A highly reliable power grid load management method and system

By performing time synchronization and multi-dimensional evaluation of power grid metering nodes, dividing nodes and deploying security measures, combined with data cross-validation and differentiated synchronization strategies, the problem of data accuracy and exception handling in power grid metering management is solved, and the security of the power grid is improved. performance and data exchange capabilities.

CN118539437BActive Publication Date: 2024-10-11TONGLU COUNTY POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411002220.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-11
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

Existing technologies face insufficient data accuracy, real-time performance and abnormal situation processing capabilities in power grid metering management, especially time synchronization issues and conflicts in data comparison, which affect the accuracy of decision-making and the security and stability of the power grid.

Method used

By time synchronizing the power grid metering nodes, dividing them into key nodes, secondary nodes and general nodes based on multi-dimensional evaluation indicators, and deploying corresponding security measures and response mechanisms for different nodes, combined with data cross-validation and differentiated data synchronization strategies, Ensure data credibility and consistency.

Benefits of technology

It improves the accuracy and reliability of power grid data, effectively resists external attacks and internal errors, improves network security defense capabilities, realizes seamless data exchange and synchronization between power grid operations and multiple systems, and ensures efficient collaboration of business processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118539437B_ABST
    Figure CN118539437B_ABST
Patent Text Reader

Abstract

The present invention discloses a highly reliable power grid load management method and system, the method comprising: time synchronization of power grid metering nodes so that the power grid metering nodes collect load data in the same time dimension; importance evaluation of power grid metering nodes based on multi-dimensional evaluation indicators, and dividing the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results; abnormality detection of the load data of key nodes, and cross-validation of the marked deviation abnormal data to determine whether the deviation abnormal data is credible; matching the deviation abnormal data with a corresponding response mechanism according to the credible judgment result. The present invention deploys different levels of security measures for power grid nodes to enhance the network security defense capability of the power system; improves the accuracy and reliability of data through data cross-validation; and constructs a differentiated data synchronization strategy to achieve seamless data exchange and synchronization between multiple systems such as power grid operation, energy management and customer service.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid metering management, and in particular to a highly reliable power grid load management method and system. Background Art

[0002] At present, electronic metering technology faces many challenges in the metering management of important objects. These challenges are mainly reflected in data accuracy, real-time performance, and the system's ability to cope with abnormal situations. Moreover, the time synchronization problem has always been a bottleneck for multi-point data comparison. The timestamps between different metering nodes are not unified, which affects the evaluation of cross-node data consistency and reliability. Although there is a time synchronization mechanism, insufficient synchronization accuracy or poor maintenance can also lead to deviations in data comparison, affecting the accuracy of decision-making.

[0003] Existing technologies lack intelligent and hierarchical management when processing abnormal data. For nodes of different importance, there is a lack of differentiated monitoring strategies, which leads to unreasonable resource allocation and the security and stability of key nodes cannot be effectively guaranteed. In addition, there are obstacles in the interaction between data integration and business systems, which affects the overall grasp of the power grid status and the ability to respond quickly. In the load data management of smart grids, there is a contradiction between data authenticity identification and abnormal data correction. On the one hand, it is necessary to identify the authenticity of real-time load data, power supply quality and energy consumption data, and timely identify and mark data points with large deviations; on the other hand, it is necessary to exchange data and synchronize time between different metering nodes to effectively correct abnormal data. There is an inherent conflict and tension between these two requirements. In order to resolve this contradiction, it is urgent to find a balance between data authenticity identification and abnormal data correction. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a highly reliable power grid load management method and system.

[0005] In a first aspect, an embodiment of the present invention provides a highly reliable power grid load management method, comprising:

[0006] Time synchronization is performed on the power grid metering nodes so that the power grid metering nodes collect load data in the same time dimension;

[0007] The importance of the power grid metering nodes is evaluated based on multi-dimensional evaluation indicators, and the power grid metering nodes are divided into key nodes, secondary nodes and general nodes according to the evaluation results, wherein the multi-dimensional evaluation indicators include power supply reliability, network importance and load importance;

[0008] Performing anomaly detection on the load data of the key nodes, and cross-validating the marked deviation anomaly data to determine whether the deviation anomaly data is credible;

[0009] According to the credible judgment result, a corresponding response mechanism is matched to the deviation abnormal data.

[0010] Preferably, after dividing the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results, the method further includes:

[0011] Deploy a first security measure on the key node, wherein the first security measure at least includes encryption, real-time monitoring, data analysis and security audit;

[0012] Deploy a second security measure on the secondary node, the second security measure at least comprising a timed data check and a periodic system audit;

[0013] A third security measure is deployed on the general node, and the third security measure at least includes periodic data verification and system audit.

[0014] Preferably, after matching the deviation abnormal data with a corresponding response mechanism, the method further includes:

[0015] The trusted judgment result and the security measure deployment strategy are combined to generate a differentiated data synchronization strategy, wherein the differentiated data synchronization strategy at least includes a data synchronization strategy corresponding to load data with different timeliness requirements.

