Optimization analysis method and system for dispatching pumped storage power stations

By constructing the linear scheduling objective function and constraints of pumped storage power stations, and using mixed integer linear planning optimization solution, the problem of low scheduling efficiency of pumped storage power stations in the existing technology is solved, and effective suppression of grid load fluctuations and power generation is achieved. Improved efficiency.

CN118539473BActive Publication Date: 2024-11-15WUHAN UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410559957.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2024-11-15
Estimated Expiration
2044-05-08

AI Technical Summary

Technical Problem

The prior art is difficult to effectively construct a linearized processing method for pumped storage power station scheduling, resulting in low versatility and efficiency of the optimized scheduling model and unable to effectively suppress the fluctuations in the residual load of the power grid.

Method used

By mining the source load characteristics of the power grid, a scheduling objective function is built to minimize the system's residual load fluctuation and maximize the power generation benefits of pumping and storage stations, and a mixed integer linear planning is used to optimize the linearized objective function and constraints to reduce the calculation time , improve the optimization efficiency and generalization capabilities of the scheduling model.

Benefits of technology

It has achieved an optimized scheduling plan within an acceptable time, improved the stability of power grid operation, reduced the abandonment of water, wind and light of new energy, and improved the power generation efficiency of pumped storage power stations and the stability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118539473B_ABST
    Figure CN118539473B_ABST
Patent Text Reader

Abstract

The present invention discloses an optimization analysis method and system for the dispatching of a pumped-storage power station, including: extracting the load of the power grid and the output of wind power and photovoltaic power, and specifically analyzing the operation scenario data of the pumped-storage power station under study; based on the obtained load of the power grid and the output of wind power and photovoltaic power and the operation scenario data of the pumped-storage power station under study, constructing a dispatching objective function with the system residual load fluctuation minimization and the pumped-storage power station power generation benefit maximization as the dispatching objective function, taking the power generation and pumping power of the pumped-storage power station as decision variables, and establishing constraint conditions; linearizing the dispatching objective function, constraint conditions and characteristic curves, optimizing and solving the dispatching objective function and constraint conditions after the linearization by using mixed integer linear programming, and obtaining an optimized dispatching scheme for a water storage power station that can improve the power generation benefit and smooth the residual load fluctuation. The present invention can reduce the calculation time of the optimized dispatching and improve the optimization efficiency and generalization ability of the dispatching model.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of pumped storage power station dispatching, and in particular relates to an optimization analysis method and system for pumped storage power station dispatching. Background Art

[0002] With the large-scale grid connection of new energy sources, the volatility of the power system increases, and the demand for peak-shaving power sources becomes more urgent. As a mature energy storage technology, pumped-storage power stations have the advantages of fast response speed, large adjustment range, and high reliability, and have become an important means of peak-shaving of power grids. Peak-shaving and valley-filling scheduling of pumped-storage power stations is an effective way to reduce the peak-to-valley difference of power grid load, smooth the fluctuation of residual load of the power grid, and ensure the safety and stability of power system operation. Considering the universality and generalization ability of the model, the technical difficulties and challenges currently faced by the optimal scheduling of pumped-storage power stations are: 1) How to construct a linear processing method for the scheduling objective function and multi-restrictive constraints of pumped-storage power stations to improve the universality of the scheduling model. 2) In view of the dimensionality curse problem of nonlinear optimization models, how to construct a linear analytical method for the optimal scheduling of pumped-storage power stations, reduce the calculation time of optimal scheduling, and improve the optimization efficiency and generalization ability of the scheduling model. Summary of the invention

[0003] An object of the present invention is to provide an optimization analytical method for pumped storage power station scheduling in view of the deficiencies in the prior art, which method can reduce the calculation time of the optimized scheduling and improve the optimization efficiency and generalization ability of the scheduling model.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0005] An optimization analysis method for dispatching a pumped storage power station, comprising:

[0006] Step 1: For the pumped storage power station and the regional power grid it serves, explore the source-load characteristics of the power grid, extract the power grid load and wind power and photovoltaic output, and obtain the operation scenario data of the studied pumped storage power station;

[0007] Step 2: Based on the grid load, wind power, photovoltaic output and operation scenario data of the pumped-storage power station obtained in step 1, a scheduling objective function is constructed with minimizing the fluctuation of the system residual load and maximizing the power generation benefit of the pumped-storage power station as the decision variables, and the power generation and pumping power of the pumped-storage power station are established; and constraint conditions are established;

[0008] Step 3: Linearize the dispatch objective function and constraints, and use mixed integer linear programming to optimize and solve the linearized dispatch objective function and constraints to obtain an optimal dispatching plan for the pumped-storage power station that can improve power generation efficiency and smooth residual load fluctuations.

[0009] Furthermore, the specific implementation of step 1 is as follows:

[0010] Firstly, based on the studied pumped storage power station and the power grid it serves, the composition and spatial distribution of various power sources in the power grid are analyzed, the grid structure is studied, and the transmission capacity of regional and inter-provincial interconnection lines is explored;

[0011] Secondly, according to the grid load and output data, the corresponding residual load is obtained by deducting the output of wind power, photovoltaic power and new energy input from the external grid from the original load. The central point method cluster analysis is used to study the characteristics of the power load in the four seasons and the output of various power sources in the study area based on the residual load, and the typical daily processing scenario data of the grid residual load is extracted;

[0012] Finally, for the pumped-storage power station under study, its operating scenario data is analyzed and obtained.

[0013] Furthermore, typical daily scenarios of grid residual load include:

[0014] The daily average values ​​of residual load, wind power output, and photovoltaic power output are the largest;

[0015] The daily average values ​​of residual load, wind power output, and photovoltaic power output are the smallest;

[0016] The daily peak-to-valley differences of residual load, wind power output, and photovoltaic power output are the largest.

[0017] Furthermore, the operation scenario data of the pumped storage power station obtained in step 1 includes:

[0018] Comprehensive efficiency, ratio of power generation to average capacity of power generation equipment, average daily number of power generation direction starts, average daily power generation operation hours, and power generation start success rate;

[0019] The number of times of pumping for power generation every day, the number of pumping and the corresponding frequency; the start and end time and duration of pumping for power generation; the average power or maximum output of pumping.

