A steel pipe powder coating device and powder coating system

The automated design of the air supply device and base solves the problem of powder blockage in steel pipe powder coating equipment, improves powder coating efficiency and uniformity of the powder coating layer, and reduces air pollution.

CN118491758BActive Publication Date: 2026-11-17HENGYANG KEYING STEEL PIPE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410631675.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-21
Publication Date
2026-11-17
Estimated Expiration
2044-05-21

AI Technical Summary

Technical Problem

In existing steel pipe powder coating equipment, the pipes that transport powder raw materials are prone to blockage, resulting in low powder coating efficiency, high difficulty in unblocking, and uneven powder coating thickness.

Method used

A gas supply device is used to transport the vulcanized powder particles under positive pressure. A steel pipe powder coating device and a powder collection and recovery device are installed on the base, allowing the pipe to slide along the length of the base. Combined with a drive component and a support component, the automatic powder coating of the steel pipe and the recovery of the powder are realized.

Benefits of technology

It improves powder coating efficiency, reduces the possibility of powder particles polluting the air, reduces the need for manual pipe clearing, and ensures the uniformity of the powder coating layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118491758B_ABST
    Figure CN118491758B_ABST
Patent Text Reader

Abstract

This application relates to a steel pipe powder coating device and system, belonging to the technical field of metal inner plastic pipe production. The steel pipe powder coating device includes a powder tank, a vulcanizing bed, and a spray gun. The vulcanizing bed is used to vulcanize the powder flowing out of the powder tank, and the spray gun is used to spray the vulcanized powder onto the inner wall of the steel pipe. An air supply device and a conveying pipeline are provided outside the vulcanizing bed. The air supply device, the vulcanizing bed, and the spray gun are connected in series on the conveying pipeline. This application has the effect of improving the efficiency of steel pipe powder coating.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of metal inner plastic tube production, and in particular to a steel pipe powder coating device and powder coating system. Background Technology

[0002] Powder coating inside and outside steel pipes is one of the important means to improve the corrosion resistance of steel pipes. In the existing technology, two methods are usually used: dip coating and spray coating. However, due to the problems that dip coating is prone to causing raw material to drip onto the bottom of the steel pipe, resulting in a large consumption of raw material, and the thickness of the powder coating layer on the steel pipe is thicker at the point where the steel pipe first contacts the raw material, resulting in uneven thickness of the powder coating layer on the steel pipe, the spray coating method is now more commonly used.

[0003] In existing technology, the equipment used for powder coating of steel pipes typically includes a powder tank, a vulcanizing bed, a Venturi tube, and a spray gun. The powder particles in the powder tank first flow to the vulcanizing bed for vulcanization, and then the Venturi effect allows the vulcanized powder particles in the vulcanizing bed to be continuously sprayed out from the spray gun, thereby powder coating the steel pipe.

[0004] However, powder coating using the Venturi effect relies on the negative pressure generated by the Venturi tube when fluid flows through it to extract the vulcanized powder from the vulcanizing bed, which is then sprayed out by the spray gun to coat the steel pipe. However, during the powder coating process, the pipes conveying the powder raw materials are prone to blockage due to the viscosity of the vulcanized powder itself. Furthermore, since the negative pressure adsorption force is constant, it becomes impossible to extract the vulcanized powder from the vulcanizing bed. This requires workers to spend a certain amount of time clearing the blocked pipes, and the clearing process is quite difficult, thus affecting the efficiency of subsequent powder coating of the steel pipe. Summary of the Invention

[0005] To improve the efficiency of powder coating on steel pipes, in a first aspect, this application provides a steel pipe powder coating device, which adopts the following technical solution: It includes a powder tank, a vulcanizing bed, and a spray gun. The vulcanizing bed is used to vulcanize the powder flowing out of the powder tank, and the spray gun is used to spray the vulcanized powder onto the inner wall of the steel pipe. An air supply device and a conveying pipeline are installed outside the vulcanizing bed. The air supply device, the vulcanizing bed, and the spray gun are connected in series on the conveying pipeline.

[0006] Secondly, this application also provides a powder coating system employing the above-mentioned steel pipe powder coating device, using the following technical solution: In addition to the steel pipe powder coating device, it also includes a base, a steel pipe replacement device, and a powder collection and recovery device. The steel pipe powder coating device and the powder collection and recovery device are slidably installed on the base and are located at both ends of the base in the length direction. The steel pipe replacement device is installed on the base and is located between the steel pipe powder coating device and the powder collection and recovery device. The steel pipe replacement device includes a feeding component, a supporting component, a driving component, and a discharging component. The feeding component is used to transport the steel pipe to be powder coated to the supporting component. The supporting component is used to transfer the steel pipe to be powder coated to the driving component. There are two sets of driving components, which are located on both sides of the supporting component. The driving component is used to drive the steel pipe to rotate around its own axis and move the steel pipe to the discharging component. The driving component, the steel pipe powder coating device, and the powder collection and recovery device are on the same straight line.

[0007] Preferably, the feeding assembly includes a feeding conveyor belt, a fixed base, a first mounting base, a first lifting member, a transition seat, two sliding bases, two second lifting members, and two side baffles. The fixed base is mounted on the base, and the first mounting base and the first lifting member are respectively mounted on the fixed base. One end of the bottom of the transition seat is hinged to the first mounting base. The first lifting member is used to realize the up-and-down flipping of the transition seat relative to the first mounting base. The feeding conveyor belt is used to feed the steel pipe from the end of the transition seat near the first lifting member to the transition seat. The two sliding bases are located on both sides of the fixed base. The two sliding bases can move simultaneously on the base in the direction of moving closer to or away from the fixed base. The second lifting members are mounted on the sliding bases, and the second side baffles are hinged to the second lifting members. A guide rod is provided at the end of the transition seat away from the feeding conveyor belt. The two ends of the guide rod are respectively perpendicularly inserted into the two side baffles. The second lifting members are used to drive the second side baffles to rotate around the axis of the guide rod.

