Power grid risk assessment method and system based on situation awareness
By processing multi-source data of the power grid through situation awareness technology, calculating relative state characteristic values and situation prediction characteristic coefficients, combined with the exponential smoothing model, the problem of regional interference differences in power grid risk assessment is solved, and the accuracy of power grid operation risk assessment is improved.
Patent Information
- Application Number
- CN202410952459.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-16
AI Technical Summary
In the power system, the processing of multi-source data is difficult to achieve accurate risk assessment, resulting in low accuracy of power grid operation risk assessment, especially due to the large impact of regional interference differences.
The power grid risk assessment method based on situation awareness is adopted to obtain the historical status data of power grid nodes, calculate the relative status characteristic values and situation prediction characteristic coefficients, and combine the exponential smoothing model to conduct risk assessment, optimize the processing of regional interference differences, and improve the accuracy of prediction analysis. sex.
It effectively reduces the impact of regional interference on power grid operation risk assessment and improves the accuracy and reliability of assessment results.
Smart Images

Figure CN118504990B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a power grid risk assessment method and system based on situational awareness. Background Art
[0002] In the risk perception work of power systems, situational awareness, risk analysis, dispatching and decision-making technologies are currently commonly used power supply protection technologies. Among them, situational awareness technology can be used for real-time monitoring of data in power systems, real-time network status estimation, and prediction of risk trends. With the increase of monitoring and communication equipment in power systems and the increase of power system scale, data in power systems are gradually becoming multi-source and multi-structured, and the application frequency of situational awareness technology is also increasing.
[0003] Situation awareness technology can be divided into three stages: situation awareness, situation understanding, and situation prediction. The main content of situation awareness is to collect and preprocess various data from the power system. Situation understanding mainly evaluates the state of the power system through data processing methods such as data fusion, data mining, and feature extraction. Situation prediction is based on situation understanding to predict, assess risks, and warn of various changing factors in the power system. When evaluating the risks in the power system, it is difficult to effectively process the collected multi-source data. For example, the regional interference differences in the operation of the power grid reduce the state prediction results of the multi-source data, which makes the accuracy of risk assessment generally low. Summary of the invention
[0004] In order to solve the above technical problems, the purpose of this application is to provide a power grid risk assessment method and system based on situation awareness. The technical solutions adopted are as follows:
[0005] The present invention provides a method for risk assessment of power grid based on situation awareness, which comprises the following steps:
[0006] Obtain various historical status data of each node of the power grid, where each node corresponds to a different area of the power grid;
[0007] Obtaining relative state characteristic values according to the differences in short-term trend changes of different types of data in the historical state data of the power grid;
[0008] Determine the situation prediction characteristic coefficients of various power grid historical state data based on relative state characteristic values;
[0009] Obtain the risk assessment relative coefficient of each power grid historical status data through the situation prediction characteristic coefficient;
[0010] Based on the relative coefficient of risk assessment, an exponential smoothing model is used to obtain the prediction results of each power grid historical status data;
[0011] The grid operation risk assessment results are obtained by combining the prediction results of each grid historical status data and the risk assessment relative coefficient.
[0012] Furthermore, the process of acquiring the relative state characteristic value further includes:
[0013] For each node in the power grid, the same power grid historical state data of each node at all time points is used as a row vector of each node, and one row vector corresponds to one power grid historical state data;
[0014] For any row vector, the row vector is divided into subsequences, the subsequences are combined in sequence to obtain various trend evaluation sequences, and the trend statistics of all trend evaluation sequences of the row vector constitute the progressive trend characteristic sequence of the row vector;
[0015] Analyze the correlation between each trend evaluation sequence of any row vector and each trend evaluation sequence corresponding to other row vectors, and determine the first time period characteristic value between any row vector and other row vectors;
[0016] Analyze the difference between the progressive trend characteristic sequence of any row vector and other row vectors as the second time period characteristic value between any row vector and other row vectors;
[0017] The relative state eigenvalue between any row vector and other row vectors is determined based on the first periodic eigenvalue and the second periodic eigenvalue, wherein the relative state eigenvalue is positively correlated with the first periodic eigenvalue and negatively correlated with the second periodic eigenvalue.
