A method for determining the vacuum pumping time of a transformer and a vacuum pumping device

By obtaining the corresponding relationship between the exposure of the insulating parts and the vacuuming time, the vacuuming time of the transformer is determined according to the environmental conditions, which solves the problem of insufficient or too long vacuuming time in the existing technology, and improves the insulation performance and energy efficiency. .

CN118532892BActive Publication Date: 2024-10-25CHINT ELECTRIC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410993750.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-25
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

In the existing technology, the vacuuming time of the transformer is insufficient or too long, resulting in the moisture content of the insulating parts failing to meet the design requirements, affecting the electrical insulation performance and lifespan, and consuming large amounts of energy, reducing production efficiency.

Method used

By obtaining the corresponding relationship between the exposure time of the insulating parts and the vacuuming time, the appropriate vacuuming time is determined according to the preset environment and temperature change conditions, ensuring that the moisture content of the insulating parts meets the design requirements, reducing the vacuuming time and energy consumption.

Benefits of technology

On the premise of ensuring insulation performance and lifespan, the vacuuming time is shortened, production efficiency is improved, and energy consumption is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118532892B_ABST
    Figure CN118532892B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of electrical equipment, and discloses a method for determining the vacuuming time of a transformer and a vacuuming device, the method comprising: obtaining a correspondence between the exposure time of an insulating part and the vacuuming time, the correspondence being obtained when the insulating part is in a preset environment when exposed, and the temperature change of the insulating part meets a preset condition, the preset environment comprising an ambient temperature meeting a preset temperature and an ambient humidity meeting a preset humidity, the preset condition comprising a temperature change rate of the insulating part meeting a preset temperature change rate or a temperature of the insulating part meeting a preset temperature under a preset vacuum degree; determining the exposure time of a body of a transformer to be vacuumed in the preset environment; determining the vacuuming time according to the exposure time and the correspondence, thereby achieving determination of the vacuuming time according to the specific degree of moisture of the insulating part, and ensuring that the vacuuming time can be reduced as much as possible and energy consumption can be reduced on the premise that the moisture content of the insulating part after vacuuming meets the requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electrical equipment, and in particular to a method for determining the vacuuming time of a transformer and a vacuuming device. Background Art

[0002] After the transformer body is assembled, it needs to be placed in a drying furnace to remove moisture and water inside the body, reduce the adverse effects of moisture and water on the insulating parts of the transformer body, and ensure the insulation performance and service life of the transformer. After the transformer body is removed from the drying furnace, it needs to be arranged. After the transformer body is arranged, it is placed in the oil tank and vacuumed. From the time the transformer body is taken out of the oven to the time of vacuuming, the transformer body is exposed to the air, which usually takes between 4 and 12 hours, causing the insulating parts in the body to become damp. The purpose of the vacuuming treatment is to use the pressure difference to remove the moisture in the insulating parts of the body so that the moisture content of the insulating parts of the body meets the design requirements. Different voltage level transformers require different vacuuming times. For example, the vacuuming time required for 110kV-500kV transformers is usually around 12h-48h, and the vacuuming time required for transformers of 500kV and above voltage levels is longer.

[0003] In the prior art, vacuum treatment is usually performed according to the vacuum pumping time specified by the transformer voltage level, and the time is a fixed value; alternatively, the vacuum degree of the transformer is monitored during vacuum pumping, and when the vacuum degree in the transformer is detected to be lower than a threshold value, vacuum pumping is stopped.

[0004] The prior art has the following defects: whether the transformer vacuum pumping time is appropriate depends on whether the moisture content of the transformer body insulating parts is lower than the moisture content threshold. The vacuum treatment is performed with a fixed vacuum pumping time, and the vacuum treatment stop time is controlled by monitoring the transformer vacuum degree. In these two schemes, the vacuum pumping time may be insufficient, resulting in the moisture content of the transformer body insulating parts after the vacuum treatment failing to meet the design requirements, affecting the electrical insulation performance and life of the transformer, or the vacuum pumping time may be too long, resulting in energy waste and reducing the production efficiency of the transformer.

[0005] Therefore, there is an urgent need for a method for determining the vacuum pumping time of a transformer and a vacuum pumping device to solve the above-mentioned problems existing in the prior art. Summary of the invention

[0006] The purpose of the present invention is to provide a method and a vacuum pumping device for determining the vacuum pumping time of a transformer, so as to reduce the vacuum pumping time as much as possible while ensuring that the moisture content of the insulating parts of the transformer body after the vacuum pumping meets the design requirements, thereby reducing energy consumption and improving production efficiency while ensuring the electrical insulation performance and life of the transformer.

[0007] To achieve this object, the present invention adopts the following technical solutions:

[0008] In a first aspect, a method for determining the vacuum pumping time of a transformer is provided. The transformer includes a shell and a body disposed in the shell. The body is provided with N insulating members, where N is a positive integer. The method includes:

[0009] Obtaining a correspondence between the exposure time and the vacuuming time of the insulating component, wherein the correspondence is obtained when the insulating component is in a preset environment when exposed, and the temperature change of the insulating component satisfies a preset condition, wherein the preset environment includes an ambient temperature that satisfies a first preset temperature and an ambient humidity that satisfies a preset humidity, and the preset condition includes a temperature change rate of the insulating component that satisfies a preset temperature change rate or a temperature of the insulating component that satisfies a second preset temperature under a preset vacuum degree; wherein the exposure time is the time taken for the insulating component to be dried until the inside of the shell is vacuumed to meet a preset vacuum degree, and the vacuuming time is the time taken from the inside of the shell being vacuumed to meet a preset vacuum degree to the moisture content of the insulating component being less than or equal to a moisture content threshold;

[0010] Determine the exposure time of the transformer body to be evacuated under the preset environment;

[0011] The evacuation time of the transformer to be evacuated is determined according to the exposure time of the transformer body to be evacuated under the preset environment and the corresponding relationship.

[0012] As an optional solution of the method for determining the vacuuming time of the transformer provided by the present invention, the obtaining of the correspondence between the exposure time of the insulating component and the vacuuming time includes:

[0013] Controlling the insulating component to be in the preset environment and the temperature change of the insulating component to meet the preset condition;

[0014] Evacuating the environment where the insulating member is located to a preset vacuum degree;

[0015] Determining the exposure time of the insulating member;

[0016] When the duration for which the environment of the insulating member meets the preset vacuum degree reaches a first preset duration, testing the moisture content of the insulating member;

[0017] If the moisture content of the insulating member is less than or equal to the moisture content threshold, the first preset time duration is determined as the vacuuming time duration;

[0018] The corresponding relationship is determined according to the exposure time and the vacuuming time.

[0019] As an optional solution of the method for determining the vacuum pumping time of the transformer provided by the present invention, if the moisture content of the insulating component is greater than the moisture content threshold, the moisture content of the insulating component is tested again at every second preset time interval;

[0020] When the moisture content of the insulating member is less than or equal to a moisture content threshold, the sum of the first preset time period and each of the second preset time periods is determined as the vacuuming time period.

[0021] As an optional solution of the method for determining the vacuum pumping time of a transformer provided by the present invention, the method is applied to a vacuum chamber assembly, the vacuum chamber assembly includes a sealed shell and M sealed toolings sequentially connected to the sealed shell, M is a positive integer less than or equal to N, the insulating member is placed in the sealed tooling, and the body is placed in the sealed shell;

[0022] The step of evacuating the environment where the insulating member is located to a preset vacuum degree includes:

[0023] Controlling the M enclosed toolings to be connected to the enclosed shell;

[0024] The sealed housing and the sealed tooling are evacuated to a preset vacuum degree;

[0025] If the moisture content of the insulating component is greater than the moisture content threshold, testing the moisture content of the insulating component again at intervals of a second preset time length includes:

[0026] At intervals of the second preset time, disconnecting a first sealed tool, wherein the first sealed tool is the one farthest from the sealed shell among the M sealed tools connected to the sealed shell;

[0027] The moisture content of the insulating component in the first sealed tool is tested.

[0028] As an optional solution of the method for determining the vacuuming time of the transformer provided by the present invention, the obtaining of the correspondence between the exposure time of the insulating component and the vacuuming time includes:

[0029] Controlling the insulating component to be in the preset environment and the temperature change of the insulating component to meet the preset condition;

[0030] The environment in which the insulating component is located is evacuated to a preset vacuum degree, and the dew point of the gas in the environment is obtained;

[0031] Determining the exposure time of the insulating member;

[0032] According to the gas dew point and the corresponding relationship between the gas dew point and the moisture content of the insulating component, obtaining the moisture content of the insulating component;

[0033] The duration from when the environment of the insulating component meets the preset vacuum degree to when the moisture content of the insulating component is less than or equal to the moisture content threshold is determined as the vacuuming duration;

[0034] The corresponding relationship is determined according to the exposure time and the vacuuming time.

[0035] In a second aspect, a method for determining the vacuum pumping time of a transformer is provided, wherein the transformer comprises a shell and a body disposed in the shell, wherein N insulating members are disposed on the body, wherein N is a positive integer, and the method comprises:

[0036] Obtaining a corresponding relationship between the initial moisture content of the insulating member and the vacuuming time; wherein the initial moisture content is the moisture content of the insulating member after the device body is placed in the shell and before the shell is vacuumed, and the vacuuming time is the time from when the shell is vacuumed to meet a preset vacuum degree to when the moisture content of the insulating member is less than or equal to a moisture content threshold;

[0037] Determine the initial moisture content of the insulating parts on the transformer to be evacuated;

[0038] The vacuuming time of the transformer to be vacuumed is determined according to the initial moisture content of the insulating parts on the body of the transformer to be vacuumed and the corresponding relationship.

[0039] As an optional solution of the method for determining the vacuuming time of a transformer provided by the present invention, the obtaining of the corresponding relationship between the initial moisture content of the insulating component and the vacuuming time includes:

[0040] Obtaining the initial moisture content of the insulating member;

[0041] Evacuating the environment where the insulating member is located to a preset vacuum degree;

[0042] When the duration for which the environment of the insulating member meets the preset vacuum degree reaches a third preset duration, testing the moisture content of the insulating member;

[0043] If the moisture content of the insulating member is less than or equal to the moisture content threshold, the third preset time duration is determined as the vacuuming time duration;

[0044] The corresponding relationship is determined according to the initial moisture content and the vacuuming time.

[0045] As an optional solution of the method for determining the duration of transformer vacuuming provided by the present invention, if the moisture content of the insulating component is greater than the moisture content threshold, the moisture content of the insulating component is tested again at every fourth preset duration;

[0046] When the moisture content of the insulating member is less than or equal to the moisture content threshold, the sum of the third preset time period and each of the fourth preset time periods is determined as the vacuuming time period.

[0047] In a third aspect, a vacuum pumping device is provided, for implementing the method for determining the vacuum pumping time of a transformer as described above, wherein the vacuum pumping device comprises M closed tooling, a vacuum pumping device, a first vacuum pipeline and a closed shell, wherein M is a positive integer;

[0048] The vacuum pumping device is connected to the sealed housing through a first vacuum pipeline, the sealed housing is connected to the M sealed fixtures in sequence, and each sealed fixture is selectively connected to the sealed housing;

[0049] The enclosed shell is used to place the transformer body, and the enclosed tooling is used to place the insulating parts on the transformer body.

[0050] As an optional solution of the vacuum pumping device provided by the present invention, the sealed tooling includes a tooling container, a cover body, a first connecting pipe, a second connecting pipe and a first valve;

[0051] The first connecting pipe is connected to the first end of the tooling container, the second end of the tooling container is provided with a take-in / put-out port, the cover body is detachably buckled at the take-in / put-out port, the second connecting pipe is connected to the side of the cover body facing away from the tooling container, and the first valve is connected to the end of the first connecting pipe away from the tooling container;

[0052] The vacuum pumping device also includes a second vacuum pipeline, and the first valve of the sealed tooling closest to the sealed shell is connected to the sealed shell through the second vacuum pipeline, and the adjacent sealed tools are connected through the first valve and the second connecting pipe.

[0053] As an optional solution of the vacuum pumping device provided by the present invention, the enclosed tooling further includes a first dry gas source and a third valve, the first dry gas source is connected to the first connecting pipe through the third valve; and / or,

[0054] The enclosed tool further includes a second dry gas source and a fourth valve, and the second dry gas source is connected to the second connecting pipe through the fourth valve.

