A method, device, electronic device and storage medium for controlling roaming of an overhead crane

By determining the roaming center and candidate loops in the crane system, calculating the detour time and influence score, and selecting the optimal roaming path, the problem of low efficiency and interference in the existing technology is solved, and efficient crane roaming control is achieved .

CN118495358BActive Publication Date: 2024-10-01华芯(嘉兴)智能装备有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410962439.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-01
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

In the existing technology, the crane roaming control method is difficult to adapt to the changing system environment and task requirements, resulting in low transport efficiency and possible interference to the working crane.

Method used

By determining several roaming centers and their corresponding candidate loops, calculating the detour duration and influence score, the loop with the lowest comprehensive score is selected as the roaming path to adapt to changes in mission requirements and reduce interference to the working crane.

Benefits of technology

It improves the execution efficiency of wafer handling tasks and adapts to changing task requirements. At the same time, it reduces the interference of the roaming process on the working state crane and improves the overall handling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118495358B_ABST
    Figure CN118495358B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device, electronic device and storage medium for controlling roaming of an overhead crane. Based on workstations in a current overhead crane system, several roaming centers are determined. Subsequently, based on a track map of the current overhead crane system, candidate loops corresponding to each roaming center are determined. For any roaming center, the detour time of an idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center are determined. Thus, based on the detour time of an idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center, a comprehensive score of each candidate loop corresponding to the roaming center is determined. The candidate loop with the lowest comprehensive score is selected as the roaming loop of the roaming center for roaming. This can adapt to changing task requirements while avoiding interference of the roaming process to the overhead crane in a working state and reducing the handling efficiency of the overhead crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of overhead crane control, and in particular to an overhead crane roaming control method, device, electronic equipment and storage medium. Background Art

[0002] In semiconductor manufacturing, wafers need to be transported between different process equipment for processing. To improve transport efficiency and optimize production capacity, automatic material handling systems are widely used in the semiconductor manufacturing industry. Among them, overhead cranes, as a transport device that slides on elevated tracks, are widely used in the transport of Foup (Front Open Unified Pod, i.e. wafer box) in semiconductor manufacturing plants.

[0003] When a wafer box needs to be transported to the next device and a wafer box transfer request is initiated, the crane control system usually assigns an idle crane closest to the starting point to perform the transfer task corresponding to the transfer request. Therefore, in order to improve the execution efficiency of the transfer task, the idle crane can be set to roaming state, so that it moves at a constant speed on the preset roaming path, so that when a new transfer request occurs, it can be dispatched to an idle crane nearby, shortening the time cost of the crane to the starting point.

[0004] However, in setting the roaming path for the idle crane, one way is to control the idle crane to circle on certain fixed roaming paths, but this most difficult way is difficult to adapt to the ever-changing system environment. When the density of the transport tasks in each area changes, the fixed roaming path is difficult to meet the changed transport task requirements, and the interference of the roaming behavior of the crane on the working crane will be difficult to avoid. Another way is to dynamically determine the roaming path according to the task requirements through intelligent algorithms such as ant colony algorithms, which can adapt to the ever-changing task requirements, but this method has high computational complexity and low efficiency. In scenarios with limited computing resources (limited resources will tend to be used in transport path planning and crane status monitoring) or high real-time requirements, this solution is difficult to meet its requirements. More importantly, this solution also does not consider the interference of the roaming behavior of the crane on the working crane, which may affect the transport efficiency of the normally working crane. Summary of the invention

[0005] The present invention provides a method, device, electronic equipment and storage medium for controlling a roaming crane, which are used to solve the defects of the prior art that the efficiency is low and the crane is easily disturbed in its handling work.

[0006] The present invention provides a method for controlling a roaming overhead crane, comprising:

[0007] Based on the current work stations in the overhead travelling vehicle system, several roaming centers are determined;

[0008] Based on the track map of the current overhead traveling vehicle system, determining candidate loops corresponding to each roaming center; wherein the candidate loop corresponding to any roaming center is a loop that passes through any roaming center and avoids other roaming centers;

[0009] For any roaming center, determine the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and determine the influence score of each candidate loop corresponding to the any roaming center; based on the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, determine the comprehensive score of each candidate loop corresponding to the any roaming center, and select the candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center;

[0010] The idle overhead cranes on the roaming loops of each roaming center are controlled to roam on the corresponding roaming loops.