[0018] Furthermore, dividing any row vector into subsequences further includes:
[0019] A mutation point detection algorithm is used to detect mutation points in any row vector, which are used as segmentation data points of any row vector, so as to segment any row vector into subsequences.
[0020] Furthermore, the step of sequentially combining the subsequences to obtain each trend evaluation sequence further includes:
[0021] The first subsequence is used as the first trend evaluation sequence, the first subsequence and the second subsequence are combined as the second trend evaluation sequence, the first, second and third subsequences are combined as the third trend evaluation sequence, and so on to obtain various trend evaluation sequences.
[0022] Furthermore, the first time period characteristic value between any row vector and other row vectors is the mean value of the correlation obtained by analyzing all trend evaluation sequences between any row vector and other row vectors.
[0023] Furthermore, the determination of the situation prediction characteristic coefficients of the various power grid historical status data further includes:
[0024] The mean value of the relative state characteristic value between any one row vector and all other row vectors is determined as the situation prediction characteristic coefficient of the power grid historical state data corresponding to the any one row vector.
[0025] Furthermore, the risk assessment relative coefficient of each type of power grid historical status data further includes:
[0026] The proportion of the situation prediction characteristic coefficient of each type of power grid historical state data in the situation prediction characteristic coefficients of all types of power grid historical state data is determined as the risk assessment relative coefficient of each type of power grid historical state data.
[0027] Furthermore, in the process of obtaining the prediction results of each type of power grid historical status data, the risk assessment relative coefficient is used as a smoothing parameter in an exponential smoothing model, and the other two weight parameters of the exponential smoothing model are determined, wherein the other two weight parameters are positively correlated with the smoothing parameter.
[0028] Furthermore, the step of obtaining a grid operation risk assessment result by combining the prediction result of each grid historical status data and the risk assessment relative coefficient further includes:
[0029] Preset each risk level interval for each type of historical state data of the power grid, set the risk level score for each risk level interval, analyze the risk level interval where the predicted value of each type of historical state data of the power grid is located, and determine the risk level score of the predicted value;
[0030] The grid operation risk assessment results are positively correlated with the risk level scores corresponding to the predicted values of each grid historical status data and the risk assessment relative coefficient.
[0031] An embodiment of the present application also provides a situational awareness-based power grid risk assessment system, the system comprising a memory, a processor, and a computer program stored in the memory and running on the processor, and the processor implements the steps of any one of the above methods when executing the computer program.
[0032] It can be seen from the above that the power grid risk assessment method and system based on situation awareness provided by this application have at least the following beneficial effects:
[0033] Since there are regional differences in the interference effects during the operation of the power grid, that is, there are differences in the environment, equipment status and usage characteristics of different regions, in the process of risk assessment of the power grid operation status in each region based on situation awareness, the time period trend and correlation differences of the historical status data of the regional power grid operation obtained through situation awareness and situation understanding are considered, and the predictive analysis of each power grid operation status is optimized and adjusted to improve the ability to cope with regional interference effects differences in the power grid risk assessment process, thereby obtaining accurate power grid operation risk assessment results. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0035] Figure 1 A flowchart of a method for risk assessment of a power grid based on situational awareness provided in one embodiment of the present application;
[0036] Figure 2 Schematic diagram of the construction process of the relative state eigenvalues between the target row vector and other row vectors. DETAILED DESCRIPTION
[0037] In order to further explain the technical means and effects adopted by the present application to achieve the predetermined invention purpose, the following is a detailed description of the specific implementation method, structure, features and effects of the power grid risk assessment method and system based on situational awareness proposed in the present application in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.