[0020] Furthermore, the scheduling objective function constructed in step 2 is:

[0021] The first goal is to construct an objective function to minimize the fluctuation of residual load in the target-smoothing system:

[0022]

[0023] Where: F1 represents the residual load mean square error ratio; std(R0) and std(R) are the residual load mean square errors before and after optimization, respectively; R o,t and R t are the residual loads after deducting the wind, solar, and water outputs and the interconnection line power from the original loads before and after optimization in period t; L t is the total power load of the entire network system in period t; and They represent the predicted output of wind power and photovoltaic power in period t respectively; is the predicted output of hydropower in period t; The optimized (or actual) output for a pumped storage power station; The transmission power of the interconnection line outside the study area received in the t period; is the transmission power of the tie lines connected to other provincial networks in the study area during period t;

[0024] The second goal is to construct an objective function for maximizing the economic return target - the operating benefit of the pumped storage power station

[0025]

[0026] Where: F2 represents the operating income of the pumped storage power station; there are various operating conditions for pumped storage power stations, and the operating cost is related to the operating conditions of the units. For the convenience of expression, a 0-1 variable is introduced, x t =1 means the power station is in power generation operation, x t =0 means the power station is in a non-generating state, y t =1 means the power station is in pumping operation, y t =0 means the power station is in non-pumping operation; and They represent the power generation and pumping power of the pumped storage power station in period t respectively; and The on-grid electricity price and pumped hydroelectricity price of the pumped-storage power station in period t are determined according to the actual situation of the power grid;

[0027] The above is a multi-objective optimization problem. Using the weight method, the above two objective functions are assigned values ​​respectively and transformed into a single objective function:

[0028] min F=a·F1-b·F2

[0029] Where a and b are the weights corresponding to the above two objective functions respectively.

[0030] Furthermore, the constraints in step 2 are as follows:

[0031] 1) Active power balance constraints of the entire network

[0032]

[0033] Where: R t It is thermal power output;

[0034] 2) Transmission line power constraints:

[0035]

[0036] Where: L in , Respectively represent the lower and upper limits of the input power, L out , Respectively represent the lower and upper limits of the output power;

[0037] 3) Power generation and pumping capacity limits of pumped storage power stations

[0038]

[0039] Where P t ph A negative value indicates the maximum power when the power station is pumping water; A positive value indicates the maximum capacity during power generation; P t ph Can be positive or negative, negative value indicates pumping, positive value indicates power generation, P t ph =0 means shutdown or phase adjustment operation; It represents the AGC frequency regulation capacity reserved by the pumped storage power station. In addition, when pumping water, the pumping power point of the power station is discrete, and the mathematical expression is as follows:

[0040]

[0041] Where: P1, P2, ..., P n Indicates the power point when pumping water;

[0042] 4) Pumped Storage Power Station Operating Condition Constraints

[0043] From the overall perspective of the power plant, the following constraints are considered:

[0044] (a) The power station cannot be in power generation and pumping operation at the same time

[0045] x t +y t ≤1

[0046] (b) The power station should switch between power generation and pumping operation with at least one period of time.

[0047] x t +y t+1 ≤1,y t +x t+1 ≤1

[0048] (c) Constraints on the duration of power generation and pumping operations

[0049] Generation operation duration constraints

[0050]

[0051] Where: u 1,t、u 0,t They are the start and stop operation variables of the power plant. If the power plant starts the unit for power generation during period t, u 1,t =1, otherwise u 1,t =0, if the power station shuts down the unit during period t, then u 0,t =1, otherwise u 0,t =0; α1 and β1 are the shortest duration of power generation operation and shutdown of the power station respectively;

[0052] Pumping operation duration constraints

[0053]

[0054] Where: v 1,t 、v 0,t are the start and stop operation variables of the power station’s pumping operation. If the power station starts the unit for pumping during period t, v 1,t =1, otherwise v 1,t =0, if the power station shuts down the unit during period t, then v 0,t =1, otherwise v 0,t =0; α2 and β2 are the shortest durations of pumping operation and shutdown of the power station respectively;

[0055] 5) Water-energy conversion relationship of pumped storage power stations

[0056]

[0057] Where: Q t represents the power station flow in period t, Q t >0 means water flows from the upper reservoir to the lower reservoir and the power station is in power generation operation. t Indicates the generating head; Q t <0 means water flows from the lower reservoir to the upper reservoir and the power station is in pumping operation. t Indicates pumping head; They represent the power generation efficiency and pumping efficiency of the power station, both of which vary with H t changes; λ represents a constant;

[0058] The calculation formula for head and lift is as follows:

[0059] Head:

[0060] Lift:

[0061] Where: Respectively represent the average water level of the upper reservoir and the lower reservoir in the tth period; Δh t Indicates the head loss in the pipe;

[0062] 6) Water balance between upper and lower reservoirs of pumped storage power stations

[0063] Without considering other inflow supplements to the upper and lower reservoirs,

[0064] Up library:

[0065] Download library:

[0066] Where: Respectively represent the water storage capacity of the upper and lower reservoirs at the beginning of the tth period; τ is the unit conversion coefficient;

[0067] 7) Constraints on water storage capacity of upper and lower reservoirs of pumped storage power stations

[0068] Up library:

[0069] Download library:

[0070] Where: They correspond to the dead storage capacity of the lower reservoir and the storage capacity corresponding to the normal water level; They correspond to the dead storage capacity of the upper reservoir and the storage capacity corresponding to the normal water level; V B Indicates the reserved emergency reserve storage capacity;

[0071] 8) Storage capacity constraints during dispatch

[0072] The storage capacity V1 at the beginning of the scheduling period is given in advance, and the storage capacity V at the end of the scheduling period is T+1 is also given. According to the scheduling arrangement, the constraint can be expressed as:

[0073] V1(1-δ)≤V T+1 ≤V1(1+δ)

[0074] Where: δ is the allowable deviation rate.

[0075] Furthermore, the method for optimizing the objective function in step 3 is:

[0076] The objective function of minimizing the residual load fluctuation of the target-smoothing system is replaced by the average deviation formula to linearize it. The replacement formula is as follows:

[0077]

[0078] In the above formula, if the denominator is a constant, it is considered a constant.

[0079]

[0080] Then the absolute value term of the numerator is linearized, first introducing the intermediate variable R r,t, so that it satisfies the following constraints

[0081]

[0082] Then the objective function becomes:

[0083]

[0084] The linearization of the objective function is achieved through the above steps.