[0016] Preferably, the importance of the power grid metering nodes is evaluated based on multi-dimensional evaluation indicators, and the power grid metering nodes are divided into key nodes, secondary nodes and general nodes according to the evaluation results, including:

[0017] Calculate the importance score of each of the power grid metering nodes using multi-criteria decision making based on the power supply reliability, network importance and load importance;

[0018] The importance scores are sorted, and the power grid metering nodes are divided into key nodes, secondary nodes and general nodes according to the sorting results.

[0019] Preferably, before calculating the importance score of each of the power grid metering nodes by using a multi-criteria decision according to the power supply reliability, network importance and load importance, the method further includes:

[0020] A health assessment is performed on the power grid metering node, and the obtained equipment health assessment index is characterized as the power supply reliability of the power grid metering node. The equipment health assessment index is obtained using the following formula:

[0021]

[0022] Where HI represents the equipment health assessment index, Wi represents the weight of the i-th influencing factor, Fi represents the score function of the i-th influencing factor, and N represents the total number of influencing factors;

[0023] The network centrality of the power grid metering node is calculated by using the PageRank algorithm, and the network centrality is characterized as the network importance of the power grid metering node;

[0024] A node load prediction model is constructed based on the LSTM network, and the load importance of the power grid metering node is evaluated according to the node load prediction model.

[0025] Preferably, the performing of anomaly detection on the load data of the key nodes and cross-validation on the marked deviation anomaly data to determine whether the deviation anomaly data is credible includes:

[0026] Building a node load anomaly detection model based on the time series prediction model, and inputting the load data of the key node into the node load anomaly detection model to obtain the predicted load data of the key node;

[0027] Determine whether the deviation between the predicted load data and the actual load data satisfies the 3σ principle, and if not, mark the corresponding load data as abnormal deviation data;

[0028] Acquire the load data of the same time point of multiple adjacent nodes corresponding to the deviation abnormal data, and compare the deviation abnormal data with the load data at the same time point to determine the data consistency result of the adjacent nodes corresponding to the data at the same time point, wherein the data consistency result includes consistency and inconsistency;

[0029] The deviation abnormal data is evaluated as a true abnormality or a false alarm abnormality according to the data consistency result.

[0030] Preferably, comparing the abnormal deviation data with the load data at the same time point to determine the data consistency result of the adjacent nodes corresponding to the data at the same time point includes:

[0031] The abnormal deviation data is subjected to a T test respectively with the load data of each adjacent node at the same time point, and the data consistency result of each adjacent node is determined to be consistent or inconsistent according to the test result.

[0032] Preferably, the step of evaluating whether the deviation abnormal data is a true abnormality or a false alarm abnormality according to the data consistency result includes:

[0033] Counting the number of adjacent nodes whose data consistency results are consistent;

[0034] It is determined whether the number of adjacent nodes exceeds a preset threshold. If so, the deviation abnormal data is determined to be a true abnormality, otherwise it is determined to be a false alarm abnormality.

[0035] Preferably, matching the deviation abnormal data with a corresponding response mechanism according to the credibility judgment result includes:

[0036] If it is determined that the deviation abnormal data is credible, an abnormal response mechanism is matched to the deviation abnormal data, and the abnormal response mechanism at least includes adjusting the node load and repairing the node equipment;

[0037] If it is determined that the deviation abnormal data is not credible, data processing is performed on the deviation abnormal data, and the data processing at least includes error correction and data cleaning.

[0038] In a second aspect, an embodiment of the present invention provides a highly reliable power grid load management system, which is applicable to the power grid load management method as described above, including:

[0039] A time synchronization module, used for performing time synchronization on the power grid metering nodes so that the power grid metering nodes collect load data in the same time dimension;

[0040] A metering node division module, used to evaluate the importance of the power grid metering nodes based on multi-dimensional evaluation indicators, and divide the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results, wherein the multi-dimensional evaluation indicators include power supply reliability, network importance and load importance;

[0041] A data credibility judgment module is used to perform anomaly detection on the load data of the key nodes, and cross-validate the marked deviation abnormal data to determine whether the deviation abnormal data is credible;

[0042] The response mechanism matching module is used to match the corresponding response mechanism to the deviation abnormal data according to the trustworthy judgment result.

