Railway engineering consulting system and consulting method based on BIM and large model
Through the railway engineering consultation system based on BIM and large models, the problems of data integration and intuitiveness in railway construction engineering consultation are solved, intelligent analysis of data and three-dimensional visual query are realized, and consultation efficiency and information utilization are improved.
Patent Information
- Application Number
- CN202411011270.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-26
AI Technical Summary
There are problems in railway construction engineering consulting such as inconsistent data standards, poor data intuitiveness, unstructured data accounting for the majority and difficulty in effective utilization. In particular, due to insufficient application of advanced technologies, semantic association relies on manual interpretation.
A railway engineering consulting system based on BIM and large models is used to achieve data integration and visual display through data collection, integration, technical consultation and process management modules. It uses deep learning algorithms for intelligent analysis and semantic understanding, and combines GIS and BIM technology. Three-dimensional visual query optimizes the query function of unstructured data.
It achieves efficient integration and intuitive expression of data at each stage of railway engineering, improves the intelligent parsing capabilities of unstructured data, improves the fusion and query efficiency of survey and design data, and supports visual collaboration and efficient document retrieval of design-technical consulting collaborative offices. .
Smart Images

Figure CN118536950B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway engineering management, and in particular to a railway full-process engineering consulting system and a consulting method based on BIM and a large model. Background Art
[0002] The railway process engineering consulting model is an innovative management form in which consulting units participate in the whole process of railway construction project management. Through comprehensive, cross-stage, integrated engineering consulting and project management services, it can integrate and integrate consulting work at all stages and solve the problem of fragmented engineering consulting service methods. BIM technology is a new technology that has emerged in the field of computer-aided architectural design in recent years. It establishes a complete and highly centralized information model of construction projects based on various relevant information data of construction projects, thereby improving the informationization and integration of construction projects throughout the entire life cycle of construction project design, construction, operation and maintenance management.
[0003] A large model refers to a deep learning model with a large number of parameters and a large model size. It has achieved remarkable success in many fields, especially in natural language processing, image recognition, and speech recognition. Large models can learn rich feature representations and knowledge, thereby playing a role in semantic understanding, content organization, document generation, etc.
[0004] Railway construction engineering consulting covers project approval, survey and design, construction implementation, and operation and maintenance, focusing on major aspects such as project progress, quality, investment, and safety, and involves information such as survey and design, progress plan, budget and bidding control price, investment completion and project payment, and important technical matters. At present, railway construction engineering consulting has the following problems:
[0005] 1. Data standards at different stages are not unified, making it difficult to integrate applications; 2. Two-dimensional data lacks intuitiveness and is difficult to fully utilize; 3. Unstructured data accounts for more than 80%, and due to insufficient application of advanced technologies, semantic associations rely on manual interpretation. Summary of the invention
[0006] In order to realize the integration and intuitive expression of data at various stages of railway engineering and improve the intelligent analysis of unstructured data, one object of the present invention is to provide a railway engineering consulting system based on BIM and large models; another object of the present invention is to provide a railway engineering consulting method based on BIM and large models.
[0007] To this end, the present invention adopts the following technical solutions:
[0008] A railway engineering consulting system based on BIM and large models includes a data acquisition module, a data integration module, a technical consulting module, a process management module and a system management module, wherein:
[0009] The data acquisition module is used to collect the data required for railway engineering consulting management, collect the management behavior and process documents generated by the technical consulting module, and send them to the data integration module;
[0010] The data integration module is used to classify and store the received data required for railway engineering consulting management, the management behaviors and process documents generated by the technical consulting module according to the data type, build a relational database and a document database, establish a three-dimensional visualization environment integrating BIM and GIS and a knowledge map of management units for railway engineering consulting, realize data integration and visualization, and provide data services for the technical consulting module and process management module;
[0011] The technical consulting module is used to provide the railway survey and design team and the technical consulting team with a design-technical consulting collaborative office function, which generates a large number of management behaviors and process documents customized by users;
[0012] The process management module is used to intelligently parse the process documents in the data integration module, and based on the deep learning algorithm, perform model training according to the customized adjustment of user management behavior to optimize the intelligent query function of the document;
[0013] The system management module is used for user management and authority management, generating user names, passwords, authorities, etc. and passing them to the data acquisition module, which is then integrated into the data integration module. At the same time, through authority verification, it provides services for the customized interface generation of the technical consulting module.
[0014] The data types include structured data and unstructured data. The structured data include Excel tables and relational databases; the unstructured data include documents.
[0015] A method for conducting railway engineering consultation using the railway engineering consultation system comprises the following steps:
[0016] S1, establish a 3D visualization environment: establish a GIS-based 3D geographic scene; convert the GIS drone data of the local area into engineering coordinates, lightweight and component decompose the BIM model, and integrate it into the GIS-based 3D geographic scene;
[0017] S2, establishing a relational database: analyzing the collected data through the data integration module, designing a relational database and selecting a suitable data engine, creating a relational database, tables and table relationships, and importing the collected data into the relational database;
[0018] S3, based on the semantic understanding ability of the big model, extract the semantic information of the survey and design data, generate the ontology and association, and establish the management unit knowledge graph of railway engineering consulting through the data integration module, including the following sub-steps:
[0019] S31, based on the big model, extract the name column of each table in the relational database established in S2, export the table name, column name and their comments in the relational database into a table as the input of the big model, and obtain the name column in a prompt manner;
[0020] S32, input the name column obtained in S31, perform semantic similarity analysis using prompt, align synonyms, and treat each name column as an independent ontology class;
[0021] S33, input the aligned name column, use prompt to perform semantic inclusion association analysis, and obtain the hierarchical association between ontology classes;
[0022] S34, parsing the record values under each name column table by table, eliminating the records without semantics, and performing semantic similarity and semantic inclusion association analysis in the same manner as steps S32 and S33. After elimination, deduplication and semantic alignment, the record is extracted to form an ontology, and an ontology class is assigned to the ontology;
[0023] Wherein, the large model described in step S31 adopts the Baichuan large model;
[0024] S35, on the knowledge graph of the management unit of railway engineering consulting, continue to use the link prediction algorithm to deeply mine the potential associations of the data, and use historical link data and features to train the machine learning model;
[0025] S4, expanding the management unit knowledge graph of the railway engineering consulting through the data integration module: adding a BIM component ontology to the management unit knowledge graph of the railway engineering consulting, and establishing associations between the BIM component ontology and various ontologies in the management unit knowledge graph of the railway engineering consulting, developing a query function based on the management unit knowledge graph of the railway engineering consulting and the BIM component ontology, and realizing railway engineering information query based on the BIM model, including the following sub-steps:
[0026] S41, extracting the BIM component semantic structure tree:
[0027] First, traverse all BIM components, extract the attribute codes of the components and summarize them into a code table;
[0028] Then, the duplicate codes in the code table are removed; each attribute code in the code table after deduplication is traversed in turn, the "Railway Engineering Information Model Data Storage Standard" is checked, and the semantic structure tree of the code is established;
[0029] Finally, the depth-first principle is adopted, and the semantic structure tree with the largest depth value is taken as the benchmark. Each semantic structure tree is traversed in turn, and information gain is performed on the semantic structure tree to form the BIM component semantic structure tree of the project.
