By designing a ship-loading device for wind power jackets, the jackets are directly transported to the ship deck using the cooperation of transport vehicles, lifting components and clamping ring components. This solves the problem of low efficiency of existing ship-loading methods and achieves Simplify operations and improve shipping efficiency.

CN118545532BActive Publication Date: 2024-10-22ZHONGHAI FULU HEAVY IND CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410994429.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-22
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

The existing ship-loading method of wind power jackets is inefficient and often requires the use of equipment such as slip shoes, traction devices, and cranes, resulting in a complicated ship-loading process and limited ship load.

Method used

A ship loading device is designed, including a transport vehicle, a lifting component, a support component and a pile ring component. Through the cooperation of these components, the transport vehicle can directly and stably transport the wind power jacket to the barge deck, eliminating the need for additional loading and unloading. Lifting steps.

Benefits of technology

It simplifies the shipping operation, improves the shipping efficiency, reduces the original load of the ship, increases the shipping capacity, thereby improving the transportation efficiency of the wind power jacket.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118545532B_ABST
    Figure CN118545532B_ABST
Patent Text Reader

Abstract

The present application provides a loading device for a wind power conduit rack, comprising a transport vehicle, two groups of lifting assemblies, a support assembly, at least three pile ring assemblies and at least three cushions, wherein the two groups of lifting assemblies are arranged on the top of the transport vehicle, the lifting assembly comprises at least two lifting devices, the support assembly comprises a connecting beam and two lifting beams, the connecting beam is fixed between the two lifting beams, each lifting beam is arranged on the top of the lifting device of one group of lifting assemblies, the pile ring assembly comprises a pile ring, the pile ring of each pile ring assembly is used to be sleeved on a pile leg of a wind power conduit rack, the pile ring abuts against the top of the lifting beam, each cushion is used to be arranged at the bottom of a pile leg, a lifting beam is used to be arranged between two adjacent pile legs, and another lifting beam is used to be arranged on the side of the remaining pile leg relative to the lifting beam arranged between two adjacent pile legs. The loading device of the present application is conducive to assisting in improving the loading efficiency of the wind power conduit rack, and the present application also provides a loading method that is conducive to improving the loading efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of offshore wind power development, and in particular to a ship loading device and a ship loading method for a wind power conduit frame. Background Art

[0002] Conventional pile-based wind turbine conduit racks are about 100 meters high and weigh about 2,000 tons. At present, the loading methods of large marine structures such as wind turbine conduit racks usually include: (1) transporting the marine structure to the designated location of the ship through skids, traction devices, and transport vehicles, and then unloading the structure, resulting in low loading efficiency; (2) arranging structures such as cranes, slide rails, carts, and lifting mechanisms on the ship deck, and transferring the conduit rack to the deck through the cooperation of functional parts on the ship deck, resulting in limited ship load. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art, an object of the present invention is to provide a loading device that is helpful in assisting in improving the loading efficiency of a wind power conduit rack.

[0004] The present application also provides a method for loading a wind turbine conduit rack. The loading method of the present application is conducive to simplifying the operation steps, thereby facilitating improving the loading efficiency.

[0005] To solve the above problems, the technical solution adopted by the present invention is as follows:

[0006] A ship loading device for a wind power pipe frame, comprising:

[0007] Transport vehicle, used to transport wind turbine conduit racks to designated locations on the barge deck;

[0008] Two groups of lifting assemblies are arranged along the travel direction of the transport vehicle and are both arranged on the top of the transport vehicle, the lifting assemblies include at least two lifting devices, and at least two of the lifting devices are arranged at intervals along a first direction perpendicular to the travel direction;

[0009] A support assembly, comprising a connecting beam and two lifting beams, wherein the connecting beam is fixed between the two lifting beams, and each lifting beam is arranged on the top of the lifting device of a group of the lifting assemblies;

[0010] At least three pile ring assemblies, each of which comprises a pile ring, wherein the pile ring of each pile ring assembly is used for sleeve connection to a pile leg of the wind power conduit rack, and the pile ring abuts against the top of the lifting beam; and

[0011] At least three piers, each of which is used to be arranged at the bottom of a pile leg, one lifting beam is used to be arranged between two adjacent pile legs, and another lifting beam is used to be arranged on one side of the remaining pile leg relative to the lifting beam arranged between two adjacent pile legs.

