Multi-scale progressive emergency collaborative control method for multi-energy networks in response to rainstorm disasters

Through the multi-energy network multi-scale progressive emergency collaborative control method, combined with the dynamic models of the water conservancy network and distribution network, the problem of collaborative control of the distribution network and water conservancy network under heavy rain disasters is solved, reducing flood risks and load losses, and avoiding Cascade propagation improves solution efficiency.

CN118523315BActive Publication Date: 2024-10-18HUNAN UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410966913.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-10-18
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively collaboratively control the distribution network and water conservancy network under heavy rain disasters, resulting in cascading propagation of flood accidents and power failures between the two, and it is difficult for existing optimization methods to efficiently solve problems with stochastic partial differential constraints.

Method used

The multi-energy network multi-scale progressive emergency collaborative control method is used to construct a water conservancy network dynamic model and a distribution network AC power flow linearization model. The power-water conservancy network optimal control model is constrained by stochastic hydrodynamic partial differential constraints, combined with Preissmann four-point hidden finite difference method and multi-field The scene rainfall intensity time series represents the uncertainty of the rainfall source term and is transformed into a scenario-based mixed integer nonlinear programming model. A preventive control-deduction feedback-decision correction multi-time scale progressive emergency collaborative control strategy is proposed through the dynamic feasible region. A piecewise fast solving algorithm solves the model.

Benefits of technology

It effectively reduces the distribution network flooding risk and load loss, avoids large-scale power outages and flood accidents, improves the safe and reliable operation capabilities of the distribution network and water conservancy network under heavy rain disasters, reduces the difficulty of solving the optimization model and improves the solving efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118523315B_ABST
    Figure CN118523315B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-scale progressive emergency collaborative control method for a multi-energy network in response to a rainstorm disaster, comprising the following steps: S1. constructing a scenario-based mixed integer nonlinear programming model; S2. forming a multi-time-scale progressive emergency collaborative control strategy based on the upper, middle and lower layers of preventive control, deduction feedback and decision correction on the basis of the scenario-based mixed integer nonlinear programming model; S3. based on a fast solution algorithm for dynamic feasible domain segmentation, the constraints are approximated by piecewise linear relaxation by introducing auxiliary variables, thereby converting the mixed integer nonlinear programming model into a mixed integer piecewise linear relaxation approximation model, solving the mixed integer piecewise linear relaxation approximation model until it converges to the global optimal solution of the original nonlinear model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power systems, and in particular to a multi-energy network multi-scale progressive emergency collaborative control method for coping with rainstorm disasters. Background Art

[0002] Heavy rain disasters can easily lead to river overflows and floods, causing distribution network equipment to be flooded and tripped, and electric-driven drainage pump stations to be forced to shut down for a long time, which further aggravates flood disasters and causes waterlogging accidents and power failures to cascade across networks between the water conservancy network and the distribution network, resulting in the continuous expansion of power outages and flooded areas.

[0003] At present, most of the existing research focuses on the emergency control methods of urban distribution networks in response to rainstorm disasters. There is a lack of relevant research on the emergency coordinated control of distribution networks and water conservancy networks under rainstorm disasters. It is difficult to support the emergency power supply to drainage pumping stations while reducing the load loss of distribution networks, and it is difficult to avoid the cross-network interactive cascade propagation of waterlogging accidents and power failures between water conservancy networks and distribution networks. In addition, in order to accurately characterize the dynamic characteristics of non-constant and non-uniform water flow in rivers under uncertain rainfall distribution, it is necessary to introduce hydrodynamic partial differential equations with random rainfall source terms to model the river flow. Therefore, the emergency coordinated control of distribution networks and water conservancy networks is a large-scale optimization problem with random partial differential constraints. The time-space discretization of partial differentials will introduce a large number of non-convex nonlinear algebraic constraints, which are difficult to solve efficiently by existing optimization methods. Summary of the invention

[0004] In view of this, the present invention provides a multi-energy network multi-scale progressive emergency collaborative control method for responding to rainstorm disasters, which is used to at least solve the problem in the prior art of lack of emergency collaborative control strategies for the safe and reliable operation of distribution networks and water conservancy networks under rainstorm disasters.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] The multi-scale progressive emergency coordinated control method for multi-energy networks in response to rainstorm disasters includes the following steps:

[0007] S1. Construct a dynamic model of the water conservancy network and establish a linearized AC power flow model of the distribution network. Based on the dynamic model of the water conservancy network and the linearized AC power flow model of the distribution network, the optimal control model of the power-water conservancy network with random hydrodynamic partial differential constraints is constructed with the goal of minimizing the expected sum of power load loss and river over-limit water level. The Preissmann four-point implicit finite difference method with variable time scale is used to discretize the dynamic model of the water conservancy network into a set of nonlinear algebraic equations in time and space. The uncertainty of the rainfall source term is characterized by a multi-scenario rainfall intensity time series, so as to transform the proposed optimal control model of the power-water conservancy network into a scenario-based mixed integer nonlinear programming model.

[0008] S2. Based on the scenario-based mixed integer nonlinear programming model, a multi-time scale progressive emergency collaborative control strategy is formed based on the upper, middle and lower layers of preventive control, deduction feedback and decision correction:

[0009] S21. The upper layer is used to obtain the preventive control plan of the distributed generator set and pump station and the pre-deployment plan of the emergency power supply vehicle as a preventive control strategy and send it to the lower layer; if the current period is the first control period in the rainstorm disaster, directly proceed to S23, if not, proceed to S22-S23;

[0010] S22. The middle layer receives the current period decision correction plan and future time range transmitted by the lower layer The decision correction scheme is used as an input parameter to deduce the time range. The evolution of river floods and ground flooding are simulated internally, the ring main units with flooding risks are predicted, and the corresponding ring main unit information and time information are sent to the lower layer;

[0011] S23. In the first control period, the lower layer performs preliminary decision correction according to the preventive control strategy sent by the upper layer to adjust the output of the distributed generator set and the pumping flow of the pump station, and sends the decision correction plan after the preliminary decision correction to the middle layer. In other control periods, the lower layer performs rolling decision correction iteration on the preventive control strategy of the upper layer according to the ring network cabinet information and time information sent by the middle layer, obtains the decision correction plan and sends it to the middle layer, and adjusts the output of the distributed generator set and the pumping flow of the pump station according to the decision correction plan, and controls the line switch to perform dynamic network reconstruction;

[0012] S3. A fast solution algorithm based on dynamic feasible domain segmentation introduces auxiliary variables to approximate the constraints by piecewise linear relaxation, thereby transforming the mixed integer nonlinear programming model into a mixed integer piecewise linear relaxation approximation model, and solving the mixed integer piecewise linear relaxation approximation model until it converges to the global optimal solution of the original nonlinear model.

[0013] Preferably, the specific contents of constructing the dynamic model of the water conservancy network in S1 include:

[0014] Representing the water network as a graph ,in is a node set, For the river collection, ; Indicates that the two end nodes are and The river, , the one-dimensional Saint-Venant hydrodynamic partial differential equations are used to characterize the dynamic characteristics of river flow:

[0015] (1)

[0016] (2)

[0017] (3)

[0018] In the formula, represents the distance along the river channel, where , Indicates the length of the river; represents time, where , It is a limited time frame; Indicates water level; represents the rainfall source term, which characterizes the rainfall intensity per unit width; It indicates the water flow rate per unit width of the river section; Indicates friction in the river; Indicates the slope of the riverbed; represents the Manning coefficient; Indicates the width of the river; represents the acceleration due to gravity;

[0019] To prevent flooding caused by river overflow, time Water level at distance The constraints are:

[0020] (4)

[0021] in, To warn of water levels;

[0022] make represents a collection of pumping stations, Represents the water conservancy network node A collection of connected pumping stations; definition and They are the inflow and outflow nodes of the water conservancy network respectively. A collection of rivers, including , ; The continuity and energy constraints of the water conservancy network nodes are:

[0023] (5)

[0024] (6)

[0025] In the formula, As a parameter, if Pumping station in At the moment Pumping water from other areas to the node ,parameter The value is 1, otherwise the value is -1; Indicates pump station At the moment of traffic.

