Underground energy storage chamber segmented lining structure device and construction method

Through the segmented lining structure and expansion and contraction, sealing, and monitoring technologies, the problems of high construction cost of underground energy storage chambers and insufficient utilization of the surrounding rock resistance are solved, and the construction and stability of efficient and economical energy storage in soft rock areas are achieved. run.

CN118548077BActive Publication Date: 2024-10-15XUZHOU ZHONGKUANG GEOTECHNICAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411026286.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-15
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

The construction cost of existing underground energy storage chambers is high, and the resistance of surrounding rock cannot be fully utilized, which limits the development of compressed gas or compressed liquid energy storage. Especially in soft rock areas, the lining structure has high cost and insufficient sealing performance.

Method used

A segmented lining structure device is adopted, including a lining unit, an expansion and contraction structure, a sealing structure and a monitoring structure. The lining unit is spliced ​​through an annular structure, and the expansion and contraction components and sealing components are used to achieve expansion, deformation and sealing of the lining structure, and the monitoring structure is monitored in real time. and control the status of the energy storage bank.

Benefits of technology

Under the action of high internal pressure, the lining structure can make full use of the resistance of the surrounding rock, reduce internal forces and cracks, ensure sealing performance and stability, and achieve safe and economical energy storage construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118548077B_ABST
    Figure CN118548077B_ABST
Patent Text Reader

Abstract

The present invention discloses a piece-type lining structure device and a construction method for an underground energy storage chamber. Through the piece-type design of the lining structure, supplemented by expansion and contraction structure connection, and the provision of a sealing structure and a monitoring structure, the lining structure is expanded and deformed in the radial direction during the inflation or liquid filling process of the energy storage chamber, and the expansion and deformation are suppressed by utilizing the elastic-plastic deformation produced by the compression of the surrounding rock and the larger surrounding rock resistance provided by the increase in strength parameters. At the same time, when the limit position is reached, the expansion and contraction structure plays a limiting role to limit the further expansion and deformation of the lining structure, thereby fully ensuring safety. In the process of degassing or discharging liquid, the lining structure can be restored to its initial state under the action of the expansion and contraction structure. At the same time, the provided sealing structure and monitoring structure can effectively control the gas or liquid leakage rate and maintain the overall stability of the energy storage chamber.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of compressed gas or compressed liquid energy storage, and in particular relates to a segmented lining structure device and a construction method for an underground energy storage chamber. Background Art

[0002] Compressed gas energy storage (CAES) or compressed liquid energy storage is a type of physical energy storage with the advantages of high efficiency, large capacity, long life, relatively low cost, and environmental friendliness. It is considered to be the most promising large-scale and long-term energy storage technology.

[0003] At present, my country's compressed gas energy storage or compressed liquid energy storage technology has entered the demonstration stage. The main technical products are divided into two parts: aboveground and underground. The construction cost of underground energy storage chambers accounts for about 20% to 30% of the total cost. my country's underground energy storage mainly uses salt caverns and artificially excavated hard rock chambers, but salt cavern energy storage has disadvantages such as small resources and uneven distribution, and artificially excavated hard rock energy storage has disadvantages such as high cost (2500~3000 yuan / m³), long cycle, and difficult site selection, which to a certain extent restricts the comprehensive development of compressed gas energy storage or compressed liquid energy storage. Correspondingly, the application technology in the underground space of existing soft rock abandoned mines is still blank. Although it has the dual attributes and business prospects of "waste resource development + new energy storage", the composite lining sealing solution of "monolithic reinforced concrete + steel lining" in the hydraulic industry has problems such as too high lining structure cost and inability to fully utilize the surrounding rock resistance, which is the main bottleneck restricting the development of underground soft rock high internal pressure energy storage technology.

[0004] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention

[0005] The object of the present invention is to provide a segmented lining structure device and a construction method for an underground energy storage chamber, which can solve the problems in the prior art.

[0006] In order to achieve the above-mentioned object, a specific embodiment of the present invention provides a segmented lining structure device of an underground energy storage chamber, comprising:

[0007] A lining structure, wherein the lining structure comprises at least one annular structure formed by splicing a plurality of lining units, each of the lining units comprises a lining sheet and end connectors located at both ends of the lining sheet, and the end connectors of adjacent lining units are movably connected;

[0008] An expansion and contraction structure is arranged between the end connectors of adjacent lining units so that the adjacent lining units can move closer to or farther from each other according to a certain trajectory. The expansion and contraction structure comprises a first expansion and contraction component and a second expansion and contraction component both fixed between the end connectors of adjacent lining units. The first expansion and contraction component and the second expansion and contraction component work together to limit the adjacent lining units.

[0009] The sealing structure comprises a first sealing component and a second sealing component, wherein the first sealing component is arranged on the end connectors of the adjacent lining units and covers the connection gap between the two adjacent end connectors, and the second sealing component is arranged on the inner wall of the lining sheet of the lining unit in the ring;

[0010] The monitoring structure includes a first monitoring component, a second monitoring component and a third monitoring component. The first monitoring component is arranged on the end connector of the lining unit and on the inner wall of the lining sheet of the lining unit, and is at least used to monitor the stress and strain state of the lining unit. The second monitoring component is arranged on the first expansion and contraction component and the second expansion and contraction component, and is at least used to monitor the stress and deformation state of the expansion and contraction structure. The third monitoring component is arranged on the second sealing component and the second expansion and contraction component, and is at least used to monitor the sealing state of the energy storage chamber.

[0011] In one or more embodiments of the present invention, the lining sheet includes a lining sheet body, a plurality of layers of annular reinforcement arranged inside the lining sheet body, and an axial reinforcement arranged inside the lining sheet body and arranged along the axial direction, and annular reinforcement end connectors are provided at both ends of the annular reinforcement, and the ends of the annular reinforcement of the lining sheet are interconnected with each other through the annular reinforcement end connectors.

[0012] In one or more embodiments of the present invention, the end connectors of adjacent lining units are connected by a mortise and tenon structure;

[0013] Each of the terminal connectors includes a groove terminal or a convex terminal, and a terminal anchor block arranged in the groove terminal or the convex terminal, and the terminal connector is connected to the annular rib terminal connector through the terminal anchor block.

[0014] In one or more embodiments of the present invention, each of the terminal connectors includes a terminal inner wall surface located inside the ring, a terminal outer wall surface located outside the ring, and a terminal end surface connecting the terminal inner wall surface and the terminal outer wall surface;

[0015] A connection hole is formed on the end surface of each of the end connectors, and the connection hole is used to set the first expansion and contraction assembly;

[0016] A buffer plate is provided on the end surface of each end connector;

[0017] A connecting ear plate is arranged on the inner wall surface of the end of each of the end connectors. The connecting ear plate is fixedly connected to the end anchor block, and the connecting ear plate is used to arrange the second expansion and contraction assembly.

