A method for calculating capacity electricity price of hybrid storage power station and storage medium thereof

By constructing a scheduling model and operating period pricing model of hybrid storage power stations, combining storage capacity leasing and electricity gains and losses, the problem of capacity electricity price calculation of hybrid storage power stations is solved, and accurate operating efficiency evaluation and planning and design support is achieved.

CN118552233BActive Publication Date: 2024-11-05XIAN UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411005858.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-05
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

It is difficult to effectively calculate the capacity electricity price of hybrid storage power stations in the prior art, especially in hybrid pumped storage power stations. The short-term-medium- and long-term multi-scale coordinated peak-shaving method is insufficient, resulting in difficulty in quantitative operational benefits, which in turn affects the calculation of capacity electricity prices.

Method used

A hybrid power station capacity electricity price calculation method is proposed, including obtaining operation characteristics and profit and loss rules, building two hydropower station scheduling models that combine preset scheduling periods, and combining operating period pricing models to establish a hybrid power station capacity electricity price calculation model, considering the library capacity A short-term-medium- and long-term multi-scale coordinated peak-sharing model is proposed for leasing and electricity gains and losses.

Benefits of technology

Accurately calculate the long series of operation of hybrid power stations and cascade hydropower stations, improve the capacity electricity price calculation system of pumped storage power stations, provide technical support for the planning and design of hybrid pumped storage power stations, and clarify the capacity electricity price calculation model and pure pumped storage power stations The difference.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118552233B_ABST
    Figure CN118552233B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of pumped-storage power stations, and discloses a method for calculating the capacity electricity price of a hybrid storage power station and a storage medium thereof, to obtain the operating characteristics of the hybrid storage power station and the profit and loss rules generated by the operation; to construct a first hydropower station dispatching model combining two preset dispatching periods according to the operating characteristics and the profit and loss rules; to construct a hybrid storage power station capacity electricity price calculation model according to the operating period pricing model and the first hydropower station dispatching model, which is used to calculate the capacity electricity price of the hybrid storage power station. The present invention focuses on the dispatching subject of the hybrid storage power station, clarifies the unique cost and benefit components such as the storage capacity rental amount generated by its pumping operation, the resulting electricity profit and loss value of the cascade hydropower station, and the additional seasonal hydropower abandonment, and proposes a short-term, medium-term and long-term multi-scale collaborative peak-shaving model for cascade hydropower stations including hybrid storage power stations, accurately calculates the long series operation of the hybrid storage power station and the cascade hydropower station, and couples it with the operating period pricing model to establish a capacity electricity price calculation model for the hybrid storage power station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a method for calculating capacity electricity price of a hybrid storage power station and a storage medium thereof, belonging to the technical field of pumped storage power stations. Background Art

[0002] A pumped storage power station, also known as a storage hydropower station, is a hydropower station that can pump water to an upper reservoir for energy storage. A pumped storage power station uses electricity during low load periods to pump water to an upper reservoir, and releases water to a lower reservoir for power generation during peak load periods. It can convert excess electricity during low load periods into high-value electricity during peak load periods.

[0003] Capacity electricity price is an important way for pumped storage power stations to "make up for costs and obtain reasonable profits". The existing verification method is mainly applicable to pure pumped storage power stations. The cost and income composition of hybrid pumped storage power stations is different from that of pure pumped storage power stations. It is urgent to propose a capacity electricity price calculation method that matches its cost and income model.

[0004] There are relatively many studies on the medium- and long-term scheduling of cascade hydropower stations including hybrid storage power stations in existing research, but insufficient consideration has been given to the short-term, medium-term and long-term multi-scale coordinated peak-shaving methods of hybrid storage power stations and cascade hydropower stations, resulting in certain difficulties in quantifying the long-term series operation benefits of hybrid storage power stations, which in turn restricts the calculation of the capacity electricity price of hybrid storage power stations. Summary of the invention

[0005] The purpose of the present invention is to provide a method for calculating the capacity electricity price of a hybrid storage power station and a storage medium thereof, so as to improve the capacity electricity price calculation system of the hybrid storage power station and clarify that the calculation mode of the capacity electricity price of the hybrid storage power station is different from that of the capacity electricity price of a pure pumped storage power station.