[0026] Preferably, the specific contents of establishing the distribution network AC power flow linearization model in S1 include:

[0027] The distribution network diagram Indicates that Indicates the busbar and ring main unit assembly, represents a set of lines, where ; Indicates time range The set of discrete time periods in , represents the busbar set connected to the distributed generator set, Indicates the busbar set that can be connected to the emergency power supply vehicle. represents a collection of pumping stations, Indicates busbar A collection of connected pumping stations, Indicates the emergency power supply vehicle assembly, represents the scheduling time step; the line capacity constraint is approximated by a set of linear constraints that define a convex feasible domain ;

[0028] The distribution network constraints are as follows:

[0029] (7)

[0030] (8)

[0031] (9)

[0032] (10)

[0033] (11)

[0034] (12)

[0035] (13)

[0036] (14)

[0037] In the formula, express Moment bus Active / reactive power output by distributed generator sets; express Moment bus Emergency power supply vehicle Output active / reactive power; express Moment bus The load service rate at the location; express Moment bus Active / reactive load at the location, excluding pump station load; express Moment bus Pumping station Active / reactive power consumed; express Timeline Active / reactive power flowing upstream; is a binary variable. If the line exist If disconnected at any time, The value is 0, otherwise the value is 1; express Moment bus The square of the voltage amplitude, Respectively Upper / lower limits; It is a binary parameter. If the emergency power supply vehicle With busbar If connected, is 1, otherwise it is 0; , and Respectively indicate lines resistance, reactance and capacitance; ; is a binary parameter. If the bus Ring main unit If the system cannot run continuously, The value is 0, otherwise the value is 1; Indicates line The initial state of and Respectively represent busbar The upper / lower limits of the active power and reactive power output of the distributed generator sets; Respectively represent busbar Limit the upward / downward climbing rate of distributed generator sets; Indicates emergency power supply vehicle Maximum active / reactive power output;

[0038] Establish a pump station operation control model to obtain the pump station exist Active power consumed at any time and reactive power , the specific contents include:

[0039] Assume that the pump station is equipped with an automatic transfer switch that can be connected to different distribution network buses, but can only be connected to one bus at a time;

[0040] set up For pumping stations The connected distribution network busbar set and the pump station operation control model are:

[0041] (15)

[0042] (16)

[0043] In the formula, Indicates the density of water; Indicates pump station The static pressure head; Indicates pump station Pumping efficiency; Indicates pump station Constant power factor; It is a binary parameter. If the pump station exist Moment and Busbar Connected, The value is 1, otherwise the value is 0; Respectively represent pumping stations The upper limit of active power and reactive power consumed.

[0044] Preferably, the specific contents of the optimal control model of the electric power-water network with stochastic hydrodynamic partial differential constraints in S1 include:

[0045] Introducing a slack variable relaxation Constraints:

[0046] (17)

[0047] Distribution network and water conservancy network in time range The objective functions in and express:

[0048] (18)

[0049] (19)

[0050] In the formula, Indicates the definition of busbar Upload priority weight;

[0051] In the dynamic model of the water conservancy network, equation (1) is the random hydrodynamic partial differential constraint, and the optimal control model of the power-water conservancy network with random hydrodynamic partial differential constraint is for:

[0052] (20)

[0053] The Preissmann four-point implicit scheme is used to numerically discretize the one-dimensional Saint-Venant hydrodynamic partial differential equations in time and space. The specific contents include:

[0054] Each river Continuous space-time domain is divided into a discrete point grid with a time step of , the spatial step length is , each point in Direction and The coordinates of the directions are and express;

[0055] set up , For rivers ,point Variables and parameters are marked with subscripts and and superscript ; The size depends on The maximum rainfall intensity of all rivers in the period; the one-dimensional Saint-Venant hydrodynamic partial differential equations are discretized in time and space using the Preissmann four-point implicit finite difference method, and the following is obtained:

[0056] (twenty one)

[0057] (twenty two)

[0058] Among them, the nonlinear non-convex constraints , and They are:

[0059] (twenty three)

[0060] (twenty four)

[0061] (25)

[0062] in, ;

[0063] Then the one-dimensional Saint-Venant hydrodynamic partial differential equations are transformed into nonlinear algebraic constraints (21)-(25); the constraints of equations (5), (6) and (17) are also discretized as:

[0064] (26)

[0065] (27)

[0066] (28)

[0067] Objective Function and Translates to:

[0068] (29)

[0069] (30)

[0070] A potential rainfall scenario set is constructed through multiple rainfall intensity time series to characterize the uncertainty of rainfall temporal and spatial distribution: represents a collection of rainfall scenes, Representation scene Probability of occurrence; scenario The corresponding rainfall intensity time series is expressed as :

[0071] (31)

[0072] (32)

[0073] according to Calculate the scene The rainfall intensity ;make ; and scene The corresponding objective functions, variables, and parameters are marked with subscripts ; then the model is converted into a scenario-based mixed integer nonlinear programming model :

[0074] (33)

[0075] In the formula, Corresponding scenarios The objective function under .

[0076] Preferably, in S2:

[0077] The preventive control of upper-level risk aversion is modeled as a two-stage optimization model: the first-stage model implements the pre-deployment of emergency power supply vehicles and optimizes the control plan of distributed generators and pump stations; the second-stage model re-controls the output of distributed generators and pump stations to cope with possible rainfall scenarios, and introduces conditional value at risk (CVaR) to control the risks brought by rainfall distribution uncertainty;

[0078] definition is the expected rainfall scenario with the maximum probability of occurrence, and is defined as ,Will Represents a collection of rainfall scenes Remove the expected rainfall scenario with the highest probability of occurrence The collection after

[0079] The pre-deployment constraints of emergency power supply vehicles are:

[0080] (34)

[0081] In the formula, is a binary variable. If the emergency power supply vehicle Connected to busbar ,but , otherwise 0; Indicates connection to busbar The total permissible capacity of MEGs;

[0082] The upper / lower reserve capacity constraints of distributed generators are:

[0083] (35)

[0084] In the formula, Representation scene Down Moment bus The active power / reactive power output by the distributed generator sets, Representation scene Down Moment bus Up / down spare capacity of distributed generators, Indicates busbar The upper / lower reserve capacity limit of distributed generator sets;

[0085] The output adjustment constraints of distributed generators and pumping stations are:

[0086] (36)

[0087] (37)

[0088] In the formula, Representation scene Down Moment bus The active power / reactive power output by the distributed generator sets, Representation scene Down Time pumping station of traffic, It is a pumping station The upper limit of flow adjustment;

[0089] The two-stage optimization model of risk aversion preventive control is:

[0090] (38)

[0091] In the formula, is a weighting coefficient with a value range between [0,1], is the value at risk;

