A quality detector for production of decorative materials

By designing a quality detector for the production of decorative materials, using solar simulators and detection components to simulate the aging state of composite panels and conducting multiple tests, the existing technology solves the problem of waterproofing and impact resistance testing of composite panels during use. difficult problem, achieving a comprehensive assessment of the quality of composite panels.

CN118533672BActive Publication Date: 2024-10-18SHANDONG HUIFENG NEW MATERIALS CORP LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410993367.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-18
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

The existing composite board detection method can only conduct a single test on the newly produced composite board, and cannot judge its waterproofing effect and strength during use, which has limitations.

Method used

A quality detector for the production of decorative materials is designed, including a fixed frame, a cover and a solar simulator. By simulating sunlight exposure to aging composite panels, combined with water injection and knock tests, multiple times of lighting, water injection and knocks are recorded. Data to detect the waterproofness and impact resistance of composite panels.

Benefits of technology

By simulating the aging state of composite boards under long-term light exposure, the quality of composite boards affected by light during daily use can be effectively judged, including waterproofness and impact resistance, and more accurate detection results can be provided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118533672B_ABST
    Figure CN118533672B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of material detection, and in particular to a quality detector for decorative material production, including a fixing frame and a fixing component, etc.; the fixing frame is connected to the fixing component. The present invention simulates the long-term sun irradiation of a composite board through a solar simulator to simulate the aging state of the composite board under long-term light exposure, and then turns off the solar simulator. Then, the staff will use an external detection device to test the aged composite board by water injection and knocking to determine whether the composite board will have water leakage and damage problems. During the test process, multiple lighting, water injection and knocking are performed to test, and the data are recorded to simulate the quality of the composite board after being affected by light during daily use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of material detection, and in particular to a quality detector for decorative material production. Background Art

[0002] As a kind of indoor building decoration material, wood composite board is often used as the floor and decorative wall panel of the room. After the existing composite board is produced, it is usually necessary to test its waterproof effect and strength. However, the existing testing method only performs a single test on the newly produced composite board, which is unable to judge the waterproof effect and strength of the composite board during the specific use of the composite board, and has certain limitations. Summary of the invention

[0003] In order to overcome the disadvantage that the existing detection method only performs a single test on the composite board just produced and cannot judge the waterproof effect and strength of the composite board during the specific use of the composite board, the present invention provides a quality detector for the production of decorative materials.

[0004] Technical solution: A quality detector for decorative material production, including a fixing frame and a fixing component; the fixing frame is connected to the fixing component; it also includes a cover and a solar simulator; the fixing component is connected to the cover; a plurality of solar simulators are fixedly connected to the inner wall of the cover; and another plurality of solar simulators are fixedly connected to the fixing frame.

[0005] In addition, it is particularly preferred that the fixed component includes an electric slide rail, an electric slider, a first limit plate, a first rubber block, a second limit plate, a first connecting plate, a first electric push rod, a third limit plate and a second rubber block; a plurality of electric slide rails are fixedly connected to the fixed frame; a plurality of electric sliders are slidably connected to each electric slide rail; a plurality of electric sliders at the rear are commonly connected to the first limit plate; a plurality of electric sliders at the front are commonly connected to another first limit plate; each first limit plate is provided with a first through slot; a plurality of push rods are fixedly connected to the first through slot on each first limit plate; A first rubber block is connected; a second limit plate is fixedly connected to the opposite sides of the two first limit plates; a plurality of first connecting plates are fixedly connected to each electric slide rail; a first electric push rod is fixedly connected to each first connecting plate; a third limit plate is fixedly connected to the telescopic ends of a plurality of first electric push rods on the left side; another third limit plate is fixedly connected to the telescopic ends of a plurality of first electric push rods on the right side; the third limit plate is located in a plurality of first through grooves; a second rubber block is fixedly connected to each third limit plate; all the first connecting plates are fixedly connected to the cover shell.

