A vehicle command and management system and method based on Beidou navigation

Through the vehicle command and management system based on Beidou navigation, combined with high-precision positioning and deep learning technology, real-time human resource scheduling and path planning are realized, solving the problems of deployment imbalance and cross-regional collaborative operations in the existing technology, and improving the response to complex security situations. efficiency and response speed.

CN118522154BActive Publication Date: 2024-10-11贵州省第一测绘院(贵州省北斗导航位置服务中心)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410985243.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-11
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

The existing public security traffic management human resources deployment method has problems such as imbalanced deployment, multiple levels of early warning information transmission, and multiple commands. It is difficult to flexibly adjust manpower deployment according to changes in real-time traffic conditions and early warning information, and there is a lack of effective management mechanisms for cross-regional collaborative operations and resource sharing. It is difficult to cope with the complex and ever-changing public security situation.

Method used

Adopting a vehicle command and management system based on Beidou navigation, combined with high-precision positioning, Internet of Things, big data and deep learning technology, it can realize real-time dynamic scheduling of human resources, intelligent early warning and path planning, support cross-regional collaborative operations and resource optimization, and use Beidou positioning The terminal uploads vehicle location and status data in real time, uses GIS and long-short-term memory neural networks to predict traffic congestion and accident-prone areas, and dynamically adjusts dispatch strategies and path planning.

Benefits of technology

It improves the deployment efficiency and response speed of human resources, enables flexible response to complex security situations, ensures rapid response and efficient collaborative operations in emergencies, reduces resource waste, provides accurate path planning and navigation services, and improves vehicle efficiency. driving efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118522154B_ABST
    Figure CN118522154B_ABST
Patent Text Reader

Abstract

This application proposes a vehicle command and management system and method based on Beidou navigation, which belongs to the field of satellite navigation application technology. The system includes a high-precision positioning and Internet of Things basic module, which realizes high-precision positioning based on the Beidou positioning terminal installed on the vehicle, uploads vehicle data in real time through the Internet of Things technology, and provides real-time human resource monitoring, management and visualization based on GIS; an intelligent prediction and early warning system module, based on the collected historical early warning information data, traffic flow data, and meteorological data, uses deep learning to establish a prediction model, automatically identifies potential traffic congestion areas and accident-prone areas, generates early warnings in advance and dispatches manpower on standby; an adaptive scheduling and resource optimization module, which analyzes traffic conditions, manpower distribution, staff status and early warning urgency in real time, dynamically adjusts scheduling strategies, and uses optimization algorithms to ensure optimal resource allocation. It greatly improves the flexibility of manpower use and the efficiency of handling emergencies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of satellite navigation application technology, and in particular relates to a vehicle command and management system and method based on Beidou navigation. Background Art

[0002] Due to the limited management resources of the city and the different busyness of various sections of the city, the human resources required to be dispatched to each section are also different. The existing methods of allocating human resources for public security traffic management are mainly based on walkie-talkies, telephones, etc., which have problems such as unbalanced allocation, multiple levels of early warning information transmission, and multiple commands.

[0003] The document with the prior art publication number CN117459900A provides an integrated management system for patrol vehicles, which combines smart police cars, mobile terminals and command centers, transmits on-site information in real time, and uses geographic information system technology to display the location and driving route of police cars on the map, so as to achieve rapid response to alarm information, and use GIS, video stream processing and voice recognition technology to improve the efficiency of manpower dispatch, ensure safety and shorten emergency response time. The above-mentioned prior art has improved the efficiency of manpower deployment and response speed to a certain extent, but there are still some challenges and limitations in practical applications. The dynamic dispatch and real-time optimization of human resources are insufficient, and it is impossible to flexibly adjust the manpower deployment according to the real-time traffic conditions and changes in warning information; at the same time, there is a lack of effective integration and management mechanism for cross-regional collaborative operations and resource sharing, which makes it difficult to cope with the complex and changing security situation.

[0004] In view of this, we proposed a vehicle command and management system and method based on Beidou navigation. Summary of the invention

[0005] The present invention provides a vehicle command and management system based on Beidou navigation, which aims to strengthen the integration of Beidou products and services with various equipment and application systems through the combined application of Beidou spatiotemporal information, the Internet of Things, and big data, and to conduct real-time, visual, and customized management of personnel, vehicles, etc., to achieve dynamic scheduling of human resources, integrated command, etc., and to improve response speed and execution efficiency.

[0006] The present application provides a vehicle command and management system based on Beidou navigation, which is connected to a vehicle intelligent management platform. The system includes:

[0007] The high-precision positioning and IoT basic module achieves meter-level to sub-meter-level high-precision positioning based on the Beidou positioning terminal installed on the vehicle. It uploads vehicle location, speed, status and other data in real time through IoT technology, and provides real-time human resource monitoring, management and visualization based on GIS.

[0008] The intelligent prediction and warning system module extracts key features based on the collected historical warning information data, traffic flow data, and meteorological data, and uses the long-term and short-term memory neural network to establish a prediction model to predict the probability of warning occurrence or traffic congestion index. t =tanh(W hx x t +W hh h t-1 +b h ), y t =W yh h t +b y , where h t is the hidden state, x t is the input data, i.e. the extracted key features, y t is the predicted value, W hx ,W hh ,W yh is the weight matrix, b h ,b y is the bias term and tanh is the activation function to automatically identify potential traffic congestion areas and accident-prone areas, generate early warnings and dispatch manpower on standby.

[0009] The adaptive scheduling and resource optimization module analyzes traffic conditions, manpower distribution, staff status and warning urgency in real time, dynamically adjusts scheduling strategies, and uses optimization algorithms to ensure optimal resource allocation.