[0038] Unless otherwise specified and limited, terms such as "comprises", "comprising" or any other variants thereof are intended to cover non-exclusive inclusion, so that a circuit structure, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such articles or devices. In the absence of further restrictions, an element defined by the sentence "comprising a ..." does not exclude the presence of other identical elements in the article or device including the element. In addition, the term "and\or" used herein includes any and all combinations of one or more related listed items. All technical and scientific terms used herein have the same meaning as those commonly understood by technicians in the technical field of this application.
[0039] The specific scheme of the power grid risk assessment method and system based on situation awareness provided by the present application is described in detail below with reference to the accompanying drawings.
[0040] See also Figure 1 , which shows a flowchart of a method for risk assessment of a power grid based on situational awareness provided by an embodiment of the present application, the method comprising the following steps:
[0041] Step 1: Obtain various historical power grid status data for power grid risk assessment.
[0042] Obtain historical grid status data of power supply reliability of different nodes in the grid operation system, wherein the historical grid status data includes equipment failure rate data , System failure power outage rate data , Average power outage time data for users , Average power outage user data and load transferability data , where the nodes in the power grid operation represent different areas in the entire power grid structure. The power grid data collected by each node can be used to analyze the power consumption characteristics of different areas in the power grid structure. Therefore, by analyzing the historical power grid status data of each node, the impact of the power consumption characteristics of the area where each node is located on the power grid operation risk assessment can be further determined, thereby obtaining accurate power grid operation risk assessment results.
[0043] Specifically, for each node in the power grid, the sequence of power grid historical state data obtained at different time points during the historical state detection process of the node is used as the historical state data sequence. For example, the historical state data sequence of the Xth node at time point n is ,in, They are , , , and The data value at time point n; the set consisting of the historical state data sequence of all time points of each node is taken as the historical state data set of each node, for example The historical status data set corresponding to each node .
[0044] So far, the historical status data sequence and historical status data set of each node in the power grid operation system have been obtained.
[0045] Step 2: Obtain relative state characteristic values based on the differences in short-term trend changes of different types of data in the historical state data of the power grid.
[0046] Since the electricity consumption characteristics of different regions change differently during the operation of the power grid, the greater the regional interference difference is when the historical status data of different power grids are used to predict the current risk status of the node, considering that the power grid operation characteristics in different regions are affected by interference factors to different degrees, the situation prediction process in the power grid operation risk assessment process in different regions is optimized and adjusted to reduce the interference of regional interference factor characteristics differences on the power grid operation situation prediction.
[0047] Specifically, the historical state data sequence and historical state data set of each node in the power grid operation system are obtained by step 1, and the relative change characteristics of the power grid historical state data of each node are analyzed to determine the relative influence of the data characteristic changes of each node by regional interference. Therefore, the trend characteristic analysis of the power grid historical state data of each node in the power grid operation to construct the relative state characteristic value is as follows:
[0048] The first sub-step: for the target row vector, divide the target row vector into sub-sequences.
[0049] First, in this embodiment, in order to facilitate the analysis of the trend characteristics of the historical status data of each node of the power grid, for each node in the power grid operation system, the historical status data sequence corresponding to each time point in the historical status data set of the node is used as a column of data in the matrix, and the matrix composed of the historical status data sequences corresponding to all time points in the historical status data set is used as the node risk analysis matrix.
[0050] It should be noted that the arrangement order of the historical status data sequence from left to right in the node risk analysis matrix is the ascending order of the corresponding time points, and each row vector in the node risk analysis matrix reflects the time series of the same power grid historical status data of the node at all time points.
[0051] Then, for any row vector in the node risk analysis matrix, that is, each row vector, for the convenience of analysis and expression, this embodiment uses the any row vector as the target row vector, divides the target row vector into subsequences. The specific process is: using the SNHT (Standard Normal Homogeneity Test) mutation point detection algorithm to obtain the mutation point in the target row vector, using the mutation point as the segmentation data point of the target row vector, and dividing the target row vector according to the segmentation data point of the target row vector.
[0052] Specifically, in this embodiment, the target row vector is composed of , where the mutation data points detected are and , taking 15 and 19 as the split data points to divide the data into the following subsequences: , and .