[0018] In one or more embodiments of the present invention, the first expansion and contraction assembly includes a tensile energy absorbing elastic member, a tensile limiting steel cable and an end fixing member, and both ends of the tensile limiting steel cable and the tensile energy absorbing elastic member are fixed in the connecting hole of the end connecting member through the end fixing member.

[0019] In one or more embodiments of the present invention, the second expansion and contraction assembly includes a plurality of expansion and contraction connecting rods and connecting rod ear plates, one end of the expansion and contraction connecting rod is rotatably disposed on the connecting ear plate of the end connector, and the other end is rotatably disposed on the connecting rod ear plate, and the expansion and contraction connecting rods of adjacent end connectors are connected by at least one of the connecting rod ear plates.

[0020] In one or more embodiments of the present invention, the first monitoring member includes a stress and strain monitoring sensor, which is arranged on the inner wall surface of each of the end connectors and the inner wall surface of each of the lining sheets;

[0021] The second monitoring member includes a stress-strain monitoring sensor, which is arranged on each of the tensile energy-absorbing elastic members, each of the tensile limit steel cables, and each of the expansion and contraction connecting rods;

[0022] The third monitoring component includes a pressure flow monitoring sensor, which is arranged on the inner wall surface of each lining sheet and on each connecting rod ear plate of the second expansion and contraction assembly.

[0023] In one or more embodiments of the present invention, the first sealing assembly includes a plurality of sealing corrugated plates and a compression-resistant connecting rod;

[0024] A plurality of the sealing corrugated plates are arranged between adjacent end connectors, and can be deformed as the gap at the connection between adjacent end connectors changes, so as to completely cover and seal the gap at the connection, thereby ensuring the sealing of the gap at the connection;

[0025] The compression-resistant connecting rod is arranged between the sealing corrugated plate and the connecting ear plate located in the ring.

[0026] In one or more embodiments of the present invention, the second sealing assembly includes a sealing layer and a protective layer which are sequentially arranged on the inner wall surface of the lining sheet.

[0027] In one or more embodiments of the present invention, the underground energy storage chamber segmented lining structure device also includes a buffer layer arranged between the lining structure and the energy storage chamber, and a grouting liquid filled between the buffer layer and the energy storage chamber.

[0028] In one or more embodiments of the present invention, the underground energy storage chamber segmented lining structure device also includes a control structure, which is used to receive and process monitoring data of the monitoring structure, and issue different levels of early warning forecasts based on the comparison results of the monitoring data with the corresponding preset values ​​in the simulation database.

[0029] In one or more embodiments of the present invention, the control structure includes a controller, a monitoring data receiving unit and an early warning unit, and the early warning unit includes a lining sheet early warning device, an expansion and contraction structure early warning device, a sealing structure early warning device and an energy storage chamber early warning device;

[0030] The controller is pre-stored with a simulation database under different working conditions;

[0031] The monitoring data receiving unit is used to receive the monitoring data of the monitoring structure in real time and transmit it to the controller;

[0032] The controller processes the monitoring data and performs real-time comparative analysis with the simulation database. When the monitoring data exceeds the corresponding preset value, the controller activates the corresponding early warning device according to different monitoring objects.

[0033] A specific embodiment of the present invention provides a construction method of the above-mentioned underground energy storage chamber segmented lining structure device, comprising:

[0034] According to the required stratum structure, surrounding rock characteristics, and operating pressure of the energy storage chamber, the segmented lining structure device is designed with parameters, including lining structure form, segment position, segment number, lining unit form, expansion and contraction structure form, sealing structure form, and monitoring structure form;

[0035] Construct a buffer layer on the inner surface of the energy storage chamber, and perform back-wall grouting filling in the cavity between the energy storage chamber and the buffer layer;

[0036] The lining units are made by prefabrication or cast-in-place construction methods, and the construction and installation of different lining units are carried out in a bottom-up order;

[0037] During the installation of the lining unit, the first expansion and contraction assembly is installed simultaneously, and after the first expansion and contraction assembly is installed, the first sealing assembly is installed, and then the second sealing assembly is installed, and finally the second expansion and contraction assembly is installed;

[0038] The construction nodes of each monitoring component of the monitoring structure are interspersed in the construction process of the corresponding monitored object.

[0039] Compared with the prior art, the segmented lining structure device and construction method of the underground energy storage chamber of the present invention are suitable for the construction of shallow buried, soft rock compressed gas energy storage or compressed liquid energy storage underground energy storage chambers. Under the action of circulating high internal pressure, the lining structure can be allowed to undergo radial expansion and large deformation, making full use of the resistance of the surrounding rock, thereby reducing the internal force of the lining structure and the generation of cracks, ensuring the sealing of the segmented positions while ensuring the stability of the underground energy storage chamber.

[0040] The underground energy storage chamber segmented lining structure device and construction method of the present invention have good adaptability and economy for underground shallow buried, soft rock high internal pressure energy storage reservoirs. During the process of filling the energy storage reservoir (energy storage chamber) with gas or liquid, the lining structure expands and deforms in the radial direction, and at the same time, the elastic-plastic deformation caused by the compression of the surrounding rock and the greater surrounding rock resistance provided by the increase in strength parameters are used to suppress the expansion and deformation. At the same time, when the limit position is reached, the expansion and contraction structure plays a limiting role to limit the further expansion and deformation of the lining structure, fully ensuring safety and allowing it to return to the initial state during the process of degassing or releasing liquid; at the same time, the underground energy storage chamber segmented lining structure device of the present invention includes a sealing structure and a monitoring structure, which can effectively control the gas or liquid leakage rate and maintain the overall stability of the energy storage reservoir.

[0041] The underground energy storage chamber segmented lining structure device and construction method of the present invention can adapt to shallow buried and soft rock underground energy storage chambers, while ensuring the stability of the surrounding rock and lining structure and the sealing performance of the energy storage chamber.

[0042] The underground energy storage chamber segmented lining structure device and construction method of the present invention can undergo large expansion deformation in the radial direction of the chamber under the action of the high internal pressure of the pressure storage, so that the surrounding rock is compressed and provides elastic surrounding rock resistance, thereby ensuring the internal and external force balance of the lining structure and controlling the deformation and damage of the lining structure itself.

[0043] The underground energy storage chamber segmented lining structure device and construction method of the present invention sets an annular expansion and contraction structure between adjacent lining units to control the lining structure to perform expansion and contraction movements along a specific trajectory - including two dynamic processes: expansion during inflation or liquid filling and contraction during deflation or liquid discharge.

