A plant protection big data monitoring method and system for pomegranate and potato intercropping

Through the plant protection big data monitoring method for pomegranates and potatoes, the data is collected and analyzed, and the planting indicators are revised, which solves the problems of uncertainty in interplanting operations and inaccurate regional delineation, and achieves efficient and accurate operation of pomegranates and potatoes interplanting.

CN118504954BActive Publication Date: 2024-10-01LIANGSHAN YI AUTONOMOUS PREFECTURE ACAD OF AGRI SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410977857.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-01
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

The existing agricultural product traceability system cannot effectively identify and evaluate the quality of agricultural products during the production process, resulting in uncertainty in interplanting operations and impact on production quality. The demarcation of suitable growth areas for pomegranate and potatoes is inaccurate and work efficiency is low.

Method used

The plant protection big data monitoring method for pomegranates and potatoes is used to locate the target pomegranate and potato intercropping fields by collecting intercropping monitoring requests, collect harvest evaluation data, correct and verify planting indicators, and perform corresponding interplanting operations to improve the efficiency of pomegranate and potato intercropping. Accuracy and efficiency.

Benefits of technology

It achieves accurate evaluation and parameter correction of pomegranate and potato interplanting, improves data processing efficiency, reduces abnormal misjudgment rates, and enhances the accuracy and efficiency of interplanting operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118504954B_ABST
    Figure CN118504954B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of big data processing, and in particular to a plant protection big data monitoring method and system for interplanting of pomegranate and potato, collecting interplanting monitoring requests, including interplanting planting projects and interplanting planting objects to be monitored; locating the target pomegranate and potato interplanting field in the pomegranate and potato interplanting field set based on the interplanting planting object to be monitored; collecting the harvest evaluation data of the target pomegranate and potato interplanting field; correcting and verifying the pomegranate and potato interplanting row to be monitored based on the harvest evaluation data and the interplanting planting project to obtain the verification result; correcting the planting index of the pomegranate and potato interplanting row to be monitored based on the verification result; after completing the correction of the planting index, executing the interplanting monitoring request to perform the operation corresponding to the interplanting planting project on the pomegranate and potato interplanting row to be monitored. The present invention can accurately evaluate the harvest of pomegranate and potato interplanting and effectively correct the interplanting parameters of pomegranate and potato.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of big data processing technology, and in particular to a plant protection big data monitoring method and system for pomegranate and potato intercropping. Background Art

[0002] Since each intercropper has different levels of knowledge or techniques of intercropping, their specific intercropping operations often have great uncertainty, which affects the quality of production. On the consumer side, the existing agricultural product traceability system starts tracking from the post-production processing and circulation links, and cannot identify the production quality of agricultural products. As intercroppers, since they cannot distinguish the pros and cons of the intercropping process, they can only sell to middlemen at the price of currency, which also frustrates the quality awareness of intercroppers and affects the healthy development of the intercropping industry. The quality of agricultural products is essentially completed in the production process, which is the most basic link and also determines the price of agricultural products and the benefits of intercroppers.

[0003] To solve the problem of selecting suitable areas for the growth of pomegranate potatoes in ecological big data, and the problem of which pomegranate potatoes are suitable for growth in a certain area. In the prior art, suitable growth zones are all manually demarcated, so the demarcation range is vague and inaccurate. Moreover, the manual demarcation method has low work efficiency and requires a lot of experience and judgment, and it is impossible to demarcate all pomegranate potatoes. Summary of the invention

[0004] To achieve the above objectives, this application provides the following technical solutions:

[0005] According to the first aspect of the present invention, the present invention claims a plant protection big data monitoring method for pomegranate and potato intercropping, comprising:

[0006] Collecting interplanting monitoring requests, wherein the interplanting monitoring requests include interplanting planting projects and interplanting planting objects to be monitored;

[0007] Based on the interplanting object to be monitored, a target pomegranate-potato interplanting field furrow is located in a pomegranate-potato interplanting field furrow set, wherein the pomegranate-potato interplanting field furrow set includes a plurality of pomegranate-potato interplanting field furrows, and the pomegranate-potato interplanting field furrow includes a plurality of pomegranate-potato interplanting rows;

[0008] Collecting harvest evaluation data of the target pomegranate and potato intercropping field;

[0009] Based on the harvest evaluation data and the interplanting project, the pomegranate and potato interplanting rows are corrected and verified to obtain a verification result;

[0010] Based on the verification result, the planting index of the pomegranate and potato interplanting row is corrected;

[0011] After the modification of the planting index is completed, the interplanting monitoring request is executed to perform operations corresponding to the interplanting project on the pomegranate and potato interplanting row.

[0012] Further, the interplanting planting project includes a first planting project and a second planting project, the correction verification includes a first correction verification and a second correction verification, and the verification result includes a first correction verification result and a second correction verification result;

[0013] Based on the harvest evaluation data and the interplanting project, the pomegranate and potato interplanting rows are corrected and verified to obtain verification results, including:

[0014] When the interplanting project is the first planting project, a first correction check is performed on the pomegranate and potato interplanting row based on the harvest evaluation data to obtain a first correction check result;

[0015] When the interplanting project is a second planting project, performing a second correction check on the pomegranate and potato interplanting row based on the harvest evaluation data to obtain a second correction check result;

[0016] The planting index correction includes a first planting index correction and a second planting index correction, and the planting index correction of the pomegranate-potato interplanting row based on the verification result includes:

[0017] Based on the first correction verification result, a first planting index correction is performed on the pomegranate-potato interplanting row;

[0018] Based on the second correction verification result, a second planting index correction is performed on the pomegranate-potato intercropping row.

[0019] Further, the harvest evaluation data includes correction indicators of pomegranate-potato intercropping rows in the target pomegranate-potato intercropping field, and the correction indicators include a first correction indicator and a second correction indicator;

[0020] Based on the harvest evaluation data, a first correction check is performed on the pomegranate-potato interplanting row to obtain a first correction check result, including:

[0021] Determining all correction indicators corresponding to the pomegranate-potato intercropping row based on the harvest evaluation data of the target pomegranate-potato intercropping field;

[0022] When the correction index corresponding to the pomegranate-potato interplanting row includes neither the first correction index nor the second correction index, a first correction verification result is obtained.

[0023] The first planting index correction of the pomegranate-potato interplanting row based on the first correction verification result includes:

[0024] Based on the first correction verification result, the first correction indicator of the interplanting monitoring request is updated for the pomegranate-potato interplanting row in the harvest evaluation data of the target pomegranate-potato interplanting field.