[0055] According to a fourth aspect, a device for determining the duration of transformer evacuation is provided, comprising a unit for executing the method for determining the duration of transformer evacuation as described above.

[0056] In a fifth aspect, an electronic device is provided, comprising a memory and a processor, wherein the memory stores a computer program executable on the processor, and when the processor executes the program, the method for determining the duration of evacuating a transformer as described above is implemented.

[0057] In a sixth aspect, a readable storage medium is provided, wherein the readable storage medium includes a computer program or instruction. When the computer program or instruction is executed by a device for determining the duration of transformer vacuum pumping, the method for determining the duration of transformer vacuum pumping as described above is implemented.

[0058] Beneficial effects of the present invention:

[0059] The present invention provides a method, device, electronic device and readable storage medium for determining the vacuuming time of a transformer. The vacuuming time of the transformer depends on the degree of moisture of the insulating parts on the transformer body, and the degree of moisture of the insulating parts mainly depends on four factors: ambient temperature, ambient humidity, temperature change of the insulating parts, and the exposure time of the insulating parts. When the insulating parts are exposed, they are in a preset environment (the ambient temperature meets the first preset temperature and the ambient humidity meets the preset humidity), and the temperature change of the insulating parts when exposed meets the preset conditions (the temperature change rate of the insulating parts meets the preset temperature change rate or the temperature of the insulating parts meets the second preset temperature under the preset vacuum degree), the corresponding relationship between the exposure time of the insulating parts and the vacuuming time is obtained, and the corresponding relationship is used as a reference for the actual transformer vacuuming. In the transformer assembly process, when the transformer is vacuumed, the exposure time of the transformer to be vacuumed in the preset environment is first determined, and the exposure time is substituted into the above-mentioned corresponding relationship to determine the vacuuming time required for the transformer to be vacuumed. The degree of moisture of the insulation parts of different transformers is different. This method determines the vacuuming time of the transformer according to the four factors that affect the moisture degree of the insulation parts. It can determine the vacuuming time according to the specific moisture degree of the insulation parts of the transformer. On the premise of ensuring that the moisture content of the insulation parts of the transformer body after vacuuming meets the design requirements, the vacuuming time can be reduced as much as possible. While ensuring the electrical insulation performance and life of the transformer, it can also reduce energy consumption and improve production efficiency.

[0060] The present invention also provides another method, device, electronic device and readable storage medium for determining the vacuuming time of a transformer. By obtaining the corresponding relationship between the initial moisture content of the insulating parts and the vacuuming time, the corresponding vacuuming time of the insulating parts under different initial moisture contents can be obtained. During actual vacuuming, the initial moisture content of the insulating parts of the bodies of different transformers is different. Substituting the initial moisture content of the insulating parts of the body of the transformer to be vacuumed into the above corresponding relationship (the corresponding relationship between the initial moisture content of the insulating parts and the vacuuming time), the vacuuming time of the transformer to be vacuumed can be determined. This method also determines the vacuuming time according to the specific degree of moisture of the transformer insulating parts. On the premise of ensuring that the moisture content of the body insulating parts of the transformer after vacuuming meets the design requirements, the vacuuming time can be reduced as much as possible, and energy consumption can be reduced while ensuring the electrical insulation performance and life of the transformer, thereby improving production efficiency.

[0061] The present invention also provides a vacuum pumping device, which adopts the above method for determining the vacuum pumping time of the transformer. When determining the corresponding relationship, the body of the device with the insulating parts can be placed in the vacuum chamber assembly, and the vacuum pumping device is connected to the vacuum chamber assembly to evacuate the inside of the vacuum chamber assembly, so that the environment of the insulating parts on the body meets the preset vacuum degree. When the moisture content of the insulating parts in the vacuum chamber assembly is less than or equal to the moisture content threshold, the vacuum pumping time can be determined. Through the vacuum pumping device, multiple groups of vacuum pumping time data can be accumulated and tested, which is convenient for obtaining the corresponding relationship between the exposure time of the insulating parts and the vacuum pumping time, or obtaining the corresponding relationship between the initial moisture content of the insulating parts and the vacuum pumping time. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments of the present invention are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the drawings without creative work.

[0063] Figure 1 is a first flow chart of a method for determining a transformer vacuum pumping time length provided in a first embodiment of the present invention;

[0064] Figure 2 is a second flow chart of the method for determining the duration of transformer vacuuming provided in the first embodiment of the present invention;

[0065] Figure 3 It is a structural schematic diagram of a vacuum pumping device provided in a specific embodiment of the present invention;

[0066] Figure 4 is a schematic structural diagram of a test insulating member provided in a specific embodiment of the present invention;

[0067] Figure 5 It is a schematic diagram of the connection of multiple closed toolings provided in a specific embodiment of the present invention;

[0068] Figure 6 It is a structural schematic diagram of a closed tooling provided in a specific embodiment of the present invention;

[0069] Figure 7 is a flow chart of a method for determining the duration of transformer vacuuming provided by Embodiment 2 of the present invention;

[0070] Figure 8 is a first flow chart of a method for determining the duration of transformer vacuuming provided by Embodiment 3 of the present invention;

[0071] Fig. 9 This is the second flow chart of the method for determining the vacuum pumping time of a transformer provided in the third embodiment of the present invention.

[0072] In the figure:

[0073] 1. Sealed tooling; 2. Vacuuming equipment; 3. First vacuum pipeline; 4. Sealed shell; 5. Second vacuum pipeline; 6. Fifth valve; 7. Sixth valve;

[0074] 11. tooling container; 12. cover body; 13. first connecting pipe; 14. second connecting pipe; 15. first valve; 16. second valve; 17. third valve; 18. fourth valve; 19. sealing member; 110. pipe joint;

[0075] 111, accommodating chamber; 112, first flange; 131, second flange; 141, third flange; 142, fourth flange;

[0076] 10. Test insulation parts; 101. Punch holes. DETAILED DESCRIPTION

[0077] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0078] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0079] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0080] In the description of this embodiment, the terms "upper", "lower", "left", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operate in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0081] In this embodiment, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects before and after are in an "or" relationship.

[0082] In the embodiments of the present invention, the same reference numerals denote the same components, and for the sake of brevity, detailed descriptions of the same components are omitted in different embodiments.

[0083] Embodiment 1

[0084] The transformer includes a shell and a body arranged in the shell. The body includes a high-voltage winding, a low-voltage winding, an iron core and an insulating member. The high-voltage winding is sleeved outside the low-voltage winding, and the low-voltage winding is sleeved outside the iron core. Insulating members are arranged between the low-voltage winding and the iron core, between the low-voltage winding and the high-voltage winding, on the side of the high-voltage winding facing away from the low-voltage winding, on the two end faces of the high-voltage winding along the axial direction, and on the two end faces of the low-voltage winding along the axial direction.

[0085] The production process of the transformer includes: drying the body of the transformer in a drying furnace, removing the body of the transformer from the drying furnace after drying, arranging the body of the transformer removed from the drying furnace in an open environment, placing the arranged body of the transformer into a transformer shell, and evacuating the inside of the shell.

[0086] From the time the transformer body is removed from the drying furnace until the inside of the shell is evacuated, the transformer body is exposed to the air for a period of 4 to 12 hours, which causes the insulation parts on the body to become damp. The purpose of the vacuum treatment is to use the pressure difference to remove the moisture in the insulation parts of the body so that the moisture content of the insulation parts of the body meets the design requirements.

[0087] like Figure 1 As shown, it is a flow chart of the method for determining the vacuum pumping time of the transformer provided in this embodiment. The method for determining the vacuum pumping time of the transformer includes:

[0088] S1. Obtain the correspondence between the duration of the insulation being exposed to air and the duration of the vacuuming. The correspondence is obtained when the insulation is exposed to air and is in a preset environment, and the temperature change of the insulation meets a preset condition. The preset environment includes an environment temperature that meets a first preset temperature and an environment humidity that meets a preset humidity, and the preset condition includes a temperature change rate of the insulation that meets a preset temperature change rate or a temperature of the insulation that meets a second preset temperature under a preset vacuum degree.

[0089] Specifically, the above correspondence can be obtained under the preset conditions that when the insulating member is exposed to air, the ambient temperature satisfies the first preset temperature, and the ambient humidity satisfies the preset humidity, and the temperature change rate of the insulating member when exposed to air satisfies the preset temperature change rate. Exemplarily, the first preset temperature is 25°C, the preset humidity is 50%, and the preset temperature change rate is 5°C / h, that is, the temperature change of the insulating member is 5°C per hour.

[0090] Alternatively, the above correspondence can also be obtained under the preset conditions that when the insulating member is exposed to air, the ambient temperature satisfies the first preset temperature, and the ambient humidity satisfies the preset humidity, and the temperature of the insulating member satisfies the second preset temperature under the preset vacuum degree. For example, the first preset temperature is 20°C, the preset humidity is 50%, and the second preset temperature is 50°C to 60°C.

[0091] The exposure time is the time from when the insulating part is dried to when the inside of the shell is evacuated to meet the preset vacuum degree, and the vacuuming time is the time from when the inside of the shell is evacuated to meet the preset vacuum degree to when the moisture content of the insulating part is less than or equal to the moisture content threshold. The moisture content threshold is 0.5% for example.

[0092] S2. Determine the time that the body of the transformer to be evacuated is exposed to air under a preset environment.

[0093] For example, during the actual transformer assembly stage, timing starts when the transformer body is removed from the drying furnace and stops when the interior of the shell is evacuated to a preset vacuum degree, thereby obtaining the exposure time of the insulating parts of the transformer body to be evacuated.

[0094] S3. Determine the vacuuming time of the transformer to be vacuumed according to the exposure time of the transformer body to be vacuumed under a preset environment and the corresponding relationship.

[0095] Specifically, if it is determined in step S3 that the vacuum evacuation time of the transformer to be evacuated is 16 hours, after the shell is evacuated to meet the preset vacuum degree, the vacuum degree in the shell needs to be maintained at the preset vacuum degree for 16 hours, so that the moisture content of the insulating parts on the transformer body can be less than or equal to the moisture content threshold.

[0096] Exemplarily, the above-mentioned preset vacuum degree is less than or equal to 133 Pa. For example, the preset vacuum degree is 133 Pa, that is, the pressure corresponding to 1 mm of mercury. Usually, when the vacuum degree reaches 133 Pa, it is considered that the vacuum degree in the shell meets the standard. Of course, in other embodiments, the preset vacuum degree can also be 60 Pa, 70 Pa, 80 Pa, etc., which can be set according to needs.

[0097] The length of time it takes to evacuate a transformer depends on the degree of moisture on the insulating parts on the transformer body, and the degree of moisture on the insulating parts mainly depends on four factors: ambient temperature, ambient humidity, temperature change of the insulating parts, and the length of time the insulating parts are exposed to air. When the insulating parts are exposed to air, they are in a preset environment (the ambient temperature meets the first preset temperature and the ambient humidity meets the preset humidity), and the temperature change of the insulating parts when exposed to air meets the preset conditions (the temperature change rate of the insulating parts meets the preset temperature change rate or the temperature of the insulating parts meets the second preset temperature under the preset vacuum degree), the corresponding relationship between the length of time the insulating parts are exposed to air and the length of time of evacuation is obtained, and this corresponding relationship is used as a reference when the actual transformer is evacuated to air. In the transformer assembly process, when evacuating the transformer, first determine the length of time the transformer to be evacuated is exposed to air in the preset environment, and substitute the length of time exposed to air into the above-mentioned corresponding relationship to determine the length of time the transformer to be evacuated is required to evacuate to air. The degree of moisture of the insulation parts of different transformers is different. This method determines the vacuuming time of the transformer according to the four factors that affect the moisture degree of the insulation parts. It can determine the vacuuming time according to the specific moisture degree of the insulation parts of the transformer. On the premise of ensuring that the moisture content of the insulation parts of the transformer body after vacuuming meets the design requirements, the vacuuming time can be reduced as much as possible. While ensuring the electrical insulation performance and life of the transformer, it can also reduce energy consumption and improve production efficiency.

[0098] In step S1, the correspondence between the exposure time and the vacuum pumping time of the transformer is obtained by performing multiple tests and accumulating multiple sets of test data of the exposure time and the vacuum pumping time of the transformer, each set of test data including the exposure time and the corresponding vacuum pumping time. Exemplarily, the corresponding relationship between the exposure time and the vacuum pumping time of the transformer can be obtained by inputting the obtained multiple sets of test data into a computing device.