[0011] According to a method for controlling a roaming crane provided by the present invention, determining the influence score of each candidate loop corresponding to any roaming center specifically includes:

[0012] Obtain the planned path of each overhead crane in working state;

[0013] For any candidate loop corresponding to any roaming center, calculating the overlapped sections between any candidate loop and the planned paths of each overhead travelling vehicle in working state and the number of overlapped times of each overlapped section;

[0014] The influence score of any candidate loop is determined based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state.

[0015] According to a method for controlling roaming of an overhead crane provided by the present invention, determining the influence score of any candidate loop based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead crane in working state specifically includes:

[0016] Determine a single influence score of any overlapping section between any candidate loop and the planned path of each overhead crane in working state based on the type score of any overlapping section and the traffic state score of any overlapping section;

[0017] The influence score of any candidate loop is determined based on the number of overlaps of each overlapped section between any candidate loop and the planned path of each overhead travelling crane in working state and a single influence score.

[0018] According to a method for controlling roaming of an overhead crane provided by the present invention, the step of determining the detour time of an idle overhead crane on each candidate loop corresponding to any roaming center specifically includes:

[0019] For any candidate loop corresponding to any roaming center, obtaining time series data of any candidate loop; the time series data of any candidate loop includes the length, track type and historical traffic data of each track segment from the starting track segment to the ending track segment on any candidate loop;

[0020] Inputting the time series data of any candidate loop into a pre-trained time estimation model to obtain the detour time of the idle overhead crane on any candidate loop output by the time estimation model;

[0021] The time estimation model is obtained by training based on sample time series data of the sample loop and the actual detour duration of the idle overhead crane on the sample loop.

[0022] According to a method for controlling a roaming overhead crane provided by the present invention, the time estimation model is trained based on the following steps:

[0023] Inputting the sample time series data of any sample loop into the initial estimation model to obtain the detour time of the idle overhead crane on the sample loop output by the initial estimation model;

[0024] Calculating the model prediction loss based on the difference between the detour time of the idle overhead crane on each sample loop output by the initial estimation model and the actual detour time of the idle overhead crane on the corresponding sample loop;

[0025] The model parameters of the initial estimation model are adjusted based on the model prediction loss to obtain the time estimation model.

[0026] According to a method for controlling roaming of an overhead crane provided by the present invention, the method of determining a plurality of roaming centers based on working stations in the current overhead crane system specifically includes:

[0027] Obtain the task priority of each wafer handling task corresponding to each work station in each statistical time period;

[0028] For any work station, based on the task priorities of each wafer handling task corresponding to any work station in each statistical time period, determine the number of tasks corresponding to each task priority of any work station in each statistical time period; determine the median of the number of tasks corresponding to any task priority of any work station in each statistical time period as the benchmark number of tasks corresponding to any task priority of any work station; determine the importance of any work station based on the benchmark number of tasks corresponding to each task priority of any work station;

[0029] Based on the importance of each work site, several roaming centers are determined.

[0030] The present invention also provides a roaming control device for an overhead traveling vehicle, comprising:

[0031] A roaming center determination unit, used to determine a number of roaming centers based on the working stations in the current overhead traveling vehicle system;

[0032] A candidate loop determining unit, configured to determine candidate loops corresponding to each roaming center based on the track map of the current overhead traveling vehicle system; wherein the candidate loop corresponding to any roaming center is a loop passing through any roaming center and avoiding other roaming centers;

[0033] a roaming loop determining unit, configured to determine, for any roaming center, a detour time of an idle overhead vehicle on each candidate loop corresponding to the any roaming center and an influence score of each candidate loop corresponding to the any roaming center, determine a comprehensive score of each candidate loop corresponding to the any roaming center based on the detour time of an idle overhead vehicle on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, and select a candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center;

[0034] The roaming unit is used to control the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loops.

[0035] According to a roaming control device for an overhead traveling vehicle provided by the present invention, the determining of the influence scores of each candidate loop corresponding to any roaming center specifically includes:

[0036] Obtain the planned path of each overhead crane in working state;

[0037] For any candidate loop corresponding to any roaming center, calculating the overlapped sections between any candidate loop and the planned paths of each overhead travelling vehicle in working state and the number of overlapped times of each overlapped section;

[0038] The influence score of any candidate loop is determined based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state.

[0039] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any of the above-mentioned methods for controlling the roaming of an overhead crane is implemented.