[0006] In addition, it is particularly preferred that the second limiting plate is arranged in a wedge-shaped structure.

[0007] Furthermore, it is particularly preferred that the first rubber block is arranged in an arc-shaped structure.

[0008] In addition, it is particularly preferred that a detection component is also included, which includes a second electric push rod, a second connecting plate, a connecting rod, a nozzle, a first connecting tube, a second connecting tube, a water bag, a first magnet block and a second magnet block; a plurality of second electric push rods are passed through the cover shell; the telescopic ends of all the second electric push rods are commonly fixedly connected to the second connecting plate; a plurality of connecting rods are fixedly connected to the second connecting plate; all the connecting rods are commonly fixedly connected to the nozzle; the nozzle is connected to a plurality of first connecting tubes; the nozzle is connected to a plurality of second connecting tubes; each second connecting tube is connected to a water bag; each water bag is fixedly connected to the first magnet block; a plurality of second magnet blocks are fixedly connected to the second connecting plate; each second magnet block is magnetically attracted to the corresponding first magnet block.

[0009] Furthermore, it is particularly preferred that the nozzles are arranged in a cross-shaped structure.

[0010] Furthermore, it is particularly preferred that an elastic rod is provided on each second connecting pipe.

[0011] In addition, it is particularly preferred that a blocking assembly is also included, which includes a third connecting plate, a winding wheel, a DD motor, an insulating cloth and an electric clamp; the third connecting plate is fixedly connected to the fixed frame; the winding wheel is rotatably connected to the third connecting plate; the DD motor is fixedly connected to the third connecting plate; the output shaft of the DD motor is fixedly connected to the winding wheel; the insulating cloth is wound on the winding wheel; and the electric clamp is fixedly connected to the first limiting plate in the front.

[0012] In addition, it is particularly preferred that a second through slot is formed on the second limiting plate.

[0013] Furthermore, it is particularly preferred that fiber paper is arranged on the insulating cloth.

[0014] Beneficial effects: 1. The present invention simulates the long-term sun irradiation of the composite board through a solar simulator to simulate the aging state of the composite board under long-term light, and then turns off the solar simulator. Then the staff will use the external detection equipment to test the aged composite board by water injection and tapping to determine whether the composite board will leak and break. During the test, multiple illumination, water injection and tapping tests are performed, and the data is recorded to simulate the quality of the composite board after being affected by light during daily use.

[0015] 2. The present invention absorbs water in the nozzle and the water bag through the first connecting tube and the second connecting tube. When the water in the water bag is sucked out, the second connecting tube is restored to a vertical state under the elastic force of the elastic rod, and the second connecting tube drives the water bag to reset, so that the first magnet block and the second magnet block are magnetically attracted together, that is, the waterproofness and impact resistance of the aged composite board after long-term light exposure can be detected in this way;

[0016] 3. The present invention uses the heat of the solar simulator to dry the dripping water droplets, so that water stains appear on the insulating cloth. That is, the water stains on the insulating cloth are used to determine the leakage points at the joints of the composite panels. Then the staff marks the leaking parts of the composite panels according to the water stains on the insulating cloth. Then the staff disassembles the spliced ​​composite panels and further detects the cause of the leakage. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of a quality detector for decorative material production of the present invention;

[0018] Figure 2 It is a schematic diagram of the combined structure of the first limit plate, the first rubber block and the second limit plate of the quality detector for decorative material production of the present invention;

[0019] Figure 3 It is a schematic diagram of the combined structure of the first electric push rod, the third limit plate and the second rubber block of the quality detector for decorative material production of the present invention;

[0020] Figure 4 This is a schematic diagram of the combined structure of a quality detector cover and a solar simulator for production of decorative materials according to the present invention;

[0021] Figure 5 It is a structural schematic diagram of a quality detector detection component for decorative material production of the present invention;

[0022] Figure 6 It is a schematic diagram of the combined structure of the nozzle of the quality detector for decorative material production of the present invention, the first connecting pipe, the second connecting pipe and the water bag;

[0023] Figure 7 for Figure 6 A magnified view of area A in;

[0024] Figure 8 It is a structural schematic diagram of a quality detector blocking assembly for decorative material production of the present invention;

[0025] Fig. 9 It is a schematic structural diagram of the quality detector isolation cloth used in the production of decorative materials of the present invention.

