A power equipment data security monitoring system and method based on the Internet of Things

By extracting features and constructing regression models for fault data of power equipment, we can calculate fault thresholds and credibility thresholds, judge faults in real time and verify the credibility of early warnings. This solves the problems of low efficiency and misjudgment in traditional monitoring technology, and improves fault management. Credibility and accuracy of judgments.

CN118523491BActive Publication Date: 2024-10-18QINGDAO YUHUA OF ELECTRONICS SCI & TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410585796.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-13
Publication Date
2024-10-18
Estimated Expiration
2044-05-13

AI Technical Summary

Technical Problem

Traditional power equipment fault monitoring technology is inefficient and prone to misjudgments, leading to waste of resources and potential accidents. Moreover, the data may be tampered with or untrue, affecting the credibility of fault judgments.

Method used

By collecting historical fault data, extracting feature data and environmental data, building a regression model, calculating fault thresholds and credibility thresholds, faults can be determined in real time and early warnings issued to verify the credibility of early warnings and reduce misjudgments.

Benefits of technology

It improves the efficiency and credibility of fault judgment, reduces resource consumption and economic losses, and ensures the accuracy and reliability of fault warnings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118523491B_ABST
    Figure CN118523491B_ABST
Patent Text Reader

Abstract

The present invention discloses a power equipment data security monitoring system and method based on the Internet of Things, and belongs to the field of security monitoring technology. The present invention collects equipment data of power equipment failures in history, extracts characteristic data reflecting equipment failures after analyzing the equipment data; calculates a fault threshold for judging whether the power equipment fails according to the characteristic data of power equipment failures in history; collects all environmental data when power equipment fails in history, searches for credible parameters that have an influencing relationship with the characteristic data, and calculates the credibility threshold of the equipment failure; collects real-time characteristic data, uses the fault threshold to judge whether the power equipment fails, and issues a fault warning; calculates the credibility of the fault warning issued in real time, judges whether the fault warning is true according to the credibility threshold, and issues a data abnormality warning whether the characteristic data collected in real time has been tampered with.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of safety monitoring, and in particular to a power equipment data safety monitoring system and method based on the Internet of Things. Background Art

[0002] With the growth of energy demand and the expansion of the scale of power systems, the reliability and safety requirements of power equipment are also increasing. The traditional regular maintenance mode can no longer meet the needs of real-time status monitoring and maintenance of equipment, so it is necessary to introduce advanced monitoring technology to improve the energy efficiency and reliability of equipment. The failure and downtime of power equipment will not only affect the stable operation of the power system, but also lead to shutdown and increased maintenance costs. By monitoring the status and health of equipment in real time, potential problems can be discovered in advance and preventive maintenance can be carried out, thereby reducing operating costs. And with the continuous development of big data and Internet of Things technology, the cost of sensors is constantly decreasing, and the ability of data collection and processing is constantly increasing, providing a broader development space for the safety monitoring of power equipment. By deploying sensors on power equipment, real-time monitoring and data collection of equipment status can be achieved, providing data support for the safe operation of equipment. When conducting real-time fault monitoring of power equipment, it is necessary to collect multiple data to conduct comprehensive analysis of the power equipment from multiple aspects. The amount of calculation is large and the efficiency is low. In addition, the collected data may be false data, including data leakage, tampering, sensor failure, etc., which may lead to misjudgment of the fault; the fault may not be discovered or there may be no fault but an early warning is issued. In either case, unnecessary resources will be consumed, causing accidents and reducing work efficiency. Summary of the invention

[0003] The purpose of the present invention is to provide a power equipment data security monitoring system and method based on the Internet of Things to solve the problems raised in the above background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0005] A method for monitoring power equipment data security based on the Internet of Things, the method comprising the following steps:

[0006] S100, collecting equipment data of failures of power equipment during operation in history, analyzing the equipment data and extracting characteristic data reflecting the equipment failure;

[0007] Furthermore, the specific steps of extracting characteristic data reflecting equipment failure after analyzing the equipment data are as follows:

[0008] S101. Collect the equipment data of power equipment failure in history. , Indicates the 1st, 2nd, 3rd, ... types of equipment data values ​​when the power equipment fails in the collected history, where n is a positive integer; collects the equipment data of the power equipment that fails m times in history; and collects the equipment data of n types of power equipment before the failure, and collects them m times;

[0009] S102, after collecting data of n types of equipment with and without power equipment failures m times, calculate the average change value of each type of equipment, the formula is:

[0010] ;

[0011] in the formula It indicates the average change value of each device data when failure occurs and when no failure occurs. represents the data value of each device when the power equipment is not faulty, Q represents the data value of each device after the power equipment fails, and m represents the number of data of each device collected before and after the power equipment fails;

[0012] S103. Calculate the average change value of each device data. , It is expressed as the average change value of the 1st, 2nd, 3rd...nth type of equipment data calculated. The change values ​​of the n types of equipment data are compared and analyzed, and the equipment data corresponding to the maximum value is extracted as the characteristic data of the power equipment failure .