[0010] On the basis of the above technical solutions, the vehicle command and management system based on Beidou navigation also includes.

[0011] The collaborative operation and cross-regional collaboration module has a built-in multi-police type and multi-department collaboration mechanism. It automatically coordinates the human resources of different regions and departments according to the needs of early warning information, supports cross-regional command and dispatch, and ensures rapid response and collaborative operations in emergencies.

[0012] The path planning and avoidance system module combines real-time traffic data and road condition information to provide accurate road condition information, perform path planning, dynamically adjust routes, provide real-time navigation, prompt road condition changes and the best driving route, and ensure fast and safe arrival at the scene.

[0013] The mobile terminal interaction and real-time feedback module realizes two-way instant communication based on the equipped smart mobile terminal. The smart mobile terminal has built-in dedicated applications for front-line staff to use.

[0014] Preferably, the high-precision positioning and Internet of Things basic modules include a Beidou positioning unit, a real-time upload unit and a GIS integration unit. The Beidou positioning unit uses the Beidou high-precision positioning terminal installed on each vehicle to achieve meter-level or even sub-meter-level positioning accuracy, and reflects the dynamic position and driving status of each vehicle in real time. The real-time upload unit uses the Internet of Things technology to upload the vehicle's real-time position data, speed data and other status information through an encrypted channel to the cloud-based vehicle intelligent management platform. The GIS integration unit displays the real-time position of the vehicle based on the received real-time data, realizes real-time monitoring of the vehicle, and dynamically tracks and replays the vehicle's driving path.

[0015] Preferably, the intelligent prediction and warning system module includes a data collection and storage unit, a prediction model construction unit and a warning trigger unit. The data collection and storage unit collects multivariate data such as historical warning information records, real-time traffic flow data, weather forecast information, holidays and special event schedules, processes the data, builds a big data warehouse, and classifies and stores various types of original data and processed data. The prediction model construction unit extracts key features from the data, builds training data sets and test data sets, uses long short-term memory neural networks to build prediction models, performs rolling predictions for each future time point, and outputs predicted warning probability or traffic congestion index, etc. The warning trigger unit identifies potential traffic congestion areas and accident-prone areas based on the prediction results, generates warning information in advance, and sets warning thresholds based on the severity of historical warnings and response requirements. If the model prediction value exceeds the preset threshold, a warning is triggered.

[0016] Preferably, the adaptive scheduling and resource optimization module processes and analyzes the collected data in real time by analyzing multi-source data such as traffic conditions, manpower distribution, staff status and warning urgency, extracts key features for decision support, and dynamically adjusts the scheduling strategy based on predefined rules and real-time data, giving priority to assigning manpower closest to the scene of the incident, taking into account the fatigue of the staff and the fuel level of the vehicle to avoid excessive use of a certain staff or vehicle. It uses genetic algorithms for global optimization to generate an initial solution group (scheduling plan), selects excellent solutions according to the fitness function, generates new solutions through crossover operations, mutates the new solutions to increase the diversity of solutions, and repeats selection, crossover and mutation until the predetermined convergence conditions are reached to ensure optimal resource allocation.

[0017] Preferably, the collaborative operation and cross-regional collaboration modules collect real-time warning information and human resource data of each region, obtain cross-regional geographical boundary data and traffic flow data, ensure the feasibility of cross-regional scheduling, consider factors such as staff status, location, equipment, etc., calculate the matching degree of resources and events, establish an inter-regional collaboration mechanism, coordinate human resources in different regions, use optimization algorithms such as genetic algorithms, comprehensively consider matching degree and collaboration degree, find the optimal scheduling plan for human resources and collaboration, convert the optimized scheduling plan into specific task instructions, assign them to corresponding human resources, send task instructions in real time through smart mobile terminals, and receive feedback to ensure the execution and adjustment of instructions, so as to automatically coordinate human resources in different regions and departments and realize cross-regional command and dispatch.

[0018] Preferably, the path planning and avoidance system module combines real-time traffic data and road condition information to provide accurate path planning and navigation services for vehicles, obtains the location information of each vehicle, integrates the urban traffic monitoring system, floating vehicle data, predicted traffic flow data, etc., forms a real-time traffic status map, receives warning information, and uses the static information provided by the GIS system to calculate the real-time weight of the road based on these data. The objective function is to minimize the driving time and driving cost to ensure that the vehicle reaches the destination at the fastest speed. At the same time, multiple path selection algorithms are run, each algorithm calculates one or more paths based on the input data, and the results of multiple path selection algorithms are integrated according to the weights to calculate the comprehensive score. The path with the highest comprehensive score is selected as the final path. According to the changes in real-time data, the path planning is dynamically adjusted, and the path is recalculated regularly to ensure the real-time and accuracy of the path selection.

[0019] Preferably, the two-way instant communication in the mobile terminal interaction and real-time feedback module is: based on the equipped smart mobile terminal, the dispatch instruction is received in real time, and the on-site situation is uploaded.

[0020] According to the present application, a vehicle command and management method based on Beidou navigation is also provided, and the method includes:

[0021] S1. The Beidou high-precision positioning terminal installed in the vehicle collects information such as vehicle location and speed in real time, and uploads the data to the vehicle intelligent management platform of the command center through the Internet of Things (IoT) technology.

[0022] S2. The uploaded data is stored and processed in the vehicle intelligent management platform. Based on the geographic information system (GIS), the vehicle location and manpower distribution are displayed in real time to achieve visual management of human resources.