[0085] Furthermore, the linearization method of the constraints is:

[0086] First, the linearization method of the hydropower conversion relationship includes:

[0087] The unit efficiency is a quadratic function of the unit's water flow and head, expressed as:

[0088] η g,t =ρ0+ρ1·Q t +ρ2·h t +ρ3·Q t ·h t +ρ4·Q t 2 +ρ5·h t 2

[0089] Where: i , i=0,1,...,5 are the coefficients of each item. The corresponding efficiency curve of the unit can be obtained by data fitting;

[0090] Through algebraic operations, it is found that the unit output is a nonlinear function of the unit's power generation flow Q and the power generation head h, which can be expressed as:

[0091] P ph =f(h,Q)

[0092] Discretize the net water head into N i Each section:

[0093]

[0094] Let discrete variables When h t ∈[h n-1 ,h n ], it is expressed as

[0095]

[0096] Where: u t∈{0,1} is the unit state variable, when its value is 1, it is in operation state, and when its value is 0, it is in shutdown state. This constraint ensures that when the unit is in operation state, the net water head can only be in a certain discrete interval. The fixed water head is At this time, the hydropower conversion relationship is a univariate function of the amount of water used for power generation:

[0097]

[0098] Interpolate the power generation flow and select the highest efficiency point of the unit as the interpolation point;

[0099] With L n Interpolation points satisfy:

[0100]

[0101] The power generation flow and linear output of the unit are expressed as

[0102]

[0103]

[0104] The above steps realize the linearization of the water-electricity conversion relationship of the unit;

[0105] Linearization of water level and storage capacity relationship:

[0106] The steps for linearizing the upper reservoir water level are as follows:

[0107] Discretize the storage capacity of the upper reservoir into M-1 intervals

[0108]

[0109] Let discrete variables And there is

[0110]

[0111] This constraint is an indicator variable constraint. In a certain scheduling period, its storage capacity can be expressed as

[0112]

[0113] The upper reservoir water level Z during this dispatching period u,t for:

[0114]

[0115] In the formula, Z u,m represents the mth discrete water level point of the upper reservoir;

[0116] The above method is used to linearize the water level of the lower reservoir. First, the storage capacity of the lower reservoir is discretized into N-1 intervals.

[0117]

[0118] Get the upper reservoir water level Z during the dispatch period d,t for:

[0119]

[0120] Where: Z d,n represents the nth discrete water level point of the lower reservoir, represents the storage capacity of the nth discrete storage capacity interval of the lower reservoir in the tth period, Represents the discrete variable of the lower reservoir.

[0121] Furthermore, after linearization in step 3, the method for solving the mixed integer linear programming includes:

[0122] First, the linearized scheduling objective function and constraints are regarded as mixed integer linear programming problems and converted into mathematical models that can be processed by CPLEX, so that the integer variables in the scheduling objective function and constraints are represented by binary variables, thereby converting the original problem into a linear programming problem.

[0123] Secondly, linear programming algorithms are used to solve the transformed linear programming problems, including the simplex method and the interior point method;

[0124] Thirdly, in the process of solving linear programming problems, integer variables are processed by integer variable reduction method, including separating integer variables from continuous variables and ensuring that integer variables are constrained;

[0125] After that, the solution is optimized by adding new constraints until the optimal solution or approximate optimal solution that satisfies all constraints is found;

[0126] Finally, CPLEX converts the linear programming solution back into the mixed integer programming solution, thereby obtaining an optimal scheduling scheme for the pumped-storage power station that can improve power generation efficiency and smooth residual load fluctuations.

[0127] Another object of the present invention is to provide a system for implementing the above-mentioned optimization analysis method for dispatching a pumped storage power station, comprising:

[0128] The data acquisition and analysis module is used to obtain the source-load characteristics of the power grid and the regional power grid it serves, extract the power grid load and wind power and photovoltaic output, and obtain the operating scenario data of the pumped-storage power station under study;

[0129] The scheduling objective function construction module is used to construct the scheduling objective function based on the data obtained by the data acquisition and analysis module, with the system residual load fluctuation minimization and the pumped storage power station power generation benefit maximization as the scheduling objective function, with the power generation and pumping power of the pumped storage power station as the decision variables, and establish the constraint conditions;

[0130] Linearization processing module, used to perform linearization processing on scheduling objective functions and constraints;

[0131] The scheme analysis module is used to optimize and analyze the scheduling objective function and constraint conditions processed by the linearization processing module using mixed integer linear programming, and obtain the optimal scheduling scheme of the pumped storage power station that can improve power generation efficiency and smooth residual load fluctuations.

[0132] Compared with the prior art, the present invention has the following beneficial effects:

[0133] 1. The present invention eliminates the limitations of deterministic methods, intelligent algorithms, etc. in the application of optimal scheduling of hydropower systems, can reduce the calculation time of optimal scheduling, obtain a better solution within an acceptable time range, and can improve the optimization efficiency and generalization ability of the scheduling model;

[0134] 2. The present invention adopts mathematical statistics, cluster analysis, scenario reduction and other methods to extract the typical daily load of the power grid and the typical daily power generation scenarios of new energy sources, so as to reduce the uncertainty of the residual load of the power grid and reduce the calculation amount of the dispatching model;

[0135] 3. The present invention constructs a multi-objective peak-shaving dispatching model for a pumped-storage power station, and adopts a mixed integer linear programming method to efficiently solve the dispatching model, which can coordinately optimize and smooth the fluctuation of the residual load of the power grid and the power station's peak-shaving dispatching objectives, so as to improve the stability of the power grid operation and reduce the abandonment of new energy water, wind and solar power. BRIEF DESCRIPTION OF THE DRAWINGS

[0136] Figure 1 is a flow chart of an optimization analysis method for dispatching a pumped storage power station according to an embodiment of the present invention;

[0137] Figure 2 is a simplified diagram of a pumped-storage power station in the optimization analysis method for dispatching a pumped-storage power station according to an embodiment of the present invention;

[0138] Figure 3 It is a principle diagram of mixed integer linear programming optimization calculation in the optimization analytical method for pumped storage power station scheduling according to an embodiment of the present invention. DETAILED DESCRIPTION

[0139] The technical solutions in the embodiments of the present invention will be described clearly and completely below in combination with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0140] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0141] The present invention will be further described below in conjunction with specific embodiments, but the present invention is not limited thereto.