[0043] Compared with the prior art, the highly reliable power grid load management method and system of the embodiment of the present invention have the following beneficial effects: importance assessment is performed on power grid nodes, and security measures of corresponding levels are deployed accordingly, so as to effectively resist external attacks and internal errors, protect sensitive information, and enhance the network security defense capability of the power system; data accuracy and reliability are improved through data cross-validation, and the problems of misjudgment and decision-making errors caused by data errors or inconsistencies are solved; and seamless data exchange and synchronization between multiple systems such as power grid operation, energy management and customer service are achieved by constructing differentiated data synchronization strategies, which not only improves data quality, but also ensures efficient collaboration of business processes, and provides comprehensive and accurate decision-making basis for power grid operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a flow chart of a highly reliable power grid load management method according to an embodiment of the present invention;

[0045] Figure 2 It is a schematic diagram of a process of dividing a power grid metering node according to an embodiment of the present invention;

[0046] Figure 3 It is a schematic diagram of a process for obtaining multi-dimensional evaluation indicators of a power grid metering node according to an embodiment of the present invention;

[0047] Figure 4 It is a schematic diagram of a process for deploying security measures according to an embodiment of the present invention;

[0048] Figure 5 It is a schematic diagram of a process for determining the credibility of abnormal deviation data according to an embodiment of the present invention;

[0049] Figure 6 is a schematic diagram of a process for evaluating a true anomaly or a false alarm anomaly according to an embodiment of the present invention;

[0050] Figure 7 is a flow chart of a matching response mechanism according to an embodiment of the present invention;

[0051] Figure 8 is another flow chart of a highly reliable power grid load management method according to an embodiment of the present invention;

[0052] Fig. 9 It is a structural schematic diagram of a highly reliable power grid load management system according to an embodiment of the present invention. DETAILED DESCRIPTION

[0053] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0054] like Figure 1 As shown, the embodiment of the present invention provides a highly reliable power grid load management method, comprising the steps of:

[0055] S1. Time synchronization of power grid metering nodes so that the power grid metering nodes collect load data in the same time dimension;

[0056] Deploy accurate time synchronization servers in power grid metering nodes such as main substations, regional power distribution rooms, and user-side metering devices. Use satellite timing technologies such as GPS and Beidou, IEEE1588 high-precision time synchronization protocols, or network timing protocols such as NTP to achieve time synchronization between different metering nodes, so that the timestamps of each node remain consistent, meeting the millisecond-level synchronization accuracy requirements in the electric energy metering scenario. For the load data collected by each metering node, a unified timestamp information is added to the data frame. The timestamp format can be Unix timestamp or ISO8601 format, accurate to milliseconds, to ensure that the data of different nodes can be accurately aligned in the time dimension. By deploying a time synchronization server, a reliable time synchronization communication link is established with each metering node, and the standard time is broadcast to each node periodically to achieve node time calibration and synchronization, and the time deviation of each node is monitored, and the time is adjusted in time to control the system's global time synchronization error within the set threshold range.

[0057] Specifically, when deploying time synchronization servers in the main substation, regional power distribution room and user-side metering device, this embodiment selects the PTP time synchronization solution that complies with the IEEE1588 V2 standard, receives satellite timing signals through GPS receivers, and uses the PTP protocol to synchronize the time to each metering node, and the synchronization accuracy can reach 100 nanoseconds. When marking the timestamp of the data frame, the Unix timestamp format is used, that is, the total number of milliseconds calculated from 00:00:00 UTC on January 1, 1970, represented by a 64-bit long integer. For the monitoring of time synchronization errors, a dedicated time synchronization server is deployed to periodically perform statistical analysis on the time deviation of each node. When the deviation exceeds 100 microseconds, an alarm is issued in time and automatic calibration is performed. Through these measures, the time label of the load metering data can be ensured to be accurate and reliable, providing high-quality data support for subsequent energy consumption design, line loss analysis, load forecasting and other applications.

[0058] S2. Evaluate the importance of power grid metering nodes based on multi-dimensional evaluation indicators, and divide the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results;

[0059] Among them, the multi-dimensional evaluation indicators include power supply reliability, network importance and load importance.

[0060] Specifically, Figure 2 As shown, step S2 includes:

[0061] S201, calculating the importance score of each power grid metering node using multi-criteria decision making based on power supply reliability, network importance and load importance;

[0062] Taking into account the power supply reliability, network importance and load importance of the node, the importance score of each power grid metering node is calculated by using the hierarchical analysis method and fuzzy comprehensive evaluation method.

[0063] It should be noted that if Figure 3 As shown, before step S201, the following steps are also included:

[0064] S201-A, performing health assessment on the power grid metering node, and representing the obtained equipment health assessment index as the power supply reliability of the power grid metering node;

[0065] The device health index evaluation method based on the physical model is adopted to comprehensively consider the influencing factors such as the equipment's operating time, load level, maintenance history, etc., and the health evaluation of the power grid metering node is performed to obtain the device health evaluation index. Specifically, the following formula is used to obtain the device health evaluation index:

[0066]

[0067] Among them, HI represents the equipment health assessment index, W i represents the weight of the i-th influencing factor, F i represents the score function of the i-th influencing factor, and N represents the total number of influencing factors. The weight can be determined by the hierarchical analysis method, and the score function can be constructed by expert experience and statistical analysis. Furthermore, in this embodiment, when HI<60 points, the health status of the equipment is determined to be "sub-healthy"; when HI<30 points, the health status of the equipment is determined to be "dangerous".