[0013] Find the characteristic data when the power equipment fails and judge the fault of the power equipment according to the characteristic data, which can reduce the amount of system calculation, save resource consumption, and greatly improve the efficiency of fault judgment;

[0014] S200, calculating a fault threshold for determining whether a fault occurs in the power equipment according to characteristic data of a fault occurring in the power equipment during operation in the past;

[0015] Furthermore, the specific steps of calculating the fault threshold for determining whether a fault occurs in the power equipment are as follows:

[0016] S201. Collect the characteristic data values ​​of power equipment failure in history. , represents the characteristic data value collected when the power equipment has the 1st, 2nd, 3rd ... mth fault, where m is a positive integer;

[0017] S202, calculating the fault threshold according to the characteristic data of the power equipment when the fault occurred in the history, the formula is:

[0018] ;

[0019] in the formula Indicates the fault threshold for judging whether the power equipment has failed. Indicates the characteristic data collected when power equipment fails in the past.

[0020] S300, extracting the relationship between all data and characteristic data when a power equipment failure occurs in the history, finding the credible parameters that have an influencing relationship with the characteristic data, and calculating the credibility threshold of the equipment failure;

[0021] Furthermore, the specific steps for finding the credible parameters that have an impact on the feature data are as follows:

[0022] S311. Collect L kinds of environmental data when the characteristic data of the power equipment changes in history, draw a scatter plot with the characteristic data as the independent variable and the environmental data as the variable, observe and analyze the drawn scatter plot, calculate the regression model of each environmental data and characteristic data, and use the regression model to represent the relationship between each environmental data and characteristic data; suppose the expression of the regression model is:

[0023] ;

[0024] In the expression, represents the calculated value of each environmental data, Represents the value of the feature data, a represents the slope of the regression model, and b represents the intercept of the regression model;

[0025] S312. Calculate the slope and intercept of the regression model for each environmental data using the formula:

[0026] ;

[0027] ;

[0028] In the formula, K represents the number of collected feature data and each type of environmental data. Indicates the value of each environmental data, Represents the different feature data values ​​collected, represents the average value of the collected environmental data, represents the average value of the collected feature data, ; Calculate the expressions of the regression model of L kinds of environmental data in turn, and finally get the regression model of L environmental data as , It is expressed as the regression model expression of the calculated 1st, 2nd, 3rd, ... Lth environmental data;

[0029] S313. After calculating the regression model for each environmental data, the difference between the calculated value and the true value of the environmental data in each regression model is calculated. The formula is:

[0030] ;

[0031] in the formula represents the difference between the calculated value and the true value of the environmental data in each regression model, Represents the true value of the environmental data for each point in the scatter plot, represents the calculated value of environmental data on the regression model in the scatter plot, and K represents the number of environmental data points in the scatter plot; the difference value of L regression models obtained by calculation is , It is expressed as the difference value of the 1st, 2nd, 3rd, ... Lth regression models calculated;

[0032] S314, calculating the median value of the L regression model difference values, the formula is:

[0033] ;

[0034] In the formula, Expressed as L regression model difference values, It is expressed as the maximum value of the difference values ​​of L regression models, It is expressed as the minimum value of the difference values ​​of L regression models;

[0035] when When judging There is no influence relationship between the environmental data and characteristic data corresponding to the difference value. When judging There is an influence relationship between the environmental data and the characteristic data corresponding to the difference value, and the environmental data with an influence relationship is defined as the credible parameter B.

[0036] A regression model is constructed for each type of environmental data. The difference value of each regression model is calculated to determine whether there is an influence relationship between the corresponding environmental data and the characteristic data, and to find out the credible parameters in the environmental data that have an influence relationship with the characteristic data. When judging the fault of the power equipment, there may be leakage of characteristic data, resulting in tampering of the characteristic data, or the collected characteristic data may be untrue due to location factors, and finally the problem of misjudgment of the fault may occur. The use of credible parameters can verify whether the final fault judgment is credible, which greatly improves the credibility of the system fault judgment and reduces the probability of misjudgment.

