A steel structure model demonstration method based on QR code identification
Through the steel structure model demonstration method based on QR code identification, computer vision technology is used to generate and optimize QR code labels, which solves the problem of component location identification at the construction site, improves construction efficiency and accuracy, monitors and handles risks in a timely manner, and ensures Stability of steel structure engineering.
Patent Information
- Application Number
- CN202410910376.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-07-09
AI Technical Summary
At the construction site of large-scale steel structure projects, it is difficult for construction personnel to accurately identify and view the location information of steel structure components in real time, resulting in a decrease in construction efficiency and accuracy.
A steel structure model demonstration method based on QR code identification is adopted. The steel structure model is analyzed through computer vision technology, QR code labels are generated and optimized, and QR code labels are updated and adjusted in real time based on construction data to ensure accurate association between QR codes and component information.
It improves the accuracy of QR code layout and construction efficiency at the construction site, detects potential problems and risks in a timely manner, reduces waste of resources, and ensures stable operation of the system.
Smart Images

Figure CN118469519B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of model demonstration, and in particular to a steel structure model demonstration method based on two-dimensional code identification. Background Art
[0002] The steel structure model demonstration based on QR code identification refers to the process of displaying and demonstrating the design, construction and engineering scheme of steel structure in a graphical way by using computer technology and tools such as building information modeling (BIM). Through the steel structure model demonstration based on QR code identification, users can understand the structure, component layout, material usage, etc. of the overall steel structure, as well as the specific parameters and characteristics of each component in an intuitive way. This demonstration usually includes functions such as three-dimensional model display, animation demonstration, and interactive operation, which is designed to help users better understand and evaluate steel structure engineering projects and support the needs of various stages such as design, construction, maintenance and education. At the construction site of a large steel structure project, construction workers need to accurately install steel structure components according to the design drawings. However, due to factors such as the large scale of the project, the large number of components, and the complex construction environment, it is difficult for construction workers to accurately identify the location of each component. In addition, even with design drawings, it is difficult to view the specific location information of the components in real time on site. Summary of the invention
[0003] The purpose of the present invention is to provide a steel structure model demonstration method based on two-dimensional code identification to solve the shortcomings of the background technology.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a steel structure model demonstration method based on two-dimensional code identification, comprising the following steps;
[0005] S1: The construction personnel import the steel structure model file based on the QR code identification of the project into the system through the background of the steel structure model demonstration system based on the QR code identification, and pre-process the imported model;
[0006] S2: The system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identifies the basic attribute information of each component, and automatically generates a QR code with the steel structure component label, and associates the QR code with the information of the corresponding component;
[0007] S3: Comprehensively analyze the actual construction data and steel structure quality data of the construction site, evaluate the accuracy of the association between the QR code and the corresponding component information, and optimize the layout of the generated QR code;
[0008] S4: The construction personnel print the corresponding QR code and paste it on the corresponding steel structure component according to the position recommended by the system;
[0009] S5: During the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and updated and adjusted in real time according to the actual construction situation.
[0010] In a preferred embodiment, in S3, a comprehensive analysis is performed on the actual construction data and steel structure quality data of the construction site, specifically:
[0011] The actual construction data includes a steel structure construction efficiency deviation value and a steel structure model position offset ratio based on a two-dimensional code identifier, and the steel structure quality data includes a steel structure quality fluctuation value;
[0012] The method for obtaining the construction efficiency deviation value is as follows: obtain the time elapsed from the start to the end of construction in the m time period, obtain the amount of tasks completed during the actual construction process, calculate the actual construction efficiency, obtain the historical construction efficiency data of the steel structure in the historical construction data, calculate the average historical construction efficiency, and calculate the construction efficiency deviation value of the steel structure. The calculation expression is: , where To construct the efficiency deviation value, is the average historical construction efficiency, For actual building efficiency;
[0013] The method for obtaining the position offset ratio of the steel structure model based on the two-dimensional code identification is as follows: preprocessing the steel structure model based on the two-dimensional code identification and the component position data in the actual construction, performing feature extraction on the steel structure model based on the two-dimensional code identification and the component position data in the actual construction, matching the components in the steel structure model based on the two-dimensional code identification with the components in the actual construction, finding the corresponding components, and for each pair of matching components, calculating the position offset between them, and obtaining the component position in the steel structure model based on the two-dimensional code identification is: , the actual component position in construction is , calculate the position offset of the steel structure model based on the QR code identification, the calculation expression is: , where The position offset of the steel structure model based on the QR code identification is calculated. After the position offset of all components is calculated, the overall position offset ratio is calculated. The calculation expression is: , where N is the number of components, i is the position offset of the i-th component, is the position offset ratio of the steel structure model based on the QR code identification;
[0014] The method for obtaining the steel structure quality fluctuation value is: obtain the steel structure quality index data in the real-time feedback data of the system, establish a steel structure quality index data set, and calculate the average value vn of the data set. The calculation expression is: , where Represents each sample data, m represents the number of samples, calculates the difference between each sample data and the average value, and then squares, sums, and takes the square root of these differences to calculate the standard deviation of the steel structure quality value. The calculation expression is: , where is the standard deviation of the steel structure quality value, that is, the calculated steel structure quality fluctuation value.