[0030] S42, according to the BIM component semantic structure tree obtained in S41, adding the ontology class and ontology class association of the BIM component to the management unit knowledge graph of railway engineering consulting to form a BIM component semantic knowledge structure tree;
[0031] S43, traversing each BIM component one by one, using the component ID as a unique identifier, and adding each component to the corresponding BIM component ontology class;
[0032] S44, establish a mapping between the ontology class of the BIM component and the corresponding ontology class in the management unit knowledge graph of railway engineering consulting established in S3, the mapping is a many-to-many mapping, and add the mapping class ontology and ontology association in the management unit knowledge graph of railway engineering consulting;
[0033] S45, querying the auxiliary information of BIM components based on the management unit knowledge graph of railway engineering consulting;
[0034] S5, user login, verification and interface customization are performed through the system management module: users and permissions are assigned to each participating unit, and the users of each participating unit log in to the system using a user name and password, and permission verification is first performed, and then a customized system interface is intelligently generated for each user;
[0035] S6, design-technical consulting collaborative office through the technical consulting module: railway survey and design team users and technical consulting team users query and retrieve information based on the BIM model in a three-dimensional visualization environment, establish an expert database, set up a consulting process, and realize visual collaboration of design solutions and technical consulting. The system synchronously collects the management behavior customized and adjusted in the process and the process documents generated;
[0036] S7, establishing a document database through the data integration module: receiving documents generated during the visual collaborative work process between the railway survey and design team and the technical consulting team, classifying and storing the documents, and performing multi-label management on each document based on the semantic understanding of the big model and the knowledge graph of the management unit of the railway project;
[0037] S8, intelligent analysis of collaborative office process documents through the process management module: Based on the deep learning algorithm, model training is performed according to the customized adjustment of management behavior, the architecture of collaborative office process document query is optimized, and efficient document retrieval function is provided.
[0038] Wherein, step S1 comprises the following sub-steps:
[0039] S11, the design unit uploads GIS basic geographic data through the data acquisition module, the GIS basic geographic data includes basic terrain and image data, and the basic terrain and image data are modeled through pyramids and detail levels to form a GIS basic three-dimensional geographic scene;
[0040] S12, the construction unit uploads the GIS drone data of the local area through the data acquisition module. The GIS drone data is consistent with the engineering coordinate system of the GIS basic three-dimensional geographic scene formed in S11 after coordinate conversion, and is integrated into the GIS basic three-dimensional geographic scene by layer overlay;
[0041] S13, the design unit uploads the BIM model through the data acquisition module, performs lightweight processing and component decomposition on the BIM model, resets the origin of the decomposed BIM component model and performs coordinate conversion; calculates the posture parameters of each BIM component model according to the linear coordinate system of the railway project, including three-dimensional offset parameters, rotation parameters, and scaling parameters, and integrates them into the basic three-dimensional geographic scene by using layer overlay.
[0042] S14, the design unit uploads the survey and design data through the data acquisition module.
[0043] Step S2 includes the following sub-steps:
[0044] S21, analyzing the structured data, unstructured data, users of each construction party and their permission applications in the technical consulting data and the survey and design data, and analyzing the data source, data format, data structure and data relationship of the user-defined process and historical behavior data in the technical consulting process;
[0045] S22, conduct conceptual design of relational database, abstract data into entities, and identify similar entities in different data sources;
[0046] S23, perform logical design of relational database, use EF framework to convert conceptual model into relational model, determine the structure, field type, primary key and foreign key of data table;
[0047] S24, perform physical design of the relational database, and determine the data storage method, index strategy, and partition strategy based on the data volume and data access requirements;
[0048] S25, select a suitable data engine based on business needs and retrieval performance requirements;
[0049] S26, based on the EF framework, adopts a model-first strategy to automatically create relational databases, tables, and table relationships in programming software;
[0050] S27, importing the data collected by the data collection module into the relational database, and performing query performance and practical processing tests to build the relational database.
[0051] Step S45 includes the following sub-steps:
[0052] 1) The user selects a BIM building in the 3D visualization environment, and the system obtains the component ID and attribute code of the component, forming a tuple of {component ID, attribute code};
[0053] 2) In the knowledge graph of the management unit of railway engineering consulting, query the semantic knowledge structure tree of the BIM component, obtain the semantic knowledge structure tree of the BIM component, and extract the attributes in reverse according to the component decomposition relationship;
[0054] 3) Query the mapping class ontology and ontology association, complete the mapping of the BIM component ontology class to the management unit knowledge graph ontology class of railway engineering consulting, and obtain triples;
[0055] 4) Decompose the triples in step 3) and link them with the component semantic knowledge structure tree in step 2) to form a vector; in the management unit knowledge graph of railway engineering consulting, filter the attributes of the ontology class in each vector in turn and convert the query results into DataTable;
[0056] 5) Dynamically add Table pages in the 3D visualization environment, and embed the multiple DataTables obtained in step 4) into each Table page for dynamic display.
[0057] Step S5 includes the following sub-steps:
[0058] S51, the super administrator with the highest authority of the system uses the account, password, and verification code to log in to the system, enter the user management submodule, and use "Add Personnel" according to the personnel role table provided by the project contact of each participating unit to enter the login name, name, role, unit, title, position, and telephone information into the system. After the operation is completed, the project contact of each participating unit is notified;
[0059] S52, the successfully added users will be listed in the system. The super administrator can use "roles" to uniformly assign permissions to all users of the same role, or select a user and assign permissions to the user separately. The permissions are divided into menu viewing, process customization, process approval, data entry, data modification, and data deletion. Each function of the system contains multiple permissions.
[0060] S53, the successfully added user logs in to the system using the login name, initial password, and verification code. After passing the verification, the user can change the password in the personal information submodule and view system messages in the message center, including login information, approval information, agency information, and office warnings;
[0061] S54, recording the operations of each logged-in user, including login date, login time, log-out time, page browsing and browsing duration, page operation, page jump, and sending the operation record to the data collection module, and integrating it in the data integration module;
[0062] S55, if the history record of the currently logged-in user is not empty, then after successful verification, the user's frequently used modules, recent operation data and recently submitted process information are deployed on the user customization interface according to the user's operating habits based on the history records.