[0068] S201-B, using PageRank algorithm to calculate the network centrality of the power grid metering node, and characterizing the network centrality as the network importance of the power grid metering node;

[0069] Specifically, this embodiment sets the damping factor d to 0.85, the initial PR value to 1 / M (M is the total number of network nodes), and the iterative calculation formula is PR(i)=(1-d) / M+d·∑PR(j) / L(j), where PR(j) is the PR value of node j, and L(j) is the out-degree of node j. The iteration stops when the PR value converges or the number of iterations reaches 100. The PR value of the power grid metering node is calculated and used to quantify the network centrality of the power grid metering node.

[0070] S201-C. Build a node load prediction model based on the LSTM network, and evaluate the load importance of the power grid metering node according to the node load prediction model.

[0071] Perform statistical analysis and trend prediction on the node load data, calculate the node load rate, load density, peak-to-valley ratio and other indicators, establish a node load prediction model based on the LSTM network, identify load change trends, periodic laws and mutation events, evaluate the load importance of the node, and characterize the dynamic characteristics and uncertainty of the load.

[0072] Specifically, when constructing the node load prediction model, this embodiment uses an LSTM network, inputs historical load data, normalizes it to the range of 0 to 1, selects the number of hidden layer nodes as 128, the learning rate is 0.001, the batch size is 72, trains 1000 epochs, and takes the average root mean square error of the last 100 epochs as the generalization error of the model. When the generalization error is less than 5%, it indicates that the model performance is good, and this model is used as the node load prediction model.

[0073] S202: sorting the importance scores, and dividing the power grid metering nodes into key nodes, secondary nodes and general nodes according to the sorting results.

[0074] According to the sorting results and the set division standards of key nodes, secondary nodes and general nodes, the power grid metering nodes are graded. In the formulation of the division standards, the principles of consistency, scientificity, operability and other principles of grade division are fully considered to ensure the rationality and interpretability of the grading results. It should be noted that the division standards are three selection ranges for the sorting results. For example, the first 20% of the nodes in the sorting results are taken as key nodes, the middle 60% of the nodes in the sorting results are taken as secondary nodes, and the last 20% of the nodes in the sorting results are taken as general nodes.

[0075] It can be understood that after step S2, the nodes are divided into three categories: high-load, high-impact key nodes such as main substations and large industrial user connection points, secondary nodes such as regional distribution rooms and secondary substations, and general nodes such as small distribution stations and residential distribution areas.

[0076] It should be noted that if Figure 4 As shown, after step S2, the following steps are also included:

[0077] S2-A, deploy the first security measure for key nodes;

[0078] For key nodes with high load and high impact, such as main substations and large industrial user connection points, the first security measures are deployed, which include at least encryption, real-time monitoring, data analysis and security auditing.

[0079] Specifically, for key nodes, advanced encryption algorithms are used to encrypt data, such as AES-256, RSA and other algorithms, to ensure data confidentiality. At the same time, a real-time monitoring system is deployed to continuously monitor the operating status and data flow of the nodes. Through big data analysis technology, real-time monitoring data of key nodes are analyzed, including abnormal behavior detection and risk assessment. Once a suspicious situation is found, an alarm is triggered immediately. In addition, frequent security audits are implemented on key nodes, such as daily system log analysis and account authority review.

[0080] Furthermore, this embodiment uses a 2048-bit RSA key to encrypt sensitive data of key nodes. When the CPU usage of a key node exceeds 90% for 5 consecutive minutes, a security alarm is triggered.

[0081] S2-B, deploying a second security measure on the secondary node;

[0082] For secondary nodes such as regional power distribution rooms and secondary substations, deploy second security measures, which at least include timed data verification and regular system audits.

[0083] Specifically, for secondary nodes, a timed data verification mechanism is used, such as performing hash operations on node data every hour and comparing it with backup data to ensure data integrity and consistency. At the same time, regular system audits are performed on secondary nodes, such as weekly checks on system configuration and security policies.

[0084] Furthermore, this embodiment uses the SHA-256 algorithm to perform a hash operation on the data of the secondary node and compares it with the hash value of the last backup. If there is a mismatch, an alarm is triggered.

[0085] S2-C, deploy the third security measure for general nodes.

[0086] For general nodes such as small distribution stations and residential distribution areas, third security measures are deployed, which at least include periodic data verification and system auditing.

[0087] Specifically, for general nodes, periodic data verification measures are adopted, such as daily backup of node data and regular sampling inspections. At the same time, basic-level security audits are implemented for general nodes, such as monthly inspections of system logs to identify suspicious activities.

[0088] Furthermore, this embodiment randomly selects 10% of general nodes every day to perform data integrity checks.

[0089] By deploying security measures of corresponding levels through steps S2-A to S2-C, it is possible to effectively resist external attacks and internal errors, protect sensitive information, and enhance the network security defense capabilities of the power system.