[0008] Preferably, the base is provided with an installation groove whose extension direction is parallel to the length direction of the base. A first bidirectional lead screw is provided in the installation groove. Two sliding bases are respectively installed at both ends of the first bidirectional lead screw. The base is provided with a first driving member for driving the bidirectional lead screw to rotate around its own axis. When the first bidirectional lead screw rotates, the two sliding bases move towards each other or move away from each other at the same time.

[0009] Preferably, the outer wall of the guide rod protrudes from the surface of the transition seat used to abut against the steel pipe. An anti-detachment mechanism is provided on the side baffle. The anti-detachment mechanism includes a second mounting seat, a first pushing member, and a stop rod. The second mounting seat is located on the side of the side baffle away from the transition seat. The first pushing member is mounted on the second mounting seat. One end of the stop rod is perpendicularly inserted through the side baffle, and the other end of the stop rod is connected to the first pushing member. When the stop rod is not pushed out by the first pushing member, the end face of the stop rod is flush with the side of the side baffle near the transition seat. When the stop rod is used to abut against the outer wall of the steel pipe, the end of the stop rod connected to the first pushing member is located in the side baffle.

[0010] Preferably, the transition seat is provided with a slot for passing through the transition seat. The support assembly includes a mounting base, a second pushing member, and three sets of support mechanisms. The mounting base is mounted on the base, and the second pushing member is mounted on the base to push the mounting base to move along a direction perpendicular to the length of the base. The second pushing member is used to align the mounting base, drive assembly, steel pipe powder coating device, and powder collection and recovery device in a straight line. The three sets of support mechanisms are respectively mounted on the mounting base and arranged sequentially from the direction closest to the steel pipe powder coating device to the direction closest to the powder collection and recovery device. The middle support mechanism is fixedly mounted on the mounting base and corresponds to the position of the transition seat. Each support mechanism includes an arc-shaped support plate, a third mounting seat, a third lifting member, a mounting plate, a second driving member, a guide shaft, and two support seats. The third mounting base is set on the mounting base, and the third lifting component is set on the third mounting base to change the height of the mounting plate; the arc-shaped support plate is provided with a guide part, and the guide part is provided with an arc-shaped guide groove that passes through the guide part. Two support seats are respectively mounted on the mounting plate and located on both sides of the arc-shaped guide groove. One end of the guide shaft is connected to one of the support seats, and the other end of the guide rod passes through the arc-shaped guide groove and is connected to the other support seat; the second driving component is set on the mounting plate to drive the arc-shaped support plate to move along the extension direction of the arc-shaped guide groove; when it is necessary to remove the steel pipe from the transition seat, one end of the arc-shaped support plate corresponding to the transition seat extends into the groove and pushes out the steel pipe that abuts against the guide rod. The moving direction of the other two arc-shaped support plates is opposite to that of the arc-shaped support plate that pushes out the steel pipe.

[0011] Preferably, the side of the arc-shaped support plate used to support the steel pipe is provided with multiple balls by ball joint.

[0012] Preferably, the drive assembly includes a drive wheel, a driven wheel, an adjusting seat, a fourth lifting member, a fourth mounting seat, and two sliding seats. The fourth mounting seat is slidably mounted on the base, the fourth lifting member is mounted on the fourth mounting seat, the adjusting seat is provided with a third drive member and a second bidirectional lead screw, the two sliding seats are respectively mounted on both ends of the second bidirectional lead screw, the drive wheel and the driven wheel are respectively mounted on the two sliding seats, when the second bidirectional lead screw rotates around its own axis, the two sliding seats can move towards or away from each other simultaneously, the adjusting seat on which the drive wheel is mounted is provided with a fourth drive member for driving the drive wheel to rotate, and both the drive wheel and the driven wheel can abut against the outer wall of the steel pipe.

[0013] Preferably, the unloading assembly includes a storage rack and two unloading conveyor belts. When the fourth lifting component is in the descending state, the steel pipe located between the driving wheel and the driven wheel will be transferred to the two unloading conveyor belts. The storage rack is used to collect the steel pipes rolling off the unloading conveyor belts.

[0014] Preferably, the powder collection and recovery device includes a fifth mounting base, a cover, an exhaust fan, and a powder collection cover. The fifth mounting base is mounted on a base, the cover is mounted on the fifth mounting base, the exhaust fan is mounted on the cover, and the cover is provided with a connecting pipe that communicates with the powder collection cover.

[0015] In summary, compared with the prior art, the advantages of this application are as follows: 1. Compressed air is supplied to the vulcanizing bed through an air supply device, thereby conveying the vulcanized powder particles in the vulcanizing bed towards the spray gun and finally spraying them out through the spray gun. Because positive pressure is used to convey the vulcanized raw material towards the spray gun, even if the conveying pipeline is blocked during this process, the material blocking the conveying pipeline can be dispersed by continuously pressurizing the conveying pipeline through the air supply device, so that the conveying pipeline is unblocked again. In this process, it is not easy to clear the conveying pipeline manually, thus achieving the effect of increasing the efficiency of steel pipe powder coating.