[0015] In a preferred embodiment, the construction efficiency deviation value is normalized based on the position offset ratio of the steel structure model identified by the QR code and the steel structure quality fluctuation value, and the accuracy coefficient of the association between the QR code and the corresponding component information is calculated based on the normalized construction efficiency deviation value and the position offset ratio of the steel structure model identified by the QR code and the steel structure quality fluctuation value.
[0016] In a preferred embodiment, the accuracy coefficient of the association between the QR code and the corresponding component information is compared with a standard threshold. If the accuracy coefficient of the association between the QR code and the corresponding component information is greater than or equal to the standard threshold, no abnormal signal is issued; if the accuracy coefficient of the association between the QR code and the corresponding component information is less than the standard threshold, an abnormal signal is issued and the layout of the generated QR code is optimized.
[0017] In a preferred embodiment, in S5, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and updated and adjusted in real time according to the actual construction situation, specifically:
[0018] Set the risk prediction interval of the steel structure model demonstration system based on the QR code identification, and obtain the risk ratio of the system sending abnormal signals when the QR code is associated with the corresponding component information within a certain period of time;
[0019] If no abnormal signal is emitted when the QR code is associated with the corresponding component information within a certain period of time, the QR code is marked as a low-risk QR code, and a third-level warning signal is generated;
[0020] If an abnormal signal is sent when the QR code is associated with the corresponding component information within a certain period of time, and the risk ratio of the abnormal signal is less than the risk ratio threshold, the QR code is marked as a medium-risk QR code, and a second-level warning signal is generated;
[0021] If an abnormal signal is emitted when the QR code is associated with the corresponding component information within a certain period of time, and the risk ratio of the abnormal signal is greater than or equal to the risk ratio threshold, the QR code will be marked as a high-risk QR code, and a first-level warning signal will be generated.
[0022] The present invention also provides a steel structure model demonstration system based on two-dimensional code identification, including a model preprocessing module, a two-dimensional code generation module, a comprehensive analysis module, a two-dimensional code position marking module and a feedback adjustment module;
[0023] Model preprocessing module: construction personnel import the steel structure model file based on QR code identification of the project into the system through the background of the steel structure model demonstration system based on QR code identification, and preprocess the imported model;
[0024] QR code generation module: The system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identify the basic attribute information of each component, and automatically generate a QR code with the steel structure component label, and associate the QR code with the information of the corresponding component;
[0025] Comprehensive analysis module: conducts comprehensive analysis on the actual construction data and steel structure quality data of the construction site, evaluates the accuracy of the association between the QR code and the corresponding component information, and optimizes the layout of the generated QR code;
[0026] QR code position marking module: construction personnel print the corresponding QR code and stick it on the corresponding steel structure component according to the position recommended by the system;
[0027] Feedback adjustment module: During the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and real-time updates and adjustments are made based on the actual construction situation.
[0028] In the above technical solution, the technical effects and advantages provided by the present invention are:
[0029] 1. The present invention can evaluate the accuracy of the association between the QR code and the corresponding component information by comprehensively analyzing the actual construction data and steel structure quality data. According to the evaluation results, the QR code layout of the construction site is optimized. The goal of the optimization is to ensure the accurate association between the QR code and the component information and to improve the construction efficiency and accuracy. When optimizing the layout, multiple factors need to be considered, including the actual situation of the construction site, the layout of the steel structure components, the requirements of the construction process, etc. Based on these factors, a reasonable QR code layout scheme is designed so that the QR code can be easily scanned and accurately associated with the component information;
[0030] 2. The present invention monitors the accuracy of the correlation between the QR code and the component information in real time, so that the system can promptly discover potential problems and risks. According to the early warning signals of different risk levels, construction personnel can take corresponding measures in advance to effectively control risks and prevent the occurrence or expansion of faults. Marking QR codes as QR codes of different risk levels helps construction personnel to allocate resources and energy more reasonably. For low-risk QR codes, the maintenance frequency can be reduced and resources can be saved; for high-risk QR codes, monitoring and maintenance can be strengthened to ensure the stable operation of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0032] Figure 1 The figure is a flow chart of the method of the present invention.