[0006] In a first aspect, an embodiment of the present invention provides a method for calculating the capacity electricity price of a hybrid storage power station, comprising:

[0007] Step 1: Obtain the operating characteristics of the hybrid storage power station and the profit and loss rules generated by the operation;

[0008] Step 2: constructing a first hydropower station dispatching model combining two preset dispatching deadlines according to the operation characteristics and profit and loss rules;

[0009] Step 3: construct a capacity electricity price calculation model for a hybrid storage power station based on the operating period pricing model and the first hydropower station dispatching model, which is used to calculate the capacity electricity price of the hybrid storage power station.

[0010] Preferably, the step 2 specifically includes:

[0011] Step 2.1, constructing a joint dispatching model of the first-term cascade hydropower station and the hybrid storage power station according to the operating characteristics and profit and loss rules;

[0012] Step 2.2: construct a first hydropower station dispatching model for the first term combined with the second term based on the joint dispatching model of the cascade hydropower station and the hybrid storage power station for the first term.

[0013] Preferably, the step 2.1 specifically includes:

[0014] Establishing a benefit optimization strategy for the joint dispatch of the first-term cascade hydropower station and the hybrid storage power station based on the operating characteristics and profit and loss rules;

[0015] According to the benefit optimization strategy, a joint dispatching model of the first-term cascade hydropower stations and hybrid storage power stations is constructed.

[0016] Preferably, the objective function of the joint dispatching model of the cascade hydropower station and the hybrid storage power station within the first term is:

[0017] During the peak-shaving and valley-filling stages within the preset time period of the hybrid-storage power station, the difference between the total power generation of the upstream and downstream hydropower stations and the hybrid-storage power station and the pumped power of the hybrid-storage power station is the largest.

[0018] Preferably, the objective function of the first hydropower station scheduling model is:

[0019] The long series of upstream and downstream hydropower stations and hybrid storage power stations have the largest peak-shaving capacity.

[0020] Preferably, the constraints of the first hydropower station scheduling model include:

[0021] Including cascade hydropower station reservoir water balance constraints of mixed-storage power stations, pumping and power generation flow constraints of mixed-storage power stations, pumping head and output constraints of mixed-storage power stations, power generation head and output constraints of hydropower stations, and daily total water outflow constraints.

[0022] Preferably, the step 3 specifically includes:

[0023] Constructing a capacity electricity price calculation model for a hybrid storage power station based on the operation period pricing model and the first hydropower station dispatching model;

[0024] According to the capacity electricity price calculation model of the hybrid storage power station, the preset hydropower price and the storage capacity rental unit price are input so that the present value of the net cash flow of the hybrid storage power station is zero, and the capacity electricity price of the hybrid storage power station under the preset hydropower price and the storage capacity rental unit price level is obtained.

[0025] Preferably, the operating period pricing model is determined according to the operating period pricing method.

[0026] Preferably, the profit and loss rules specifically include:

[0027] The storage capacity rental amount generated by the extraction operation of the mixed storage power station, the resulting electricity profit and loss value of the cascade hydropower stations, and the additional seasonal hydropower abandonment electricity.

[0028] In a second aspect, an embodiment of the present invention provides a computer-readable storage medium, on which computer program instructions are stored, and the computer program instructions execute the method described in the first aspect.