[0053] The second sub-step: combine the sub-sequences in sequence to obtain each trend evaluation sequence, and use the trend statistics of all trend evaluation sequences of the target row vector to form the progressive trend feature sequence of the target row vector.
[0054] Furthermore, due to the influence of interference factors such as the environment, power equipment status and power consumption characteristics of the node area, the state change characteristics of different types of power grid historical state data used for power grid operation risk assessment have time lag changes. Therefore, based on the periodic change characteristics of each type of power grid historical state data of the node, a relative feature analysis is performed on each other type of power grid historical state data of the node in the same period. The specific analysis process is as follows:
[0055] The subsequences divided by the target row vector are combined in sequence to obtain the trend evaluation sequence. For example, the subsequences after the target row vector is divided are: , and , then the trend evaluation sequences are , and , taking each trend evaluation sequence of the target row vector as input, using the Mann-Kendall trend test algorithm to obtain the trend statistics of each trend evaluation sequence, and taking the sequence composed of the trend statistics of all trend evaluation sequences as the progressive trend characteristic sequence of the target row vector;
[0056] By obtaining the progressive trend characteristic sequence of the target row vector, the progressive trend characteristic sequences of other row vectors can be obtained respectively. If the trend changes of different rows in different periods are quite different after the division based on the characteristics of the target row vector, it means that the historical state data of the power grid corresponding to the target row vector is highly sensitive to the changes of regional risk characteristics.
[0057] The third sub-step: analyzing the correlation between each trend evaluation sequence of the target row vector and each trend evaluation sequence corresponding to other row vectors, and determining the first time period characteristic value between the target row vector and other row vectors.
[0058] Furthermore, in order to ensure the consistency of the analysis between the target row vector and other row vectors, the division result of the target row vector is used as a division template to divide the other row vectors in the node risk analysis matrix at the same position. Therefore, the subsequences of the target row vector and other row vectors after division are one-to-one corresponding, and the number of elements in the corresponding subsequences is the same; specifically, for example, the subsequences after the target row vector is divided are , and , except for the target row vector, if the subsequence after any other row vector is divided into , and ,but , , and , , They correspond from left to right, and the number of elements in the corresponding subsequences is the same;
[0059] Since the subsequence division method of the target row vector is the same as that of each other row vector, the trend evaluation sequences obtained by the target row vector and each other row vector are also corresponding. For example, the trend evaluation sequences of the target row vector are , and , except for the target row vector, one of the row vector trend evaluation sequences is , and ,and , , and , , From left to right, calculate the correlation between the target row vector and the trend evaluation sequence corresponding to each other row vector, and use the mean of all the correlations as the first period characteristic value between the target row vector and each other row vector. It should be noted that there are many ways to measure the correlation between two sequences, such as the Pearson correlation coefficient, the Spearman rank correlation coefficient, etc. In this embodiment, the Pearson correlation coefficient is used. The specific calculation is a known technology and will not be described in detail in this embodiment. As other implementation methods, the implementer may use other methods of measuring the correlation between sequences in the prior art, and this application does not impose any special restrictions.
[0060] It can be understood that the smaller the first time period characteristic value between the target row vector and each other row vector is, the greater the difference in the time period correlation change of the power grid risk characteristics between the power grid historical status data corresponding to the target row vector and other types of power grid historical status characteristic data is.
[0061] The fourth sub-step: Analyze the difference between the progressive trend feature sequences of the target row vector and other row vectors, and construct the second period feature value between the target row vector and other row vectors.
[0062] Furthermore, the difference between the progressive trend feature sequence of the target row vector and the progressive trend feature sequence of each other row vector is analyzed as the second period feature value between the target row vector and each other row vector. It should be noted that there are many methods for measuring the difference between two sequences, such as the Flemingham distance and the DTW distance. In this embodiment, the Flemingham distance is used to measure the difference between the two sequences.
[0063] It should be noted that the larger the second period characteristic value between the target row vector and each other row vector, the greater the scalability ratio of mapping the data in the progressive trend characteristic sequence of the target row vector to the progressive trend characteristic sequence of each other row vector, that is, the greater the difference in the periodic trend changes of different power grid historical status data.