[0099] Specifically, obtaining the correspondence between the exposure time of the insulating component and the vacuum evacuation time of the transformer includes:

[0100] S11, controlling the insulating component to be in a preset environment, and the temperature change of the insulating component to meet a preset condition.

[0101] Specifically, the test process can be carried out in a factory. In a factory environment, the three factors of ambient temperature, ambient humidity, and temperature change of insulating parts are all controllable. When controlling the ambient humidity, the relative humidity of the environment is controlled, which is easier to control and has a high accuracy rate.

[0102] In order to meet the above-mentioned preset environment and preset conditions, the ambient temperature in the factory can be controlled to meet the first preset temperature, the ambient humidity in the factory can be controlled to meet the preset humidity, and the temperature change rate of the insulating member when exposed to air can be controlled to meet the preset temperature change rate. Alternatively, in order to meet the above-mentioned preset environment and preset conditions, the ambient temperature in the factory can be controlled to meet the first preset temperature, the ambient humidity in the factory can be controlled to meet the preset humidity, and the temperature of the insulating member under the preset vacuum degree can be controlled to meet the second preset temperature.

[0103] For example, the factory is provided with air conditioning equipment for controlling the ambient temperature and dehumidification and humidification equipment for controlling the ambient humidity. The ambient temperature and ambient humidity to be achieved in the factory can be set on the air conditioning equipment and the dehumidification and humidification equipment.

[0104] Optionally, the method for controlling the temperature change rate of the insulating component when it is exposed to air includes: controlling the temperature of the area where the insulating component on the controller is located when it is exposed to air, and controlling the insulating component to avoid cold airflow from fans or mobile air conditioners in the factory.

[0105] Optionally, the method of controlling the temperature of the insulating part under a preset vacuum degree to meet a second preset temperature includes: controlling the temperature of the area where the insulating part on the controller is exposed to air (the greater the difference between the temperature of the area where the insulating part is exposed to air and the temperature of the device body, the faster the temperature drops), the length of time the insulating part on the controller is exposed to air, etc. (the longer the insulating part is exposed to air, the more the temperature drops).

[0106] S12. Evacuate the environment where the insulating component is located to meet the preset vacuum degree.

[0107] Specifically, the environment where the insulating member is located can be evacuated by a vacuum device to meet a preset vacuum degree. The preset vacuum degree is exemplarily less than or equal to 133 Pa. Evacuating the environment where the insulating member is located can simulate the state of the insulating member on the body of an actual transformer during the vacuum process.

[0108] S13. Determine the exposure time of the insulating parts.

[0109] Specifically, before the environment where the insulating component is located is evacuated, the insulating component is exposed to an open air environment to simulate the moisture condition of the insulating component on the body of an actual transformer.

[0110] Specifically, when the insulating component is initially in an exposed environment, it is the start timing point of the exposed time of the insulating component, and the time T1 at this time is recorded. When the environment where the insulating component is located is evacuated to meet the preset vacuum degree, it is the end timing point of the exposed time of the insulating component, and the time T2 at this time is recorded. Thus, it can be determined that the exposed time of the insulating component is the time from time T1 to time T2.

[0111] S14. When the duration of the environment in which the insulating component is located meeting the preset vacuum degree reaches a first preset duration t1, the moisture content of the insulating component is tested.

[0112] The first preset time t1 is less than the specified vacuum time of the transformer. The specified vacuum time of the transformer is the vacuum time specified in the specifications of the power industry, which is an empirical value. For example, the specified vacuum time of a transformer of a certain voltage level is greater than or equal to 24 hours. The first preset time t1 is 70% to 85% of the specified vacuum time. For example, when the specified vacuum time is 24 hours, the first preset time t1 is 19 hours or 20 hours.

[0113] In step S14, by testing the moisture content of the insulating component, it can be determined whether the moisture content of the insulating component under the preset vacuum environment meets the requirement, and further whether the vacuuming time meets the requirement.

[0114] S15. If the moisture content of the insulating part is less than or equal to the moisture content threshold, the first preset time t1 is determined as the vacuuming time; if the moisture content of the insulating part is greater than the moisture content threshold, the moisture content of the insulating part is tested again at intervals of the second preset time t2; when the moisture content of the insulating part is less than or equal to the moisture content threshold, the sum of the first preset time t1 and each second preset time t2 is determined as the vacuuming time.

[0115] Exemplarily, the moisture content threshold is 0.5%. In step S15, if the moisture content of the tested insulating part is less than or equal to 0.5%, it means that the moisture content of the insulating part in the preset vacuum environment at this time meets the requirements, and the first preset time t1 can be determined as the vacuuming time. In step S15, if the moisture content of the tested insulating part is greater than 0.5%, it means that the moisture content of the insulating part in the preset vacuum environment at this time does not meet the requirements. In this case, the moisture content of the insulating part is tested again after a second preset time t2. If the moisture content of the tested insulating part still does not meet the requirement of less than or equal to 0.5%, the moisture content of the insulating part is tested again after a second preset time t2, and the test is repeated until the moisture content of the tested insulating part is less than or equal to 0.5%. At this time, the vacuuming time is determined as the sum of the first preset time t1 and all the second preset time t2s.

[0116] Exemplarily, t2 may be 0.5 hour, 1 hour, etc.

[0117] S16, determining a corresponding relationship according to the exposure time and the vacuuming time.

[0118] After repeating the test for many times, multiple groups of test data can be obtained, each group of test data includes the exposure time of the insulating part and the vacuuming time obtained in this test; the corresponding relationship between the exposure time and the vacuuming time can be determined based on the multiple groups of test data.

[0119] Exemplarily, in a set of tests, the first preset temperature is 20°C, the preset humidity is 50%, and the preset temperature change rate is 5°C / h. That is, the preset environment at this time is: the ambient temperature meets 20°C, and the ambient humidity meets 50%. The preset condition is that the temperature change rate when the insulating part is exposed to the air meets 5°C / h. During the test, the ambient temperature is controlled at 20°C, the ambient humidity is controlled at 50%, and the temperature change rate when the insulating part is exposed to the air is controlled at 5°C / h. Conducting multiple tests under the preset environment and preset conditions can obtain multiple sets of exposure time and vacuuming time, and obtain the corresponding relationship between the exposure time and the vacuuming time according to the multiple sets of data obtained, for example, draw a curve of the exposure time and the vacuuming time. What is finally obtained is the "corresponding relationship between the exposure time and the vacuuming time" under the condition of "the ambient temperature is 20°C, the ambient humidity is 50%, and the temperature change rate when the insulating part is exposed to the air is 5°C / h".

[0120] When the actual transformer is arranged and vacuumed in the factory, the ambient temperature is controlled at 20°C, the ambient humidity is controlled at 50%, and the temperature change rate of the insulating parts on the body when exposed is controlled at 5°C / h. After obtaining the exposure time of the insulating parts of the transformer body, the vacuuming time of the transformer can be determined by substituting it into the "corresponding relationship between exposure time and vacuuming time". The transformer is vacuumed according to the vacuuming time, so that the moisture content of the insulating parts on the transformer body can be reduced to less than or equal to the moisture content threshold.

[0121] For example, in another set of tests, the first preset temperature is 25°C, the preset humidity is 45%, and the preset temperature change rate is 7°C / h. The preset environment at this time is: the ambient temperature meets 25°C, and the ambient humidity meets 45%. The preset condition is that the temperature change rate when the insulating part is exposed to the air meets 7°C / h. After multiple tests, the "corresponding relationship between the exposed time and the vacuum time" can be obtained under the condition of "the ambient temperature is 25°C, the ambient humidity is 45%, and the temperature change rate when the insulating part is exposed to the air is 7°C / h".

[0122] When the actual transformer is arranged and vacuumed in the factory, the ambient temperature is controlled at 25°C, the ambient humidity is controlled at 45%, and the temperature change rate of the insulating parts on the body when exposed to air is controlled at 7°C / h. After obtaining the exposure time of the insulating parts of the transformer body, the vacuuming time of the transformer can be determined by substituting it into the "corresponding relationship between exposure time and vacuuming time". The transformer is vacuumed according to the vacuuming time, so that the moisture content of the insulating parts on the transformer body can be reduced to less than or equal to the moisture content threshold.

[0123] Multiple batches of tests can be conducted, and in each group of tests, the first preset temperature, preset humidity, and preset temperature change rate are different, so as to obtain the "corresponding relationship between the exposure time and the vacuuming time" under various conditions. For different regions, the ambient temperature and ambient humidity control of the factory are different. When assembling the transformer in practice, the ambient temperature, ambient humidity, and the temperature change rate of the insulating parts when exposed to air are controlled as needed, and the exposure time of the insulating parts of the transformer body is substituted into a corresponding relationship to obtain the vacuuming time.

[0124] Of course, the step of controlling the temperature change rate of the insulating member when exposed to air to meet the preset temperature change rate can be replaced by: controlling the temperature of the insulating member under the preset vacuum degree to meet the second preset temperature. The second preset temperature can be considered as the final dampening temperature of the insulating member. After the environment where the insulating member is located is evacuated to meet the preset vacuum degree, the insulating member will no longer absorb water and get damp. In other words, after the insulating member reaches the final dampening temperature, it is considered that it will no longer absorb water and get damp.

[0125] Exemplarily, in a set of tests, the first preset temperature is 20°C, the preset humidity is 50%, and the preset insulation temperature is 50°C to 60°C. That is, the preset environment at this time is: the ambient temperature meets 20°C, and the ambient humidity meets 50%. The preset condition is that the temperature of the insulation under the preset vacuum degree meets 50°C to 60°C. During the test, the ambient temperature is controlled at 20°C, the ambient humidity is controlled at 50%, and the temperature of the insulation under the preset vacuum degree is controlled within the range of 50°C to 60°C. Conducting multiple tests under the preset environment and preset conditions can obtain multiple sets of exposure time and vacuuming time, and obtain the corresponding relationship between the exposure time and the vacuuming time according to the multiple sets of data obtained, for example, draw a curve of the exposure time and the vacuuming time. What is finally obtained is the "corresponding relationship between the exposure time and the vacuuming time" under the condition of "the ambient temperature is 20°C, the ambient humidity is 50%, and the temperature of the insulation under the preset vacuum degree is within the range of 5°C to 10°C".

[0126] When the actual transformer is arranged and vacuumed in the factory, the ambient temperature is controlled at 20°C, the ambient humidity is controlled at 50%, and the temperature of the insulating parts under the preset vacuum degree is controlled within the range of 5°C to 10°C. After obtaining the exposure time of the insulating parts of the transformer body, the vacuuming time of the transformer can be determined by substituting it into the "corresponding relationship between exposure time and vacuuming time". The transformer is vacuumed according to the vacuuming time, so that the moisture content of the insulating parts on the transformer body can be reduced to less than or equal to the moisture content threshold.

[0127] Similarly, multiple groups of tests can be conducted, and in each group of tests, the first preset temperature, the preset humidity, and the second preset temperature are different, so as to obtain the "corresponding relationship between the exposure time and the vacuuming time" under various conditions. When assembling the transformer in practice, the ambient temperature, ambient humidity, and the temperature of the insulating parts under the preset vacuum degree are controlled as needed, and the exposure time of the insulating parts of the transformer body is substituted into a corresponding relationship to obtain the vacuuming time.

[0128] The above method for determining the vacuum pumping time of the transformer uses a vacuum pumping device. Figure 3 , which is a schematic diagram of the structure of the vacuum pumping device provided in this embodiment, and the vacuum pumping device is used to carry out multiple tests. Specifically, the vacuum pumping device includes a vacuum pumping device 2 and a vacuum chamber assembly. The vacuum pumping device is selectively connected to the vacuum chamber assembly. The vacuum chamber assembly is used to place the body and the insulating member, and the vacuum pumping device is used to evacuate the vacuum chamber assembly.

[0129] When determining the corresponding relationship, the device body with the insulating parts can be placed in the vacuum chamber assembly, and the vacuum pumping device can be connected to the vacuum chamber assembly to evacuate the inside of the vacuum chamber assembly, so that the environment of the insulating parts on the device body meets the preset vacuum degree. When the moisture content of the insulating parts in the vacuum chamber assembly is less than or equal to the moisture content threshold, the vacuum pumping time can be determined. The vacuum pumping device can be used to accumulate and test multiple groups of vacuum pumping time data, which is convenient for obtaining the corresponding relationship between the exposure time of the insulating parts and the vacuum pumping time, or obtaining the corresponding relationship between the initial moisture content of the insulating parts and the vacuum pumping time.