[0040] The present invention also provides a non-transitory computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the overhead crane roaming control method as described above is implemented.

[0041] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the computer program implements any of the above-mentioned methods for controlling the roaming of an overhead crane.

[0042] The present invention provides a method, device, electronic device and storage medium for controlling roaming of an overhead crane. Based on the workstations in the current overhead crane system, several roaming centers are determined to adapt to the ever-changing task requirements, thereby effectively improving the execution efficiency of the wafer handling task; then, based on the track map of the current overhead crane system, candidate loops corresponding to each roaming center are determined; for any roaming center, the detour time of an idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center are determined, so that based on the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center, the comprehensive score of each candidate loop corresponding to the roaming center is determined, and the candidate loop with the lowest comprehensive score is selected as the roaming loop of the roaming center, and the idle overhead cranes on the roaming loops of each roaming center are controlled to roam on the corresponding roaming loops, so that the roaming process can be avoided as much as possible from interfering with the overhead crane in a working state and reducing the handling efficiency of the overhead crane while adapting to the ever-changing task requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1 It is a flow chart of the overhead crane roaming control method provided by the present invention;

[0045] Figure 2 It is a flowchart of a method for determining an influence score of a candidate loop provided by the present invention;

[0046] Figure 3 It is a flowchart of a method for determining the detour duration of a candidate loop provided by the present invention;

[0047] Figure 4 It is a structural schematic diagram of the overhead crane roaming control device provided by the present invention;

[0048] Figure 5It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] Figure 1 FIG. 1 is a flow chart of the overhead crane roaming control method provided by the present invention, such as Figure 1 As shown, the method includes:

[0051] Step 110, determining a number of roaming centers based on the current work sites in the overhead traveling vehicle system;

[0052] Step 120, based on the track map of the current overhead traveling vehicle system, determining candidate loops corresponding to each roaming center; wherein the candidate loop corresponding to any roaming center is a loop that passes through any roaming center and avoids other roaming centers;

[0053] Step 130: for any roaming center, determining the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and determining the influence score of each candidate loop corresponding to the any roaming center; based on the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, determining the comprehensive score of each candidate loop corresponding to the any roaming center, and selecting the candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center;

[0054] Step 140: Control the idle overhead cranes on the roaming loops of the roaming centers to roam on the corresponding roaming loops.

[0055] Here, at fixed time intervals or when the process node is switched, several workstations with densely distributed task demands and / or high-priority task demands can be selected from the various workstations in the current overhead crane system as roaming centers for subsequent idle overhead cranes to adapt to the ever-changing task demands, thereby effectively improving the execution efficiency of wafer handling tasks.

[0056] Among them, when determining the roaming center, the wafer handling task data in the past period of time can be collected and analyzed, including the starting point of the handling, the task priority, and the time distribution of the handling task. By analyzing the historical wafer handling task data, the law and trend of the handling task can be summarized, so as to predict the task demand distribution of each work station in the future, and screen out the work stations with intensive task demand. Here, a neural network model (such as a recurrent neural network and its variants) can be used to predict the task demand distribution of each work station in the future preset time period based on the historical wafer handling task data. In addition, the operating status and production capacity of semiconductor manufacturing equipment and the correlation between different equipment can also be analyzed, so as to predict the work stations with more intensive task demand based on the operating status, production capacity and correlation between different equipment of semiconductor manufacturing equipment. Among them, the operating status and production capacity of the equipment will directly affect the wafer handling demand. For example, when a certain equipment is shut down or the production capacity is increased, the wafer supply demand for other equipment may increase. In addition, the process flow of semiconductor manufacturing can also be analyzed to understand the demand for wafer handling at each work station in different process steps. Different process steps may require wafer handling between different equipment, so the analysis of the process flow can help predict the wafer handling task demand of different work stations.

[0057] In some embodiments, in order to improve the efficiency of the roaming center determination link, the task priority of each wafer handling task corresponding to each workstation in each statistical time period can be obtained. Among them, the wafer handling task corresponding to any workstation in any statistical time period is the wafer handling task with the handling starting point of the workstation. For any workstation, the number of tasks corresponding to each task priority of the workstation in each statistical time period can be determined based on the task priority of each wafer handling task corresponding to the workstation in each statistical time period. Subsequently, the median of the number of tasks corresponding to any task priority of the workstation in each statistical time period can be determined as the number of benchmark tasks corresponding to the task priority of the workstation. For example, if the number of tasks corresponding to any task priority of the workstation in each statistical time period is n1, n2, ..., ni, respectively, then the median of n1, n2, ..., ni is used as the number of benchmark tasks corresponding to the task priority of the workstation. Based on the number of benchmark tasks corresponding to each task priority of the workstation, the importance of the workstation can be determined. Among them, the weight of each task priority can be determined based on the level of each task priority, and the higher the priority of any task, the higher its weight is. Therefore, a weighted sum operation is performed based on the weight of each task priority and the number of benchmark tasks corresponding to each task priority of the work site to obtain the importance of the work site.