[0016] 2. By installing a powder collection and recovery device on the base that is aligned with the steel pipe powder coating device, when the inner wall of the steel pipe needs to be powder coated, the steel pipe powder coating device is aligned with one end of the steel pipe to be powder coated, while the powder collection and recovery device is aligned with the other end of the steel pipe to be powder coated. This allows the powder particles sprayed out by the spray gun that do not adhere to the inner wall of the steel pipe to be powder coated, thereby reducing the possibility of powder particles polluting the air. Attached Figure Description

[0017] Figure 1 This is a perspective view of a steel pipe powder coating device according to Embodiment 1 of this application; Figure 2 yes Figure 1 A pneumatic circuit diagram of a steel pipe powder coating device; Figure 3 This is a layout diagram of a steel pipe powder coating system according to Embodiment 2 of this application; Figure 4 This is a three-dimensional schematic diagram of a steel pipe powder coating system according to Embodiment 2 of this application; Figure 5 yes Figure 4 A three-dimensional schematic diagram of the loading and unloading assembly; Figure 6 yes Figure 5 A full sectional view from the side; Figure 7 yes Figure 5 Enlarged view of point A in the middle; Figure 8 yes Figure 4 A 3D schematic diagram showing the components of the feeding assembly, unloading assembly, steel pipe powder coating device, and powder collection and recovery device hidden. Figure 9 yes Figure 8 Enlarged view of point B in the middle; Figure 10 yes Figure 8 A three-dimensional diagram from another perspective; Figure 11 yes Figure 10 Enlarged diagram of point C in the middle.

[0018] Explanation of reference numerals in the attached figures: 1. Steel pipe powder coating device; 101. Powder tank; 102. Vulcanizing bed; 103. Spray gun; 104. Gas supply device; 105. Conveying pipeline; 2. Base; 201. Mounting slot; 202. First bidirectional lead screw; 203. First driving component; 3. Steel pipe replacement device; 301. Feeding assembly; 3011. Feeding conveyor belt; 3012. Fixed base; 3013. First mounting seat; 3014. First lifting component; 3015. Transition seat; 30151. Groove; 3016. Sliding base; 3017. Second lifting component; 3018. Side baffle; 3019. Guide rod; 3020. Anti-detachment mechanism; 30201. Second mounting seat; 30202. First pushing component; 30203. Stop bar; 302. Support component; 3021. Mounting base; 3022. Second pusher; 3023. Support mechanism; 30231. Arc-shaped support plate; 30232. Guide section; 30233. Arc-shaped guide groove; 30234. Ball bearing; 30235. Third mounting seat; 30236. Mounting plate; 30237. Second drive component; 30238. Guide shaft; 30239. Support seat; 30240. Third lifting component; 303, Drive assembly; 3031, Drive wheel; 3032, Driven wheel; 3033, Adjusting seat; 30331, Second double-acting lead screw; 30332, Third drive component; 3034, Fourth lifting component; 3035, Fourth mounting seat; 3036, Sliding seat; 3037, Fourth drive component; 304. Feeding assembly; 3041. Feeding conveyor belt; 3042. Storage rack; 4. Powder collection and recovery device; 401. Fifth mounting base; 402. Cover; 403. Exhaust fan; 404. Powder collection cover. Detailed Implementation

[0019] The following is in conjunction with the appendix Figure 1-11 This application will be described in further detail.

[0020] Embodiment 1 of this application discloses a steel pipe powder coating device 1, which is described in reference to... Figure 1 and Figure 2It includes a powder tank 101, a vulcanizing bed 102, a spray gun 103, an air supply device 104, and a conveying pipeline 105. The vulcanizing bed 102 is located below the powder tank 101 and is used to vulcanize the powder particles flowing out of the powder tank 101. In this embodiment, the air supply device 104 is an air compressor.

[0021] The air supply device 104, the vulcanizing bed 102, and the spray gun 103 are connected in series on the conveying pipeline 105. The conveying pipeline 105 allows the compressed air provided by the air supply device 104 to enter the vulcanizing bed 102 and transport the vulcanized powder particles in the vulcanizing bed 102 to the spray gun 103 and finally spray them out from the spray gun 103. During this process, if the powder particles block the conveying pipeline 105, the air supply device 104 will still supply air, causing the pressure in the conveying pipeline 105 to gradually increase until the gas can disperse the blockage in the conveying pipeline 105, thereby enabling the spray gun 103 to perform powder coating treatment on the steel pipe normally.

[0022] It should be noted that in order to avoid safety accidents caused by excessive pressure inside the delivery pipeline 105, a pressure sensor (not shown in the figure) is also installed on the delivery pipeline 105 to detect pressure changes inside the delivery pipeline 105.

[0023] Furthermore, a spray gun cleaning air passage is also provided on the conveying pipeline 105. The spray gun cleaning air passage is connected in parallel with the vulcanizing bed 102 on the conveying pipeline 105. This allows the gas to clean the raw materials adhering to the inside of the spray gun 103 by ensuring that the airflow from the gas supply device 104 flows only into the spray gun cleaning air passage when it is necessary to clean the powder particles inside the spray gun 103.

[0024] The implementation principle of Embodiment 1 of this application is as follows: the raw material in the powder tank 101 enters the vulcanizing bed 102 for vulcanization. Subsequently, gas is injected into the conveying pipeline 105 through the gas supply device 104, so that the gas can enter the vulcanizing bed 102 through the conveying pipeline 105. Then, the raw material in the vulcanizing bed 102 after vulcanization is completed is conveyed to the spray gun 103 and finally sprayed out through the spray gun 103 to coat the steel pipe with plastic.

