A protection structure for DTU power distribution device

By designing the protective structure of the DTU power distribution device and using rainwater collection and floating bucket mechanisms to achieve internal circulation, the problem of poor dehumidification effect of existing technology in rainy weather is solved, ensuring the appropriate temperature and drying of electrical equipment under different weather conditions. , protect the normal operation of the equipment.

CN118539330BActive Publication Date: 2024-10-11GUANGDONG JINHUILONG ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411003321.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-11
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

The heat dissipation method of the existing DTU power distribution cabinet fails in rainy weather and cannot effectively dehumidify, causing moisture damage to electrical equipment.

Method used

A protective structure for the DTU power distribution device is designed, including a protective box, a condensation chamber, a ventilation chamber and a pipeline chamber. The rainwater collection and floating bucket mechanism is used to achieve internal circulation in rainy weather to prevent the entry of moist air and ensure the electrical equipment suitable temperature and dryness.

Benefits of technology

Effectively dehumidify and dissipate heat under different weather conditions, protect electrical equipment, ensure its normal operation, and avoid moisture damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118539330B_ABST
    Figure CN118539330B_ABST
Patent Text Reader

Abstract

The technical field of power distribution equipment of the present invention specifically relates to a protection structure of a DTU power distribution device, including a protection box body, the protection box body is divided into an equipment room, a condensation room, a pipeline room and a ventilation room, a DTU power distribution cabinet is placed in the equipment room, a main pipeline is set up in the pipeline room, the main pipeline is provided with an exhaust channel, the main pipeline is provided with an air inlet channel, a sleeve is installed inside the middle side of the main pipeline, the sleeve is connected with a sliding sealing block, the sliding sealing block is connected with a connecting rod, the connecting rod is connected with a plugging head, the sleeve is connected with a vertical pipe, the vertical pipe is connected with a bucket-shaped cavity, the bucket-shaped cavity is provided with a floating barrel, and the floating barrel is provided with a rainwater collection mechanism; the present invention utilizes rainwater, and can cool the outside atmosphere and enter the DTU power distribution cabinet through external circulation in normal weather, and can circulate the air inside the protection box through internal circulation in rainy weather to prevent humid air from entering and causing damage to electrical equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power distribution equipment, and in particular relates to a protection structure of a DTU power distribution device. Background Art

[0002] DTU is a wireless terminal device specially used to convert serial port data into IP data or convert IP data into serial port data for transmission through wireless communication network. In the power system, the distribution automation terminal has certain requirements on temperature and moisture.

[0003] During the operation of the DTU power distribution cabinet, the internal electrical equipment will generate a lot of heat. In order to make the electrical equipment work at a suitable temperature, heat dissipation is required. At the same time, the electrical equipment is easily damaged by moisture in the air. Therefore, in the prior art, before the outside air is blown into the DTU power distribution cabinet for heat exchange and heat dissipation, a condenser is often used to cool the air, and the water in the air is condensed to form droplets to prevent moisture from entering the DTU power distribution cabinet.

[0004] However, this heat dissipation method is only applicable in normal weather when the air humidity is low. Once it rains, the moisture in the air increases and the dehumidification effect of the condenser will be greatly reduced. For this reason, we propose a protection structure for the DTU distribution device, which can ensure the operating temperature of the DTU distribution cabinet and dehumidify the air entering the DTU distribution cabinet under different weather conditions. Summary of the invention

[0005] The purpose of the present invention is to provide a protection structure for a DTU power distribution device to solve the problems existing in the background technology.

[0006] In order to achieve the above technical objectives, the technical solution adopted by the present invention is as follows:

[0007] A protection structure for a DTU power distribution device, comprising a protection box, wherein the protection box is divided into an equipment room located at the front side, a condensation room located at the upper part of the rear side, a pipeline room located above the equipment room and the condensation room, and a ventilation room located at the lower part of the rear side by a plurality of first partitions, a DTU power distribution cabinet is placed inside the equipment room, an exhaust port is arranged on the top of the DTU power distribution cabinet, and an air inlet is arranged at the lower end of the rear side of the DTU power distribution cabinet;

[0008] A main pipeline extending frontward and rearward is horizontally arranged inside the pipeline chamber, an exhaust passage is arranged between the front side of the main pipeline and the exhaust port, and an air inlet passage is arranged between the rear side of the main pipeline and the condensation chamber;