[0058] The above method can be used to determine the importance of each work site, and then determine a number of roaming centers based on the importance of each work site. For example, work sites with importance higher than a preset threshold can be selected as roaming centers.

[0059] After the roaming center is determined, the candidate loops corresponding to each roaming center can be determined based on the track map of the current overhead traveling vehicle system. Any roaming center corresponds to one or more candidate loops, and the candidate loop corresponding to any roaming center is a loop consisting of multiple track segments that passes through the roaming center and avoids other roaming centers.

[0060] Considering that the roaming process needs to adapt to the ever-changing task requirements so that an idle overhead crane can be dispatched nearby when a new transport request appears, and at the same time, it is necessary to try to avoid the roaming process from interfering with the overhead crane in the working state and reducing the handling efficiency of the overhead crane, therefore, for any roaming center, the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center can be determined as the basis for selecting the roaming path of the idle overhead crane. Among them, the detour time of the idle overhead crane on any candidate loop is the running time of the idle overhead crane from any point on the candidate loop to the point; the influence score of any candidate loop represents the influence of the roaming process of the idle overhead crane on the candidate loop on other overhead cranes in the working state, and the larger the influence score of the candidate loop, the higher the influence of the idle overhead crane on the candidate loop on other overhead cranes in the working state.

[0061] In some embodiments, Figure 2 As shown, the influence scores of each candidate loop corresponding to any roaming center can be determined in the following manner:

[0062] Step 210, obtaining the planned path of each overhead travelling crane in working state;

[0063] Step 220, for any candidate loop corresponding to any roaming center, calculating the overlapped sections between any candidate loop and the planned paths of each overhead travelling vehicle in working state and the number of overlapped sections;

[0064] Step 230 : determining the influence score of any candidate loop based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in operation.

[0065] Specifically, the planned paths of each overhead crane in working state can be obtained from the overhead crane dispatching system. For any candidate loop corresponding to the roaming center, the overlapping sections between the candidate loop and the planned paths of each overhead crane in working state and the number of overlaps of each overlapping section can be determined according to the track marks of each track segment contained in the candidate loop and the track marks of each track segment contained in the planned paths of each overhead crane in working state. Here, for any track segment contained in the candidate loop, the track mark of the track segment contained in the candidate loop can be matched with the track mark of each track segment contained in the planned paths of each overhead crane in working state in sequence and the number of successful matches can be counted; if the number of successful matches is greater than 0, the track segment is regarded as an overlapping section, and the number of successful matches is recorded as the number of overlaps of the overlapping section. The above operation is performed for each track segment contained in the candidate loop to obtain the overlapping sections between the candidate loop and the planned paths of each overhead crane in working state and the number of overlaps of each overlapping section. The influence score of the candidate loop may be determined according to the number of overlaps of the overlapping sections between the candidate loop and the planned paths of each overhead travelling crane in operation.

[0066] In some embodiments, the single influence score of the overlapping section can be determined based on the type score of any overlapping section between the candidate loop and the planned path of each overhead crane in working state and the traffic state score of the overlapping section. Wherein, if any overlapping section is a straight road, its type score can be set to a first preset type score, and if any overlapping section is a curve, its type score can be set to a second preset type score, and the second preset type score is greater than the first preset type score. The traffic state score of any overlapping section characterizes the degree of congestion of the overlapping section. The higher its traffic state score, the more likely the overlapping section is to be congested. Here, the traffic state score of the overlapping section can be determined based on the number of overhead cranes located in the overlapping section in each historical time period. For example, the average value or median of the number of overhead cranes located in the overlapping section in each historical time period can be obtained as the traffic state score of the overlapping section. Subsequently, the single influence score of the overlapping section can be determined based on the type score of any overlapping section between the candidate loop and the planned path of each overhead crane in operation and the traffic status score of the overlapping section. For example, the sum or product of the type score of any overlapping section and the traffic status score of the overlapping section can be used as the single influence score of the overlapping section. The influence score of the candidate loop can be determined based on the number of overlaps of each overlapping section between the candidate loop and the planned path of each overhead crane in operation and the single influence score. Here, the number of overlaps of each overlapping section can be used as the weight corresponding to the corresponding overlapping section, so that the single influence scores of each overlapping section are weighted and summed to obtain the influence score of the candidate loop.