[0012] In some possible implementations, the pile ring includes:

[0013] Two clamping pile parts, the two clamping pile parts are detachably connected to form a ring; and

[0014] A support member, protruding from at least one of the pile clamping parts along the axial direction of the pile clamping ring;

[0015] The pile ring assembly also includes:

[0016] A limiting ring is arranged on one side of the pile clamping ring away from the lifting beam, the limiting ring is used to be sleeved on the pile leg, and one end of the support member away from the pile clamping part is used to abut against the limiting ring.

[0017] In some possible implementations, the pile ring further includes:

[0018] A rubber pad is fixed to the inner surface of each of the pile clamping parts, and the rubber pad is used to abut against the circumferential outer surface of the pile leg.

[0019] In some possible implementations, the lifting assembly further includes:

[0020] At least two bases, the base comprising a bottom and two side portions arranged opposite to each other along the travel direction, the bottom being stacked on the top of the transport vehicle, the bottom and the side portions surrounding each other to form a first mounting groove, the first mounting groove being arranged away from the transport vehicle, and each of the lifting devices being clamped in one of the first mounting grooves; and

[0021] A connecting rod is connected between two adjacent bases.

[0022] In some possible implementations, one of the end surface of the lifting device opposite to the bottom and the end surface of the bottom opposite to the first mounting groove is provided with a protrusion, and the other is provided with a groove, and the protrusion is fixed in the groove.

[0023] In some possible implementations, the side portion includes:

[0024] A baffle, wherein the baffles on the two sides and the bottom are arranged to form the first installation groove; and

[0025] At least two first reinforcing ribs are arranged at intervals along the first direction, and the first reinforcing ribs are adjacent to between the baffle and the bottom.

[0026] In some possible implementations, an outer surface of the pile portion is recessed to form a second installation groove, the second installation groove has an opening opposite to the limiting ring, and the support member is fixed in the second installation groove;

[0027] The pile ring also includes:

[0028] a flange connected to a side wall of the second mounting groove facing away from the opening, the flange protruding from the pile portion in a radial direction of the pile ring, the flange and a partial area of ​​the pile portion adjacent to the flange jointly abutting against the lifting beam; and

[0029] At least two second reinforcing ribs are provided, wherein the second reinforcing ribs are adjacent to the flange and the side wall of the second mounting groove, and the support member is further provided between two adjacent second reinforcing ribs.

[0030] In some possible embodiments, the number of the connecting beams is two, and the two connecting beams and the two lifting beams form a square frame structure. The support assembly also includes four support rods, each of which is connected between the adjacent connecting beams and the lifting beams, and the four support rods are distributed in a diamond shape.

[0031] The present application also provides a method for loading a wind turbine conduit frame, which is performed by the loading device, and the loading method comprises the following steps:

[0032] At least three of the cushions are arranged at the assembly site, the bottom of each leg of the wind turbine conduit rack is installed on the end of one of the cushions, and each leg is sleeved with the pile clamping ring of the pile clamping ring assembly;

[0033] The transport vehicle transports the lifting assembly and the supporting assembly to the bottom of the wind turbine conduit rack, so that one lifting beam is arranged between two adjacent pile legs, the other lifting beam is arranged on one side of the remaining pile leg opposite to the lifting beam arranged between two adjacent pile legs, and the pile clamping ring abuts against the top of the lifting beam;

[0034] The lifting device lifts up the pile ring so that the cushion pier is off the ground, and the transport vehicle transports the wind turbine conduit rack to the deck of the barge according to a predetermined route;

[0035] The lifting device is lowered to place the cushion on the deck of the barge, and the lifting beam is lowered to be separated from the pile ring;

[0036] The transport vehicle transports the fallen lifting assembly and the supporting assembly separated from the pile ring back to the final assembly site.

[0037] In some possible implementations, the steps are further included:

[0038] removing the pile clamping ring separated from the lifting beam from the pile leg;

[0039] The transport vehicle also transports the removed pile ring back to the final assembly site.

[0040] Compared with the prior art, the present invention has the following beneficial effects:

[0041] In the present application, the coordination of the pile ring assembly, the support assembly and the lifting assembly enables the transport vehicle to directly and stably transport the wind power conduit rack to the designated position on the barge deck without the need for additional assistance from structures such as sliding shoes, rails, traction devices or lifting devices, thereby helping to simplify the use steps of the loading device, thereby helping to improve the loading efficiency of the wind power conduit rack. In addition, the loading device of the present application does not need to be installed on the ship deck for use, which helps to reduce the original load of the ship, thereby helping to improve the loading capacity of the wind power conduit rack, and thus helping to improve the transportation efficiency of the wind power conduit rack.