[0009] A sleeve arranged transversely is installed inside the middle side of the main pipeline, and sliding sealing blocks are slidably connected on both sides of the sleeve. The middle side of the sleeve is elastically connected to the two sliding sealing blocks respectively through springs, and the sliding sealing blocks on both sides are fixedly connected to connecting rods, and the ends of the connecting rods are fixedly connected to plugging heads. The middle pipe of the sleeve is connected to a vertical pipe, and the upper end pipe of the vertical pipe is connected to a bucket-shaped cavity fixed to the protective box body, and the upper side of the bucket-shaped cavity is open and provided with a floating bucket, and the floating bucket is provided with a rainwater collection mechanism;

[0010] Annular blocks are also processed on both sides of the main pipe, and the annular blocks on both sides are respectively located on the sides facing the exhaust channel and the air inlet channel;

[0011] The bucket-shaped cavity, the vertical pipe and the sleeve are filled with liquid. Under the elastic force of the two springs, the two sliding sealing blocks are brought close to each other. At the same time, under the buoyancy of the liquid, the floating barrel floats on the upper end of the bucket-shaped cavity, and the plugging heads on both sides are respectively in contact with the annular stoppers on both sides.

[0012] A condensation mechanism is arranged inside the condensation chamber, and the condensation chamber is communicated with the ventilation chamber. A connecting pipeline is communicated between the ventilation chamber and the air inlet, and a blower is installed in the connecting pipeline.

[0013] The pipe diameter of the main pipe located at the front side of the exhaust channel and at the rear side of the inlet channel is D 1 ;

[0014] The diameter of the plugging head is D 2 ;

[0015] The pipe diameter of the connecting section between the exhaust channel and the main pipe and the connecting section between the air inlet channel and the main pipe is D 3 ;

[0016] The D 1 , said D 2 , said D 3 The following relationship is satisfied:

[0017] D 1 <D 2 <D 3 .

[0018] The bottom of the floating bucket is also fixedly connected to a first L-shaped connecting pipe, the vertical section of which is a telescopic pipe, the horizontal section of which extends through and extends to the outside of the pipeline chamber, and the horizontal section of which is equipped with a first solenoid valve.

[0019] The condensing mechanism includes a cooling box, which is equipped with multiple condensing tubes. An installation chamber is provided on one side of the left-right direction of the interior of the condensing chamber. The cooling box is installed inside the installation chamber. Each of the condensing tubes passes through the installation chamber and extends to the other side of the left-right direction of the interior of the condensing chamber. A guide plate is fixedly connected between the installation chamber and the top of the condensing chamber.

[0020] A second L-shaped connecting pipe is fixedly connected to the bottom of the condensing chamber, a vertical section of the second L-shaped connecting pipe is connected to the bottom of the condensing chamber, and a drainage mechanism is fixedly connected to the horizontal section of the second L-shaped connecting pipe.

[0021] The drainage mechanism includes a drainage box, and a plurality of vertically arranged filters are installed inside the drainage box. An air outlet is provided on the side of the drainage box away from the second L-shaped connecting pipe. The bottom inner wall of the drainage box is processed into an inclined structure and the higher side is the side away from the vertical section of the second L-shaped connecting pipe. A collecting water tank is also provided inside the ventilation chamber, and a drainage pipe extending to the interior of the collecting water tank is installed on the lower side of the bottom inner wall of the drainage box.

[0022] The protection box is also provided with dustproof nets corresponding to the front and rear ends of the main pipe.

[0023] The upper side of the float is processed into a closed structure, and the rainwater collection mechanism includes a rainwater tank mounted above the protective box body. The bottom of the rainwater tank is higher than the bottom of the float. An oblique water inlet pipe is fixedly connected to the bottom of the rainwater tank. The lower side of the oblique water inlet pipe slides and extends to the interior of the float. A second solenoid valve is installed on the oblique water inlet pipe. An overflow drain pipe is installed on the upper side of the float. The rainwater tank is also provided with an electronic liquid level meter, and a screen is also installed on the top of the rainwater tank.