[0023] S3. The system integrates historical warning information data, real-time traffic flow and meteorological data, and uses deep learning algorithms to analyze and predict potential traffic congestion areas and accident-prone areas, generate warning information in advance, and pre-dispatch human resources based on the prediction results.

[0024] S4. When an early warning occurs, determine whether the event is an ordinary event or an event that requires collaborative work and cross-regional collaboration. If it is an ordinary event, the adaptive scheduling and resource optimization module dynamically adjusts the human resource scheduling strategy, giving priority to allocating human resources that are close and in good condition, to ensure that the early warning is responded to and processed in a timely manner.

[0025] S5. When an incident requires collaborative work and cross-regional collaboration, collect real-time warning information and human resource data from each region, obtain cross-regional geographic boundary data and traffic flow data, consider factors including staff status, location, and equipment, calculate the matching degree between resources and events, establish an inter-regional collaboration mechanism, coordinate human resources in different regions, use genetic algorithms to comprehensively consider matching and collaboration, find the optimal scheduling plan for human resources and collaboration, realize collaborative work and cross-regional collaboration among multiple police types and departments, ensure rapid response and efficient cooperation in emergencies, and improve handling efficiency.

[0026] S6. Combine real-time traffic data and road condition information to obtain the location information of each vehicle, integrate the urban traffic monitoring system, floating vehicle data, and predicted traffic flow data to form a real-time traffic status map, receive warning information, and use the static information provided by the GIS system. Based on the above data, calculate the real-time weight of the road. The objective function is to minimize the driving time and driving cost. Run multiple path selection algorithms at the same time. Each algorithm calculates one or more paths based on the input data. The results of multiple path selection algorithms are integrated according to the algorithm weights, and the comprehensive score is calculated. The path with the highest comprehensive score is selected as the final path, providing accurate path planning and navigation services for vehicles to ensure rapid arrival at the scene.

[0027] S7. Through smart mobile terminals, two-way instant communication between staff and the command center is realized. Staff can receive dispatch instructions and upload the on-site situation in real time to re-determine the type of incident and determine whether reinforcement is needed or to interrupt excessive resource investment in time.

[0028] The vehicle command and management system and method based on Beidou navigation described in the present invention have the following advantages.

[0029] The system makes full use of the high-precision positioning capability of Beidou navigation technology to ensure accurate grasp of the vehicle's location. Through the Internet of Things technology, the system can collect and upload vehicle information in real time, so that the command center can keep abreast of the distribution of manpower at any time. By integrating historical warning information data, real-time traffic flow and meteorological data, and using deep learning algorithms, it can realize intelligent prediction of potential traffic problems, provide strong support for the pre-dispatch of manpower, and improve the foresight and initiative of the system. The adaptive dispatching method can greatly improve the efficiency of manpower use, reduce the waste of resources, and realize collaborative operations and cross-regional collaboration between multiple police types and departments. In an emergency, by automatically coordinating human resources in different regions and departments, it can ensure rapid response and efficient cooperation, improve handling efficiency, provide path planning and avoidance functions, provide accurate path planning and navigation services for vehicles, ensure rapid arrival at the scene and improve vehicle driving efficiency.

[0030] The vehicle command and management system based on Beidou navigation of the present invention realizes functions such as precise positioning, intelligent prediction, adaptive scheduling, path planning, and collaborative operation of vehicles by combining Beidou navigation technology, Internet of Things technology, and big data technology, thereby improving the efficiency and response speed of human resource deployment and providing strong support for urban management and public safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a structural diagram of the vehicle command and management system based on Beidou navigation provided for this application.

[0032] Figure 2 This is a structural diagram of the high-precision positioning and Internet of Things basic modules in the Beidou navigation-based vehicle command and management system provided for this application.

[0033] Figure 3 This is a module structure diagram of the intelligent prediction and early warning system in the Beidou navigation-based vehicle command and management system provided in this application.

[0034] Figure 4 Flowchart of the vehicle command and management method based on Beidou navigation provided for this application.

[0035] Figure 5 This application presents a schematic diagram of vehicle distribution data information provided by the GIS integration unit based on the vehicle intelligent management platform.

[0036] Figure 6 This application is based on the vehicle intelligent management platform to display the vehicle tracking data information provided by the GIS integration unit.

[0037] Figure 7 This application is based on the vehicle intelligent management platform to display the vehicle historical trajectory data information provided by the GIS integration unit.

[0038] Figure 8 A command and dispatch schematic diagram of the adaptive dispatch and resource optimization module in the Beidou navigation-based vehicle command and management system provided in this application. DETAILED DESCRIPTION

[0039] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings.

[0040] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other.

[0041] Please refer to Figure 1 , which shows the structure diagram of the vehicle command and management system based on Beidou navigation provided by the present application. An embodiment of the present application provides a vehicle command and management system based on Beidou navigation, which is connected to the vehicle intelligent management platform. The system includes.

[0042] High-precision positioning and Internet of Things basic module, each vehicle is equipped with a Beidou positioning terminal to achieve high-precision positioning from meter to sub-meter level, and upload vehicle location, speed, status and other data in real time through Internet of Things technology, and provide real-time human resource monitoring, management and visualization display functions based on the geographic information system GIS.

[0043] The intelligent prediction and warning system module is used to collect historical warning information data, traffic flow data, meteorological data, etc., and store them in the data warehouse. It uses deep learning to analyze the data, establish a prediction model, automatically identify potential traffic congestion areas and accident-prone areas, generate warnings in advance, and dispatch manpower on standby.