[0090] It should be noted that this embodiment also formulates differentiated monitoring and management strategies for nodes of different levels. Implement key monitoring and priority protection for key nodes, increase the measurement sampling frequency, shorten the data upload cycle, increase the types of early warning indicators, strengthen abnormal data analysis and fault diagnosis, configure redundant communication links, application status estimation and alarm criteria, deploy edge computing facilities and other measures, so as to improve the local intelligence level and autonomy of key nodes and ensure their reliable operation and continuous power supply. Implement routine monitoring and regular maintenance of secondary nodes, adjust monitoring parameters as needed, and conduct regular equipment inspections and health assessments. Implement simplified monitoring and sampling analysis for general nodes, reduce the frequency of data collection, simplify data items, and conduct regular communication status and battery power checks. By implementing differentiated monitoring and management strategies, it helps to concentrate resources to protect critical infrastructure, while reasonably allocating maintenance resources and improving the stability and efficiency of the overall system.

[0091] S3. Perform anomaly detection on the load data of key nodes and cross-validate the marked deviation anomaly data to determine whether the deviation anomaly data is credible;

[0092] Specifically, Figure 5 As shown, step S3 includes:

[0093] S301, constructing a node load anomaly detection model based on the time series prediction model, and inputting the load data of the key nodes into the node load anomaly detection model to obtain the predicted load data of the key nodes;

[0094] It should be noted that before building the node load anomaly detection model, by building a power grid data integration and analysis platform, the real-time and historical data scattered in various business systems and databases are centrally managed and uniformly accessed, forming a unified view and query interface for the entire network data, providing support for cross-node and cross-system data comparison and analysis. For different types of data sources, corresponding data collection and transmission protocols, such as Modbus, IEC 61850, DNP3, etc., are used to achieve real-time collection and upload of key node data of the power grid to ensure the timeliness and integrity of the data. For massive historical data, big data processing platforms such as Hadoop and Spark are used, HDFS is used for data storage, MapReduce and Spark SQL are used for data query and aggregation analysis, to achieve distributed storage and batch processing of data, and improve data access and analysis efficiency.

[0095] Specifically, this embodiment adopts a Hadoop-based data lake architecture when building a power grid data integration and analysis platform, and uses tools such as Flume and Kafka to achieve real-time data collection of various business systems, with a throughput of 100,000 data per second. The historical data in HDFS is organized and managed through components such as Hive and HBase, supporting the storage and query of PB-level data. Spark Streaming is used to achieve streaming processing of real-time data, with latency controlled at the second level. Furthermore, this embodiment builds a node load anomaly detection model based on the ARIMA model.

[0096] S302, determining whether the deviation between the predicted load data and the actual load data satisfies the 3σ principle, and if not, marking the corresponding load data as abnormal deviation data;

[0097] If the deviation between the predicted load data and the actual load data exceeds 3 times the standard deviation, the corresponding load data is judged to be abnormal deviation data.

[0098] Furthermore, the principle and applicable scenarios of deviation abnormal data are briefly analyzed. Abnormal data is stored in association with metadata information such as timestamp and data source to provide a data basis for subsequent cross-validation. According to the grid topology and equipment connection relationship, each metering node is automatically discovered and associated to form a network model of the metering node. By constructing the grid domain ontology and knowledge graph, and using natural language processing and machine learning technologies such as ontology matching and entity linking, the automatic discovery and association mapping of semantic relationships between data sources are realized, and an association model of data sources is formed to provide topological and semantic support for cross-validation.

[0099] Specifically, when performing semantic association mapping, this embodiment uses Word2Vec to train the semantic model of the power grid field, identifies key entities such as equipment and measuring points, represents entity semantics through knowledge graph embedding, calculates entity similarity based on graph embedding models such as TransE, and uses topic model LDA clustering to form semantic topics, thereby constructing an ontology knowledge base for power equipment and data.

[0100] S303, obtaining load data of multiple adjacent nodes at the same time corresponding to the deviation abnormal data, and comparing the deviation abnormal data with the load data at the same time point to determine the data consistency result of the adjacent nodes corresponding to the data at the same time point;

[0101] The data consistency results include consistency and inconsistency. The deviation abnormal data is subjected to T test with the load data of each adjacent node at the same time, and the data consistency result of each adjacent node is determined to be consistent or inconsistent according to the test results.

[0102] Specifically, this embodiment obtains the simultaneous point load data of 10 adjacent nodes corresponding to the deviation abnormal data, and performs a T test on the deviation abnormal data and the simultaneous point load data of each adjacent node respectively. If there is no significant difference between the simultaneous point load data of the adjacent nodes at a confidence level of 95%, the data consistency results of the adjacent nodes are determined to be consistent; otherwise, the data consistency results of the adjacent nodes are determined to be inconsistent.

[0103] S304. Evaluate the deviation abnormal data to be a real abnormality or a false alarm abnormality based on the data consistency result.

[0104] Specifically, Figure 6 As shown, step S304 includes:

[0105] S304-A, the number of adjacent nodes whose statistical data consistency results are consistent;

[0106] S304-B, determine whether the number of adjacent nodes exceeds a preset threshold, if so, determine that the deviation abnormal data is a true abnormality, otherwise, determine that it is a false alarm abnormality.