[0024] The present invention utilizes rainwater to cool the outside air and allow it to enter the DTU power distribution cabinet in normal weather through external circulation, thereby ensuring that the DTU power distribution cabinet is at a suitable working temperature. In rainy weather, the present invention can isolate the outside air through internal circulation, and circulate the air inside the protection box to prevent humid air from entering and causing damage to electrical equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention is further illustrated by means of the non-limiting examples given in the accompanying drawings.

[0026] Figure 1 The structure of the first embodiment of the present invention is shown in FIG. Figure 1 ;

[0027] Figure 2 The structure of the first embodiment of the present invention is shown in FIG. Figure 2 ;

[0028] Figure 3 It is a schematic diagram of the internal cross-sectional structure of the protection box of the present invention;

[0029] Figure 4 for Figure 3 A schematic diagram of the structure at A;

[0030] Figure 5 for Figure 3 A schematic diagram of the structure at B;

[0031] Figure 6 It is a schematic diagram of the state of the present invention when it is in the outer circulation;

[0032] Figure 7 It is a schematic diagram of the state of the present invention when it is in the inner cycle;

[0033] The main component symbols are described as follows:

[0034] Protection box 100, first partition 101, equipment room 110, DTU power distribution cabinet 111, condensing chamber 120, cooling box 121, condensing pipe 122, installation chamber 123, guide plate 124, second L-shaped connecting pipe 125, drainage box 126, filter 1261, air outlet 1262, drainage pipe 1263, pipeline chamber 130, main pipeline 131, annular block 1311, exhaust channel 132, air inlet channel 133, sleeve 134, sliding seal Sealing block 1341, spring 1342, connecting rod 1343, sealing head 1344, vertical pipe 135, bucket-shaped cavity 1351, float 1352, first L-shaped connecting pipe 1353, first solenoid valve 1354, ventilation chamber 140, connecting pipeline 141, blower 142, collecting water tank 143, dustproof net 150, rainwater tank 200, oblique water inlet pipe 201, second solenoid valve 202, overflow drain pipe 203, electronic liquid level meter 204, screen 205. DETAILED DESCRIPTION

[0035] In order to enable those skilled in the art to better understand the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0036] Embodiment 1, as Figures 1 to 7A protective structure of a DTU power distribution device shown in the figure includes a protective box 100, which is divided into an equipment room 110 located at the front side, a condensing room 120 located at the upper part of the rear side, a pipeline room 130 located above the equipment room 110 and the condensing room 120, and a ventilation room 140 located at the lower part of the rear side by a plurality of first partitions 101. A DTU power distribution cabinet 111 is placed inside the equipment room 110, an exhaust port is arranged on the top of the DTU power distribution cabinet 111, an air inlet is arranged at the lower end of the rear side of the DTU power distribution cabinet 111, a main pipeline 131 extending forward and backward is horizontally arranged inside the pipeline room 130, an exhaust passage 132 is arranged between the front side of the main pipeline 131 and the exhaust port 122, and an air inlet passage 133 is arranged between the rear side of the main pipeline 131 and the condensing room 120;

[0037] A transversely arranged sleeve 134 is installed inside the middle side of the main pipeline 131, and sliding sealing blocks 1341 are slidably connected on both sides of the sleeve 134. The middle side of the sleeve 134 is elastically connected to the two sliding sealing blocks 1341 through springs 1342, and the sliding sealing blocks 1341 on both sides are fixedly connected to connecting rods 1343, and the ends of the connecting rods 1343 are fixedly connected to plugging heads 1344. The middle pipe of the sleeve 134 is connected to the vertical pipe 135, and the upper end pipe of the vertical pipe 135 is connected to a bucket-shaped cavity 1351 fixed to the protective box 100. The upper side of the bucket-shaped cavity 1351 is open and is provided with a float 1352, and the float 1352 is provided with a rainwater collection mechanism. Annular blocks are also processed on both sides of the main pipeline 131 1311, the annular blocks 1311 on both sides are respectively located on the sides facing the exhaust channel 132 and the air inlet channel 133, the bucket-shaped cavity 1351, the vertical pipe 135 and the sleeve 134 are filled with liquid, and under the elastic force of the two springs 1342, the two sliding sealing blocks 1341 are close to each other. At the same time, under the buoyancy of the liquid, the float barrel 1352 floats on the upper end of the bucket-shaped cavity 1351, and the blocking heads 1344 on both sides are respectively abutted against the annular blocks 1311 on both sides, a condensation mechanism is provided inside the condensation chamber 120, and the condensation chamber 120 is connected with the ventilation chamber 140, and the ventilation chamber 140 is connected with the air inlet by a connecting pipe 141, and the connecting pipe 141 is installed with a blower 142.