[0026] In the figure: 1-fixed frame, 2-electric slide rail, 3-electric slider, 4-first limit plate, 4a-first through slot, 5-first rubber block, 6-second limit plate, 6a-second through slot, 7-first connecting plate, 8-first electric push rod, 9-third limit plate, 10-second rubber block, 11-cover, 12-solar simulator, 101-second electric push rod, 102-second connecting plate, 103-connecting rod, 104-nozzle, 105-first connecting pipe, 106-second connecting pipe, 106a-elastic rod, 107-water bag, 108-first magnet block, 109-second magnet block, 201-third connecting plate, 202-winding wheel, 203-DD motor, 204-isolating cloth, 205-electric clamp. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] Example 1

[0029] A quality detector for the production of decorative materials, such as Figure 1-4 As shown, it includes a fixing frame 1 and a fixing component; the fixing frame 1 is connected to the fixing component;

[0030] It also includes a cover 11 and a solar simulator 12; the cover 11 is connected to the fixed component; a plurality of solar simulators 12 are fixedly connected to the inner wall of the cover 11; and another plurality of solar simulators 12 are fixedly connected to the fixed frame 1.

[0031] The fixing components include an electric slide rail 2, an electric slider 3, a first limit plate 4, a first rubber block 5, a second limit plate 6, a first connecting plate 7, a first electric push rod 8, a third limit plate 9 and a second rubber block 10; two electric slide rails 2 symmetrically arranged on the left and right are bolted to the fixing frame 1; two electric sliders 3 symmetrically arranged on the front and back are slidably connected to each electric slide rail 2; the two electric sliders 3 at the rear are commonly connected to the first limit plate 4; the two electric sliders 3 at the front are commonly connected to another first limit plate 4; each first limit plate 4 is provided with a first through slot 4a; a fixed connection is provided on the first through slot 4a on each first limit plate 4 A first rubber block 5 is connected; a second limit plate 6 is fixedly connected to the opposite sides of the two first limit plates 4; two first connecting plates 7 symmetrically arranged front and back are fixedly connected to each electric slide rail 2; a first electric push rod 8 is fixedly connected to each first connecting plate 7; the telescopic ends of the two first electric push rods 8 on the left are commonly fixedly connected to a third limit plate 9; the telescopic ends of the two first electric push rods 8 on the right are commonly fixedly connected to another third limit plate 9; the third limit plate 9 is located in the two first through grooves 4a; a second rubber block 10 is fixedly connected to each third limit plate 9; all the first connecting plates 7 are commonly fixedly connected to the cover shell 11.

[0032] The second limiting plate 6 is configured to have a wedge-shaped structure, and is used to cooperate with the compression to fix the composite plate to prevent the composite plate from being deflected.

[0033] The first rubber block 5 is arranged in an arc-shaped structure, so that the composite board can push the first rubber block 5 and the composite board can pass through the first through groove 4a, thereby preventing the first rubber block 5 from blocking the composite board.