[0025] Further, the harvest evaluation data includes correction indicators of pomegranate-potato intercropping rows in the target pomegranate-potato intercropping field, and the correction indicators include a first correction indicator and a second correction indicator;

[0026] Performing a second correction check on the pomegranate-potato interplanting row based on the harvest evaluation data to obtain a second correction check result, including:

[0027] Determining all correction indicators corresponding to the pomegranate-potato intercropping row based on the harvest evaluation data of the target pomegranate-potato intercropping field;

[0028] When the correction index corresponding to the pomegranate-potato interplanting row includes only the second correction index, a second correction verification result is obtained; when the correction index corresponding to the pomegranate-potato interplanting row includes neither the first correction index nor the second correction index, a second correction verification result is obtained;

[0029] The method of correcting the second planting index of the pomegranate-potato interplanting row based on the second correction verification result includes:

[0030] Based on the second revised verification result, the second revised indicator of the interplanting monitoring request is updated for the pomegranate-potato interplanting row in the harvest evaluation data of the target pomegranate-potato interplanting field.

[0031] Furthermore, before collecting the intercropping monitoring request, the method further includes:

[0032] Collect historical planting data of pomegranate and potato intercropping rows within the specified value range;

[0033] Counting the historical planting cycle of each pomegranate-potato interplanting row based on the historical planting data;

[0034] Based on the historical planting cycle and the specified value range, the pomegranate and potato intercropping rows are processed into planting areas to obtain a pomegranate and potato intercropping field set;

[0035] The pomegranate and potato planting field set includes a first pomegranate and potato planting field and a plurality of second pomegranate and potato planting fields;

[0036] The pomegranate-potato interplanting row is processed for planting areas based on the historical planting cycle and the specified value range to obtain a pomegranate-potato interplanting field set, including:

[0037] Calculate the historical planting coverage of each pomegranate-potato interplanting row based on the historical planting cycle;

[0038] Generate a first planting area;

[0039] When the historical planting coverage of the pomegranate-potato interplanting row is not within a specified value range, updating the pomegranate-potato interplanting row to the first planting area;

[0040] When the historical planting coverage of the pomegranate-potato intercropping row is within a specified value range, a second planting area corresponding to the pomegranate-potato intercropping row is generated, and the pomegranate-potato intercropping row is updated to the second planting area corresponding to the pomegranate-potato intercropping row.

[0041] Further, the pomegranate-potato interplanting row includes a plurality of pomegranate-potato interplanting row blocks;

[0042] The step of generating a second planting area corresponding to the pomegranate-potato interplanting row and updating the pomegranate-potato interplanting row to the second planting area corresponding to the pomegranate-potato interplanting row includes:

[0043] Generating a second planting area corresponding to the pomegranate-potato interplanting row;

[0044] Updating the plurality of pomegranate-potato interplanting row blocks to the second planting area corresponding to the pomegranate-potato interplanting row;

[0045] Before locating the target pomegranate-potato interplanting field furrow in the pomegranate-potato interplanting field furrow set based on the interplanting planting object to be monitored, the method further includes:

[0046] Collect planting area update requests;

[0047] When the request type of the planting area update request is a user planting area type, the planting area update request is used to re-divide the planting area according to the planting density in the pomegranate and potato intercropping field set;

[0048] When the request type of the planting area update request is an automatic planting area type, the planting density in the pomegranate and potato intercropping field set is automatically re-planted.

[0049] Furthermore, the planting density in the pomegranate and potato intercropping field set is automatically replanted, including:

[0050] Collect historical planting data of pomegranate and potato intercropping rows within the specified value range;

[0051] Counting the historical planting cycle of each pomegranate-potato intercropping row in the pomegranate-potato intercropping field set based on the historical planting data;

[0052] Performing planting area processing on the pomegranate-potato intercropping row based on the historical planting cycle and the specified value range to obtain a pomegranate-potato intercropping field set after automatically re-planting the area;

[0053] The planting area update request includes the number of planting areas;

[0054] The planting area update request is used to re-divide the planting area according to the planting density in the pomegranate and potato intercropping field set, including:

[0055] The planting areas in the pomegranate-potato intercropping field set are equally divided to obtain pomegranate-potato intercropping field sets with the same number of planting areas as the pomegranate-potato intercropping field set after the planting areas.

[0056] Further, after executing the interplanting monitoring request to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row, it also includes:

[0057] Collect historical planting data for pomegranate and potato intercropping rows;

[0058] The historical planting data of the pomegranate-potato intercropping row is updated based on the intercropping monitoring request.

[0059] Further, the harvest evaluation data includes correction indicators of pomegranate-potato intercropping rows in the target pomegranate-potato intercropping field;

[0060] After executing the interplanting monitoring request to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row, the method further includes:

[0061] The correction index of the intercropping monitoring request is deleted for the pomegranate-potato intercropping row in the harvest evaluation data of the target pomegranate-potato intercropping field.

[0062] According to the second aspect of the present invention, the present invention claims a plant protection big data monitoring system for pomegranate and potato intercropping, comprising:

[0063] A collection module, used for collecting interplanting monitoring requests, wherein the interplanting monitoring requests include interplanting planting items and interplanting planting objects to be monitored;

[0064] A positioning module, used for locating a target pomegranate-potato interplanting field furrow in a pomegranate-potato interplanting field furrow set based on the interplanting planting object to be monitored, wherein the pomegranate-potato interplanting field furrow set includes a plurality of pomegranate-potato interplanting field furrows, and the pomegranate-potato interplanting field furrow includes a plurality of pomegranate-potato interplanting rows;

[0065] A correction index module is used to collect harvest evaluation data of the target pomegranate and potato intercropping field;

[0066] A verification module, used for performing correction verification on the pomegranate-potato interplanting row based on the harvest evaluation data and the interplanting project to obtain a verification result;

[0067] A correction module, used for correcting the planting index of the pomegranate-potato interplanting row based on the verification result;

[0068] An execution module, used for executing the interplanting monitoring request after completing the modification of the planting index, so as to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row;

[0069] The plant protection big data monitoring system for pomegranate and potato intercropping is used to execute the plant protection big data monitoring method for pomegranate and potato intercropping.

[0070] The present application relates to the field of big data processing technology, and in particular to a plant protection big data monitoring method and system for interplanting of pomegranate and potato, collecting interplanting monitoring requests, including interplanting planting projects and interplanting planting objects to be monitored; locating target pomegranate and potato interplanting fields in a set of pomegranate and potato interplanting fields based on the interplanting planting objects to be monitored; collecting harvest evaluation data of target pomegranate and potato interplanting fields; correcting and verifying pomegranate and potato interplanting rows based on the harvest evaluation data and interplanting planting projects to obtain verification results; correcting planting indicators of pomegranate and potato interplanting rows based on the verification results; after completing the correction of planting indicators, executing interplanting monitoring requests to perform operations corresponding to interplanting planting projects on pomegranate and potato interplanting rows. The present invention can accurately evaluate the harvest of pomegranate and potato interplanting and effectively correct the interplanting parameters of pomegranate and potato. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 A workflow diagram of a plant protection big data monitoring method for intercropping of pomegranate and potato as claimed in an embodiment of the present application;

[0072] Figure 2 A second workflow diagram of a plant protection big data monitoring method for pomegranate and potato intercropping as claimed in an embodiment of the present application;

[0073] Figure 3 This is a structural module diagram of a plant protection big data monitoring system for pomegranate and potato intercropping as claimed in an embodiment of the present application. DETAILED DESCRIPTION

[0074] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0075] The terms "first", "second" and "third" in this application are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, the features defined as "first", "second" and "third" may explicitly or implicitly include multiple such features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. All directional indications (such as up, down, left, right, front, back...) in the embodiments of this application are only used to explain the relative position relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or modules is not limited to the listed steps or modules, but optionally also includes steps or modules that are not listed, or optionally also includes other steps or modules inherent to these processes, methods, products or devices.