[0025] Reference Figure 3 , Figure 4 , Figure 5 and Figure 6Embodiment 2 of this application provides a steel pipe powder coating system, which, in addition to the steel pipe powder coating device 1 in Embodiment 1, also includes a base 2, a steel pipe replacement device 3, and a powder collection and recovery device 4. The base 2 is a cuboid, and the steel pipe powder coating device 1, the steel pipe replacement device 3, and the powder collection and recovery device 4 are arranged sequentially along the length of the base 2. The steel pipe powder coating device 1 and the powder collection and recovery device 4 are slidably mounted on the base 2 and can slide along the length of the base 2. This allows the distance between the steel pipe powder coating device 1 and the powder collection and recovery device 4 to be adjusted according to the length of the steel pipe, thereby powder coating treatment on the inner wall of steel pipes of different lengths located on the steel pipe replacement device 3.

[0026] The steel pipe replacement device 3 includes a feeding assembly 301, a supporting assembly 302, a driving assembly 303, and a discharging assembly 304. The feeding assembly 301, supporting assembly 302, and discharging assembly 304 are sequentially arranged on the base 2 along a direction perpendicular to the length of the base. The feeding assembly 301 includes a feeding conveyor belt 3011, a fixed base 3012, a first mounting seat 3013, a first lifting component 3014, a transition seat 3015, two sliding bases 3016, two second lifting components 3017, and two side baffles 3018. The fixed base 3012 is fixedly mounted on the base 2, and the first mounting seat 3013 is vertically fixed on the fixed base 3012. The first lifting component 3014 is also vertically fixed on the fixed base 3012. The first lifting component 3014 is an electric push rod. The bottom of the transition seat 3015 at the end away from the feeding conveyor belt is hinged to the first lifting component 3014, while the bottom of the transition seat 3015 at the end closer to the feeding conveyor belt is hinged to the output end of the first lifting component 3014. This allows the transition seat 3015 to rotate up and down relative to the first mounting base 3013 when the first lifting component 3014 starts to move. This allows the speed at which the steel pipe on the transition seat 3015 rolls toward the supporting component 302 to be adjusted by adjusting the inclination of the transition seat 3015 when the steel pipe is on the transition seat 3015.

[0027] It is worth mentioning that, since the steel pipe needs to be preheated before powder coating, the raw material sprayed on the inner wall of the steel pipe can melt and adhere to the inner wall of the steel pipe. Therefore, in order to ensure the powder coating effect, the feeding conveyor belt 3011 in this embodiment is a chain transmission belt in the heating furnace. This allows the steel pipe to move to the transition seat 3015 via the feeding conveyor belt 3011 after being heated.

[0028] Furthermore, since the height of the end of the transition seat 3015 near the feeding conveyor belt 3011 can be adjusted by the action of the first lifting component 3014, the transition seat 3015 can be adapted to heating furnaces with different discharge heights by first adjusting the height of the end of the transition seat 3015 near the feeding conveyor belt 3011.

[0029] Two sliding bases 3016 are distributed on both sides of the fixed base 3012, and the two sliding bases 3016 are slidably mounted on the base 2. The sliding direction of the two sliding bases 3016 is perpendicular to the conveying direction of the feeding conveyor belt 3011. A second lifting member 3017 is provided on each sliding base 3016. The second lifting member 3017 is also an electric push rod. One end of the side baffle 3018 is hinged to the movable end of the second lifting member 3017. At the end of the transition seat 3015 away from the feeding conveyor belt 3011, a part with a length direction equal to the length of the base 2 is installed by a fixed connection. The guide rod 3019 is parallel to the direction of the guide rod. The two ends of the guide rod 3019 are perpendicularly inserted into the two side baffles 3018. This allows the side baffles 3018 to rotate around the axis of the guide rod 3019 when the second lifting member 3017 is in motion. This also allows the two side baffles 3018 to limit the steel pipe located on the transition seat 3015 when the moving end of the first lifting member 3014 is at the same height as the moving end of the second lifting member 3017. This allows the steel pipe to roll along the length of the transition seat 3015 as much as possible with its axis perpendicular to the length of the transition seat 3015.

[0030] Reference Figure 3 , Figure 5 and Figure 6 To achieve synchronous movement of the two sliding bases 3016 on the base 2, an installation groove 201 extending in the same direction as the length of the base 2 is provided on the base 2. A first bidirectional lead screw 202 is installed in the installation groove 201, and lead screw nuts adapted to the bidirectional lead screw are provided on the two sliding bases 3016. A first driving member 203 with its output end connected to the bidirectional lead screw is also provided on the base 2. The first driving member 203 is a drive motor. This allows the two sliding bases 3016 to slide simultaneously on the base 2 towards the fixed base 3012 or away from the fixed base 3012 when the bidirectional lead screw rotates around its own axis under the action of the drive motor.

