A method, system, electronic equipment and medium for analyzing earthwork efficiency

By monitoring video and stacking density data, key frame images are extracted to identify loading times and loading heights, and combined with operation duration and stacking density, the problem of low accuracy in earthmoving operation efficiency analysis in the existing technology is solved, and the workload of the digging bucket is realized. Precise positioning and time recording improve the accuracy of earthmoving efficiency analysis.

CN118552089BActive Publication Date: 2024-10-29FOSHAN SHUNDE JETONE DIGITAL TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411008172.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-29
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

The existing earth-moving operation efficiency analysis method is difficult to accurately judge the specific working conditions of the bucket by detecting the overall accumulation of the soil pile, resulting in deviations in efficiency assessment and reducing the accuracy of earth-moving operation efficiency analysis.

Method used

By obtaining surveillance video and packing density data of the earthmoving operation area, key frame images are extracted to identify the effective loading times of the bucket and the loading height of the engineering vehicle. Combined with the operation duration and packing density, the efficiency of the earthmoving operation is calculated, and each operation of the bucket is realized. precise positioning and time recording of quantities.

Benefits of technology

Improves the accuracy of earthmoving efficiency analysis, reduces human intervention and errors, provides a comprehensive and accurate efficiency assessment that takes into account time efficiency, workload and soil pile characteristics, and improves the ability to identify the specific workload of the bucket .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118552089B_ABST
    Figure CN118552089B_ABST
Patent Text Reader

Abstract

A method, system, electronic device and medium for analyzing earthwork efficiency, relating to the field of image processing technology. The method comprises: obtaining a monitoring video of an earthwork area and the stacking density of earth in the earthwork area; when there is an engineering vehicle in the monitoring video, extracting the first frame image of the bucket and the second frame image of the engineering vehicle in the monitoring video, and determining the first moment when the engineering vehicle enters; according to the first frame image, identifying the effective loading times of the bucket, and according to the second frame image, identifying the loading height of the engineering vehicle; when the loading height is greater than or equal to the preset loading height, determining the second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determining the operation duration based on the first moment and the second moment; combining the operation duration, the effective loading times and the stacking density to determine the earthwork efficiency of the earthwork area. The implementation of the technical solution provided by the present application achieves the effect of improving the accuracy of earthwork efficiency analysis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of image processing technology, and in particular to an earthwork operation efficiency analysis method, system, electronic equipment and medium. Background Art

[0002] With the acceleration of urbanization and the vigorous development of infrastructure construction, earthwork plays a vital role in modern construction. As the basic link of engineering construction, the efficiency of earthwork directly affects the progress and cost control of the entire project. Therefore, accurate and efficient analysis of earthwork efficiency has become an indispensable part of engineering management.

[0003] At present, the existing earthwork efficiency analysis method analyzes the operation status of factory vehicles by detecting the overall accumulation of soil piles in the earthwork operation area. However, in practical applications, since the actual operation status of the bucket on different soil piles is different each time when digging the soil pile, it is difficult to judge the specific working status of the bucket by only detecting the overall accumulation of soil piles in the earthwork operation area, resulting in deviations in efficiency evaluation, and thus low accuracy of earthwork efficiency analysis. Summary of the invention

[0004] The present application provides an earthwork operation efficiency analysis method, system, electronic equipment and medium, which have the effect of improving the accuracy of earthwork operation efficiency analysis.

[0005] In a first aspect, the present application provides a method for analyzing earthwork efficiency, comprising:

[0006] Obtaining monitoring video of an earthwork operation area and a packing density of earthwork in the earthwork operation area;

[0007] When there is an engineering vehicle in the monitoring video, extracting a first frame image of the bucket and a second frame image of the engineering vehicle in the monitoring video, and determining a first moment when the engineering vehicle enters the earthwork operation area;

[0008] According to the first frame image, identifying the effective loading times of the bucket, and according to the second frame image, identifying the loading height of the engineering vehicle;

[0009] When the loading height of the engineering vehicle is greater than or equal to the preset loading height, determining a second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determining the operation time of the engineering vehicle based on the first moment and the second moment;

[0010] The earthwork operation efficiency of the earthwork operation area is determined in combination with the operation duration, the effective loading times and the stacking density.

[0011] By adopting the above technical solutions, monitoring videos and stacking density data are obtained, and a comprehensive data collection foundation is established. This covers not only the dynamic operation process, but also the static earthwork characteristics. When the system detects that the engineering vehicle enters the operation area, the key frame image is extracted and the time point is recorded to achieve accurate positioning and time marking of the operation process. This automated monitoring method improves the efficiency and accuracy of data collection and reduces human intervention and errors. By analyzing the first frame image of the bucket, the effective loading times can be identified, which directly reflects the actual workload. At the same time, by analyzing the second frame image of the engineering vehicle to identify the loading height, the loading status of the vehicle can be accurately judged. When the loading height reaches or exceeds the preset value, the second moment is automatically recorded, and the accurate operation time is calculated in combination with the first moment. This automated time recording and calculation method not only improves the accuracy of efficiency evaluation, but also provides the possibility of analyzing time allocation during the operation process. By comprehensively considering the operation time, effective loading times and stacking density, an indicator that fully reflects the efficiency of earthwork operations can be calculated. This comprehensive indicator not only takes into account time efficiency, but also includes workload and soil pile characteristics, namely soil pile density, providing a more comprehensive and accurate efficiency evaluation, realizing the identification of the specific workload of the bucket at each time, thereby improving the accuracy of earthwork operation efficiency analysis.

[0012] In a second aspect of the present application, a system for analyzing earthwork efficiency is provided, the system comprising:

[0013] An information acquisition module, used to acquire monitoring video of an earthwork operation area and the accumulation density of earthwork in the earthwork operation area;

[0014] An image extraction module, for extracting a first frame image of the bucket and a second frame image of the engineering vehicle in the monitoring video when an engineering vehicle is present in the monitoring video, and determining a first moment when the engineering vehicle enters the earthwork operation area;

[0015] an image recognition module, for identifying the effective loading times of the bucket according to the first frame image, and identifying the loading height of the engineering vehicle according to the second frame image; when the loading height of the engineering vehicle is greater than or equal to a preset loading height, determining a second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determining the operation time of the engineering vehicle based on the first moment and the second moment;

[0016] The earthwork operation efficiency analysis module is used to determine the earthwork operation efficiency of the earthwork operation area in combination with the operation duration, the effective loading times and the stacking density.

[0017] In a third aspect of the present application, an electronic device is provided, comprising a memory, a processor, and a program stored in the memory and executable on the processor, wherein the program can implement an earthwork efficiency analysis method when loaded and executed by the processor.

[0018] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor implements a method for analyzing earthwork efficiency.