[0107] Specifically, this embodiment determines whether the number of adjacent nodes with consistent data consistency results exceeds 8. If so, the deviation abnormal data is determined to be a real abnormality, otherwise it is determined to be a false alarm abnormality. It can be understood that determining the deviation abnormal data as a real abnormality indicates that the deviation abnormal data is credible; conversely, determining the deviation abnormal data as a false alarm abnormality indicates that the deviation abnormal data is unreliable.

[0108] It should be noted that when performing cross-node data comparison, the time synchronization accuracy between different nodes needs to be considered. By analyzing the deviation distribution of data timestamps, the error compensation method is used to estimate the time deviation between nodes. When performing data comparison, the timestamp deviation is automatically compensated to eliminate the impact of synchronization errors and improve the accuracy of data comparison. For nodes with low time synchronization accuracy, timely alarms are required to trigger the time synchronization and calibration process to ensure that each node collects and transmits data under a unified time reference.

[0109] S4. According to the credible judgment results, the corresponding response mechanism is matched to the deviation abnormal data.

[0110] Specifically, Figure 7 As shown, step S4 includes:

[0111] S401, if it is determined that the deviation abnormal data is credible, matching the deviation abnormal data with an abnormal response mechanism;

[0112] Among them, the abnormal response mechanism at least includes adjusting the node load and repairing the node equipment. If the abnormal data indicates that there is a problem such as load imbalance or equipment failure in the power grid node, the control instructions for load adjustment or equipment maintenance are automatically issued. The load distribution plan of the affected nodes is recalculated through the optimal power flow algorithm based on linear programming to achieve load balancing and optimization, and alleviate the impact of abnormal conditions on the power grid. At the same time, a network reconstruction algorithm based on deep reinforcement learning is adopted to autonomously learn the optimal topology and parameter settings under abnormal scenarios to improve the efficiency and reliability of load scheduling. When issuing equipment maintenance commands, work order tasks are automatically generated, and the analysis results of abnormal data, fault judgment, maintenance suggestions and other information are pushed to the on-site operation and maintenance personnel through the work order system to prompt and guide maintenance operations.

[0113] Specifically, this embodiment adopts a mixed integer linear programming model when performing load adjustment, takes the node voltage qualification rate and network loss rate as the objective function, and takes the flow constraint, voltage constraint, power constraint, etc. as the constraint conditions to solve the optimal active and reactive output and load control strategy. Through real-time calculation and sensitivity analysis of power flow, the load scheduling scheme is dynamically optimized to achieve node voltage deviation within 3% and reduce the network loss rate by 2 percentage points. When performing equipment maintenance, an image recognition model based on convolutional neural network is used to detect defects in visible light images of transmission lines. By collecting sample images of typical defects such as conductor sag, insulator damage, and tower corrosion, a defect feature library is constructed, and data enhancement, transfer learning and other methods are used to optimize the model, so that the accuracy of defect recognition reaches more than 95%, realizing intelligent inspection and status evaluation of equipment.

[0114] S402: If it is determined that the deviation abnormal data is not credible, data processing is performed on the deviation abnormal data.

[0115] Among them, data processing includes at least error correction and data cleaning. For false alarm abnormal data, the erroneous data is automatically recorded and marked. Through data tracking and tracing, the links and causes of abnormal data are found, and the processes of data collection, transmission, and processing are optimized and improved. The accuracy and adaptability of anomaly detection are improved through feature engineering optimization and algorithm model selection. Through incremental learning and active learning, the false alarm rate and missed alarm rate are reduced. For erroneous abnormal data, data cleaning and error correction procedures are started. The outliers are corrected or eliminated, and the missing or erroneous data are estimated and filled by data interpolation, smoothing and other methods. Digital signal processing technologies such as Kalman filtering and wavelet transform are used to remove data noise and extract features, ensure the integrity and accuracy of data, and maintain the reliability of power grid operation data.

[0116] Furthermore, if Figure 8 As shown, after step S4, the following steps are also included:

[0117] S5. Combine the trusted judgment results with the security measures deployment strategy to generate a differentiated data synchronization strategy.

[0118] According to the trusted judgment results and security measures deployment strategy, a system integration solution based on microservice architecture is adopted to classify data from the dimensions of data timeliness, business importance, data volume, etc. according to the data characteristics and business needs of nodes at different levels, and design differentiated data synchronization strategies. Among them, differentiated data synchronization strategies at least include data synchronization strategies corresponding to load data with different timeliness requirements.