[0076] Reference to "embodiments" herein means that the specific features, structures, or characteristics described in conjunction with the embodiments may be included in multiple embodiments of the present application. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0077] The embodiments of the present invention provide a plant protection big data monitoring method, system, server and computer-readable storage medium for pomegranate and potato intercropping, which can solve the above-mentioned abnormal misjudgment situation.

[0078] In some embodiments, the plant protection big data monitoring system for pomegranate and potato intercropping can also be integrated into multiple servers. For example, the plant protection big data monitoring system for pomegranate and potato intercropping can be integrated into multiple servers, and the plant protection big data monitoring method for pomegranate and potato intercropping of the present invention is implemented by multiple servers.

[0079] The server can collect intercropping monitoring requests, which include intercropping planting projects and intercropping planting objects to be monitored; locate the target pomegranate-potato intercropping field in the pomegranate-potato intercropping field set based on the intercropping planting objects to be monitored, the pomegranate-potato intercropping field set includes multiple pomegranate-potato intercropping fields, and the pomegranate-potato intercropping field includes multiple pomegranate-potato intercropping rows; collect harvest evaluation data of the target pomegranate-potato intercropping field; based on the harvest evaluation data and the intercropping planting project, correct and verify the pomegranate-potato intercropping rows to obtain the verification results; based on the verification results, correct the planting indicators of the pomegranate-potato intercropping rows; when the planting indicator correction is completed, execute the intercropping monitoring request to perform operations corresponding to the intercropping project on the pomegranate-potato intercropping rows.

[0080] Therefore, this scheme can determine whether the intercropping monitoring request can be corrected and executed based on the harvest evaluation data of the target pomegranate-potato intercropping field corresponding to the pomegranate-potato intercropping row, so as to perform the operations corresponding to the intercropping project on the pomegranate-potato intercropping row. This scheme can judge the anomaly more accurately, thereby solving the problem of low data processing efficiency caused by the above-mentioned misjudgment of anomalies.

[0081] It should be noted that the serial numbers of the following embodiments are not intended to limit the preferred order of the embodiments.

[0082] In this embodiment, a plant protection big data monitoring method for pomegranate and potato intercropping is provided. Figure 1 As shown, the specific process of the plant protection big data monitoring method for pomegranate and potato intercropping can be as follows:

[0083] 101. Collect interplanting monitoring requests, which include interplanting planting projects and interplanting planting objects to be monitored.

[0084] The interplanting monitoring request refers to an interplanting monitoring request for data in a database, and may include the interplanting planting project of the interplanting monitoring request and the interplanting planting object to be monitored to be operated by the interplanting monitoring request.

[0085] Specifically, the method for collecting intercropping monitoring requests can be to collect them from a network server through the network, or to have a server that has integrated a plant protection big data monitoring system for pomegranate and potato intercropping generate them periodically for collection, or a technician can operate the server, and the plant protection big data monitoring system for pomegranate and potato intercropping can collect the intercropping monitoring requests generated by the server, and so on.

[0086] For example, in some embodiments, a plant protection big data monitoring system for intercropping of pomegranates and potatoes can collect intercropping monitoring requests issued by technicians. Specifically, in a database update scenario, technicians can import update files into a database server. During the update file import process, the database server can generate multiple intercropping monitoring requests based on the update files and the technicians' update operations.

[0087] Among them, the intercropping project can record specific operation methods for pomegranate and potato planting, such as fertilization operations, pest and disease operations, irrigation operations, rotation operations, etc.

[0088] Among them, the interplanting object to be monitored can record the pomegranate-potato interplanting row operated by the interplanting monitoring request, and the pomegranate-potato interplanting row is composed of data particles storing data information in the database.

[0089] Among them, data granule refers to the smallest unit used to store data information in the database.

[0090] It should be noted that the pomegranate-potato intercropping row in the current database is a tuple composed of multiple data particles, where a tuple is a row of data in the data table structure stored in the database.

[0091] In this solution, the specific way in which the pomegranate-potato intercropping row is composed of data particles can be determined based on the initial setting of the database, or can be modified based on the settings of the database by technicians, that is, the size of the pomegranate-potato intercropping row is modified to be smaller than the size of the tuple.

[0092] Among them, the pomegranate-potato intercropping field bed set may include one or more pomegranate-potato intercropping field beds, and each pomegranate-potato intercropping field bed may include one or more pomegranate-potato intercropping rows.

[0093] In some embodiments, the planting density can be automatically allocated to the pomegranate and potato intercropping field in advance, so that the planting density is reasonably allocated, thereby further reducing the probability of abnormal misjudgment. After step 101, the following steps may be included:

[0094] Collect historical planting data of pomegranate and potato intercropping rows within the specified value range;

[0095] Count the historical planting cycles of each pomegranate-potato intercropping row based on historical planting data;

[0096] Based on the historical planting cycle and the specified value range, the planting area of ​​the pomegranate-potato intercropping rows was processed to obtain the pomegranate-potato intercropping field set.

[0097] The specified value range may be set by a person skilled in the art, may be collected through a network, may be obtained based on a previously calculated misjudgment probability, and so on.

[0098] The historical planting data of the pomegranate-potato interplanting row refers to the interplanting monitoring requests recorded in the historical time, that is, the information of the planting items of the pomegranate-potato interplanting row in the historical time is recorded. Based on these historical planting data, the number of operations of each pomegranate-potato interplanting row from the historical moment to the present moment can be counted.

[0099] In some embodiments, the pomegranate-potato interplanting field set may include a first pomegranate-potato interplanting field set and a plurality of second pomegranate-potato interplanting field sets, and the step of "processing the pomegranate-potato interplanting rows in planting areas based on historical planting cycles and a specified value range to obtain a pomegranate-potato interplanting field set" may include the following steps:

[0100] Calculate the historical planting coverage of each pomegranate-potato intercropping row based on the historical planting cycle;

[0101] Generate a first planting area;

[0102] When the historical planting coverage of the pomegranate-potato interplanting row is not within the specified value range, the pomegranate-potato interplanting row is updated to the first planting area;

[0103] When the historical planting coverage of the pomegranate-potato intercropping row is within a specified value range, a second planting area corresponding to the pomegranate-potato intercropping row is generated, and the pomegranate-potato intercropping row is updated to the second planting area corresponding to the pomegranate-potato intercropping row.