[0130] like Figure 3 As shown, the vacuum chamber assembly includes a sealed shell 4 and M sealed fixtures 1 connected to the sealed shell in sequence. And the M sealed fixtures 1 are arranged in sequence along the X direction. During the test, N insulating parts are arranged on the body, N is a positive integer, and M is a positive integer less than or equal to N. The vacuum pumping equipment 2 is connected to the sealed shell 4 through the first vacuum pipeline 3, and each sealed fixture 1 is selectively connected to the sealed shell 4. The sealed shell 4 is used to place the body of the transformer, and the sealed fixture 1 is used to place the insulating parts.

[0131] In step S12, the environment where the insulating member is located is evacuated to meet a preset vacuum degree, including:

[0132] S121, controlling M sealed toolings 1 to be connected to the sealed shell 4.

[0133] In step S121, after the M sealed fixtures 1 are connected to the sealed shell 4, the device body placed in the sealed shell 4 and the insulating member placed in the sealed fixture 1 can be placed under the same air pressure.

[0134] S122, evacuate the sealed shell 4 and the sealed tooling 1 to a preset vacuum degree, so that the environment where the insulating component is located is evacuated to a preset vacuum degree.

[0135] When the multiple sealed fixtures 1 are connected to the sealed shell 4, the sealed shell 4 and the multiple sealed fixtures 1 can be evacuated by the vacuum device 2, so that the sealed shell 4 and the sealed fixtures 1 are all in a vacuum environment. Optionally, the first vacuum pipeline 3 is a hose, which is more convenient to connect.

[0136] In step S15, if the moisture content of the insulating component is greater than the moisture content threshold, the moisture content of the insulating component is tested again after each second preset time interval, including:

[0137] S151 . Disconnect the first sealed fixture at every second preset time t2 . The first sealed fixture is the one farthest from the sealed shell 4 among the M sealed fixtures 1 connected to the sealed shell 4 .

[0138] S152. Test the moisture content of the insulating parts in the first closed tooling.

[0139] Specifically, in step S15, when the moisture content of the tested insulating member is greater than the moisture content threshold value after the preset vacuum degree is maintained for a first preset time t1, it indicates that the vacuuming time is too short and the moisture content of the insulating member cannot meet the requirement. Figure 3 , after the second preset time t2, disconnect the sealed tool 1 farthest from the sealed shell 4, the sealed shell 4 and the rest of the sealed tool 1 still maintain the preset vacuum degree, and test the moisture content of the insulating parts in the sealed tool 1. If the moisture content of the insulating parts in the sealed tool 1 satisfies less than or equal to 0.5%, the vacuuming time is determined to be the sum of the first preset time t1 and a second preset time t2. For example, the first preset time t1 is 20 hours, and the second preset time t2 is 1 hour. At this time, the vacuuming time is determined to be 21 hours. If the moisture content of the insulating parts in the sealed tool 1 is greater than 0.5%, continue to disconnect the next sealed tool 1 and test the moisture content of the insulating parts in the sealed tool 1. If the moisture content of the insulating parts measured at this time satisfies less than or equal to 0.5%, the vacuuming time is determined to be the sum of the first preset time t1 and the two second preset time t2. For example, the first preset time t1 is 20 hours, and the second preset time t2 is 1 hour. At this time, the vacuuming time is determined to be 22 hours.

[0140] See also Figure 3 , the sealed housing 4 is connected to three sealed fixtures 1, that is, M is 3. In step S15, the sealed fixture 1 farthest from the sealed housing 4, that is, the first sealed fixture 1 along the X direction, is first disconnected. When it is determined that the moisture content of the insulating parts in the sealed fixture 1 is greater than the moisture content threshold of 0.5%, the second sealed fixture 1 along the X direction is disconnected after a second preset time t2, and the moisture content of the insulating parts is tested. Since the first sealed fixture 1 along the X direction has been disconnected, the second sealed fixture 1 along the X direction is the sealed fixture 1 farthest from the sealed housing 4.

[0141] If the insulating parts on the transformer are removed, the operation is difficult. Optionally, the N insulating parts on the transformer may include the insulating parts on the transformer and the test insulating parts 10 (see Figure 4 ). A test insulating part 10 may be prepared and arranged on the body of the device, so as to be removed from the body of the device and placed in the closed tooling 1. The insulating part on the body of the device is defined as a self-insulating part. When the test insulating part 10 is arranged on the body of the device, the total number of the self-insulating part and the test insulating part 10 is N. In other embodiments, the test insulating part 10 may not be arranged, and the moisture content of the self-insulating part of the body of the device may be tested. In this case, the N insulating parts of the body of the device are all self-insulating parts.

[0142] When the test insulating member 10 is set on the body, the closed tool 1 is used to place the test insulating member 10 on the body. Figure 4 The test insulating member 10 shown is used to simulate the insulating member on the body, and its material is consistent with the material of the insulating member on the body, so that the moisture absorption speed and drying speed of the test insulating member 10 are almost consistent with the moisture absorption speed and drying speed of the insulating member on the body.

[0143] Specifically, before the sealed housing 4 and the sealed tooling 1 are evacuated to meet the preset vacuum degree, a pretreatment stage is also included. The pretreatment stage specifically includes:

[0144] S01, prepare a device body and several test insulating parts 10 for testing. Several test insulating parts 10 are placed on the device body, and the several test insulating parts 10 are placed in a drying furnace together with the device body for drying, and are moved out of the drying furnace together and the device body is arranged in a preset environment, and the several test insulating parts 10 are placed in a sealed housing 4 together with the arranged device body. The preset environment at this time refers to the above description, which will not be repeated here.

[0145] Combination Figure 4 The test insulating member 10 is provided with a through hole 101, and a cloth strip can be used to tie the test insulating member 10 to the device body through the through hole 101. Several test insulating members 10 are dispersed on the device body, and the test insulating members 10 can be arranged more densely at positions that are more susceptible to moisture, so that the moisture level of the test insulating member 10 is as consistent as possible with that of the insulating member of the device body.

[0146] Several test insulating parts 10 are put into and out of the drying furnace together with the device body, and are arranged together with the device body and placed in the closed shell 4, so that the test insulating parts 10 and the insulating parts on the device body are in the same open air environment and have approximately the same moisture degree.

[0147] The drying furnace is exemplified by a kerosene vapor phase drying furnace commonly used in the transformer body drying process.

[0148] Furthermore, the time when the test insulating parts 10 and the device body are removed from the drying oven together is the start timing point of the exposure time of the insulating parts on the device body. At this time, the timing module can be controlled to start timing.

[0149] The number of test insulating members 10 can be set according to the test requirements, and can be 10 to 30, for example, 12, 18, 20, etc. The test insulating member 10 is a 3 mm thick insulating heat-resistant paperboard, and its material is consistent with the material of the insulating member on the body. The 3 mm thick insulating heat-resistant paperboard can more realistically simulate the degree of moisture of the insulating member on the body. If it is too thin, it will be quite different from the moisture of the insulating member on the body. If it is too thick, it will lead to waste of materials.

[0150] S02, connecting the sealed shell 4 and a plurality of sealed fixtures 1; before evacuating the vacuum, removing a plurality of test insulating parts 10 from the device body and placing them in a plurality of sealed fixtures 1 respectively.

[0151] In step S02, the sealed housing 4 and the plurality of sealed fixtures 1 are connected, and the sealed housing 4 needs to be connected to the vacuum pump 2 via the first vacuum pipeline 3. After the sealed housing 4 and the plurality of sealed fixtures 1 are connected, each sealed fixture 1 has a state of being connected to the sealed housing 4 and a state of being disconnected from the sealed housing 4.

[0152] In step S02, a plurality of test insulating components 10 are removed from the device body using dry tools (such as dry clips) to prevent the operator's hands from directly touching the test insulating components 10, thereby increasing the degree of moisture in the test insulating components 10 and improving the accuracy of the test results. A test insulating component 10 is placed in each closed tool 1.

[0153] After the pretreatment stage is completed, the sealed housing 4 is controlled to be connected with the M sealed toolings 1, and the sealed housing 4 is evacuated to a preset vacuum degree and then maintained for a first preset time t1. When the vacuuming device 2 evacuates the sealed housing 4 to a preset vacuum degree, it is the end timing point of the exposure time of the insulating part. At this time, the timing module can be controlled to stop timing and obtain the exposure time of the insulating part on the body. The time interval between the end timing point and the start timing point in step S01 is the exposure time of the insulating part.

[0154] For the temperature change of the test insulating part 10, its temperature change rate when exposed to air can be controlled to meet a preset change rate, or, when the internal environment of the sealed shell 4 reaches a preset vacuum degree, the temperature of the test insulating part 10 needs to meet a second preset temperature. Specifically, the method of controlling the temperature change rate of the insulating part when exposed to air includes: controlling the temperature of the finishing area of ​​the control body, and controlling the body to avoid the cold air flow of the fan or mobile air conditioner in the factory. The method of controlling the temperature of the insulating part under a preset vacuum degree to meet the second preset temperature includes: controlling the temperature of the finishing area of ​​the control body (the greater the difference between the temperature of the finishing area and the temperature of the body, the faster the temperature drops), controlling the length of time the body is exposed to air, etc. (the longer the body is exposed to air, the more the temperature drops).

[0155] After the first preset time t1, the connection between the sealed tool 1 farthest from the sealed shell 4 and the sealed shell 4 is disconnected, and the test insulating member 10 in the sealed tool 1 is taken out to measure the moisture content of the test insulating member 10.

[0156] When the connection between the sealed tool 1 and the sealed shell 4 is disconnected, the remaining sealed tool 1 remains connected to the sealed shell 4, and the vacuum pumping device 2 continues to vacuumize. After the sealed tool 1 is disconnected from the sealed shell 4, it will not affect the continued vacuuming of the sealed shell 4 and the remaining sealed tool 1.

[0157] When taking out the test insulating part 10 in the sealed tool 1, dry tools (such as dry clamps) can be used to take out the test insulating part 10 to prevent the test insulating part 10 from absorbing moisture and water during the taking-out process, thereby improving the accuracy of the test result.

[0158] If it is determined that the moisture content of the test insulating part 10 in the first closed tool 1 that is disconnected is greater than the moisture content threshold value of 0.5%, then one closed tool 1 is disassembled along the X direction at every second preset time t2, and the moisture content of the test insulating part 10 in the closed tool 1 is tested until the moisture content of the tested test insulating part 10 satisfies the moisture content threshold value of 0.5%. Then, the vacuuming can be stopped and the vacuuming time can be determined.

[0159] Specifically, the second preset time length t2 is the time interval between two disconnections of the connection between the sealed tool 1 and the sealed housing 4. Exemplarily, t2 may be 0.5 hours, 1 hour, and the like.

[0160] The vacuuming time can be calculated by the formula t1+(n-1)t2; wherein n is the number of disconnections of the closed tooling 1, and n is a positive integer greater than or equal to 1.

[0161] For example, t1 is 20 hours, and the sealed tool 1 is disconnected 3 times in total (n is 3), that is, the test insulating member 10 is taken out and the moisture content is tested three times in total. t2 is 1 hour. The vacuuming time is equal to 20+(3-1)×1=22 hours.

[0162] After repeated tests, multiple sets of test data were obtained, each set of test data including the exposure time and vacuum time. For example, in one set of data, the exposure time of the device body was 12 hours, and the vacuum time was 22 hours; in another set of data, the exposure time of the device body was 11 hours, and the vacuum time was 21 hours. The corresponding relationship between the exposure time and the vacuum time can be obtained through multiple sets of data.

[0163] Exemplarily, at least 20 tests are conducted to obtain the correspondence between the exposure time and the vacuuming time under the condition that "the ambient temperature is at the first preset temperature, the ambient humidity is at the preset humidity, and the temperature change rate of the insulating member when exposed to air is at the preset temperature change rate". Furthermore, the number of tests is not less than 100 times, so that the obtained correspondence is more accurate and reliable, and has a higher reference significance. It can be understood that the more tests are conducted, the more accurate the correspondence between the exposure time and the vacuuming time (such as a curve graph) is.