[0119] Adopting RESTful API and XML / JSON and other standard data formats, it realizes loose coupling integration with business systems such as power grid operation management system (SCADA), energy management system (EMS), customer service system (CSS), and supports cross-platform and cross-language heterogeneous system interconnection. Differentiated data synchronization strategies include at least:

[0120] 1) For data with high timeliness requirements such as voltage, current, and power, a real-time data exchange solution based on a data bus is adopted, and lightweight publish-subscribe message protocols such as MQTT are selected to locally aggregate and clean the real-time measurement data of each node through the EdgeComputing edge computing node. According to the data collection frequency and control time constant of each business system, the data push cycle is reasonably set, and the communication bandwidth, delay jitter and other factors are comprehensively weighed to determine the optimal data push cycle, so as to achieve end-to-end transmission delay of milliseconds to seconds;

[0121] 2) For data with relatively low timeliness requirements such as power consumption, electricity charges, and alarms, an offline data synchronization solution based on a data warehouse is used to map and configure the data of each business system according to the source table, target table, conversion rules, etc., and use ETL tools to extract incremental data from the source system to clean and convert the data format, encoding, precision, etc.;

[0122] 3) For tables in the source system where data changes frequently and timeliness requirements are high, use micro-batch incremental synchronization at the minute or hour level;

[0123] 4) For tables with slow data changes and low timeliness requirements, daily or weekly batch incremental synchronization is used to dynamically control the ETL execution frequency and data shard size through scheduling tasks to balance data timeliness and system load.

[0124] By building the above differentiated data synchronization strategy, seamless data exchange and synchronization between multiple systems such as power grid operation, energy management and customer service is achieved, which not only improves data quality, but also ensures efficient collaboration of business processes, providing comprehensive and accurate decision-making basis for power grid operations.

[0125] The embodiment of the present invention provides a highly reliable power grid load management method, which evaluates the importance of power grid nodes and deploys security measures of corresponding levels accordingly, effectively resists external attacks and internal errors, protects sensitive information, and improves the network security defense capability of the power system; improves the accuracy and reliability of data through data cross-validation, and solves the problems of misjudgment and decision-making errors caused by data errors or inconsistencies; and achieves seamless data exchange and synchronization between multiple systems such as power grid operation, energy management, and customer service by building a differentiated data synchronization strategy, which not only improves data quality, but also ensures efficient collaboration of business processes, providing a comprehensive and accurate decision-making basis for power grid operations.

[0126] like Fig. 9 As shown, an embodiment of the present invention provides a highly reliable power grid load management system, which is applicable to the power grid load management method as described above, including:

[0127] The time synchronization module 1 is used to synchronize the time of the power grid metering nodes so that the power grid metering nodes can collect load data in the same time dimension;

[0128] The metering node division module 2 is used to evaluate the importance of the power grid metering nodes based on multi-dimensional evaluation indicators, and divide the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results. The multi-dimensional evaluation indicators include power supply reliability, network importance and load importance;

[0129] Data credibility judgment module 3 is used to detect anomalies in the load data of key nodes and cross-validate the marked deviation anomaly data to determine whether the deviation anomaly data is credible;

[0130] The response mechanism matching module 4 is used to match the corresponding response mechanism to the deviation abnormal data according to the trustworthy judgment result.

[0131] It should be noted that each module in the above-mentioned high-reliability power grid load management system can be fully or partially implemented by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules. For the specific definition of a high-reliability power grid load management system, please refer to the definition of a high-reliability power grid load management method above. The two have the same functions and effects and will not be repeated here.

[0132] In summary, the embodiment of the present invention provides a highly reliable power grid load management method and system, which evaluates the importance of power grid nodes and deploys security measures of corresponding levels accordingly, effectively resists external attacks and internal errors, protects sensitive information, and improves the network security defense capability of the power system; improves the accuracy and reliability of data through data cross-validation, and solves the problems of misjudgment and decision-making errors caused by data errors or inconsistencies; and achieves seamless data exchange and synchronization between multiple systems such as power grid operation, energy management, and customer service by constructing differentiated data synchronization strategies, which not only improves data quality, but also ensures efficient collaboration of business processes, providing comprehensive and accurate decision-making basis for power grid operations.

[0133] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0134] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A highly reliable power grid load management method, characterized in that: include: Time synchronization is performed on the power grid metering nodes so that the power grid metering nodes collect load data in the same time dimension; The importance of the power grid metering nodes is evaluated based on multi-dimensional evaluation indicators, and the power grid metering nodes are divided into key nodes, secondary nodes and general nodes according to the evaluation results, wherein the multi-dimensional evaluation indicators include power supply reliability, network importance and load importance; Performing anomaly detection on the load data of the key nodes, and cross-validating the marked deviation anomaly data to determine whether the deviation anomaly data is credible; According to the credible judgment result, a corresponding response mechanism is matched to the abnormal deviation data; The performing of abnormality detection on the load data of the key nodes and cross-validation on the marked abnormal deviation data to determine whether the abnormal deviation data is credible includes: Building a node load anomaly detection model based on the time series prediction model, and inputting the load data of the key node into the node load anomaly detection model to obtain the predicted load data of the key node; Determine whether the deviation between the predicted load data and the actual load data satisfies the 3σ principle, and if not, mark the corresponding load data as abnormal deviation data; Acquire the load data of the same time point of multiple adjacent nodes corresponding to the deviation abnormal data, and compare the deviation abnormal data with the load data at the same time point to determine the data consistency result of the adjacent nodes corresponding to the data at the same time point, wherein the data consistency result includes consistency and inconsistency; The deviation abnormal data is evaluated as a true abnormality or a false alarm abnormality according to the data consistency result.