[0092] The evolution of river floods and the ground flooding process are deduced through a one-dimensional-two-dimensional coupled hydrodynamic model. The finite difference method of the Preissmann four-point implicit format and the finite volume method of the Godunov format are used to solve the one-dimensional-two-dimensional coupled hydrodynamic model to obtain the spatiotemporal distribution of the flooding depth of the distribution network ring main unit within the future set time range. The ring main unit with flooding risk is identified by judging the flooding depth; if the flooding depth of a ring main unit exceeds the specified safety threshold within the set time range, the ring main unit is at risk of flooding, and the ring main unit number and the time when the flooding depth exceeds the specified safety threshold are recorded;

[0093] The lower-level decision correction is completed through the decision correction model. In each time period, the short-term forecast information is distributed according to the rainfall intensity, and the decision correction model is used to correct the rainfall intensity in the selected time range. The internal solution decision correction model is used to correct the upper-level decision according to the decision model. The specific contents include:

[0094] set up represents the root busbar set, Indicates busbar The connected busbar set; the constraints for network reconstruction, distributed generator re-control and pump station flow adjustment are as follows:

[0095] (39)

[0096] (40)

[0097] (41)

[0098] (42)

[0099] (43)

[0100] (44)

[0101] In the formula, is a binary variable, if Time bus It is a bus The parent node of The value is 1, otherwise the value is 0;

[0102] The decision correction model is as follows:

[0103] (45)

[0104] Solve the decision correction model to obtain the output control quantity of distributed generator sets and pump stations in heavy rain disasters, as well as the state control quantity of line switches; adjust the output control quantity of distributed generator sets and pump stations in heavy rain in the upper-level preventive control strategy according to constraints (43) and (44).

[0105] Preferably, the rolling decision correction iteration step in S23 is specifically as follows:

[0106] 1) In Time period, update time range The short-term forecast information of rainfall intensity distribution in the inner part is used to obtain the flooding risk identification results of the middle-level distribution network ring network cabinet, which is used to determine the ring network cabinet that needs to be actively closed. The closing time is the time when the flooding depth of the ring network cabinet exceeds the specified safety threshold;

[0107] 2) Set the time step to , in the time interval The decision correction model is solved internally. If the decision correction model is not feasible, the constraints (43) and (44) are relaxed, and the decision correction model is solved again to obtain the control results of the output of the distributed generator set and the pump station and the control results of the line switch;

[0108] 3) Only implement it for the current time period Control results of distributed generators, pump station output and line switches;

[0109] 4) Shift the time frame forward , repeat steps 2)-4), if the current scheduling period is the last scheduling period, the algorithm terminates.

[0110] Preferably, in S21, the time step is set in a long time scale manner; if the current period is the first control period in the rainstorm disaster, S23 is directly performed, if not, S22-S23 are performed;

[0111] In S22, the middle layer receives the current period decision correction plan and future time range transmitted by the lower layer The decision correction scheme is used as an input parameter to deduce the time range The evolution of inland river floods and the ground flooding process determine the number of the distribution network ring main cabinet with flooding risk and the time when the flooding depth exceeds the specified safety threshold, and send the number and time information to the lower layer;

[0112] In S23, the lower layer receives the distribution network ring main cabinet number and the time information when the flooding depth exceeds the specified safety threshold sent by the middle layer, establishes a decision correction model, sets the time step in a short time scale, implements a single rolling decision correction iteration, and sends the resulting decision correction plan to the middle layer.

[0113] Preferably, the specific content of S3 includes:

[0114] Iterative solution algorithm based on dynamic feasible region segmentation The global optimal solution is obtained by:

[0115] First, introduce auxiliary variables and , defined as:

[0116] (46)

[0117] (47)

[0118] (48)

[0119] Rewrite constraints (24) and (25) as:

[0120] (49)

[0121] make for The lower limit of , and for The lower and upper limits of ; , and About In the interval A monotonic function in About In the interval Monotonic function within ;

[0122] Consider the interval Monotonic function in , its feasible domain Divided into segments, and the segment set is ,in is a pair of real numbers, representing In segmentation The lower and upper limits in ; Introducing continuous variables and assign it to , introduce binary variables and assign it to the segment ; The piecewise linear relaxation of is approximated as:

[0123] (50)

[0124] Therefore, constraints (23), (46) and (47) are approximately replaced by:

[0125] (51)

[0126] The constraint (48) contains bilinear terms and , consider the definition in and Bilinear function on ,Will The feasible domain Divide segments, and the segment set is ,in is a pair of real numbers, representing In segmentation The lower and upper bounds in ; Introducing binary variables and two continuous variables and , and assign it to the segment ; The piecewise linear relaxation of is approximated as:

[0127] (52)

[0128] Therefore, constraint (48) is approximately replaced by:

[0129] (53)

[0130] Thus, Transformed into a mixed integer piecewise linear relaxation approximation model ,as follows:

[0131] (54)

[0132] A dynamic feasible region segmentation scheme is used to iteratively tighten the piecewise linear relaxation approximation in constraints (51) and (53):

[0133] (3) At each iteration, the current The segment where the optimal solution is located is divided into four non-uniform sparse segments. ,make , express The segment collection of , express The optimal solution of express The optimal solution of ,make Representation Model A collection of binary variables, express The optimal solution of express The optimal solution of , ,use Build of , solve ;

[0134] (4) By adjusting parameters Controls the size of non-uniform sparse segments; reference constraints (55) to :

[0135] (55)

[0136] Constraint (55) will All binary variables in are fixed to constant values, thus Transform it into a nonlinear programming model, solve the nonlinear programming model to obtain its local optimal solution; the local optimal solution of the nonlinear programming model is the original The optimal objective value provides an upper limit estimate, using express; The optimal solution is The optimal target value of provides a lower bound estimate, denoted by ;when and The difference is lower than the allowable deviation When , it is considered to converge to The global optimal solution of .

[0137] Preferably, the specific contents of step (1) include:

[0138] Initialization parameters, where , ; Allowable deviation ; Tuning parameters ;initial , ; ;

[0139] Solution ,get and , ; Calculate the target value ,use renew ;

[0140] For each ,Will The segment where express;

[0141] like , then To update ,Will To update , and Updated to:

[0142] ;

[0143] Otherwise, Updated to:

[0144] ;

[0145] in, Indicates the original The longest segment, .

[0146] It can be seen from the above technical solutions that, compared with the prior art, the present invention discloses a multi-energy network multi-scale progressive emergency collaborative control method for responding to rainstorm disasters, which has the following beneficial effects:

[0147] (1) The present invention establishes an optimal control model for an electric power-hydraulic network with random hydrodynamic partial differential constraints under uncertain rainfall distribution. The present invention uses a one-dimensional Saint-Venant hydrodynamic partial differential equation group to construct a dynamic model of the hydropower network, and establishes a linearized model of the AC flow of the distribution network. On this basis, the optimal control model for an electric power-hydraulic network with random hydrodynamic partial differential constraints is constructed with the goal of minimizing the expected sum of the power load loss and the river over-limit water level. The Preissmann four-point implicit finite difference method with a variable time scale is used to discretize the hydrodynamic partial differential equations in time and space into a set of nonlinear algebraic equations. The multi-scenario rainfall intensity time series is used to characterize the uncertainty of the rainfall source term, thereby converting the proposed optimal control model for the electric power-hydraulic network into a scenario-based mixed integer nonlinear programming model, which can effectively reduce the flooding risk and load loss of the distribution network.