[0104] For example, pomegranate-potato intercropping rows with high historical planting coverage can be regarded as more likely to produce anomalies when the computer processes these pomegranate-potato intercropping rows. Therefore, dividing these pomegranate-potato intercropping rows that are more likely to produce anomalies into a separate group and dividing the pomegranate-potato intercropping rows that are not prone to anomalies into one group can effectively reduce the anomaly misjudgment rate and reduce the amount of calculation at the same time, especially when there are too many pomegranate-potato intercropping rows.

[0105] In some embodiments, in order to minimize the number of pomegranate-potato interplanting fields, thereby reducing memory consumption, the pomegranate-potato interplanting row may include multiple pomegranate-potato interplanting row blocks, and the step of "generating a second planting area corresponding to a pomegranate-potato interplanting row, and updating the pomegranate-potato interplanting row to the second planting area corresponding to the pomegranate-potato interplanting row" may include the following specific steps:

[0106] Generate the second planting area corresponding to the pomegranate and potato interplanting rows;

[0107] A plurality of pomegranate-potato interplanting row blocks are updated to the second planting area corresponding to the pomegranate-potato interplanting rows.

[0108] Among them, the specific method of the second planting area is: when the historical planting coverage of each second planting area is not within the specified value range, its historical planting coverage is equal to the sum of the historical planting coverage of all pomegranate and potato interplanting rows in the second planting area group.

[0109] 102. Locate the target pomegranate-potato intercropping field in the pomegranate-potato intercropping field set based on the intercropping object to be monitored.

[0110] The pomegranate-potato interplanting bed set may include multiple pomegranate-potato interplanting beds, and each pomegranate-potato interplanting bed may include multiple pomegranate-potato interplanting rows.

[0111] Based on the intercropping objects to be monitored, the target pomegranate-potato intercropping field beds corresponding to the pomegranate-potato intercropping rows can be located in the pomegranate-potato intercropping field bed set.

[0112] For example, based on the interplanting object to be monitored, the target pomegranate-potato interplanting field corresponding to the pomegranate-potato interplanting row can be located in the pomegranate-potato interplanting field set. For example, assuming that the interplanting object to be monitored uses the pomegranate-potato interplanting row c as the pomegranate-potato interplanting row, the pomegranate-potato interplanting field 2 can be determined as the target pomegranate-potato interplanting field.

[0113] In some embodiments, the present solution can frequently and automatically update the pomegranate and potato intercropping field set, so that the determination of abnormalities can be more accurate. Therefore, each time before step 102, the following steps can be included to prevent missing abnormalities:

[0114] Collect planting area update requests;

[0115] When the request type of the planting area update request is the user planting area type, the planting area update request is used to re-divide the planting area according to the planting density in the pomegranate and potato intercropping field set;

[0116] When the request type of the planting area update request is the automatic planting area type, the planting density in the pomegranate and potato intercropping field set is automatically re-planted.

[0117] The planting area update request is a request for updating a set of pomegranate and potato intercropping fields. The planting area update request can be set and issued by a user, or generated periodically by itself, or collected from a network.

[0118] Among them, the planting area update request can have multiple types. For example, the planting area update request can be a user planting area type or an automatic planting area type. In some embodiments, the planting area update request can also be a mixed planting area type.

[0119] Among them, the planting area update request of the user planting area type means that the planting area update request is a planting area update request issued by the user, and the planting area update request of the automatic planting area type means that the planting area update request is a planting area update request automatically generated by a computer.

[0120] Specifically, in some embodiments, the step of "automatically replanting the planting density in the pomegranate and potato intercropping field set" may include the following steps:

[0121] Collect historical planting data of pomegranate and potato intercropping rows within the specified value range;

[0122] Based on the historical planting data, the historical planting cycle of each pomegranate-potato intercropping row in the pomegranate-potato intercropping field set is counted;

[0123] The planting area of ​​the pomegranate-potato intercropping rows is processed based on the historical planting cycle and the specified value range, and the pomegranate-potato intercropping field set after the automatic re-planting area is obtained.

[0124] Specifically, in some embodiments, the planting area update request may include the number of planting areas, and the step of "using the planting area update request to re-divide the planting areas according to the planting density in the pomegranate and potato intercropping field set" may include the following steps:

[0125] The planting areas in the pomegranate-potato intercropping field set are equally divided to obtain pomegranate-potato intercropping field sets with the same number of planting areas as the pomegranate-potato intercropping field set after the planting areas.

[0126] The planting area update request of the user planting area type may include the number of planting areas set by the user.

[0127] For example, the user sets the number of planting areas to 5. Assuming there are 100 planting densities in total, the 100 planting densities are divided into 5 groups, each group including 20 planting densities.

[0128] In some embodiments, in order to improve the accuracy of exception verification and reduce the difficulty of user operation, a planting area update request of a mixed planting area type can also be provided. The specific mixed planting area method is a hybrid of the above-mentioned user planting area method and the computer automatic planting area method.

[0129] For example, the planting area update requests of the user's planting area type can be collected, and the planting areas of the pomegranate and potato intercropping rows can be pre-planned based on the planting area update requests of the user's planting area type. In the subsequent data processing scenarios, the data of these pre-planned user planting areas can be further automatically planted.

[0130] 103. Collect harvest evaluation data of target pomegranate and potato intercropping fields.

[0131] Among them, the harvest evaluation data refers to the status information of the correction indicators of all pomegranate-potato intercropping rows in the pomegranate-potato intercropping field, and the correction indicators are used to represent the crop growth status of the pomegranate-potato intercropping rows or the pomegranate-potato intercropping field.

[0132] The state information of the correction indicator may indicate the type of the correction indicator, and the correction indicator may include multiple types, such as irrigation water volume, pest and disease medicine volume, fertilizer volume, and the like.

[0133] For example, in some embodiments, the correction index can be divided into a first correction index and a second correction index, pomegranate-potato intercropping field A can have a mapping relationship with harvest evaluation data A, and pomegranate-potato intercropping field B can have a mapping relationship with harvest evaluation data B.

[0134] Specifically, the harvest evaluation data A contains information on correction indicators of pomegranate-potato intercropping rows in pomegranate-potato intercropping field A, for example, the first correction indicator added by work A to pomegranate-potato intercropping row x in pomegranate-potato intercropping field A, and the second correction indicator added by work B to pomegranate-potato intercropping row y in pomegranate-potato intercropping field A.

[0135] 104. Based on the harvest evaluation data and the intercropping project, the pomegranate and potato intercropping rows are corrected and verified to obtain the verification results.

[0136] Among them, the interplanting planting project may include a first planting project and a second planting project, the correction verification may include a first correction verification and a second correction verification, and the verification result may include a first correction verification result and a second correction verification result.

[0137] Step 104 may include the following steps:

[0138] Based on the harvest evaluation data and interplanting project, the pomegranate and potato interplanting rows were corrected and verified, and the verification results were obtained, including:

[0139] When the interplanting project is the first planting project, a first correction check is performed on the pomegranate and potato interplanting row based on the harvest evaluation data to obtain a first correction check result;

[0140] When the interplanting project is the second planting project, a second correction check is performed on the pomegranate and potato interplanting rows based on the harvest evaluation data to obtain a second correction check result.