[0033] Figure 2 It is a system module diagram of the present invention. DETAILED DESCRIPTION
[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example
[0035] See also Figure 1 As shown, the steel structure model demonstration method based on QR code identification described in this embodiment includes the following steps:
[0036] S1: The construction personnel import the steel structure model file based on the QR code identification of the project into the system through the background of the steel structure model demonstration system based on the QR code identification, and pre-process the imported model;
[0037] S2: The system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identifies the basic attribute information of each component, and automatically generates a QR code with the steel structure component label, and associates the QR code with the information of the corresponding component;
[0038] S3: Comprehensively analyze the actual construction data and steel structure quality data of the construction site, evaluate the accuracy of the association between the QR code and the corresponding component information, and optimize the layout of the generated QR code;
[0039] S4: The construction personnel print the corresponding QR code and paste it on the corresponding steel structure component according to the position recommended by the system;
[0040] S5: During the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and updated and adjusted in real time according to the actual construction situation.
[0041] Among them, in S1, the construction personnel import the steel structure model file based on QR code identification of the project into the system through the background of the steel structure model demonstration system based on QR code identification, and pre-process the imported model, specifically:
[0042] The construction personnel select and upload the steel structure model file based on the QR code identification of the project through the background interface of the steel structure model demonstration system based on the QR code identification, and the system accepts and imports the file. The system parses the imported model file and extracts the steel structure component data, material information, location coordinates and other related data. The imported model data is cleaned up, including removing invalid or redundant component data, repairing errors or incomplete parts in the model, to ensure the accuracy and completeness of the data. The imported model is optimized, including merging duplicate components, simplifying the model structure, etc., to improve the loading speed and performance of the model.
[0043] If necessary, the system may perform coordinate conversion to ensure that the location coordinates in the model match the coordinate system of the actual construction site. If the model file does not conform to the format required by the system, the system may perform format conversion to convert the model file to a standard format supported by the system for subsequent processing and display. Verify the processed model data to ensure that the processing results meet expectations and meet system requirements, such as component quantity, material properties, location information, etc. Add metadata tags to the processed model data, including component name, material specifications, design parameters and other information for subsequent data management and display.
[0044] In S2, the system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identifies the basic attribute information of each component, and automatically generates a QR code with the steel structure component label, and associates the QR code with the information of the corresponding component;
[0045] The pre-processed steel structure model based on the QR code identification is image processed to extract the features of each component. These features may include information such as the shape, size, color, texture, etc. of the component. The extracted features are analyzed using target detection algorithms, such as target detection methods based on deep learning (such as YOLO, Faster R-CNN, etc.), to detect and locate each component in the model.
[0046] The system can use image segmentation algorithms, such as region-based segmentation methods (such as region growing, watershed algorithm, etc.), to segment the model image into multiple parts with independent regions, each of which represents a component. Similarly, shape matching techniques, such as template matching, contour matching, etc., can be used to match the detected components with known steel structure component templates to further confirm the type and shape of the component.
[0047] The segmentation results are post-processed and optimized to eliminate noise and false detection in the segmentation results, ensuring that each component is accurately identified and segmented. The system extracts basic attribute information from the identified components, such as the type, size, material, etc. of the component. It may involve technologies such as image feature extraction and pattern matching. The system automatically generates a corresponding QR code with a steel structure component label based on the attribute information of each component. The QR code may contain a unique identifier and other key information of the component. The system associates the generated QR code with the information of the corresponding component and stores the associated information in the system database. In this way, when the user scans the QR code, the system can quickly find the attribute information of the corresponding component based on the information in the QR code.