[0044] The underground energy storage chamber segmented lining structure device and construction method of the present invention sets a specific sealing structure between adjacent lining units, which can adapt to the deformation of the lining structure during expansion and contraction, ensure the sealing performance of the energy storage chamber, and control the energy (gas or liquid) leakage rate within a reasonable range.

[0045] The underground energy storage chamber segmented lining structure device and construction method of the present invention sets monitoring structures at key parts of the lining unit, expansion and contraction structure and sealing structure to monitor the stress and deformation status in real time, and promptly issues early warning and control when the allowable value is exceeded.

[0046] The underground energy storage chamber segmented lining structure device and construction method of the present invention have an annular expansion and contraction structure including a first expansion and contraction component and a second expansion and contraction component, which together ensure the long-term stable and safe operation of the segmented lining structure device. The first expansion and contraction component includes functions such as slow expansion and contraction, ultimate tensile strength, radial shear resistance, closed pressure bearing, and self-sealing. The second expansion and contraction component is easy to install, easy to monitor in operation, and easy to maintain, providing multiple safety guarantees for the segmented lining structure device. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0048] Figure 1 It is a schematic diagram of the overall structure of the underground energy storage chamber segmented lining structure device in a contracted state in one embodiment of the present invention;

[0049] Figure 2 It is a schematic diagram of the overall structure of the expanded state of the segmented lining structure device of the underground energy storage chamber in one embodiment of the present invention;

[0050] Figure 3 It is a schematic diagram of the lining structure of a sliced ​​lining structure device of an underground energy storage chamber in one embodiment of the present invention;

[0051] Figure 4 It is a schematic diagram of the expansion and contraction structure and the sealing structure of the segmented lining structure device of the underground energy storage chamber in one embodiment of the present invention;

[0052] Figure 5 It is a partially enlarged schematic diagram of the expansion and contraction structure and the sealing structure of the segmented lining structure device of the underground energy storage chamber in one embodiment of the present invention;

[0053] Figure 6 It is a schematic diagram of the monitoring structure arrangement of the segmented lining structure device of the underground energy storage chamber in one embodiment of the present invention;

[0054] Figure 7 The following is a process flow chart of a construction method of a segmented lining structure device for an underground energy storage chamber in one embodiment of the present invention;

[0055] Figure 8 The present invention is a flowchart of the construction and operation and maintenance method of the segmented lining structure device of the underground energy storage chamber in one embodiment of the present invention.

[0056] Description of main reference numerals:

[0057] 1- lining structure, 11- surrounding rock, 12- grouting filling layer, 13- buffer layer, 14- lining plate, 141- concrete lining plate body, 142- circumferential reinforcement, 143- circumferential reinforcement end connector, 15- end connector, 151- end anchor block, 152- groove end, 153- convex end, 154- inter-plate connecting hole, 155- connecting ear plate, 156- connecting pin shaft hole, 157- buffer plate;

[0058] 2-expansion and contraction structure, 21-first expansion and contraction assembly, 211-tensile energy-absorbing elastic member, 212-tensile limiting steel cable, 213-end fixing member, 22-second expansion and contraction assembly, 221-expansion and contraction connecting rod, 224-connecting rod ear plate, 225-pin shaft;

[0059] 3-sealing structure, 31-first sealing assembly, 311-inner sealing corrugated plate, 312-outer sealing corrugated plate, 314-pressure-resistant connecting rod, 32-second sealing assembly;

[0060] 4- monitoring structure, 41- first monitoring component, 411- groove end monitoring sensor, 412- convex end monitoring sensor, 413- lining middle monitoring sensor, 42- second monitoring component, 421- tensile energy absorption spring monitoring sensor, 422- limit tensile steel cable monitoring sensor, 423- expansion and contraction connecting rod monitoring sensor, 43- third monitoring component, 431- gas (liquid) monitoring sensor inside the energy storage chamber, 432- gas (liquid) monitoring sensor at the expansion and contraction joint position. DETAILED DESCRIPTION

[0061] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0062] As mentioned in the background technology, my country's compressed gas energy storage or compressed liquid energy storage technology has entered the demonstration stage. The main technical products are divided into two parts: above ground and underground. The construction cost of underground energy storage chambers accounts for about 20% to 30% of the total cost. my country's underground energy storage mainly uses salt caverns and artificially excavated hard rock chambers, but salt cavern energy storage has the disadvantages of small resources and uneven distribution, and artificially excavated hard rock energy storage has the disadvantages of high cost (2500 to 3000 yuan / m³), long cycle, and difficult site selection, which to a certain extent limits the comprehensive development of compressed gas energy storage or compressed liquid energy storage. The corresponding application technology in the underground space of existing soft rock abandoned mines is still blank. Although it has the dual attributes and business prospects of "waste resource development + new energy storage", the composite lining sealing solution of "monolithic reinforced concrete + steel lining" in the hydraulic industry has problems such as high lining structure cost and inability to fully utilize the resistance of the surrounding rock.

[0063] The prior art, for example, the invention patent with application number CN202310662201.7, discloses an adaptive deformation sealing structure for an artificial rock cave gas storage, specifically discloses an adaptive deformation sealing structure, the sealing structure includes a sealing structure body, the sealing structure layer of the sealing structure body includes, from the outside to the inside, the formation surrounding rock, the sprayed concrete layer, the precast concrete lining layer, the transition layer and the flexible sealing layer. The precast concrete lining layer is formed by splicing a plurality of precast concrete components together, a wedge block is installed between two adjacent precast concrete components, and the wedge block is anchored in the anchor drill hole of the surrounding rock with an anchor rod; the inner surface of the precast concrete lining layer is provided with a flexible sealing layer, and the flexible sealing layer is bonded to the inner surface of the transition layer.

[0064] Another example is the invention patent with publication number CN110080822B, which discloses an underground cave gas storage and concrete lining joint anti-gas seepage structure. The anti-gas seepage structure includes a groove arranged at the joint opening of the concrete lining joint, and a sealing strip located in the groove; a cover plate is installed at the notch of the groove, and a filling material is filled between the groove wall, the cover plate and the outer wall of the sealing strip; a first spring and a second spring are arranged in the sealing strip, and both ends of the first spring and the second spring are pressed tightly against the inner wall of the sealing strip.

[0065] Although the above-mentioned invention patent proposes the concept of concrete joint design, its main purpose is to control the development of lining cracks. The radial expansion deformation that this design can adapt to is limited and uncontrollable, resulting in a low utilization rate of the surrounding rock resistance and being unable to adapt to shallow buried, soft rock underground high internal pressure energy storage chambers.