[0063] Step S6 includes the following sub-steps:
[0064] S61, the railway survey and design team and the technical consulting team administrator user logs into the system through step S5, and after verification, enters the technical consulting module;
[0065] S62, the administrator user of the railway survey and design team establishes a survey and design team personnel database, and the administrator user of the technical consulting team establishes a survey and design team personnel database and a technical consulting team expert database;
[0066] S63, create a design-technical consultation collaborative office process, including the following steps:
[0067] 1) Experts from the technical consulting team log in to the system and enter the technical consulting module;
[0068] 2) Experts from the technical consulting team create a new task order, fill in page information, task order information, add recipients and issue the task order, wherein the information of the task order is automatically filled in by clicking on the BIM component and selecting information in the 3D visualization environment;
[0069] 3) The recipient of the survey and design team logs into the system, enters the technical consultation module, displays the current task list, views the task details, and modifies or submits the interim results by clicking on the BIM components in the 3D visualization environment;
[0070] 4) The technical consulting team experts log in to the system, enter the technical consulting module, display the current approval task list, and review, approve, return and / or add review opinions for the interim results submitted in step 3), and generate review records; if the technical consulting team experts have objections to the submitted results, and the recipient of the task is online, a one-on-one meeting is initiated by inviting the recipient to jointly conduct information query and business docking based on the BIM model in a 3D visualization environment;
[0071] 5) The login information, browsing information, approval information, and submitted documents of the technical consulting team and the survey and design team are collected through the data acquisition module and integrated in the data integration module for subsequent analysis.
[0072] Step S7 includes the following sub-steps:
[0073] (1) The data acquisition module receives the documents generated during the visual collaborative work process between the railway survey and design team and the technical consulting team, and submits them to the data integration module;
[0074] (2) After the data integration module receives the document, first, it selects a suitable document database system. The present invention selects MongoDB. Then, it designs the structure of the document database, including determining the document types to be stored, the attributes of each type of document, and the relationship between each type of document. Then, it defines the structure of each type of document, including the field name, field type, and possible default values. Finally, it uses the API provided by the database system to classify the received documents, insert them into the corresponding collection, and perform multi-label management on each document based on the semantic understanding of the large model and the knowledge graph of the management unit of the railway project. Specifically:
[0075] 1) Based on the locally deployed Baichuan big model, semantic understanding of received documents is performed to extract keywords;
[0076] 2) The keywords extracted by the Baichuan model are matched with the ontology in the knowledge graph of the management unit of the railway project. Word2vec is used to convert the text into a vector. The cosine similarity of the vector is used to calculate the similarity between the two. The search results above the threshold are returned and sorted according to the similarity. The cosine similarity calculation formula is as follows:
[0077] ,
[0078] Among them, A and B are the vectors converted by the keyword using the Word2vec algorithm, and the vector dimension is =100.
[0079] 3) Keywords greater than the threshold are used as search terms for received documents, and associations are established between received documents and the ontology in the knowledge graph of the management unit of railway engineering.
[0080] Step S8 includes the following sub-steps:
[0081] (1) Provides search and custom modification of keywords, classification directories, and uploaded material identification. After logging into the system and undergoing user and authority authentication, the user enters the process management module and can search for documents based on keywords, classification directories, and uploaded material identification. At the same time, after selecting a document, the keyword, classification directory, and uploaded material identification information of the document can be modified;
[0082] (2) Based on the deep learning algorithm, according to the customized adjustment of technical quality management behavior, model training is carried out to optimize the architecture of technical quality data management. The specific steps are as follows:
[0083] 1) Collect and process historical behavior data of user management behaviors: store the historical behavior data in the form of time series, with each row representing a user's behavior record at a specific time point. Clean and normalize each row of data to remove data redundancy and eliminate invalid behavior records;
[0084] 2) Extract useful features from the original data. The useful features include: average number of behaviors in the sliding window, distribution of active time periods, user identity and permissions, historical search records, historical operation records and other indicators. The custom adjustment records of the current logged-in user are embedded using the word embedding method to form a high-dimensional enhanced feature set. The high-dimensional enhanced features will be used as the input training set data of the Long Short-Term Memory (LSTM) model;
[0085] 3) Build LSTM model: In Keras, use Sequential to build the model and add LSTM layer and output layer. The specific method is as follows:
[0086] from keras.models import Squential
[0087] from keras.layers import LSTM,Dense
[0088] model=Sequntial()
[0089] model.add(LSTM(units=64,input_shape=(None,1)))
[0090] model.add(Dense(units=1);
[0091] 4) Training model: Use the training set data to train the LSTM model. Use the compile method to compile the model, and use the fit method for training. x_train and y_train are the training sets. The details are as follows:
[0092] model.compile(optimizer='adam',loss='mean_squared_error')
[0093] model.fit(x_train,y_train,epochs=10,batch_size=32);
[0094] 5) Evaluation and adjustment: On an independent test set, the mean square error (MSE) evaluation metric is used to evaluate the performance of the model;
[0095] 6) Model deployment and application. Convert the trained LSTM model into a specific file format (such as ONNX format) and output it to the production environment so that the model can run in the online service. After logging into the process management module, users can perform intelligent queries on collaborative office process documents.
[0096] Compared with the prior art, the present invention has the following beneficial effects:
[0097] 1. This invention takes BIM technology as the core, highly integrates the massive data management capability of GIS and the refined model building capability of BIM technology, and realizes the efficient integration of survey and design data;
[0098] 2. The present invention extracts semantic information of survey and design data based on large model technology, establishes a knowledge graph of management units for railway engineering and expands the BIM component ontology, thus realizing three-dimensional visual query of railway engineering information based on BIM model;
[0099] 3. Based on the big model technology, the present invention classifies, stores and semantically understands the massive unstructured data generated in the design-technology consulting collaborative office process, and based on the deep learning algorithm, performs model training according to the customized adjustment of user management behavior, thereby optimizing the intelligent query function of the document. BRIEF DESCRIPTION OF THE DRAWINGS
[0100] Figure 1 It is a block diagram of the railway engineering consulting system of the present invention;
[0101] Figure 2 It is a flow chart of the railway engineering consulting method of the present invention. DETAILED DESCRIPTION
[0102] The system and method of the present invention are described in detail below with reference to the accompanying drawings.
[0103] like Figure 1As shown, the railway engineering consulting system based on BIM and large models of the present invention includes: a data acquisition module, a data integration module, a technical consulting module, a process management module and a system management module. Among them:
[0104] The data acquisition module is used to collect the data required in the railway engineering consulting management, collect the management behavior and process documents generated by the technical consulting module and send them to the data integration module.
[0105] The data integration module is used to classify and store the received data according to the data type, construct a relational database and a document database, establish a three-dimensional visualization environment integrating BIM and GIS and a knowledge map of the management unit of railway engineering consulting, realize data integration and visualization, and provide data services for the technical consulting module and process management module. The data types include structured data and unstructured data, the structured data includes Excel tables and relational databases, and the unstructured data includes documents.
[0106] The technical consulting module is used to provide design-technical consulting collaborative office functions for users of the railway survey and design team and the technical consulting team. This process generates a large number of management behaviors and process documents customized by users.