[0048] In S3, the actual construction data and steel structure quality data of the construction site are comprehensively analyzed to evaluate the accuracy of the association between the QR code and the corresponding component information, and the layout of the generated QR code is optimized, specifically:
[0049] The actual construction data includes a steel structure construction efficiency deviation value and a steel structure model position offset ratio based on a two-dimensional code identifier, and the steel structure quality data includes a steel structure quality fluctuation value;
[0050] The method for obtaining the construction efficiency deviation value is as follows: obtain the time mt from the start to the end of construction in the m time period, which can be recorded and calculated according to the actual situation of the construction site, and obtain the task volume hp completed during the actual construction process, which can be counted and calculated according to the workload statistics of the construction site to calculate the actual construction efficiency , obtain the historical construction efficiency data of steel structures in historical construction data, and calculate the average historical construction efficiency , calculate the construction efficiency deviation value of the steel structure, the calculation expression is: , where is the construction efficiency deviation value;
[0051] The larger the construction efficiency deviation value, the greater the deviation between the actual construction efficiency and the expected efficiency. In steel structure construction, this deviation may lead to increased confusion and uncertainty in the construction process, thereby affecting the accuracy of the association between the QR code and the corresponding component information. Specifically:
[0052] A larger construction efficiency deviation value means that the construction progress is not in line with expectations, which may lead to increased confusion and tension on the construction site. In this case, construction workers may be more likely to make mistakes or omissions, thus affecting the accuracy of the association between the QR code and the component information.
[0053] If the actual construction progress deviates significantly from the expected progress, some component information may be outdated or inaccurate. Due to delays or advances in construction progress, the component information in the system may not be updated or adjusted in time, resulting in a decrease in the accuracy of the association between the QR code and the component information.
[0054] Deviations in the actual construction process may cause inconsistencies between the construction data and the data recorded in the system. For example, due to insufficient number of workers or shortage of materials, the actual construction efficiency decreases, while the data recorded in the system is still calculated according to the expected construction efficiency. In this case, the association between the QR code and the component information may be inconsistent or wrong.
[0055] In summary, the larger the construction efficiency deviation value, the greater the uncertainty of the construction site, which may affect the accuracy of the association between the QR code and the corresponding component information. Therefore, in order to ensure the accuracy of the QR code information, it is necessary to monitor the construction progress in a timely manner and make timely adjustments and updates to the actual construction situation to ensure that the component information in the system is consistent with the actual situation.
[0056] By evaluating the position offset ratio of the steel structure model based on the QR code identification, we can have a more comprehensive understanding of the position accuracy during the steel structure construction process, thereby effectively improving the accuracy of the association between the QR code and the component information, and optimizing the construction management and process, specifically:
[0057] The position offset ratio of the steel structure model based on the QR code can help evaluate the degree of deviation between the steel structure model based on the QR code and the position of the components in actual construction. By comparing the position of the components in the model with the position of the components in actual construction, the position offset ratio can be obtained to evaluate the accuracy of the association between the QR code and the component information.
[0058] If it is found that there is a large deviation between the steel structure model based on the QR code identification and the actual component position in the construction, the position of the QR code can be adjusted and corrected in time to ensure the accurate association between the QR code and the component information. This helps to avoid information mismatch or errors caused by position offset during the construction process.
[0059] By monitoring the position deviation ratio, possible problems or errors in the construction process can be discovered in time and effective construction guidance can be provided. For example, if the position deviation of some components is found to be large, the construction personnel can be reminded to pay attention to possible construction errors or adjust the construction plan to ensure construction quality and safety.
[0060] The method for obtaining the position offset ratio of the steel structure model based on the QR code identification is as follows:
[0061] Pre-process the steel structure model based on QR code identification and the component position data in actual construction to ensure that the data format is consistent and can be compared;
[0062] Extract features from the steel structure model based on the QR code and the component position data in actual construction. The features may include the position coordinates of the components, the dimensions of the components, the relative position relationship between the components, etc.
[0063] Use matching algorithms to match components in the steel structure model based on QR code identification with components in actual construction to find corresponding components, which may involve algorithms such as pattern recognition and shape matching;
[0064] For each pair of matching components, the position offset between them is calculated. The position offset can be calculated using the Euclidean distance to obtain the component position in the steel structure model based on the QR code identification: , the actual component position in construction is , calculate the position offset of the steel structure model based on the QR code identification, the calculation expression is: , where The position offset of the steel structure model based on the QR code identification is calculated. After the position offset of all components is calculated, the overall position offset ratio can be calculated. The calculation expression is: , where N is the number of components, i is the position offset of the i-th component, is the position offset ratio of the steel structure model based on the QR code identification. The larger the position offset ratio of the steel structure model based on the QR code identification, the worse the accuracy of the association between the QR code and the corresponding component information, which may lead to errors and delays in the construction process. The specific impacts are as follows:
[0065] When the position of the steel structure model based on the QR code identification is greatly offset, the component associated with the QR code may not match the component position in the actual construction. This will cause the component information displayed after scanning the QR code to be inconsistent with the actual component, thereby reducing the accuracy of the QR code and the corresponding component information.