[0038] In the initial state of the device, Figures 1 to 6 As shown, at this time, under the elastic force of the two springs 1342, the two sliding sealing blocks 1341 are brought close to each other, and at the same time, under the buoyancy of the liquid, the floating barrel 1352 floats on the upper end of the bucket-shaped cavity 1351, and the blocking heads 1344 on both sides respectively abut against the annular stoppers 1311 on both sides, thereby blocking the middle of the main pipeline 131. At this time, when the blower 142 is working, the gas is circulated externally, and the circulation route is as follows: Figure 6As shown by the middle arrow, the outside air enters through the rear side of the main pipe 131, enters the condensation chamber 120 through the air inlet channel 133, cools the gas through the condensation mechanism of the condensation chamber 120, and condenses the water in the air into droplets to remove the moisture in the air. The dehumidified cooling air enters the ventilation chamber 140, enters the air inlet of the DTU power distribution cabinet 111 through the connecting pipe 141, and dissipates heat and cools the electrical equipment inside the DTU power distribution cabinet 111 to ensure that the DTU power distribution cabinet 111 is at a suitable working temperature. Finally, the heat-exchanged air passes through the exhaust channel 132 and is discharged from the front side of the main pipe 131;

[0039] If it rains, the humidity in the air increases. At this time, the rainwater collection mechanism of the float 1352 collects rainwater. After the rainwater enters the float 1352, the weight of the float 1352 increases. At this time, the float 1352 moves downward under the action of gravity, squeezing the liquid in the bucket-shaped cavity 1351, the vertical pipe 135 and the sleeve 134. Through the transmission of the liquid, the liquid is filled into the sleeve 134, and the sliding sealing blocks 1341 on both sides slide away, overcoming the elastic force of the springs 1342 on both sides, so that the springs 1342 stretch the side length, and the blocking heads 1344 on both sides are pushed away to the side facing the exhaust channel 132 and the air inlet channel 133 through the transmission of the connecting rod 1343. The front and rear sides of the main channel 131 are blocked. At this time, when the blower 142 is working, the gas is internally circulated, and the circulation route is as follows: Figure 7 As shown by the middle arrow, the outside air will no longer be able to enter through the rear side of the main line 131. After passing through the main line 131, the internal air enters the condensation chamber 120 through the air inlet channel 133. The gas is cooled by the condensation mechanism of the condensation chamber 120, and the water in the air is condensed to form droplets to remove the moisture in the air. The dehumidified cooling air enters the ventilation chamber 140 and enters the air inlet of the DTU power distribution cabinet 111 through the connecting pipe 141 to dissipate heat and cool the electrical equipment inside the DTU power distribution cabinet 111 to ensure that the DTU power distribution cabinet 111 is at a suitable working temperature. Finally, the air after heat exchange will enter the main line 131 again for internal circulation, which not only ensures that the DTU power distribution cabinet 111 is at a suitable working temperature, but also prevents the humid air from the outside from entering the DTU power distribution cabinet 111 to damage the electrical equipment.

[0040] In this embodiment, by utilizing rainwater, the outside air can be cooled and enter the DTU distribution cabinet 111 through external circulation in normal weather, ensuring that the DTU distribution cabinet 111 is at a suitable working temperature. In rainy weather, the outside air can be isolated through internal circulation, and the air inside the protective box 100 can be circulated to prevent humid air from entering and causing damage to electrical equipment.

[0041] As a further illustration of this embodiment, Figure 6 As shown, the pipe diameter of the main pipe 131 located at the front side of the exhaust channel 132 and the rear side of the inlet channel 133 is D 1 ;

[0042] The diameter of the plugging head 1344 is D 2 ;

[0043] The pipe diameter of the connecting section between the exhaust passage 132 and the main pipe 131 and the connecting section between the air inlet passage 133 and the main pipe 131 is D 3 ;

[0044] D 1 , D 2 , D 3 The following relationship is satisfied:

[0045] D 1 <D 2 <D 3 .