[0067] In other embodiments, Figure 3 As shown, the detour time of the idle overhead crane on each candidate loop corresponding to any roaming center can be determined in the following manner:

[0068] Step 310: for any candidate loop corresponding to any roaming center, obtaining time series data of any candidate loop; the time series data of any candidate loop includes the length, track type and historical traffic data of each track segment from the starting track segment to the ending track segment on any candidate loop;

[0069] Step 320, inputting the time series data of any candidate loop into a pre-trained time estimation model, and obtaining the detour time of the idle overhead crane on any candidate loop output by the time estimation model;

[0070] The time estimation model is obtained by training based on sample time series data of the sample loop and the actual detour duration of the idle overhead crane on the sample loop.

[0071] Specifically, a time estimation model can be pre-trained to predict the detour time of an idle overhead crane on any candidate loop. The initial estimation model (e.g., a recurrent neural network) can be trained based on the sample time series data of the sample loop and the actual detour time of the idle overhead crane on the sample loop to obtain the time estimation model.

[0072] In some embodiments, sample time series data of multiple sample loops can be collected, and the idle overhead crane can be controlled to roam on each sample loop, so as to collect the actual detour time of the idle overhead crane on each sample loop. The sample loop can be any loop composed of multiple track segments in the current overhead crane system, and the sample time series data of the sample loop includes the length, track type and historical traffic data of each track segment from the starting track segment to the end track segment on the corresponding sample loop (the starting track segment can be randomly selected from the various track segments included in the sample loop, and the end track segment can be determined after the starting track segment is determined). The historical traffic data of any track segment includes the flow and average traffic speed of the track segment in multiple historical time periods. Subsequently, the sample time series data of each sample loop is sequentially input into the initial estimation model to obtain the detour time of the idle overhead crane on the corresponding sample loop output by the initial estimation model. Based on the difference between the detour time of the idle overhead crane on each sample loop output by the initial estimation model and the actual detour time of the idle overhead crane on the corresponding sample loop, the model prediction loss is calculated, and the model parameters of the initial estimation model are adjusted based on the model prediction loss to obtain the time estimation model.

[0073] After obtaining the time estimation model, the time series data of any candidate loop corresponding to the roaming center can be obtained. The time series data of any candidate loop includes the length, track type and historical traffic data of each track segment from the starting track segment (which can be randomly determined) to the ending track segment on the candidate loop. Then the time series data of the candidate loop is input into the time estimation model, and the detour time of the idle overhead crane on the candidate loop output by the time estimation model can be obtained.

[0074] Based on the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center, the comprehensive score of each candidate loop corresponding to the roaming center can be determined. For example, the sum of the detour time of the idle overhead crane on any candidate loop corresponding to the roaming center and the influence score of the candidate loop can be used as the comprehensive score of the candidate loop. Based on the comprehensive scores of each candidate loop, the candidate loop with the lowest comprehensive score can be selected as the roaming loop of the roaming center. After obtaining the roaming loops of each roaming center, the idle overhead crane located on the roaming loop of each roaming center or the idle overhead crane closest to the roaming loop can be controlled to roam on the corresponding roaming loop.

[0075] In summary, the method provided in the embodiment of the present invention determines several roaming centers based on the workstations in the current overhead crane system to adapt to the ever-changing task requirements, thereby effectively improving the execution efficiency of the wafer handling task; then, based on the track map of the current overhead crane system, determines the candidate loops corresponding to each roaming center; for any roaming center, determines the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and determines the influence score of each candidate loop corresponding to the roaming center, thereby determining the comprehensive score of each candidate loop corresponding to the roaming center based on the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center, and selects the candidate loop with the lowest comprehensive score as the roaming loop of the roaming center, and controls the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loop, which can adapt to the ever-changing task requirements while avoiding the roaming process from interfering with the overhead crane in a working state and reducing the handling efficiency of the overhead crane as much as possible.