[0042] In the present application, by cooperating with a loading device of a specific structure, the transport vehicle can directly transport the wind turbine conduit rack to a designated position on the barge deck, thereby omitting the step of the transport vehicle transferring the wind turbine conduit rack to a traction device or a lifting device. Therefore, the loading method of the present application is conducive to simplifying the operation steps, thereby facilitating the improvement of loading efficiency. In addition, by installing the cushion pier on the wind turbine conduit rack for joint loading, the present application can reduce the operation steps of repeatedly placing the cushion pier on the barge deck, which is also conducive to further improving loading efficiency.

[0043] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 A structural schematic diagram of a ship loading device provided in an embodiment of the present application for loading a wind turbine conduit rack;

[0045] Figure 2 for Figure 1 The structural diagram of the pile clamp ring assembly (partial exploded view) and the pile leg is shown;

[0046] Figure 3 for Figure 1 An enlarged view of part A is shown.

[0047] Description of reference numerals:

[0048] 100-shipping device; 10-transport vehicle; 20-lifting assembly; 21-lifting device; 22-base; 221-bottom; 222-side; 2221-baffle; 2222-first reinforcement rib; 23-connecting rod; 220-first mounting groove; 30-support assembly; 31-lifting beam; 32-connecting beam; 33-support rod; 40-pile ring assembly; 42-pile ring; 421-pile part; 422-support member; 423-flange; 424-second reinforcement rib; 4210-second mounting groove; 43-limiting ring; 44-third reinforcement rib; 50-pad; 200-wind turbine conduit rack; 201-pile leg; X-driving direction; Y-first direction. DETAILED DESCRIPTION

[0049] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0050] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. It should be noted that when an element is referred to as "fixed to" another element, it can be directly on the other element or there can be a centered element. When an element is referred to as "connected to" another element, it can be directly connected to the other element or there can be a centered element. When an element is referred to as "arranged on" another element, it can be arranged on the other element or there can be a centered element.

[0051] Reference Figure 1 One embodiment of the present application provides a loading device for a wind turbine conduit rack, hereinafter referred to as the loading device 100, and the loading device 100 includes a transport vehicle 10, two sets of lifting assemblies 20, a support assembly 30, at least three pile ring assemblies 40 (three pile ring assemblies 40 are shown in the figure) and at least three cushion piers 50 (three cushion piers 50 are shown in the figure). Exemplarily, the transport vehicle 10 can be a self-propelled modular flatbed vehicle. Exemplarily, the number of transport vehicles 10 can be two, and the two transport vehicles 10 can travel in parallel, so as to increase the bearing surface. The transport vehicle 10 is used to transport the wind turbine conduit rack 200 to a designated position on the deck of a barge. Exemplarily, the number of pile legs 201 of the wind turbine conduit rack 200 is at least three, for example, the number of pile legs 201 can be three or four.

[0052] Two groups of lifting assemblies 20 are arranged along the travel direction X of the transport vehicle 10 and are both arranged on the top of the transport vehicle 10. For example, the lifting assemblies 20 can be installed on the top of the transport vehicle 10 or placed on the top of the transport vehicle 10. In this embodiment, the lifting assemblies 20 are placed on the transport vehicle 10, so as to facilitate the adjustment of the spacing of the lifting assemblies 20 as needed. The lifting assembly 20 includes at least two lifting devices 21. In this embodiment, the lifting assembly 20 includes two lifting devices 21, and at least two lifting devices 21 are arranged at intervals along a first direction Y perpendicular to the travel direction X. For example, the lifting device 21 can include a hydraulic lift or a motor lift.

[0053] The support assembly 30 includes a connecting beam 32 and two lifting beams 31. The connecting beam 32 is fixed between the two lifting beams 31. For example, the connecting beam 32 and the lifting beam 31 can be fixed by connecting nails or welding. Each lifting beam 31 is arranged at the top of a lifting device 21 of a lifting assembly. For example, the two lifting beams 31 can be arranged at intervals along the driving direction X. For example, the lifting beam 31 can be a box-type structure, and for example, the connecting beam 32 can be a truss structure, so as to improve the transportation stability of the tooling.