[0066] If the component information associated with the QR code is inconsistent with the actual component location during construction, construction workers may be misled. They may mistakenly believe that the component indicated by the QR code matches the actual component location, and thus take wrong actions or decisions, increasing the possibility of errors during construction.
[0067] When the QR code is not accurately associated with the corresponding component information, construction workers may need additional time and energy to correct errors or confirm component locations, which will lead to decreased construction efficiency.
[0068] The quality fluctuation value of steel structure refers to the degree to which the quality parameters of steel structure change or fluctuate during the manufacturing or construction process. This fluctuation usually refers to the degree of change between the quality parameters of steel structure (such as size, geometry, surface quality, etc.) and their average value within a certain time range. The quality fluctuation value can be used to measure the quality stability and consistency of steel structure, as well as the quality control effect during the manufacturing or construction process.
[0069] For example, suppose that in a steel structure manufacturing plant, the dimensions of the same batch of steel structures are measured to obtain the length of each component. If these length values vary greatly over a period of time, even if the average length remains unchanged, it indicates that the quality of the steel structure fluctuates. The quality fluctuation value can be used to quantify the degree of this fluctuation, usually measured by calculating the standard deviation, range or other statistical indicators.
[0070] At the construction site, the quality fluctuation value of the steel structure is also an important indicator. During the construction process, the steel structure may be affected by factors such as temperature changes, construction errors, and material quality, resulting in fluctuations in quality parameters. Timely monitoring and evaluation of quality fluctuation values can help detect quality problems early and take corresponding measures to adjust and improve them, ensuring the quality stability and consistency of the steel structure.
[0071] The method for obtaining the steel structure quality fluctuation value is: obtain the steel structure quality index data in the real-time feedback data of the system, establish a steel structure quality index data set, and calculate the average value vn of the data set, that is, the average value of all sample data. The calculation expression is: , where Represents each sample data, m represents the number of samples, calculates the difference between each sample data and the average value, and then squares, sums, and takes the square root of these differences to calculate the standard deviation of the steel structure quality value. The calculation expression is: , where is the standard deviation of the steel structure quality value, that is, the steel structure quality fluctuation value is calculated;
[0072] The larger the steel structure quality fluctuation value, the greater the quality volatility of the steel structure, that is, the quality parameters of the steel structure have changed significantly within a certain period of time. In this case, the accuracy of the association between the QR code and the corresponding component information may be affected by the following:
[0073] Large fluctuations in the quality of steel structures may cause the actual size, shape and other quality parameters of the components to be inconsistent with the data in the steel structure model based on the QR code identification. This may cause the component information associated with the QR code to not match the actual component, thus affecting the accuracy of the QR code.
[0074] Large quality fluctuations may mean that the position and geometry of the component have changed significantly within a certain time frame. This will increase the uncertainty of the QR code attachment position, which may make it difficult for construction workers to accurately scan the QR code, thus affecting the accuracy of the association between the QR code and component information.
[0075] The large fluctuations in the quality of steel structures may reflect the instability and error accumulation during the construction process. This may mean that during the construction process, construction workers may face more errors and changes, thereby increasing the challenge of accurately associating the QR code with the corresponding component information.
[0076] In summary, the greater the fluctuation value of steel structure quality, the more likely the accuracy of the association between the QR code and the corresponding component information will be affected, which may lead to problems such as inconsistent matching, increased position deviation, and increased possibility of construction errors. Therefore, in practical applications, it is necessary to pay attention to the stability and consistency of steel structure quality, and timely adjust and correct steel structure quality parameters to ensure the accuracy of the association between the QR code and the corresponding component information.
[0077] Comprehensively analyze the actual construction data and steel structure quality data of the construction site, evaluate the accuracy of the association between the QR code and the corresponding component information, and optimize the layout of the generated QR code, specifically:
[0078] The construction efficiency deviation value is normalized based on the position offset ratio of the steel structure model marked with the QR code and the quality fluctuation value of the steel structure. The accuracy coefficient of the association between the QR code and the corresponding component information is calculated based on the normalized construction efficiency deviation value and the position offset ratio of the steel structure model marked with the QR code and the quality fluctuation value of the steel structure.