[0031] Reference Figure 5 , Figure 6 and Figure 7Furthermore, the transition seat 3015 is provided with a guide rod 3019, one end of which has a vertical slot 30151 penetrating through the transition seat 3015. The outer wall of the guide rod 3019 protrudes from the surface of the transition seat 3015 used to abut against the steel pipe. This allows the steel pipe on the transition seat 3015 to abut against the guide rod 3019 when it rolls to it, thus limiting the rolling of the steel pipe on the transition seat 3015. Both side baffles 3018 are equipped with anti-detachment mechanisms 3020. 20 includes a second mounting base 30201, a first pushing member 30202, and a stop lever 30203. The second mounting base 30201 is disposed on the side of the side baffle 3018 away from the transition seat 3015. The first pushing member 30202 is a cylinder, mounted on the second mounting base 30201. The movable end of the first pushing member 30202 is connected to the stop lever 30203. The end of the stop lever 30203 away from the first pushing member 30202 passes through the side baffle 3018 and is located on the side baffle 3018. On the side of the side baffle 3018 near the transition seat 3015, when the first pusher 30202 is in the retracted state, the end face of the stop rod 30203 away from the first pusher 30202 is flush with the surface of the side baffle 3018 near the transition seat 3015. When the first pusher 30202 is in the extended state, the end of the stop rod 30203 away from the first pusher 30202 extends out from the side baffle 3018, thereby assisting the guide rod 3019 in restricting the steel pipe on the transition seat 3015, so that the transition seat 3015... The steel pipe on 5 will not easily fall off the transition seat 3015. At this time, the end of the stop bar 30203 near the first pusher 30202 is inserted into the side baffle 3018. This means that when the stop bar 30203 blocks the steel pipe, the side baffle 3018 is used to bear the impact transmitted by the steel pipe to the stop bar 30203, thereby reducing the probability that the moving end of the first pusher 30202 will deform when the stop bar 30203 and the guide rod 3019 block the steel pipe, thus protecting the first pusher 30202.

[0032] It is worth mentioning that the steel pipe is transported to the transition seat 3015 by the feeding conveyor belt 3011, and the steel pipe on the transition seat 3015 is limited by two side baffles 3018 and a stop bar 30203 that can move synchronously toward or away from the transition seat 3015. This allows the transition seat 3015 to transfer steel pipes of different lengths and diameters, provided that the length and diameter of the steel pipes meet the size of the heating furnace.

[0033] Reference Figure 4 , Figure 8 and Figure 9The supporting component 302 includes a mounting base 3021, a second pusher 3022, and three sets of supporting mechanisms 3023. The mounting base 3021 is rectangular and is slidably mounted on the base 2. The second pusher 3022 is also mounted on the base 2. The second pusher 3022 is a cylinder, and its movable end is connected to the mounting base 3021. When the second pusher 3022 extends, the mounting base 3021 moves toward the transition seat 3015. When the second pusher 3022 retracts, the mounting base 3021 moves away from the transition seat 3015 and is aligned with the steel pipe powder coating device 1 and the powder collection and recovery device 4.

[0034] Three sets of support mechanisms 3023 are arranged sequentially along the length of the base 2. The middle support mechanism 3023 is fixed on the mounting base 3021 and corresponds to the position of the support seat. The other two support mechanisms 3023 are respectively set at both ends of the mounting base 3021 and are adjustable. This allows the distance between the three support mechanisms 3023 to be adjusted according to the length of the steel pipe. Each support mechanism 3023 includes an arc-shaped support plate 30231, a third mounting seat 30235, a third lifting component 30240, a mounting plate 30236, a second driving component 30237, a guide shaft 30238, and two support seats 30239. The third mounting seat 30235 is set on the base 2, and the third lifting component 30240 is mounted on the third mounting seat 30235. The third lifting component 30240 is also an electric push rod. The movable end of the third lifting component 30240 is connected to the mounting plate 30236. When the third lifting component 30240... When the 40 starts operating, the height of the mounting plate 30236 changes accordingly; the arc-shaped support plate 30231 is provided with a guide part 30232, and the guide part 30232 is provided with an arc-shaped guide groove 30233 that passes through the guide part 30232. Two support seats 30239 are respectively provided on both sides of the arc-shaped guide groove 30233. One end of the guide shaft 30238 is installed on one of the support seats 30239, and the other end of the guide shaft 30238 passes through the arc. The guide groove 30233 is connected to another support base 30239. The second driving member 30237 is a drive motor. A transmission gear is installed on the output shaft of the drive motor. On the side of the guide part 30232 away from the arc-shaped support plate 30231, there is a transmission gear that can mesh with the transmission gear. This allows the drive member to drive the transmission gear to start rotating when it is started, thereby causing the arc-shaped support plate 30231 to start moving along the extension direction of the arc-shaped guide groove 30233.

[0035] When it is necessary to remove the steel pipe that abuts against the guide rod 3019 from the transition seat 3015, the second driving member 30237 located in the middle can be activated to make the arc-shaped support plate 30231 located in the middle start to move. Then, the first pushing member 30202 drives the push rod to retract. After that, one end of the arc-shaped support plate 30231 located in the middle passes through the slot 30151 from under the transition seat 3015 and abuts against the outer wall of the steel pipe on the transition seat 3015, driving the steel pipe to roll over the guide rod 3019 and finally roll off the transition seat 3015.

[0036] In order to prevent the steel pipe on the transition seat 3015 from easily falling to the ground when it rolls down, when the second drive component 30237 in the middle is activated, the other two second drive components 30237 are also activated simultaneously, and their rotation direction is opposite to that of the second drive component 30237 in the middle. This causes the arc-shaped support plate 30231 driven by the two second drive components 30237 to move in the opposite direction to the movement direction of the middle support plate. This ensures that the steel pipe falling from the transition seat 3015 will be supported by the two arc-shaped support plates 30231.

[0037] When the two arc-shaped support plates 30231 that limit the steel pipe come into contact with the steel pipe, the two arc-shaped support plates 30231 return to their original positions under the action of their respective driving components. The arc-shaped support plate 30231 used to push out the steel pipe also returns to its original position at the same time. At this time, the three arc-shaped support plates 30231 support one steel pipe at the same time. Subsequently, the second pushing component 3022 retracts to drive the mounting base 3021 to move on the base 2. At this time, the three arc-shaped support plates 30231 on the mounting base 3021 are on the same straight line as the driving components 303 on both sides of the mounting base 3021. Subsequently, the third lifting component 30240 lowers the height of the arc-shaped support plates 30231, so that the steel pipe supported by the three support plates can be lowered onto the driving component 303 and driven by the driving component 303 to start rotating around its own axis.