[0066] Based on this, the present application proposes a segmented lining structure device and construction method for an underground energy storage chamber. Through the segmented design of the lining structure, supplemented by an expansion and contraction structure connection, and the provision of a sealing structure and a monitoring structure, it is achieved that during the inflation or liquid filling process of the energy storage chamber, the lining structure expands and deforms in the radial direction, and at the same time, the elastic-plastic deformation produced by the compression of the surrounding rock and the greater surrounding rock resistance provided by the increase in strength parameters are used to suppress the expansion and deformation. At the same time, when the limit position is reached, the expansion and contraction structure plays a limiting role to limit further expansion and deformation of the lining structure, thereby fully ensuring safety. During the degassing or liquid discharge process, the lining structure can be restored to its initial state under the action of the expansion and contraction structure. At the same time, the sealing structure and monitoring structure provided can effectively control the gas or liquid leakage rate and maintain the overall stability of the energy storage chamber.

[0067] like Figure 1 and Figure 2 As shown, a segmented lining structure device of an underground energy storage chamber in one embodiment of the present invention includes a lining structure 1, an expansion and contraction structure 2, a sealing structure 3, a monitoring structure 4 and a control structure.

[0068] The lining structure 1 is mainly used to resist the high internal pressure gas pressure and external surrounding rock pressure in the underground energy storage chamber, ensure the stability of the energy storage chamber, and serve as a sealed main structure. Taking a circular underground energy storage chamber as an example, the structural layers from outside to inside are the surrounding rock 11, the back wall grouting filling layer 12, the buffer layer 13 and the lining structure 1. As the main body of the underground energy storage chamber, the lining structure 1 is preferably a reinforced concrete structure, which can transfer load to the external surrounding rock under the action of the internal air pressure, and can withstand the external surrounding rock pressure during the degassing or liquid discharge stage of the energy storage chamber.

[0069] The lining structure 1 comprises at least one annular structure formed by splicing a plurality of lining units. Each lining unit comprises a lining sheet 14 and end connectors 15 located at both ends of the lining sheet 14. The end connectors 15 of adjacent lining units are movably connected via an expansion and contraction structure 2.

[0070] The piece-by-piece splicing setting of the lining structure 1 can form a number of split seams in the annular direction of the energy storage chamber, realizing the physical separation of the lining structure in the annular direction. Furthermore, under the action of high internal pressure, the lining structure 1 can achieve a large degree of expansion displacement in the radial direction and fully squeeze the surrounding rock to generate elastic resistance. When the surrounding rock resistance increases to a certain value, the lining structure 1 maintains a stable balance under the joint action of the air internal pressure, the surrounding rock external pressure and the expansion and contraction structure 2.

[0071] like Figure 2 and Figure 3As shown, the number of lining pieces 14 (lining units) is designed according to specific geological conditions. In this embodiment, there are four uniform pieces. Each lining piece 14 mainly includes a concrete lining piece body 141, annular reinforcement 142, annular reinforcement end connector 143, axial reinforcement (not shown) and other structures.

[0072] The concrete lining sheet body 141 is the main structure of the lining sheet 14 and is made of concrete with good strength and impermeability. Multiple layers of annular reinforcement 142 are arranged inside the concrete lining sheet body 141 to improve the annular tensile performance of the lining sheet 14. At the same time, multiple axial reinforcements are arranged in the axial direction of the concrete lining sheet body 141 to form a high-strength steel mesh structure.

[0073] Both ends of the annular reinforcement 142 are provided with annular reinforcement end connectors 143. The ends of the annular reinforcement 142 of the lining sheet 14 are connected to each other through the annular reinforcement end connectors 143 and the end connectors 15. Preferably, the annular reinforcement end connectors 143 and the end connectors 15 can be welded or in a special buckle form, so as to enhance the connection performance with the concrete lining sheet body 141.

[0074] The end connectors 15 are arranged at both ends of the lining sheet 14, and are used for interconnection and separation between adjacent lining sheets 14. Specifically, the end connectors 15 of adjacent lining units are connected by mortise and tenon structures. Exemplarily, the end connector 15 includes one of a groove end 152 and a convex end 153, and an end anchor block 151 arranged in the groove end or the convex end. The end anchor block 151 is interconnected with the annular rib end connector 143 inside the lining sheet 14 on one side, and is interconnected with one of the groove end 152 and the convex end 153 on the other side, thereby forming an integral structure, which can be a steel structure or a reinforced concrete structure.

[0075] Among them, the two end connectors 15 of the adjacent lining units connected by mortise and tenon joints, one of which is a groove end 152, and the other is a convex end 153. The groove end 152 and the convex end 153 mesh with each other, and have the functions of radial shear resistance, expansion and contraction guidance, and closed pressure bearing, to prevent the adjacent lining units from shifting relative to each other in the radial direction, and guide during the expansion and contraction process, to ensure that the lining units move according to the designed trajectory during the expansion and contraction cycle, wherein the designed trajectory is preferably that a plurality of lining units in an annular structure gradually expand outward along the circumference of the ring, so that the lining structure expands and deforms in the radial direction.

[0076] Each end connector 15 includes an inner wall surface of the end located inside the ring, an outer wall surface of the end located outside the ring, and an end face connecting the inner wall surface of the end and the outer wall surface of the end. An inter-sheet connection hole 154 is provided on the end face of each end connector 15 along the annular direction for installing the first expansion and contraction assembly 21, and a buffer plate 157 is provided on the end face of the end to prevent damage to the end caused by expansion and contraction collision.

[0077] A connecting lug plate 155 is provided on the inner wall surface of each end connector 15, and specifically, the connecting lug plate 155 is fixedly connected to the end anchor block 151. A connecting pin hole 156 is provided on the connecting lug plate 155 for installing the second expansion and contraction assembly 22, thereby realizing the expansion limit of the lining sheet 14 in the radial direction.

[0078] like Figure 1 and Figure 2 As shown, the expansion and contraction structure 2 is mainly used to connect the lining units to ensure that the lining units expand and contract according to the designed trajectory, and play a limiting role at the extreme position to prevent excessive radial expansion and displacement, which may cause plastic damage or instability of the surrounding rock.

[0079] The expansion and contraction structure 2 is arranged between the end connectors 15 of adjacent lining units so that the adjacent lining units can move closer to or farther from each other according to a certain trajectory. The certain trajectory is that a plurality of lining units in an annular structure gradually expand outward along the circumference of the ring, so that the lining structure expands and deforms in the radial direction. The expansion and contraction structure 2 includes a first expansion and contraction component 21 and a second expansion and contraction component 22, both of which are fixed between the end connectors 15 of adjacent lining units.