[0107] The process management module is used to intelligently parse the process documents in the data integration module, and based on the deep learning algorithm, perform model training according to the customized adjustment of user management behavior to optimize the intelligent query function of the document.
[0108] The system management module is used for user management and authority management, generating user names, passwords, authorities, etc. and passing them to the data acquisition module, which is then integrated into the data integration module. At the same time, through authority verification, it provides services for the customized interface generation of the technical consulting module.
[0109] like Figure 2 As shown, the railway engineering consulting method based on BIM and large model of the present invention comprises the following steps:
[0110] S1, establish a three-dimensional visualization environment: collect GIS basic geographic data, local area GIS drone data, BIM model and survey and design data through the data acquisition module; establish a basic three-dimensional geographic scene based on GIS basic geographic data; convert the local area (details) GIS drone data into engineering coordinates and integrate it into the GIS basic three-dimensional geographic scene; lightweight and component decompose the BIM model and integrate it into the GIS basic three-dimensional geographic scene. It includes the following steps:
[0111] S11, the design unit uploads GIS basic geographic data through the data acquisition module, the GIS basic geographic data includes basic terrain and image data, and the basic terrain and image data are modeled through pyramids and detail levels to form a basic three-dimensional geographic scene;
[0112] S12, the construction unit uploads the GIS drone data of the local area through the data acquisition module. The GIS drone data is consistent with the engineering coordinate system of the GIS basic three-dimensional geographic scene formed in S11 after coordinate conversion, and is integrated into the GIS basic three-dimensional geographic scene by layer overlay;
[0113] S13, the design unit uploads the BIM model through the data acquisition module, performs lightweight processing and component decomposition on the BIM model, resets the origin of the decomposed BIM component model and performs coordinate conversion; calculates the posture parameters of each BIM component model according to the linear coordinate system of the railway project, including three-dimensional offset parameters, rotation parameters, and scaling parameters, and integrates them into the basic three-dimensional geographic scene by using layer overlay.
[0114] S14, the design unit uploads the survey and design data (including structured data and unstructured data) through the data acquisition module.
[0115] S2, establish a relational database: analyze the collected data through the data integration module, design a relational database and select a suitable data engine, create a relational database, tables and table relationships, and import the collected data into the relational database. It includes the following steps:
[0116] S21, analyzing the structured data (such as Excel spreadsheets, relational databases, etc.), unstructured data (such as documents, etc.), users of each construction party and their permission applications in the survey and design data and technical consulting data, and the data source, data format, data structure and data relationship of the user-defined process and historical behavior data in the technical consulting process;
[0117] S22, conduct conceptual design of the database, abstract data into entities, and identify similar entities in different data sources;
[0118] S23, perform logical design of the database, use the EF framework to convert the conceptual model into a relational model, and determine the structure, field type, primary key, foreign key, etc. of the data table;
[0119] S24, perform physical design of the database, and determine the data storage method, index strategy, and partition strategy based on the data volume and data access requirements;
[0120] S25, select a data engine, and select a suitable data engine according to business needs and retrieval performance requirements. In one embodiment of the present invention, Oracle is selected as the data engine;
[0121] S26, based on the EF framework, adopts a model-first strategy to automatically create databases, tables, and table relationships in programming software;
[0122] S27, importing the data collected by the data collection module into the database, and performing query performance, practical processing and other tests to build the relational database.
[0123] S3, establish the management unit knowledge graph of railway engineering consulting through the data integration module: based on the semantic understanding ability of the big model, extract the semantic information of the survey and design data, generate ontology and association, and establish the management unit knowledge graph of railway engineering. It includes the following steps:
[0124] S31, based on the big model, extract the name column of each table in the relational database established in S2, such as the model name column of the model table, the bridge name column of the bridge table, the tunnel name column of the tunnel table, etc. The present invention uses the locally deployed Baichuan big model to export the table name, column name and their comments in the Oracle relational database into a table as the input of the Baichuan big model, and uses the prompt method to obtain the name column;
[0125] S32, based on the Baichuan model, inputs the name column obtained in S31, uses prompt to perform semantic similarity analysis, such as bridge name and bridge name, aligns synonyms, and treats each name column as an independent ontology class;
[0126] S33, based on the Baichuan model, input the aligned name column, use prompt to perform semantic inclusion association analysis, and obtain the hierarchical association between ontology classes, such as the work site class contains the bridge name class, tunnel name class, etc.;
[0127] S34, based on the Baichuan big model, analyzes the record values under each name column table by table, removes the records without semantics, and uses the same method as S32 and S33 to perform semantic similarity and semantic inclusion association analysis. After removal, deduplication and semantic alignment, the record is extracted to form an ontology, and the ontology is assigned an ontology class. To ensure the uniqueness of the data, the same ontology is prohibited under the same ontology. For example: the bridge name column of the bridge table has 2 records, namely XX Bridge and XX Bridge (continuous beam), and "XX Bridge" contains "XX Bridge (continuous beam)", then XX Bridge and XX Bridge (continuous beam) are respectively used as ontologies and assigned the "bridge class" (ontology class) attribute.
[0128] After the above S31~S34, the management unit knowledge graph of railway engineering consulting has been basically established.
[0129] S35, on the management unit knowledge graph of railway engineering consulting, the link prediction algorithm is continued to be used to deeply mine the potential association of the data. The present invention adopts a machine learning method and uses historical link data and features to train a machine learning model;
[0130] S4, expand the management unit knowledge graph of railway engineering consulting through the data integration module: add BIM component ontology to the management unit knowledge graph of railway engineering consulting, establish the association between BIM component ontology and various ontologies in the management unit knowledge graph of railway engineering consulting, develop the query function based on the management unit knowledge graph of railway engineering and BIM component ontology, and realize the railway engineering information query based on BIM model. It includes the following steps:
[0131] S41, extract the semantic structure tree of BIM components: The railway BIM model currently delivered complies with the "Railway Engineering Information Model Data Storage Standard" issued by the Railway BIM Alliance in 2015. This standard covers and involves eight professional fields of railway engineering lines, tracks, roadbeds, bridges, tunnels, stations, roadbed drainage, and geology. It object-orientedly defines all the components of the railway engineering information model, and the content covers single projects, components, and their assembly and inclusion relationships. It can fully describe the organizational structure from a work site to a component to the smallest component unit. The "Railway Engineering Information Model Data Storage Standard" can be viewed through the attribute code of each BIM component to establish the semantic structure tree of the BIM component. Specifically:
[0132] First, traverse all BIM components, extract the attribute codes of the components, and summarize them into a code table;
[0133] Then, the duplicate codes in the code table are removed; each attribute code in the code table after deduplication is traversed in turn, the "Railway Engineering Information Model Data Storage Standard" is checked, and the semantic structure tree of the code is established;
[0134] Finally, the depth-first principle is adopted, and the semantic structure tree with the largest depth value is taken as the benchmark. Each semantic structure tree is traversed in turn, and information gain is performed on the semantic structure tree to form the BIM component semantic structure tree of the project.