[0064] The fifth sub-step: based on the first period characteristic value and the second period characteristic value, determine the relative state characteristic value between the target row vector and other row vectors.
[0065] The relative state eigenvalue between the target row vector and each other row vector is calculated based on the first periodic eigenvalue and the second periodic eigenvalue between the target row vector and each other row vector , where the relative state characteristic value is positively correlated with the first period characteristic value and negatively correlated with the second period characteristic value.
[0066] Preferably, in this embodiment, the calculation relationship between the target row vector and each other row vector relative state characteristic value is: , relative state eigenvalue The larger the value of is, the greater the difference in the trend and correlation change of the power grid risk change characteristics corresponding to the target row vector and each other row vector is.
[0067] Specifically, for a schematic diagram of the construction process of the relative state characteristic values between the target row vector and other row vectors in this embodiment, please refer to Figure 2 .
[0068] Step 3: Calculate the situation prediction characteristic coefficients of different power grid historical state data based on the relative state characteristic values.
[0069] For each type of power grid historical state data of the node, vector division is performed based on the periodic characteristics of each type of power grid historical state data, and the periodic trends and correlation differences of different power grid historical state data are analyzed based on the division results; therefore, in the process of relative analysis of the target row vector in the above steps, the situation prediction characteristic coefficient of the power grid historical state data corresponding to the target row vector is calculated by the relative state characteristic value between the target row vector and each other row vector .
[0070] The situation prediction characteristic coefficient of the power grid historical state data corresponding to the target row vector , the specific calculation formula is: ;in Represents the target row vector and the Relative state eigenvalues between row vectors; is the number of types of historical state data of the power grid, that is, the number of rows of the node risk analysis matrix; the situation prediction characteristic coefficient of the calculated target row vector is The larger the value of , the more sensitive the historical state data of the power grid corresponding to the target row vector is to the situation prediction of the change of regional power grid risk characteristics when making a relative analysis of other row vectors based on the data change characteristics of the target row vector.
[0071] It should be understood that the above calculation process is to take one of the row vectors in the node risk analysis matrix corresponding to the node as the target row vector, and then obtain the situation prediction characteristic coefficient of the target row vector based on the relative analysis result; therefore, each other row vector in the node risk analysis matrix is taken as the target row vector in turn, and the corresponding situation prediction characteristic coefficient can also be obtained according to the above calculation process.
[0072] At this point, the situation prediction characteristic coefficient of each row vector in the node risk analysis matrix is obtained, that is, the situation prediction characteristic coefficient of the power grid historical state data corresponding to each row vector in the node risk analysis state matrix is obtained.
[0073] Step 4: Obtain the risk assessment relative coefficient of each power grid historical status data through the situation prediction characteristic coefficient.
[0074] Furthermore, the risk situation of various power grid historical status data will be analyzed to construct a relative risk assessment coefficient. Specifically, the proportion of the situation prediction characteristic coefficient of each power grid historical status data corresponding to the node in the situation prediction characteristic coefficient of all power grid historical status data is used as the relative risk assessment coefficient of each power grid historical status data. The corresponding calculation formula is: , the confidence level of each power grid historical status data for regional power grid risk characteristic analysis is reflected through the risk assessment relative coefficient, where, Indicates The relative coefficient of risk assessment of the historical status data of the power grid is and Respectively represent Species and The situation prediction characteristic coefficient of the historical state data of the power grid; It represents the number of types of historical status data of the power grid, and its size is the same as the number of rows in the node risk analysis matrix.
[0075] It is understandable that The larger the relative risk assessment coefficient of the historical state data of the power grid, the higher the The greater the impact of the historical status data of the power grid on regional power grid status prediction.
[0076] Step 5: Based on the relative coefficient of risk assessment, an exponential smoothing model is used to obtain the prediction results of each power grid historical status data.