[0037] Furthermore, the specific steps for calculating the credibility threshold of the equipment failure are:

[0038] S321, the credible parameters that have been calculated and influenced by the characteristic data are: , It is represented by the calculated 1st, 2nd, 3rd, ...dth trusted parameters, where d is a positive integer; each trusted parameter value when a fault occurs in the power equipment in history is collected;

[0039] S322. Calculate the credibility threshold of the feature data according to the credibility parameter. The formula is:

[0040] ;

[0041] in the formula Indicates the credibility threshold of characteristic data when a power equipment fails. It represents the value of each credible parameter when a fault occurs in the power equipment, and d represents the number of credible parameters calculated.

[0042] S400, collecting real-time characteristic data, using fault thresholds to determine whether a fault occurs in the power equipment, and issuing a fault warning;

[0043] Furthermore, the specific steps of using the fault threshold to determine whether a fault occurs in the power equipment are as follows:

[0044] S401, collect the real-time characteristic data of the power equipment as T_s, and use the fault threshold calculated in S200 to judge the real-time characteristic data. When the real-time power equipment fails, it will be judged and a fault warning will be issued. When the real-time power equipment is working normally, no failure will occur.

[0045] S500, calculating the credibility of the fault warning issued in real time, judging whether the fault warning is true according to the credibility threshold, and issuing a data abnormality warning whether the characteristic data collected in real time has been tampered with.

[0046] Furthermore, the specific steps for calculating the credibility of the fault warning issued in real time are:

[0047] S501, after the real-time power equipment is fault-diagnosed and the fault threshold is issued, the regression model of each credible parameter and characteristic data in S311 is extracted, and the real-time characteristic data T_s is used to calculate the real-time credible parameter values, and the formula is:

[0048] ;

[0049] According to the regression model, each real-time credible parameter value is calculated , Indicates the real-time 1st, 2nd, 3rd, ...dth trusted parameter value;

[0050] S502. Calculate the reliability of the fault warning according to the real-time reliable parameter value, and the formula is:

[0051] ;

[0052] in the formula Indicates the credibility of the fault warning calculated in real time, It represents the value of each trusted parameter calculated in real time, and d represents the number of trusted parameters;

[0053] S503: Extract the credibility threshold calculated in S322 to judge the credibility of the real-time fault warning. When the fault warning is judged to be not credible, the real-time feature data is at risk of being tampered with, and a data abnormality warning is issued; When the fault warning is judged to be credible, the fault of the power equipment is maintained.

[0054] The real-time credible parameter value is calculated by using the regression model of the credible parameter, and the credibility is calculated by using the real-time credible parameter value, which can reflect the credibility of the real-time fault warning. The credibility threshold is used to complete the verification of the real-time fault warning, avoiding unnecessary economic losses caused by system misjudgment;

[0055] An Internet of Things-based power equipment data security monitoring system, the power equipment data security monitoring system includes a data collection module, a trusted parameter analysis module, a threshold calculation module, a fault judgment module, a credibility judgment module and an early warning module;

[0056] The data collection module is used to collect data on power equipment failures in history and extract characteristic data of power equipment failures;

[0057] The trusted parameter analysis module is used to analyze historical data and draw a scatter plot to find trusted parameters that have an impact on feature data;

[0058] The threshold calculation module is used to calculate the credibility threshold according to the credible parameters and calculate the fault threshold according to the historical characteristic data;

[0059] The fault judgment module is used to collect characteristic data in real time and judge whether a fault occurs in the real-time power equipment according to the fault threshold;

[0060] The credibility judgment module is used to calculate the credibility of the fault warning by using the real-time credible parameter value after calculating the real-time credible parameter value, and judge the credibility of the fault warning according to the credibility threshold;

[0061] The early warning module is used to issue a fault early warning when it is determined that a fault exists in the power equipment, and to issue a data abnormality early warning when it is determined that the credibility of the fault early warning is not high.

[0062] The trusted parameter analysis module is used to analyze the environmental data when power equipment fails in history, construct a scatter plot, use the scatter plot to establish a regression model for each type of environmental data, and after judging the regression model, find the trusted parameters that have an influencing relationship with the feature data.