[0046] The advantage of such a configuration is that when the blocking head 1344 moves at the connecting section between the exhaust channel 132 and the main line 131 and at the connecting section between the air inlet channel 133 and the main line 131, they will not contact each other to avoid greater friction. At the same time, when the blocking head 1344 moves to the main line 131 at the front side of the exhaust channel 132 and the rear side of the air inlet channel 133, they can be directly blocked by the blocking head 1344.

[0047] As a further description of the floating bucket in this embodiment, Figure 3 and Figure 4 As shown, a first L-shaped connecting pipe 1353 is also fixedly connected to the bottom of the float barrel 1352, the vertical section of the first L-shaped connecting pipe 1353 is a telescopic tube, the horizontal section of the first L-shaped connecting pipe 1353 extends through and extends to the outside of the pipeline chamber 130, and the horizontal section of the first L-shaped connecting pipe 1353 is installed with a first solenoid valve 1354.

[0048] When the float barrel 1352 needs to be drained, all the rainwater in the float barrel 1352 can be discharged by opening the first solenoid valve 1354 of the first L-shaped connecting pipe 1353. In addition, since the vertical section of the first L-shaped connecting pipe 1353 is a telescopic tube, the float barrel 1352 can adaptively expand and contract its length during the descent and ascent process.

[0049] As a specific description of the condensation mechanism and the interior of the condensation chamber in this embodiment, Figure 3 and Figure 5As shown, the condensing mechanism includes a cooling box 121, and a plurality of condensing tubes 122 are installed in the cooling box 121. A mounting chamber 123 is provided on one side of the condensing chamber 120 in the left-right direction. The cooling box 121 is installed in the mounting chamber 123. Each condensing tube 122 passes through the mounting chamber 123 and extends to the other side of the condensing chamber 120 in the left-right direction. A guide plate 124 is fixedly connected between the mounting chamber 123 and the top of the condensing chamber 120.

[0050] A second L-shaped connecting pipe 125 is fixedly connected to the bottom of the condensing chamber 120, a vertical section of the second L-shaped connecting pipe 125 is connected to the bottom of the condensing chamber 120, and a drainage mechanism is fixedly connected to the horizontal section of the second L-shaped connecting pipe 125;

[0051] The drainage mechanism includes a drainage box 126, and a plurality of vertically arranged filters 1261 are installed inside the drainage box 126. An air outlet 1262 is provided on the side of the drainage box 126 away from the second L-shaped connecting pipe 125. The bottom inner wall of the drainage box 126 is processed into an inclined structure and the higher side is the side away from the vertical section of the second L-shaped connecting pipe 125. A collecting water tank 143 is also arranged inside the ventilation chamber 140, and a drainage pipe 1263 extending to the inside of the collecting water tank 143 is installed on the lower side of the bottom inner wall of the drainage box 126.

[0052] The cooling box 121 can be refrigerated by semiconductor cooling technology. The installation chamber 123 is used to install the cooling box 121, so that the cooling box 121 is isolated in the condensing chamber 120 to prevent the temperature of the hot end of the semiconductor from causing the temperature change in the condensing chamber 120. The coolant in the cooling box 121 is pumped into each condensing tube 122 through a built-in pump to form a loop. When the air enters the condensing chamber 120, the moisture in the air can be condensed through each condensing tube 122 to form droplets. After the formed droplets enter the second L-shaped connecting pipe 125, they are discharged into the collecting water tank 143 through the drain pipe 1263 of the drain box 126. At the same time, the air after condensation and dehumidification by the condensing tube 122 is discharged in the passage. After entering the drainage box 126 through the second L-shaped connecting pipe 125, the dehumidified air can also pass through the multiple filters 1261 arranged inside the drainage box 126 to allow the moisture in the air to adhere, and then converge to the bottom of the drainage box 126 and be discharged into the collection tank 143 through the drainage pipe 1263. In this way, the air can be dehumidified twice, so that the air does not contain a large amount of moisture. The air that has been dehumidified twice enters the ventilation chamber 140 through the air outlet 1262 of the drainage box, and the blower 142 can send the dry air in the ventilation chamber 140 into the DTU distribution cabinet 111, which can effectively ensure that the air will not cause damage to the internal electrical equipment after entering the DTU distribution cabinet 111.