[0044] The adaptive scheduling and resource optimization module analyzes traffic conditions, manpower distribution, staff status and warning urgency in real time, dynamically adjusts scheduling strategies, gives priority to assigning manpower that is close and in good condition, and uses optimization algorithms to ensure optimal resource allocation.

[0045] The collaborative operation and cross-regional collaboration module has a built-in multi-police type and multi-department collaboration mechanism. It automatically coordinates the human resources of different regions and departments according to early warning needs, supports cross-regional command and dispatch, and ensures rapid response and collaborative operations in emergencies.

[0046] The path planning and avoidance system module combines real-time traffic data and road condition information to provide accurate road condition information, perform path planning, dynamically adjust routes, provide real-time navigation, prompt road condition changes and the best driving route, and ensure quick and safe arrival at the scene.

[0047] The mobile terminal interaction and real-time feedback module is equipped with a smartphone or tablet computer and has a built-in dedicated application for front-line staff to use, realizing two-way instant communication. Staff can receive dispatch instructions immediately and upload the on-site situation in real time, such as pictures, videos, and electronic reports reflecting the data of the on-site situation.

[0048] Please refer to Figure 2 , which shows a structural diagram of a high-precision positioning and Internet of Things basic module in a vehicle command and management system based on Beidou navigation provided by an embodiment of the present application. The high-precision positioning and Internet of Things basic module includes a Beidou positioning unit, a real-time upload unit and a GIS integration unit. The Beidou positioning unit includes a Beidou high-precision positioning terminal installed on each vehicle. The vehicles include cars, motorcycles, etc. The terminal has a built-in Beidou satellite navigation chip, which can receive signals from the Beidou satellite system and perform accurate position calculation. As a global satellite navigation system independently developed by China, the Beidou system not only covers the world, but also has outstanding positioning accuracy in China and surrounding areas, which can achieve meter-level or even sub-meter-level positioning accuracy. The positioning terminal continuously receives satellite signals, and after complex algorithm processing, calculates the vehicle's precise position, speed and other information, reflecting the dynamic position and driving status of each vehicle in real time.

[0049] The real-time upload unit uses Internet of Things technology, especially the Internet of Things card and 4G / 5G mobile communication network, to upload the vehicle's real-time location data, speed data and other status information to the cloud-based vehicle intelligent management platform through an encrypted channel. The Internet of Things card is a data transmission card designed specifically for Internet of Things devices that can ensure the security and stability of data transmission.

[0050] The GIS integrated unit displays the real-time location of the vehicle based on the real-time data received, and realizes real-time monitoring of the vehicle. The vehicle distribution, tracking and trajectory are respectively Figures 5 to 7 The real-time human resource monitoring, management and visualization information provided by the GIS integration unit are displayed through the vehicle intelligent management platform. For example, the vehicle distribution function on the vehicle intelligent management platform can be used to view the current location of all vehicles, and the vehicle tracking function can be used to dynamically track specific vehicles. The historical trajectory function can replay the vehicle's driving path to help analyze human resource deployment and action patterns.

[0051] Please refer to Figure 3, which shows a module structure diagram of an intelligent prediction and warning system in a vehicle command and management system based on Beidou navigation provided by an embodiment of the present application. The intelligent prediction and warning system module includes a data collection and storage unit, a prediction model construction unit and a warning trigger unit. The data collection and storage unit is used to collect multivariate data such as historical warning information records, traffic flow data, weather forecast information, holidays and special event schedules, etc. The historical warning information record data includes the time, location, type, processing time and other information of past traffic accidents, violations, congestion and other events. Traffic flow data includes real-time and historical traffic flow information, vehicle speed, traffic density, etc. Meteorological data includes historical and real-time weather condition data, including temperature, rainfall, visibility, etc., and other related data such as holidays, major events, etc. The collected multivariate data is processed, including cleaning data, removing outliers and missing values, and standardizing data to ensure the comparability of data from different sources, building a big data warehouse, and classifying and storing various types of original data and processed data.

[0052] The prediction model building unit extracts key features from the original data and processed data, such as time (hour, week, season), location (latitude and longitude, road type), traffic flow, warning high-incidence period, weather conditions, etc., builds training data sets and test data sets based on historical data, and uses long short-term memory neural network for prediction. t =tanh(W hx x t +W hh h t-1 +b h ), y t =W yh h t +b y , where h t is the hidden state, y t is the predicted value, x t The key features extracted from the input data, such as time, location, etc., W hx ,W hh ,W yh is the weight matrix, b h ,b y is the bias term, tanh is the activation function, the model is trained using historical data, and the loss function uses mean square error, MSE=1 / n∑ i=1 n (y i −y^ i ) 2 ,y i is the true value, y^ iis the predicted value, n is the number of samples, and the model performance is evaluated through cross-validation and other techniques to adjust the hyperparameters. After the model training is completed, a rolling prediction is made for each future time point (such as the next day or week), and the predicted warning probability or traffic congestion index is output.

[0053] The warning trigger unit identifies potential traffic congestion areas and accident-prone areas based on the prediction results, generates warning information in advance, and sets warning thresholds based on historical warning severity and response requirements. If the model prediction value exceeds the preset threshold, a warning is triggered. For example, if it is predicted that traffic congestion in a certain area will reach a peak within the next hour, or the probability of an accident will increase significantly, the warning information will be automatically pushed to the command center and relevant staff, and the emergency plan will be activated, manpower will be deployed to potential high-risk areas in advance, or vehicle patrol routes will be adjusted.