[0079] For example, the present invention can use the following formula to calculate the accuracy coefficient of the association between the two-dimensional code and the corresponding component information, and the calculation expression is: , where is the accuracy coefficient, To construct the efficiency deviation value, is the position offset ratio of the steel structure model based on the QR code identification, is the steel structure quality fluctuation value, To construct the efficiency deviation value, the position offset ratio of the steel structure model based on the QR code and the proportional coefficient of the steel structure quality fluctuation value are calculated. ; Compare the accuracy coefficient of the association between the QR code and the corresponding component information with the standard threshold. If the accuracy coefficient of the association between the QR code and the corresponding component information is greater than or equal to the standard threshold, it means that the accuracy of the steel structure model data information based on the QR code identification associated with the corresponding component information is higher, and no abnormal signal is issued at this time; if the accuracy coefficient of the association between the QR code and the corresponding component information is less than the standard threshold, it means that the accuracy of the steel structure model data information based on the QR code identification associated with the corresponding component information is lower, and an abnormal signal is issued at this time, and the layout of the generated QR code is optimized.
[0080] In this embodiment, the accuracy of the association between the QR code and the corresponding component information can be evaluated by comprehensively analyzing the actual construction data and the steel structure quality data. According to the evaluation results, the QR code layout of the construction site is optimized. The goal of the optimization is to ensure the accurate association between the QR code and the component information and improve the construction efficiency and accuracy. When optimizing the layout, multiple factors need to be considered, including the actual situation of the construction site, the layout of the steel structure components, the requirements of the construction process, etc. Based on these factors, a reasonable QR code layout scheme is designed so that the QR code can be easily scanned and accurately associated with the component information. Example
[0081] In S4, the construction personnel print the corresponding QR code and paste it on the corresponding steel structure component according to the position recommended by the system, including:
[0082] Confirm that the system has generated a QR code and recommended the corresponding location. Import the generated QR code image into the printing device or the computer connected to the printing device. Select a printing device suitable for printing QR codes, such as a printer or label printer. In the printing device or printing software, adjust the print settings, including paper size, print quality, print direction, etc., to ensure the quality and accuracy of the QR code printing. Select the QR code image file to be printed on the computer or printing device. Preview and confirm the printing effect in the print settings. Start the printing operation and wait for the printing to complete.
[0083] Prepare the steel structure components to which the QR codes are to be affixed. Clean the surface of the component and ensure that the surface is clean and flat to ensure that the QR code can be firmly affixed and remains clearly visible. Affix the printed QR code to the corresponding steel structure component at the position recommended by the system. Pay attention to the accuracy and precision of the QR code affixation position, and avoid damage or obstruction of the QR code. Check the affixment of all QR codes to ensure that each QR code is affixed to the correct component. Confirm the readability and clarity of the QR code, and whether it matches the associated component information in the system. Record the affixation position and component information of each QR code for subsequent use and management.
[0084] In S5, during the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and real-time updates and adjustments are made according to the actual construction situation, specifically:
[0085] When the accuracy of the association between the QR code and the corresponding component information remains at a low level for a certain period of time, it indicates that the risk of failure of the steel structure model demonstration system based on QR code identification is higher, specifically:
[0086] The risk prediction interval of the steel structure model demonstration system based on the QR code identification is set. The time length corresponding to the risk prediction interval of the steel structure model demonstration system based on the QR code identification is fixed, and its range changes with the passage of time, always ending at the real-time point. It mainly includes:
[0087] Obtain the risk ratio of abnormal signals issued by the system when the QR code is associated with the corresponding component information within a certain period of time;
[0088] If no abnormal signal is issued when the QR code is associated with the corresponding component information within a certain period of time, it means that the possibility of failure of the steel structure model demonstration system based on the QR code identification is low, and the QR code is marked as a low-risk QR code. At this time, a third-level warning signal is generated. Construction personnel need to regularly check the system operation status to ensure that the association between the QR code and the component information is still accurate and reliable. If an abnormality is found or a new warning signal appears, the processing strategy should be adjusted in time;
[0089] If an abnormal signal is issued when the QR code is associated with the corresponding component information within a certain period of time, and the risk ratio of the abnormal signal is less than the risk ratio threshold, it means that the possibility of failure of the steel structure model demonstration system based on the QR code identification is medium, and the QR code is marked as a medium-risk QR code. At this time, a secondary warning signal is generated. Construction personnel need to strengthen monitoring and maintenance, pay close attention to the components related to these QR codes and the operating status of the system, increase the inspection frequency, and deal with abnormal situations in time to prevent the occurrence or expansion of failures;
[0090] If an abnormal signal is issued when the QR code is associated with the corresponding component information within a certain period of time, and the risk ratio of the abnormal signal is greater than or equal to the risk ratio threshold, it means that the steel structure model demonstration system based on the QR code identification is likely to fail. The QR code is marked as a high-risk QR code. At this time, a first-level warning signal is generated. The construction personnel should immediately take emergency measures to inspect and maintain the system to resolve possible faults as soon as possible. The system operation can be suspended, and the components associated with the high-risk QR code should be inspected and repaired in detail to ensure the safety and normal operation of the system.