[0080] like Figure 2 , Figure 4 and Figure 5 As shown, the first expansion and contraction assembly 21 is a buried expansion and contraction structure used to connect adjacent lining units. Preferably, the first expansion and contraction assembly 21 is arranged inside the end connector 15 of the lining unit, and further located in the inter-sheet connection hole 154.

[0081] The first expansion and contraction assembly 21 mainly includes a tensile energy absorbing elastic member 211, a tensile limit steel cable 212, an end fixing member 213 and other structures. Both ends of the tensile energy absorbing elastic member 211 and the tensile limit steel cable 212 are firmly connected to the groove end 152 and the convex end 153 respectively through the end fixing member 213. The tensile energy absorbing elastic member 211 adopts a high-strength tensile spring structure, and the tensile limit steel cable 212 adopts a high-strength steel cable structure with a certain elongation rate. The end fixing member 213 is preferably an end connecting rod.

[0082] During the process of filling the underground energy storage chamber with gas or liquid, the tensile energy absorbing elastic member 211 is slowly stretched to limit the radial expansion rate of the lining unit and achieve slow expansion. When the designed position is reached, it is stretched and tensioned together with the tensile limit steel cable 212 to play a limiting role. During the process of degassing or de-liquiding the underground energy storage chamber, the tensile energy absorbing elastic member 211 has a contraction function, thereby ensuring that the lining unit contracts and resets according to the designed trajectory.

[0083] The second expansion and contraction assembly 22 is an external expansion and contraction structure, which is used for connecting and limiting adjacent lining units, and works together with the first expansion and contraction structure to prevent excessive expansion and displacement of the lining units, thereby ensuring safe and stable operation of the energy storage chamber.

[0084] The second expansion and contraction assembly 22 is preferably a telescopic hinged connecting rod structure, which mainly includes an expansion and contraction connecting rod 221, a connecting rod ear plate 224 and other structures. Pin holes are set at both ends of the expansion and contraction connecting rod 221, one end is hinged to the connecting ear plate 155 on the end connector 15 of the lining unit through the pin 225, and the other end is hinged to another expansion and contraction connecting rod 221 through the connecting rod ear plate 224, and the other end of the other expansion and contraction connecting rod 221 is hinged to the connecting ear plate 155 on the end connector 15 of another lining unit.

[0085] During the process of inflating the underground energy storage chamber with air or liquid, the lining unit undergoes radial expansion and displacement. At the same time, the expansion and contraction connecting rod 221 can rotate and be straightened around the connection hinge (located on the connecting rod ear plate 224 and the point where the two expansion and contraction connecting rods 221 intersect) and form a straight line at the extreme position, thereby limiting the lining unit from continuing to expand.

[0086] like Figure 2 , Figure 4 , Figure 5 and Figure 6 As shown, the sealing structure 3 is mainly used to ensure the sealing performance of the underground energy storage chamber, control the leakage rate of high internal pressure gas, and ensure the operating efficiency of compressed gas or compressed liquid energy storage. The sealing structure 3 mainly includes a first sealing component 31 and a second sealing component 32. The first sealing component 31 is arranged on the end connector 15 of adjacent lining units and covers and seals the connection gap between two adjacent end connectors 15. The first sealing component 31 is used for sealing between lining units. The second sealing component 32 is arranged on the inner wall surface of the lining sheet 14 of the lining unit (the side wall located in the ring is the inner wall), and the second sealing component 32 is used for sealing the inner wall of the lining sheet 14.

[0087] During the expansion and displacement of the lining units, adjacent lining units will separate, and a large gap will be generated between two adjacent end connectors 15, which is a weak point in sealing. Therefore, a first sealing assembly 31 is provided at the position of the adjacent end connectors 15 of the two lining units, which can adapt to the deformation gap and ensure the sealing performance.

[0088] The first sealing assembly 31 mainly includes an inner sealing corrugated plate 311, an outer sealing corrugated plate 312, a corrugated plate end connection (not shown), a compression connecting rod 314 and other structures. The inner sealing corrugated plate 311 and the outer sealing corrugated plate 312 are respectively arranged at the gap positions of the inner wall surface and the outer wall surface of the end connection piece 15 of the adjacent lining units. The inner sealing corrugated plate 311 and the outer sealing corrugated plate 312 are both made of corrugated steel plates with high pressure resistance and sealing performance. One end is connected to the groove end 152 through the corrugated plate end connection, and the other end is connected to the adjacent convex end 153. At the same time, the inner sealing corrugated plate 311 and the connecting ear plate 155 are connected to each other by setting a tensile connecting rod 314 to improve its ability to resist the internal pressure of gas or compressed liquid. As the adjacent lining units expand and separate, the inner sealing corrugated plate 311 and the outer sealing corrugated plate 312 can be stretched and deformed synchronously to ensure the sealing of the seam.

[0089] At the same time, a second sealing component 32 is arranged on the inner wall surface of the lining sheet 14 of each lining unit to prevent leakage caused by micro cracks on the surface of the lining sheet 14. The second sealing component 32 includes a thin sealing layer, a sealing layer protective layer, and the like.

[0090] Since each lining unit allows a large degree of deformation at the end position, the degree of deformation and cracking within the end of a single lining unit is very low, and the thin sealing layer can ensure the sealing performance of the lining sheet 14 in each lining unit. Specifically, the thin sealing layer can be a thin layer of rubber or iron sheet. At the same time, a sealing layer protective layer is provided on the surface of the thin sealing layer to play an anti-corrosion protection role.

[0091] like Figure 2 and Figure 6 As shown, the monitoring structure 4 is mainly used to monitor the stress, deformation and stability of the lining structure 1, the expansion and contraction structure 2 and the sealing structure 3 during the operation of the compressed gas or liquid energy storage. When the design allowable value is exceeded, early warning and control are carried out to restore the safe operation state.

[0092] The monitoring structure 4 mainly includes a first monitoring component 41, a second monitoring component 42, a third monitoring component 43, etc. The first monitoring component 41 is arranged on the end connector 15 of the lining unit and on the lining sheet 14 of the lining unit, and is at least used to monitor the stress and strain state of the lining unit. The second monitoring component 42 is arranged on the first expansion and contraction component 21 and the second expansion and contraction component 22, and is at least used to monitor the stress and deformation state of the expansion and contraction structure 2. The third monitoring component 43 is arranged on the second sealing component 32 and the second expansion and contraction component 22, and is at least used to monitor the sealing state of the energy storage chamber.

[0093] The first monitoring element 41 is mainly arranged at the end and the middle inner wall of the lining unit, specifically a stress and strain monitoring sensor, which monitors the stress and strain state of different positions of the lining unit in real time, including a groove end monitoring sensor 411, a convex end monitoring sensor 412, and a lining middle monitoring sensor 413. Among them, the groove end monitoring sensor 411 is arranged on the inner wall surface of the groove end 152, the convex end monitoring sensor 412 is arranged on the inner wall surface of the convex end 153, and the lining middle monitoring sensor 413 is arranged on the inner wall surface of the middle part of the lining piece 14.