[0141] The correction index may include a first correction index and a second correction index, and the step of "performing a first correction check on the pomegranate and potato interplanting row based on the harvest evaluation data to obtain a first correction check result" may include the following steps:

[0142] Determine all correction indicators corresponding to the pomegranate-potato intercropping rows based on the harvest evaluation data of the target pomegranate-potato intercropping field;

[0143] When the correction index corresponding to the pomegranate-potato interplanting row includes neither the first correction index nor the second correction index, a first correction verification result is obtained.

[0144] The step of "performing a second correction check on the pomegranate and potato interplanting rows based on the harvest evaluation data to obtain a second correction check result" may include the following steps:

[0145] Determine all correction indicators corresponding to the pomegranate-potato intercropping rows based on the harvest evaluation data of the target pomegranate-potato intercropping field;

[0146] When the correction index corresponding to the pomegranate-potato interplanting row includes only the second correction index, a second correction verification result is obtained;

[0147] When the correction index corresponding to the pomegranate-potato interplanting row includes neither the first correction index nor the second correction index, a second correction verification result is obtained.

[0148] 105. Based on the verification results, the planting indicators of the pomegranate and potato intercropping rows are modified.

[0149] The planting index correction may include a first planting index correction and a second planting index correction, and step 105 may include the following steps:

[0150] Based on the first correction verification result, a first planting index correction is performed on the pomegranate-potato interplanting row;

[0151] Based on the second correction verification result, a second planting index correction is performed on the pomegranate-potato intercropping row.

[0152] The step of "correcting the first planting index of the pomegranate-potato interplanting row based on the first correction verification result" may include the following steps:

[0153] Based on the first revised verification result, a first revised indicator of the intercropping monitoring request is updated for the pomegranate-potato intercropping row in the harvest evaluation data of the target pomegranate-potato intercropping field.

[0154] The step of "correcting the second planting index of the pomegranate-potato interplanting row based on the second correction verification result" may include the following steps:

[0155] Based on the second revised verification result, a second revised indicator of the intercropping monitoring request is updated for the pomegranate-potato intercropping row in the harvest evaluation data of the target pomegranate-potato intercropping field.

[0156] Specifically, in some embodiments, in order to further distinguish the read and write operations, thereby reducing the accuracy of the abnormality check, the interplanting planting project may include a first planting project and a second planting project, and the planting index correction includes a first planting index correction and a second planting index correction. Step 104 may include the following steps:

[0157] When the interplanting project is the first planting project, the first planting index of the pomegranate and potato interplanting row is corrected based on the harvest evaluation data;

[0158] When the interplanting project is the second planting project, the second planting index of the pomegranate and potato interplanting row is corrected based on the harvest evaluation data.

[0159] For example, the first planting project may be of the pest and disease treatment type, the second planting project may be of the fertilization type, and so on.

[0160] For example, the first planting index correction may refer to the application of pesticides to the pomegranate-potato intercropping rows, and the second planting index correction may refer to the application of fertilizers to the pomegranate-potato intercropping rows, and so on.

[0161] Specifically, the pomegranate-potato interplanting row may have multiple work items for work updates. In some embodiments, the harvest evaluation data may include a correction index of the pomegranate-potato interplanting row in the target pomegranate-potato interplanting field. The correction index may include a first correction index and a second correction index. The step of "correcting the first planting index of the pomegranate-potato interplanting row based on the harvest evaluation data" may include the following steps:

[0162] Determine all correction indicators corresponding to the pomegranate-potato intercropping rows based on the harvest evaluation data of the target pomegranate-potato intercropping field;

[0163] When the correction indicators corresponding to the pomegranate-potato intercropping row include neither the first correction indicator nor the second correction indicator, the first correction indicator of the intercropping monitoring request is updated for the pomegranate-potato intercropping row in the harvest evaluation data of the target pomegranate-potato intercropping field.

[0164] Specifically, the pomegranate-potato interplanting row may have multiple work items for work updates. In some embodiments, the harvest evaluation data may include a correction index of the pomegranate-potato interplanting row in the target pomegranate-potato interplanting field. The correction index may include a first correction index and a second correction index. The step of "correcting the second planting index of the pomegranate-potato interplanting row based on the harvest evaluation data" may include the following steps:

[0165] Determine all correction indicators corresponding to the pomegranate-potato intercropping rows based on the harvest evaluation data of the target pomegranate-potato intercropping field;

[0166] When the correction index corresponding to the pomegranate-potato interplanting row includes only the second correction index, updating the second correction index of the interplanting monitoring request for the pomegranate-potato interplanting row in the harvest evaluation data of the target pomegranate-potato interplanting field;

[0167] When the correction index corresponding to the pomegranate-potato intercropping row includes neither the first correction index nor the second correction index, the second correction index of the intercropping monitoring request is updated for the pomegranate-potato intercropping row in the harvest evaluation data of the target pomegranate-potato intercropping field.

[0168] 106. After the modification of the planting index is completed, the interplanting monitoring request is executed to perform operations corresponding to the interplanting project on the pomegranate and potato interplanting rows.

[0169] When the correction is completed, the interplanting monitoring request can be executed to perform operations corresponding to the interplanting project on the pomegranate and potato interplanting rows.

[0170] When the correction fails, it is necessary to recheck whether there is still anomalies, so as to wait for other work to be released until the anomaly disappears. After the correction is completed, the interplanting monitoring request is executed to perform the corresponding operations of the interplanting project on the pomegranate and potato interplanting rows.

[0171] In some embodiments, each time the interplanting monitoring request is executed, after the operation corresponding to the interplanting planting project is performed on the pomegranate and potato interplanting row, the execution can be saved in the historical planting data, so as to update the pomegranate and potato interplanting field set through the automatic planting area, thereby reducing the amount of calculation for subsequent data processing and improving the efficiency of data processing. Therefore, after step 105, the following steps may also be included:

[0172] Collect historical planting data for pomegranate and potato intercropping rows;

[0173] Update historical planting data of pomegranate and potato intercropping rows based on intercropping monitoring requests.

[0174] In some embodiments, the harvest evaluation data may include the correction index of the pomegranate-potato interplanting row in the target pomegranate-potato interplanting field. The interplanting monitoring request is executed to perform the operation corresponding to the interplanting project on the pomegranate-potato interplanting row and then release it in time to improve the efficiency of other work processing data. Therefore, after step 105, the following steps may also be included:

[0175] In the harvest evaluation data of the target pomegranate-potato intercropping field, the correction index for the intercropping monitoring request is deleted for the pomegranate-potato intercropping row.