2. The power grid load management method according to claim 1, characterized in that: After dividing the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results, the method further includes: Deploy a first security measure on the key node, wherein the first security measure at least includes encryption, real-time monitoring, data analysis and security audit; deploying a second security measure on the secondary node, the second security measure comprising at least a timed data check and a periodic system audit; A third security measure is deployed on the general node, and the third security measure at least includes periodic data verification and system audit.

3. The power grid load management method according to claim 2, characterized in that: After matching the deviation abnormal data with a corresponding response mechanism, the method further includes: The trusted judgment result and the security measure deployment strategy are combined to generate a differentiated data synchronization strategy, wherein the differentiated data synchronization strategy at least includes a data synchronization strategy corresponding to load data with different timeliness requirements.

4. The power grid load management method according to claim 1, characterized in that: The importance of the power grid metering nodes is evaluated based on the multi-dimensional evaluation index, and the power grid metering nodes are divided into key nodes, secondary nodes and general nodes according to the evaluation results, including: Calculate the importance score of each of the power grid metering nodes using multi-criteria decision making based on the power supply reliability, network importance and load importance; The importance scores are sorted, and the power grid metering nodes are divided into key nodes, secondary nodes and general nodes according to the sorting results.

5. The power grid load management method according to claim 4, characterized in that: Before calculating the importance score of each of the power grid metering nodes by using a multi-criteria decision according to the power supply reliability, network importance and load importance, the method further includes: A health assessment is performed on the power grid metering node, and the obtained equipment health assessment index is characterized as the power supply reliability of the power grid metering node. The equipment health assessment index is obtained using the following formula: Among them, HI represents the equipment health assessment index, W i represents the weight of the i-th influencing factor, F i represents the score function of the i-th influencing factor, and N represents the total number of influencing factors; The network centrality of the power grid metering node is calculated by using the PageRank algorithm, and the network centrality is characterized as the network importance of the power grid metering node; A node load prediction model is constructed based on the LSTM network, and the load importance of the power grid metering node is evaluated according to the node load prediction model.

6. The power grid load management method according to claim 1, characterized in that: The comparing the abnormal deviation data with the load data at the same time point to determine the data consistency result of the adjacent nodes corresponding to the data at the same time point includes: The abnormal deviation data is subjected to a T test respectively with the load data of each adjacent node at the same time point, and the data consistency result of each adjacent node is determined to be consistent or inconsistent according to the test result.

7. The power grid load management method according to claim 1, characterized in that: The evaluating, based on the data consistency result, whether the deviation abnormal data is a real abnormality or a false alarm abnormality includes: Counting the number of adjacent nodes whose data consistency results are consistent; It is determined whether the number of adjacent nodes exceeds a preset threshold. If so, the deviation abnormal data is determined to be a true abnormality, otherwise it is determined to be a false alarm abnormality.

8. The power grid load management method according to claim 1, characterized in that: According to the credible judgment result, matching the deviation abnormal data with a corresponding response mechanism includes: If it is determined that the deviation abnormal data is credible, an abnormal response mechanism is matched to the deviation abnormal data, and the abnormal response mechanism at least includes adjusting the node load and repairing the node equipment; If it is determined that the deviation abnormal data is not credible, data processing is performed on the deviation abnormal data, and the data processing at least includes error correction and data cleaning.

9. A highly reliable power grid load management system, applicable to the power grid load management method according to any one of claims 1 to 8, characterized in that: include: A time synchronization module, used for performing time synchronization on the power grid metering nodes so that the power grid metering nodes collect load data in the same time dimension; A metering node division module, used to evaluate the importance of the power grid metering nodes based on multi-dimensional evaluation indicators, and divide the power grid metering nodes into key nodes, secondary nodes and general nodes according to the evaluation results, wherein the multi-dimensional evaluation indicators include power supply reliability, network importance and load importance; A data credibility judgment module is used to perform anomaly detection on the load data of the key nodes, and cross-validate the marked deviation abnormal data to determine whether the deviation abnormal data is credible; A response mechanism matching module is used to match a corresponding response mechanism to the deviation abnormal data according to the trustworthy judgment result; The performing of abnormality detection on the load data of the key nodes and cross-validation on the marked abnormal deviation data to determine whether the abnormal deviation data is credible includes: Building a node load anomaly detection model based on the time series prediction model, and inputting the load data of the key node into the node load anomaly detection model to obtain the predicted load data of the key node; Determine whether the deviation between the predicted load data and the actual load data satisfies the 3σ principle, and if not, mark the corresponding load data as abnormal deviation data; Acquire the load data of the same time point of multiple adjacent nodes corresponding to the deviation abnormal data, and compare the deviation abnormal data with the load data at the same time point to determine the data consistency result of the adjacent nodes corresponding to the data at the same time point, wherein the data consistency result includes consistency and inconsistency; The deviation abnormal data is evaluated as a true abnormality or a false alarm abnormality according to the data consistency result.