[0054] Combined with reference Figure 2 The pile ring assembly 40 includes a pile ring 42. The pile ring 42 of each pile ring assembly 40 is used to be sleeved on a pile leg 201 of a wind turbine conduit rack 200, and the pile ring 42 abuts against the top of the lifting beam 31. Exemplarily, the inner surface of the pile ring 42 can abut against the outer surface of the pile leg 201. At this time, the pile ring 42 is sleeved on the periphery of the cushion body 41 so that the two can be detachably connected. The inner surface of the pile ring 42 can also be connected to the outer surface of the pile leg 201 by welding or integral molding. At this time, the cushion body 41 and the pile ring 42 are not detachably connected.

[0055] Each pier 50 is used to be arranged at the bottom of a pile leg 201. For example, the pier 50 can be fixed to the bottom of the pile leg 201, so as to reduce the operation steps of placing the pier again on the barge deck later, thereby facilitating the improvement of loading efficiency. In specific application, the pier 50 can be welded to the bottom of the pile leg 201 of the wind turbine conduit rack 200, so as to support the wind turbine conduit rack 200 above the pier 50. For example, the pile leg 201 can be only stacked on the pier 50, so that the pier 50 is not loaded with the wind turbine conduit rack 200, thereby facilitating the improvement of the reusability of the pier 50. A lifting beam 31 is used to be arranged between two adjacent pile legs 201, and another lifting beam 31 is used to be arranged on the side of the remaining pile leg 201 relative to the lifting beam 31 arranged between two adjacent pile legs 201.

[0056] In the present application, the coordination of the pile ring assembly 40, the support assembly 30 and the lifting assembly 20 enables the transport vehicle 10 to directly and stably transport the wind power conduit rack 200 to the designated position on the barge deck without the need for additional assistance of structures such as sliding shoes, rails, traction devices or lifting devices, thereby simplifying the use steps of the loading device 100, thereby helping to improve the loading efficiency of the wind power conduit rack 200. In addition, the loading device 100 of the present application does not need to be installed on the ship deck for use, which is conducive to reducing the original load of the ship, thereby helping to improve the loading capacity of the wind power conduit rack 200, and thus helping to improve the transportation efficiency of the wind power conduit rack 200.

[0057] In some embodiments, the end surface of the pier 50 relative to the pile leg 201 can be recessed to form a clip groove (not shown), so that the pile leg 201 is fixed in the clip groove and then fixed by welding. The clip groove is beneficial to further improve the installation stability of the wind turbine conduit rack 200.

[0058] In some embodiments, in conjunction with reference Figure 2 The pile ring 42 includes two pile parts 421 and a support member 422. The two pile parts 421 are detachably connected to form a ring. The two pile parts 421 are detachably connected, which is convenient for recycling the pile ring 42, thereby helping to reduce the transportation cost of the ship loading device 100. The support member 422 is protruding from at least one pile part 421 along the axial direction of the pile ring 42 (the figure shows that one support member 422 is protruding from one pile part 421). The pile ring assembly 40 also includes a limit ring 43, combined with reference Figure 1 The limiting ring 43 is arranged on one side of the pile clamping ring 42 away from the lifting beam 31. Exemplarily, the limiting ring 43 and the pile clamping ring 42 can be coaxially arranged, and the limiting ring 43 is used to be sleeved on the pile leg 201. The end of the support member 422 away from the pile clamping part 421 is used to abut against the limiting ring 43, thereby preventing the pile clamping ring 42 from shifting, thereby helping to improve the positioning stability of the pile clamping ring 42.

[0059] In this embodiment, the two clamping pile parts 421 can be detachably connected by connecting nails. In other embodiments, the two clamping pile parts 421 can be detachably connected by means of buckles and slots. Specifically, buckles can be provided at both ends of one clamping pile part 421 along the curvature direction of the clamping pile ring 42, and slots can be provided at both ends of the other clamping pile part 421 along the curvature direction of the clamping pile ring 42.

[0060] In some embodiments, the pile ring 42 further includes a rubber pad (not shown), which is fixed to the inner surface of each pile portion 421 and is used to abut against the circumferential outer surface of the pile leg 201. The rubber pad is conducive to increasing the friction force, thereby further improving the positioning stability of the pile ring 42, and the rubber pad is also conducive to reducing the local concentrated force, thereby improving the protection of the pile leg 201. Exemplarily, the rubber pad may include a rubber pad.