[0148] (2) The present invention proposes a preventive control-deduction feedback-decision correction multi-time scale progressive emergency collaborative control strategy. The preventive control of the upper risk avoidance is modeled as a two-stage optimization model. In the first stage, the emergency power supply vehicle is pre-deployed and the control plan of the distributed generator set and the pump station is optimized. In the second stage, the distributed generator set and the pump station are re-controlled to cope with possible rainfall scenarios, and the conditional risk value CvaR is introduced to control the risks brought by the uncertainty of rainfall distribution. The middle layer uses a one-dimensional-two-dimensional coupled hydrodynamic model to deduce the evolution of river floods and the ground flooding process, and obtains the spatiotemporal distribution of the flooding depth of the distribution network ring main cabinet within the future set time range. By judging the flooding depth, the ring main cabinet with flooding risk is identified, and the results are fed back to the lower layer. The lower layer uses the model predictive control method to establish a rolling decision correction model. On the basis of the control plan obtained by the upper layer, the distributed generator set is re-controlled and the network is reconstructed to support the emergency power supply to the pump station. The strategy proposed in the present invention can effectively avoid large-scale power outages and flooding accidents in the distribution network and water conservancy network under heavy rain disasters.

[0149] (3) The present invention proposes a fast solution algorithm based on dynamic feasible domain segmentation. By introducing auxiliary variables to approximate the constraints by piecewise linear relaxation, the mixed integer nonlinear programming model is transformed into an easy-to-solve mixed integer piecewise linear relaxation approximation model, and the approximate model is efficiently solved until it converges to the global optimal solution of the original nonlinear model. The algorithm is also suitable for solving the upper-level preventive control model and the lower-level decision correction model. The algorithm proposed in the present invention can transform the mixed integer nonlinear programming model into an easy-to-solve mixed integer linear programming problem, reduce the difficulty of solving the optimization model and improve the solution efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0150] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0151] Figure 1 A flow chart of a multi-scale progressive emergency collaborative control method for a multi-energy network to cope with rainstorm disasters provided by the present invention;

[0152] Figure 2 Comparison results of river overflow risk simulation provided by the embodiments of the present invention; (a) is strategy 1, (b) is strategy 2, and (c) is strategy 3. DETAILED DESCRIPTION

[0153] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0154] The present invention provides a multi-energy network multi-scale progressive emergency coordinated control method for responding to rainstorm disasters, such as Figure 1 As shown, the following steps are included:

[0155] S1. First, construct a dynamic model of the water conservancy network. The large-scale water conservancy network is represented as a graph. ,in is a node set, Gather for the river. Indicates that the two end nodes are and The one-dimensional Saint-Venant hydrodynamic partial differential equations are used to characterize the dynamic characteristics of the river flow, as follows:

[0156] (1)

[0157] (2)

[0158] (3)

[0159] In the formula, represents the distance along the river channel, where , Indicates the length of the river; represents time, where , It is a limited time frame; Indicates water level; represents the rainfall source term, which characterizes the rainfall intensity per unit width; It indicates the water flow rate per unit width of the river section; Indicates friction in the river; Indicates the slope of the riverbed; represents the Manning coefficient; Indicates the width of the river; represents the acceleration due to gravity;

[0160] To prevent flooding caused by river overflow, time Water level at distance The constraints are:

[0161] (4)

[0162] in, To warn of water levels;

[0163] make represents a collection of pumping stations, Represents the water conservancy network node A collection of connected pumping stations; definition and They are the inflow and outflow nodes of the water conservancy network respectively. A collection of rivers, including , ; The continuity and energy constraints of the water conservancy network nodes are:

[0164] (5)

[0165] (6)

[0166] In the formula, As a parameter, if Pumping station in At the moment Pumping water from other areas to the node ,parameter The value is 1, otherwise the value is -1; Indicates pump station At the moment of traffic.

[0167] Then, a linearized model of AC power flow in the distribution network is established. During a rainstorm disaster, if the flooding depth of the ring main unit exceeds the predetermined safety threshold, the ring main unit will be unable to continue operating due to a fault or active shutdown. At this time, the load or power supply cable connected to the ring main unit will be cut or disconnected. Indicates that Indicates the busbar and ring main unit assembly, Represents a line collection. Indicates time range The set of discrete time periods in represents the busbar set connected to the distributed generator set, Indicates the busbar set that can be connected to the emergency power supply vehicle. Indicates busbar A collection of connected pumping stations, Indicates the emergency power supply vehicle assembly, represents the scheduling time step. The line capacity constraint is approximated by a set of linear constraints that define a convex feasible domain .

[0168] The distribution network constraints are as follows:

[0169] (7)

[0170] (8)

[0171] (9)

[0172] (10)

[0173] (11)

[0174] (12)

[0175] (13)

[0176] (14)

[0177] In the formula, express Moment bus Active / reactive power output by distributed generator sets; express Moment bus Emergency power supply vehicle Output active / reactive power; express Moment bus The load service rate at the location; express Moment bus Active / reactive load at the location, excluding pump station load; express Moment bus Pumping station Active / reactive power consumed; express Timeline Active / reactive power flowing upstream; is a binary variable. If the line exist If disconnected at any time, The value is 0, otherwise the value is 1; express Moment bus The square of the voltage amplitude, Respectively Upper / lower limits; It is a binary parameter. If the emergency power supply vehicle With busbar If connected, is 1, otherwise it is 0; , and Respectively indicate lines resistance, reactance and capacitance; ; is a binary parameter. If the bus Ring main unit If the system cannot run continuously, The value is 0, otherwise the value is 1; Indicates line The initial state of and Respectively represent busbar The upper / lower limits of the active power and reactive power output of the distributed generator sets; Respectively represent busbar Limit the upward / downward climbing rate of distributed generator sets; Indicates emergency power supply vehicle Maximum active / reactive power output.

[0178] Secondly, the pump station operation control model is established. Assume that the pump station is equipped with an automatic transfer switch and can be connected to multiple distribution network buses, but can only be connected to one bus at a time. For pumping stations Connected distribution network busbar collection, pump station exist The active power and reactive power consumed at each moment are respectively and The pump station operation model is as follows:

[0179] (15)

[0180] (16)

[0181] In the formula, Indicates the density of water; Indicates pump station The static pressure head; Indicates pump station Pumping efficiency; Indicates pump station Constant power factor; It is a binary parameter. If the pump station exist Moment and Busbar Connected, The value is 1, otherwise the value is 0; Respectively represent pumping stations The upper limit of active power and reactive power consumed.

[0182] Finally, based on the above model, an optimal control model of the power-water network with stochastic hydrodynamic partial differential constraints is established. In a rainstorm disaster, the distribution network minimizes load loss and ensures that key pumping stations can continue to operate, and the water conservancy network minimizes the river water level limit to reduce the risk of flooding in the distribution network. By introducing a slack variable Relax constraint (4) to avoid potential infeasibility as follows:

[0183] (17)

[0184] Distribution network and water conservancy network in time range The objective functions in and Indicates as follows:

[0185] (18)

[0186] (19)

[0187] In the formula, Indicates the definition of busbar The upper load priority weight.