[0054] As an alternative to this application, see Figure 8 The adaptive scheduling and resource optimization module dynamically adjusts the scheduling strategy, optimizes resource allocation, and ensures efficient use of manpower by analyzing multi-source data such as traffic conditions, manpower distribution, staff status, and warning urgency in real time. The collected traffic condition data includes real-time traffic flow, congestion conditions, accident information, etc. The manpower distribution data includes the current vehicle location, quantity, and distribution status, etc. The staff status data includes staff fatigue, duty hours, vehicle fuel level, etc. The warning urgency data includes the type, urgency, and processing time limit of the current warning information.

[0055] Process and analyze the collected data in real time, extract key features for decision support, dynamically adjust the scheduling strategy based on predefined rules and real-time data, give priority to assigning human resources closest to the incident site, consider the fatigue of staff and vehicle fuel level, avoid overuse of a certain staff or vehicle, determine the scheduling priority according to the urgency of the warning, and define the objective function of the scheduling strategy to achieve optimal resource allocation, Min∑ i=1 n (w response T i +w fatigue F i +w fuel D i ), where the response time T i , calculate the time required for the manpower in each scheduling scheme to reach the incident site from the current location, and calculate the worker fatigue F based on real-time traffic data and path planning algorithm i , evaluate the fatigue status of the staff in each scheduling plan, and comprehensively evaluate the factors such as working hours, recent rest time, fuel consumption D i,Estimate the fuel consumption of vehicles in each scheduling scheme, based on the distance traveled by the vehicles and the fuel efficiency of the vehicles,w response 、w fatigue and w fuel is a weight parameter used to adjust the relative importance of response time, worker fatigue, and fuel consumption in the total cost. These weight parameters are adjusted according to specific application scenarios and strategies to reflect the priority of different costs. Constraints include response time constraints to ensure that manpower arrives at the site in the shortest time, T i ≤T max , T i is the response time of the i-th person, T max is the maximum allowed response time; worker status constraints to avoid scheduling workers with high fatigue, F j ≤F max , F j is the fatigue level of the jth worker, F max is the maximum fatigue allowed; the fuel level constraint ensures that the vehicle has sufficient fuel level, L k ≥L min , L k is the fuel level of the kth vehicle, L min The genetic algorithm is used for global optimization to generate an initial solution group, i.e., a scheduling scheme. Excellent solutions are selected according to the fitness function. New solutions are generated through crossover operations. The new solutions are mutated to increase the diversity of solutions. Selection, crossover, and mutation are repeated until the predetermined convergence condition is reached.

[0056] As an optional solution of this application, the collaborative operation and cross-regional collaboration module enables collaborative operation and cross-regional collaboration between multiple police types and departments. In emergency events, by automatically coordinating the human resources of different regions and departments, rapid response and efficient cooperation can be ensured to improve the efficiency of handling. Real-time warning information, including event type, location, urgency, etc., is collected from the warning information system of each region. Human resource data of each region, including staff location, status, equipment and other information, is collected. Cross-regional geographical boundary data and traffic flow data are obtained to ensure the feasibility of cross-regional scheduling. Considering factors such as staff status, location, equipment, etc., the matching degree between resources and events is calculated. Match(R) j ,E i ) = γProximity(R j ,E i )+δReadiness(R j )+ηEquipment(R j ), where Match(R j ,E i ) is the resource R j With event Ei Proximity(R j ,E i ) is the distance between the resource and the event, and Readiness (R j ) is the readiness state of the resource, Equipment(R j ) is the equipment status of resources, γ, δ and η are weight coefficients, and a collaboration mechanism between regions is established to coordinate the human resources of different regions. k ,A l ) = λResourceAvailability(A k ,A l )+μResponseTime(A k ,A l )+νCoordinationEfficiency(A k ,A l ), where Collaboration(A k ,A l ) is area A k With area A l The degree of collaboration, ResourceAvailability (A k ,A l ) is the availability of resources between regions, ResponseTime(A k ,A l ) is the response time, CoordinationEfficiency(A k ,A l ) is the collaboration efficiency, λ, μ and ν are weight coefficients, and optimization algorithms such as genetic algorithms are used to comprehensively consider the matching degree and collaboration degree to find the optimal human resources and collaboration solution. Fitness(S)=∑ i=1 n (Match(R i ,E i )+Collaboration(A i1 ,A i2 )), where Fitness(S) represents the fitness of solution S, Match(R i ,E i ) is the matching degree between the ith event and the resource, Collaboration(A i1 ,A i2) is the degree of cooperation between regions involved in the ith event. An initial set of plans is generated, each plan represents a human resource scheduling arrangement. The fitness of each plan is calculated according to the matching degree and the degree of cooperation. The plan with high fitness is selected for the next step. The selected plans are cross-operated to generate new plans. Some plans are mutated to increase diversity. The above steps are repeated until the optimal or approximately optimal plan is found. The optimized scheduling plan is converted into specific task instructions and assigned to the corresponding human resources. The task instructions are sent in real time through the smart mobile terminal, and feedback is received to ensure the execution and adjustment of the instructions.