[0176] As can be seen from the above, the embodiment of the present invention can collect interplanting monitoring requests and pomegranate-potato interplanting field sets, the pomegranate-potato interplanting field set includes multiple pomegranate-potato interplanting fields, the pomegranate-potato interplanting fields include multiple pomegranate-potato interplanting rows, the interplanting monitoring request includes an interplanting project and an interplanting object to be monitored; based on the interplanting object to be monitored, the target pomegranate-potato interplanting field corresponding to the pomegranate-potato interplanting row is located in the pomegranate-potato interplanting field set; the harvest evaluation data of the target pomegranate-potato interplanting field is collected; based on the harvest evaluation data and the interplanting project, the planting index of the pomegranate-potato interplanting row is corrected; when the planting index correction is completed, the interplanting monitoring request is executed to perform the operation corresponding to the interplanting project on the pomegranate-potato interplanting row. Therefore, this solution can correct the corresponding planting index for the module to be monitored based on the target pomegranate and potato intercropping field to which the module to be monitored belongs, thereby executing the intercropping monitoring request. Therefore, the present invention can reduce the amount of calculation when collecting harvest evaluation data and correcting planting indexes, thereby improving the efficiency of data processing while ensuring safety.

[0177] Based on the method described in the above embodiment, further details will be given below.

[0178] In this embodiment, the method of the embodiment of the present invention is described in detail by taking the plant protection big data monitoring system for pomegranate and potato intercropping integrated into a database server as an example.

[0179] like Figure 2 As shown in the figure, a plant protection big data monitoring method for pomegranate and potato intercropping has the following specific process:

[0180] 201. Automatically update a pomegranate-potato interplanting field bed set, wherein the updated pomegranate-potato interplanting field bed set includes a plurality of pomegranate-potato interplanting field beds, and the pomegranate-potato interplanting field beds include a plurality of pomegranate-potato interplanting rows.

[0181] In this embodiment, before the pomegranate-potato interplanting field bed set is automatically updated, the pomegranate-potato interplanting field bed set can be assigned by the user how the planting density is distributed among the pomegranate-potato interplanting field beds.

[0182] The principles for specific user planting areas are the same and the methods are varied, so I will not go into detail here.

[0183] The user planting area method can adjust the scale of the abnormality check, so that the scale is reduced from the tuple to the pomegranate-potato interplanting field set by the user, thereby reducing the amount of information maintenance. For example, assuming that work T1 accesses the pomegranate-potato interplanting row x and the pomegranate-potato interplanting row y of the tuple, if the user divides the pomegranate-potato interplanting row x and the pomegranate-potato interplanting row y into the same pomegranate-potato interplanting field, then after executing work T1 (i.e., step 207), it is only necessary to record that work T1 accesses the array.

[0184] In some embodiments, it may be difficult for the user to set an appropriate size of the exception check scale (i.e., the planting area of ​​the pomegranate-potato intercropping field). In order to reduce the probability of misjudgment of anomalies, this embodiment can automatically update the pomegranate-potato intercropping field set.

[0185] The computer automatically updates the pomegranate-potato intercropping field set in a manner that determines the pomegranate-potato intercropping rows that are prone to abnormalities among the pomegranate-potato intercropping rows. These pomegranate-potato intercropping rows that are prone to abnormalities can be referred to as abnormality-prone modules, and the pomegranate-potato intercropping rows that are not prone to abnormalities can be referred to as non-abnormal modules. Then, each abnormality-prone module is individually regarded as a pomegranate-potato intercropping field, and the non-abnormal modules are updated to n pomegranate-potato intercropping fields.

[0186] Here, n is a positive integer, and the specific size of n can be specified by the user, or can be set by a person skilled in the art, or can be determined based on the number of modules that are not prone to abnormalities.

[0187] Specifically, the method of determining modules prone to abnormality and modules not prone to abnormality is as follows:

[0188] First, historical planting data of pomegranate and potato intercropping rows within the specified value range were collected;

[0189] Based on the historical planting data, the historical planting cycle of each pomegranate-potato intercropping row in the pomegranate-potato intercropping field set is counted;

[0190] The planting area of ​​the pomegranate-potato intercropping rows is processed based on the historical planting cycle and the specified value range, and the pomegranate-potato intercropping field set after the automatic re-planting area is obtained.

[0191] For example, the specified value range is 10 to positive infinity. Based on the historical planting data, the historical planting cycle of each pomegranate-potato intercropping row in the pomegranate-potato intercropping field set can be counted, and the pomegranate-potato intercropping rows with historical planting cycles between 10 and positive infinity are determined as modules prone to abnormality, otherwise they are modules not prone to abnormality.

[0192] 202. Collect intercropping monitoring requests, wherein the intercropping monitoring request includes an intercropping planting project and an intercropping planting object to be monitored, and locate the target pomegranate-potato intercropping field corresponding to the pomegranate-potato intercropping row in the pomegranate-potato intercropping field set based on the intercropping planting object to be monitored, and collect harvest evaluation data of the target pomegranate-potato intercropping field.

[0193] Specifically, the intercropping project may be a fertilization type and a pest and disease treatment type. Assume that the pomegranate-potato intercropping row is pomegranate-potato intercropping row c, and the target pomegranate-potato intercropping field to which the pomegranate-potato intercropping row belongs is pomegranate-potato intercropping field 2.

[0194] The harvest evaluation data of pomegranate and potato intercropping field 2 is collected.

[0195] For example, the harvest evaluation data of pomegranate-potato intercropping field 2 can be collected, wherein the harvest evaluation data of pomegranate-potato intercropping field 2 records the pest and disease application operation updated by the current work A on the pomegranate-potato intercropping row a, and the fertilization operation updated by the current work B on the pomegranate-potato intercropping row c.

[0196] 203. Based on the harvest evaluation data and intercropping project, the planting indicators of pomegranate and potato intercropping rows were revised.

[0197] At this time, the pomegranate-potato interplanting row is the pomegranate-potato interplanting row c, and the pomegranate-potato interplanting row c currently has a fertilization operation updated by work B. Based on the fertilization operation and the interplanting project, the planting index of the pomegranate-potato interplanting row can be corrected.

[0198] When the pomegranate-potato intercropping row c currently has a fertilization operation updated by work B, if the intercropping project is of the fertilization type, the fertilization operation of this work can be updated on the pomegranate-potato intercropping row; if the intercropping project is of the pest and disease treatment type, the correction fails.

[0199] For example, when task T needs to apply pesticides to a certain pomegranate and potato intercropping row in a certain tuple, the following steps can be referred to:

[0200] Collecting harvest evaluation data of the tuple;

[0201] If the harvest evaluation data has no correction indicators, the correction is successful;

[0202] Otherwise the correction fails.

[0203] For example, when task T needs to add fertilizer to a certain pomegranate and potato intercropping row in a certain tuple, the following steps can be referred to:

[0204] Collecting harvest evaluation data of the tuple;

[0205] If the harvest evaluation data has no correction indicators, the correction is successful;

[0206] If the harvest evaluation data has correction indicators, check the correction indicators of the pomegranate potato interplanting rows;

[0207] If there is no pesticide application operation for pests and diseases in the correction indicators of the pomegranate-potato interplanting row, the correction is successful;

[0208] Otherwise the correction fails.