[0019] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0020] By adopting the technical solution of the present application, monitoring video and stacking density data are obtained, and a comprehensive data collection foundation is established. This not only covers the dynamic operation process, but also includes the static earthwork characteristics. When the system detects that the engineering vehicle enters the operation area, the key frame image is extracted and the time point is recorded to achieve accurate positioning and time marking of the operation process. This automated monitoring method improves the efficiency and accuracy of data acquisition and reduces human intervention and errors. By analyzing the first frame image of the bucket, the effective loading number can be identified, which directly reflects the actual workload. At the same time, by analyzing the second frame image of the engineering vehicle to identify the loading height, the loading status of the vehicle can be accurately judged. When the loading height reaches or exceeds the preset value, the second moment is automatically recorded, and the accurate operation time is calculated in combination with the first moment. This automated time recording and calculation method not only improves the accuracy of efficiency evaluation, but also provides the possibility for analyzing time allocation during the operation process. By comprehensively considering the operation time, effective loading number and stacking density, an indicator that fully reflects the efficiency of earthwork operations can be calculated. This comprehensive indicator not only takes into account time efficiency, but also includes workload and soil pile characteristics, namely soil pile density, providing a more comprehensive and accurate efficiency evaluation, realizing the identification of the specific workload of the bucket at each time, thereby improving the accuracy of earthwork operation efficiency analysis. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a flow chart of an earthwork operation efficiency analysis method provided in an embodiment of the present application;

[0022] Figure 2 It is a structural schematic diagram of an earthwork efficiency analysis system provided in an embodiment of the present application;

[0023] Figure 3 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application.

[0024] Description of reference numerals: 300, electronic device; 301, processor; 302, communication bus; 303, user interface; 304, network interface; 305, memory. DETAILED DESCRIPTION

[0025] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0026] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0027] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0028] The present application embodiment provides a method for analyzing earthwork efficiency. In one embodiment, please refer to Figure 1 , Figure 1 The present invention provides a flow chart of the earthwork efficiency analysis method provided in the embodiment of the present invention. The method can be implemented by a computer program, which can be integrated into an application or run as an independent tool application. The method can also be implemented by a single-chip microcomputer or run on an earthwork efficiency analysis system based on the von Neumann system. Specifically, the method can include the following steps:

[0029] Step 101: Obtain monitoring video of an earthwork operation area and the accumulation density of earthwork in the earthwork operation area.

[0030] The earthwork operation area refers to a specific place where earthwork excavation, loading and transportation are carried out. In the embodiment of the present application, it can be understood as a clearly defined area, which usually includes the area where the excavator is excavating the earth, the area where the engineering vehicles are parked and loaded, and the related transportation channels. This area may be part of a construction site, a road construction site, or other places where large-scale earthwork operations are required.

[0031] Surveillance video refers to a continuous sequence of images captured and recorded by a camera installed in a specific area. In the embodiments of the present application, it can be understood as real-time or stored video data recorded by a high-definition camera installed in the earthwork area. These video data clearly show the activities of the entire earthwork area, especially the operation process of excavators and engineering vehicles.

[0032] The bulk density of earthwork refers to the mass of earthwork per unit volume. In the embodiment of the present application, it can be understood as the average compactness of the earthwork to be excavated or excavated in the earthwork operation area. This parameter reflects the physical properties of earthwork, including factors such as looseness.

[0033] Specifically, obtain surveillance video of the earthwork operation area and the bulk density of the earthwork. The surveillance video is the basic data source for subsequent analysis, while the bulk density is an important factor affecting the operation efficiency. Install high-definition cameras at key locations in the earthwork operation area to ensure that the operation scene can be fully covered, especially the activity area of ​​​​the excavator and engineering vehicles. These cameras are connected to the central monitoring system via the network and transmit video data in real time. Using soil density measuring equipment, such as a nuclear density meter or a ring knife method, sampling measurements are taken at multiple representative locations in the operation area to calculate the average bulk density. These data can be input into the analysis system through the on-site terminal equipment. By obtaining high-quality surveillance video, a reliable data source can be provided for subsequent image analysis, thereby achieving accurate identification of the bucket loading and engineering vehicle transportation process. Accurate bulk density data helps to consider the influence of earthwork characteristics in efficiency calculations and improve the accuracy of analysis results.

[0034] Step 102: When there is an engineering vehicle in the monitoring video, extract the first frame image of the bucket and the second frame image of the engineering vehicle in the monitoring video, and determine the first moment when the engineering vehicle enters the earthwork operation area.

[0035] Among them, engineering vehicles refer to special vehicles used for transportation, loading or other professional operations in engineering projects such as construction and road construction. In the embodiments of the present application, it can be understood as a large truck or dump truck mainly used for earthwork transportation. Such vehicles usually have a large load capacity and are specially designed for operation in complex construction site environments.

[0036] The bucket refers to the main working device for digging and loading materials at the front end of the excavator. In the embodiment of the present application, it can be understood as a large shovel-like structure installed at the end of the excavator boom, usually made of steel, with a large volume and a solid structure.

[0037] The first frame image refers to a specific static image extracted from the surveillance video. In the embodiment of the present application, it can be understood as a frame selected from a continuous video sequence, which clearly shows the state and position of the bucket. This image is usually obtained by comparing multiple consecutive frames with a preset standard bucket image and selecting the frame with the highest similarity.

[0038] The second frame image refers to another specific static image extracted from the surveillance video. In the embodiment of the present application, it can be understood as a frame selected from a continuous video sequence, which clearly shows the complete outline and status of the engineering vehicle. This image is usually obtained by comparing multiple consecutive frames with a preset standard engineering vehicle image and selecting the frame with the highest similarity.

[0039] The first moment refers to a specific time point during the earthwork operation. In the embodiment of the present application, it can be understood as the moment when the engineering vehicle first appears in the monitoring video, that is, when it enters the earthwork operation area. This time point is usually accurately recorded by the timestamp of the video frame or the system clock.

[0040] Specifically, the surveillance video is analyzed through a real-time image recognition algorithm. When an engineering vehicle is detected entering the field of view, the image extraction and time recording process is triggered. In order to accurately analyze the loading status of the bucket, the system will select a frame that clearly shows the state of the bucket from the continuous video frames and use it as the first frame image. This process usually involves comparing multiple continuous frames with the preset standard bucket image and selecting the frame with the highest similarity. A frame that clearly shows the complete outline of the engineering vehicle is extracted as the second frame image, which is crucial for the subsequent analysis of the vehicle's loading height. While extracting these two key frames, the time point when the engineering vehicle first appears in the surveillance video is recorded, that is, the first moment when the engineering vehicle enters the earthwork operation area. The accurate recording of this moment is the starting point for calculating the vehicle's operating time, which is of great significance for subsequent efficiency analysis. Through this process, the system can quickly and accurately capture key visual information and time data, laying a data foundation for subsequent in-depth analysis.

[0041] Based on the above embodiment, as an optional embodiment, in step 102: extracting the first frame image of the bucket and the second frame image of the engineering vehicle in the monitoring video, this step may also include the following steps:

[0042] Step 201: compare multiple frame images in the monitoring video with a standard bucket image to obtain a first similarity between each frame image and the standard bucket image, and compare each frame image with a standard engineering vehicle image to obtain a second similarity between each frame image and the standard engineering vehicle image.

[0043] The standard bucket image refers to a set of representative bucket images prepared in advance. In the embodiment of the present application, it can be understood as a series of high-definition bucket images at different angles and states, which are carefully selected and processed to clearly show the typical features and structure of the bucket.