[0164] like Figure 5 and Figure 6As shown, the sealed tool 1 includes a tool container 11, and a receiving chamber 111 is defined in the tool container 11, and the receiving chamber 111 is used to place the test insulating member 10. The tool container 11 is provided with an openable cover 12, and after opening the cover 12, the test insulating member 10 in the tool container 11 can be taken out to perform a moisture content test.

[0165] See also Figure 3 and Figure 5 , M sealed fixtures 1 are connected in sequence along the X direction, and the M sealed fixtures 1 gradually approach the sealed shell 4 along the X direction. That is, the X direction is the arrangement direction of the multiple sealed fixtures 1, and the X direction points to the sealed shell 4. The end of the fixture container 11 close to the sealed shell 4 is defined as the first end of the fixture container 11, and the end of the fixture container 11 away from the sealed shell 4 is defined as the second end of the fixture container 11. The first end of the fixture container 11 is provided with a first valve 15, and the first valve 15 is used to control the connection and disconnection between the fixture container 11 and the sealed shell 4.

[0166] The first end of the tooling container 11 closest to the sealed shell 4 is connected to the sealed shell 4 through the first valve 15 ; the first ends of the remaining tooling containers 11 are connected to the second ends of the adjacent tooling containers 11 through the first valve 15 .

[0167] Furthermore, the vacuum pumping device further includes a second vacuum pipeline 5. The first valve 15 of the tooling container 11 closest to the closed shell 4 is connected to the closed shell 4 through the second vacuum pipeline 5, which is exemplarily a hose for easier connection.

[0168] In step S121, all the first valves 15 are controlled to open, so that the multiple sealed tools 1 are connected to the sealed shell 4. At this time, vacuum is drawn through the vacuum pumping device 2, so that the sealed shell 4 and the sealed tools 1 are both in a vacuum environment.

[0169] In step S151, when the first sealed tool 1 is disconnected, Figure 5 , control the first valve 15 at the first end of the outermost tooling container 11 to close, and open the cover 12; if the moisture content of the test insulating member 10 in the first closed tooling 1 that is disconnected is greater than the moisture content threshold, then control the first valves 15 at the first ends of multiple tooling containers 11 to close one by one along the X direction, and open the cover 12, and the time interval between two adjacent closings of the first valve 15 is the second preset time length t2.

[0170] After the vacuum degree in the sealed shell 4 and multiple sealed fabs 1 is maintained at the preset vacuum degree for the first preset time t1, the first valve 15 at the first end of the outermost fab container 11 is first controlled to be closed to disconnect the fab container 11 from the other fab containers 11 and the sealed shell 4, and the cover 12 of the fab container 11 is opened to take out the internal test insulating part 10 to test the moisture content. If the moisture content measured at this time is less than or equal to 0.5%, there is no need to remove the cover 12 of the next sealed fab 1. That is, at this time, the number of disconnections n of the sealed fab 1 is 1, and only the cover 12 of the outermost fab container 11 is removed to take out the test insulating part 10 for moisture content testing. The outermost fab container 11 is the fab container 11 of the sealed fab 1 farthest from the sealed shell 4. If the moisture content of the test insulating part 10 in the outermost tooling container 11 is higher than 0.5%, the next adjacent closed tooling 1 (the second closed tooling 1) is disassembled along the X direction. Specifically, during disassembly, the first valve 15 at the first end of the second tooling container 11 is controlled to be closed to disconnect the connection between the tooling container 11 and the remaining tooling containers 11 and the closed shell 4. After that, the cover 12 is opened to take out the test insulating part 10 in the tooling container 11 for moisture content measurement. If the moisture content is less than or equal to 0.5%, there is no need to disassemble the cover 12 of the next closed tooling 1. That is, the number of disconnections n of the closed tooling 1 is 2 at this time. If the moisture content is higher than 0.5%, the third closed tooling 1 is disassembled along the X direction until the moisture content of the test insulating part 10 taken out from the inside is less than or equal to 0.5%.

[0171] It should be noted that the time interval between two disconnections of the first valve 15 is the second preset time length t2.

[0172] In other embodiments, the M sealed fixtures 1 do not have to be arranged in a sequentially connected manner, but multiple sealed fixtures 1 are arranged at intervals along the circumference of the sealed shell 4, and each sealed fixture 1 is connected to the sealed shell 4 through the first valve 15. After the vacuum degree in the sealed shell 4 and the multiple sealed fixtures 1 is maintained at a preset vacuum degree for a first preset time t1, the first valve 15 of any fixture container 11 can be disconnected, and the internal test insulating part 10 can be taken out after disassembling the cover body 12 to test the moisture content. If the number of disconnections n of the sealed fixture 1 is greater than or equal to 2, the disconnection order of the first valve 15 on the fixture container 11 is not limited, and any first valve 15 can be disconnected. It is only necessary to ensure that the time interval between the disconnection of two adjacent first valves 15 is t2.

[0173] See also Figure 5 The second end of the outermost tooling container 11 is provided with a second valve 16 to ensure the sealing of the second end of the tooling container 11. Of course, the second end of the outermost tooling container 11 may not be provided with the second valve 16, and may be directly sealed.

[0174] See also Figure 5 and Figure 6 The sealed tooling 1 also includes a first connecting pipe 13, a second connecting pipe 14 and a sealing member 19. The first connecting pipe 13 is connected to the first end of the tooling container 11. The second end of the tooling container 11 is provided with a take-in and put-out port, and the cover body 12 is detachably buckled at the take-in and put-out port. Specifically, a first flange 112 is circumferentially provided at the second end of the tooling container 11, and the cover body 12 is in contact with the first flange 112 and connected by bolts. The sealing member 19 is clamped between the first flange 112 and the cover body 12 to ensure the airtightness between the cover body 12 and the tooling container 11 and avoid gas leakage during vacuuming. The second connecting pipe 14 is connected to the side of the cover body 12 facing away from the tooling container 11, and the first valve 15 is connected to the end of the first connecting pipe 13 away from the tooling container 11.

[0175] Further, the first connecting pipe 13 is welded to the first end of the tooling container 11, and a second flange 131 is provided at one end of the first connecting pipe 13 away from the tooling container 11, and the second flange 131 is used to be bolted to the flange structure on the first valve 15. A third flange 141 is provided at one end of the second connecting pipe 14, and a fourth flange 142 is provided at the other end. The third flange 141 is connected to the cover body 12 by screws or welding, and the fourth valve 18 is connected to the flange structure of the first valve 15 of the adjacent tooling container 11, for example, by bolts.

[0176] The first valve 15 is illustratively a butterfly valve, which is convenient for electrical control, and the butterfly valve itself has a flange structure, which is easy to achieve fixed connection with the first connecting pipe 13 and the second connecting pipe 14 .

[0177] In some embodiments, after controlling the first valve 15 to close and before opening the cover 12, the method further includes:

[0178] Dry gas is filled into the tooling container 11 to destroy the vacuum environment in the tooling container 11, so as to prevent the cover body 12 from being difficult to open under the negative pressure, thereby improving the convenience of removing the cover body 12.

[0179] Specifically, see Figure 5 The sealed tool 1 further includes a first dry gas source, a third valve 17, a second dry gas source and a fourth valve 18. The first dry gas source is connected to the first connecting pipe 13 through the third valve 17. The second dry gas source is connected to the second connecting pipe 14 through the fourth valve 18. In step S140, by opening the third valve 17 and / or the fourth valve 18, the first dry gas source can be made to pass dry gas into the tool container 11 through the first connecting pipe 13 and / or the second dry gas source can be made to pass dry gas into the tool container 11 through the second connecting pipe 14, so as to destroy the vacuum environment in the tool container 11.

[0180] Exemplarily, when dry gas is filled into the tooling container 11 to make the pressure in the tooling container 11 consistent with the external air pressure, the third valve 17 and / or the fourth valve 18 can be closed. Further, the third valve 17 and / or the fourth valve 18 are ball valves.

[0181] In this embodiment, a third valve 17 is provided on the first connecting pipe 13, and a fourth valve 18 is provided on the second connecting pipe 14, and the structures of the third valve 17 and the fourth valve 18 are consistent, so there is no need to distinguish between the first connecting pipe 13 and the second connecting pipe 14 when manufacturing them, and there is no need to distinguish between them during subsequent transportation and storage, thereby reducing the difficulty of production.

[0182] Exemplarily, the first dry gas source and / or the second dry gas source is a dry air generator or a dry nitrogen bottle.

[0183] Optionally, at least three test insulating parts 10 are arranged in each closed tool 1. In step S152, the moisture content of at least two test insulating parts 10 is measured and the average value is taken to obtain the moisture content mean; and it is determined whether the moisture content mean is less than or equal to the moisture content threshold. By measuring the moisture content of at least two test insulating parts 10 and taking the average value, the moisture content measurement result is more accurate and reliable. In addition, it is not necessary to measure the moisture content of all the test insulating parts 10 in the tooling container 11. On the one hand, it saves costs and improves test efficiency. On the other hand, the untested test insulating parts 10 can be used as spare test parts for retesting. For example, three test insulating parts 10 are arranged in each closed tool 1. In step S14, the moisture content of two of the test insulating parts 10 is measured and the average value is taken. When the difference in moisture content between the two tested test insulating parts 10 is large, it means that one of the test insulating parts 10 may be contaminated, resulting in excessive moisture content. At this time, the third test insulating part 10 can be retested, and the average value of the moisture content of the two test insulating parts 10 with the smallest difference can be taken.

[0184] Exemplarily, the test insulating component 10 is placed in a halogen moisture meter to detect its moisture content.

[0185] Optionally, after taking out the test insulating member 10 in the sealed tool 1 and before measuring the moisture content of the test insulating member 10, the following steps are further included:

[0186] The removed test insulating member 10 is placed in a vacuum environment and sealed. Sealing the removed test insulating member 10 in a vacuum environment can prevent the test insulating member 10 from being contaminated by moisture or water, and ensure that the moisture content of the test insulating member 10 will not change due to contamination during the process from when the test insulating member 10 is removed to when the moisture content test is completed, thereby improving the test accuracy.

[0187] The method for sealing the removed test insulating part 10 in a vacuum environment includes: 1) immediately placing the removed test insulating part 10 in a ziplock bag for sealing; 2) immediately placing the removed test insulating part 10 in a vacuum bag for vacuuming to isolate the test insulating part 10 from the air in the shortest time.

[0188] Optionally, step S02 of the preprocessing stage specifically includes:

[0189] S021, connecting multiple sealed tools 1 in sequence and then evacuating the vacuum to test the vacuum leakage rate after the multiple sealed tools 1 are connected. When the vacuum leakage rate after the multiple sealed tools 1 are connected is less than a first leakage rate threshold, execute step S022.

[0190] By testing the vacuum leakage rate after multiple sealed frocks 1 are connected, it is possible to detect whether there are leakage points after multiple sealed frocks 1 are connected, so as to avoid affecting the results of the vacuum test. Specifically, the vacuum pumping equipment 2 can be connected to multiple sealed frocks 1, and the vacuum pumping is stopped after the vacuum is pumped to meet the preset vacuum degree (exemplarily 133pa). After a period of time (for example, 0.5h), the vacuum degree in the sealed frock 1 is detected, and the vacuum leakage rate during this period of time is calculated. If the calculated vacuum leakage rate is less than the first leakage rate threshold, step S132 is executed. If the calculated vacuum leakage rate is greater than the first leakage rate threshold, it is necessary to check the leakage point until the vacuum leakage rate meets the standard. The leakage point may appear at the connection between the cover body 12 and the frock container 11, the connection of the first valve 15, and other positions.

[0191] Exemplarily, the first leakage rate threshold is 2000 Pa·L / s.

[0192] Specifically, the number of sealed fixtures 1 to be set is determined by the operator based on experience. For example, if the specified vacuuming time is 24 hours, the actual vacuuming time is estimated to be between 22 hours and 26 hours based on experience; t2 is 1 hour, and based on experience, 6 sealed fixtures 1 can be prepared in series. Three test insulating parts 10 are placed in each sealed fixture 1, and a total of 18 test insulating parts 10 need to be prepared.

[0193] S022. Remove several test insulating parts 10 from the device body and place them in a plurality of closed toolings 1 respectively.