[0188] Due to the uncertainty of rainfall temporal and spatial distribution, the rainfall source term in the water conservancy network model is random, so constraint (1) is a random hydrodynamic partial differential constraint. Optimal control model of power-water network with random hydrodynamic partial differential constraints As shown below:

[0189] (20)

[0190] The Preissmann four-point implicit scheme is used to numerically discretize the one-dimensional Saint-Venant hydrodynamic partial differential equations in time and space. Continuous space-time domain is divided into a discrete point grid with a time step of , the spatial step length is , each point in Direction and The coordinates of the directions are and Indicates. , For the river ,point Variables and parameters are marked with subscripts and and superscript . The size depends on The maximum rainfall intensity of all rivers during the period. When the rainfall intensity is high, it is recommended 5 or 15 minutes, in order to make a quick emergency response to the flooding of distribution network and river flooding. The time-space discretization of (1)-(3) is performed using the Preissmann four-point implicit finite difference method, and the following is obtained:

[0191] (twenty one)

[0192] (twenty two)

[0193] Among them, the nonlinear non-convex constraints , and They are:

[0194] (twenty three)

[0195] (twenty four)

[0196] (25)

[0197] in, ;

[0198] Therefore, the one-dimensional Saint-Venant hydrodynamic partial differential equations are transformed into nonlinear algebraic constraints (21)-(25). Constraints (5), (6) and (17) are also discretized as:

[0199] (26)

[0200] (27)

[0201] (28)

[0202] Objective Function and Translates to:

[0203] (29)

[0204] (30)

[0205] Multiple rainfall intensity time series can be used to construct a set of potential rainfall scenarios to characterize the uncertainty of rainfall temporal and spatial distribution. represents a collection of rainfall scenes, Representation scene Probability of occurrence. Scenario The corresponding rainfall intensity time series is expressed as ,as follows:

[0206] (31)

[0207] (32)

[0208] according to The scene can be calculated The rainfall intensity .make . With the scene The corresponding objective functions, variables, and parameters are marked with subscripts Therefore, the model Can be converted into a scenario-based mixed integer nonlinear programming model , as shown below:

[0209] (33)

[0210] In the formula, Corresponding scenarios The objective function under .

[0211] S2. Based on the scenario-based mixed integer nonlinear programming model obtained in S1, an upper-level risk-averse preventive control model and a lower-level progressive decision correction model are established respectively. The middle-level flood simulation method and how to identify the distribution network ring main cabinets with flooding risks are described, and finally a preventive control-simulation feedback-decision correction multi-time scale progressive emergency collaborative control strategy is formed.

[0212] At the upper level, the risk-averse preventive control is modeled as a two-stage optimization model. In the first stage, the emergency power supply vehicle is pre-deployed and the control plan of the distributed generator sets and pump stations is optimized. In the second stage, the output of the distributed generator sets and pump stations is re-controlled to cope with possible rainfall scenarios, and the conditional value at risk (CVaR) is introduced to control the risks brought by the uncertainty of rainfall distribution. Definition is the expected rainfall scenario with the maximum probability of occurrence, and is defined as ,Will Represents a collection of rainfall scenes Remove the expected rainfall scenario with the highest probability of occurrence After the collection.

[0213] The pre-deployment constraints of emergency power supply vehicles are:

[0214] (34)

[0215] In the formula, Indicates connection to busbar The total permissible capacity of MEGs; is a binary variable. If the emergency power supply vehicle Connected to busbar ,but , otherwise 0.

[0216] The upper / lower reserve capacity constraints of distributed generators are:

[0217] (35)

[0218] In the formula, Representation scene Down Moment bus The active power / reactive power output by the distributed generator sets, Representation scene Down Moment bus Up / down spare capacity of distributed generators, Indicates busbar The upper / lower reserve capacity limit of distributed generator sets.

[0219] The output adjustment constraints of distributed generators and pumping stations are:

[0220] (36)

[0221] (37)

[0222] In the formula, Representation scene Down Moment bus The active power / reactive power output by the distributed generator sets, Representation scene Down Time pumping station of traffic, It is a pumping station The upper limit of flow adjustment.

[0223] Therefore, the two-stage optimization model of risk aversion preventive control is:

[0224] (38)

[0225] In the formula, is a weighting coefficient with a value range between [0,1], The value at risk.

[0226] At the middle level, a one-dimensional-two-dimensional coupled hydrodynamic model is used to accurately deduce the evolution of river floods and the ground flooding process. The one-dimensional-two-dimensional coupled hydrodynamic model is solved by the finite difference method of the Preissmann four-point implicit format and the finite volume method of the Godunov format to obtain the spatiotemporal distribution of the flooding depth of the distribution network ring network cabinet within the future set time range, and the ring network cabinet with flooding risk is identified by judging the flooding depth. If the flooding depth of a ring network cabinet exceeds the specified safety threshold within the set time range, the ring network cabinet is at risk of flooding, and the ring network cabinet number and the time when the flooding depth exceeds the specified safety threshold are recorded.

[0227] In the lower-level progressive decision correction process, once multiple ring main units cannot maintain normal operation and are shut down, the network can be dynamically reconstructed by controlling the output of distributed generators and controlling line switches on the basis of the preventive control plan to avoid large-scale load losses and maintain continuous power supply to the pump station. In addition, the flow of the pump station should be controlled according to the real-time rainfall intensity distribution to avoid river overflow. The model predictive control method is used to deal with the uncertainty of rainfall distribution. In each time period, according to the short-term forecast information of rainfall intensity distribution, within the selected time range The internal solution decision correction model. represents the root busbar set, Indicates busbar The constraints for network reconstruction, distributed generator re-control and pump station flow adjustment are as follows:

[0228] (39)

[0229] (40)

[0230] (41)

[0231] (42)

[0232] (43)

[0233] (44)

[0234] In the formula, is a binary variable, if Time bus It is a bus The parent node of The value is 1, otherwise the value is 0.

[0235] The decision correction model is as follows:

[0236] (45)

[0237] By solving the decision correction model, we can obtain the output control quantity of distributed generators and pump stations in heavy rain disasters, as well as the state control quantity of line switches. Constraints (43) and (44) show that the output control quantity of distributed generators and pump stations in heavy rain disasters must be within the prevention and control plan.

[0238] The steps of rolling decision correction iteration are as follows:

[0239] 1) In Time period, update time range The short-term forecast information of rainfall intensity distribution in the inner layer is used to obtain the flooding risk identification results of the middle-layer distribution network ring network cabinets, which are used to determine which ring network cabinets need to be actively closed. The closing time is the time when the flooding depth of the ring network cabinet exceeds the specified safety threshold;

[0240] 2) Set the time step to , in the time interval The decision correction model (45) is solved. If the decision correction model (45) is not feasible, then the constraints (43) and (44) are relaxed and the decision correction model (45) is solved again. The control results of the output of the distributed generator set and the pump station and the control results of the line switch are obtained;

[0241] 3) Only implement it for the current time period Control results of distributed generators, pump station output and line switches;

[0242] 4) Shift the time frame forward , repeat steps 2)-4), if the current scheduling period is the last scheduling period, the algorithm terminates.

[0243] Finally, the preventive control-deduction feedback-decision correction multi-time scale progressive emergency coordinated control strategy is as follows:

[0244] 1) Establish and solve the two-stage optimization model of risk aversion preventive control (38) using a long time scale, i.e. setting the time step to 60 minutes. The solution is the preventive control plan for distributed generators and pumping stations and the pre-location plan for emergency power supply vehicles. The control plan is sent to the lower level, and the pre-location plan for emergency power supply vehicles is implemented.

[0245] 2) If the current period is the first control period in the rainstorm disaster, jump to 3). Otherwise, the middle layer receives the current period decision correction plan and future time range transmitted by the lower layer. The decision correction scheme is used as an input parameter to deduce the time range. The evolution of inland river floods and the ground flooding process determine the number of the distribution network ring network cabinet with flooding risk and the time when the flooding depth exceeds the specified safety threshold, and send the number and time information to the lower layer.

[0246] 3) In the first control period, the lower layer makes a preliminary decision correction based on the preventive control strategy sent by the upper layer to adjust the output of the distributed generator set and the pumping flow of the pump station, and sends the decision correction plan after the preliminary decision correction to the middle layer. In other control periods, the lower layer receives the distribution network ring main cabinet number and the time information when the flooding depth exceeds the specified safety threshold sent by the middle layer, establishes a decision correction model (45), adopts a short time scale, that is, sets the time step to 15 minutes, implements a single rolling decision correction iteration, and sends the resulting decision correction plan to the middle layer.