[0053] As a further optimization of this embodiment, Figure 1As shown, the protection box 100 is also provided with a dustproof net 150 corresponding to the front and rear ends of the main pipe 131, so that dust and impurities from the outside will not enter the protection box 100, and a dustproof effect is achieved.

[0054] As a further description of the rainwater collection mechanism in this embodiment, Figures 1 to 3 As shown, the upper side of the float 1352 is processed into a closed structure, and the rainwater collection mechanism includes a rainwater tank 200 mounted above the protective box 100. The bottom of the rainwater tank 200 is higher than the bottom of the float 1352. An oblique water inlet pipe 201 is fixedly connected to the bottom of the rainwater tank 200. The lower side of the oblique water inlet pipe 201 slides and extends to the interior of the float 1352. The oblique water inlet pipe 201 is installed with a second solenoid valve 202. An overflow drain pipe 203 is installed on the upper side of the float 1352. The rainwater tank 200 is also provided with an electronic liquid level meter 204, and a screen 205 is also installed on the top of the rainwater tank 200.

[0055] When it is raining, the rainwater tank 200 can collect rainwater. The screen 205 can prevent debris such as leaves from entering the rainwater tank 200. The electronic liquid level meter 204 can monitor the liquid level of the rainwater collected in the rainwater tank 200. When the second solenoid valve 202 of the inclined water inlet pipe 201 is opened, the rainwater can be discharged into the float 1352. When the float 1352 is full of rainwater, excess rainwater entering the float 1352 will be discharged from the upper side of the float 1352 through the overflow drain pipe 203.

[0056] Embodiment 2 is a further description based on Embodiment 1. In this embodiment, the rainwater tank 200 is further provided with a timer (not shown in the figure) and a rainwater sensor (not shown in the figure). The liquid level of the rainwater tank 200 is monitored according to the electronic liquid level meter 204. The rainwater sensor is used to monitor the rainwater situation, and the timer is used to time the electronic liquid level meter 204. Further description is made, specifically:

[0057] ① When the rain sensor does not monitor rain, it is in non-rainy weather. In this weather, the first solenoid valve 1354 is closed, the second solenoid valve 202 is closed, and the timer and the electronic liquid level meter 204 do not work;

[0058] ② When the rain sensor detects rain, it is determined that it is raining. In this weather, the first solenoid valve 1354 is closed, the second solenoid valve 202 is closed, and the timer starts timing with the rain sensor detecting rain as the timing starting point. The timer is preset with a monitoring period T (which can be set to 30 minutes) formed by multiple interval periods △t (which can be set to 5 minutes). The electronic liquid level meter 204 starts to monitor the liquid level of the rain tank 200 and makes the following judgments:

[0059] Judgment A: In the monitoring period T, the liquid level value monitored by the electronic liquid level meter 204 is less than the maximum liquid level preset value. At the same time, in the most recent interval period △t, the liquid level change △L monitored by the electronic liquid level meter 204 is less than the minimum liquid level change preset value. It is judged to be light rain weather. In this kind of weather with light rainfall, the humidity in the air is small. The condensation pipe 122 of the condensation chamber 120 inside the protective box 100 and the drainage mechanism inside the ventilation chamber 140 can dehumidify the air in this weather. Therefore, the second solenoid valve 202 is opened, and the first solenoid valve 202 is opened. When the first solenoid valve 1354 is opened, the rainwater collected by the rainwater tank 200 will directly enter the float 1352 through the oblique water inlet pipe 201 and be discharged through the first L-shaped connecting pipe 1353. The position of the float 1352 in the bucket-shaped cavity 1351 will not change, and the gas is in an external circulation state until the electronic liquid level meter 204 monitors the liquid level in the rainwater tank 200 to return to zero. The timer takes this moment as the starting point for timing again, and at the same time, the second solenoid valve 202 is closed, the rainwater tank 200 collects rainwater and enters the next monitoring cycle T.