[0061] In some embodiments, in conjunction with reference Figures 1 to 3 The outer surface of a pile portion 421 is recessed to form a second installation groove 4210. The second installation groove 4210 has an opening relative to the limiting ring 43. The support member 422 is fixed in the second installation groove 4210. Specifically, the support member 422 can be fixed by welding or integral molding or clamping. The pile ring 42 also includes a flange 423 and at least two second reinforcing ribs 424 (two second reinforcing ribs 424 are shown in the figure). The flange 423 is connected to the side wall of the second installation groove 4210 away from the opening. The flange 423 protrudes from the pile portion 421 along the radial direction of the pile ring 42. The flange 423 and the pile portion 421 adjacent to the flange 423 are jointly abutted against the lifting beam 31. The second reinforcing rib 424 is adjacent to the flange 423 and the side wall of the second installation groove 4210. The support member 422 is also arranged between two adjacent second reinforcing ribs 424. The structure of the pile ring 42 is conducive to increasing the contact area between the pile ring 42 and the lifting beam 31, thereby improving the transportation stability. The structure of the pile ring 42 is also conducive to improving the strength, thereby improving the positioning stability of the pile ring 42.

[0062] In other embodiments, the flange 423 , the second reinforcing rib 424 and the second mounting groove 4210 may be omitted. Accordingly, the support member 422 may be fixed to the end surface of the clamping portion 421 relative to the support member 422 or the outer side surface of the clamping portion 421 .

[0063] In some embodiments, reference Figure 2 The pile ring assembly 40 further includes a third reinforcing rib 44, which is adjacent to the limiting ring 43 and the pier body 41 and is used to improve the support strength of the limiting ring 43. Exemplarily, the limiting ring 43 and the third reinforcing rib 44 can be welded to the pile leg 201.

[0064] In some embodiments, reference Figure 1 and Figure 3The lifting assembly 20 further includes at least two bases 22 (two bases 22 are shown in the figure) and a connecting rod 23. The base 22 includes a bottom 221 and two side portions 222 arranged opposite to each other along the travel direction X. The bottom 221 is stacked on the top of the transport vehicle 10. The bottom 221 and the side portions 222 are surrounded to form a first installation groove 220. The first installation groove 220 is arranged away from the transport vehicle 10. Each lifting device 21 is clamped in a first installation groove 220. The connecting rod 23 is connected between two adjacent bases 22. The structure of the lifting assembly 20 is conducive to improving the placement stability of the lifting assembly 20, and at the same time, it is conducive to improving the convenience of loading the lifting assembly 20.

[0065] In some embodiments, one of the end surface of the lifting device 21 relative to the bottom 221 and the end surface of the bottom 221 relative to the first mounting groove 220 is provided with a protrusion (not shown in the figure), and the other is provided with a groove (not shown in the figure), and the protrusion is fixed in the groove. The cooperation of the protrusion and the groove can further improve the placement stability of the lifting device 21. In this embodiment, the end surface of the lifting device 21 relative to the bottom 221 is provided with four protrusions, and the end surface of the bottom 221 relative to the first mounting groove 220 is provided with four grooves, and each protrusion is fixed in a groove.

[0066] In some embodiments, reference Figure 3 The side portion 222 includes a baffle 2221 and at least two first reinforcing ribs 2222 arranged at intervals along the first direction Y. The baffles 2221 of the two side portions 222 and the bottom 221 are arranged to form a first installation groove 220, and the first reinforcing ribs 2222 are adjacent to the baffle 2221 and the bottom 221. The structure of the side portion 222 is conducive to improving the rigidity and stability of the structure.

[0067] In some embodiments, reference Figure 1 and Figure 3 , the number of connecting beams 32 is two, and the two connecting beams 32 and the two lifting beams 31 form a square frame structure. The support assembly 30 also includes four support rods 33. Exemplarily, the support rods 33 can be cylindrical structures, and each support rod 33 is connected between the adjacent connecting beams 32 and lifting beams 31, and the four support rods 33 are arranged in a rhombus distribution. Exemplarily, mounting holes can be set at the positions where the support rods 33 are installed on both the connecting beams 32 and the lifting beams 31, and the support rods 33 can be inserted into the mounting holes for fixing. Exemplarily, the support rods 33 can also be connected to the connecting beams 32 and the lifting beams 31 by welding. The structure of the support assembly 30 is conducive to improving stability.