[0063] The threshold calculation module includes a fault threshold calculation unit and a credibility threshold calculation unit;

[0064] The fault threshold calculation unit is used to analyze the characteristic data of the power equipment when the fault occurs in the history, and calculate the fault threshold used to judge whether the real-time power equipment fails;

[0065] The credibility threshold calculation unit is used to calculate the credibility threshold used to determine whether the fault warning is credible by using the credible parameter values ​​when the power equipment fails in history.

[0066] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0067] 1. The present invention searches for characteristic data of power equipment faults and uses the characteristic data to perform real-time fault detection on the power equipment. When it is determined that the power equipment may fail, a fault warning is issued so that maintenance personnel can handle the fault in time to avoid accidents.

[0068] 2. The present invention collects environmental data when a fault occurs in the power equipment to construct a scatter plot, calculates the regression model of each scatter plot, and searches for credible parameters that have an influencing relationship with the feature data by judging the difference value of the regression model. The credible parameters are used to calculate the credibility threshold to judge the credibility of the real-time fault warning, thereby avoiding misjudgment of the system, increasing resource consumption, and reducing economic losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0069] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0070] Figure 1 It is a module distribution diagram of a power equipment data security monitoring system based on the Internet of Things of the present invention;

[0071] Figure 2 It is a schematic diagram of the steps of a method for data security monitoring of power equipment based on the Internet of Things of the present invention;

[0072] Figure 3 It is a scatter plot of environmental data and characteristic data of a method for data security monitoring of power equipment based on the Internet of Things of the present invention. DETAILED DESCRIPTION

[0073] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0074] See also Figure 1-Figure 2 , the present invention provides a technical solution:

[0075] A method for monitoring power equipment data security based on the Internet of Things, the method comprising the following steps:

[0076] S100, collecting equipment data of failures of power equipment during operation in history, analyzing the equipment data and extracting characteristic data reflecting the equipment failure;

[0077] The specific steps to extract characteristic data reflecting equipment failure after analyzing equipment data are as follows:

[0078] S101. Collect the equipment data of power equipment failure in history. , Indicates the 1st, 2nd, 3rd, ... types of equipment data values ​​when the power equipment fails in the collected history, where n is a positive integer; collects the equipment data of the power equipment that fails m times in history; and collects the equipment data of n types of power equipment before the failure, and collects them m times;

[0079] S102, after collecting data of n types of equipment with and without power equipment failures m times, calculate the average change value of each type of equipment, the formula is:

[0080] ;

[0081] in the formula It indicates the average change value of each device data when failure occurs and when no failure occurs. represents the data value of each device when the power equipment is not faulty, Q represents the data value of each device after the power equipment fails, and m represents the number of data of each device collected before and after the power equipment fails;

[0082] S103. Calculate the average change value of each device data. , It is expressed as the average change value of the 1st, 2nd, 3rd...nth type of equipment data calculated. The change values ​​of the n types of equipment data are compared and analyzed, and the equipment data corresponding to the maximum value is extracted as the characteristic data of the power equipment failure .

[0083] Find the characteristic data when the power equipment fails and judge the fault of the power equipment according to the characteristic data, which can reduce the amount of system calculation, save resource consumption, and greatly improve the efficiency of fault judgment;

[0084] S200, calculating a fault threshold for determining whether a fault occurs in the power equipment according to characteristic data of a fault occurring in the power equipment during operation in the past;

[0085] The specific steps for calculating the fault threshold used to determine whether a fault occurs in the power equipment are:

[0086] S201. Collect the characteristic data values ​​of power equipment failure in history. , represents the characteristic data value collected when the power equipment has the 1st, 2nd, 3rd ... mth fault, where m is a positive integer;

[0087] S202, calculating the fault threshold according to the characteristic data of the power equipment when the fault occurred in the history, the formula is:

[0088] ;

[0089] in the formula Indicates the fault threshold for judging whether the power equipment has failed. Indicates the characteristic data collected when power equipment fails in the past.