[0060] Decision B: In the monitoring period T, if the liquid level value monitored by the electronic liquid level meter 204 is higher than the preset maximum liquid level value, it is judged as heavy rain weather. In such heavy rain weather, the air is humid, and the condensation pipe 122 of the condensation chamber 120 inside the protective box 100 and the drainage mechanism inside the ventilation chamber 140 weaken the dehumidification effect of the air in such weather. Therefore, the second solenoid valve 202 is opened, the first solenoid valve 1354 is closed, and the rainwater collected in the rainwater tank 200 enters the float 1352 through the oblique water inlet pipe 201, and is no longer discharged through the first L-shaped connecting pipe 1353. The float 1352 increases in weight due to the entry of rainwater and descends. At this time, the gas is in an internal circulation state, and the outside air will no longer enter until the electronic liquid level meter 204 monitors the liquid level in the rainwater tank 200 and returns to zero. The timer takes this moment as the starting point for timing again, and the second solenoid valve 202 is closed at the same time, the rainwater tank 200 collects rainwater and enters the next monitoring period T.

[0061] Judgment C: In the monitoring period T, the liquid level value monitored by the electronic liquid level meter 204 is less than the maximum preset value of the liquid level. At the same time, in each interval period △t, the liquid level change △L monitored by the electronic liquid level meter 204 is greater than the minimum preset value of the liquid level change. It is judged to be moderate rainfall weather. In such moderate rainfall weather, as the rainfall time increases, the humidity of the air will gradually increase. Therefore, the second solenoid valve 202 is closed, the first solenoid valve 1354 is closed, and rainwater is collected and temporarily stored through the rainwater tank 200. The timer takes the end time point of the monitoring period T as the timing starting point, and monitors the next monitoring period T, as follows:

[0062] ① In the next monitoring cycle T, the liquid level value monitored by the electronic liquid level meter 204 is still less than the maximum preset value of the liquid level. At this time, it means that although it is a long-term rainfall, the rainfall is small. Therefore, the second solenoid valve 202 is opened, the first solenoid valve 1354 is opened, and the condensation pipe 122 of the condensation chamber 120 inside the protective box 100 and the drainage mechanism inside the ventilation chamber 140 can dehumidify the air in this weather. After the rainwater collected in the rainwater tank 200 enters the float 1352, it is discharged through the first L-shaped connecting pipe 1353 until the electronic liquid level meter 204 monitors the liquid level in the rainwater tank 200 to return to zero. The timer takes this moment as the starting point for timing again, and at the same time, the second solenoid valve 202 is closed, and the rainwater tank 200 collects rainwater and enters the monitoring of the next monitoring cycle T;

[0063] ② In the next monitoring cycle T, the liquid level value monitored by the electronic liquid level meter 204 is greater than the maximum preset value of the liquid level. At this time, it indicates that the rainfall is long and the rainfall is large. Therefore, the second solenoid valve 202 is opened, and the first solenoid valve 1354 is closed. The rainwater collected in the rainwater tank 200 enters the float 1352. The float 1352 increases in weight due to the entry of rainwater and descends. At this time, the gas is in an internal circulation state, and the outside air will no longer enter until the electronic liquid level meter 204 monitors the liquid level in the rainwater tank 200 and returns to zero. The timer uses this moment as the starting point for timing again. At the same time, the second solenoid valve 202 is closed, and the rainwater tank 200 collects rainwater and enters the next monitoring cycle T.

[0064] In this way, the gas circulation mode of the DTU distribution cabinet 111 can be adaptively changed under different weather conditions.

[0065] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the technical field without departing from the spirit and technical ideas disclosed by the present invention should still be covered by the claims of the present invention.