[0142] like Figure 1 As shown, an embodiment of the present invention discloses an optimization analysis method for dispatching a pumped storage power station, comprising:

[0143] Step 1: For the pumped storage power station and the regional power grid it serves, explore the source-load characteristics of the power grid, extract the power grid load and wind power and photovoltaic output, and specifically analyze the operating scenario data of the pumped storage power station under study;

[0144] First, based on the studied pumped-storage power station and the power grid it serves, the composition and spatial distribution of various power sources in the power grid are analyzed. The power sources in the power grid include thermal power generation, wind power, photovoltaic power generation, and pumped-storage power station power generation; the grid structure is studied and the transmission capacity of regional and inter-provincial interconnection lines is explored;

[0145] Secondly, according to the grid load and output data, the corresponding residual load is obtained by deducting the output of wind power, photovoltaic power and new energy input from the external network from the original load, and then the randomness and volatility of the corresponding residual load are calculated and compared according to the evaluation indicators of the peak-shaving and valley-filling pumped storage power station serving the grid. Among them, the randomness indicators include the proportion of pumped storage output and the probability distribution characteristics of the output. The proportion of pumped storage output is calculated as the percentage of the measured power at each moment to its rated capacity. The calculation idea of ​​the probability distribution characteristics of the output is: set the power interval, divide the output range into multiple power segments, and count the probability density of each power segment; then, the theoretical probability density curve is fitted to the empirical probability density distribution, and the theoretical probability density curve is obtained by the least squares method or kernel density estimation method. The volatility indicators include output variability, output imbalance rate, output peak-valley difference rate, load rate, mean square error and coefficient of variation. Among them, the output variability refers to the ratio of the difference between the output at the current moment and the output at the previous moment to its installed capacity, which reflects the magnitude of output fluctuation and the frequency of occurrence. The time scales of output imbalance rate include day, month and year. Among them, the daily imbalance rate reflects the fluctuation of output within the day. It is the ratio of daily average output to the maximum average output within the day. The closer its value is to 1, the smaller the fluctuation of output within the day. The time scales of output peak-to-valley difference rate include day, month and year. It reflects the maximum output variation range of the day, month and year. It is the ratio of the difference between the maximum output and the minimum output to the installed capacity. The smaller the value, the smaller the output variation range. The daily average load rate and the minimum load rate are indicators reflecting the daily fluctuation of load, which are respectively expressed by the ratio of the daily average load, the daily minimum load and the daily maximum load. The mean square error and the coefficient of variation are used to describe the degree of fluctuation of the time series (output process, load process). The mean square error and the coefficient of variation within the day are calculated by the output at 15 minutes. The indicators of randomness and volatility are calculated using the calculation methods of the existing technology, which will not be described one by one here. Through detailed analysis and calculation of randomness and volatility, a reference can be provided for more accurately constructing and optimizing the dispatching model of pumped-storage power stations, thereby improving the stability of the power grid and its ability to accept renewable energy power generation.

[0146] Then, from multiple perspectives, a pumped-storage power station output characteristic evaluation index system is constructed, including technical performance indicators, operation and maintenance indicators, economic indicators, and social benefit indicators. Among them, technical performance indicators include pumping volume and efficiency, power generation volume and efficiency, and conversion losses. Operation and maintenance indicators include operation reliability (including equipment failure rate, operation interruption frequency, etc.), maintenance cost (the proportion of maintenance and repair costs in the total operation cost), and operation efficiency (ratio of energy consumption to output during operation). Economic indicators include return on investment (investment payback period, net present value, internal rate of return, etc.), operating costs (labor, energy, maintenance and other costs), and electricity price competitiveness (comparison between the power station power generation price and the market average electricity price). Social benefit indicators include peak load regulation capacity (the power station's response speed and regulation ability to grid load fluctuations), grid stability (stabilizing effect on grid frequency and voltage), support for new energy (the storage and regulation ability of pumped-storage power stations for unstable energy such as solar energy and wind energy), etc. These indicators are also constructed and calculated using existing technical methods, and are not described here one by one. By constructing these indicators, decision makers can better evaluate the role of pumped-storage power stations in power grid operation, better understand and manage the performance of pumped-storage power stations, and provide a reference basis for the selection and implementation of subsequent plans.

[0147] Then, the K-medoids cluster analysis was used to study the power load and output characteristics of various power sources in the four seasons of the research area, and the typical daily output scenario data of the grid residual load was extracted. The steps of cluster analysis using the K-medoids cluster analysis are as follows:

[0148] 1. Collect regional power load data for the four seasons and output data of various power sources, clean the data, and handle issues such as missing values ​​and outliers.

[0149] 2. According to the power load characteristics of the four seasons and the output characteristics of various power sources in each study area, several power load points and output characteristic points of various power sources are randomly selected as the initial cluster centers within the power load characteristics and output characteristics of various power sources in each season.

[0150] 3. Assign each data point to the nearest cluster center.

[0151] 4. Calculate the new center of each cluster. The cluster center is the data point that best represents other points in the cluster.

[0152] 5. Repeat the above steps until the cluster center does not change or the preset number of iterations is reached. The number of clusters K can be determined based on actual conditions or experience.

[0153] 6. Analyze the clustering results through visualization methods (scatter plots, box plots), understand the characteristics of power load and power output in different seasons, compare the differences and similarities between different clusters, obtain the relationship between power load and power output, and extract the typical daily output scenario data of the grid residual load, including:

[0154] The daily average values ​​of residual load, wind power output, and photovoltaic power output are the largest;

[0155] The daily average values ​​of residual load, wind power output, and photovoltaic power output are the smallest;

[0156] The daily peak-to-valley differences of residual load, wind power output, and photovoltaic power output are the largest.

[0157] Finally, for the pumped-storage power station under study, its operation mode (operation cycle, power generation, pumping, energy storage and energy release stages, how to adjust the operation according to the grid load demand and renewable energy output fluctuations, and the reserve capacity management of the power station), characteristics (technical parameters of the power station: installed capacity, reservoir capacity, head height, efficiency, etc., the response speed and regulation ability of the power station to the grid, and the operational reliability of the power station: equipment failure rate, maintenance cycle and life) and operation (functional application) scenarios are analyzed in detail. The schematic diagram of the pumped-storage power station is shown in Figure 1. Figure 2 shown.

[0158] Step 2: Based on the grid load, wind power, photovoltaic output and operation scenario data of the pumped-storage power station obtained in step 1, a scheduling objective function is constructed with minimizing the fluctuation of the system residual load and maximizing the power generation benefit of the pumped-storage power station as the decision variables, and the power generation and pumping power of the pumped-storage power station are established; and constraint conditions are established;

[0159] In this step, the first goal is to establish the objective function of minimizing the residual load fluctuation of the target-smoothing system:

[0160]

[0161] Where: F1 represents the residual load mean square error ratio; std(R0) and std(R) are the residual load mean square errors before and after optimization, respectively, in MW; R o,t and R t are the residual loads after deducting the wind, solar, and water outputs and the interconnection line power from the original loads before and after optimization in period t, in MW; L t is the total power load of the entire network system in period t, in MW; and They represent the predicted output of wind power and photovoltaic power in the t period, in MW; is the predicted hydropower output in period t, in MW; is the optimized (or actual) output of the pumped storage power station, in MW; The transmission power of the interconnection line outside the study area received in the t period is in MW; It is the transmission power of the interconnection line connecting the study area with other provincial grids in period t, in MW.