[0135] For example, when generating a semantic structure tree of bridge-related BIM components, first, according to the coding level, take the pile foundation with the largest level as the benchmark, and construct {bridge-substructure-pier-pile foundation}; then traverse each semantic structure tree in turn, such as traversing to a simply supported beam and constructing {bridge-superstructure-beam}, then use the semantic structure tree of the simply supported beam to perform information gain on the semantic structure tree of the pile foundation, forming:
[0136] Bridges - Superstructures - Beams;
[0137] -Substructure -Piers -Pile foundations.
[0138] S42, according to the BIM component semantic structure tree obtained in S41, adding the ontology class and ontology class association of the BIM component to the management unit knowledge graph of railway engineering consulting to form a BIM component semantic knowledge structure tree;
[0139] S43, traversing each BIM component one by one, using the component ID as a unique identifier, and adding each component to the corresponding BIM component ontology class;
[0140] S44, establish a mapping between the ontology class of the BIM component and the corresponding ontology class in the management unit knowledge graph of railway engineering consulting established in S3, the mapping is a many-to-many mapping (for example, equal-span bridge piers and unequal-span bridge piers in the BIM component ontology class correspond to bridge piers in S3), add the mapping class ontology and ontology association in the management unit knowledge graph of railway engineering consulting;
[0141] S45, query the auxiliary information of BIM components based on the knowledge graph of the management unit of railway engineering consulting. Take the Z pile foundation of the Y pier of the XX super-large bridge as an example, the details are as follows:
[0142] 1) The user selects the Z pile foundation of the Y pier of the XX super-large bridge in the 3D visualization environment, and the system obtains the component ID and attribute code of the component, forming a tuple of {component ID, attribute code};
[0143] 2) In the knowledge graph of the management unit of railway engineering consulting, the semantic knowledge structure tree of the BIM component is queried to obtain the semantic knowledge structure tree of the BIM component as {bridge, super-large bridge, substructure, pier, pile foundation}. According to the component decomposition relationship, the attributes are extracted in reverse order to obtain {bridge, XX super-large bridge, substructure, pier Y, pile foundation Z};
[0144] 3) Query the mapping class ontology and ontology association, complete the mapping of BIM component ontology class to the management unit knowledge graph ontology class of railway engineering consulting, and obtain {component ID, attribute code, {ontology class: 1 ,O 2 ,...,O n}}, where {ontology class: O 1 ,O 2 ,...,O n} is a set. Among them, O represents the entity.
[0145] 4) Decompose the triples in step 3) and link them with the component semantic knowledge structure tree in step 2) to form {{{bridge, XX super-large bridge, substructure, Y pier, Z pile foundation}, O 1},{{{Bridge, XX super-large bridge, substructure, pier Y, pile foundation Z},O 2},...,{{{Bridge, XX super-large bridge, substructure, pier Y, pile foundation Z},O n In the management unit knowledge graph of railway engineering consulting, each ontology class (O i ) filter the attributes of {bridge, XX super-large bridge, substructure, pier Y, pile foundation Z} and convert the query results into DataTable;
[0146] 5) Dynamically add Table pages in the 3D visualization environment, and embed the multiple DataTables obtained in step 4) into each Table page for dynamic display.
[0147] S5, user login, verification and interface customization through the system management module:
[0148] Assign users and permissions to each participating unit. Users of each participating unit log in to the system using their username and password. First, the permissions are verified, and then a customized system interface is intelligently generated for each user, including the following steps:
[0149] S51, the super administrator with the highest authority of the system uses the account, password, and verification code to log in to the system, enter the user management submodule, and use "Add Personnel" according to the personnel role table provided by the project contact of each participating unit to enter the login name, name, role, unit, title, position, and telephone information into the system. After the operation is completed, the project contact of each participating unit is notified;
[0150] S52. The users who have been added successfully will be listed in the system. The super administrator can use "roles" to uniformly assign permissions to all users of the same role, or select a user and assign permissions to the user individually. The permissions are divided into menu viewing, process customization, process approval, data entry, data modification, data deletion, etc. Each function of the system contains multiple permissions. For example, the consulting plan module includes consulting plan menu viewing, consulting plan process customization, consulting plan process approval, consulting plan data entry, consulting plan data modification, consulting plan data deletion, consulting plan statistical analysis, and consulting plan form output.
[0151] S53, the successfully added user can log in to the system with the login name, initial password and verification code. After passing the verification, the password can be changed in the personal information submodule, and the system messages can be viewed in the message center, including login information, approval information, agency information, office warnings, etc.
[0152] S54, recording the operations of each logged-in user, including login date, login time, log-out time, page browsing and browsing duration, page operation, and page jump. The historical records will be sent to the data collection module and integrated in the data integration module;
[0153] S55, if the history record of the currently logged-in user is not empty, then after successful verification, the user's frequently used modules, recent operation data, recent submission process and other information are deployed according to the historical records and the user's operating habits to customize the user interface.
[0154] S6, design-technical consulting collaborative office through technical consulting module: Railway survey and design team and technical consulting team users query and retrieve information based on BIM model in 3D visualization environment, establish expert database, set consulting process, realize visual collaboration of design scheme and technical consulting, and the system synchronously collects the management behavior and process documents generated in the process of customized adjustment. It includes the following steps:
[0155] S61, the railway survey and design team and the technical consulting team administrator user logs into the unified system through step S5, and after verification, enters the technical consulting module;
[0156] S62, the administrator user of the railway survey and design team and the technical consulting team respectively establishes the survey and design team personnel database and the technical consulting team expert database. Taking the railway survey and design team as an example, first, the survey and design team expert logs in to the system, opens the "Phase Management" form in the special consulting submodule, fills in the form information, adds the project stage, and can also modify and delete the project stage; then, the survey and design team expert selects the project to be added, opens "Add Consulting Expert", selects the person to be added from the entered personnel, adds to the expert database, and supplements the position, major and other information. The operation of adding professionals is the same and will not be repeated.
[0157] S63, create a collaborative office process for design and technical consultation: organize the current user's office tasks, and perform office work such as creating, transferring, applying, reviewing, and leaving messages for tasks. The details are as follows:
[0158] 1) Experts from the technical consulting team log in to the system and enter the technical consulting module;
[0159] 2) Experts of the technical consulting team can create a new task order, fill in the page information, task order information, add recipients, and issue the task order. The information of the task order can be automatically filled in by clicking on the BIM component in the 3D visualization environment and selecting the information;
[0160] 3) The receiver of the survey and design team logs in to the system, enters the technical consultation module, displays the current task list, and views the task details. The receiver can modify or submit interim results, such as design plans and drawings for each stage, design change plans, construction organization plans, etc., by clicking on BIM components in the 3D visualization environment;
[0161] 4) The technical consulting team experts log in to the system, enter the technical consulting module, display the current approval task list, review and approve, return, add review comments to the results submitted in step 3), and generate review records; if the technical consulting team experts have objections to the submitted results, and the recipient of the task is online, they can start a one-on-one meeting by inviting the recipient to jointly conduct information query and business docking based on the BIM model in a 3D visualization environment;
[0162] 5) The login information, browsing information, approval information, submitted documents, etc. of the technical consulting team and the survey and design team are collected through the data collection module and integrated in the data integration module for subsequent analysis.