[0209] 204. After the modification of the planting index is completed, the interplanting monitoring request is executed to perform operations corresponding to the interplanting project on the pomegranate-potato interplanting row, and the historical planting data of the pomegranate-potato interplanting row is updated based on the interplanting monitoring request, and the modified index of the interplanting monitoring request is deleted for the pomegranate-potato interplanting row in the harvest evaluation data of the target pomegranate-potato interplanting field.

[0210] If the correction fails, wait for work B to release the pomegranate-potato intercropping row, then complete the planting indicator correction, and execute the intercropping monitoring request to perform operations corresponding to the intercropping project on the pomegranate-potato intercropping row, and update the historical planting data of the pomegranate-potato intercropping row based on the intercropping monitoring request, and delete the correction indicators of the intercropping monitoring request for the pomegranate-potato intercropping row in the harvest evaluation data of the target pomegranate-potato intercropping field.

[0211] If the correction is successful, the interplanting monitoring request is executed to perform operations corresponding to the interplanting project on the pomegranate-potato interplanting rows, and the historical planting data of the pomegranate-potato interplanting rows is updated based on the interplanting monitoring request, and the correction indicators of the interplanting monitoring request are deleted for the pomegranate-potato interplanting rows in the harvest evaluation data of the target pomegranate-potato interplanting field.

[0212] Whenever the user inputs data, the intercropping monitoring request issued by the user is assigned to the corresponding database group by the coordination system, so that the user's pest and disease treatment data is dispersed and stored in different database groups.

[0213] As can be seen from the above, the embodiment of the present invention can automatically update the pomegranate-potato interplanting field set, the updated pomegranate-potato interplanting field set includes multiple pomegranate-potato interplanting fields, and the pomegranate-potato interplanting field includes multiple pomegranate-potato interplanting rows; collect interplanting monitoring requests, the interplanting monitoring requests include interplanting planting projects and interplanting planting objects to be monitored; locate the target pomegranate-potato interplanting field set corresponding to the pomegranate-potato interplanting row based on the interplanting planting objects to be monitored; collect Collect the harvest evaluation data of the target pomegranate-potato interplanting field; modify the planting index of the pomegranate-potato interplanting row based on the harvest evaluation data and the interplanting planting project; after the modification of the planting index is completed, execute the interplanting monitoring request to perform the operation corresponding to the interplanting planting project on the pomegranate-potato interplanting row; update the historical planting data of the pomegranate-potato interplanting row based on the interplanting monitoring request, and delete the correction index of the interplanting monitoring request for the pomegranate-potato interplanting row in the harvest evaluation data of the target pomegranate-potato interplanting field. Therefore, the embodiment of the present invention can improve the concurrency of work and the throughput of the database while ensuring the accuracy of abnormal verification, thereby improving the efficiency of data processing.

[0214] According to another embodiment of the present invention, the present invention claims a plant protection big data monitoring system for pomegranate and potato intercropping, referring to Figure 3 ,include:

[0215] A collection module, used for collecting interplanting monitoring requests, wherein the interplanting monitoring requests include interplanting planting items and interplanting planting objects to be monitored;

[0216] A positioning module, used for locating a target pomegranate-potato interplanting field furrow in a pomegranate-potato interplanting field furrow set based on the interplanting planting object to be monitored, wherein the pomegranate-potato interplanting field furrow set includes a plurality of pomegranate-potato interplanting field furrows, and the pomegranate-potato interplanting field furrow includes a plurality of pomegranate-potato interplanting rows;

[0217] A correction index module is used to collect harvest evaluation data of the target pomegranate and potato intercropping field;

[0218] A verification module, used for performing correction verification on the pomegranate-potato interplanting row based on the harvest evaluation data and the interplanting project to obtain a verification result;

[0219] A correction module, used for correcting the planting index of the pomegranate-potato interplanting row based on the verification result;

[0220] An execution module, used for executing the interplanting monitoring request after completing the modification of the planting index, so as to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row;

[0221] The plant protection big data monitoring system for pomegranate and potato intercropping is used to execute the plant protection big data monitoring method for pomegranate and potato intercropping

[0222] In the several embodiments provided in the present application, it should be understood that the disclosed systems, systems and methods can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of modules is only a logical function division. There may be other division methods in actual implementation, such as multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of systems or modules, which can be electrical, mechanical or other forms.

[0223] In addition, each functional module in each embodiment of the present application can be integrated into a processing module, or each module can exist physically separately, or two or more modules can be integrated into one module. The above integrated modules can be implemented in the form of hardware or in the form of software functional modules. The above is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of this application, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present application.

[0224] The specific implementation methods of the invention are described in detail above, but they are only examples, and the present application is not limited to the specific implementation methods described above. For those skilled in the art, any equivalent modification or substitution of the invention is also within the scope of the present application, and therefore, the equalization, modification, and improvement made without departing from the spirit and principle of the present application should be included in the scope of the present application.