[0162] The second goal is to establish an economic return target - an objective function that maximizes the operating benefits of a pumped storage power station.

[0163]

[0164] Where: F2 represents the operating income of the pumped storage power station; there are various operating conditions for pumped storage power stations, and the operating cost is related to the operating conditions of the units. For the convenience of expression, a 0-1 variable is introduced, x t =1 means the power station is in power generation operation, x t =0 means the power station is in a non-generating state, y t =1 means the power station is in pumping operation, y t =0 means the power station is in non-pumping operation. and They represent the power generation and pumping power of the pumped storage power station in period t respectively; and The on-grid electricity price and pumped hydroelectricity price of the pumped-storage power station in period t are determined according to the actual situation of the power grid.

[0165] The above is a multi-objective optimization problem. Using the weight method, the above two objectives are assigned values ​​respectively and transformed into a single objective function:

[0166] minF=a·F1-b·F2

[0167] Where F is the scheduling objective function, a and b are the weights corresponding to objective I and objective II, respectively.

[0168] Taking the generating (pumping) power of the pumped-storage power station as the decision variable and considering the peak-shaving and valley-filling function of the pumped-storage power station, the pumped-storage power station is optimized collaboratively, that is, the most suitable solution is deduced by adjusting the assignment of the two objective functions.

[0169] Then, based on the dispatch objective function, power grid and pumped storage power station data, the constraints are established, mainly as follows:

[0170] ① Active power balance constraints of the entire network

[0171]

[0172] Where: R t It can be considered as thermal power output; other variables have the same meaning as above;

[0173] ② Transmission line power constraints:

[0174]

[0175] Where: L in , Respectively represent the lower and upper limits of the input power, L out , Respectively represent the lower and upper limits of the output power;

[0176] ③Power generation and pumping power limits of pumped storage power stations

[0177]

[0178] Where P t ph A negative value indicates the maximum power when the power station is pumping water; A positive value indicates the maximum capacity during power generation; P t ph Can be positive or negative, negative value indicates pumping, positive value indicates power generation, P t ph =0 means shutdown or phase adjustment operation; It indicates the AGC frequency regulation capacity reserved by the pumped storage power station. Since the Heimifeng Power Station is a fixed-speed unit, the unit generally pumps water at full capacity during pumping conditions, so there is no frequency regulation during pumping conditions. In addition, during pumping, the pumping power point of the power station is discrete, and the mathematical expression is as follows:

[0179]

[0180] Where: P1, P2, ..., P n Indicates the power point when pumping water.

[0181] ④ Pumped storage power station operating conditions constraints

[0182] From the overall perspective of the power station, the following constraints are generally considered:

[0183] (a) The power station cannot be in power generation and pumping operation at the same time

[0184] x t +y t ≤1

[0185] (b) The power station should switch between power generation and pumping operation with at least one period of time.

[0186] x t +y t+1 ≤1,y t +x t+1 ≤1

[0187] (c) Constraints on the duration of power generation and pumping operations

[0188] Generation operation duration constraints

[0189]

[0190] Where: u 1,t 、u 0,t They are the start and stop operation variables of the power plant. If the power plant starts the unit for power generation during period t, u 1,t =1, otherwise u 1,t =0, if the power station shuts down the unit during period t, then u 0,t =1, otherwise u 0,t =0; α1 and β1 are the shortest duration of power generation operation and shutdown of the power station respectively.

[0191] Pumping operation duration constraints

[0192]

[0193] Where: v 1,t 、v 0,t are the start and stop operation variables of the power station’s pumping operation. If the power station starts the unit for pumping during period t, v 1,t =1, otherwise v 1,t =0, if the power station shuts down the unit during period t, then v 0,t =1, otherwise v 0,t =0; α2 and β2 are the shortest durations of pumping operation and shutdown of the power station respectively.

[0194] ⑤ Water-energy conversion relationship of pumped storage power station

[0195]

[0196] Where: Q t represents the power station flow in period t, Q t >0 means water flows from the upper reservoir to the lower reservoir and the power station is in power generation operation. t Indicates the generating head; Q t <0 means water flows from the lower reservoir to the upper reservoir and the power station is in pumping operation. t Indicates pumping head; They represent the power generation efficiency and pumping efficiency of the power station, both of which vary with H t changes; λ represents a constant.

[0197] The calculation formula for head and lift is as follows:

[0198] Head:

[0199] Lift:

[0200] Where: They correspond to the average water levels of the upper reservoir and the lower reservoir in the tth period; Δh t Indicates the head loss in the pipe.

[0201] ⑥Balance of water volume between upper and lower reservoirs of pumped storage power station

[0202] Without considering other inflow supplements to the upper and lower reservoirs,

[0203] Up library:

[0204] Download library:

[0205] Where: They correspond to the water storage capacity (storage capacity) of the upper and lower reservoirs at the beginning of the tth period respectively; τ is the unit conversion coefficient.

[0206] ⑦ Constraints on water storage capacity of upper and lower reservoirs of pumped storage power stations

[0207] Up library:

[0208] Download library:

[0209] Where: They correspond to the dead storage capacity of the lower reservoir and the storage capacity corresponding to the normal water level; They correspond to the dead storage capacity of the upper reservoir and the storage capacity corresponding to the normal water level; V B Indicates the reserved emergency reserve storage capacity.

[0210] ⑧Scheduling storage capacity constraints

[0211] The storage capacity V1 at the beginning of the scheduling period is given in advance, and the storage capacity V at the end of the scheduling period is T+1 is also given. According to the scheduling arrangement, the constraint can be expressed as:

[0212] V1(1-δ)≤V T+1 ≤V1(1+δ)

[0213] Where: δ is the allowable deviation rate.

[0214] Step 3: Linearize the dispatch objective function and constraint conditions, and use mixed integer linear programming to optimize and solve the dispatch objective function and constraint conditions after linearization, so as to obtain an optimal dispatching scheme for the pumped storage power station that can improve power generation efficiency and smooth residual load fluctuations;

[0215] Since the objective function of the regulation target - minimizing the fluctuation of the residual load of the system is a nonlinear function, it needs to be linearized. In this embodiment, the average deviation formula is used to replace the original objective function. The replacement formula is as follows:

[0216]

[0217] Observe the above formula and know that the denominator is a constant, so it is considered a constant.