[0068] Another embodiment of the present application also provides a method for loading a wind turbine conduit frame, and the loading device 100 of the above embodiment is used for the loading method. The loading method includes the following steps:

[0069] At least three cushions 50 are arranged at the assembly site (three cushions 50 are shown in the figure), and the bottom of each leg 201 of the wind power conduit rack 200 is installed on the end of a cushion 50, so that the wind power conduit rack 200 is supported above the cushion body 41. For example, the wind power conduit rack 200 can be fixed by welding. Each leg 201 is sleeved with a pile ring 42 of a pile ring assembly 40. For example, the pile ring assembly 40 can be installed on the leg 201 first, and then the leg 201 is installed on the cushion 50, or the leg 201 can be installed on the cushion 50 first and then the pile ring assembly 40 is installed. If the wind power conduit rack 200 is shipped with the corresponding pile ring assembly 40, the installation step of the pile ring assembly 40 can be omitted.

[0070] The transport vehicle 10 transports the lifting assembly 20 and the supporting assembly 30 to the bottom of the wind turbine conduit rack 200, so that one lifting beam 31 is arranged between two adjacent pile legs 201, and the other lifting beam 31 is arranged on one side of the remaining pile legs 201 relative to the lifting beam 31 arranged between two adjacent pile legs 201. In this embodiment, one set of lifting assemblies 20 is placed between two adjacent cushion piers 50, and another cushion pier 50 is arranged between two adjacent lifting devices 21 of another set of lifting assemblies 20, and the pile clamping ring 42 abuts against the top of the lifting beam 31.

[0071] The lifting device 21 lifts up the pile ring 42, so that the cushion 50 is lifted off the ground. At this time, the wind turbine conduit frame 200 is lifted up synchronously, and the transport vehicle 10 transports the wind turbine conduit frame 200 to a designated position on the barge deck according to a predetermined route.

[0072] The lifting device 21 is lowered to place the cushion 50 on the deck of the barge, and at the same time, the lifting beam 31 is lowered to be separated from the pile ring 42.

[0073] The transport vehicle 10 transports the lowered lifting assembly 20 and the support assembly 30 separated from the pile ring 42 back to the final assembly site, so that the loading process can be repeated.

[0074] In the present application, by cooperating with a loading device 100 of a specific structure, the transport vehicle 10 can directly transport the wind power conduit rack 200 to a designated position on the barge deck, thereby omitting the step of the transport vehicle 10 transferring the wind power conduit rack 200 to a traction device or a lifting device. Therefore, the loading method of the present application is conducive to simplifying the operation steps, thereby facilitating the improvement of loading efficiency. In addition, by installing the cushion 50 on the wind power conduit rack 200 for joint loading, the present application can reduce the operation steps of repeatedly placing the cushion 50 on the barge deck, which is also conducive to further improving loading efficiency.

[0075] In some embodiments, the method of shipping further comprises the steps of:

[0076] The pile ring 42 separated from the lifting beam 31 is removed from the pile leg 201. At this time, the pile ring 42 includes two detachably connected pile parts 421, and the pile ring 42 and the pile leg 201 are sleeved and fixed. The transport vehicle 10 also transports the removed pile ring 42 back to the final assembly site, so as to facilitate the recycling of the pile ring 42, thereby reducing the transportation cost of loading.

[0077] The above-mentioned embodiments are only preferred embodiments of the present invention and cannot be used to limit the scope of protection of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.

Claims

1. A ship loading device for a wind power pipe rack, It is characterized in that include: Transport vehicle, used to transport wind turbine conduit racks to designated locations on the barge deck; Two groups of lifting assemblies are arranged along the travel direction of the transport vehicle and are both arranged on the top of the transport vehicle, the lifting assemblies include at least two lifting devices, and at least two of the lifting devices are arranged at intervals along a first direction perpendicular to the travel direction; A support assembly, comprising a connecting beam and two lifting beams, wherein the connecting beam is fixed between the two lifting beams, and each lifting beam is arranged on the top of the lifting device of a group of the lifting assemblies; At least three pile ring assemblies, each of which comprises a pile ring, wherein the pile ring of each pile ring assembly is used for sleeve connection to a pile leg of the wind power conduit rack, and the pile ring abuts against the top of the lifting beam; and At least three piers, each of which is used to be arranged at the bottom of a pile leg, one lifting beam is used to be arranged between two adjacent pile legs, and another lifting beam is used to be arranged on one side of the remaining pile leg relative to the lifting beam arranged between two adjacent pile legs.