[0090] S300, extracting the relationship between all data and characteristic data when a power equipment failure occurs in the history, finding the credible parameters that have an influencing relationship with the characteristic data, and calculating the credibility threshold of the equipment failure;

[0091] The specific steps for finding the trusted parameters that have an impact on the feature data are as follows:

[0092] S311. Collect L kinds of environmental data when the characteristic data of the power equipment changes in history, draw a scatter plot with the characteristic data as the independent variable and the environmental data as the variable, observe and analyze the drawn scatter plot, calculate the regression model of each environmental data and characteristic data, and use the regression model to represent the relationship between each environmental data and characteristic data; suppose the expression of the regression model is:

[0093] ;

[0094] In the expression, represents the calculated value of each environmental data, Represents the value of the feature data, a represents the slope of the regression model, and b represents the intercept of the regression model;

[0095] S312. Calculate the slope and intercept of the regression model for each environmental data using the formula:

[0096] ;

[0097] ;

[0098] In the formula, K represents the number of collected feature data and each type of environmental data. Indicates the value of each environmental data, Represents the different feature data values ​​collected, represents the average value of the collected environmental data, represents the average value of the collected feature data, ; Calculate the expressions of the regression model of L kinds of environmental data in turn, and finally get the regression model of L environmental data as , It is expressed as the regression model expression of the calculated 1st, 2nd, 3rd, ... Lth environmental data;

[0099] S313. After calculating the regression model for each environmental data, the difference between the calculated value and the true value of the environmental data in each regression model is calculated. The formula is:

[0100] ;

[0101] in the formula represents the difference between the calculated value and the true value of the environmental data in each regression model, Represents the true value of the environmental data for each point in the scatter plot, represents the calculated value of environmental data on the regression model in the scatter plot, and K represents the number of environmental data points in the scatter plot; the difference value of L regression models obtained by calculation is , It is expressed as the difference value of the 1st, 2nd, 3rd, ... Lth regression models calculated;

[0102] S314, calculating the median value of the L regression model difference values, the formula is:

[0103] ;

[0104] In the formula, Expressed as L regression model difference values, It is expressed as the maximum value of the difference values ​​of L regression models, It is expressed as the minimum value of the difference values ​​of L regression models;

[0105] when When judging There is no influence relationship between the environmental data and characteristic data corresponding to the difference value. When judging There is an influence relationship between the environmental data and the characteristic data corresponding to the difference value, and the environmental data with an influence relationship is defined as a credible parameter B.

[0106] A regression model is constructed for each type of environmental data. The difference value of each regression model is calculated to determine whether there is an influence relationship between the corresponding environmental data and the characteristic data, and to find out the credible parameters in the environmental data that have an influence relationship with the characteristic data. When judging the fault of the power equipment, there may be leakage of characteristic data, resulting in tampering of the characteristic data, or the collected characteristic data may be untrue due to location factors, and finally the problem of misjudgment of the fault may occur. The use of credible parameters can verify whether the final fault judgment is credible, which greatly improves the credibility of the system fault judgment and reduces the probability of misjudgment.

[0107] The specific steps for calculating the credibility threshold of equipment failure are:

[0108] S321, the credible parameters that have been calculated and influenced by the characteristic data are: , It is represented by the calculated 1st, 2nd, 3rd, ...dth trusted parameters, where d is a positive integer; each trusted parameter value when a fault occurs in the power equipment in history is collected;

[0109] S322. Calculate the credibility threshold of the feature data according to the credibility parameter. The formula is:

[0110] ;

[0111] in the formula Indicates the credibility threshold of characteristic data when a power equipment fails. It represents the value of each credible parameter when a fault occurs in the power equipment, and d represents the number of credible parameters calculated.

[0112] S400, collecting real-time characteristic data, using fault thresholds to determine whether a fault occurs in the power equipment, and issuing a fault warning;

[0113] The specific steps of using the fault threshold to determine whether a power device has a fault are as follows:

[0114] S401, collect the real-time characteristic data of the power equipment as T_s, and use the fault threshold calculated in S200 to judge the real-time characteristic data. When the real-time power equipment fails, it will be judged and a fault warning will be issued. When the real-time power equipment is working normally, no failure will occur.

[0115] S500, calculating the credibility of the fault warning issued in real time, judging whether the fault warning is true according to the credibility threshold, and issuing a data abnormality warning whether the characteristic data collected in real time has been tampered with.

[0116] The specific steps for calculating the credibility of the fault warning issued in real time are:

[0117] S501, after the real-time power equipment is fault-diagnosed and the fault threshold is issued, the regression model of each credible parameter and characteristic data in S311 is extracted, and the real-time characteristic data T_s is used to calculate the real-time credible parameter values, and the formula is:

[0118] ;

[0119] According to the regression model, each real-time credible parameter value is calculated , Indicates the real-time 1st, 2nd, 3rd, ...dth trusted parameter value;

[0120] S502. Calculate the reliability of the fault warning according to the real-time reliable parameter value, and the formula is:

[0121] ;

[0122] in the formula Indicates the credibility of the fault warning calculated in real time, It represents the value of each trusted parameter calculated in real time, and d represents the number of trusted parameters;

[0123] S503: Extract the credibility threshold calculated in S322 to judge the credibility of the real-time fault warning. When the fault warning is judged to be not credible, the real-time feature data is at risk of being tampered with, and a data abnormality warning is issued; When the fault warning is judged to be credible, the fault of the power equipment is maintained.