[0163] S7, establish a document database through the data integration module: receive documents generated during the visual collaborative work process of the railway survey and design team and the technical consulting team, classify and store the documents, and perform multi-label management on each document based on the semantic understanding of the big model and the knowledge graph of the management unit of the railway project. It includes the following steps:
[0164] (1) The data acquisition module receives the documents generated during the visual collaborative work process between the railway survey and design team and the technical consulting team, and submits them to the data integration module;
[0165] (2) After the data integration module receives the document, first, it selects a suitable document database system. The present invention selects MongoDB. Then, it designs the structure of the document database, including determining the document types to be stored, the attributes of each type of document, and the relationship between each type of document. Then, it defines the structure of each type of document, including the field name, field type, and possible default values. Finally, it uses the API provided by the database system to classify the received documents, insert them into the corresponding collection, and perform multi-label management on each document based on the semantic understanding of the large model and the knowledge graph of the management unit of the railway project. Specifically:
[0166] 1) Based on the locally deployed Baichuan big model, semantic understanding of received documents is performed to extract keywords;
[0167] 2) The keywords extracted by the Baichuan model are matched with the ontology in the knowledge graph of the management unit of the railway project. Word2vec is used to convert the text into a vector. The cosine similarity of the vector is used to calculate the similarity between the two. The search results above the threshold are returned and sorted according to the similarity. The cosine similarity calculation formula is as follows:
[0168] ,
[0169] Among them, A and B are the vectors converted by the keyword using the Word2vec algorithm, and the vector dimension is =100.
[0170] 3) Keywords greater than the threshold are used as search terms for received documents, and associations are established between received documents and the ontology in the knowledge graph of the management unit of railway engineering.
[0171] S8, intelligent analysis of collaborative office process documents through the process management module: Based on the deep learning algorithm, according to the customized adjustment of management behavior, model training is carried out to optimize the architecture of collaborative office process document query and provide efficient document retrieval function. It includes the following sub-steps:
[0172] (5) Provides search and custom modification of keywords, classification directories, and uploaded material identification. After logging into the system and undergoing user and authority authentication, the user enters the process management module and can search for documents based on keywords, classification directories, and uploaded material identification. At the same time, after selecting a document, the keyword, classification directory, and uploaded material identification information of the document can be modified;
[0173] (6) Based on the deep learning algorithm, according to the customized adjustment of technical quality management behavior, model training is carried out to optimize the architecture of technical quality data management. The specific steps are as follows:
[0174] 1) Collect and process historical behavior data of user management behaviors. Store the data in the form of time series, with each row representing a user's behavior record at a specific time point. Clean and normalize each row of data to remove data redundancy and invalid behavior records;
[0175] 2) Extract useful features from the original data. The specific method is: calculate the average number of behaviors in the sliding window, the distribution of active time periods, user identity and permissions, historical search records, historical operation records and other indicators, and use the word embedding method to embed the custom adjustment records of the current logged-in user to form a high-dimensional enhanced feature set. The high-dimensional enhanced features will be used as the input training set data of the Long Short-Term Memory (LSTM) model;
[0176] 3) Build an LSTM model. In Keras, use Sequential to build a model and add an LSTM layer and an output layer. The specific method is as follows:
[0177] from keras.models import Squential
[0178] from keras.layers import LSTM,Dense
[0179] model=Sequntial()
[0180] model.add(LSTM(units=64,input_shape=(None,1)))
[0181] model.add(Dense(units=1)
[0182] 4) Training model. Use the training set data to train the LSTM model. Use the compile method to compile the model, and use the fit method to train it. x_train and y_train are the training sets. The details are as follows:
[0183] model.compile(optimizer='adam',loss='mean_squared_error')
[0184] model.fit(x_train,y_train,epochs=10,batch_size=32)
[0185] 5) Evaluation and adjustment: On an independent test set, the mean square error (MSE) evaluation indicator is used to evaluate the performance of the model.
[0186] 6) Model deployment and application. Convert the trained LSTM model into a specific file format (such as ONNX format) and output it to the production environment so that the model can run in the online service. After logging into the process management module, users can perform intelligent queries on collaborative office process documents.
Claims
1. A railway engineering consulting method based on BIM and large models, characterized by The following steps are involved: S1, establish a three-dimensional visualization environment: establish a GIS-based three-dimensional geographic scene; Convert the GIS drone data of the local area into engineering coordinates, lightweight and component decompose the BIM model, and integrate it into the GIS basic three-dimensional geographic scene; S2, establish a relational database: analyze the collected data through the data integration module, design a relational database and select a suitable data engine, create a relational database, tables and table relationships, and import the collected data into the relational database; S3, based on the semantic understanding ability of the big model, extracts the semantic information of the survey and design data, generates ontology and association, and establishes the knowledge graph of the management unit of railway engineering consulting through the data integration module, including the following sub-steps: S31, based on the big model, extract the name column of each table in the relational database established in S2, export the table name, column name and its annotations in the relational database into a table as the input of the big model, and obtain the name column in a prompt manner, wherein the name column is the model name column of the model table, the bridge name column of the bridge table, and the tunnel name column of the tunnel table; S32, input the name column obtained in S31, perform semantic similarity analysis using prompt, align synonyms, and treat each name column as an independent ontology class; S33, input the aligned name column, use prompt to perform semantic inclusion association analysis, and obtain the hierarchical association between ontology classes; S34, parsing the record values under each name column table by table, eliminating the records without semantics, and performing semantic similarity and semantic inclusion association analysis in the same manner as steps S32 and S33. After elimination, deduplication and semantic alignment, the record is extracted to form an ontology, and an ontology class is assigned to the ontology; Wherein, the large model described in step S31 adopts the Baichuan large model; S35, on the knowledge graph of the management unit of railway engineering consulting, continue to use the link prediction algorithm to deeply mine the potential associations of the data, and use historical link data and features to train the machine learning model; S4, expanding the management unit knowledge graph of the railway engineering consulting through the data integration module: adding a BIM component ontology to the management unit knowledge graph of the railway engineering consulting, and establishing associations between the BIM component ontology and various ontologies in the management unit knowledge graph of the railway engineering consulting, developing a query function based on the management unit knowledge graph of the railway engineering consulting and the BIM component ontology, and realizing railway engineering information query based on the BIM model, including the following sub-steps: S41, extracting the BIM component semantic structure tree: First, traverse all BIM components, extract the attribute codes of the components and summarize them into a code table; Then, the duplicate codes in the code table are removed; each attribute code in the code table after deduplication is traversed in turn, the "Railway Engineering Information Model Data Storage Standard" is checked, and the