[0034] First, the staff installs the quality detector for decorative material production at the position where it is needed, and then the staff splices the four processed composite panels together, and then the staff places the spliced ​​composite panel on the wedge-shaped surfaces of the two second limiting plates 6, and limits the composite panel through the wedge-shaped surfaces of the second limiting plates 6, and at the same time controls the two electric sliders 3 on the corresponding electric slide rails 2 to slide toward each other, and the electric sliders 3 drive the two first limiting plates 4 to move toward each other, and the two first limiting plates 4 drive the two first rubber blocks 5 and the two second limiting plates 6 to move toward each other, at this time, the composite panel will move up relative to the wedge-shaped surfaces of the second limiting plates 6, and the second limiting plates 6 will gradually move to the bottom of the composite panel. At the same time, when the first limiting plates 4 move, the composite panel will pass through the first through groove 4a, and the spliced ​​composite panel will be fixed by the first rubber block 5, and the first rubber block 5 is conducive to ensuring the stability of the composite panel during the detection process, and then the corresponding first electric push rod 8 is controlled to push the corresponding third limiting plate 9, so that the two third limiting plates 9 move toward each other, and then the third limiting plate 9 drives the second rubber block 10 to move toward each other and approach the spliced ​​composite board, further fix the spliced ​​composite board to prevent the spliced ​​composite board from loosening, and then turn on the solar simulator 12, that is, simulate the long-term sunlight exposure to the composite board through the solar simulator 12 to simulate the aging state of the composite board under long-term light exposure, and then turn off the solar simulator 12. Then the staff will use the external detection equipment to test the aged composite board by water injection and tapping to determine whether the composite board will have problems of leakage and damage. During the test, multiple illumination, water injection and tapping tests are carried out, and the data are recorded to simulate the quality of the composite board after being affected by light during daily use. It should be noted that the composite board will be exposed to sunlight during daily use. If only the conventional leakage test and tapping test are performed on the newly produced good composite board, the data obtained are only for waterproofness and impact resistance, and the waterproofness and impact resistance of the composite board during its use cannot be tested.

[0035] Example 2

[0036] On the basis of the above-mentioned embodiment 1, Figure 5-7As shown, the housing 11 also includes a detection component, which includes a second electric push rod 101, a second connecting plate 102, a connecting rod 103, a nozzle 104, a first connecting pipe 105, a second connecting pipe 106, a water bag 107, a first magnet block 108 and a second magnet block 109; four second electric push rods 101 distributed in a rectangular shape are pierced on the housing 11; the telescopic ends of all the second electric push rods 101 are fixedly connected to the second connecting plate 102; the second connecting plate 102 is fixedly connected to four connecting rods Connecting rod 103; all connecting rods 103 are fixedly connected to a nozzle 104; four first connecting tubes 105 are connected to the nozzle 104; a plurality of second connecting tubes 106 are connected to the nozzle 104; each second connecting tube 106 is connected to a water bag 107; each water bag 107 is fixedly connected to a first magnet block 108; a plurality of second magnet blocks 109 are fixedly connected to the second connecting plate 102; each second magnet block 109 is magnetically attracted to the corresponding first magnet block 108.

[0037] The nozzle 104 is arranged in a cross-shaped structure to cover the joints of the composite panels.

[0038] The bottom of the nozzle 104 is provided with a rubber material for closely contacting the composite plate.

[0039] Each second connecting tube 106 is provided with an elastic rod 106a for driving the second connecting tube 106 to reset.