[0038] Furthermore, in order to reduce the friction between the arc-shaped support plates 30231 of the steel pipe and prevent the arc-shaped support plates 30231 from scratching the outer wall of the steel pipe when they move along the extension direction of the arc-shaped guide groove 30233, multiple balls 30234 that can abut against the outer wall of the steel pipe are provided on the side of each arc-shaped support that is used to abut against the outer wall of the steel pipe by means of ball joint.

[0039] Reference Figure 4 , Figure 10 and Figure 11Two sets of drive components 303 are provided, both located on the line connecting the steel pipe powder coating device 1 and the powder collection and recovery device 4. Each drive component 303 includes a drive wheel 3031, a driven wheel 3032, an adjusting seat 3033, a fourth lifting member 3034, a fourth mounting seat 3035, and two sliding seats 3036. The fourth mounting seat 3035 is slidably mounted on the base 2, while the fourth lifting member 3034 is mounted on the fourth mounting seat 3035. The fourth lifting member 3034 is an electric push rod, and its movable end is connected to the adjusting seat 3033, allowing the height of the adjusting seat 3033 to be adjusted. A second bidirectional lead screw 30331 and a third drive member 30332 are provided on the adjusting seat 3033. The length direction of the second bidirectional lead screw 30331 is perpendicular to the length direction of the base 2. The third drive member 30332 is a drive motor, and its output shaft is connected to the second bidirectional lead screw 30331. The two sliding seats... The seats 3036 are respectively installed at both ends of the bidirectional lead screw along the length of the lead screw via lead screw nuts. This allows the two sliding seats 3036 to move closer or further apart simultaneously when the third driving member 30332 drives the bidirectional lead screw on the adjusting seat 3033 to rotate. The driving wheel 3031 is installed on one of the sliding seats 3036, and the driven wheel 3032 is installed on the other sliding seat 3036. Correspondingly, a fourth driving member 3037 is provided on the sliding seat 3036 where the driving wheel 3031 is installed. The fourth driving member 3037 is also a drive motor. The output shaft of the fourth driving member 3037 is connected to the driving wheel 3031. This allows the driving wheel 3031 to start rotating when the fourth driving member 3037 is started. Since both the driving wheel 3031 and the driven wheel 3032 are in contact with the outer wall of the steel pipe, when the driving wheel 3031 rotates, it can drive the steel pipe to rotate around its own axis. At this time, the driven wheel 3032 also rotates along with the steel pipe.

[0040] The adjustable distance between the driving wheel 3031 and the driven wheel 3032 allows steel pipes of different diameters to be stably driven to rotate around their own axis by adjusting the distance between them. Simultaneously, this also allows for adjustments to the height of the steel pipe's axis when there is a small error in height between the axis of the steel pipe to be powder-coated, the axis of the powder coating device 1, and the axis of the powder collection device 4. These adjustments can be made by adjusting the distance between the driving wheel 3031 and the driven wheel 3032, ensuring stable rotation of the steel pipe around its own axis.

[0041] After the steel pipe is powder coated, the fourth lifting component 3034 drives the adjusting seat 3033 to descend, which allows the steel pipe located between the driving wheel 3031 and the driven wheel 3032 to fall onto the unloading assembly 304. The unloading assembly 304 includes two parallel unloading conveyor belts 3041 and a storage rack 3042. The storage rack 3042 is located at the end of the unloading conveyor belt 3041 away from the driving assembly 303. When the steel pipe falls onto the unloading conveyor belt 3041, the steel pipe rolls from the unloading conveyor belt 3041 onto the storage rack 3042 under its own gravity. The two unloading conveyor belts 3041 are located on both sides of the mounting base 3021 along its length, which prevents the unloading conveyor belts 3041 from easily interfering with the movement of the mounting base 3021 on the base 2.

[0042] Reference Figure 4 The powder collection and recovery device 4 includes a fifth mounting base 401, a cover 402, an exhaust fan 403, and a powder collection hood 404. The fifth mounting base 401 is mounted on the base 2, and the cover 402 is mounted on the fifth mounting base 401. The exhaust fan 403 is mounted on the top of the cover 402 to extract air from inside the cover 402. A connecting pipe is provided between the cover 402 and the powder collection hood. One end of the connecting pipe is connected to the cover 402, and the other end of the connecting pipe is connected to the powder collection hood. The powder collection hood 404 is used to absorb the powder that is not attached inside the steel pipe.

[0043] The implementation principle of Embodiment 2 of this application is as follows: First, adjust the distance between the two sliding bases 3016 and the fixed base 3012 according to the length of the steel pipe so that the distance between the two side baffles 3018 is adapted to the length of the steel pipe. Then, the heated steel pipe is transported to the transition seat 3015 by the feeding conveyor belt 3011. The steel pipe rolls on the transition seat 3015 from the direction close to the feeding conveyor belt 3011 to the guide rod 3019. At this time, the baffle 30203 is in the extended state, which prevents the steel pipe from easily falling off the transition seat 3015.