[0057] As an optional solution of this application, the path planning and avoidance system module combines real-time traffic data and road condition information to provide accurate path planning and navigation services for vehicles. By avoiding congested and accident sections, it can ensure that the vehicle arrives at the scene quickly and improves handling efficiency. Through the Beidou high-precision positioning terminal, the location information of each vehicle is updated in real time to sub-meter accuracy, integrating urban traffic monitoring systems, floating vehicle data, predicted traffic flow data, etc. to form a real-time traffic status map, receive warning information, including the location of the warning and the urgency assessment, and use the road network, speed limit, one-way street and other warning information provided by the GIS system. According to the above data, the real-time weight z(e) of each road e is calculated. The objective function is to minimize driving time and driving cost to ensure that the vehicle reaches the destination as quickly as possible, Min∑ i=1 n (t i +c i ), t i is the travel time of the i-th road section, c i The driving cost of the i-th section of road, such as fuel consumption, tolls, etc., runs multiple path selection algorithms at the same time, and each algorithm calculates one or more paths based on the input data. For example, the Dijkstra algorithm is used to calculate the shortest path distance of each node, d[v]=min(dist[u],dist[v]+w(u,v)), where dist(u) is the shortest distance from the source point to vertex u, and w(u,v) is the weight of edge u to v (travel time and travel cost). The A* algorithm is a shortest path algorithm based on heuristic search. It combines the current path cost and the estimated cost to reach the end point to quickly find the optimal path, f(v)=g(v)+h(v), where f(v) is the total estimated cost of vertex v, g(v) is the actual cost from the starting point to v, and h(v) is the heuristic estimated cost from v to the end point. The ant colony algorithm is an optimization algorithm that simulates the foraging behavior of ants. It finds the optimal path through the positive feedback mechanism of pheromones. τ ij (t+1)=(1-ρ)τ ij (t)+Δτ ij , where τ ij(t) is the pheromone concentration on path (i, j), ρ is the pheromone volatility coefficient, Δτ ij is the amount of pheromone increase. The results of each algorithm are integrated according to the algorithm weight to calculate the comprehensive score. Score(P)=∑ k=1 m α k Path k (P) where Score(P) is the comprehensive score of path P, α k is the weight of the kth algorithm, Path k (P) is the path score of the kth algorithm. The path with the highest comprehensive score is selected as the final path. According to the real-time data changes, the path planning is dynamically adjusted and the path is recalculated regularly to ensure the real-time and accuracy of the path selection.

[0058] For example, based on real-time traffic data, road condition information, warning information, and static information provided by the GIS system, the real-time weight z(e) of each road e is calculated, and the minimization of driving time and driving cost is taken as the objective function. Multiple path selection algorithms are used to calculate one or more paths respectively, such as using the Dijkstra algorithm to calculate the shortest path distance of each node, the A* algorithm is a shortest path algorithm based on heuristic search, which combines the current path cost and the estimated cost of reaching the destination to quickly find the optimal path, and the ant colony algorithm is an optimization algorithm that simulates the foraging behavior of ants, and finds the optimal path through the positive feedback mechanism of pheromones. The above three path selection algorithms are based on the real-time weight z(e) of each road e to calculate the sum of the real-time weights of the road combination under each path ∑z i (e), the sum of real-time weights ∑z i (e) The path score is obtained through mapping calculation. The path score of each path is used as a reference indicator. The optimal path corresponding to each algorithm is obtained according to different path selection algorithms. Based on this, the path score calculated by other algorithms for the optimal path is found. The optimal path results under different algorithms are integrated by combining the weights of each algorithm to calculate the comprehensive score Score(P)=∑ k=1 m α k Path k (P), compare the comprehensive scores of the optimal paths under different algorithms, and select the path with the highest comprehensive score as the final path.

[0059] As an optional solution of this application, the mobile terminal interaction and real-time feedback module provides a convenient means of communication for front-line staff. By being equipped with smart phones or tablets, staff can receive dispatch instructions from the command center in real time and upload the on-site situation. The two-way instant communication method greatly improves communication efficiency and response speed, allowing the command center to understand the on-site situation in a timely manner and make correct decisions.

[0060] In one embodiment of the present application, Beidou high-precision positioning terminals are installed on 52 vehicles of a fleet in Guiyang City to realize real-time, visual and customized management of vehicles, dynamic scheduling of fleet human resources, integrated command, etc., and improve response speed and execution efficiency.

[0061] Please refer to Figure 4 , which shows a flow chart of a vehicle command and management method based on Beidou navigation provided by an embodiment of the present application. The vehicle command and management method based on Beidou navigation includes the following steps.

[0062] S1. The Beidou high-precision positioning terminal installed on the vehicle collects information such as vehicle location and speed in real time, and uploads the data to the command center's smart management platform through the Internet of Things technology.

[0063] S2. After receiving the data, the geographic information system GIS is used to process and display the vehicle location in real time, realize the visual monitoring of human resources, and develop functions such as vehicle distribution, real-time tracking and historical trajectory playback based on the vehicle status and location data.

[0064] S3. The system integrates historical warning information data, real-time traffic flow and meteorological data, and uses deep learning algorithms to analyze and predict potential traffic congestion areas and accident-prone areas, generate warning information in advance, and pre-dispatch human resources based on the prediction results.

[0065] S4. When an early warning occurs, determine whether the event is an ordinary event or an event that requires collaborative work and cross-regional collaboration. If it is an ordinary event, the adaptive scheduling and resource optimization module dynamically adjusts the human resource scheduling strategy, giving priority to allocating human resources that are close and in good condition, to ensure that the early warning is responded to and processed in a timely manner.

[0066] S5. When an incident requires collaborative work and cross-regional collaboration, with the support of the collaborative work and cross-regional collaboration module, collaborative work and cross-regional collaboration between multiple police types and departments can be achieved to ensure rapid response and efficient cooperation in emergency incidents, thereby improving handling efficiency.

[0067] S6. Use the path planning and avoidance system module, combined with real-time traffic data and road condition information, to provide vehicles with accurate path planning and navigation services to ensure rapid arrival at the scene.

[0068] S7. Through the mobile terminal interaction and real-time feedback module, two-way instant communication between staff and the command center is realized. Staff can receive dispatch instructions and upload the on-site situation in real time, re-determine the type of event, determine whether reinforcement is needed or interrupt excessive resource investment in time.