[0094] The second monitoring component 42 is mainly used to monitor the stress and deformation state of the first expansion and contraction components 21 and the second expansion and contraction components 22, and is specifically a stress and strain monitoring sensor, including a tensile energy absorbing spring monitoring sensor 421, a limit tensile steel cable monitoring sensor 422, and an expansion and contraction connecting rod monitoring sensor 423. Among them, the tensile energy absorbing spring monitoring sensor 421 is arranged on the surface of the tensile energy absorbing elastic component 211, the limit tensile steel cable monitoring sensor 422 is arranged on the surface of the tensile limit steel cable 212, and the expansion and contraction connecting rod monitoring sensor 423 is arranged on the surface of the expansion and contraction connecting rod 221.

[0095] The third monitoring component 43 is mainly used to monitor the gas or liquid state inside the energy storage chamber and at the end joint position of the lining unit, and reflects the sealing performance of different positions. Specifically, it is a pressure flow monitoring sensor, including a gas (liquid) monitoring sensor 431 inside the energy storage chamber and a gas (liquid) monitoring sensor 432 at the expansion joint position. The gas (liquid) monitoring sensor 431 inside the energy storage chamber is arranged at the middle inner side of the lining sheet 14 to monitor the overall sealing performance of the energy storage chamber, and the gas (liquid) monitoring sensor 432 at the expansion joint position is arranged on the connecting rod ear plate 224 of the second expansion and contraction assembly 22 to monitor the sealing state at the end joint of the adjacent lining unit.

[0096] The control structure is mainly used to receive and process the monitoring data of the monitoring structure, and issue different levels of early warnings and forecasts based on the comparison results of the monitoring data with the corresponding preset values ​​in the simulation database. For example, when the stress-strain value or gas sealing performance of the monitored object exceeds the design and operation allowable values ​​(the design and operation allowable values ​​are pre-written in the simulation database), different levels of early warnings and forecasts are issued to instruct the maintenance of the energy storage chamber.

[0097] The control structure mainly includes a controller, a monitoring data receiving unit, and an early warning and forecasting unit. Among them, the monitoring data receiving unit includes a lining piece monitoring module, an expansion and contraction structure monitoring module, and a sealing monitoring module. The early warning and forecasting unit includes a lining piece early warning device, an expansion and contraction structure early warning device, a sealing structure early warning device, and an overall early warning device for the energy storage chamber.

[0098] During the design stage of the energy storage chamber, simulation of the expansion and contraction of the segmented lining structure device is carried out, and a simulation database under different working conditions is established and embedded in the controller to provide data support for control decisions. The lining piece monitoring module is used to receive the stress and strain monitoring data of the groove end monitoring sensor 411, the convex end monitoring sensor 412, and the lining middle monitoring sensor 413 in real time, and transmit and store them to the controller. The expansion and contraction structure monitoring module is used to receive the stress and strain monitoring data of the tensile energy absorption spring monitoring sensor 421, the limit tensile steel cable monitoring sensor 422, and the expansion and contraction connecting rod monitoring sensor 423 in real time, and transmit and store them to the controller. The sealing monitoring module is used to receive the gas (liquid) state data of the gas (liquid) monitoring sensor 431 inside the energy storage chamber and the gas (liquid) monitoring sensor 432 at the expansion and contraction joint position in real time, and transmit and store them to the controller. The controller comprehensively processes the above monitoring data and conducts real-time comparative analysis with the expansion and contraction simulation database. When the monitoring data exceeds the design allowable value, or deviates greatly from the expansion and contraction simulation database, for example, when the deviation exceeds 10%, the controller issues corresponding early warning forecasts for different monitoring objects, including lining sheet early warning, expansion and contraction structure early warning, sealing structure early warning, and overall energy storage chamber early warning.

[0099] refer to Figure 7 As shown, a specific embodiment of the present invention also provides a construction method of the above-mentioned underground energy storage chamber segmented lining structure device, which specifically includes the following steps:

[0100] S1. According to the required stratum structure, surrounding rock characteristics and operating pressure of the energy storage chamber, the segmented lining structure device is designed with parameters, including lining structure form, segment position, number of segments, lining unit form, expansion and contraction structure form, sealing structure form and monitoring structure form.

[0101] S2, construct a buffer layer on the inner surface of the energy storage chamber, and perform back-wall grouting filling in the void gap between the energy storage chamber and the buffer layer.

[0102] S3, use prefabrication or cast-in-place construction methods to make lining units, and carry out the construction and installation of different lining units in a bottom-up order.

[0103] S4, during the installation process of the lining unit, the first expansion and contraction assembly is installed simultaneously, and after the first expansion and contraction assembly is installed, the first sealing assembly is installed, and then the second sealing assembly is installed, and finally the second expansion and contraction assembly is installed.

[0104] S5, the construction nodes of each monitoring component of the monitoring structure are interspersed in the construction process of the corresponding monitored object.

[0105] Specifically, refer to Figure 8 shown.

[0106] (1) Design of energy storage chamber for segmented lining structure device

[0107] According to the geological structure, surrounding rock characteristics, operating pressure, etc. of the energy storage chamber, analyze and determine whether to use a segmented lining structure device. If so, perform parameter design, including lining structure form, segment position, number of segments, lining unit form, expansion and contraction structure form, sealing structure form, monitoring structure form, etc.

[0108] (2) Excavation and treatment of confining pressure

[0109] This step is divided into two categories: existing underground chambers and newly excavated underground chambers. For existing underground chambers, confining pressure reinforcement and surface treatment are required to make them meet the requirements of strength, stability and cross-sectional shape. For newly excavated underground chambers, standardized construction is carried out according to the designed cross-sectional shape, and support is provided as the excavation progresses.

[0110] (3) Buffer layer construction

[0111] The construction quality of the inner wall of the buffer layer is controlled according to the standard design section size. Construction methods such as mesh spraying and formwork cast-in-place can be used. It is required to have certain structural strength, toughness and sealing performance. The cavity gap between the buffer layer and the lining sheet can be filled with grouting behind the wall to ensure direct fit and load transfer between the two.

[0112] (4) Construction of lining pieces and end connectors

[0113] The construction and quality control of lining pieces and end connectors are related to the stability and sealing of the energy storage chamber. Prefabrication or cast-in-place construction methods can be used. The overall construction is carried out in the order of formwork, steel bar binding, concrete pouring, steel structure connection, and maintenance, with a focus on controlling the installation dimensions and connection quality between different structural devices. The construction and installation of different lining pieces and end connectors are carried out in a bottom-up order.