[0044] The standard engineering vehicle images refer to a set of representative engineering vehicle images prepared in advance. In the embodiment of the present application, it can be understood as a series of high-definition engineering vehicle images at different angles and states, which are carefully selected and processed to clearly show the typical features and structures of engineering vehicles, especially the overall outline and rear compartment of the vehicle.

[0045] A frame image refers to a single static image extracted from a continuous video sequence. In the embodiment of the present application, it can be understood as each independent picture in the surveillance video, which are arranged continuously at a certain time interval to form a complete video sequence.

[0046] The first similarity refers to the similarity between the frame image in the surveillance video and the standard bucket image. In the embodiment of the present application, it can be understood as a quantitative indicator for measuring the matching degree between the bucket features in the current frame image and the preset standard bucket image. This similarity is usually expressed as a percentage or a value between 0 and 1.

[0047] The second similarity refers to the similarity between the frame image in the surveillance video and the standard engineering vehicle image. In the embodiment of the present application, it can be understood as a quantitative indicator for measuring the matching degree between the engineering vehicle features in the current frame image and the preset standard engineering vehicle image. This similarity is usually expressed as a percentage or a value between 0 and 1, where 1 represents a complete match and 0 represents a complete mismatch.

[0048] Specifically, frame images are continuously extracted from the surveillance video. For each frame, it is compared with the pre-prepared standard bucket image and standard engineering vehicle image. This comparison process involves a variety of image processing techniques, such as feature point extraction, such as using SIFT or SURF algorithms, contour matching and texture analysis, etc. Taking these factors into consideration, a first similarity is calculated for the degree of matching between each frame and the standard bucket image, and a second similarity is also calculated for the degree of matching between each frame and the standard engineering vehicle image. These similarities are usually expressed as values ​​between 0 and 1, 1 indicates a complete match, and 0 indicates a complete mismatch. Through this process, the presence and clarity of the bucket and engineering vehicle in each frame can be quickly and accurately evaluated, laying a solid data foundation for the entire earthwork efficiency analysis system and ensuring the accuracy of subsequent analysis.

[0049] Step 202: Filter out frame images corresponding to a first similarity greater than or equal to a preset similarity as first frame images, and filter out frame images corresponding to a second similarity greater than or equal to a preset similarity as second frame images.

[0050] The preset similarity refers to a similarity threshold value preset by the system. In the embodiment of the present application, it can be understood as a standard value for screening high-quality frame images, usually expressed as a value or percentage between 0 and 1. This threshold is determined based on a large amount of experimental data and professional experience, and is used to distinguish high-quality, representative frame images from low-quality or unclear frame images.

[0051] Specifically, a preset similarity threshold is set, which is usually determined based on a large amount of experimental data and professional experience to ensure that the screened images have sufficiently high quality and representativeness. Then, all the calculated first similarities and second similarities are traversed, and frame images with a first similarity greater than or equal to the preset similarity are screened out as the first frame image, and frame images with a second similarity greater than or equal to the preset similarity are screened out as the second frame image. This screening method can effectively exclude those frame images with low quality or unclear features, and retain high-quality images with the highest similarity that can represent the state of the bucket and engineering vehicle.

[0052] Step 103: Identify the effective loading times of the bucket according to the first frame image, and identify the loading height of the engineering vehicle according to the second frame image.

[0053] The effective loading times refers to the number of times the excavator bucket successfully completes loading and reaches a preset standard during earthwork operations. In the embodiment of the present application, it can be understood as the number of loading operations in which the bucket changes from a fully loaded state to an unloaded state.

[0054] The loading height refers to the vertical height of the earthwork material piled in the rear compartment of the engineering vehicle. In the embodiment of the present application, it can be understood as the vertical distance from the bottom of the compartment to the top of the earthwork pile, and this height reflects the current loading state and capacity utilization of the vehicle.

[0055] Specifically, the first frame image, i.e., the bucket image, is identified. The image segmentation technology is used to accurately identify the bucket contour and internal area, and then the area ratio of the bucket filling is calculated. The system sets a filling ratio threshold, such as 80% or 90% of the bucket capacity. When the filling ratio exceeds this threshold, the bucket is considered to be fully loaded, and a preset empty ratio threshold, such as 10% or 5%, is set. When the filling ratio is less than the preset empty ratio threshold, the bucket is considered to be empty. The process of the bucket changing from a full load state to an empty state is recorded as an effective loading. By analyzing the continuous first frame image sequence, the number of effective loadings of the bucket can be accurately counted. This method can not only reflect the working efficiency of the excavator, but also provide an important basis for estimating the actual earthwork transportation volume. At the same time, the second frame image, i.e., the engineering vehicle image, is analyzed. By using image processing technologies such as edge detection and contour analysis, the upper edge contour of the rear compartment of the engineering vehicle and the top contour of the earthwork pile can be accurately identified. By calculating the vertical distance between the two contours, the current loading height can be accurately measured. This data not only reflects the loading status of the vehicle, but can also be used to estimate the volume of earth transported and analyze loading uniformity. Through the process of recognizing frame images, the effective loading times of the bucket and the loading height of the engineering vehicle are accurately identified, providing data support for the comprehensive evaluation of earthwork efficiency.

[0056] Based on the above embodiment, as an optional embodiment, in step 103: identifying the effective loading times of the bucket according to the first frame image, this step may also include the following steps:

[0057] Step 301: performing image segmentation on the first frame image to determine the bucket area in the first frame image; and calculating the filling ratio in the bucket area.

[0058] The bucket area refers to a specific area in the first frame image that contains the complete outline of the excavator bucket. In the embodiment of the present application, it can be understood as a closed area that accurately represents the shape and position of the bucket extracted from the entire first frame image by image segmentation technology. This area usually includes the entire structure of the bucket, from the hinge point to the cutting edge, and the two side walls.

[0059] The filling ratio refers to the degree to which the interior of the bucket is filled with earthwork materials. In the embodiments of the present application, it can be understood as the ratio of the area in the bucket area that has been occupied by earthwork materials to the area of ​​the entire bucket area, usually expressed as a percentage. This ratio reflects the loading efficiency and utilization rate of the bucket in a single excavation operation.

[0060] Image segmentation refers to the process of dividing a digital image into multiple pixel sets, where each set represents a specific object or region in the image. In the embodiment of the present application, it can be understood as an image processing technique for accurately extracting and separating the bucket area from the first frame image, distinguishing it from the background and other irrelevant elements.

[0061] Specifically, the first frame image is segmented. This process uses computer vision technology combined with traditional methods such as edge detection and region growing. The purpose of image segmentation is to clearly separate the bucket area from the complex background environment to ensure the accuracy and robustness of subsequent analysis. With this method, the bucket area can be accurately identified and extracted under various lighting conditions and environmental interference to obtain an accurate bucket outline. After the segmentation is completed, a clearly defined bucket area is obtained, which includes the entire structure of the bucket, from the hinge point to the cutting edge, and the two side walls. The filling ratio in the bucket area is calculated. This step is achieved by analyzing the pixel distribution in the bucket area, using color thresholding, texture analysis or machine learning algorithms to distinguish between empty bucket areas and filled earthwork areas. By calculating the ratio of the number of pixels in the filled area to the number of pixels in the entire bucket area, an accurate filling ratio can be obtained, usually expressed as a percentage. Image segmentation and filling ratio calculation provide data support for identifying the number of effective loading times of the bucket.