[0076] The overhead crane roaming control device provided by the present invention is described below. The overhead crane roaming control device described below and the overhead crane roaming control method described above can be referred to each other.

[0077] Based on any of the above embodiments, Figure 4 Schematic diagram of the structure of the overhead travelling control device provided by the present invention. Figure 4 As shown, the device comprises:

[0078] A roaming center determining unit 410 is used to determine a number of roaming centers based on the working stations in the current overhead traveling vehicle system;

[0079] The candidate loop determining unit 420 is used to determine the candidate loops corresponding to the respective roaming centers based on the track map of the current overhead traveling vehicle system; wherein the candidate loop corresponding to any roaming center is a loop passing through the any roaming center and avoiding other roaming centers;

[0080] The roaming loop determining unit 430 is used to determine, for any roaming center, the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, determine the comprehensive score of each candidate loop corresponding to the any roaming center based on the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, and select the candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center;

[0081] The roaming unit 440 is used to control the idle overhead traveling vehicles on the roaming loops of each roaming center to roam on the corresponding roaming loops.

[0082] The device provided by the embodiment of the present invention determines several roaming centers based on the workstations in the current overhead crane system to adapt to the ever-changing task requirements, thereby effectively improving the execution efficiency of the wafer handling task; then determines the candidate loops corresponding to each roaming center based on the track map of the current overhead crane system; for any roaming center, determines the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and determines the influence score of each candidate loop corresponding to the roaming center, thereby determining the comprehensive score of each candidate loop corresponding to the roaming center based on the detour time of the idle overhead crane on each candidate loop corresponding to the roaming center and the influence score of each candidate loop corresponding to the roaming center, and selects the candidate loop with the lowest comprehensive score as the roaming loop of the roaming center, and controls the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loop, which can adapt to the ever-changing task requirements while avoiding the roaming process from interfering with the overhead crane in the working state and reducing the handling efficiency of the overhead crane as much as possible.

[0083] Based on any of the foregoing embodiments, determining the influence score of each candidate loop corresponding to any roaming center specifically includes:

[0084] Obtain the planned path of each overhead crane in working state;

[0085] For any candidate loop corresponding to any roaming center, calculating the overlapped sections between any candidate loop and the planned paths of each overhead travelling vehicle in working state and the number of overlapped times of each overlapped section;

[0086] The influence score of any candidate loop is determined based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state.

[0087] Based on any of the above embodiments, determining the influence score of any candidate loop based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state specifically includes:

[0088] Determine a single influence score of any overlapping section between any candidate loop and the planned path of each overhead crane in working state based on the type score of any overlapping section and the traffic state score of any overlapping section;

[0089] The influence score of any candidate loop is determined based on the number of overlaps of each overlapped section between any candidate loop and the planned path of each overhead travelling crane in working state and a single influence score.

[0090] Based on any of the above embodiments, determining the detour time of the idle overhead crane on each candidate loop corresponding to any of the roaming centers specifically includes:

[0091] For any candidate loop corresponding to any roaming center, obtaining time series data of any candidate loop; the time series data of any candidate loop includes the length, track type and historical traffic data of each track segment from the starting track segment to the ending track segment on any candidate loop;

[0092] Inputting the time series data of any candidate loop into a pre-trained time estimation model to obtain the detour time of the idle overhead crane on any candidate loop output by the time estimation model;

[0093] The time estimation model is obtained by training based on sample time series data of the sample loop and the actual detour duration of the idle overhead crane on the sample loop.

[0094] Based on any of the above embodiments, the time estimation model is trained based on the following steps:

[0095] Inputting the sample time series data of any sample loop into the initial estimation model to obtain the detour time of the idle overhead crane on the sample loop output by the initial estimation model;

[0096] Calculating the model prediction loss based on the difference between the detour time of the idle overhead crane on each sample loop output by the initial estimation model and the actual detour time of the idle overhead crane on the corresponding sample loop;

[0097] The model parameters of the initial estimation model are adjusted based on the model prediction loss to obtain the time estimation model.

[0098] Based on any of the above embodiments, the step of determining a plurality of roaming centers based on the workstations in the current overhead travelling vehicle system specifically includes:

[0099] Obtain the task priority of each wafer handling task corresponding to each work station in each statistical time period;

[0100] For any work station, based on the task priorities of each wafer handling task corresponding to any work station in each statistical time period, determine the number of tasks corresponding to each task priority of any work station in each statistical time period; determine the median of the number of tasks corresponding to any task priority of any work station in each statistical time period as the benchmark number of tasks corresponding to any task priority of any work station; determine the importance of any work station based on the benchmark number of tasks corresponding to each task priority of any work station;

[0101] Based on the importance of each work site, several roaming centers are determined.