[0247] By implementing the above steps 1)-3), it is possible to progressively control the output of distributed generators and drainage pumping stations at multiple scales during rainstorm disasters and implement dynamic network reconstruction, thereby reducing the load loss of the distribution network while supporting the emergency power supply of the drainage pumping stations to reduce the risk of flooding in the distribution network.

[0248] S3. Nonlinear nonconvex constraints (23)-(25) lead to The upper-level preventive control model and the lower-level progressive decision correction model are difficult to solve and take a long time to calculate. The fractional exponent of increases the complexity of the calculation. To solve this problem, an iterative solution algorithm based on dynamic feasible domain segmentation is proposed to efficiently solve the model. The global optimal solution is obtained. This algorithm is also applicable to solving the upper-level preventive control model and the lower-level progressive decision correction model.

[0249] First, introduce auxiliary variables and , defined as follows:

[0250] (46)

[0251] (47)

[0252] (48)

[0253] Rewrite constraints (24) and (25) as:

[0254] (49)

[0255] make for The lower limit of and for lower and upper limits. , and About In the interval A monotonic function in About In the interval Now consider the interval Monotonic function in , its feasible domain Divided into segments, and the segment set is ,in is a pair of real numbers, representing In segmentation Introducing continuous variables and assign it to , introduce binary variables and assign it to the segment . The piecewise linear relaxation of is approximated as follows:

[0256] (50)

[0257] Therefore, constraints (23), (46) and (47) are approximately replaced by:

[0258] (51)

[0259] The constraint (48) contains bilinear terms and Consider the definition of and Bilinear function on ,Will The feasible domain Divide segments, and the segment set is ,in is a pair of real numbers, representing In segmentation Introducing binary variables and two continuous variables , , and assign it to the segment . The piecewise linear relaxation of is approximated as:

[0260] (52)

[0261] Therefore, constraint (48) can be approximately replaced by:

[0262] (53)

[0263] Thus, Transformed into an easily solvable mixed integer piecewise linear relaxation approximation model ,as follows:

[0264] (54)

[0265] A dynamic feasible region segmentation scheme is used to iteratively tighten the piecewise linear relaxation approximation in constraints (51) and (53). Specifically, at each iteration, the current The segment where the optimal solution is located is divided into four non-uniform sparse segments. ,make . express The segment collection of express The optimal solution of express In addition, let Representation Model A collection of binary variables, express The optimal solution of express The optimal solution of . The fast solution algorithm based on dynamic feasible domain segmentation is shown in Table 1. By adjusting the parameters The size of the non-uniform sparse segments can be controlled. Constraint (55) All binary variables in are fixed to constant values, thus It is converted into a nonlinear programming model, and the local nonlinear solver can be used to efficiently solve the nonlinear programming model to obtain its local optimal solution. The local optimal solution of the nonlinear programming model is the original The optimal objective value provides an upper limit estimate, using express. The optimal solution is The optimal target value of provides a lower bound estimate, denoted by .when and The difference is lower than the allowable deviation When , it is considered to converge to The global optimal solution of .

[0266] Table 1 Fast solution algorithm based on dynamic feasible domain segmentation

[0267] ;

[0268] In order to further demonstrate the advantages of the method proposed in the present invention, a simulation experiment will be used to illustrate:

[0269] The following simulation comparison schemes are adopted: 1) Strategy 1 is the control method proposed by this invention; 2) Strategy 2 does not consider the emergency coordinated control of the distribution network and the water conservancy network, and the distribution network and the water conservancy network perform emergency control of rainstorms separately; 3) Strategy 3 is that the distribution network and the water conservancy network do not make emergency decisions on rainstorms in time. The index comparison results of different strategies under typical rainstorm scenarios are shown in Table 2, and the simulation comparison results of river overflow risk are shown in Table 2. Figure 2 shown.

[0270] Table 2 Comparison of performance indicators of different strategies in typical rainstorm scenarios

[0271] ;

[0272] From Table 2 and Figure 2The simulation comparison results show that: 1) Due to the significant imbalance in the intensity and spatiotemporal distribution of rainstorm disasters, the rainfall intensity in the downstream of the outer river is higher than that in the upstream at the beginning of the disaster. In Strategy 1, the water conservancy network uses the storage capacity of the upstream river to temporarily reduce the drainage flow of the associated drainage pump station, and the power grid can give priority to guaranteeing the surge in electricity demand of the downstream drainage pump station; 2) Strategy 1 supports the emergency power supply of the water conservancy network's peak-shifting regulation and pump station joint scheduling under the spatiotemporal differentiation of rainstorms through power grid repair and reconstruction and pre-deployment of emergency power supply vehicles, avoiding the interruption of power supply to pump stations during rainstorms, resulting in insufficient drainage capacity and further expansion of waterlogging, and the waterlogging damage is reduced by 83.51% compared with Strategy 2; 3) The existing decision-making method for emergency dispatching of pumps and gates in water conservancy networks to deal with rainstorm disasters is mainly based on the basin hydrological and hydrodynamic model, which does not fully consider the important role of power grid emergency repair and reconstruction and key pump station power supply in the prevention and control of rainstorm waterlogging disasters, resulting in overflow of some rivers, thereby expanding the urban waterlogging area and the scope of power grid flooding failure. Strategy 1 reduces the load loss by 63.38% compared with Strategy 2. Therefore, compared with the existing emergency drainage dispatching method of water conservancy network under heavy rain disasters, the power-water conservancy network emergency linkage decision proposed in this paper provides reliable power supply for key drainage gate pump power loads through dynamic power grid reconstruction and fault repair support, effectively reducing urban power grid load losses and waterlogging losses.