[0114] (5) Expansion and contraction structure construction

[0115] It includes the construction of two major structural devices: the first expansion and contraction component (buried expansion and contraction structure) and the second expansion and contraction component (external expansion and contraction structure). The buried expansion and contraction structure is installed and fixed synchronously during the construction of the lining segment, focusing on controlling the installation position, initial state and fixing quality of the tensile energy absorption spring and the tensile limit steel cable. The external expansion and contraction structure is installed after the construction and maintenance of the lining segment is completed, focusing on controlling the installation direction and articulation quality of different expansion and contraction connecting rods.

[0116] (6) Sealing structure construction

[0117] It includes the construction of two major structural devices: the first sealing component (seal between lining units) and the second sealing component (seal on the inner wall of the lining sheet). The first sealing component (seal between lining units) is constructed after the lining sheet and the expansion and contraction structure are constructed. The inner and outer sealing corrugated plates are welded and fixed to the two end connectors respectively, and a compression connecting rod is set. The second sealing component (seal on the inner wall of the lining sheet) is installed and fixed on the inner wall of the lining sheet using rivets, adhesives, etc.

[0118] (7) Monitoring structure construction

[0119] It includes the first monitoring component (lining unit monitoring), the second monitoring component (expansion and contraction structure monitoring), and the third monitoring component (sealing structure monitoring). Each monitoring component is independent of each other, and its construction nodes are interspersed in the construction process of the corresponding monitored object. Due to the large volume and axial length of the underground energy storage chamber, a group of monitoring (including the first monitoring component, the second monitoring component, and the third monitoring component) can be set up at a certain distance in the extension direction of the chamber, or key monitoring arrangements can be made for weak locations, and a control structure can be installed in the monitoring room.

[0120] (8) Pressurization, commissioning and operation of energy storage chamber

[0121] After completing the above-mentioned construction processes, pressurization and pressure relief debugging and trial operation are carried out in the energy storage chamber. The construction quality, operation stability and sealing performance of the energy storage chamber are detected and analyzed through the dual means of remote monitoring system and manual entry into the chamber for monitoring. After confirming that they meet the design requirements, they are allowed to enter normal operation.

[0122] (9) Regulation and maintenance during operation

[0123] During the long-term compressed gas or liquid energy storage process, the expansion and contraction structure, sealing structure and other device structures of the underground energy storage chamber will age and be damaged to a certain extent, resulting in performance degradation, and maintenance or replacement is necessary. Therefore, through remote monitoring and surveillance systems and regular on-site inspections of the chamber, problems that occur during operation can be discovered and rectified in a timely manner to ensure the long-term stability and sealing performance of the compressed air energy storage underground chamber.

[0124] Compared with the prior art, the segmented lining structure device and construction method of the underground energy storage chamber of the present invention are suitable for the construction of shallow buried, soft rock compressed gas energy storage or compressed liquid energy storage underground energy storage chambers. Under the action of circulating high internal pressure, the lining structure can be allowed to undergo radial expansion and large deformation, making full use of the resistance of the surrounding rock, thereby reducing the internal force of the lining structure and the generation of cracks, ensuring the sealing of the segmented positions while ensuring the stability of the underground energy storage chamber.

[0125] The underground energy storage chamber segmented lining structure device and construction method of the present invention have good adaptability and economy for underground shallow buried, soft rock high internal pressure energy storage reservoirs. During the process of filling the energy storage reservoir (energy storage chamber) with gas or liquid, the lining structure expands and deforms in the radial direction, and at the same time, the elastic-plastic deformation caused by the compression of the surrounding rock and the greater surrounding rock resistance provided by the increase in strength parameters are used to suppress the expansion and deformation. At the same time, when the limit position is reached, the expansion and contraction structure plays a limiting role to limit the further expansion and deformation of the lining structure, fully ensuring safety and allowing it to return to the initial state during the process of degassing or releasing liquid; at the same time, the underground energy storage chamber segmented lining structure device of the present invention includes a sealing structure and a monitoring structure, which can effectively control the gas or liquid leakage rate and maintain the overall stability of the energy storage reservoir.

[0126] The underground energy storage chamber segmented lining structure device and construction method of the present invention can adapt to shallow buried and soft rock underground energy storage chambers, while ensuring the stability of the surrounding rock and lining structure and the sealing performance of the energy storage chamber.

[0127] The underground energy storage chamber segmented lining structure device and construction method of the present invention can undergo large expansion deformation in the radial direction of the chamber under the action of the high internal pressure of the pressure storage, so that the surrounding rock is compressed and provides elastic surrounding rock resistance, thereby ensuring the internal and external force balance of the lining structure and controlling the deformation and damage of the lining structure itself.

[0128] The underground energy storage chamber segmented lining structure device and construction method of the present invention sets an annular expansion and contraction structure between adjacent lining units to control the lining structure to perform expansion and contraction movements along a specific trajectory - including two dynamic processes: expansion during inflation or liquid filling and contraction during deflation or liquid discharge.

[0129] The underground energy storage chamber segmented lining structure device and construction method of the present invention sets a specific sealing structure between adjacent lining units, which can adapt to the deformation of the lining structure during expansion and contraction, ensure the sealing performance of the energy storage chamber, and control the energy (gas or liquid) leakage rate within a reasonable range.

[0130] The underground energy storage chamber segmented lining structure device and construction method of the present invention sets monitoring structures at key parts of the lining unit, expansion and contraction structure and sealing structure to monitor the stress and deformation status in real time, and promptly issues early warning and control when the allowable value is exceeded.

[0131] The underground energy storage chamber segmented lining structure device and construction method of the present invention have an annular expansion and contraction structure including a first expansion and contraction component and a second expansion and contraction component, which together ensure the long-term stable and safe operation of the segmented lining structure device. The first expansion and contraction component includes functions such as slow expansion and contraction, ultimate tensile strength, radial shear resistance, closed pressure bearing, and self-sealing. The second expansion and contraction component is easy to install, easy to monitor in operation, and easy to maintain, providing multiple safety guarantees for the segmented lining structure device.