[0102] Figure 5 is a schematic diagram of the structure of the electronic device provided by the present invention, such as Figure 5 As shown, the electronic device may include: a processor (processor) 510, a memory (memory) 520, a communication interface (Communications Interface) 530 and a communication bus 540, wherein the processor 510, the memory 520, and the communication interface 530 communicate with each other through the communication bus 540. The processor 510 can call the logic instructions in the memory 520 to execute the overhead crane roaming control method, which includes: determining a number of roaming centers based on the work stations in the current overhead crane system; determining candidate loops corresponding to each roaming center based on the track map of the current overhead crane system; wherein the candidate loop corresponding to any roaming center is a loop that passes through any roaming center and avoids other roaming centers; for any roaming center, determining the detour time of an idle overhead crane on each candidate loop corresponding to any roaming center and determining the influence score of each candidate loop corresponding to any roaming center, determining the comprehensive score of each candidate loop corresponding to any roaming center based on the detour time of an idle overhead crane on each candidate loop corresponding to any roaming center and the influence score of each candidate loop corresponding to any roaming center, and selecting the candidate loop with the lowest comprehensive score as the roaming loop of any roaming center; controlling the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loop.

[0103] In addition, the logic instructions in the above-mentioned memory 520 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0104] On the other hand, the present invention also provides a computer program product, the computer program product includes a computer program stored on a non-transitory computer-readable storage medium, the computer program includes program instructions, when the program instructions are executed by a computer, the computer can execute the overhead crane roaming control method provided by the above methods, the method comprising: determining a plurality of roaming centers based on work stations in the current overhead crane system; determining candidate loops corresponding to each roaming center based on a track map of the current overhead crane system; wherein the candidate loop corresponding to any roaming center is a loop that passes through any roaming center and avoids other roaming centers. Road; for any roaming center, determine the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and determine the influence score of each candidate loop corresponding to the any roaming center; based on the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, determine the comprehensive score of each candidate loop corresponding to the any roaming center, and select the candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center; control the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loops.

[0105] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which is implemented by a processor to execute the above-mentioned overhead crane roaming control method, the method comprising: determining a plurality of roaming centers based on work stations in the current overhead crane system; determining candidate loops corresponding to each roaming center based on a track map of the current overhead crane system; wherein the candidate loop corresponding to any roaming center is a loop passing through any roaming center and avoiding other roaming centers; for any roaming center, determining the detour time of an idle overhead crane on each candidate loop corresponding to any roaming center and determining the influence score of each candidate loop corresponding to any roaming center, determining the comprehensive score of each candidate loop corresponding to any roaming center based on the detour time of an idle overhead crane on each candidate loop corresponding to any roaming center and the influence score of each candidate loop corresponding to any roaming center, and selecting the candidate loop with the lowest comprehensive score as the roaming loop of any roaming center; and controlling the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loops.

[0106] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0107] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0108] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for controlling a roaming crane, characterized in that: include: Based on the current work stations in the overhead travelling vehicle system, several roaming centers are determined; Based on the track map of the current overhead traveling vehicle system, determining candidate loops corresponding to each roaming center; wherein the candidate loop corresponding to any roaming center is a loop that passes through any roaming center and avoids other roaming centers; For any roaming center, determine the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and determine the influence score of each candidate loop corresponding to the any roaming center; based on the detour time of the idle overhead crane on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, determine the comprehensive score of each candidate loop corresponding to the any roaming center, and select the candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center; Controlling the idle overhead cranes on the roaming loops of each roaming center to roam on the corresponding roaming loops; The determining of the influence scores of the candidate loops corresponding to any roaming center specifically includes: Obtain the planned path of each overhead crane in working state; For any candidate loop corresponding to any roaming center, calculating the overlapped sections between any candidate loop and the planned paths of each overhead travelling vehicle in working state and the number of overlapped times of each overlapped section; Determining the influence score of any candidate loop based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state; The step of determining the detour time of the idle overhead crane on each candidate loop corresponding to any roaming center specifically includes: For any candidate loop corresponding to any roaming center, obtaining time series data of any candidate loop; the time series data of any candidate loop includes the length, track type and historical traffic data of each track segment from the starting track segment to the ending track segment on any candidate loop; Inputting the time series data of any candidate loop into a pre-trained time estimation model to obtain the detour time of the idle overhead crane on any candidate loop output by the time estimation model; The time estimation model is obtained by training based on sample time series data of the sample loop and the actual detour duration of the idle overhead crane on the sample loop.