[0077] Furthermore, the input is each row vector in the node risk analysis matrix, that is, each type of power grid historical state data collected, and the Holt-Winters exponential smoothing model is used to obtain the prediction value corresponding to each row vector, where the risk assessment relative coefficient of the power grid historical state data corresponding to each row vector is As a smoothing parameter , for example, When the historical state data of the power grid is used for prediction, the smoothing parameter , that is, The greater the impact of the historical state data of the power grid on the regional power grid state prediction, the larger the smoothing parameter. In the process of prediction and analysis of historical status data of power grid, the greater the influence of historical data on the prediction results, the more accurate the prediction results will be.
[0078] It should be noted that there are three weight parameters in the Holt-Winters exponential smoothing model, namely , and , and the relationship between the parameters is , , so the smoothing parameter is determined After that, you can determine and .
[0079] Step 6: Evaluate the grid operation risk based on the prediction results of each grid historical status data.
[0080] Furthermore, through the above calculations, the predicted value of each row vector in the node risk analysis matrix can be obtained, that is, the predicted value of each current power grid historical status data is obtained, and the predicted value of each power grid historical status data is transmitted to the power grid operation system, and combined with the risk assessment relative coefficient of each power grid historical status data, the power grid operation risk assessment result is obtained.
[0081] Specifically, in this embodiment, the grid operation risk assessment result can be obtained in the following manner:
[0082] Taking one of the various power grid historical status data as an example, one of the data in this embodiment is the equipment failure rate data. First, the predicted value of the equipment failure rate data is normalized, and the risk level score interval corresponding to the predicted value is set, which is: , , , , , each interval corresponds to a risk level score of 1-5, and the larger the score, the greater the risk level of the power grid. For example, if the predicted value of the equipment failure rate data is 0.2, the corresponding risk level score is 1. So far, according to the above process of the embodiment of the present application, the implementer can combine the actual application scenario to obtain the risk level score of each type of power grid historical status data;
[0083] The relative coefficient of risk assessment of each type of power grid historical status data can reflect the confidence level of each type of power grid historical status data for regional power grid risk feature analysis. Therefore, the relative coefficient of risk assessment of each type of power grid historical status data can be used as a weight and combined with the risk level score to obtain a comprehensive evaluation result of power grid operation risk.
[0084] The comprehensive evaluation result of the power grid operation risk corresponds to the calculation formula: ;in, Indicates the results of the grid operation risk assessment. Indicates Risk level scoring of historical power grid status data, Indicates that based on The relative coefficient of risk assessment is calculated based on the predicted value of the historical status data of the power grid; Indicates the number of types of historical status data of the power grid; represents the rounding function; the grid operation risk assessment result The value range is The larger the value, the greater the risk of power grid operation.
[0085] Based on the same inventive concept as the above method, an embodiment of the present application also provides a power grid risk assessment system based on situational awareness, including a memory, a processor, and a computer program stored in the memory and running on the processor, and when the processor executes the computer program, the steps of any one of the above-mentioned power grid risk assessment methods based on situational awareness are implemented.
[0086] It is to be understood that the sequence of the embodiments of the present application described above is for description only and does not represent the advantages and disadvantages of the embodiments. The above describes specific embodiments of the present specification. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0087] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.
[0088] The above content is only an implementation method of the present application and is not intended to limit the scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly used in other related technical fields, are also included in the protection scope of the present application.