[0218]

[0219] Then the absolute value term of the numerator is linearized, first introducing the intermediate variable R r,t , so that it satisfies the following constraints

[0220]

[0221] Then the objective function becomes:

[0222]

[0223] The linearization of the objective function is achieved through the above steps.

[0224] After linear optimization of the first objective function, it is substituted into the scheduling objective function in step 2: min F = a·F1-b·F2 to obtain the scheduling objective function after linear optimization.

[0225] Then the constraints are linearized. The linearization methods of constraints include:

[0226] First, the hydropower conversion relationship is linearized

[0227] In general, the unit efficiency is a quadratic function of the unit's power generation water flow and head (lift). Taking power generation efficiency as an example, it is expressed as

[0228] η g,t =ρ0+ρ1·Q T +ρ2·h t +ρ3·Q t ·h t +ρ4·Q t 2 +ρ5·h T 2

[0229] Where: i , i=0,1,...,5 are the coefficients of each item. The corresponding efficiency curve of the unit can be obtained by data fitting;

[0230] Through algebraic operations, it can be known that the unit output is a nonlinear function of the unit's power generation flow Q and the power generation head h, which can be expressed as:

[0231] P ph =f(h,Q)

[0232] Discretize the net water head into N i Each section:

[0233]

[0234] Let discrete variables When h t ∈[h n-1 ,h n ], it is expressed as

[0235]

[0236] Where: u t ∈{0,1} is the unit state variable, when its value is 1, it is in operation state, and when its value is 0, it is in shutdown state. This constraint ensures that when the unit is in operation state, the net water head can only be in a certain discrete interval. The fixed water head is At this time, the hydropower conversion relationship is a univariate function of the amount of water used for power generation:

[0237]

[0238] Interpolate the power generation flow and select the highest efficiency point of the unit as the interpolation point;

[0239] With L n Interpolation points satisfy:

[0240]

[0241] The power generation flow and linear output of the unit are expressed as

[0242]

[0243]

[0244]

[0245] The above steps realize the linearization of the water-electricity conversion relationship of the unit;

[0246] Linearization of water level and storage capacity relationship:

[0247] The steps for linearizing the upper reservoir water level are as follows:

[0248] Discretize the storage capacity of the upper reservoir into M-1 intervals

[0249]

[0250] Let discrete variables And there is

[0251]

[0252] This constraint is an indicator variable constraint. In a certain scheduling period, its storage capacity can be expressed as

[0253]

[0254] The upper reservoir water level Z during this dispatching period u,t for:

[0255]

[0256] In the formula, Z u,m represents the mth discrete water level point of the upper reservoir;

[0257] The linearization of the upper reservoir water level is achieved through the above steps;

[0258] Similarly, the water level of the lower reservoir is linearized, and the storage capacity of the lower reservoir is discretized into N-1 intervals.

[0259]

[0260] Get the upper reservoir water level Z during the dispatch period d,t for:

[0261]

[0262] Where: Z d,n represents the nth discrete water level point of the lower reservoir, represents the storage capacity of the nth discrete storage capacity interval of the lower reservoir in the tth period, Represents the discrete variable of the lower reservoir.

[0263] After linearization, the scheduling objective function is solved using mixed integer linear programming. The process is as follows: Figure 3 As shown, the steps are as follows:

[0264] Model transformation: The scheduling objective function and constraints together form a mixed integer linear programming problem, and then the mixed integer linear programming problem is transformed into a mathematical model that CPLEX can handle. At the same time, CPLEX will preprocess the problem before starting to solve it, including simplifying constraints, eliminating redundant variables, fixing certain variables, etc., to reduce the scale and complexity of the problem. For example, in the fixed objective function and is a constant variable. By adding slack variables, the objective function of power generation benefit F2 is converted into an inequality constraint.

[0265] Solving linear programming problems: CPLEX will select the appropriate algorithm based on the characteristics of the problem. For this problem, CPLEX usually uses the branch and bound algorithm (Branch and Bound) and the cutting plane algorithm (Cutting Plane). Branch and bound is the core algorithm for solving MILP problems. It decomposes the total objective function into two sub-problems and bounds these sub-problems, that is, determines the range of the optimal solution of each objective function (F1 and F2). If the optimal solution range of an objective function indicates that it cannot be better than the optimal solution currently found, then the sub-problem will be pruned and no longer considered further. After that, the optimal solution is selected based on the Pareto front, the specific situation of the problem and the priority of the objective function;

[0266] Handling integer variables: When solving linear programming problems, CPLEX uses a special technique called integer variable reduction (IVR) to handle integer variables. By continuous relaxation, the integer variable x t and t Relax to continuous variables; branch and bound, check integer variable v 1,t 、v 0,t 、u 1,t 、u 0,t possible integer values ​​and add constraints for each integer value. This technique is suitable for situations where the integer variables have little effect on the solution of the problem;

[0267] Iteration and optimization: Optimize the solution by adding new constraints (cutting planes). At the same time, after finding a feasible solution, CPLEX uses cutting techniques to eliminate non-optimal solutions in feasible solutions based on the competitive relationship between objective functions F1 and F2, and quickly searches for feasible solutions in the remaining search space. Until the optimal solution or approximate optimal solution that satisfies all constraints is found;

[0268] Solution conversion: Finally, CPLEX converts the linear programming solution back into the mixed integer programming solution to obtain the optimal scheduling plan for the pumped storage power station.

[0269] The entire solution process is highly automated, and CPLEX will automatically adjust the algorithm parameters according to the different characteristics of the problem to obtain the best solution efficiency.

[0270] The embodiment of the present invention further provides a system for implementing the above-mentioned optimization analysis method for dispatching a pumped storage power station, comprising:

[0271] The data acquisition and analysis module is used to obtain the grid source-load characteristics, extract the grid load and wind power and photovoltaic output of the pumped-storage power station and the regional power grid it serves, and specifically analyze the operating scenario data of the pumped-storage power station under study;

[0272] The scheduling objective function construction module is used to construct the scheduling objective function based on the data obtained by the data acquisition and analysis module, with the system residual load fluctuation minimization and the pumped storage power station power generation benefit maximization as the scheduling objective function, with the power generation and pumping power of the pumped storage power station as the decision variables, and establish the constraint conditions;

[0273] Linearization processing module, used to perform linearization processing on scheduling objective functions and constraints;

[0274] The scheme analysis module is used to optimize and solve the scheduling objective function and constraint conditions processed by the linearization processing module using mixed integer linear programming, and obtain the optimal scheduling scheme of the pumped storage power station that can improve power generation efficiency and smooth residual load fluctuations.