2. The ship loading device according to claim 1, It is characterized in that The pile ring comprises: Two clamping pile parts, the two clamping pile parts are detachably connected to form a ring; and A support member, protruding from at least one of the pile clamping parts along the axial direction of the pile clamping ring; The pile ring assembly also includes: A limiting ring is arranged on one side of the pile clamping ring away from the lifting beam, the limiting ring is used to be sleeved on the pile leg, and one end of the support member away from the pile clamping part is used to abut against the limiting ring.

3. The ship loading device according to claim 2, It is characterized in that The pile ring also includes: A rubber pad is fixed to the inner surface of each of the pile clamping parts, and the rubber pad is used to abut against the circumferential outer surface of the pile leg.

4. The ship loading device according to claim 1, It is characterized in that The lifting assembly also includes: At least two bases, the base comprising a bottom and two side portions arranged opposite to each other along the travel direction, the bottom being stacked on the top of the transport vehicle, the bottom and the side portions surrounding each other to form a first mounting groove, the first mounting groove being arranged away from the transport vehicle, and each of the lifting devices being clamped in one of the first mounting grooves; and A connecting rod is connected between two adjacent bases.

5. The ship loading device according to claim 4, It is characterized in that One of the end surface of the lifting device relative to the bottom and the end surface of the bottom relative to the first installation groove is provided with a protrusion, and the other is provided with a groove, and the protrusion is fixed in the groove.

6. The ship loading device according to claim 4, It is characterized in that The side portion comprises: A baffle, wherein the baffles on the two sides and the bottom are arranged to form the first installation groove; and At least two first reinforcing ribs are arranged at intervals along the first direction, and the first reinforcing ribs are adjacent to between the baffle and the bottom.

7. The ship loading device according to claim 2, It is characterized in that The outer surface of the clamping part is recessed to form a second installation groove, the second installation groove has an opening opposite to the limiting ring, and the support member is fixed in the second installation groove; The pile ring also includes: a flange connected to a side wall of the second mounting groove facing away from the opening, the flange protruding from the pile portion in a radial direction of the pile ring, the flange and a partial area of ​​the pile portion adjacent to the flange jointly abutting against the lifting beam; and At least two second reinforcing ribs are provided, wherein the second reinforcing ribs are adjacent to the flange and the side wall of the second mounting groove, and the support member is further provided between two adjacent second reinforcing ribs.

8. The ship loading device according to claim 1, It is characterized in that There are two connecting beams, and the two connecting beams and the two lifting beams form a square frame structure. The support assembly also includes four support rods, each of which is connected between the adjacent connecting beams and the lifting beams, and the four support rods are distributed in a diamond shape.

9. A method for loading a wind power conduit frame. It is characterized in that The loading method is carried out by the loading device according to any one of claims 1 to 8, and the loading method comprises the following steps: At least three of the cushions are arranged at the assembly site, the bottom of each leg of the wind turbine conduit rack is installed on the end of one of the cushions, and each leg is sleeved with the pile clamping ring of the pile clamping ring assembly; The transport vehicle transports the lifting assembly and the supporting assembly to the bottom of the wind turbine conduit rack, so that one lifting beam is arranged between two adjacent pile legs, the other lifting beam is arranged on one side of the remaining pile leg opposite to the lifting beam arranged between two adjacent pile legs, and the pile clamping ring abuts against the top of the lifting beam; The lifting device lifts up the pile ring so that the cushion pier is off the ground, and the transport vehicle transports the wind turbine conduit rack to the deck of the barge according to a predetermined route; The lifting device is lowered to place the cushion on the deck of the barge, and the lifting beam is lowered to be separated from the pile ring; The transport vehicle transports the fallen lifting assembly and the supporting assembly separated from the pile ring back to the final assembly site.

10. The method for loading a ship according to claim 9, It is characterized in that Also includes the steps: removing the pile clamping ring separated from the lifting beam from the pile leg; The transport vehicle also transports the removed pile ring back to the final assembly site.

Citation Information

Patent Citations

  • Bottom tool for offshore wind power booster station jacket roll-on and roll-off and installation method

    CN111962487A

  • Transportation system and method for transporting tower of wind turbine

    CN114941607A

  • Offshore wind power jacket roll-on and roll-off method

    CN116216364A

  • Jacket auxiliary shipping structure

    CN212655171U