semantic structure tree of the code is established; Finally, the depth-first principle is adopted, and the semantic structure tree with the largest depth value is taken as the benchmark. Each semantic structure tree is traversed in turn, and information gain is performed on the semantic structure tree to form the BIM component semantic structure tree of the project. When generating the semantic structure tree of bridge-related BIM components, firstly, according to the coding level, taking the pile foundation with the largest level as the benchmark, {bridge-substructure-pier-pile foundation} is constructed; then, each semantic structure tree is traversed in turn. When traversing to the simply supported beam and constructing {bridge-superstructure-beam}, the semantic structure tree of the simply supported beam is used to perform information gain on the semantic structure tree of the pile foundation, forming: Bridges - Superstructures - Beams; -Substructure -Piers -Pile foundations; S42, according to the BIM component semantic structure tree obtained in S41, adding the ontology class and ontology class association of the BIM component to the management unit knowledge graph of railway engineering consulting to form a BIM component semantic knowledge structure tree; S43, traversing each BIM component one by one, using the component ID as a unique identifier, and adding each component to the corresponding BIM component ontology class; S44, establish a mapping between the ontology class of the BIM component and the corresponding ontology class in the management unit knowledge graph of railway engineering consulting established in S3, the mapping is a many-to-many mapping, and add the mapping class ontology and ontology association in the management unit knowledge graph of railway engineering consulting; S45, querying the auxiliary information of BIM components based on the management unit knowledge graph of railway engineering consulting; S5, user login, verification and interface customization through the system management module: users and permissions are assigned to each participating unit, and users of each participating unit log in to the system using usernames and passwords. First, permission verification is performed, and then a customized system interface is intelligently generated for each user; S6, design-technical consulting collaborative office through the technical consulting module: Railway survey and design team users and technical consulting team users query and retrieve information based on the BIM model in a 3D visualization environment, establish an expert database, set up a consulting process, and realize visual collaboration of design solutions and technical consulting. The system simultaneously collects the management behaviors and process documents generated by the customized adjustments in the process; S7, establish a document database through the data integration module: receive documents generated during the visual collaborative work process between the railway survey and design team and the technical consulting team, classify and store the documents, and perform multi-label management on each document based on the semantic understanding of the big model and the knowledge graph of the management unit of the railway project; S8, intelligent analysis of collaborative office process documents through the process management module: Based on the deep learning algorithm, model training is performed according to the customized adjustment of management behavior, the architecture of collaborative office process document query is optimized, and document retrieval function is provided; Wherein, step S45 includes the following sub-steps: 1) The user selects a BIM building in the 3D visualization environment, and the system obtains the component ID and attribute code of the component, forming a tuple of {component ID, attribute code}; 2) In the knowledge graph of the management unit of railway engineering consulting, the semantic knowledge structure tree of the BIM component is queried to obtain the semantic knowledge structure tree of the BIM component as {bridge, super-large bridge, substructure, pier, pile foundation}. According to the component decomposition relationship, the attributes are extracted in reverse order to obtain {bridge, XX super-large bridge, substructure, pier Y, pile foundation Z}; 3) Query the mapping class ontology and ontology association, complete the mapping of BIM component ontology class to the management unit knowledge graph ontology class of railway engineering consulting, and obtain {component ID, attribute code, {ontology class: O1, O2, ..., O n }}, where {ontology class: O1, O2, ..., O n } is a set, O represents the ontology class; 4) Decompose the triples in step 3) and link them with the component semantic knowledge structure tree in step 2) to form {{{bridge, XX super-large bridge, substructure, pier Y, pile foundation Z}, O1},{{{bridge, XX super-large bridge, substructure, pier Y, pile foundation Z}, O2},...,{{{bridge, XX super-large bridge, substructure, pier Y, pile foundation Z}, O n }}; In the knowledge graph of the management unit of railway engineering consulting, filter the attributes of {bridge, XX super-large bridge, substructure, Y pier, Z pile foundation} for each ontology class in turn, and convert the query results into DataTable; 5) Dynamically add Table pages in the 3D visualization environment, and embed the multiple DataTables obtained in step 4) into each Table page for dynamic display; Step S8 includes the following sub-steps: (1) Provide retrieval and custom modification of keywords, classification directories, and uploaded material identification: After logging into the system and undergoing user and authority authentication, the user enters the process management module and can search for documents based on keywords, classification directories, and uploaded material identification. At the same time, after selecting a document, the keyword, classification directory, and uploaded material identification information of the document can be modified; (2) Based on the deep learning algorithm, according to the customized adjustment of technical quality management behavior, model training is carried out to optimize the architecture of technical quality data management. The specific steps are as follows: 1) Collect and process historical behavior data of user management behaviors: store the historical behavior data in the form of time series, with each row representing a user's behavior record at a specific time point. Clean and normalize each row of data to remove data redundancy and eliminate invalid behavior records; 2) Extract useful features from the original data. The features include: average number of behaviors in the sliding window, distribution of active time periods, user identity and permissions, historical search records and historical operation records. The custom adjustment records of the current logged-in user are embedded using the word embedding method to form a high-dimensional enhanced feature set. The high-dimensional enhanced features will be used as the input training set data of the long short-term memory network model. 3) Build LSTM model: In Keras, use Sequential to build the model and add LSTM layer and output layer; 4) Training model: Use the training set data to train the LSTM model, use the compile method to compile the model, and use the fit method to train it; 5) Evaluation and adjustment: On an independent test set, the mean square error evaluation metric is used to evaluate the performance of the model; 6) Model deployment and application: Convert the trained LSTM model into ONNX format and output it, and deploy it to the production environment so that the model can run in the online service; after the user logs in to the process management module, perform intelligent query on the collaborative office process documents.
2. The railway engineering consulting method based on BIM and large model according to claim 1 is characterized in that: Step S1 includes the following sub-steps: S11, the design unit uploads GIS basic geographic data through the data acquisition module, the GIS basic geographic data includes basic terrain and image data, and the basic terrain and image data are modeled through pyramids and detail levels to form a GIS basic three-dimensional geographic scene; S12, the construction unit uploads the GIS drone data of the local area through the data acquisition module. The GIS drone data is consistent with the engineering coordinate system of the GIS basic three-dimensional geographic scene formed in S11 after coordinate conversion, and is integrated into the GIS basic three-dimensional geographic scene by layer overlay; S13, the design unit uploads the BIM model through the data acquisition module, performs lightweight processing and component decomposition on the BIM model, resets the origin of the decomposed BIM component model and performs coordinate conversion; Calculate the posture parameters of each BIM component model according to the linear coordinate system of the railway project, including three-dimensional offset parameters, rotation parameters, and scaling parameters, and integrate them into the basic three-dimensional geographic scene by layer overlay; S14, the design unit uploads the survey and design data through the data acquisition module.