Claims

1. A plant protection big data monitoring method for pomegranate and potato intercropping. It is characterized in that include: Collecting interplanting monitoring requests, wherein the interplanting monitoring requests include interplanting planting projects and interplanting planting objects to be monitored; Based on the interplanting object to be monitored, a target pomegranate-potato interplanting field furrow is located in a pomegranate-potato interplanting field furrow set, wherein the pomegranate-potato interplanting field furrow set includes a plurality of pomegranate-potato interplanting field furrows, and the pomegranate-potato interplanting field furrow includes a plurality of pomegranate-potato interplanting rows; Collecting harvest evaluation data of the target pomegranate and potato intercropping field; Based on the harvest evaluation data and the interplanting project, the pomegranate-potato interplanting row to be monitored is corrected and verified to obtain a verification result; Based on the verification results, the planting index of the pomegranate-potato interplanting row to be monitored is corrected; After the planting index correction is completed, the interplanting monitoring request is executed to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row to be monitored; The interplanting project records the specific operation methods for planting pomegranates and potatoes, including at least: fertilization operation, pest and disease operation, irrigation operation, and rotation operation; The pomegranate-potato interplanting row operated by the interplanting monitoring request is recorded in the interplanting planting object to be monitored, and the pomegranate-potato interplanting row is composed of data particles storing data information in the database; The interplanting planting project includes a first planting project and a second planting project, the correction verification includes a first correction verification and a second correction verification, and the verification result includes a first correction verification result and a second correction verification result; Based on the harvest evaluation data and the interplanting project, the pomegranate-potato interplanting row to be monitored is corrected and verified to obtain a verification result, including: When the interplanting project is the first planting project, a first correction check is performed on the pomegranate and potato interplanting row to be monitored based on the harvest evaluation data to obtain a first correction check result; When the interplanting project is a second planting project, performing a second correction check on the pomegranate and potato interplanting row to be monitored based on the harvest evaluation data to obtain a second correction check result; The planting index correction includes a first planting index correction and a second planting index correction, and the planting index correction of the pomegranate-potato interplanting row to be monitored based on the verification result includes: Based on the first correction and verification result, a first planting index is corrected for the pomegranate-potato interplanting row to be monitored; Based on the second correction verification result, a second planting index correction is performed on the pomegranate-potato interplanting row to be monitored; The harvest evaluation data includes correction indicators of pomegranate and potato intercropping rows in the target pomegranate and potato intercropping field, and the correction indicators include a first correction indicator and a second correction indicator; Based on the harvest evaluation data, a first correction check is performed on the pomegranate-potato interplanting row to be monitored to obtain a first correction check result, including: Determining all correction indicators corresponding to the pomegranate-potato intercropping row to be monitored based on the harvest evaluation data of the target pomegranate-potato intercropping field; When the correction index corresponding to the pomegranate-potato interplanting row to be monitored includes neither the first correction index nor the second correction index, a first correction verification result is obtained; The first planting index correction of the pomegranate-potato interplanting row to be monitored based on the first correction verification result includes: Based on the first correction verification result, in the harvest evaluation data of the target pomegranate-potato intercropping field, the first correction index of the intercropping monitoring request is updated for the pomegranate-potato intercropping row to be monitored; The harvest evaluation data includes correction indicators of pomegranate and potato intercropping rows in the target pomegranate and potato intercropping field, and the correction indicators include a first correction indicator and a second correction indicator; Based on the harvest evaluation data, the second planting index of the pomegranate-potato interplanting row to be monitored is corrected, including: Determining all correction indicators corresponding to the pomegranate-potato intercropping row to be monitored based on the harvest evaluation data of the target pomegranate-potato intercropping field; When the correction index corresponding to the pomegranate-potato interplanting row to be monitored only includes the second correction index, a second correction verification result is obtained; when the correction index corresponding to the pomegranate-potato interplanting row to be monitored includes neither the first correction index nor the second correction index, a second correction verification result is obtained; The performing of a second planting index correction on the pomegranate-potato interplanting row to be monitored based on the second correction verification result includes: Based on the second correction verification result, updating the second correction index of the interplanting monitoring request for the pomegranate-potato interplanting row to be monitored in the harvest evaluation data of the target pomegranate-potato interplanting field; Before collecting the intercropping monitoring request, the method further includes: Collect historical planting data of pomegranate and potato intercropping rows within the specified value range; Counting the historical planting cycle of each pomegranate-potato interplanting row based on the historical planting data; Based on the historical planting cycle and the specified value range, the pomegranate and potato intercropping rows are processed into planting areas to obtain a pomegranate and potato intercropping field set; The pomegranate and potato planting field set includes a first pomegranate and potato planting field and a plurality of second pomegranate and potato planting fields; The pomegranate-potato interplanting row is processed for planting areas based on the historical planting cycle and the specified value range to obtain a pomegranate-potato interplanting field set, including: Calculate the historical planting coverage of each pomegranate-potato interplanting row based on the historical planting cycle; Generate a first planting area; When the historical planting coverage of the pomegranate-potato interplanting row is not within a specified value range, updating the pomegranate-potato interplanting row to the first planting area; When the historical planting coverage of the pomegranate-potato interplanting row is within a specified value range, a second planting area corresponding to the pomegranate-potato interplanting row is generated, and the pomegranate-potato interplanting row is updated to the second planting area corresponding to the pomegranate-potato interplanting row; The pomegranate-potato interplanting row comprises a plurality of pomegranate-potato interplanting row blocks; The step of generating a second planting area corresponding to the pomegranate-potato interplanting row and updating the pomegranate-potato interplanting row to the second planting area corresponding to the pomegranate-potato interplanting row includes: Generating a second planting area corresponding to the pomegranate-potato interplanting row; Updating the plurality of pomegranate-potato interplanting row blocks to the second planting area corresponding to the pomegranate-potato interplanting row; Before locating the target pomegranate-potato interplanting field furrow in the pomegranate-potato interplanting field furrow set based on the interplanting planting object to be monitored, the method further includes: Collect planting area update requests; When the request type of the planting area update request is a user planting area type, the planting area update request is used to re-divide the planting area according to the planting density in the pomegranate and potato intercropping field set; When the request type of the planting area update request is an automatic planting area type, the planting density in the pomegranate and potato intercropping field set is automatically re-planted.

2. The plant protection big data monitoring method for pomegranate and potato intercropping according to claim 1, It is characterized in that The planting density in the pomegranate and potato intercropping field set is automatically replanted in an area, including: Collect historical planting data of pomegranate and potato intercropping rows within the specified value range; Counting the historical planting cycle of each pomegranate-potato intercropping row in the pomegranate-potato intercropping field set based on the historical planting data; Performing planting area processing on the pomegranate-potato intercropping row based on the historical planting cycle and the specified value range to obtain a pomegranate-potato intercropping field set after automatically re-planting the area; The planting area update request includes the number of planting areas; The method of re-dividing the planting area according to the planting density in the pomegranate and potato intercropping field set by using the planting area update request includes: The planting density in the pomegranate-potato intercropping field set is evenly divided into the pomegranate-potato intercropping field sets with the number of the planting areas, so as to obtain the pomegranate-potato intercropping field set after the planting areas.

3. The plant protection big data monitoring method for pomegranate and potato intercropping according to claim 1, It is characterized in that After executing the interplanting monitoring request to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row to be monitored, the method further includes: Collect historical planting data for pomegranate and potato intercropping rows; The historical planting data of the pomegranate-potato intercropping row is updated based on the intercropping monitoring request.

4. The plant protection big data monitoring method for pomegranate and potato intercropping according to claim 1, It is characterized in that The harvest evaluation data include correction indicators of pomegranate-potato intercropping rows in the target pomegranate-potato intercropping field; After executing the interplanting monitoring request to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row to be monitored, the method further includes: The correction index of the intercropping monitoring request is deleted for the pomegranate-potato intercropping row to be monitored in the harvest evaluation data of the target pomegranate-potato intercropping field.

5. A plant protection big data monitoring system for pomegranate and potato intercropping. It is characterized in that include: A collection module, used for collecting interplanting monitoring requests, wherein the interplanting monitoring requests include interplanting planting items and interplanting planting objects to be monitored; A positioning module, used for locating a target pomegranate-potato interplanting field furrow in a pomegranate-potato interplanting field furrow set based on the interplanting planting object to be monitored, wherein the pomegranate-potato interplanting field furrow set includes a plurality of pomegranate-potato interplanting field furrows, and the pomegranate-potato interplanting field furrow includes a plurality of pomegranate-potato interplanting rows; A correction index module is used to collect harvest evaluation data of the target pomegranate and potato intercropping field; A verification module, used for performing correction verification on the pomegranate-potato interplanting row to be monitored based on the harvest evaluation data and the interplanting project to obtain a verification result; A correction module, used for correcting the planting index of the pomegranate-potato interplanting row to be monitored based on the verification result; An execution module, used for executing the interplanting monitoring request after completing the planting index correction, so as to perform the operation corresponding to the interplanting project on the pomegranate and potato interplanting row to be monitored; The plant protection big data monitoring system for pomegranate and potato intercropping is used to execute the plant protection big data monitoring method for pomegranate and potato intercropping according to any one of claims 1-4.