[0273] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A multi-scale progressive emergency collaborative control method for multi-energy networks in response to rainstorm disasters, characterized in that: The following steps are involved: S1. Construct a dynamic model of the water conservancy network and establish a linearized AC flow model of the distribution network. Based on the dynamic model of the water conservancy network and the linearized AC flow model of the distribution network, the optimal control model of the power-water conservancy network with random hydrodynamic partial differential constraints is constructed with the goal of minimizing the expected sum of power load loss and river over-limit water level. The Preissmann four-point implicit finite difference method with variable time scale is used to discretize the dynamic model of the water conservancy network into a set of nonlinear algebraic equations in time and space. The multi-scenario rainfall intensity time series is used to characterize the uncertainty of the rainfall source term, so as to transform the proposed optimal control model of the power-water conservancy network into a scenario-based mixed integer nonlinear programming model. ; The specific contents of constructing the dynamic model of the water conservancy network in S1 include: Representing the water network as a graph ,in is a node set, For the river collection, ; Indicates that the two end nodes are and The river, , the one-dimensional Saint-Venant hydrodynamic partial differential equations are used to characterize the dynamic characteristics of river flow: (1) (2) (3) In the formula, represents the distance along the river channel, where , Indicates the length of the river; represents time, where , It is a limited time frame; Indicates water level; represents the rainfall source term, which characterizes the rainfall intensity per unit width; It indicates the water flow rate per unit width of the river section; Indicates friction in the river; Indicates the slope of the riverbed; represents the Manning coefficient; Indicates the width of the river; represents the acceleration due to gravity; To prevent flooding caused by river overflow, time Water level at distance The constraints are: (4) in, To warn of water levels; make represents a collection of pumping stations, Represents the water conservancy network node A collection of connected pumping stations; definition and They are the inflow and outflow nodes of the water conservancy network respectively. A collection of rivers, including , ; The continuity and energy constraints of the water conservancy network nodes are: (5) (6) In the formula, As a parameter, if Pumping station in At the moment Pumping water from other areas to the node ,parameter The value is 1, otherwise the value is -1; Indicates pump station At the moment Traffic volume; The specific contents of establishing the distribution network AC power flow linearization model in S1 include: The distribution network diagram Indicates that Indicates the busbar and ring main unit assembly, represents a set of lines, where ; Indicates time range The set of discrete time periods in , represents the busbar set connected to the distributed generator set, Indicates the busbar set that can be connected to the emergency power supply vehicle. represents a collection of pumping stations, Indicates busbar A collection of connected pumping stations, Indicates the emergency power supply vehicle assembly, represents the scheduling time step; the line capacity constraint is approximated by a set of linear constraints that define a convex feasible domain ; The distribution network constraints are as follows: (7) (8) (9) (10) (11) (12) (13) (14) In the formula, express Moment bus Active / reactive power output by distributed generator sets; express Moment bus Emergency power supply vehicle Output active / reactive power; express Moment bus The load service rate at the location; express Moment bus Active / reactive load at the location, excluding pump station load; express Moment bus Pumping station Active / reactive power consumed; express Timeline Active / reactive power flowing upstream; is a binary variable. If the line exist If disconnected at any time, The value is 0, otherwise the value is 1; express Moment bus The square of the voltage amplitude, Respectively Upper / lower limits; It is a binary parameter. If the emergency power supply vehicle With busbar If connected, is 1, otherwise it is 0; , and Respectively indicate lines resistance, reactance and capacitance; ; is a binary parameter. If the bus Ring main unit If the system cannot run continuously, The value is 0, otherwise the value is 1; Indicates line The initial state of and Respectively represent busbar The upper / lower limits of the active power and reactive power output of the distributed generator sets; Respectively represent busbar Limit the upward / downward climbing rate of distributed generator sets; Indicates emergency power supply vehicle Maximum active / reactive power output; Establish a pump station operation control model to obtain the pump station exist Active power consumed at any time and reactive power , the specific contents include: When the pump station is equipped with an automatic transfer switch, the pump station is connected to different distribution network buses through the automatic transfer switch, and the pump station is connected to only one bus at most at a time; set up For pumping stations The connected distribution network busbar set and the pump station operation control model are: (15) (16) In the formula, Indicates the density of water; Indicates pump station The static pressure head; Indicates pump station Pumping efficiency; Indicates pump station Constant power factor; It is a binary parameter. If the pump station exist Moment and Busbar Connected, The value is 1, otherwise the value is 0; Respectively represent pumping stations The upper limit of active power and reactive power consumed; S2. Based on the scenario-based mixed integer nonlinear programming model, a multi-time scale progressive emergency collaborative control strategy is formed based on the upper, middle and lower layers of preventive control, deduction feedback and decision correction: S21. The upper layer is used to obtain the preventive control plan of the distributed generator set and pump station and the pre-deployment plan of the emergency power supply vehicle as a preventive control strategy and send it to the lower layer; if the current period is the first control period in the rainstorm disaster, directly proceed to S23, if not, proceed to S22-S23; S22. The middle layer receives the current period decision correction plan and future time range transmitted by the lower layer The decision correction scheme is used as an input parameter to deduce the time range. The evolution of inland river floods and ground flooding process predicts the ring main units with flooding risks, and sends the corresponding ring main unit information and time information to the lower layer; S23. In the first control period, the lower layer performs preliminary decision correction according to the preventive control strategy sent by the upper layer to adjust the output of the distributed generator set and the pumping flow of the pump station, and sends the decision correction plan after the preliminary decision correction to the middle layer. In other control periods, the lower layer performs rolling decision correction iteration on the preventive control strategy of the upper layer according to the ring network cabinet information and time information sent by the middle layer, obtains the decision correction plan and sends it to the middle layer, and adjusts the output of the distributed generator set and the pumping flow of the pump station according to the decision correction plan, and controls the line switch to perform dynamic network reconstruction; S3. A fast solution algorithm based on dynamic feasible domain segmentation introduces auxiliary variables to approximate the constraints by piecewise linear relaxation, thereby transforming the mixed integer nonlinear programming model into a mixed integer piecewise linear relaxation approximation model, and solving the mixed integer piecewise linear relaxation approximation model until it converges to the global optimal solution of the original nonlinear model.

2. The multi-scale progressive emergency coordinated control method for multi-energy networks in response to rainstorm disasters according to claim 1 is characterized in that: The specific contents of the optimal control model of the power-water network with stochastic hydrodynamic partial differential constraints in S1 include: Introducing a slack variable relaxation Constraints: (17) Distribution network and water conservancy network in time range The objective functions in and express: (18) (19) In the formula, Indicates the definition of busbar Upload priority weight; In the dynamic model of the water conservancy network, equation (1) is the random hydrodynamic partial differential constraint, and the optimal control model of the power-water conservancy network with random hydrodynamic partial differential constraint is for: (20) The Preissmann four-point implicit scheme is used to numerically discretize the one-dimensional Saint-Venant hydrodynamic partial differential equations in time and space. The specific contents include: Each river Continuous space-time domain is divided into a discrete point grid with a time step of , the spatial step length is , each point in Direction and The coordinates of the directions are and express; set up , For rivers ,point Variables and parameters are marked with subscripts and and superscript ; The size depends on The maximum rainfall intensity of all rivers in the period; the one-dimensional Saint-Venant hydrodynamic partial differential equations are discretized in time and space using the Preissmann four-point implicit finite difference method, and the following is obtained: (21) (22) Among them, the nonlinear non-convex constraints , and They are: (23) (24) (25) in, ; Then the one-dimensional Saint-Venant hydrodynamic partial differential equations are transformed into nonlinear algebraic constraints (21)-(25); the constraints of equations (5), (6) and (17) are also discretized as: (26) (27) (28) Objective Function and Translates to: (29) (30) A potential rainfall scenario set is constructed through multiple rainfall intensity time series to characterize the uncertainty of rainfall temporal and spatial distribution: represents a collection of rainfall scenes, Representation scene Probability of occurrence; scenario The corresponding rainfall intensity time series is expressed as : (31) (32) according to Calculate the scene The rainfall intensity ;make ; and scene The corresponding objective functions, variables, and parameters are marked with subscripts ; then the model is converted into a scenario-based mixed integer nonlinear programming model : (33) In the formula, Corresponding scenarios The objective function under .