3. The railway engineering consulting method based on BIM and large model according to claim 1 is characterized in that: Step S2 includes the following sub-steps: S21, analyzing the structured data, unstructured data, users of each construction party and their permission applications in the technical consulting data and the survey and design data, and analyzing the data source, data format, data structure and data relationship of the user-defined process and historical behavior data in the technical consulting process; S22, conduct conceptual design of relational database, abstract data into entities, and identify similar entities in different data sources; S23, perform logical design of relational database, use EF framework to convert conceptual model into relational model, determine the structure, field type, primary key and foreign key of data table; S24, perform physical design of the relational database, and determine the data storage method, index strategy, and partition strategy based on the data volume and data access requirements; S25, select a suitable data engine based on business needs and retrieval performance requirements; S26, based on the EF framework, adopts a model-first strategy to automatically create relational databases, tables, and table relationships in programming software; S27, importing the data collected by the data collection module into the relational database, and performing query performance and practical processing tests to build the relational database.
4. The railway engineering consulting method based on BIM and large model according to claim 1 is characterized in that: Step S5 The following steps are included: S51, the super administrator with the highest authority of the system uses the account, password, and verification code to log in to the system, enter the user management submodule, and use "Add Personnel" according to the personnel role table provided by the project contact of each participating unit to enter the login name, name, role, unit, title, position, and telephone information into the system. After the operation is completed, the project contact of each participating unit is notified; S52, the successfully added users will be listed in the system. The super administrator can use "roles" to uniformly assign permissions to all users of the same role, or select a user and assign permissions to the user individually. The permissions are divided into menu viewing, process customization, process approval, data entry, data modification, and data deletion. Each function of the system contains multiple permissions; S53, the successfully added user logs in to the system using the login name, initial password, and verification code. After passing the verification, the user can change the password in the personal information submodule and view system messages in the message center, including login information, approval information, agency information, and office warnings; S54, recording the operations of each logged-in user, including login date, login time, log-out time, page browsing and browsing duration, page operation, page jump, and sending the operation record to the data collection module, and integrating it in the data integration module; S55, if the history record of the currently logged-in user is not empty, then after successful verification, the user's frequently used modules, recent operation data and recently submitted process information are deployed on the user customization interface according to the user's operating habits based on the history records.
5. The railway engineering consulting method based on BIM and large model according to claim 1 is characterized in that: Step S6 includes the following sub-steps: S61, the railway survey and design team and the technical consulting team administrator user logs into the system through step S5, and after verification, enters the technical consulting module; S62, the administrator user of the railway survey and design team establishes a survey and design team personnel database, and the administrator user of the technical consulting team establishes a survey and design team personnel database and a technical consulting team expert database; S63, create a collaborative office process between design and technical consultation, The following steps are included: 1) Experts from the technical consulting team log in to the system and enter the technical consulting module; 2) Experts from the technical consulting team create a new task order, fill in page information, task order information, add recipients and issue the task order, wherein the information of the task order is automatically filled in by clicking on the BIM component and selecting information in the 3D visualization environment; 3) The recipient of the survey and design team logs into the system, enters the technical consultation module, displays the current task list, views the task details, and modifies or submits the interim results by clicking on the BIM components in the 3D visualization environment; 4) The technical consulting team experts log in to the system, enter the technical consulting module, display the current approval task list, and review, approve, return and / or add review opinions for the interim results submitted in step 3), and generate review records; if the technical consulting team experts have objections to the submitted results, and the recipient of the task is online, a one-on-one meeting is initiated by inviting the recipient to jointly conduct information query and business docking based on the BIM model in a 3D visualization environment; 5) The login information, browsing information, approval information, and submitted documents of the technical consulting team and the survey and design team are collected through the data acquisition module and integrated in the data integration module for subsequent analysis.
6. The railway engineering consulting method based on BIM and large model according to claim 1 is characterized in that: Step S7 includes the following sub-steps: (1) The data acquisition module receives the documents generated during the visual collaborative work process between the railway survey and design team and the technical consulting team, and submits them to the data integration module; (2) After receiving the document, the data integration module first selects a suitable document database system and then designs the structure of the document database, including determining the types of documents to be stored, the attributes of each type of document, and the relationship between the various types of documents; Then, define the structure of each type of document, including field name, field type, and possible default value; finally, use the API provided by the database system to classify the received documents, insert them into the corresponding collection, and perform multi-label management on each document based on the semantic understanding of the big model and the knowledge graph of the management unit of the railway project. Specifically: 1) Based on the locally deployed Baichuan big model, semantic understanding of the received documents is performed to extract keywords; 2) The keywords extracted by the Baichuan model are matched with the ontology in the knowledge graph of the management unit of the railway project. Word2vec is used to convert the text into a vector. The cosine similarity of the vector is used to calculate the similarity between the two. The search results above the threshold are returned and sorted according to the similarity. The cosine similarity calculation formula is as follows: , Among them, A and B are the vectors converted by the keyword using the Word2vec algorithm, and the vector dimension is n =100; 3) Keywords greater than the threshold are used as search terms for received documents, and associations are established between received documents and the ontology in the knowledge graph of the management unit of railway engineering.
7. A system for executing the railway engineering consulting method based on BIM and large model as claimed in any one of claims 1 to 6, characterized in that: It includes data acquisition module, data integration module, technical consulting module, process management module and system management module, among which: The data acquisition module is used to collect the data required for railway engineering consulting management, collect the management behavior and process documents generated by the technical consulting module and send them to the data integration module; The data integration module is used to classify and store the received data required for railway engineering consulting management, the management behaviors and process documents generated by the technical consulting module according to the data type, build a relational database and a document database, establish a three-dimensional visualization environment integrating BIM and GIS and a knowledge map of management units for railway engineering consulting, realize data integration and visualization, and provide data services for the technical consulting module and process management module; The technical consulting module is used to provide the railway survey and design team and the technical consulting team with a design-technical consulting collaborative office function, which generates a large number of management behaviors and process documents customized by users; The process management module is used to intelligently parse the process documents in the data integration module, and based on the deep learning algorithm, perform model training according to the customized adjustment of the management behavior to optimize the intelligent query function of the document; The system management module is used for user management and authority management, generating user names, passwords and authorities and passing them to the data acquisition module, and then integrating them into the data integration module; at the same time, through authority verification, it provides services for the customized interface generation of the technical consulting module.
8. The system according to claim 7, characterized in that: The data types include structured data and unstructured data. The structured data include Excel tables and relational databases, and the unstructured data include documents.