[0040] After being irradiated by the solar simulator 12 for a long time, the staff first uses an external pump to connect with the first connecting pipe 105, and then controls the second electric push rod 101 to push the second connecting plate 102 to move downward, and the second connecting plate 102 drives the components connected thereto to move downward, that is, drives the connecting rod 103, the nozzle 104, the first connecting pipe 105, the second connecting pipe 106, the water bag 107, the first magnet block 108 and the second magnet block 109 to move downward, drives the nozzle 104 to move downward to contact the first rubber block 5, the second limit plate 6 and The composite board is fixed by the second rubber block 10. Since the bottom of the nozzle 104 is made of rubber, the nozzle 104 fits tightly with the composite board, and the nozzle 104 is located at the joint of the composite board. Then the external pump is controlled to run, and water is injected into the nozzle 104 through the first connecting pipe 105. Since the nozzle 104 is located at the joint of the composite board, the waterproof effect of the joint of the composite board is detected in this way, and part of the water in the nozzle 104 flows into the water bag 107 through the second connecting pipe 106. When the water bag 107 is filled with water, the water bag 107 falls downward under the action of gravity, and the water The capsule 107 drives the first magnet block 108 to separate from the second magnet block 109, and the water capsule 107 falls downward and hits the composite board below. In this way, it is simulated whether the waterproof effect of the composite board joint will be affected when the composite board is hit. In this process, the staff observes whether there is water leakage under the composite board. After completing the detection work, the staff controls the external pump to absorb the water in the nozzle 104 and the water capsule 107 through the first connecting pipe 105 and the second connecting pipe 106. When the water in the water capsule 107 is sucked out, under the elastic force of the elastic rod 106a, the water in the water capsule 107 is sucked out. The second connecting tube 106 returns to the vertical state, and the second connecting tube 106 drives the water bag 107 to reset, so that the first magnet block 108 and the second magnet block 109 are magnetically attracted together, that is, the waterproofness and impact resistance of the aged composite board after long-term light exposure are detected in this way. It should be noted that during the use of the composite board, since it adopts a splicing method, the impact test will affect the waterproof effect of the splicing part, and after light aging, it is more likely to be damaged by impact again, that is, the above method is used to concentrate on testing the waterproof effect of the composite board connection.

[0041] Example 3

[0042] Based on the above embodiment 2, Figure 8-9As shown, it also includes a blocking component, which includes a third connecting plate 201, a winding wheel 202, a DD motor 203, an insulating cloth 204 and an electric clamp 205; the third connecting plate 201 is fixedly connected to the fixed frame 1; the winding wheel 202 is rotatably connected to the third connecting plate 201; the DD motor 203 is bolted to the third connecting plate 201; the output shaft of the DD motor 203 is fixedly connected to the winding wheel 202; the insulating cloth 204 is rolled up on the winding wheel 202; the electric clamp 205 is fixedly connected to the first limiting plate 4 in front.

[0043] The second limiting plate 6 is provided with a second through slot 6a for limiting the insulating cloth 204 so as to facilitate the insulating cloth 204 to be in close contact with the composite plate.

[0044] Fiber paper is provided on the isolation cloth 204, so as to better judge the water stains after the water droplets are dried.

[0045] Before using the nozzle 104 for waterproof testing, an external gas injection device is connected to the gas injection port. The staff first controls the DD motor 203 to drive the reel 202 to rotate for unwinding, and then the staff pulls the isolation cloth 204 to make the isolation cloth 204 pass through the corresponding second through slots 6a on the two second limiting plates 6 in sequence, and then places the isolation cloth 204 on the electric clamp 205, and then controls the electric clamp 205 to fix the isolation cloth 204, and then places the spliced ​​composite board on the second limiting plate 6, and then the second rubber block 10 controls the DD motor 203 to drive the reel 202 to rotate and rewind the isolation cloth 204. , so that the insulating cloth 204 is close to the composite board. At this time, the insulating cloth 204 is located between the solar simulator 12 connected to the fixing frame 1 and the composite board. That is, during the waterproof test, when the composite board joint leaks, water will drip on the insulating cloth 204. In this process, the dripping water droplets are dried by the heat of the solar simulator 12, so that water stains appear on the insulating cloth 204. That is, the water stains on the insulating cloth 204 are used to judge the leakage point at the composite board joint. Then the staff marks the leaking part of the composite board according to the water stains on the insulating cloth 204, and then the staff disassembles the spliced ​​composite board and further detects the cause of the composite board leakage.

[0046] It should be understood that this embodiment is only used to illustrate the present invention and is not used to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope limited by the appended claims of the application.