[0091] The risk ratio threshold is set by personnel in this field according to the specific situation of the risk ratio of the system sending out an abnormal signal when the QR code is associated with the corresponding component information within a certain period of time in the steel structure model demonstration system based on QR code identification, and will not be elaborated here.
[0092] Specifically, the risk level of the first-level warning signal is higher than that of the second-level warning signal, and the risk level of the second-level warning signal is higher than that of the third-level warning signal. According to the risk level of each QR code, the steel structure model demonstration system based on the QR code identification is predicted to fail. Dividing the risk level of the QR code into the first, second and third levels will help system managers to more clearly understand the risk situation of the system and the degree of priority. In this way, high-risk faults and problems can be handled first, resources and energy can be allocated effectively, and the stability and reliability of system operation can be improved. Example
[0093] See also Figure 2 As shown, the steel structure model demonstration method system based on two-dimensional code identification described in this embodiment includes a model preprocessing module, a two-dimensional code generation module, a comprehensive analysis module, a two-dimensional code position marking module and a feedback adjustment module;
[0094] Model preprocessing module: construction personnel import the steel structure model file based on QR code identification of the project into the system through the background of the steel structure model demonstration system based on QR code identification, and preprocess the imported model;
[0095] QR code generation module: The system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identify the basic attribute information of each component, and automatically generate a QR code with the steel structure component label, and associate the QR code with the information of the corresponding component;
[0096] Comprehensive analysis module: conducts comprehensive analysis on the actual construction data and steel structure quality data of the construction site, evaluates the accuracy of the association between the QR code and the corresponding component information, and optimizes the layout of the generated QR code;
[0097] QR code position marking module: construction personnel print the corresponding QR code and stick it on the corresponding steel structure component according to the position recommended by the system;
[0098] Feedback adjustment module: During the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and real-time updates and adjustments are made based on the actual construction situation.
[0099] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0100] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0101] It should be understood that the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding.
[0102] In this application, "at least one" means one or more, and "more than one" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b, or c can be represented by: a, b, c, ab, ac, bc, or abc, where a, b, c can be single or multiple.
[0103] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0104] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0105] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0106] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0107] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0108] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0109] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.
[0110] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A steel structure model demonstration method based on QR code identification, characterized in that: The steps include: S1: The construction personnel import the steel structure model file based on the QR code identification of the project into the system through the background of the steel structure model demonstration system based on the QR code identification, and pre-process the imported model; S2: The system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identifies the basic attribute information of each component, and automatically generates a QR code with the steel structure component label, and associates the QR code with the information of the corresponding component; S3: Comprehensively analyze the actual construction data and steel structure quality data of the construction site, evaluate the accuracy of the association between the QR code and the corresponding component information, and optimize the layout of the generated QR code; Step S3 specifically includes: the actual construction data includes a steel structure construction efficiency deviation value and a steel structure model position offset ratio based on a two-dimensional code identifier, and the steel structure quality data includes a steel structure quality fluctuation value; The method for obtaining the construction efficiency deviation value is as follows: obtain the time elapsed from the start to the end of construction in the m time period, obtain the amount of tasks completed during the actual construction process, calculate the actual construction efficiency, obtain the historical construction efficiency data of the steel structure in the historical construction data, calculate the average historical construction efficiency, and calculate the construction efficiency deviation value of the steel structure. The calculation expression is: , where To construct the efficiency deviation value, is the average historical construction efficiency, For actual construction efficiency; The method for obtaining the position offset ratio of the steel structure model based on the two-dimensional code identification is as follows: preprocessing the steel structure model based on the two-dimensional code identification and the component position data in the actual construction, performing feature extraction on the steel structure model based on the two-dimensional code identification and the component position data in the actual construction, matching the components in the steel structure model based on the two-dimensional code identification with the components in the actual construction, finding the corresponding components, and