[0062] Based on the above embodiment, as an optional embodiment, in step 301: calculating the filling ratio in the bucket area, this step may also include the following steps:

[0063] Step 311: Determine the pixel area of ​​the bucket area and the pixel area of ​​the earthwork area in the bucket area based on the pixel values ​​of the pixel points in the bucket area.

[0064] The pixel value of a pixel refers to the numerical information contained in each smallest unit, i.e., pixel, in a digital image. In the embodiment of the present application, it can be understood as the numerical value representing the color and brightness information of each point in the image, which is usually expressed in the form of grayscale values.

[0065] Pixel area refers to the number of pixels contained in a specific area in an image. In the embodiment of the present application, it can be understood that the area size of a specific area, such as a bucket area or an earthwork area, is represented by calculating the total number of pixels in the area.

[0066] Specifically, the image of the identified bucket area is processed, and the bucket itself and the earth in it are distinguished by analyzing the pixel values ​​of the pixels, which usually involves setting color thresholds or using more complex image segmentation algorithms. For the bucket area, the total number of pixels is calculated as the pixel area of ​​the bucket area. At the same time, the number of pixels in the earth area is identified and calculated as the pixel area of ​​the earth area. This pixel analysis-based method can provide highly accurate area calculation results, providing a data basis for subsequent filling ratio calculation and loading status judgment.

[0067] Step 321: Divide the pixel area of ​​the earthwork area by the pixel area of ​​the bucket area to obtain the filling ratio in the bucket area.

[0068] Specifically, the obtained pixel areas of the earthwork area and the bucket area are used for mathematical calculations, that is, the pixel area of ​​the earthwork area is divided by the pixel area of ​​the bucket area to obtain a decimal value between 0 and 1, which is the filling ratio. For example, if the pixel area of ​​the earthwork area is 8000 and the pixel area of ​​the bucket area is 10000, then the filling ratio is 0.8, that is, 80%. This calculation method can provide accurate filling status information. The filling ratio is a direct quantitative indicator for evaluating the working efficiency of the excavator. It not only reflects the effect of a single excavation operation, but can also be used to determine whether it has reached a full load or no-load state, realizing the conversion of the image analysis results into an intuitive efficiency indicator. This process improves the accuracy of efficiency evaluation.

[0069] Step 302: Determine whether the filling ratio is greater than or equal to a preset full load ratio; if the filling ratio is greater than or equal to the preset full load ratio, determine that the bucket area is in a full load state.

[0070] The preset full load ratio refers to a filling ratio threshold value preset by the system, which is used to determine whether the bucket has reached a full load state. In the embodiment of the present application, it can be understood as a standard value indicating the effective loading of the bucket, usually expressed as a percentage, such as 80%, 85% or 90%. This ratio is determined based on engineering practice experience, equipment characteristics and specific operation requirements.

[0071] The full load state refers to the state in which the bucket reaches the expected load in a single excavation operation. In the embodiment of the present application, it can be understood as the loading state when the filling ratio in the bucket area reaches or exceeds the preset full load ratio. This state indicates that the bucket has been loaded with enough earthwork materials and is considered to be a valid loading operation.

[0072] Specifically, a preset full load ratio is set, which is usually determined based on a lot of practical experience and specific engineering requirements, such as 80%, 85% or 90%. The purpose of setting a preset full load ratio is to provide a quantitative standard for loading, which not only ensures that the bucket capacity is fully utilized, but also avoids the potential safety hazards and efficiency losses caused by overloading. The calculated filling ratio is compared with the preset full load ratio. If the filling ratio is greater than or equal to the preset full load ratio, the system determines that the bucket area is in a full load state. When the system determines that the bucket area is in a full load state, it means that this excavation operation is identified as an effective loading. This information will be used for subsequent statistics of the number of effective loadings, which is an important basis for evaluating the working efficiency of the excavator. At the same time, the determination of the full load state can also be used to trigger other related operations, such as notifying the operator to complete an effective loading, or starting the next loading process in the automation system. Through this process, the effect of each excavation operation can be evaluated in real time and accurately, providing high-quality basic data for earthwork efficiency analysis.

[0073] Step 303: If the filling ratio is less than the preset empty ratio, it is determined that the bucket area is in an empty state.

[0074] The preset empty ratio refers to a lower filling ratio threshold value preset by the system, which is used to determine whether the bucket has reached an empty state. In the embodiment of the present application, it can be understood as a standard value indicating that the bucket has basically completed unloading, usually expressed as a percentage, such as 10%, 15% or 20%. This ratio is determined based on engineering practice experience, equipment characteristics and specific operation requirements, and is always less than the preset full load ratio.

[0075] The no-load state refers to the state when the bucket is ready to start a new round of excavation operation after unloading. In the embodiment of the present application, it can be understood as the loading state when the filling ratio in the bucket area is lower than the preset no-load ratio. This state means that the bucket has unloaded most or all of the earthwork materials and is basically in an empty state, and the next working cycle can be started.

[0076] Specifically, a preset no-load ratio is set, which is usually lower than the preset full-load ratio, such as 10%, 15% or 20%. The purpose of setting the preset no-load ratio is to provide an objective and quantitative standard for identifying that the bucket has completed unloading and is ready to start a new round of excavation. When the filling ratio is reduced to less than the preset no-load ratio, the bucket area will be judged to be in an no-load state. This judgment process reflects the entire working cycle of the bucket from full loading to complete unloading. This judgment method can accurately capture the complete working cycle of the excavator, including loading, transportation, unloading and return stages; by setting a reasonable preset no-load ratio, it can avoid misjudgment caused by residues or image noise, and can also identify abnormal working conditions, such as incomplete unloading or midway stagnation. When the system determines that the bucket area is in an no-load state, it means that a complete working cycle has ended and a new cycle is about to begin. By accurately identifying the full-load and no-load states, the system can comprehensively analyze the working efficiency of the excavator, identify potential efficiency bottlenecks, and optimize the operation process, thereby improving the overall efficiency of the project.

[0077] Step 304: In the first frame image, the total number of times the bucket area changes from a full-load state to an empty-load state is counted as the effective loading number of the bucket.

[0078] Specifically, a counter is set with an initial value of 0, and each time the bucket area is detected to change from a fully loaded state to an unloaded state, the counter is incremented by 1. This method ensures that each count represents a complete earthwork transportation process. The number of effective loads directly reflects the actual workload and efficiency of the excavator, and requires accurate state identification and real-time data processing to avoid missing or repeated counts. The timestamp of each effective load can also be recorded for more detailed analysis. This process provides an objective and accurate workload indicator that can be used to evaluate efficiency, identify efficiency fluctuations, and calculate more valuable indicators in combination with other parameters. This method has strong reliability and adaptability, can eliminate the impact of abnormal operations, and is easy to adapt to different types of excavators and working environments.