Claims
1. A power grid risk assessment method based on situation awareness, characterized in that: The method comprises the following steps: Obtain various historical status data of each node of the power grid, where each node corresponds to a different area of the power grid; Obtaining relative state characteristic values according to the differences in short-term trend changes of different types of data in the historical state data of the power grid; Determine the situation prediction characteristic coefficients of various power grid historical state data based on relative state characteristic values; Obtain the risk assessment relative coefficient of each power grid historical status data through the situation prediction characteristic coefficient; Based on the relative coefficient of risk assessment, an exponential smoothing model is used to obtain the prediction results of each power grid historical status data; The grid operation risk assessment results are obtained by combining the prediction results of each grid historical status data and the risk assessment relative coefficient; The relative state characteristic value acquisition process further includes: For each node in the power grid, the same power grid historical state data of each node at all time points is used as a row vector of each node, and one row vector corresponds to one power grid historical state data; For any row vector, the row vector is divided into subsequences, the subsequences are combined in sequence to obtain various trend evaluation sequences, and the trend statistics of all trend evaluation sequences of the row vector constitute the progressive trend characteristic sequence of the row vector; Analyze the correlation between each trend evaluation sequence of any row vector and each trend evaluation sequence corresponding to other row vectors, and determine the first time period characteristic value between any row vector and other row vectors; Analyze the difference between the progressive trend characteristic sequence of any row vector and other row vectors as the second time period characteristic value between any row vector and other row vectors; The relative state eigenvalue between any row vector and other row vectors is determined based on the first periodic eigenvalue and the second periodic eigenvalue, wherein the relative state eigenvalue is positively correlated with the first periodic eigenvalue and negatively correlated with the second periodic eigenvalue.
2. The power grid risk assessment method based on situational awareness according to claim 1, characterized in that: The dividing of any row vector into subsequences further comprises: A mutation point detection algorithm is used to detect mutation points in any row vector, which are used as segmentation data points of any row vector, so as to segment any row vector into subsequences.
3. The power grid risk assessment method based on situational awareness according to claim 1, characterized in that: The step of sequentially combining the subsequences to obtain each trend evaluation sequence further includes: The first subsequence is used as the first trend evaluation sequence, the first subsequence and the second subsequence are combined as the second trend evaluation sequence, the first, second and third subsequences are combined as the third trend evaluation sequence, and so on to obtain various trend evaluation sequences.
4. The power grid risk assessment method based on situational awareness according to claim 1, characterized in that: The first time period characteristic value between any row vector and other row vectors is the mean value of the correlation obtained by analyzing all trend evaluation sequences of any row vector and other row vectors.
5. The method for power grid risk assessment based on situational awareness according to claim 4, characterized in that: The determination of the situation prediction characteristic coefficients of the various power grid historical status data further includes: The mean value of the relative state characteristic value between any one row vector and all other row vectors is determined as the situation prediction characteristic coefficient of the power grid historical state data corresponding to the any one row vector.
6. The power grid risk assessment method based on situational awareness according to claim 1, characterized in that: The risk assessment relative coefficient of each type of power grid historical status data further includes: The proportion of the situation prediction characteristic coefficient of each type of power grid historical state data in the situation prediction characteristic coefficients of all types of power grid historical state data is determined as the risk assessment relative coefficient of each type of power grid historical state data.
7. The power grid risk assessment method based on situational awareness according to claim 1, characterized in that: In the process of obtaining the prediction results of each type of power grid historical status data, the risk assessment relative coefficient is used as a smoothing parameter in the exponential smoothing model, and the other two weight parameters of the exponential smoothing model are determined, wherein the other two weight parameters are positively correlated with the smoothing parameter.
8. The method for power grid risk assessment based on situational awareness according to claim 1, characterized in that: The step of obtaining a grid operation risk assessment result by combining the prediction result of each grid historical status data and the risk assessment relative coefficient further includes: Preset each risk level interval for each type of historical state data of the power grid, set the risk level score for each risk level interval, analyze the risk level interval where the predicted value of each type of historical state data of the power grid is located, and determine the risk level score of the predicted value; The grid operation risk assessment results are positively correlated with the risk level scores corresponding to the predicted values of each grid historical status data and the risk assessment relative coefficient.
9. A power grid risk assessment system based on situational awareness, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 8 are implemented.
Citation Information
Patent Citations
Active power distribution network operation situation evaluation method based on effectiveness function
CN107832929A
Situational awareness method and device based on long-short-term memory network, equipment and medium
CN112580788A
Power grid trend early warning method based on monitoring operation data
CN116468243A
Multi-source data fusion network security situation awareness method and device
CN117240541A
Risk fault situation awareness system based on multi-source data fusion
CN117726164A