Claims

1. A vehicle command and management system based on Beidou navigation, connected to a vehicle intelligent management platform, characterized in that: The system includes: High-precision positioning and IoT basic module, based on the Beidou positioning terminal installed in the vehicle to achieve high-precision positioning, upload vehicle data in real time through IoT technology, and provide real-time human resource monitoring, management and visualization based on GIS; The intelligent prediction and warning system module extracts key features based on the collected historical warning information data, traffic flow data, and meteorological data, and uses the long-term and short-term memory neural network to establish a prediction model to predict the probability of warning occurrence or traffic congestion index. t =tanh(W hx x t +W hh h t-1 +b h ), y t =W yh h t +b y , where h t is the hidden state, x t is the input data, i.e. the extracted key features, y t is the predicted value, W hx ,W hh ,W yh is the weight matrix, b h ,b y is the bias term and tanh is the activation function to automatically identify potential traffic congestion areas and accident-prone areas, generate early warnings and dispatch manpower on standby; Adaptive scheduling and resource optimization module, which analyzes traffic conditions, manpower distribution, staff status and warning urgency in real time, dynamically adjusts scheduling strategies, and uses optimization algorithms to ensure optimal resource allocation; The collaborative operation and cross-regional collaboration module has a built-in multi-departmental collaboration mechanism, which automatically coordinates the human resources of different regions and departments according to the needs of early warning information, supports cross-regional command and dispatch, and ensures rapid response and collaborative operation in emergencies; The path planning and avoidance system module combines real-time traffic data and road condition information to provide accurate road condition information, perform path planning, dynamically adjust routes, and provide real-time navigation; The adaptive scheduling and resource optimization module: By analyzing multi-source data including traffic conditions, manpower distribution, staff status and warning urgency in real time, key features are extracted for decision support, and scheduling strategies are dynamically adjusted based on predefined rules and real-time data; Use genetic algorithms for global optimization, generate an initial solution group, select excellent solutions based on the fitness function, generate new solutions through crossover operations, mutate the new solutions to increase the diversity of solutions, and repeat selection, crossover and mutation until the predetermined convergence conditions are reached to ensure optimal resource allocation; The objective function of the scheduling strategy is defined as: Where n is the number of scheduling schemes; Response time T i , based on real-time traffic data and path planning algorithms, calculate the time required for manpower in each scheduling scheme to reach the incident site from the current location; Staff fatigue level F i , comprehensively evaluate the fatigue status of workers in each scheduling plan by taking into account factors such as working hours and recent rest time; Fuel consumption i , estimating the fuel consumption of vehicles in each scheduling scheme based on the distance traveled by the vehicles and the fuel efficiency of the vehicles; w response 、w fatigue and w fuel is a weight parameter used to adjust the relative importance of response time, worker fatigue and fuel consumption in the total cost, and the weight parameter is adjusted according to specific application scenarios and strategies to reflect the priority of different costs; Constraints include response time constraints, ensuring that manpower arrives at the scene in the shortest time, T i ≤T max , T i is the response time of the i-th person, T max is the maximum allowed response time; worker status constraint: avoid scheduling workers with high fatigue, F j ≤F max , F j is the fatigue level of the jth worker, F max is the maximum fatigue allowed; the fuel level constraint ensures that the vehicle has sufficient fuel level, L k ≥L min , L k is the fuel level of the kth vehicle, L min is the minimum fuel level; The collaborative operation and cross-regional collaboration module: Collect real-time warning information and human resource data from each region, obtain cross-regional geographic boundary data and traffic flow data, and ensure the feasibility of cross-regional scheduling; Consider factors including staff status, location, and equipment, calculate the matching degree between resources and events, establish inter-regional collaboration mechanisms, and coordinate human resources in different regions; Use genetic algorithms to combine matching and collaboration to find the optimal scheduling solution for human resources and collaboration; Convert the optimized dispatching plan into specific task instructions and assign them to the corresponding human resources to automatically coordinate the human resources in different regions and departments and realize cross-regional command and dispatch; The considerations include factors such as the worker's status, location, and equipment, and the degree of matching between computing resources and events, specifically: Match(R j ,E i ) = γProximity(R j ,E i ) + δReadiness(R j ) + ηEquipment(R j ), where, Match(R j ,E i ) is the resource R j With event E i Proximity(R j ,E i ) is the distance between the resource and the event, and Readiness (R j ) is the readiness state of the resource, Equipment(R j ) is the equipment status of resources, γ, δ and η are weight coefficients; The establishment of an inter-regional cooperation mechanism to coordinate human resources in different regions is as follows: Collaboration(A k ,A l )=λResourceAvailability(A k ,A l )+μResponseTime(A k , A l )+νCoordinationEfficiency(A k ,A l ), where Collaboration(A k ,A l ) is area A k With area A l The degree of collaboration, ResourceAvailability (A k ,A l ) is the availability of resources between regions, ResponseTime(A k ,A l ) is the response time, CoordinationEfficiency(A k ,A l ) is the collaboration efficiency, λ, μ and ν are weight coefficients; The genetic algorithm is used to comprehensively consider the matching degree and the cooperation degree to find the optimal scheduling scheme of human resources and cooperation, specifically: Among them, Fitness(S) represents the fitness of the solution S, n is the number of events to be processed, Match(R i ,E i ) is the matching degree between the ith event and the resource, Collaboration(A i1 ,A i2 ) is the degree of cooperation among regions involved in the ith event; When an early warning occurs, the event type is determined. If it is a common event, the human resource dispatch strategy is dynamically adjusted to give priority to human resources that are close and in good condition. When the event requires collaborative work and cross-regional collaboration, collect real-time warning information and human resource data from each region, obtain cross-regional geographic boundary data and traffic flow data, consider factors including staff status, location, and equipment, calculate the matching degree between resources and events, establish an inter-regional collaboration mechanism, coordinate human resources in different regions, use genetic algorithms to comprehensively consider matching and collaboration, find the optimal scheduling plan for human resources and collaboration, and realize collaborative work and cross-regional collaboration among multiple departments; The path planning and avoidance system module: Combine real-time traffic data and road condition information to provide accurate route planning and navigation services for vehicles; Obtain the location information of each vehicle, integrate the urban traffic monitoring system, floating vehicle data, and predicted traffic flow data to form a real-time traffic status map, receive early warning information, and use the static information provided by the GIS system; Calculate the real-time weight of the road, the objective function is to minimize the travel time and travel cost, and ensure that the vehicle reaches the destination at the fastest speed; Run multiple path selection algorithms at the same time. Each algorithm calculates one or more paths based on the input data. The results of multiple path selection algorithms are integrated according to the weights, and the comprehensive scores are calculated. The path with the highest comprehensive score is selected as the final path. Dynamically adjust path planning based on real-time data changes and recalculate the path regularly.