[0044] When the steel pipe needs to be removed from the transition seat 3015, the first pusher 30202 drives the push rod to retract, and the second pusher 3022 is in the extended state. At this time, the mounting base 3021 is positioned on the base 2 near the transition seat 3015. Immediately afterwards, the three third drive members 30332 are activated simultaneously. Under the action of the third drive members 30332, the arc-shaped support plate 30231 on the support mechanism 3023 in the middle position enters the opening slot on the transition seat 3015 from below, and guides the guide rod 301. The steel pipe with limit 9 is pushed out from the transition seat 3015, allowing it to roll over the guide rod 3019. The arc-shaped support plates 30231 on the other two support mechanisms 3023 move in the opposite direction to the arc-shaped support plate 30231 that pushes out the steel pipe, thus limiting and supporting the pushed-out steel pipe. After the pushed-out steel pipe is supported by the two arc-shaped support plates 30231, all three support plates return to their original positions. At this time, all three arc-shaped support plates 30231 support the steel pipe.

[0045] Subsequently, the second pushing component 3022 retracts, causing the mounting base 3021 to move away from the transition seat 3015 on the base 2. When the mounting base 3021 stops moving, the mounting base 3021, the drive assembly 303, the steel pipe powder coating device 1, and the powder collection and recovery device 4 are on the same straight line. Then, the third lifting component 30240 on the three supporting mechanisms 3023 descends synchronously. During the descent, the steel pipe on the arc-shaped support plate 30231 is supported by the drive assembly 303. When the third lifting component 30240 is at its lowest position, the second pushing component 3022 changes from the retracted state to the extended state, causing the mounting base 3021 to move back towards the transition seat 3015. After the mounting base 3021 stops moving, the third lifting component 30240 pushes the arc-shaped support plate 30231 up to its highest position to facilitate support for the next steel pipe.

[0046] The steel pipe located on the drive assembly 303 is made coaxial with the spraying end of the steel pipe powder coating device 1 and the recovery end of the powder collection and recovery device 4 by adjusting the distance between the drive wheel 3031 and the driven wheel 3032 and the lifting height of the fourth lifting component 3034. The steel pipe powder coating device 1 and the powder collection and recovery device 4 are moved to get closer to the steel pipe, and then the spray gun 103 on the steel pipe powder coating device 1 performs powder coating on the steel pipe. The powder collection hood 404 on the powder collection and recovery device 4 absorbs the raw materials inside the steel pipe that are not attached to the inner wall of the steel pipe, thereby reducing the degree of air pollution.

[0047] After the powder coating is completed, the fourth lifting component 3034 drives the driving wheel 3031 and the driven wheel 3032 to descend. During the descent of the fourth lifting component 3034, the steel pipe will come into contact with the unloading conveyor belt 3041 and roll from the unloading conveyor bag onto the storage rack 3042.

[0048] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.

Claims

1. A steel pipe powder coating system, comprising a steel pipe powder coating device (1), characterized in that: It also includes a base (2), a steel pipe replacement device (3), and a powder collection and recovery device (4). The steel pipe powder coating device (1) and the powder collection and recovery device (4) are slidably installed on the base (2) and are located at both ends of the base (2) in the length direction. The steel pipe replacement device (3) is installed on the base (2) and is located between the steel pipe powder coating device (1) and the powder collection and recovery device (4). The steel pipe replacement device (3) includes a feeding assembly (301), a supporting assembly (302), a driving assembly (303), and a discharging assembly (304). The feeding assembly (301) is used to convey the steel pipe to be powder coated toward the supporting assembly (302). The supporting assembly (302) is used to transfer the steel pipe to be powder coated to the driving assembly (303). The driving assembly (303) is provided in two sets and is located on both sides of the supporting assembly (302). The driving assembly (303) is used to drive the steel pipe to rotate around its own axis and move the steel pipe to the unloading assembly (304). The driving assembly (303), the steel pipe powder coating device (1), and the powder collection and recovery device (4) are on the same straight line. The feeding assembly (301) includes a feeding conveyor belt (3011), a fixed base (3012), a first mounting base (3013), a first lifting member (3014), a transition seat (3015), two sliding bases (3016), two second lifting members (3017), and two side baffles (3018). The fixed base (3012) is mounted on the base (2). The first mounting base (3013) and the first lifting member (3014) are respectively mounted on the fixed base (3012). One end of the bottom of the transition seat (3015) is hinged to the first mounting base (3013). The first lifting member (3014) is used to realize the up-and-down flipping of the transition seat (3015) relative to the first mounting base (3013). The feeding conveyor belt (3011) is used to move the steel pipe from the transition seat (3015) closer to the first mounting base (3013). One end of the first lifting member (3014) is fed into the transition seat (3015); the two sliding bases (3016) are respectively located on both sides of the fixed base (3012), and the two sliding bases (3016) can move simultaneously on the base (2) in a direction closer to or further away from the fixed base (3012); the second lifting member (3017) is installed on the sliding base (3016); the side baffle (3018) is hinged to the second lifting member (3017); a guide rod (3019) is provided at one end of the transition seat (3015) away from the feeding conveyor belt (3011); the two ends of the guide rod (3019) are respectively perpendicularly inserted into the two side baffles (3018); the second lifting member (3017) is used to drive the side baffle (3018) to rotate around the axis of the guide rod (3019); The transition seat (3015) is provided with a slot (30151) for penetrating the transition seat (3015). The support assembly (302) includes a mounting base (3021), a second pusher (3022), and three sets of support mechanisms (3023). The mounting base (3021) is mounted on the base (2). The second pusher (3022) is mounted on the base (2) and is used to push the mounting base (3021) to move along a direction perpendicular to the length of the base (2). When the second pusher (3022) is used to make the mounting base (3021), the drive assembly (303), the steel pipe powder coating device (1), and the powder collection and recovery device (4) in the same position... The three sets of supporting mechanisms (3023) are respectively installed on the mounting base (3021) and arranged sequentially from the direction near the steel pipe powder coating device (1) towards the direction near the powder collection and recovery device (4); the supporting mechanism (3023) located in the middle is fixedly set on the mounting base (3021) and corresponds to the position of the transition seat (3015). Each supporting mechanism (3023) includes an arc-shaped supporting plate (30231), a third mounting seat (30235), a third lifting component (30240), a mounting plate (30236), a second driving component (30237), a guide shaft (30238), and two support seats (30239). The third mounting seat (30235) The third lifting component (30240) is mounted on the mounting base (3021) and on the third mounting seat (30235) to change the height of the mounting plate (30236). A guide portion (30232) is provided on the arc-shaped support plate (30231), and an arc-shaped guide groove (30233) is provided through the guide portion (30232). Two support seats (30239) are respectively mounted on the mounting plate (30236) and located on both sides of the arc-shaped guide groove (30233). One end of the guide shaft (30238) is connected to one of the support seats (30239), and the other end of the guide rod (3019) passes through... After passing through the arc-shaped guide groove (30233), it is connected to another support seat (30239); the second driving member (30237) is disposed on the mounting plate (30236) to drive the arc-shaped support plate (30231) to move along the extension direction of the arc-shaped guide groove (30233); when it is necessary to remove the steel pipe from the transition seat (3015), one end of the arc-shaped support plate (30231) corresponding to the transition seat (3015) extends into the groove (30151) to push out the steel pipe that abuts against the guide rod (3019), and the moving direction of the other two arc-shaped support plates (30231) is opposite to that of the arc-shaped support plate (30231) that pushes out the steel pipe.

