sides of the main rod, and the two support rods have the same rotation direction relative to the turntable, and a first suction cup is rotatably arranged at one end of the support rod away from the turntable; A fixed block is arranged at one end of the main rod; a sliding hole is vertically penetrated inside the fixed block; A lifting rod is slidably disposed in the sliding hole; a scale is disposed on the side wall of the lifting rod; A second suction cup is arranged inside the cast-in-place tunnel segment model and is located at the bottom of the fixed block; a flat plate is arranged on the top of the second suction cup, and the bottom of the lifting rod is slidably matched with the flat plate; the two first suction cups are arranged on the same pipe segment of the cast-in-place tunnel segment model, and the second suction cup and the two first suction cups are respectively arranged on two adjacent pipe segments of the cast-in-place tunnel segment model; A slide groove is provided on the surface of the flat plate, the direction of the slide groove is the same as the length direction of the main rod, the lifting rod is slidably arranged in the slide groove, and the bottom of the lifting rod is a spherical surface.
2. The test device for simulating tunnel segment misalignment under actual working conditions according to claim 1 is characterized in that: The test device for simulating tunnel segment misalignment under actual working conditions also includes: A data acquisition component is arranged inside the inner box and is used to collect the soil pressure of the soil and the water pressure inside the inner box; The image acquisition component is arranged on the outer box body and is used to photograph the changes of the soil when the pipe segments are misaligned.
3. The test device for simulating tunnel segment misalignment under actual working conditions according to claim 2 is characterized in that: The data acquisition component includes: A water pressure gauge, disposed inside the soil body, for monitoring water pressure changes in the inner box; The soil pressure gauge is arranged inside the soil body and is used to monitor the pressure change of the soil body.
4. The test device for simulating tunnel segment misalignment under actual working conditions according to claim 2 is characterized in that: The image acquisition component comprises: A slide rail is arranged on the inner top wall of the outer box body; A first camera is disposed on the slide rail and can slide along the slide rail; The second camera is arranged on the outer box and located outside the outer box and corresponds to the inner box.
5. The test device for simulating tunnel segment misalignment under actual working conditions according to claim 1 is characterized in that: A strain sensor is arranged outside the jack.
6. A test method based on the test device for simulating tunnel segment misalignment under actual working conditions according to any one of claims 1 to 5, characterized in that: The following steps are involved: Start the jack and apply a preset pressure to the soil; Start the water tank and fill the inner box with water; The displacement of the pipe segments is monitored by monitoring components, and analyzed to obtain the results.
Citation Information
Patent Citations
Test device for simulating initial slab staggering of shield tunnel segment under earthquake load based on vibration table
CN114166442A
True triaxial simulated tunnel experiment device
CN106483023A
Automatic monitoring system for shield method circular seam slab staggering
CN115182739A
Stress analysis method for multifunctional subway tunnel with hidden defects
CN116046572A
Simulation test device for loading and unloading random dot matrix above model tunnel
CN116380627A