3. The multi-scale progressive emergency coordinated control method for multi-energy networks in response to rainstorm disasters according to claim 2 is characterized in that: In S2: The preventive control of upper-level risk aversion is modeled as a two-stage optimization model: the first-stage model implements the pre-deployment of emergency power supply vehicles and optimizes the control plan of distributed generators and pump stations; the second-stage model re-controls the output of distributed generators and pump stations to cope with possible rainfall scenarios, and introduces conditional value at risk (CVaR) to control the risks brought by rainfall distribution uncertainty; definition is the expected rainfall scenario with the maximum probability of occurrence, and is defined as ,Will Represents a collection of rainfall scenes Remove the expected rainfall scenario with the highest probability of occurrence The collection after The pre-deployment constraints of emergency power supply vehicles are: (34) In the formula, is a binary variable. If the emergency power supply vehicle Connected to busbar ,but , otherwise 0; Indicates connection to busbar The total permissible capacity of MEGs; The upper / lower reserve capacity constraints of distributed generators are: (35) In the formula, Representation scene Down Moment bus The active power output of the distributed generator set, Representation scene Down Moment bus Up / down spare capacity of distributed generators, Indicates busbar The upper / lower reserve capacity limit of distributed generator sets; The output adjustment constraints of distributed generators and pumping stations are: (36) (37) In the formula, Representation scene Down Moment bus The active power / reactive power output by the distributed generator sets, Representation scene Down Time pumping station of traffic, It is a pumping station The upper limit of flow adjustment; The two-stage optimization model of risk aversion preventive control is: (38) In the formula, is a weighting coefficient with a value range between [0,1], is the value at risk; The one-dimensional-two-dimensional coupled hydrodynamic model is used to deduce the evolution of river floods and the ground flooding process. The one-dimensional-two-dimensional coupled hydrodynamic model is solved by the finite difference method of the Preissmann four-point implicit format and the finite volume method of the Godunov format to obtain the spatiotemporal distribution of the flooding depth of the distribution network ring main unit within the future set time range. The ring main unit with flooding risk is identified by judging the flooding depth. If the flooding depth of a ring main unit exceeds the specified safety threshold within the set time range, the ring main unit is at risk of being flooded, and the ring main unit number and the time when the flooding depth exceeds the specified safety threshold are recorded; The lower-level decision correction is completed through the decision correction model. In each time period, the short-term forecast information is distributed according to the rainfall intensity, and the decision correction model is used to correct the rainfall intensity in the selected time range. The internal solution decision correction model is used to correct the upper-level decision according to the decision model. The specific contents include: set up represents the root busbar set, Indicates busbar The connected busbar set; the constraints for network reconstruction, distributed generator re-control and pump station flow adjustment are as follows: (39) (40) (41) (42) (43) (44) In the formula, is a binary variable, if Moment bus It is a busbar The parent node of The value is 1, otherwise the value is 0; The decision correction model is as follows: (45) Solve the decision correction model to obtain the output control quantity of distributed generator sets and pump stations in heavy rain disasters, as well as the state control quantity of line switches; adjust the output control quantity of distributed generator sets and pump stations in heavy rain in the upper-level preventive control strategy according to constraints (43) and (44).

4. The multi-scale progressive emergency coordinated control method for multi-energy networks in response to rainstorm disasters according to claim 3 is characterized in that: The specific steps of the rolling decision correction iteration in S23 are: 1) In Time period, update time range The short-term forecast information of rainfall intensity distribution in the inner part is used to obtain the flooding risk identification results of the middle-level distribution network ring network cabinet, which is used to determine the ring network cabinet that needs to be actively closed. The closing time is the time when the flooding depth of the ring network cabinet exceeds the specified safety threshold; 2) Set the time step to , in the time interval The decision correction model is solved internally. If the decision correction model is not feasible, the constraints (43) and (44) are relaxed, and the decision correction model is solved again to obtain the control results of the output of the distributed generator set and the pump station and the control results of the line switch; 3) Only implement it for the current time period Control results of distributed generators, pump station output and line switches; 4) Shift the time frame forward , repeat steps 2)-4), if the current scheduling period is the last scheduling period, the algorithm terminates.

5. The multi-scale progressive emergency coordinated control method for multi-energy networks in response to rainstorm disasters according to claim 1 is characterized in that: In S21, the time step is set in a long time scale manner; if the current period is the first control period in the rainstorm disaster, S23 is directly performed; if not, S22-S23 is performed; In S22, the middle layer receives the current period decision correction plan and future time range transmitted by the lower layer The decision correction scheme is used as an input parameter to deduce the time range The evolution of inland river floods and the ground flooding process determine the number of the distribution network ring main cabinet with flooding risk and the time when the flooding depth exceeds the specified safety threshold, and send the number and time information to the lower layer; In S23, during the first control period, the lower layer makes a preliminary decision correction according to the preventive control strategy sent by the upper layer to adjust the output of the distributed generator set and the pumping flow of the pump station, and sends the decision correction plan after the preliminary decision correction to the middle layer. In other control periods, the lower layer establishes a rolling decision correction model according to the distribution network ring network cabinet number sent by the middle layer and the time information when the flooding depth exceeds the specified safety threshold, and performs rolling decision correction iteration on the preventive control strategy of the upper layer, sets the time step in a short time scale, implements a single rolling decision correction iteration, and sends the obtained decision correction plan to the middle layer, and adjusts the output of the distributed generator set and the pumping flow of the pump station according to the decision correction plan, and controls the line switches to dynamically reconstruct the network.

6. The multi-energy network multi-scale progressive emergency coordinated control method for responding to rainstorm disasters according to claim 3 is characterized in that: The specific contents of S3 include: Iterative solution algorithm based on dynamic feasible region segmentation The global optimal solution is obtained by: First, introduce auxiliary variables and , defined as: (46) (47) (48) Rewrite constraints (24) and (25) as: (49) make for The lower limit of , and for The lower and upper limits of ; , and About In the interval A monotonic function in About In the interval Monotonic function within ; Consider the interval Monotonic function in , its feasible domain Divided into segments, and the segment set is ,in is a pair of real numbers, representing In segmentation The lower and upper limits in ; Introducing continuous variables and assign it to , introduce binary variables and assign it to the segment ; The piecewise linear relaxation of is approximated as: (50) Therefore, constraints (23), (46) and (47) are approximately replaced by: (51) The constraint (48) contains bilinear terms and , consider the definition in and Bilinear function on ,Will The feasible domain Divide segments, and the segment set is ,in is a pair of real numbers, representing In segmentation The lower and upper bounds in ; Introducing binary variables and two continuous variables and , and assign it to the segment ; The piecewise linear relaxation of is approximated as: (52) Therefore, constraint (48) is approximately replaced by: (53) Thus, Transformed into a mixed integer piecewise linear relaxation approximation model ,as follows: (54) A dynamic feasible region segmentation scheme is used to iteratively tighten the piecewise linear relaxation approximation in constraints (51) and (53): (1) At each iteration, the current The segment where the optimal solution is located is divided into four non-uniform sparse segments. ,make , express The segment collection of , express The optimal solution of express The optimal solution of ,make Representation Model A collection of binary variables, express The optimal solution of express The optimal solution of , ,use Build of , solve ; (2) By adjusting parameters Controls the size of non-uniform sparse segments; reference constraints (55) to : (55) Constraint (55) will All binary variables in are fixed to constant values, thus The integer variables in are fixed and converted into a nonlinear programming model without integer variables, and the nonlinear programming model is solved to obtain its local optimal solution; The local optimal solution of the nonlinear programming model is The optimal objective value provides an upper limit estimate, using express; The optimal solution is The optimal target value of provides a lower bound estimate, denoted by ; when and The difference is lower than the allowable deviation When , it is considered to converge to The global optimal solution of The specific contents of step (1) include: Initialization parameters, where ; Allowable deviation ; Tuning parameters ;initial , ; ; when and When using Build of ; Solve ,get and , ; Calculate the target value ,use renew ; For each ,Will The segment where express; like , then To update ,Will To update , and Updated to: ; Otherwise, Updated to: ; in, Indicates the original The longest segment, .

Citation Information

Patent Citations

  • Power distribution network and drainage basin network emergency linkage decision-making method considering rainstorm time-space differentiation

    CN115879326A

  • Air-ground emergency resource planning method considering power-communication-traffic network coupling

    CN116090677A

  • Multi-energy-flow calculation and analysis method and system for integrated energy system

    CN117852762A

  • Method for flexible coordinated operation of urban distribution network and watershed network

    US20230231411A1

  • El nino extreme weather early warning method and device based on incremental learning

    US20230393304A1