2. The steel pipe powder coating system according to claim 1, characterized in that: The base (2) is provided with an installation groove (201) whose extension direction is parallel to the length direction of the base (2). A first bidirectional lead screw (202) is provided in the installation groove (201). Two sliding bases (3016) are respectively installed at both ends of the first bidirectional lead screw (202). The base (2) is provided with a first driving member (203) for driving the first bidirectional lead screw (202) to rotate around its own axis. When the first bidirectional lead screw (202) rotates, the two sliding bases (3016) move towards each other or move away from each other at the same time.

3. The steel pipe powder coating system according to claim 1, characterized in that: The outer wall of the guide rod (3019) protrudes from the surface of the transition seat (3015) for abutting against the steel pipe. An anti-detachment mechanism (3020) is provided on the side baffle (3018). The anti-detachment mechanism (3020) includes a second mounting base (30201), a first pushing member (30202), and a stop rod (30203). The second mounting base (30201) is located on the side of the side baffle (3018) away from the transition seat (3015). The first pushing member (30202) is mounted on the second mounting base (30201). The stop rod (30203)... 203) One end of the stop rod (30203) is vertically inserted through the side baffle (3018), and the other end of the stop rod (30203) is connected to the first pusher (30202); when the stop rod (30203) is not pushed out by the first pusher (30202), the end face of the stop rod (30203) is flush with the side of the side baffle (3018) near the transition seat (3015); when the stop rod (30203) is used to abut against the outer wall of the steel pipe, the end of the stop rod (30203) connected to the first pusher (30202) is inserted through the side baffle (3018).

4. A steel pipe powder coating system according to claim 1, characterized in that: The arc-shaped support plate (30231) has multiple balls (30234) on one side for supporting the steel pipe, which are connected by a ball joint.

5. A steel pipe powder coating system according to claim 1, characterized in that: The drive assembly (303) includes a drive wheel (3031), a driven wheel (3032), an adjusting seat (3033), a fourth lifting member (3034), a fourth mounting seat (3035), and two sliding seats (3036). The fourth mounting seat (3035) is slidably disposed on the base (2). The fourth lifting member (3034) is mounted on the fourth mounting seat (3035). The adjusting seat (3033) is provided with a third drive member (30332) and a second bidirectional lead screw (30331). The two sliding seats (3036) are respectively mounted on the base (2). At both ends of the second bidirectional lead screw (30331), the driving wheel (3031) and the driven wheel (3032) are respectively mounted on two sliding seats (3036). When the second bidirectional lead screw (30331) rotates around its own axis, the two sliding seats (3036) can move towards or away from each other simultaneously. A fourth driving member (3037) for driving the driving wheel (3031) to rotate is installed on the adjusting seat (3033) on which the driving wheel (3031) is mounted. Both the driving wheel (3031) and the driven wheel (3032) can abut against the outer wall of the steel pipe.

6. A steel pipe powder coating system according to claim 5, characterized in that: The unloading assembly (304) includes a storage rack (3042) and two unloading conveyor belts (3041). When the fourth lifting member (3034) is in a descending state, the steel pipe located between the driving wheel (3031) and the driven wheel (3032) will be transferred to the two unloading conveyor belts (3041). The storage rack (3042) is used to collect the steel pipes rolling off the unloading conveyor belts (3041).

7. A steel pipe powder coating system according to claim 1, characterized in that: The powder collection and recovery device (4) includes a fifth mounting base (401), a cover (402), an exhaust fan (403), and a powder collection cover (404). The fifth mounting base (401) is mounted on the base (2), the cover (402) is mounted on the fifth mounting base (401), the exhaust fan (403) is mounted on the cover (402), and the cover (402) is provided with a connecting pipe that communicates with the powder collection cover (404).

Citation Information

Patent Citations

  • Pipe supporting and separating device

    CN103662816A

  • Steel tube perforating device and working method thereof

    CN107096825A