[0275] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the contents of the specification of the present invention should be included in the protection scope of the present invention.

Claims

1. An optimization analysis method for dispatching a pumped storage power station, characterized in that: include: Step 1: For the pumped storage power station and the regional power grid it serves, explore the source-load characteristics of the power grid, extract the power grid load and wind power and photovoltaic output, and obtain the operation scenario data of the studied pumped storage power station; Step 2: Based on the grid load, wind power, photovoltaic output and operation scenario data of the pumped-storage power station obtained in step 1, a scheduling objective function is constructed with minimizing the fluctuation of the system residual load and maximizing the power generation benefit of the pumped-storage power station as the decision variables, and the power generation and pumping power of the pumped-storage power station are established; and constraint conditions are established; Step 3: Linearize the dispatch objective function and constraint conditions, and use mixed integer linear programming to optimize and solve the dispatch objective function and constraint conditions after linearization, so as to obtain an optimal dispatching scheme for the pumped storage power station that can improve power generation efficiency and smooth residual load fluctuations; Among them, the scheduling objective function constructed in step 2 is: The first goal is to construct an objective function to minimize the fluctuation of residual load in the target-smoothing system: Where: F1 represents the residual load mean square error ratio; std(R0) and std(R) are the residual load mean square errors before and after optimization, respectively; R o,t and R t are the residual loads after deducting the wind, solar, and water outputs and the interconnection line power from the original loads before and after optimization in period t; L t is the total power load of the entire network system in period t; and They represent the predicted output of wind power and photovoltaic power in period t respectively; is the predicted output of hydropower in period t; Optimized output for pumped storage power plants; The transmission power of the interconnection line outside the study area received in the t period; is the transmission power of the tie lines connected to other provincial networks in the study area during period t; The second goal is to construct an objective function for maximizing the economic return target - the operating benefit of the pumped storage power station Where: F2 represents the operating income of the pumped storage power station; there are various operating conditions for pumped storage power stations, and the operating cost is related to the operating conditions of the units. For the convenience of expression, a 0-1 variable is introduced, x t =1 means the power station is in power generation operation, x t =0 means the power station is in a non-generating state, y t =1 means the power station is in pumping operation, y t =0 means the power station is in non-pumping operation; and They represent the power generation and pumping power of the pumped storage power station in period t respectively; and The on-grid electricity price and pumped hydroelectricity price of the pumped-storage power station in period t are determined according to the actual situation of the power grid; The above is a multi-objective optimization problem. Using the weight method, the above two objective functions are assigned values ​​respectively and transformed into a single objective function: min F=a·F1-b·F2 Where a and b are the weights corresponding to the above two objective functions respectively.

2. The optimization analysis method for dispatching a pumped storage power station according to claim 1, characterized in that: The specific implementation of step 1 is as follows: Firstly, based on the studied pumped storage power station and the power grid it serves, the composition and spatial distribution of various power sources in the power grid are analyzed, the grid structure is studied, and the transmission capacity of regional and inter-provincial interconnection lines is explored; Secondly, according to the grid load and output data, the corresponding residual load is obtained by deducting the output of wind power, photovoltaic power and new energy input from the external grid from the original load. The central point method cluster analysis is used to study the characteristics of the power load in the four seasons and the output of various power sources in the study area based on the residual load, and the typical daily processing scenario data of the grid residual load is extracted; Finally, for the pumped-storage power station under study, its operating scenario data is analyzed and obtained.

3. The optimization analysis method for dispatching a pumped storage power station according to claim 2, characterized in that: Typical daily scenarios of grid residual load include: The daily average values ​​of residual load, wind power output, and photovoltaic power output are the largest; The daily average values ​​of residual load, wind power output, and photovoltaic power output are the smallest; The daily peak-to-valley differences of residual load, wind power output, and photovoltaic power output are the largest.

4. The optimization analysis method for dispatching a pumped storage power station according to claim 2, characterized in that: The operation scenario data of the pumped storage power station obtained in step 1 include: Comprehensive efficiency, ratio of power generation to average capacity of power generation equipment, average daily number of power generation direction starts, average daily power generation operation hours, and power generation start success rate; The number of times of pumping for power generation every day, the number of pumping and the corresponding frequency; the start and end time and duration of pumping for power generation; the average power or maximum output of pumping.

5. The optimization analysis method for dispatching a pumped storage power station according to claim 1, characterized in that: The constraints in step 2 are as follows: 1) Active power balance constraints of the entire network Where: R t It is thermal power output; 2) Transmission line power constraints: Where: L in , Respectively represent the lower and upper limits of the input power, L out , Respectively represent the lower and upper limits of the output power; 3) Power generation and pumping capacity limits of pumped storage power stations Where P t ph A negative value indicates the maximum power when the power station is pumping water; A positive value indicates the maximum capacity during power generation; P t ph Can be positive or negative, negative value indicates pumping, positive value indicates power generation, P t ph =0 means shutdown or phase adjustment operation; It represents the AGC frequency regulation capacity reserved by the pumped storage power station. In addition, when pumping water, the pumping power point of the power station is discrete, and the mathematical expression is as follows: Where: P1, P2, ..., P n Indicates the power point when pumping water; 4) Pumped Storage Power Station Operating Condition Constraints From the overall perspective of the power plant, the following constraints are considered: (a) The power station cannot be in power generation and pumping operation at the same time x t +y t ≤1 (b) The power station should switch between power generation and pumping operation with at least one period of time. x t +y t+1 ≤1,and t +x t+1 ≤1 (c) Constraints on the duration of power generation and pumping operations Generation operation duration constraints Where: u 1,t 、u 0,t They are the start and stop operation variables of the power plant. If the power plant starts the unit for power generation during period t, u 1,t =1, otherwise u 1,t =0, if the power station shuts down the unit during period t, then u 0,t =1, otherwise u 0,t =0; α1 and β1 are the shortest duration of power generation operation and shutdown of the power station respectively; Pumping operation duration constraints Where: v 1,t 、v 0,t are the start and stop operation variables of the power station’s pumping operation. If the power station starts the unit for pumping during period t, v 1,t =1, otherwise v 1,t =0, if the power station shuts down the unit during period t, then v 0,t =1, otherwise v 0,t =0; α2 and β2 are the shortest durations of pumping operation and shutdown of the power station respectively; 5) Water-energy conversion relationship of pumped storage power stations Where: Q t represents the power station flow in period t, Q t >0 means water flows from the upper reservoir to the lower reservoir and the power station is in power generation operation. t Indicates the generating head; Q t <0 means water flows from the lower reservoir to the upper reservoir and the power station is in pumping operation. t Indicates pumping head; They represent the power generation efficiency and pumping efficiency of the power station, both of which vary with H t changes; λ represents a constant; The calculation formula for head and lift is as follows: Head: Lift: Where: Respectively represent the average water level of the upper reservoir and the lower reservoir in the tth period; Δh t Indicates the head loss in the pipe; 6) Water balance between upper and lower reservoirs of pumped storage power stations Without considering other inflow supplements to the upper and lower reservoirs, Up library: Download library: Where: Respectively represent the water storage capacity of the upper and lower reservoirs at the beginning of the tth period; τ is the unit conversion coefficient; 7) Constraints on water storage capacity of upper and lower reservoirs of pumped storage power stations Up library: Download library: Where: They correspond to the dead storage capacity of the lower reservoir and the storage capacity corresponding to the normal water level; They correspond to the dead storage capacity of the upper reservoir and the storage capacity corresponding to the normal water level; V B Indicates the reserved emergency reserve storage capacity; 8) Storage capacity constraints during dispatch The storage capacity V1 at the beginning of the scheduling period is given in advance, and the storage capacity V at the end of the scheduling period is T+1 is also given. According to the scheduling arrangement, the constraint can be expressed as: V1(1-δ)≤V T+1 ≤V1(1+δ) Where: δ is the allowable deviation rate.