[0079] Based on the above embodiment, as an optional embodiment, in step 103: identifying the loading height of the engineering vehicle according to the second frame image, this step may also include the following steps:

[0080] Step 305: Perform image segmentation on the second frame image to determine the rear compartment area of ​​the engineering vehicle.

[0081] The rear compartment area refers to the open cargo box part of the engineering vehicle for loading and transporting earthwork materials. In the embodiment of the present application, it can be understood as the cargo area of ​​the engineering vehicle identified in the second frame image by image segmentation technology, which is usually presented as a rectangular or trapezoidal open structure.

[0082] Specifically, the acquired second frame image is preprocessed, including denoising, adjusting contrast, etc., to improve image quality. Then, image segmentation algorithms, such as edge detection, region growing, or semantic segmentation, are used to identify and separate the rear compartment area of ​​the engineering vehicle. Accurately locating the rear compartment area is the basis for evaluating the unloading accuracy and efficiency. The rear compartment area is the target location for earthwork loading, and its accurate identification directly affects the subsequent unloading analysis. The accuracy of recognition is enhanced by utilizing the vehicle's geometric features, color features, and contextual information. At the same time, considering the complexity of the working environment, various interference factors such as illumination changes and occlusion need to be dealt with. This process provides a precise target area, laying the foundation for subsequent unloading analysis; secondly, by accurately identifying the rear compartment area, the unloading accuracy of the excavator can be better evaluated, which improves the analysis efficiency.

[0083] Step 306: Determine the upper edge contour in the rear compartment area based on the pixel values ​​of the pixel points in the rear compartment area.

[0084] The upper edge contour refers to the highest point line formed by the earthwork accumulation in the rear compartment area of ​​the engineering vehicle. In the embodiment of the present application, it can be understood as the contour line of the earthwork and air interface identified in the rear compartment area by image processing technology, which reflects the surface morphology after the earthwork is loaded.

[0085] Specifically, a more detailed pixel analysis of the identified rear compartment area is performed, and the upper edge contour of the rear compartment area can be identified by detecting mutations or gradient changes in pixel values. This usually involves the use of edge detection algorithms, such as the Canny edge detector or the Sobel operator. Morphological operations, such as dilation and erosion, can be combined to obtain a more continuous and smooth edge contour. The upper edge contour is a key reference line for evaluating earthwork loading and loading uniformity. By accurately identifying this contour, the earthwork pile height can be calculated, whether it has reached a full load state, and the uniformity of loading can be evaluated. This method based on upper edge contour analysis forms a more comprehensive and accurate earthwork operation efficiency analysis system, which not only focuses on the single loading effect, but also evaluates the efficiency of the entire transportation process, thereby improving the efficiency and quality of the entire earthwork operation process.

[0086] Step 307: Determine the vertical distance between the upper edge contour and the bottom of the compartment in the rear compartment area, and use the vertical distance as the loading height of the engineering vehicle.

[0087] Specifically, the bottom position of the rear compartment area is determined, which can usually be achieved through image analysis or preset parameters. Then the vertical distance from each point on the upper edge contour to the bottom of the compartment is calculated. This may involve using an image processing algorithm to measure the pixel distance and convert the pixel distance into an actual distance through a pre-set scaling factor. The vertical distance of multiple points can be calculated, and then the average or maximum value is taken as the final loading height. The loading height is a direct indicator for evaluating the earthwork loading volume and an important reference for judging loading efficiency and safety. By accurately measuring the loading height, the earthwork volume can be estimated, whether the optimal loading state is achieved, and the stability during transportation can be evaluated. By calculating the loading height, a key quantitative indicator is provided for the analysis of earthwork transportation efficiency. This method not only improves the accuracy of loading volume estimation, but also provides reliable data support for evaluating the efficiency of the entire earthwork transportation process.

[0088] Step 104: When the loading height of the engineering vehicle is greater than or equal to the preset loading height, determine a second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determine the operation time of the engineering vehicle based on the first moment and the second moment.

[0089] The preset loading height refers to the ideal or optimal loading height of the rear compartment of the engineering vehicle. In the embodiment of the present application, it can be understood as the optimal loading height value predetermined after comprehensive consideration of vehicle specifications, safety standards and transportation efficiency.

[0090] The second moment refers to the time point when the engineering vehicle reaches the fully loaded state. In the embodiment of the present application, it can be understood as the specific time recorded when the system detects that the loading height is greater than or equal to the preset loading height.

[0091] The operation duration refers to the time required to complete a single loading of an engineering vehicle. In the embodiment of the present application, it can be understood as the time interval from when the engineering vehicle starts to accept loading, that is, the first moment, to when it reaches a fully loaded state, that is, the second moment.

[0092] Specifically, the loading height calculated in real time is compared with the preset loading height. The preset loading height is the optimal value predetermined based on comprehensive consideration of vehicle specifications, safety standards and transportation efficiency. When it is detected that the actual loading height is greater than or equal to the preset loading height, the engineering vehicle is judged to be fully loaded, and the time point at this time is immediately recorded as the second moment. This second moment is then compared with the first moment recorded previously, usually the time point when the vehicle begins to accept loading, and the time difference between the two moments is calculated, which is the operating time of the vehicle. The operating time is a direct quantitative indicator for evaluating loading efficiency. It accurately reflects the time required from the vehicle being in place to being full, and is a key parameter for measuring the efficiency of the entire loading process. By accurately recording the full load moment and calculating the operating time, the efficiency of a single load can be comprehensively evaluated, potential efficiency bottlenecks can be identified, and a basis can be provided for optimizing the entire operating process.

[0093] Step 105: Determine the earthwork efficiency of the earthwork area based on the operation time, the effective loading times, and the stacking density.

[0094] The earthwork efficiency refers to the amount of earthwork transportation and processing work completed within a specific time. In the present application embodiment, it can be understood as the earthwork work completed per unit time after comprehensively considering the operation time, effective loading times and stacking density.

[0095] Specifically, after determining the operating time of the engineering vehicle and the effective loading times of the bucket, the influence of the earthwork bulk density on the earthwork efficiency must also be considered. The bulk density reflects the looseness of the earthwork. The looser the earthwork is, the less actual soil content of the same volume of earthwork is. In order to accurately calculate the earthwork efficiency, the bulk density needs to be introduced as a parameter into the efficiency calculation formula. According to the real-time bulk density data collected by the bulk density sensor, the average bulk density of the earthwork in the earthwork operation area is determined; then the determined average bulk density, the operating time of the engineering vehicle and the effective loading times of the bucket are substituted into the preset earthwork efficiency calculation formula for calculation. The preset formula comprehensively considers the benchmark earthwork efficiency, the influencing factor of the bulk density, the benchmark looseness coefficient of the earthwork and other parameters. By assigning weights to each influencing factor, the earthwork efficiency of the earthwork operation area can be objectively and accurately evaluated. This calculation method that combines multiple parameters can fully reflect the actual situation of the earthwork operation process, quantify the impact of the looseness of the earthwork, avoid the deviation caused by estimating the efficiency based only on the operating vehicles and loading parameters, and thus effectively improve the accuracy of earthwork operation efficiency analysis.