for each pair of matching components, calculating the position offset between them, and obtaining the component position in the steel structure model based on the two-dimensional code identification is: , the actual component position in construction is , calculate the position offset of the steel structure model based on the QR code identification, the calculation expression is: , where The position offset of the steel structure model based on the QR code identification is calculated. After the position offset of all components is calculated, the overall position offset ratio is calculated. The calculation expression is: , where N is the number of components, i is the position offset of the i-th component, is the position offset ratio of the steel structure model based on the QR code identification; The method for obtaining the steel structure quality fluctuation value is: obtain the steel structure quality index data in the real-time feedback data of the system, establish a steel structure quality index data set, and calculate the average value vn of the data set. The calculation expression is: , where Represents each sample data, m represents the number of samples, calculates the difference between each sample data and the average value, and then squares, sums, and takes the square root of these differences to calculate the standard deviation of the steel structure quality value. The calculation expression is: , where is the standard deviation of the steel structure quality value, that is, the steel structure quality fluctuation value is calculated; The construction efficiency deviation value is normalized based on the position offset ratio of the steel structure model marked by the QR code and the steel structure quality fluctuation value, and the accuracy coefficient of the association between the QR code and the corresponding component information is calculated based on the construction efficiency deviation value after normalization based on the position offset ratio of the steel structure model marked by the QR code and the steel structure quality fluctuation value; Compare the accuracy coefficient of the association between the QR code and the corresponding component information with the standard threshold. If the accuracy coefficient of the association between the QR code and the corresponding component information is greater than or equal to the standard threshold, no abnormal signal is issued; if the accuracy coefficient of the association between the QR code and the corresponding component information is less than the standard threshold, an abnormal signal is issued and the layout of the generated QR code is optimized. S4: The construction personnel print the corresponding QR code and paste it on the corresponding steel structure component according to the position recommended by the system; S5: During the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and updated and adjusted in real time according to the actual construction situation.
2. According to claim 1, a steel structure model demonstration method based on two-dimensional code identification is characterized in that: In S5, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and real-time updates and adjustments are made according to the actual construction situation, specifically: Set the risk prediction interval of the steel structure model demonstration system based on the QR code identification, and obtain the risk ratio of the system sending abnormal signals when the QR code is associated with the corresponding component information within a certain period of time; If no abnormal signal is emitted when the QR code is associated with the corresponding component information within a certain period of time, the QR code is marked as a low-risk QR code, and a third-level warning signal is generated; If an abnormal signal is sent when the QR code is associated with the corresponding component information within a certain period of time, and the risk ratio of the abnormal signal is less than the risk ratio threshold, the QR code is marked as a medium-risk QR code, and a second-level warning signal is generated; If an abnormal signal is emitted when the QR code is associated with the corresponding component information within a certain period of time, and the risk ratio of the abnormal signal is greater than or equal to the risk ratio threshold, the QR code will be marked as a high-risk QR code, and a first-level warning signal will be generated.
3. A steel structure model demonstration system based on two-dimensional code identification, used to implement a steel structure model demonstration method based on two-dimensional code identification according to any one of claims 1-2, characterized in that: It includes a model preprocessing module, a QR code generation module, a comprehensive analysis module, a QR code position marking module and a feedback adjustment module; Model preprocessing module: construction personnel import the steel structure model file based on QR code identification of the project into the system through the background of the steel structure model demonstration system based on QR code identification, and preprocess the imported model; QR code generation module: The system uses computer vision technology to analyze the pre-processed steel structure model based on the QR code identification, identify the basic attribute information of each component, and automatically generate a QR code with the steel structure component label, and associate the QR code with the information of the corresponding component; Comprehensive analysis module: conducts comprehensive analysis on the actual construction data and steel structure quality data of the construction site, evaluates the accuracy of the association between the QR code and the corresponding component information, and optimizes the layout of the generated QR code; QR code position marking module: construction personnel print the corresponding QR code and stick it on the corresponding steel structure component according to the position recommended by the system; Feedback adjustment module: During the construction process, the accuracy of the association between the QR code and the corresponding component information within a certain period of time is analyzed, and real-time updates and adjustments are made based on the actual construction situation.