[0194] S023. After connecting multiple sealed tooling 1 to the sealed shell 4, vacuum is drawn to test the vacuum leakage rate after the multiple sealed tooling 1 is connected to the sealed shell 4. Only when the vacuum leakage rate after the multiple sealed tooling 1 is connected to the sealed shell 4 is less than the second leakage rate threshold, the M sealed tooling 1 can be controlled to be connected to the sealed shell 4.

[0195] Specifically, the sealed shell 4 and multiple sealed fixtures 1 are evacuated by the vacuum pumping device 2, and the vacuum pumping is stopped after the preset vacuum degree (exemplarily 133 Pa) is met. After a period of time (for example, 0.5 h), the vacuum degree in the sealed shell 4 or the sealed fixture 1 is detected, and the vacuum leakage rate during this period of time is calculated. If the calculated vacuum leakage rate is less than the second leakage rate threshold, step S14 can be executed. If the calculated vacuum leakage rate is greater than the second leakage rate threshold, it is necessary to check the leakage point until the vacuum leakage rate meets the standard. The leakage point may appear at the connection between the sealed fixture 1 and the second vacuum pipeline 5, the connection between the sealed shell 4 and the first vacuum pipeline 3 and the second vacuum pipeline 5, and the connection between the vacuum pumping device 2 and the first vacuum pipeline 3.

[0196] Exemplarily, the second leakage rate threshold is 2000 Pa·L / s.

[0197] See also Figure 5 and Figure 6 The tooling container 11 is provided with a pipe joint 110, which is used to connect a vacuum gauge. The vacuum gauge can detect the vacuum degree in the tooling container 11, which is convenient for calculating the vacuum leakage rate.

[0198] Alternatively, see Figure 2 One end of the second vacuum pipeline 5 away from the first valve 15 is connected to the closed shell 4 through the fifth valve 6, one end of the first vacuum pipeline 3 is connected to the vacuum pumping device 2 through the sixth valve 7, and the other end is connected to the closed shell 4 through the sixth valve 7.

[0199] In the vacuuming device provided in this embodiment, the test insulating part 10 is placed in the sealed fixture 1. When the vacuuming device 2 vacuums the sealed shell 4 and multiple sealed fixtures 1, the moisture content of the insulating parts of the body can be obtained by disconnecting the connection between the sealed fixture 1 and the sealed shell 4 and taking out the internal test insulating part 10 to measure the moisture content. The change trend of the moisture content of the insulating parts on the body can be obtained through the test insulating parts 10 in multiple sealed fixtures 1. When the moisture content is less than or equal to the moisture content threshold, the vacuuming is stopped, and the vacuuming time can be determined. The vacuuming device can accumulate multiple sets of test data, which is helpful to obtain the corresponding relationship between the exposure time and the vacuuming time.

[0200] In order to more clearly illustrate the solution of this embodiment, the test process is briefly described by taking a certain 110kV transformer as an example.

[0201] The test process is carried out in the factory, and the air conditioning equipment and dehumidification and humidification equipment in the factory are controlled to make the environment in the factory meet the preset environment, that is, the ambient temperature meets the first preset temperature and the ambient humidity meets the preset humidity. For example, the first preset temperature is 25°C and the ambient humidity is 50%.

[0202] Preprocessing stage:

[0203] Prepare 12 test insulating pieces 10 with a thickness of 3 mm, tie them to the device body used for the test with cloth tape, and put the 12 test insulating pieces 10 into the drying furnace together with the device body for drying. After drying, move them out of the drying furnace together and hang them in the clean room of the factory for device body sorting. After the device body is sorted, the 12 test insulating pieces 10 are placed in the sealed shell 4 together with the sorted device body.

[0204] Connect the sealed housing 4, a plurality of sealed tools 1, the vacuum equipment 2, the first vacuum pipeline 3, and the second vacuum pipeline 5. Exemplarily, four sealed tools 1 are provided.

[0205] Specifically, first, four sealed tools 1 are connected and evacuated to 133 Pa, then the evacuation is stopped and the vacuum leakage rate is tested. If the vacuum leakage rate is greater than or equal to 2000 Pa·L / s, the leakage point is checked until the vacuum leakage rate after multiple sealed tools 1 are connected is less than 2000 Pa·L / s.

[0206] The 12 test insulating pieces 10 are removed from the device body and placed in a plurality of sealed fixtures 1. When removing the test insulating pieces 10 and placing the test insulating pieces 10 in the sealed fixtures 1, it is not allowed to directly touch the test insulating pieces 10 with hands to prevent sweat from seeping into the insulating pieces. For example, the test insulating pieces 10 can be clamped with dry clips. Three test insulating pieces 10 are placed in each sealed fixture 1. At this time, the sealed fixture 1 and the device body are in the same environment.

[0207] The vacuum equipment 2, the first vacuum pipeline 3, the sealed shell 4, the second vacuum pipeline 5 and the four connected sealed tools 1 are connected according to Figure 3 . Control all the first valve 15, the fifth valve 6 and the sixth valve 7 to open, start the vacuum pumping device 2 to vacuumize, and stop vacuuming after vacuuming to 133Pa to test the vacuum leakage rate of the entire vacuum pumping device. If the vacuum leakage rate is greater than or equal to 2000Pa·L / s, check the leakage point until the vacuum leakage rate is less than 2000Pa·L / s to ensure that the entire vacuum pumping device is well sealed.

[0208] After the airtightness of the vacuum pumping device is confirmed, all the first valves 15, the fifth valve 6 and the sixth valve 7 are controlled to open, and the vacuum pumping equipment 2 is started to perform vacuum pumping. The time when the vacuum pumping reaches the preset vacuum degree of 133 Pa is recorded. This time is the starting time point for recording the vacuum pumping duration. After the vacuum degree reaches 133 Pa, continue to vacuum pump through the vacuum pumping equipment 2 to maintain the environment in the sealed shell 4 and the sealed tooling 1 at the preset vacuum degree of 133 Pa. The maintenance time should reach the first preset time t1. The prescribed vacuum pumping time of the 110kV transformer is greater than or equal to 16 hours. In this test, the first preset time t1 is 13 hours. At the same time, when the vacuum pumping reaches the preset vacuum degree of 133 Pa, the exposure time of the insulating parts of the body is recorded. The exposure time is exemplarily 10 hours.

[0209] It should be noted that before evacuating to the preset vacuum degree of 133pa, the ambient temperature, ambient humidity and temperature of the insulating parts when the device body is exposed are recorded every 0.5 hours to control the ambient temperature to maintain at the first preset temperature and the ambient humidity to maintain at the preset humidity, that is, to ensure that the insulating parts are in the preset environment when exposed; and, to control the temperature change rate of the insulating parts when exposed to the preset temperature change rate or to control the temperature of the insulating parts under the preset vacuum degree to meet the second preset temperature, that is, to ensure that the temperature change of the insulating parts meets the preset conditions.

[0210] Exemplarily, the preset temperature change rate is 5°C / h; the second preset temperature is 50°C.

[0211] Along the X direction, the four sealed fixtures 1 are the first sealed fixture 1, the second sealed fixture 1, the third sealed fixture 1, and the fourth sealed fixture 1. Starting from the 13th hour, the first valve 15 of the first sealed fixture 1 is controlled to be closed, and the third valve 17 and / or the fourth valve 18 on the first sealed fixture 1 are opened to allow the first dry gas source and / or the second dry gas source to pass dry gas into the fixture container 11 to break the vacuum. After that, the cover 12 and the fixture container 11 of the first sealed fixture 1 are disassembled to take out the test insulation 10 inside and seal it in a vacuum environment. After sealing, it is sent to the moisture content detection laboratory for moisture content detection.

[0212] Determine that the moisture content test result of the test insulating part 10 in the first closed tool 1 is greater than 0.5%. The value of t2 is 1 hour. Starting from the 14th hour, control the first valve 15 of the second closed tool 1 to close, and open the third valve 17 and / or the fourth valve 18 of the second closed tool 1, so that the first dry gas source and / or the second dry gas source pass dry gas into the tool container 11 to break the vacuum. After that, disassemble the cover 12 and the tool container 11 of the second closed tool 1 to take out the internal test insulating part 10 and seal it in a vacuum environment. After sealing, send it to the moisture content detection laboratory for moisture content detection. The moisture content test result is less than 0.5%, which means that the vacuum removal of the surface moisture of the insulating parts of the transformer meets the process requirements, and the vacuum equipment 2 stops vacuuming.

[0213] It is determined that the vacuum pumping time in this test is equal to 14 hours. According to the experience of the power industry, the vacuum pumping time specified for 110kV transformers is greater than or equal to 16 hours. Through the above method, it can be calculated that the vacuum pumping time is equal to 14 hours to meet the requirements. While ensuring that the insulation parts of the body meet the electrical insulation requirements, it reduces energy consumption and improves production efficiency.

[0214] Repeat the above steps to obtain multiple groups of test data. The corresponding relationship between the exposure time and the vacuuming time when the preset environment and the preset conditions are met is obtained through the multiple groups of test data.

[0215] After sufficient data is accumulated, the closed tool 1 may not be used in the later stage, and the vacuuming time of the actual transformer product can be directly obtained according to the exposure time of the insulating parts of the transformer body and the obtained corresponding relationship, so as to reduce the energy waste caused by excessive vacuuming, or avoid excessive moisture content of the insulating parts due to insufficient vacuuming time, which affects the electrical insulation performance and life of the transformer.

[0216] When assembling a 110kV transformer, the assembly process is carried out in a plant where the ambient temperature and humidity are both controllable. In order to use the above-obtained corresponding relationship, the ambient temperature in the plant is controlled at a first preset temperature of 25°C, and the ambient humidity is controlled at a preset humidity of 50%.

[0217] The assembly process of the 110kV transformer generally includes: placing the body of the transformer in a drying furnace for drying; after the drying time of the body of the transformer meets the requirements, the body of the transformer is removed from the drying furnace; the body of the transformer removed from the drying furnace is exposed to the open air environment of the factory, and the body of the transformer is arranged in the open air environment, and the arrangement of the body of the transformer includes re-tightening the high-voltage winding, the low-voltage winding, adjusting the wrinkled insulating parts, etc.; after the arrangement of the body of the transformer is completed, the body of the transformer is placed in the shell of the 110kV transformer to prepare for the vacuuming process; after the preparation is completed, the inside of the shell of the transformer is vacuumed by vacuuming equipment.

[0218] When the device body is just moved out of the drying furnace and begins to be exposed to the open environment of the factory, this is the starting point for the exposure time of the insulating parts on the device body, and the control timing module starts timing; when the inside of the shell is evacuated to meet the preset vacuum degree, it is the ending point for the exposure time of the insulating parts on the device body, and the control timing module stops timing. The time elapsed from the start timing to the end timing is the exposure time of the insulating parts of the device body of the 110kV transformer.

[0219] After determining the exposure time of the insulating parts of the body of the 110 kV transformer, a corresponding relationship is searched according to the exposure time to determine the vacuuming time corresponding to the exposure time.

[0220] For example, the exposure time of the insulating parts of the 110kV transformer body is 10 hours. According to the corresponding relationship, it is determined that the vacuuming time is 14 hours when the exposure time is 10 hours. Starting from the vacuuming of the shell until the preset vacuum degree is met, the vacuuming is continued for 14 hours, so that the moisture content of the insulating parts on the body can be less than or equal to the moisture content threshold, so that the insulating parts on the body meet the electrical insulation requirements.

[0221] Embodiment 2

[0222] Based on the same inventive concept as that of the first embodiment, the present embodiment provides a method for determining the duration of vacuuming a transformer. In the method, the corresponding relationship between the duration of exposure of the insulating component and the duration of vacuuming is also obtained when the insulating component is in a preset environment when it is exposed, and the temperature change of the insulating component meets the preset conditions. The specific description of the preset environment and preset conditions refers to the first embodiment, which will not be repeated here. In the present embodiment, refer to Figure 7 , obtain the corresponding relationship between the exposure time of the insulating part and the vacuuming time, including:

[0223] S110, controlling the insulating component to be in a preset environment, and the temperature change of the insulating component to meet a preset condition.

[0224] The details of step S110 refer to the first embodiment and will not be described again here.

[0225] S120, evacuate the environment where the insulating component is located to a preset vacuum degree, and obtain the gas dew point in the environment where the insulating component is located.

[0226] Exemplarily, the preset vacuum degree is 133 Pa.

[0227] The gas dew point can be obtained by a dew point meter. Specifically, when the environment where the insulating component is located is evacuated to meet a preset vacuum degree, the gas dew point in the environment can be obtained by the dew point meter.