[0096] Based on the above embodiment, as an optional embodiment, in step 105: combining the operation time, the effective loading times and the stacking density to determine the earthwork operation efficiency of the earthwork operation area, this step may also include the following steps:

[0097] Step 401: Substitute the operation time, the effective loading times and the stacking density into a preset formula to obtain the earthwork efficiency of the earthwork operation area; wherein the preset formula is:

[0098] ;

[0099] In the formula, represents the earthwork efficiency of the earthwork area, represents the benchmark earthwork efficiency of the earthwork area, represents the effective loading times of the bucket, represents the bulk density of the earthwork, represents the influencing factor of the packing density, represents the influencing factor of the duration of the operation, represents the reference looseness coefficient of the earthwork, represents the reference constant, represents the operation time of the engineering vehicle, The correlation coefficient between the effective loading times and the operation duration is represented.

[0100] The preset formula refers to a mathematical formula for calculating the earthwork efficiency of the earthwork area. In the embodiment of the present application, the preset formula can be understood as a multivariate analysis formula including factors such as the effective loading times of the bucket, the operation time of the factory vehicle, and the stacking density of the earthwork. The preset formula is used for quantitative calculation and evaluation of the earthwork efficiency of the earthwork area. By substituting the actual test data, the earthwork efficiency of the earthwork area can be calculated.

[0101] Specifically, in order to accurately calculate the earthwork efficiency of the earthwork area, it is necessary to establish a preset calculation formula that takes into account various influencing factors. The preset formula comprehensively considers multiple parameters such as the benchmark efficiency of earthwork, the effective loading times of the bucket, and the bulk density of earthwork. Obtain the preset earthwork efficiency benchmark value, which is the earthwork processing volume per unit time under standard conditions, and then obtain the statistically obtained effective loading times of the bucket, which reflects the actual working intensity of the bucket. At the same time, obtain the earthwork bulk density obtained by detection, which reflects the looseness of the earthwork. Substitute the parameters into the preset formula to obtain the earthwork efficiency of the earthwork area. This calculation method that combines multiple factors can avoid the calculation deviation caused by considering only a single parameter. By introducing various correction coefficients, the influencing factors such as the looseness of the earthwork and the number of loadings are quantitatively considered, making the calculation results more accurate, thereby improving the accuracy of earthwork efficiency analysis.

[0102] The formula consists of three parts. The first part describes the comprehensive impact of loading times, stacking density and operation time on earthwork efficiency. middle, It indicates the effective loading times of the bucket, which means the number of times the bucket changes from a fully loaded state to an empty state, that is, the number of cycles of the bucket from a fully loaded state to an unloaded state. The more effective loading times, the more work cycles are completed in a unit of time. It indicates the bulk density of earthwork, which is the density of earthwork and affects the difficulty of loading and transportation. A larger bulk density may mean that the earthwork is more difficult to handle and the operating efficiency is lower, while a smaller bulk density means that the earthwork is easier to handle and the operating efficiency will be higher. Indicates the base looseness coefficient of earthwork: describes the looseness of earthwork. The higher the looseness, the easier it is to handle and transport the earthwork. Represents the base constant, a small positive constant used to avoid zero denominators and adjust for the effects of looseness. This part shows the effect of looseness on efficiency. Looseness coefficient Relative to bulk density The larger the ratio of , the greater the efficiency improvement. This ratio plus 1 ensures that even if the effect of slack is small, the overall term will not become zero.

[0103] Denominator middle, Indicates the operating time of engineering vehicles. This is the actual working time. Longer time usually means higher total workload. Indicates the influence factor of bulk density. This is a correction factor used to adjust the effect of bulk density on efficiency. This factor is different for different types of earthwork. Indicates the impact factor of the operation time, which is a correction factor used to adjust the impact of vehicle operation time on efficiency. This constant may be used to compensate or adjust the nonlinear factors introduced by time changes. This part represents the adjusted operation time, combined with the actual operation time Factors affecting the number of effective loading times and operation time , to take into account the impact of time on efficiency.

[0104] The second part describes the influence of effective loading times and operation duration on earthwork efficiency. The correlation coefficient between the effective loading times and the operation time is used to adjust the relationship between the operation time and the effective loading times. It represents a certain benchmark or correction value to ensure that the proportional relationship between the operation time and the effective loading times is reasonable in the calculation. The correlation coefficient is obtained from experimental data. Effective loading times. The larger the numerator, the more loading times per unit time, which helps to improve efficiency. If the operation time is Increase, then Also increases, leading to The value of becomes smaller, thus reducing the improvement in efficiency. Smaller, then The larger the value of , the higher the efficiency. The significance of is to dynamically optimize and calculate the efficiency of earthwork operations by adjusting the relationship between the number of loading times and the operation duration. It ensures that the calculated efficiency value is reasonable under different operation duration conditions. The purpose of this adjustment item is to ensure that the efficiency calculation of earthwork operations is reasonable under different working conditions and can reflect the efficiency changes in actual conditions, thereby helping to optimize the operation process and resource allocation.

[0105] The third section describes the extent to which the baseline earthwork efficiency affects the earthwork efficiency. Represents the efficiency of earthmoving operations under standard or ideal conditions. It is a reference value used to measure the change in actual efficiency relative to a baseline efficiency, which can be based on historical data, experimental results or industry standards. This gives the entire formula a basic calibration value. No matter how other variables in the formula change, the final result All based on this benchmark efficiency Adjust and zoom in.

[0106] In summary, this formula combines the influence of operation time, effective loading times and earthwork density on earthwork efficiency. and duration of work The ratio reflects the loading frequency of earthwork operations. The larger the ratio, the more loading per unit time, which means the higher the operation efficiency. The larger the value, the harder it is to dig the earth, the lower the working efficiency will be, and the stacking density will be The smaller it is, the easier it is to dig the earth, and the higher the efficiency of the operation. It indicates the contribution of loading frequency of earthwork operation to operation efficiency under the combined influence of earthwork material characteristics, namely earthwork packing density and looseness. It represents the loading frequency of earthwork operations, that is, the contribution of effective loading times and operation time to earthwork operation efficiency. The multiplication of the two ratios further accurately reflects the changes in earthwork operation efficiency under the influence of earthwork stacking density, operation time and effective loading times. Finally, the benchmark earthwork operation efficiency is corrected to obtain the actual earthwork operation efficiency.

[0107] Based on the above embodiment, as an optional embodiment, in step 105: combining the operation time, the effective loading times and the stacking density to determine the earthwork operation efficiency of the earthwork operation area, this step may also include the following steps:

[0108] Step 501: Obtain the number of fully loaded engineering vehicles and the rated load capacity of the engineering vehicles in the earthwork operation area within a preset period.

[0109] The preset period refers to the time range used to count the earthwork transportation volume, which can be understood as a statistical unit in the embodiment of the present application, and is used to determine the time span for counting the earthwork transportation volume.