[0132] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and range of equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0133] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A segmented lining structure device for an underground energy storage chamber, It is characterized in that include: A lining structure, wherein the lining structure comprises at least one annular structure formed by splicing a plurality of lining units, each of the lining units comprises a lining sheet and end connectors located at both ends of the lining sheet, and the end connectors of adjacent lining units are movably connected; An expansion and contraction structure is arranged between the end connectors of adjacent lining units so that the adjacent lining units can move closer to or farther from each other according to a certain trajectory. The expansion and contraction structure comprises a first expansion and contraction component and a second expansion and contraction component both fixed between the end connectors of adjacent lining units. The first expansion and contraction component and the second expansion and contraction component work together to limit the adjacent lining units. The sealing structure comprises a first sealing component and a second sealing component, wherein the first sealing component is arranged on the end connectors of the adjacent lining units and covers the connection gap between the two adjacent end connectors, and the second sealing component is arranged on the inner wall of the lining sheet of the lining unit; as well as The monitoring structure includes a first monitoring component, a second monitoring component and a third monitoring component. The first monitoring component is arranged on the end connector of the lining unit and on the inner wall of the lining sheet of the lining unit, and is at least used to monitor the stress and strain state of the lining unit. The second monitoring component is arranged on the first expansion and contraction component and the second expansion and contraction component, and is at least used to monitor the stress and deformation state of the expansion and contraction structure. The third monitoring component is arranged on the second sealing component and the second expansion and contraction component, and is at least used to monitor the sealing state of the energy storage chamber.

2. The underground energy storage chamber segmented lining structure device according to claim 1, It is characterized in that The lining sheet includes a lining sheet body, multiple layers of annular reinforcement arranged inside the lining sheet body, and axial reinforcement arranged inside the lining sheet body and arranged along the axial direction. Both ends of the annular reinforcement are provided with annular reinforcement end connectors, and the ends of the annular reinforcement of the lining sheet are connected to each other through the annular reinforcement end connectors.

3. The underground energy storage chamber segmented lining structure device according to claim 2, It is characterized in that The end connectors of adjacent lining units are connected by mortise and tenon structures; Each of the terminal connectors includes a groove terminal or a convex terminal, and a terminal anchor block arranged in the groove terminal or the convex terminal, and the terminal connector is connected to the annular rib terminal connector through the terminal anchor block.

4. The underground energy storage chamber segmented lining structure device according to claim 3, It is characterized in that Each of the terminal connectors includes a terminal inner wall surface located inside the ring, a terminal outer wall surface located outside the ring, and a terminal end surface connecting the terminal inner wall surface and the terminal outer wall surface; A connection hole is formed on the end surface of each of the end connectors, and the connection hole is used to set the first expansion and contraction assembly; A buffer plate is provided on the end surface of each end connector; A connecting ear plate is arranged on the inner wall surface of the end of each of the end connectors. The connecting ear plate is fixedly connected to the end anchor block, and the connecting ear plate is used to arrange the second expansion and contraction assembly.

5. The underground energy storage chamber segmented lining structure device according to claim 4, It is characterized in that The first expansion and contraction assembly includes a tensile energy absorbing elastic member, a tensile limiting steel cable and an end fixing member, and both ends of the tensile limiting steel cable and the tensile energy absorbing elastic member are fixed in the connecting hole of the end connecting member through the end fixing member.

6. The underground energy storage chamber segmented lining structure device according to claim 5, It is characterized in that The second expansion and contraction assembly includes a plurality of expansion and contraction connecting rods and connecting rod ear plates, one end of the expansion and contraction connecting rod is rotatably set on the connecting ear plate of the end connecting member, and the other end is rotatably set on the connecting rod ear plate, and the expansion and contraction connecting rods of adjacent end connecting members are connected by at least one of the connecting rod ear plates.

7. The underground energy storage chamber segmented lining structure device according to claim 6, It is characterized in that The first monitoring member comprises a stress and strain monitoring sensor, which is arranged on the inner wall surface of each of the end connectors and the inner wall surface of each of the lining sheets; The second monitoring member includes a stress-strain monitoring sensor, which is arranged on each of the tensile energy-absorbing elastic members, each of the tensile limit steel cables, and each of the expansion and contraction connecting rods; The third monitoring component includes a pressure flow monitoring sensor, which is arranged on the inner wall surface of each lining sheet and on each connecting rod ear plate of the second expansion and contraction assembly.

8. The underground energy storage chamber segmented lining structure device according to claim 4, It is characterized in that The first sealing assembly includes a plurality of sealing corrugated plates and a compression-resistant connecting rod; A plurality of the sealing corrugated plates are arranged between adjacent end connectors and can be deformed as the gap at the connection between adjacent end connectors changes, so as to completely cover and seal the gap at the connection; The compression-resistant connecting rod is arranged between the sealing corrugated plate and the connecting ear plate located in the ring.

9. The underground energy storage chamber segmented lining structure device according to claim 1, It is characterized in that The second sealing assembly includes a sealing layer and a protective layer which are sequentially arranged on the inner wall surface of the lining sheet.

10. The underground energy storage chamber segmented lining structure device according to claim 1, It is characterized in that The underground energy storage chamber segmented lining structure device also includes a buffer layer arranged between the lining structure and the energy storage chamber, and a grouting liquid filled between the buffer layer and the energy storage chamber.

11. The underground energy storage chamber segmented lining structure device according to claim 1, It is characterized in that It also includes a control structure, which is used to receive and process the monitoring data of the monitoring structure, and issue early warning forecasts of different levels according to the comparison results of the monitoring data with the corresponding preset values ​​in the simulation database.

12. The underground energy storage chamber segmented lining structure device according to claim 11, It is characterized in that The control structure includes a controller, a monitoring data receiving unit and an early warning unit, and the early warning unit includes a lining sheet early warning device, an expansion and contraction structure early warning device, a sealing structure early warning device and an energy storage chamber early warning device; The controller is pre-stored with a simulation database under different working conditions; The monitoring data receiving unit is used to receive the monitoring data of the monitoring structure in real time and transmit it to the controller; The controller processes the monitoring data and performs real-time comparative analysis with the simulation database. When the monitoring data exceeds the corresponding preset value, the controller activates the corresponding early warning device according to different monitoring objects.

13. A construction method for a segmented lining structure device for an underground energy storage chamber according to any one of claims 1 to 12, It is characterized in that include: According to the required stratum structure, surrounding rock characteristics, and operating pressure of the energy storage chamber, the segmented lining structure device is designed with parameters, including lining structure form, segment position, segment number, lining unit form, expansion and contraction structure form, sealing structure form, and monitoring structure form; Construct a buffer layer on the inner surface of the energy storage chamber, and perform back-wall grouting filling in the cavity between the energy storage chamber and the buffer layer; The lining units are made by prefabrication or cast-in-place construction methods, and the construction and installation of different lining units are carried out in a bottom-up order; During the installation of the lining unit, the first expansion and contraction assembly is installed simultaneously, and after the first expansion and contraction assembly is installed, the first sealing assembly is installed, and then the second sealing assembly is installed, and finally the second expansion and contraction assembly is installed; The construction nodes of each monitoring component of the monitoring structure are interspersed in the construction process of the corresponding monitored object.