6. The optimization analysis method for dispatching a pumped storage power station according to claim 1, characterized in that: The method for optimizing the objective function in step 3 is: The objective function of minimizing the residual load fluctuation of the target-smoothing system is replaced by the average deviation formula to linearize it. The replacement formula is as follows: In the above formula, if the denominator is a constant, it is considered a constant. Then the absolute value term of the numerator is linearized, first introducing the intermediate variable R r,t , so that it satisfies the following constraints Then the objective function becomes: The linearization of the objective function is achieved through the above steps.

7. The optimization analysis method for dispatching a pumped storage power station according to claim 5, characterized in that: The linearization method of the constraints is: First, the linearization method of the hydropower conversion relationship includes: The unit efficiency is a quadratic function of the unit's water flow and head, expressed as: or g,t =ρ0+ρ1·Q t +ρ2·h t +ρ3·Q t ·h t +ρ4·Q t 2 +ρ5·h t 2 Where: i , i=0,1,...,5 are the coefficients of each item. The corresponding efficiency curve of the unit can be obtained by data fitting; Through algebraic operations, it is found that the unit output is a nonlinear function of the unit's power generation flow Q and the power generation head h, which can be expressed as: P ph =f(h,Q) Discretize the net water head into N i Each section: Let discrete variables When h t ∈[h n-1 ,h n ], it is expressed as Where: u t ∈{0,1} is the unit state variable, when its value is 1, it is in operation state, and when its value is 0, it is in shutdown state. This constraint ensures that when the unit is in operation state, the net water head can only be in a certain discrete interval; the fixed water head is At this time, the hydropower conversion relationship is a univariate function of the amount of water used for power generation: Interpolate the power generation flow and select the highest efficiency point of the unit as the interpolation point; With L n Interpolation points satisfy: The power generation flow and linear output of the unit are expressed as The above steps realize the linearization of the water-electricity conversion relationship of the unit; Linearization of water level and storage capacity relationship: The steps for linearizing the upper reservoir water level are as follows: Discretize the storage capacity of the upper reservoir into M-1 intervals Let discrete variables And there is This constraint is an indicator variable constraint. In a certain scheduling period, its storage capacity can be expressed as The upper reservoir water level Z during this dispatching period u,t for: In the formula, Z u,m represents the mth discrete water level point of the upper reservoir; The above method is used to linearize the water level of the lower reservoir. First, the storage capacity of the lower reservoir is discretized into N-1 intervals. Get the upper reservoir water level Z during the dispatch period d,t for: Where: Z d,n represents the nth discrete water level point of the lower reservoir, represents the storage capacity of the nth discrete storage capacity interval of the lower reservoir in the tth period, Represents the discrete variable of the lower reservoir.

8. The optimization analysis method for dispatching a pumped storage power station according to claim 1, characterized in that: After linearization in step 3, the method for solving the mixed integer linear programming includes: First, the linearized scheduling objective function and constraints are regarded as mixed integer linear programming problems and converted into mathematical models that can be processed by CPLEX, so that the integer variables in the scheduling objective function and constraints are represented by binary variables, thereby converting the original problem into a linear programming problem. Secondly, linear programming algorithms are used to solve the transformed linear programming problems, including the simplex method and the interior point method; Thirdly, in the process of solving linear programming problems, integer variables are processed by integer variable reduction method, including separating integer variables from continuous variables and ensuring that integer variables are constrained; After that, the solution is optimized by adding new constraints until the optimal solution or approximate optimal solution that satisfies all constraints is found; Finally, CPLEX converts the linear programming solution back into the mixed integer programming solution, thereby obtaining an optimal scheduling scheme for the pumped-storage power station that can improve power generation efficiency and smooth residual load fluctuations.

9. A system for implementing the optimization analysis method for dispatching a pumped storage power station according to any one of claims 1 to 8, characterized in that: include: The data acquisition and analysis module is used to obtain the source-load characteristics of the power grid and the regional power grid it serves, extract the power grid load and wind power and photovoltaic output, and obtain the operating scenario data of the pumped-storage power station under study; The scheduling objective function construction module is used to construct the scheduling objective function based on the data obtained by the data acquisition and analysis module, with the system residual load fluctuation minimization and the pumped storage power station power generation benefit maximization as the scheduling objective function, with the power generation and pumping power of the pumped storage power station as the decision variables, and establish the constraint conditions; Linearization processing module, used to perform linearization processing on scheduling objective functions and constraints; The scheme analysis module is used to optimize and solve the scheduling objective function and constraint conditions processed by the linearization processing module using mixed integer linear programming, and obtain the optimal scheduling scheme of the pumped storage power station that can improve power generation efficiency and smooth residual load fluctuations.

Citation Information

Cited By

  • Linearization method of reversible pumped storage power station dispatching operation model

    CN121835152A