Claims

1. A quality detector for decorative material production, comprising a fixing frame (1) and a fixing component; the fixing frame (1) is connected to the fixing component; and the characteristics are: It also includes a cover (11) and a solar simulator (12); the cover (11) is connected to the fixed component; a plurality of solar simulators (12) are fixedly connected to the inner wall of the cover (11); and another plurality of solar simulators (12) are fixedly connected to the fixing frame (1); The fixed components include an electric slide rail (2), an electric slider (3), a first limit plate (4), a first rubber block (5), a second limit plate (6), a first connecting plate (7), a first electric push rod (8), a third limit plate (9) and a second rubber block (10); a plurality of electric slide rails (2) are fixedly connected to the fixed frame (1); a plurality of electric sliders (3) are slidably connected to each electric slide rail (2); a plurality of electric sliders (3) at the rear are commonly connected to the first limit plate (4); a plurality of electric sliders (3) at the front are commonly connected to another first limit plate (4); each first limit plate (4) is provided with a first through slot (4a); a fixed A first rubber block (5) is connected; the opposite sides of the two first limit plates (4) are fixedly connected to a second limit plate (6); each electric slide rail (2) is fixedly connected to a plurality of first connecting plates (7); each first connecting plate (7) is fixedly connected to a first electric push rod (8); the telescopic ends of the plurality of first electric push rods (8) on the left are fixedly connected to a third limit plate (9); the telescopic ends of the plurality of first electric push rods (8) on the right are fixedly connected to another third limit plate (9); the third limit plate (9) is located in the plurality of first through slots (4a); each third limit plate (9) is fixedly connected to a second rubber block (10); all the first connecting plates (7) are fixedly connected to the cover (11); The invention also includes a detection component, which includes a second electric push rod (101), a second connecting plate (102), a connecting rod (103), a nozzle (104), a first connecting pipe (105), a second connecting pipe (106), a water bag (107), a first magnet block (108) and a second magnet block (109); a plurality of second electric push rods (101) are provided on the cover (11); the telescopic ends of all the second electric push rods (101) are fixedly connected to the second connecting plate (102); a plurality of connecting rods (101) are fixedly connected to the second connecting plate (102); 3); all the connecting rods (103) are fixedly connected to a nozzle (104); the nozzle (104) is connected to a plurality of first connecting tubes (105); the nozzle (104) is connected to a plurality of second connecting tubes (106); each second connecting tube (106) is connected to a water bag (107); each water bag (107) is fixedly connected to a first magnet block (108); the second connecting plate (102) is fixedly connected to a plurality of second magnet blocks (109); each second magnet block (109) is magnetically attracted to the corresponding first magnet block (108).

2. A quality detector for decorative material production according to claim 1, characterized in that: The second limiting plate (6) is provided in a wedge-shaped structure.

3. A quality detector for decorative material production according to claim 2, characterized in that: The first rubber block (5) is arranged in an arc-shaped structure.

4. A quality detector for decorative material production according to claim 1, characterized in that: The nozzle (104) is arranged in a cross-shaped structure.

5. A quality detector for decorative material production according to claim 1, characterized in that: Each second connecting tube (106) is provided with an elastic rod (106a).

6. A quality detector for decorative material production according to claim 5, characterized in that: The invention also includes a blocking component, which includes a third connecting plate (201), a reel (202), a DD motor (203), an insulating cloth (204) and an electric clamp (205); the third connecting plate (201) is fixedly connected to the fixing frame (1); the reel (202) is rotatably connected to the third connecting plate (201); the DD motor (203) is fixedly connected to the third connecting plate (201); the output shaft of the DD motor (203) is fixedly connected to the reel (202); the insulating cloth (204) is reeled on the reel (202); and the electric clamp (205) is fixedly connected to the first limiting plate (4) in the front.

7. A quality detector for decorative material production according to claim 6, characterized in that: A second through slot (6a) is provided on the second limiting plate (6).

8. A quality detector for decorative material production according to claim 7, characterized in that: Fiber paper is provided on the isolation cloth (204).

Citation Information

Patent Citations

  • Device for detecting weather resistance of building decoration material

    CN219842317U