[0110] The number of fully loaded engineering vehicles refers to the number of fully loaded engineering transport vehicles that leave the work area after loading earth within a preset period. In the embodiments of the present application, it can be understood as the number of engineering vehicles that have performed effective earth transportation, which is used to statistically calculate the actual number of vehicles performing earth transportation operations within a given time period.

[0111] The rated load capacity refers to the design load capacity standard of the engineering transport vehicle. In the embodiments of the present application, it can be understood as the maximum load capacity allowed for the engineering vehicle when loading earth, and is used to calculate the total amount of earth transported per unit time.

[0112] Specifically, in order to comprehensively evaluate the efficiency of earthwork operations, it is necessary to calculate the actual earthwork transportation volume per unit time. The calculation of the transportation volume requires obtaining two parameters: the number of fully loaded engineering vehicles that have transported earthwork within the preset statistical period and the rated load capacity of each vehicle. First, preset the statistical period, such as daily or weekly. Then use image recognition technology to analyze all images of engineering vehicles leaving the earthwork operation area within the statistical period, determine the loading status of each vehicle, and count the number of engineering vehicles whose loading status is determined to be fully loaded. At the same time, query the product technical data of fully loaded vehicles of different models to obtain their rated load capacity. This calculation method that combines the statistics of fully loaded vehicles and the rated load parameters can directly reflect the actual efficiency and progress of earthwork transportation operations.

[0113] Step 502: Determine the earthwork transportation volume within a preset unit time according to the number of fully loaded engineering vehicles, the rated load capacity, and the duration of a preset cycle.

[0114] Among them, the earthwork transportation volume within the preset unit time refers to the average earthwork transportation weight per unit time calculated based on the number of fully loaded engineering vehicles and the rated load capacity within the statistical period. In the embodiment of the present application, it can be understood as the average weight of earthwork transportation within a given time period, which is used to evaluate the earthwork transportation efficiency in different time periods.

[0115] Specifically, first obtain the preset statistical period, such as the number of fully loaded engineering vehicles of various models and the corresponding rated load in a day or a week, and then calculate the total earthwork transportation volume of the statistical period. Then obtain the specific duration of the statistical period, and finally divide the above-mentioned total transportation volume by the duration to obtain the average earthwork transportation volume per unit time in the statistical period. This calculation method can intuitively reflect the average efficiency of earthwork transportation in different statistical periods, and it can be seen whether the efficiency and progress of earthwork transportation operations meet expectations in different time periods. This provides an important basis for monitoring and process control of earthwork operations. For example, if the calculation results show that the earthwork transportation volume per unit time in a certain period is abnormally low, the time period where the problem occurs can be quickly locked, the cause can be investigated, and timely optimization and adjustment can be made to avoid delays in the construction period.

[0116] Reference Figure 2 , is a system for analyzing earthwork efficiency provided by an embodiment of the present application, the system comprising: an information acquisition module, an image extraction module, an image recognition module, and an earthwork efficiency analysis module, wherein:

[0117] An information acquisition module, used to acquire monitoring video of the earthwork operation area and the accumulation density of earthwork in the earthwork operation area;

[0118] An image extraction module is used to extract the first frame image of the bucket and the second frame image of the engineering vehicle in the monitoring video when there is an engineering vehicle in the monitoring video, and determine the first moment when the engineering vehicle enters the earthwork operation area;

[0119] The image recognition module is used to identify the effective loading times of the bucket according to the first frame image, and to identify the loading height of the engineering vehicle according to the second frame image; when the loading height of the engineering vehicle is greater than or equal to the preset loading height, determine the second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determine the operation time of the engineering vehicle based on the first moment and the second moment;

[0120] The earthwork efficiency analysis module is used to determine the earthwork efficiency of the earthwork operation area by combining the operation time, effective loading times and stacking density.

[0121] On the basis of the above embodiment, the image extraction module is also used to compare multiple frame images in the monitoring video with the standard bucket image to obtain a first similarity between each frame image and the standard bucket image, and compare each frame image with the standard engineering vehicle image to obtain a second similarity between each frame image and the standard engineering vehicle image; filter out the frame image corresponding to the first similarity greater than or equal to the preset similarity as the first frame image, and filter out the frame image corresponding to the second similarity greater than or equal to the preset similarity as the second frame image.

[0122] On the basis of the above embodiments, the image recognition module is also used to perform image segmentation on the first frame image to determine the bucket area in the first frame image; calculate the filling ratio in the bucket area; determine whether the filling ratio is greater than or equal to a preset full load ratio; if the filling ratio is greater than or equal to the preset full load ratio, determine that the bucket area is in a full load state; after determining that the bucket area is in a full load state, determine whether the filling ratio is less than a preset empty load ratio, and the preset empty load ratio is less than the preset full load ratio; if the filling ratio is less than the preset empty load ratio, determine that the bucket area is in an empty load state; in the first frame image, count the total number of times the bucket area changes from a full load state to an empty load state each time as the effective loading number of the bucket.

[0123] Based on the above embodiment, the image recognition module is also used to determine the pixel area of ​​the bucket area and the pixel area of ​​the earthwork area in the bucket area based on the pixel values ​​of the pixel points in the bucket area; the pixel area of ​​the earthwork area is divided by the pixel area of ​​the bucket area to obtain the filling ratio in the bucket area.

[0124] Based on the above embodiment, the image recognition module is also used to perform image segmentation on the second frame image to determine the rear compartment area of ​​the engineering vehicle; determine the upper edge contour in the rear compartment area based on the pixel values ​​of the pixel points in the rear compartment area; determine the vertical distance between the upper edge contour and the bottom of the compartment in the rear compartment area, and use the vertical distance as the loading height of the engineering vehicle.

[0125] On the basis of the above embodiment, the earthwork operation efficiency analysis module is further used to substitute the operation time, the effective loading times and the stacking density into a preset formula to obtain the earthwork operation efficiency of the earthwork operation area; wherein the preset formula is:

[0126] ;

[0127] In the formula, represents the earthwork efficiency of the earthwork area, represents the benchmark earthwork efficiency of the earthwork area, represents the effective loading times of the bucket, represents the bulk density of the earthwork, represents the influencing factor of the packing density, represents the influencing factor of the duration of the operation, represents the reference looseness coefficient of the earthwork, represents the reference constant, represents the operation time of the engineering vehicle, The correlation coefficient between the effective loading times and the operation duration is represented.

[0128] Based on the above embodiment, the earthwork operation efficiency analysis module is also used to obtain the number of fully loaded engineering vehicles and the rated load capacity of the engineering vehicles in the earthwork operation area within a preset period; based on the number of fully loaded engineering vehicles, the rated load capacity and the length of the preset period, the earthwork transportation volume within a preset unit time is determined.

[0129] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0130] The present application also discloses an electronic device. Figure 3 , Figure 3 The electronic device 300 may include: at least one processor 301 , at least one network interface 304 , a user interface 303 , a memory 305 , and at least one communication bus 302 .

[0131] The communication bus 302 is used to realize the connection and communication between these components.

[0132] The user interface 303 may include a display interface and a camera interface. Optionally, the user interface 303 may also include a standard wired interface and a wireless interface.