[0228] S130, determining the exposure time of the insulating component.

[0229] S140, obtaining the moisture content of the insulating component according to the gas dew point and the corresponding relationship between the gas dew point and the moisture content of the insulating component.

[0230] In step S140, specifically, the DL / T 580 recommended standard for the electric power industry records the corresponding relationship between the gas dew point and the moisture content of the insulating parts; "DL" stands for electric power, and "T" stands for recommendation. Substituting the current gas dew point value measured by the dew point meter into the "corresponding relationship between the gas dew point and the moisture content of the insulating parts" recorded in the recommended standard, the moisture content of the insulating parts on the device body can be obtained.

[0231] S150, determining the time from when the environment of the insulating component meets the preset vacuum degree to when the moisture content of the insulating component is less than or equal to the moisture content threshold as the vacuuming time.

[0232] S160, determining a corresponding relationship according to the exposure time and the vacuuming time.

[0233] In this embodiment, the corresponding relationship is obtained through multiple tests. The vacuum device used when obtaining the corresponding relationship may not include the closed tool 1 and the second vacuum pipeline 5 in the first embodiment. The vacuum device only needs to vacuum the closed shell 4. The N insulating parts on the body only include the insulating parts on the body, and no additional test insulating parts 10 are provided.

[0234] The following further describes the process of obtaining the corresponding relationship between the exposure time and the vacuuming time with reference to the vacuuming device of this embodiment. The test process is carried out in a factory, and the air conditioning equipment and dehumidification and humidification equipment in the factory are controlled to make the environment in the factory meet the preset environment, that is, the ambient temperature meets the first preset temperature and the ambient humidity meets the preset humidity. For example, the first preset temperature is 25°C and the ambient humidity is 50%.

[0235] Preprocessing stage:

[0236] Prepare the transformer body for the test, place the transformer body in a drying furnace for drying, and after the drying time is satisfied, remove the transformer body from the drying furnace and perform trimming in an open air environment of the factory, and place the trimmed transformer body into a sealed housing 4. This step completely simulates the trimming process of the transformer body after drying, so that the moisture condition of the insulation part is consistent with the moisture condition of the transformer body during trimming.

[0237] When the device body is just removed from the drying furnace and begins to be exposed to the open air environment of the factory, this is the starting point for the exposure time of the insulating parts on the device body.

[0238] The sealed shell 4 is connected to the vacuum equipment 2 through the first vacuum pipeline 3, and a dew point meter is arranged on the first vacuum pipeline 3. The dew point meter is used to measure the gas dew point in the sealed shell 4, that is, to measure the gas dew point in the environment where the insulating component is located.

[0239] After the pretreatment stage is completed, the vacuuming device 2 is controlled to evacuate the sealed housing 4 to meet the preset vacuum degree, and the vacuum degree in the sealed housing 4 is maintained at the preset vacuum degree. When the vacuum is evacuated to meet the preset vacuum degree, it is the end timing point of the air exposure time of the insulating part. The air exposure time of the insulating part can be determined according to the start timing point of the air exposure time and the end timing point of the air exposure time.

[0240] The current moisture content of the insulating component is determined according to the corresponding relationship between the gas dew point and the moisture content of the insulating component, and the current gas dew point value measured by the dew point meter; the moisture content of the insulating component is the moisture content of the insulating component on the body of the device in the closed shell 4. Specifically, the current gas dew point value measured by the dew point meter is substituted into the "corresponding relationship between the gas dew point and the moisture content of the insulating component", and the moisture content of the insulating component corresponding to the gas dew point can be obtained.

[0241] It is determined whether the moisture content of the insulating component is less than or equal to the moisture content threshold, illustratively, the moisture content threshold is 0.5%. If yes, the vacuuming time is determined, if not, the sealed housing 4 is continuously vacuumed, and the dew point meter is made to continue to measure the gas dew point until the moisture content of the insulating component is less than or equal to the moisture content threshold of 0.5%.

[0242] Specifically, when the sealed housing 4 is evacuated to a preset vacuum degree, it is the start timing point of the evacuation duration, and when the moisture content of the insulating component is inferred to be less than or equal to the moisture content threshold of 0.5% through the gas dew point, it is the end timing point of the evacuation duration. The time from the start timing point to the end timing point is the evacuation duration.

[0243] In the method for determining the transformer evacuation time provided in this embodiment, there is no need to set up the test insulating parts 10 and the closed tooling 1. The moisture content of the insulating parts of the device body in the closed shell 4 is directly calculated by testing the gas dew point with a dew point meter. The measurement is simpler and the data collection frequency is higher.

[0244] The test is repeated many times to obtain multiple groups of test data, each group of test data includes the exposure time and vacuum evacuation time of the insulating parts of the transformer body; the corresponding relationship between the exposure time and the vacuum evacuation time is determined based on the multiple groups of test data. For example, a curve chart of the exposure time and the vacuum evacuation time is drawn based on the multiple groups of test data to provide a reference for the subsequent actual transformer vacuum evacuation.

[0245] Embodiment 3

[0246] This embodiment provides a method for determining the duration of vacuuming a transformer, and the method is implemented using the vacuuming device described in the first embodiment.

[0247] See also Figure 8 In this embodiment, the method for determining the transformer vacuum pumping time includes:

[0248] R1. Obtain the corresponding relationship between the initial moisture content of the insulating component and the vacuuming time.

[0249] Among them, the initial moisture content is the moisture content of the insulating parts after the device body is placed in the shell and before the shell is evacuated, and the vacuuming time is the time from the time the shell is evacuated to meet the preset vacuum degree to the time when the moisture content of the insulating parts is less than or equal to the moisture content threshold.

[0250] In the actual transformer assembly process, large transformers may need to be arranged and vacuumed in an outdoor open-air environment. It is difficult to control the ambient temperature to meet the first preset temperature, difficult to control the ambient humidity to meet the preset humidity, and difficult to control the temperature change of the insulating parts. When obtaining the above correspondence, there is no need to control the ambient temperature, ambient humidity and temperature change of the insulating parts. Only the relationship between the initial moisture content of the insulating parts and the vacuuming time is considered. The obtained correspondence can be applied to transformers assembled in outdoor open-air environments to determine the vacuuming time of the transformer.

[0251] R2. Determine the initial moisture content of the insulating parts on the body of the transformer to be evacuated.

[0252] R3. Determine the vacuuming time of the transformer to be evacuated according to the initial moisture content of the insulating parts on the body of the transformer to be evacuated and the corresponding relationship.

[0253] In this embodiment, by obtaining the corresponding relationship between the initial moisture content of the insulating parts and the vacuuming time, the corresponding vacuuming time of the insulating parts under different initial moisture contents can be obtained. During actual vacuuming, the initial moisture content of the insulating parts of the body of different transformers is different. Substituting the initial moisture content of the insulating parts of the body of the transformer to be vacuumed into the above corresponding relationship (the corresponding relationship between the initial moisture content of the insulating parts and the vacuuming time), the vacuuming time of the transformer to be vacuumed can be determined. This method also determines the vacuuming time according to the specific degree of moisture of the insulating parts of the transformer. On the premise of ensuring that the moisture content of the insulating parts of the body of the transformer after vacuuming meets the design requirements, the vacuuming time can be reduced as much as possible, while ensuring the electrical insulation performance and life of the transformer, it can reduce energy consumption and improve production efficiency.

[0254] like Fig. 9 As shown, specifically, obtaining the corresponding relationship between the initial moisture content and the vacuum pumping time of the transformer includes:

[0255] R11. Obtain the initial moisture content of the insulating component;

[0256] R12. Evacuate the environment where the insulating parts are located to meet the preset vacuum degree;

[0257] R13, when the time duration that the environment of the insulating component meets the preset vacuum degree reaches a third preset time duration t3, testing the moisture content of the insulating component;

[0258] R14. If the moisture content of the insulating part is less than or equal to the moisture content threshold, the third preset time t3 is determined as the vacuuming time; if the moisture content of the insulating part is greater than the moisture content threshold, the moisture content of the insulating part is tested again at every fourth preset time t4; when the moisture content of the insulating part is less than or equal to the moisture content threshold, the sum of the third preset time t3 and each fourth preset time t4 is determined as the vacuuming time.

[0259] Exemplarily, the third preset time t3 is 70% to 85% of the specified vacuuming time, which is the same as the value of the first preset time t1 in Example 1. For example, when the specified vacuuming time is 24 hours, the third preset time t3 is 19 hours or 20 hours. The fourth preset time t4 is 0.5 hours or 1 hour.

[0260] R15. Determine the corresponding relationship based on the initial moisture content and the vacuuming time.

[0261] The above correspondence is obtained through experiments, and steps R12, R13, and R14 refer to the description of steps S12, S14, and S15 in the first embodiment, and the vacuuming device used in the test process is the same as that in the first embodiment. Compared with the first embodiment, before the environment where the insulating part is located is vacuumed to meet the preset vacuum degree, the present embodiment first measures the moisture content on the insulating part, that is, the initial moisture content; and then obtains the vacuuming time through experiments, and the correspondence between the initial moisture content and the vacuuming time can be determined based on multiple groups of test data of the initial moisture content and the vacuuming time.

[0262] The following reference Figure 3 The vacuuming device shown briefly describes the experimental process of obtaining the corresponding relationship between the initial moisture content and the vacuuming time in this embodiment.

[0263] Preprocessing stage:

[0264] Prepare a device body and several test insulating parts 10 for testing. Set several test insulating parts 10 on the device body, put several test insulating parts 10 into the drying furnace together with the device body for drying, move out of the drying furnace together and arrange the device body in an open environment, and put several test insulating parts 10 into the sealed housing 4 together with the arranged device body. The ambient temperature and ambient humidity of the open environment do not need to be controlled.

[0265] The sealed shell 4 and the plurality of sealed fixtures 1 are connected. Before vacuuming, a plurality of test insulating parts 10 are removed from the body of the device, and the initial moisture content of the test insulating parts 10 is measured, and then the plurality of test insulating parts 10 are placed in M ​​sealed fixtures 1 respectively.

[0266] After the pretreatment stage is completed, the sealed housing 4 is controlled to be connected with the M sealed fixtures 1; the sealed housing 4 and the M sealed fixtures 1 are evacuated to meet the preset vacuum degree. Specifically, all the first valves 15, the fifth valves 6 and the sixth valves 7 are controlled to be opened, so that the sealed housing 4 and the M sealed fixtures 1 are all connected; the vacuuming device 2 is started to evacuate until the preset vacuum degree is reached.

[0267] Continue to evacuate the airtight shell 4 and the sealed tool 1 at a preset vacuum degree of 133 Pa through the vacuum pumping device 2, and the duration of maintenance should reach the third preset duration t3. Exemplarily, the third preset duration t3 is 19 hours or 20 hours. When the duration of maintaining the preset vacuum degree in the sealed shell 4 and the sealed tool 1 reaches the third preset duration t3, start to disassemble the cover 12 of the sealed tool 1 farthest from the sealed shell 4 to take out the test insulating part 10 inside and test the moisture content of the test insulating part 10. If the moisture content of the test insulating part 10 satisfies the moisture content threshold value, the vacuuming duration is determined to be the third preset duration t3. If the moisture content of the test insulating part 10 is greater than the moisture content threshold value, a closed tool 1 is disassembled along the X direction at intervals of the fourth preset duration t4 (exemplarily 0.5 hours or 1 hour), and the moisture content of the test insulating part 10 in the closed tool 1 is tested until the moisture content of the tested test insulating part 10 satisfies the moisture content threshold value of 0.5%. The vacuuming can be stopped and the vacuuming duration is determined. The determination of the vacuuming duration refers to Example 1 and will not be repeated here.

[0268] Repeat the test multiple times to obtain multiple groups of test data, each group of test data includes initial moisture content and vacuum pumping time; determine the corresponding relationship between initial moisture content and vacuum pumping time based on the multiple groups of test data. For example, draw a curve chart of initial moisture content and vacuum pumping time.

[0269] After the corresponding relationship is obtained, when the actual transformer is evacuated, it is only necessary to test the initial moisture content of the insulating parts after the transformer body is placed in the shell and before the inside of the shell is evacuated. Substituting the initial moisture content into the corresponding relationship between "initial moisture content and vacuuming time", the vacuuming time required for the transformer can be determined.