2. The vehicle command and management system based on Beidou navigation according to claim 1 is characterized in that: The system also includes: The mobile terminal interaction and real-time feedback module realizes two-way instant communication based on the equipped smart mobile terminal. The smart mobile terminal has built-in dedicated applications for front-line staff to use.

3. The vehicle command and management system based on Beidou navigation according to claim 1 is characterized in that: The high-precision positioning and IoT basic module includes a Beidou positioning unit, a real-time upload unit and a GIS integration unit; The Beidou positioning unit uses the Beidou high-precision positioning terminal installed on the vehicle to achieve meter-level or even sub-meter-level positioning accuracy, reflecting the dynamic position and driving status of the vehicle in real time; The real-time upload unit uses the Internet of Things technology to upload the vehicle's real-time location data, speed data and other status information to the cloud-based vehicle intelligent management platform through an encrypted channel; The GIS integrated unit displays the real-time location of the vehicle based on the real-time data received, realizes real-time monitoring of the vehicle, and dynamically tracks and replays the vehicle's driving path.

4. The vehicle command and management system based on Beidou navigation according to claim 1 is characterized in that: The intelligent prediction and early warning system module includes a data collection and storage unit, a prediction model building unit and an early warning triggering unit; The data collection and storage unit collects multi-dimensional data including historical warning information records, real-time traffic flow data, weather forecast information, holidays and special event schedules, processes the data and stores them by category; The prediction model building unit extracts key features from the data, builds training data sets and test data sets, uses long short-term memory neural networks to build prediction models, performs rolling predictions for each future time point, and outputs the predicted warning probability or traffic congestion index; The warning trigger unit identifies potential traffic congestion areas and accident-prone areas based on the prediction results, generates warning information in advance, sets warning thresholds based on historical warning severity and response requirements, and triggers a warning if the model prediction value exceeds the preset threshold.

5. The vehicle command and management system based on Beidou navigation according to claim 2 is characterized in that: The two-way instant communication in the mobile terminal interaction and real-time feedback module is: based on the equipped smart mobile terminal, the dispatch instruction is received in real time and the on-site situation is uploaded.

6. A vehicle command and management method based on Beidou navigation, applied to a vehicle command and management system based on Beidou navigation according to claims 1-5, characterized in that: include: S1. The Beidou positioning terminal installed on the vehicle collects vehicle information in real time and uploads the data to the vehicle intelligent management platform through the Internet of Things technology; S2. The uploaded data is stored and processed, and the vehicle location and manpower distribution are displayed in real time based on the geographic information system to achieve visual management of human resources; S3. The system uses deep learning algorithms to analyze and predict potential traffic congestion areas and accident-prone areas by integrating historical warning information data, real-time traffic flow and meteorological data, generate warning information in advance, and pre-dispatch manpower based on the prediction results; S4. When an early warning occurs, determine the event type. If it is a common event, dynamically adjust the human resource scheduling strategy to give priority to human resources that are close and in good condition; S5. When an event requires collaborative work and cross-regional collaboration, collect real-time warning information and human resource data from each region, obtain cross-regional geographic boundary data and traffic flow data, consider factors including staff status, location, and equipment, calculate the matching degree between resources and events, establish an inter-regional collaboration mechanism, coordinate human resources in different regions, use genetic algorithms to comprehensively consider matching and collaboration, find the optimal scheduling plan for human resources and collaboration, and realize collaborative work and cross-regional collaboration among multiple departments.

7. The vehicle command and management method based on Beidou navigation according to claim 6 is characterized in that: Also includes: S6. Combine real-time traffic data and road condition information to obtain the location information of each vehicle, integrate the urban traffic monitoring system, floating vehicle data, and predicted traffic flow data to form a real-time traffic status map, receive warning information, and use the static information provided by the GIS system to calculate the real-time weight of the road based on the above data. The objective function is to minimize the driving time and driving cost. Run multiple path selection algorithms at the same time. Each algorithm calculates one or more paths based on the input data. The results of multiple path selection algorithms are integrated according to the algorithm weights, and the comprehensive score is calculated. The path with the highest comprehensive score is selected as the final path; S7. Through smart mobile terminals, two-way instant communication between staff and the command center is realized. Staff can receive dispatch instructions and upload the on-site situation in real time to re-determine the type of incident and determine whether reinforcement is needed or to interrupt excessive resource investment in time.