[0124] The real-time credible parameter value is calculated by using the regression model of the credible parameter, and the credibility is calculated by using the real-time credible parameter value, which can reflect the credibility of the real-time fault warning. The credibility threshold is used to complete the verification of the real-time fault warning, avoiding unnecessary economic losses caused by system misjudgment;

[0125] An Internet of Things-based power equipment data security monitoring system, the power equipment data security monitoring system includes a data collection module, a trusted parameter analysis module, a threshold calculation module, a fault judgment module, a credibility judgment module and an early warning module;

[0126] The data collection module is used to collect data on power equipment failures in history and extract characteristic data of power equipment failures;

[0127] The trusted parameter analysis module is used to analyze historical data and draw a scatter plot to find trusted parameters that have an impact on feature data;

[0128] The threshold calculation module is used to calculate the credibility threshold according to the credible parameters and calculate the fault threshold according to the historical characteristic data;

[0129] The fault judgment module is used to collect characteristic data in real time and judge whether a fault occurs in the real-time power equipment according to the fault threshold;

[0130] The credibility judgment module is used to calculate the credibility of the fault warning by using the real-time credible parameter value after calculating the real-time credible parameter value, and judge the credibility of the fault warning according to the credibility threshold;

[0131] The early warning module is used to issue a fault early warning when it is determined that a fault exists in the power equipment, and to issue a data abnormality early warning when it is determined that the credibility of the fault early warning is not high.

[0132] The trusted parameter analysis module is used to analyze the environmental data when power equipment fails in history, construct a scatter plot, use the scatter plot to establish a regression model for each type of environmental data, and after judging the regression model, find the trusted parameters that have an influencing relationship with the feature data.

[0133] The threshold calculation module includes a fault threshold calculation unit and a credibility threshold calculation unit;

[0134] The fault threshold calculation unit is used to analyze the characteristic data of the power equipment when the fault occurs in the history, and calculate the fault threshold used to judge whether the real-time power equipment fails;

[0135] The credibility threshold calculation unit is used to calculate the credibility threshold used to determine whether the fault warning is credible by using the credible parameter values ​​when the power equipment fails in history.

[0136] Example 1

[0137] A fault judgment is made on a power equipment, and after analyzing the data of the power equipment when the fault occurs in the history, the difference is calculated and the maximum value is extracted to obtain the characteristic data when the power equipment fails, which is the vibration data;

[0138] Take the characteristic data as the independent variable, collect the environmental data when the power equipment fails in history and draw a scatter plot, such as Figure 3 The following are the temperature-environmental data scatter plot and the oxygen content-characteristic data scatter plot. The regression models corresponding to the two environmental data are calculated using each point in the scatter plot. , ;

[0139] Assume that the collected environmental data are temperature, humidity, oxygen content, pressure, and wind speed; draw scatter plots for the five environmental data, and calculate the difference between the calculated value and the true value of each regression model. The formula is:

[0140] ;

[0141] The calculated differences between the calculated values ​​and the true values ​​of temperature, humidity, oxygen content, pressure, and wind speed are 0, 6, 21, 10, and 7, respectively. The middle value of all the difference values ​​is calculated using the formula: ; According to the intermediate value, the environmental data that have an impact on the characteristic data are temperature, humidity, pressure, and wind speed, so the credible parameters include temperature, humidity, pressure, and wind speed;

[0142] Collect the credible parameter values ​​when the power equipment fails in history and calculate the credibility threshold. The formula is: ; Collect the characteristic data of power equipment failure in history and calculate the failure threshold as 4;

[0143] The characteristic data of power equipment collected in real time is 6.5, and the fault threshold is used to judge whether the power equipment has failed and issue a fault warning;

[0144] Calculate the credibility of real-time fault warning, and obtain the real-time four credible parameter values ​​according to the four credible parameter regression model. The formula is:

[0145] ;

[0146] The four credible parameter values ​​calculated are 70, 55, 40, and 2 respectively; the calculated real-time credibility is 41.75. After judging, the credibility of the fault warning issued in real time is not high, and a data abnormality warning is issued;