Claims

1. A protection structure of a DTU power distribution device, comprising a protection box, Features: The protective box is divided into an equipment room at the front, a condensation room at the upper rear part, a pipeline room above the equipment room and the condensation room, and a ventilation room at the lower rear part by a plurality of first partitions. A DTU power distribution cabinet is placed inside the equipment room. An exhaust port is provided on the top of the DTU power distribution cabinet, and an air inlet is provided at the lower rear end of the DTU power distribution cabinet. A main pipeline extending frontward and rearward is horizontally arranged inside the pipeline chamber, an exhaust passage is arranged between the front side of the main pipeline and the exhaust port, and an air inlet passage is arranged between the rear side of the main pipeline and the condensation chamber; A sleeve arranged transversely is installed inside the middle side of the main pipeline, and sliding sealing blocks are slidably connected on both sides of the sleeve. The middle side of the sleeve is elastically connected to the two sliding sealing blocks respectively through springs, and the sliding sealing blocks on both sides are fixedly connected to connecting rods, and the ends of the connecting rods are fixedly connected to plugging heads. The middle pipe of the sleeve is connected to a vertical pipe, and the upper end pipe of the vertical pipe is connected to a bucket-shaped cavity fixed to the protective box body, and the upper side of the bucket-shaped cavity is open and provided with a floating bucket, and the floating bucket is provided with a rainwater collection mechanism; Annular blocks are also processed on both sides of the main pipe, and the annular blocks on both sides are respectively located on the sides facing the exhaust channel and the air inlet channel; The bucket-shaped cavity, the vertical pipe and the sleeve are filled with liquid. Under the elastic force of the two springs, the two sliding sealing blocks are brought close to each other. At the same time, under the buoyancy of the liquid, the floating barrel floats on the upper end of the bucket-shaped cavity, and the plugging heads on both sides are respectively in contact with the annular stoppers on both sides. A condensation mechanism is arranged inside the condensation chamber, and the condensation chamber is communicated with the ventilation chamber. A connecting pipeline is communicated between the ventilation chamber and the air inlet, and a blower is installed in the connecting pipeline.

2. A protection structure for a DTU power distribution device according to claim 1, Features: The pipe diameter of the main pipe located at the front side of the exhaust channel and at the rear side of the inlet channel is D 1 ; The diameter of the plugging head is D 2 ; The pipe diameter of the connecting section between the exhaust channel and the main pipe and the connecting section between the air inlet channel and the main pipe is D 3 ; The D 1 , said D 2 , said D 3 The following relationship is satisfied: D 1 <D 2 <D 3 。 3. A protection structure for a DTU power distribution device according to claim 2, Features: The bottom of the floating bucket is also fixedly connected to a first L-shaped connecting pipe, the vertical section of which is a telescopic pipe, the horizontal section of which extends through and extends to the outside of the pipeline chamber, and the horizontal section of which is equipped with a first solenoid valve.

4. A protection structure for a DTU power distribution device according to claim 3, Features: The condensing mechanism includes a cooling box, which is equipped with multiple condensing tubes. An installation chamber is provided on one side of the left-right direction of the interior of the condensing chamber. The cooling box is installed inside the installation chamber. Each of the condensing tubes passes through the installation chamber and extends to the other side of the left-right direction of the interior of the condensing chamber. A guide plate is fixedly connected between the installation chamber and the top of the condensing chamber.

5. A protection structure for a DTU power distribution device according to claim 4, Features: A second L-shaped connecting pipe is fixedly connected to the bottom of the condensing chamber, a vertical section of the second L-shaped connecting pipe is connected to the bottom of the condensing chamber, and a drainage mechanism is fixedly connected to the horizontal section of the second L-shaped connecting pipe.

6. A protection structure for a DTU power distribution device according to claim 5, Features: The drainage mechanism includes a drainage box, and a plurality of vertically arranged filters are installed inside the drainage box. An air outlet is provided on the side of the drainage box away from the second L-shaped connecting pipe. The bottom inner wall of the drainage box is processed into an inclined structure and the higher side is the side away from the vertical section of the second L-shaped connecting pipe. A collecting water tank is also provided inside the ventilation chamber, and a drainage pipe extending to the interior of the collecting water tank is installed on the lower side of the bottom inner wall of the drainage box.

7. A protection structure for a DTU power distribution device according to claim 6, Features: The protection box is also provided with dustproof nets corresponding to the front and rear ends of the main pipe.

8. A protection structure for a DTU power distribution device according to claim 7, Features: The upper side of the float is processed into a closed structure, and the rainwater collection mechanism includes a rainwater tank mounted above the protective box body. The bottom of the rainwater tank is higher than the bottom of the float. An oblique water inlet pipe is fixedly connected to the bottom of the rainwater tank. The lower side of the oblique water inlet pipe slides and extends to the interior of the float. A second solenoid valve is installed on the oblique water inlet pipe. An overflow drain pipe is installed on the upper side of the float. The rainwater tank is also provided with an electronic liquid level meter, and a screen is also installed on the top of the rainwater tank.