2. The method for controlling the roaming of an overhead crane according to claim 1, characterized in that: The determining of the influence score of any candidate loop based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state specifically includes: Determine a single influence score of any overlapping section between any candidate loop and the planned path of each overhead crane in working state based on the type score of any overlapping section and the traffic state score of any overlapping section; The influence score of any candidate loop is determined based on the number of overlaps of each overlapped section between any candidate loop and the planned path of each overhead travelling crane in working state and a single influence score.

3. The method for controlling the roaming of an overhead crane according to claim 1, characterized in that: The time estimation model is trained based on the following steps: Inputting the sample time series data of any sample loop into the initial estimation model to obtain the detour time of the idle overhead crane on the sample loop output by the initial estimation model; Calculating the model prediction loss based on the difference between the detour time of the idle overhead crane on each sample loop output by the initial estimation model and the actual detour time of the idle overhead crane on the corresponding sample loop; The model parameters of the initial estimation model are adjusted based on the model prediction loss to obtain the time estimation model.

4. The method for controlling the roaming of an overhead crane according to any one of claims 1 to 3, characterized in that: The method of determining a number of roaming centers based on the working stations in the current overhead traveling vehicle system specifically includes: Obtain the task priority of each wafer handling task corresponding to each work station in each statistical time period; For any work station, based on the task priorities of each wafer handling task corresponding to any work station in each statistical time period, determine the number of tasks corresponding to each task priority of any work station in each statistical time period; determine the median of the number of tasks corresponding to any task priority of any work station in each statistical time period as the benchmark number of tasks corresponding to any task priority of any work station; determine the importance of any work station based on the benchmark number of tasks corresponding to each task priority of any work station; Based on the importance of each work site, several roaming centers are determined.

5. A roaming control device for an overhead crane, characterized in that: include: A roaming center determination unit, used to determine a number of roaming centers based on the working stations in the current overhead traveling vehicle system; A candidate loop determining unit, configured to determine candidate loops corresponding to each roaming center based on the track map of the current overhead traveling vehicle system; wherein the candidate loop corresponding to any roaming center is a loop passing through any roaming center and avoiding other roaming centers; a roaming loop determining unit, configured to determine, for any roaming center, a detour time of an idle overhead vehicle on each candidate loop corresponding to the any roaming center and an influence score of each candidate loop corresponding to the any roaming center, determine a comprehensive score of each candidate loop corresponding to the any roaming center based on the detour time of an idle overhead vehicle on each candidate loop corresponding to the any roaming center and the influence score of each candidate loop corresponding to the any roaming center, and select a candidate loop with the lowest comprehensive score as the roaming loop of the any roaming center; A roaming unit, used for controlling an idle overhead crane on a roaming loop of each roaming center to roam on a corresponding roaming loop; The determining of the influence scores of the candidate loops corresponding to any roaming center specifically includes: Obtain the planned path of each overhead crane in working state; For any candidate loop corresponding to any roaming center, calculating the overlapped sections between any candidate loop and the planned paths of each overhead travelling vehicle in working state and the number of overlapped times of each overlapped section; Determining the influence score of any candidate loop based on the number of overlaps of the overlapped sections between any candidate loop and the planned paths of each overhead travelling crane in working state; The step of determining the detour time of the idle overhead crane on each candidate loop corresponding to any roaming center specifically includes: For any candidate loop corresponding to any roaming center, obtaining time series data of any candidate loop; the time series data of any candidate loop includes the length, track type and historical traffic data of each track segment from the starting track segment to the ending track segment on any candidate loop; Inputting the time series data of any candidate loop into a pre-trained time estimation model to obtain the detour time of the idle overhead crane on any candidate loop output by the time estimation model; The time estimation model is obtained by training based on sample time series data of the sample loop and the actual detour duration of the idle overhead crane on the sample loop.

6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the overhead crane roaming control method according to any one of claims 1 to 4 is implemented.

7. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the overhead travelling crane roaming control method as claimed in any one of claims 1 to 4 is implemented.