[0147] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0148] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for data security monitoring of power equipment based on the Internet of Things, characterized in that: The method comprises the following steps: S100, collecting equipment data of failures of power equipment during operation in history, analyzing the equipment data and extracting characteristic data reflecting the equipment failure; S200, calculating a fault threshold for determining whether a fault occurs in the power equipment according to characteristic data of a fault occurring in the power equipment in history; The specific steps for calculating the fault threshold used to determine whether a fault occurs in the power equipment are: S201. Collect the characteristic data values ​​of power equipment failure in history. , represents the characteristic data value collected when the power equipment has the 1st, 2nd, 3rd ... mth fault, where m is a positive integer; S202, calculating the fault threshold according to the characteristic data of the power equipment when the fault occurred in the history, the formula is: ; in the formula Indicates the fault threshold for judging whether the power equipment has failed. Indicates the characteristic data collected in the history when the power equipment fails; S300, collecting all environmental data when power equipment fails in history, finding credible parameters that have an impact on the characteristic data, and calculating the credibility threshold of the equipment failure; The specific steps for finding the trusted parameters that have an impact on the feature data are as follows: S311. Collect L kinds of environmental data when the characteristic data of the power equipment changes in history, draw a scatter plot with the characteristic data as the independent variable and the environmental data as the variable, observe and analyze the drawn scatter plot, calculate the regression model of each environmental data and characteristic data, and use the regression model to represent the relationship between each environmental data and characteristic data; suppose the expression of the regression model is: ; In the expression, represents the calculated value of each environmental data, Represents the value of the feature data, a represents the slope of the regression model, and b represents the intercept of the regression model; S312. Calculate the slope and intercept of the regression model for each environmental data using the formula: ; ; In the formula, K represents the number of collected feature data and each type of environmental data. Indicates the value of each environmental data, Represents the different feature data values ​​collected, represents the average value of the collected environmental data, represents the average value of the collected feature data, ; Calculate the expressions of the regression model of L kinds of environmental data in turn, and finally get the regression model of L environmental data as , It is expressed as the regression model expression of the calculated 1st, 2nd, 3rd, ... Lth environmental data; S313. After calculating the regression model for each environmental data, the difference between the calculated value and the true value of the environmental data in each regression model is calculated. The formula is: ; in the formula represents the difference between the calculated value and the true value of the environmental data in each regression model, Represents the true value of the environmental data for each point in the scatter plot, represents the calculated value of environmental data on the regression model in the scatter plot, and K represents the number of environmental data points in the scatter plot; the difference value of L regression models obtained by calculation is , It is expressed as the difference value of the 1st, 2nd, 3rd, ... Lth regression models calculated; S314, calculating the median value of the L regression model difference values, the formula is: ; In the formula, Expressed as L regression model difference values, It is expressed as the maximum value of the difference values ​​of L regression models, It is expressed as the minimum value of the difference values ​​of L regression models; when When judging There is no influence relationship between the environmental data and characteristic data corresponding to the difference value. When judging There is an influence relationship between the environmental data and the characteristic data corresponding to the difference value, and the environmental data with the influence relationship is defined as the credible parameter B; The specific steps for calculating the credibility threshold of equipment failure are: S321, the credible parameters that have been calculated and influenced by the characteristic data are: , It is represented by the calculated 1st, 2nd, 3rd, ...dth trusted parameters, where d is a positive integer; each trusted parameter value when a fault occurs in the power equipment in history is collected; S322. Calculate the credibility threshold of the feature data according to the credibility parameter. The formula is: ; in the formula Indicates the credibility threshold of characteristic data when a power equipment fails. represents the value of each credible parameter when a fault occurs in the power equipment, and d represents the number of credible parameters calculated; S400, collecting real-time characteristic data, using fault thresholds to determine whether a fault occurs in the power equipment, and issuing a fault warning; S500, calculating the credibility of the fault warning issued in real time, judging whether the fault warning is true according to the credibility threshold, and issuing a data abnormality warning whether the characteristic data collected in real time has been tampered with; The specific steps for calculating the credibility of the fault warning issued in real time are: S501, after the real-time power equipment is fault-diagnosed and the fault threshold is issued, the regression model of each credible parameter and characteristic data in S311 is extracted, and the real-time characteristic data T_s is used to calculate the real-time credible parameter values, and the formula is: ; According to the regression model, each real-time credible parameter value is calculated , Indicates the real-time 1st, 2nd, 3rd, ...dth trusted parameter value; S502. Calculate the reliability of the fault warning according to the real-time reliable parameter value, and the formula is: ; in the formula Indicates the credibility of the fault warning calculated in real time, It represents the value of each trusted parameter calculated in real time, and d represents the number of trusted parameters; S503: Extract the credibility threshold calculated in S322 to judge the credibility of the real-time fault warning. When the fault warning is judged to be not credible, the real-time feature data is at risk of being tampered with, and a data abnormality warning is issued; When the fault warning is judged to be credible, the fault of the power equipment is maintained.