[0133] The network interface 304 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0134] Among them, the processor 301 may include one or more processing cores. The processor 301 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 305, and calling data stored in the memory 305. Optionally, the processor 301 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 301 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface diagrams and applications, etc.; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 301, and it can be implemented separately through a chip.

[0135] Among them, the memory 305 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 305 includes a non-transitory computer-readable storage medium. The memory 305 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 305 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 305 may optionally also be at least one storage device located away from the aforementioned processor 301. Refer to Figure 3 The memory 305 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program for an earthwork operation efficiency analysis method.

[0136] exist Figure 3In the electronic device 300 shown, the user interface 303 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 301 can be used to call the application program storing a method for analyzing earthwork efficiency in the memory 305, and when executed by one or more processors 301, the electronic device 300 executes one or more methods in the above-mentioned embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0137] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0138] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0139] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0140] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0141] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0142] The above are only exemplary embodiments of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.

[0143] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art not recorded in the present disclosure. The description and examples are to be regarded as exemplary only.

Claims

1. A method for analyzing earthwork efficiency, characterized in that: include: Obtaining monitoring video of an earthwork operation area and a packing density of earthwork in the earthwork operation area; When there is an engineering vehicle in the monitoring video, extracting a first frame image of the bucket and a second frame image of the engineering vehicle in the monitoring video, and determining a first moment when the engineering vehicle enters the earthwork operation area; According to the first frame image, identifying the effective loading times of the bucket, and according to the second frame image, identifying the loading height of the engineering vehicle; When the loading height of the engineering vehicle is greater than or equal to the preset loading height, determining a second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determining the operation time of the engineering vehicle based on the first moment and the second moment; Determine the earthwork efficiency of the earthwork area in combination with the operation duration, the effective loading times and the stacking density; The determining of the earthwork efficiency of the earthwork area in combination with the operation duration, the effective loading times and the stacking density includes: Substituting the operation time, the effective loading times and the stacking density into a preset formula to obtain the earthwork operation efficiency of the earthwork operation area; Wherein, the preset formula is: Wherein, E represents the earthwork efficiency of the earthwork area, E0 represents the benchmark earthwork efficiency of the earthwork area, L represents the effective loading times of the bucket, N represents the bulk density of the earthwork, C1 represents the influencing factor of the bulk density, C2 represents the influencing factor of the operation time, S m represents the benchmark looseness coefficient of the earthwork, ∈ represents a benchmark constant, T represents the operating time of the engineering vehicle, and k represents the correlation coefficient between the effective loading times and the operating time.

2. The earthwork efficiency analysis method according to claim 1, characterized in that: The extracting of the first frame image of the bucket in the monitoring video and the second frame image of the engineering vehicle includes: comparing a plurality of frame images in the monitoring video with a standard bucket image to obtain a first similarity between each of the frame images and the standard bucket image, and comparing each of the frame images with a standard engineering vehicle image to obtain a second similarity between each of the frame images and the standard engineering vehicle image; screening out frame images corresponding to which the first similarity is greater than or equal to a preset similarity as the first frame image, and screening out frame images corresponding to which the second similarity is greater than or equal to the preset similarity as the second frame image.

3. The earthwork efficiency analysis method according to claim 1, characterized in that: The identifying, according to the first frame of image, the effective loading times of the bucket includes: Performing image segmentation on the first frame image to determine a bucket area in the first frame image; and calculating a filling ratio in the bucket area; Determining whether the filling ratio is greater than or equal to a preset full load ratio; If the filling ratio is greater than or equal to the preset full load ratio, determining that the bucket area is in a full load state; If the filling ratio is less than the preset empty ratio, determining that the bucket area is in an empty state; In the first frame image, the total number of times the bucket area changes from the full-load state to the empty-load state each time is counted as the effective loading number of the bucket.

4. The earthwork efficiency analysis method according to claim 3, characterized in that: The calculating the filling ratio in the bucket area includes: Determine a pixel area of ​​the bucket area and a pixel area of ​​an earthwork area in the bucket area based on pixel values ​​of pixel points in the bucket area; The pixel area of ​​the earthwork area is divided by the pixel area of ​​the bucket area to obtain the filling ratio in the bucket area.

5. The earthwork efficiency analysis method according to claim 1, characterized in that: The step of identifying the loading height of the engineering vehicle according to the second frame image includes: Performing image segmentation on the second frame image to determine the rear compartment area of ​​the engineering vehicle; determining the upper edge contour of the rear compartment area based on the pixel values ​​of the pixel points in the rear compartment area; The vertical distance between the upper edge contour and the bottom of the compartment in the rear compartment area is determined and used as the loading height of the engineering vehicle.

6. The earthwork efficiency analysis method according to claim 1, characterized in that: After determining the earthwork efficiency of the earthwork area in combination with the operation duration, the effective loading times and the stacking density, the method further includes: obtaining the number of fully loaded engineering vehicles in the earthwork area within a preset period and the rated load capacity of the engineering vehicles; The earthwork transportation volume within a preset unit time is determined according to the number of fully loaded engineering vehicles, the rated load capacity and the duration of the preset cycle.

7. An earthwork efficiency analysis system, characterized in that: The system comprises: An information acquisition module, used to acquire a surveillance video of an earthwork operation area and the accumulation density of earth in the earthwork operation area; an image extraction module, used to extract a first frame image of a bucket and a second frame image of the engineering vehicle in the surveillance video when an engineering vehicle is present in the surveillance video, and determine a first moment when the engineering vehicle enters the earthwork operation area; an image recognition module, used to identify the effective loading times of the bucket according to the first frame image, and to identify the loading height of the engineering vehicle according to the second frame image; when the loading height of the engineering vehicle is greater than or equal to a preset loading height, determine a second moment when the engineering vehicle changes from a non-full-load state to a full-load state, and determine the operation duration of the engineering vehicle based on the first moment and the second moment; An earthwork operation efficiency analysis module, for determining the earthwork operation efficiency of the earthwork operation area by combining the operation duration, the effective loading times and the stacking density; The determining of the earthwork efficiency of the earthwork area in combination with the operation duration, the effective loading times and the stacking density includes: Substituting the operation time, the effective loading times and the stacking density into a preset formula to obtain the earthwork operation efficiency of the earthwork operation area; Wherein, the preset formula is: Wherein, E represents the earthwork efficiency of the earthwork area, E0 represents the benchmark earthwork efficiency of the earthwork area, L represents the effective loading times of the bucket, N represents the bulk density of the earthwork, C1 represents the influencing factor of the bulk density, C2 represents the influencing factor of the operation time, S m represents the benchmark looseness coefficient of the earthwork, ∈ represents a benchmark constant, T represents the operating time of the engineering vehicle, and k represents the correlation coefficient between the effective loading times and the operating time.

8. An electronic device, characterized in that: It includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory so that the electronic device executes the earthwork operation efficiency analysis method as described in any one of claims 1-6.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed, the earthwork operation efficiency analysis method according to any one of claims 1 to 6 is executed.

Citation Information

Patent Citations

  • Construction operation progress monitoring management method and system

    CN116993303A

  • Work support and management system for working machine

    US20060026101A1