[0270] Compared with the first embodiment, the present embodiment only adds a step of measuring the initial moisture content of the test insulating member 10, and in the present embodiment, there is no need to measure the exposure time of the insulating member. The specific implementation process of the remaining steps refers to the first embodiment.

[0271] The test process of the first and second embodiments needs to be carried out in a factory so as to control the three factors of ambient temperature, ambient humidity, and temperature change of the insulating member when exposed to air. Therefore, the first and second embodiments are suitable for transformers that undergo body finishing and vacuuming processes in a factory.

[0272] Different from the first and second embodiments, the method for determining the vacuuming time of the transformer provided in this embodiment is applicable to transformers that are subjected to body finishing and vacuuming processes in an open-air environment. Some large transformers are not suitable for assembly in a factory environment, but are assembled at the installation site, that is, the body finishing and vacuuming processes are carried out in an open-air environment. Since the body finishing time is generally 4 to 12 hours, the time span is large, and it is difficult to control the three factors of ambient temperature, ambient humidity, and temperature changes of the insulating parts when exposed to air.

[0273] By using the method for determining the evacuation time of a transformer provided in this embodiment, when actually evacuating the transformer in an open-air environment, the current initial moisture content of the insulating parts of the evacuated transformer is substituted into the "corresponding relationship between the initial moisture content of the insulating parts and the evacuation time (which can be a curve graph)" to determine the evacuation time required for the transformer. This method also determines the evacuation time based on the specific degree of moisture in the insulating parts of the transformer. On the premise of ensuring that the moisture content of the insulating parts of the transformer body after evacuation meets the design requirements, the evacuation time can be reduced as much as possible, thereby reducing energy consumption and improving production efficiency while ensuring the electrical insulation performance and life of the transformer.

[0274] On the basis of the above, an embodiment of the present application further provides a device for determining the duration of transformer evacuation, the device comprising a unit for executing the method for determining the duration of transformer evacuation as described in any of the above embodiments.

[0275] Specifically, the unit includes an acquisition unit and a processing unit.

[0276] As an achievable method, the acquisition unit is used to acquire the correspondence between the exposure time of the insulating member and the vacuuming time. The processing unit is used to determine the exposure time of the transformer body to be vacuumed in a preset environment, and determine the vacuuming time of the transformer to be vacuumed according to the exposure time of the transformer body to be vacuumed in the preset environment and the correspondence. That is, the acquisition unit and the processing unit can be used to execute the method for determining the vacuuming time of the transformer described in the first and second embodiments.

[0277] As another achievable method, the acquisition unit is used to acquire the correspondence between the initial moisture content of the insulating member and the vacuuming time. The processing unit is used to determine the initial moisture content of the insulating member on the body of the transformer to be vacuumed, and determine the vacuuming time of the transformer to be vacuumed according to the initial moisture content of the insulating member on the body of the transformer to be vacuumed and the correspondence. That is, the acquisition unit and the processing unit can be used to execute the method for determining the vacuuming time of the transformer described in Example 3.

[0278] An embodiment of the present application also provides an electronic device, which includes a memory and a processor, wherein the memory stores a computer program that can be run on the processor, and when the processor executes the program, the method for determining the vacuum pumping time of the transformer as described in any of the above embodiments is implemented.

[0279] The memory can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to the method for determining the duration of transformer vacuuming in the embodiment of the present application. The processor executes the functions of the device for determining the duration of transformer vacuuming and data processing by running the software programs, instructions and modules stored in the memory, that is, realizing the method for determining the duration of transformer vacuuming.

[0280] As an implementable manner, when the computer program stored in the memory is called and executed by the processor, the electronic device performs the following steps:

[0281] Obtaining the corresponding relationship between the exposure time of the insulating part and the vacuum evacuation time;

[0282] Determine the time that the body of the transformer to be evacuated is exposed to air under a preset environment;

[0283] The evacuation time of the transformer to be evacuated is determined according to the exposure time of the transformer body to be evacuated under a preset environment and the corresponding relationship.

[0284] As another achievable manner, when the computer program stored in the memory is called and executed by the processor, the electronic device executes the following steps:

[0285] Obtaining the corresponding relationship between the initial moisture content of the insulating component and the vacuuming time;

[0286] Determine the initial moisture content of the insulating parts on the transformer to be evacuated;

[0287] The vacuuming time of the transformer to be vacuumed is determined according to the initial moisture content of the insulating parts on the body of the transformer to be vacuumed and the corresponding relationship.

[0288] An embodiment of the present application also provides a readable storage medium, which includes a computer program or instruction. When the computer program or instruction is executed by a device for determining the vacuum pumping time of a transformer, the method for determining the vacuum pumping time of a transformer as described in any of the above embodiments is implemented.

[0289] Of course, the computer program or instructions included in the readable storage medium are not limited to the operations in the method for determining the vacuum evacuation time of the transformer as described above, but can also execute the relevant operations in the method for determining the vacuum evacuation time of the transformer provided in the embodiment of the present application, and have corresponding functions and beneficial effects.

[0290] Through the above description of the implementation methods, the technicians in the relevant field can clearly understand that the present invention can be implemented by means of software and necessary general hardware, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as a computer floppy disk, a read-only memory (ROM), a random access memory (RAM), a flash memory (FLASH), a hard disk or an optical disk, etc., which can store program codes, including a number of instructions for a computer device (which can be a robot, a personal computer, a server, or a network device, etc.) to execute the method for determining the vacuum pumping time of a transformer described in each embodiment of the present invention.

[0291] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for determining the vacuum pumping time of a transformer, wherein the transformer comprises a shell and a body disposed in the shell, wherein the body is provided with N insulating members, wherein N is a positive integer, and wherein: The method comprises: Controlling the insulating member to be in a preset environment, and the temperature change of the insulating member to meet a preset condition, wherein the preset environment includes an ambient temperature that meets a first preset temperature and an ambient humidity that meets a preset humidity, and the preset condition includes a temperature change rate of the insulating member that meets a preset temperature change rate or a temperature of the insulating member that meets a second preset temperature under a preset vacuum degree; Evacuating the environment where the insulating member is located to a preset vacuum degree; Determine the exposure time of the insulating part; wherein the exposure time is the time taken from the completion of drying of the insulating part to the vacuuming of the inside of the shell to meet the preset vacuum degree; When the duration for which the environment of the insulating member meets the preset vacuum degree reaches a first preset duration, testing the moisture content of the insulating member; If the moisture content of the insulating member is less than or equal to the moisture content threshold, the first preset time duration is determined as the vacuuming time duration; Determining a corresponding relationship between the exposure time and the vacuuming time of the insulating member according to the exposure time and the vacuuming time; Determine the exposure time of the transformer body to be evacuated under the preset environment; The evacuation time of the transformer to be evacuated is determined according to the exposure time of the transformer body to be evacuated under the preset environment and the corresponding relationship.

2. The method for determining the duration of transformer vacuuming according to claim 1, characterized in that: If the moisture content of the insulating component is greater than the moisture content threshold, the moisture content of the insulating component is tested again at intervals of a second preset time; When the moisture content of the insulating member is less than or equal to the moisture content threshold, the sum of the first preset time period and each of the second preset time periods is determined as the vacuuming time period.

3. The method for determining the duration of transformer vacuuming according to claim 2, characterized in that: The method is applied to a vacuum chamber assembly, which includes a sealed shell and M sealed fixtures sequentially connected to the sealed shell, wherein M is a positive integer less than or equal to N, the insulating member is placed in the sealed fixture, and the device body is placed in the sealed shell; The step of evacuating the environment where the insulating member is located to a preset vacuum degree includes: Controlling the M enclosed toolings to be connected to the enclosed shell; The sealed housing and the sealed tooling are evacuated to a preset vacuum degree; If the moisture content of the insulating component is greater than the moisture content threshold, testing the moisture content of the insulating component again at intervals of a second preset time length includes: At intervals of the second preset time, disconnecting a first sealed tool, wherein the first sealed tool is the one farthest from the sealed shell among the M sealed tools connected to the sealed shell; The moisture content of the insulating component in the first sealed tool is tested.

4. A method for determining the duration of vacuuming a transformer, wherein the transformer comprises a shell and a body disposed in the shell, wherein the body is provided with N insulating members, wherein N is a positive integer, and wherein: The method comprises: Controlling the insulating member to be in a preset environment, and the temperature change of the insulating member to meet a preset condition, wherein the preset environment includes an ambient temperature that meets a first preset temperature and an ambient humidity that meets a preset humidity, and the preset condition includes a temperature change rate of the insulating member that meets a preset temperature change rate or a temperature of the insulating member that meets a second preset temperature under a preset vacuum degree; The environment in which the insulating component is located is evacuated to a preset vacuum degree, and the dew point of the gas in the environment is obtained; Determine the exposure time of the insulating part; wherein the exposure time is the time taken from the completion of drying of the insulating part to the vacuuming of the inside of the shell to meet the preset vacuum degree; According to the gas dew point and the corresponding relationship between the gas dew point and the moisture content of the insulating component, obtaining the moisture content of the insulating component; The duration from when the environment of the insulating component meets the preset vacuum degree to when the moisture content of the insulating component is less than or equal to the moisture content threshold is determined as the vacuuming duration; Determining a corresponding relationship between the exposure time and the vacuuming time of the insulating member according to the exposure time and the vacuuming time; Determine the exposure time of the transformer body to be evacuated under the preset environment; The evacuation time of the transformer to be evacuated is determined according to the exposure time of the transformer body to be evacuated under the preset environment and the corresponding relationship.

5. A method for determining the duration of vacuuming a transformer, the transformer comprising a shell and a body disposed in the shell, the body being provided with N insulating members, wherein N is a positive integer, characterized in that: The method comprises: Obtaining the initial moisture content of the insulating member, wherein the initial moisture content is the moisture content of the insulating member after the device body is placed in the shell and before the shell is evacuated; Evacuating the environment where the insulating member is located to a preset vacuum degree; When the duration for which the environment of the insulating member meets the preset vacuum degree reaches a third preset duration, testing the moisture content of the insulating member; If the moisture content of the insulating member is less than or equal to the moisture content threshold, the third preset time duration is determined as the vacuuming time duration; Determining a corresponding relationship between the initial moisture content and the vacuuming duration of the insulating member according to the initial moisture content and the vacuuming duration; Determine the initial moisture content of the insulating parts on the transformer to be evacuated; The vacuuming time of the transformer to be vacuumed is determined according to the initial moisture content of the insulating parts on the body of the transformer to be vacuumed and the corresponding relationship.

6. The method for determining the duration of transformer vacuuming according to claim 5, characterized in that: If the moisture content of the insulating component is greater than the moisture content threshold, testing the moisture content of the insulating component again every fourth preset time interval; When the moisture content of the insulating member is less than or equal to the moisture content threshold, the sum of the third preset time period and each of the fourth preset time periods is determined as the vacuuming time period.

7. A vacuum pumping device, characterized in that: Used to implement the method for determining the vacuuming time of a transformer as claimed in any one of claims 1 to 6, the vacuuming device comprising M sealed tooling (1), a vacuuming device (2), a first vacuum pipeline (3) and a sealed shell (4), wherein M is a positive integer; The vacuum pumping device (2) is connected to the sealed shell (4) via a first vacuum pipeline (3); the sealed shell (4) is connected to the M sealed fixtures (1) in sequence, and each sealed fixture (1) is selectively connected to the sealed shell (4); The sealed housing (4) is used to place the transformer body, and the sealed tooling (1) is used to place the insulating parts on the transformer body.

8. The vacuum pumping device according to claim 7, characterized in that: The sealed tool (1) comprises a tool container (11), a cover body (12), a first connecting pipe (13), a second connecting pipe (14) and a first valve (15); The first connecting pipe (13) is connected to a first end of the tooling container (11); a second end of the tooling container (11) is provided with a take-in / take-out opening; the cover (12) is detachably buckled on the take-in / take-out opening; the second connecting pipe (14) is connected to a side of the cover (12) facing away from the tooling container (11); and the first valve (15) is connected to an end of the first connecting pipe (13) away from the tooling container (11); The vacuum pumping device further comprises a second vacuum pipeline (5), wherein the first valve (15) of the sealed tooling (1) closest to the sealed shell (4) is connected to the sealed shell (4) via the second vacuum pipeline (5), and the adjacent sealed tooling (1) is connected via the first valve (15) and the second connecting pipe (14).