2. According to the method for data security monitoring of power equipment based on the Internet of Things according to claim 1, it is characterized in that: The specific steps of extracting characteristic data reflecting equipment failure after analyzing the equipment data in S100 are: S101. Collect the equipment data of power equipment failure in history. , Indicates the 1st, 2nd, 3rd, ... types of equipment data values ​​when the power equipment fails in the collected history, n is a positive integer; collects the equipment data of the power equipment failure in the mth history; and collecting the equipment data of n types of power equipment before failure, for m times; S102, after collecting data of n types of equipment with and without power equipment failures m times, calculate the average change value of each type of equipment, the formula is: ; in the formula It indicates the average change value of each device data when failure occurs and when no failure occurs. represents the data value of each device when the power equipment is not faulty, Q represents the data value of each device after the power equipment fails, and m represents the number of data of each device collected before and after the power equipment fails; S103. Calculate the average change value of each device data. , It is expressed as the average change value of the 1st, 2nd, 3rd...nth type of equipment data calculated. The change values ​​of the n types of equipment data are compared and analyzed, and the equipment data corresponding to the maximum value is extracted as the characteristic data of the power equipment failure .

3. According to the method for data security monitoring of power equipment based on the Internet of Things according to claim 1, it is characterized in that: The specific steps of using the fault threshold to determine whether a fault occurs in the power equipment in S400 are: S401, collect the real-time characteristic data of the power equipment as T_s, and use the fault threshold calculated in S200 to judge the real-time characteristic data. When the real-time power equipment fails, it will be judged and a fault warning will be issued. When the real-time power equipment is working normally, no failure will occur.

4. A power equipment data security monitoring system based on the Internet of Things using a power equipment data security monitoring method based on the Internet of Things as described in any one of claims 1 to 3, characterized in that: The power equipment data security monitoring system includes a data collection module, a trusted parameter analysis module, a threshold calculation module, a fault judgment module, a credibility judgment module and an early warning module; The data collection module is used to collect data on power equipment failures in history and extract characteristic data of power equipment failures; The trusted parameter analysis module is used to analyze historical data and draw a scatter plot to find trusted parameters that have an impact on feature data; The threshold calculation module is used to calculate the credibility threshold according to the credible parameters and calculate the fault threshold according to the historical characteristic data; The fault judgment module is used to collect characteristic data in real time and judge whether a fault occurs in the real-time power equipment according to the fault threshold; The credibility judgment module is used to calculate the credibility of the fault warning by using the real-time credible parameter value after calculating the real-time credible parameter value, and judge the credibility of the fault warning according to the credibility threshold; The early warning module is used to issue a fault early warning when it is determined that a fault exists in the power equipment, and to issue a data abnormality early warning when it is determined that the credibility of the fault early warning is not high.

5. According to claim 4, a power equipment data security monitoring system based on the Internet of Things is characterized in that: The trusted parameter analysis module is used to analyze the environmental data when the power equipment fails in history, construct a scatter plot, use the scatter plot to establish a regression model for each type of environmental data, and after judging the regression model, find the trusted parameters that have an influencing relationship with the feature data.

6. According to the Internet of Things-based power equipment data security monitoring system of claim 4, it is characterized by: The threshold calculation module includes a fault threshold calculation unit and a credibility threshold calculation unit; The fault threshold calculation unit is used to analyze the characteristic data of the power equipment when the fault occurs in the history, and calculate the fault threshold used to judge whether the real-time power equipment fails; The credibility threshold calculation unit is used to calculate the credibility threshold used to determine whether the fault warning is credible by using the credible parameter values ​​when the power equipment fails in history.

Citation Information

Patent Citations

  • Fault early warning method for hydraulic equipment based on fault frequent pattern

    CN102809965A

  • Abnormal information analysis management system and method based on global monitoring

    CN116345696A