[0029] Beneficial effects: The present invention focuses on the typical dispatching entity of the hybrid storage power station, clarifies the unique cost and benefit components such as the storage capacity leasing amount generated by its pumping operation, the resulting electricity profit and loss value of the cascade hydropower station, and the increase in seasonal hydropower abandonment, and proposes a short-term, medium-term and long-term multi-scale collaborative peak-shaving model for cascade hydropower stations including hybrid storage power stations, accurately calculates the long series operation of hybrid storage power stations and cascade hydropower stations, and couples with the operating period pricing model to establish a hybrid storage power station capacity electricity price calculation model that takes into account storage capacity leasing and electricity profit and loss. The present invention improves the capacity electricity price calculation system of pumped storage power stations and can provide technical support for the planning and design of hybrid pumped storage power stations. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the relationship between the daily extraction operation mode of the hybrid storage power station and the influence of the power profit and loss in the embodiment;

[0031] Figure 2 It is a schematic diagram of the capacity electricity price calculation process of the hybrid storage power station of the present invention. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the present invention more clear, the present invention is further described in detail below in conjunction with specific implementation methods. It should be understood that the specific implementation methods described here are only used to explain the present invention and do not limit the scope of protection of the present invention.

[0033] This paper proposes a hybrid storage power station capacity price calculation method, with a particular focus on the hybrid pumped storage power station capacity price calculation model that takes into account storage capacity leasing and electricity profit and loss. Below, we will take this method as the core and elaborate on its specific application steps in the Ankang hybrid storage power station.

[0034] Step 1: Obtain the operating characteristics of the hybrid storage power station and the profit and loss rules generated by the operation; the profit and loss rules specifically include: the storage capacity rental amount generated by the extraction operation of the hybrid storage power station, the resulting electricity profit and loss value of the cascade hydropower station and the additional seasonal hydropower abandonment.

[0035] like Figure 2 As shown, in this embodiment, first of all, it includes: clarifying the typical cost and benefit components of the hybrid pumped storage power station in terms of storage capacity leasing, additional seasonal hydropower abandonment, and power loss and profit of the upper and lower reservoir power stations due to pumping operation.

[0036] Specifically, a hybrid pumped storage power station, referred to as a hybrid storage power station, refers to a hydropower station that has both pumped storage and runoff power generation functions. Currently, there are several types of power stations: one is a pure pumped storage power station, which has newly built upper and lower reservoirs. The water required for operation comes from the circulation between the upper / lower reservoirs, and generally there is no problem of reservoir capacity leasing; one is a pure pumped storage power station combined with normal storage, which relies on an existing cascade power station as the upper or lower reservoir, and corresponds to a self-built lower or upper reservoir, involving reservoir capacity leasing issues; one is a hybrid storage power station, which relies on an existing cascade power station as the upper and lower reservoirs, involving leasing issues.

[0037] Specifically, in the case of multiple development and construction entities, both hybrid storage power stations and pure pumped storage power stations with combined normal storage have storage capacity leasing problems. Assuming that the maximum daily water volume that can be pumped out by the pumped storage power station is equal, let the maximum pumping flow and maximum power generation flow be , (Unit: m³ / s), the designed pumping time and the designed power generation time are , (Unit: h), the maximum amount of water that can be pumped per day , the maximum amount of water generated during the day ,and In the case of multiple entities, the hybrid storage power station needs to rent the upper and lower storage capacity at the same time, so its storage capacity rental volume is ; The pure pumped storage power station with combined storage and normal storage is built only on the upper or lower reservoir of the existing hydropower station, and its storage capacity rental volume is When the hybrid storage power station and its upper or lower storage belong to the same entity, the storage capacity rental amount is the same as that of the pure pumped storage power station combined with normal storage.

[0038] like Figure 1 As shown in the figure, the daily power generation operation mode of the hybrid power station and the relationship between power loss and profit are shown. Under the new power system, the daily operation process of the power system has obvious stage characteristics, including morning and evening load peak periods, wind and solar power generation periods, and other load valley or flat periods. According to the 24-hour time sequence within the day, the above stages can be divided into 7 periods. Here, the morning and evening peak periods are respectively , ( Figure 1 ), the new energy generation period is , non-morning and evening peak hours and new energy peak hours are defined as other hours, which are , , , .

[0039] In the implementation example of the Ankang Hybrid Storage Power Station, based on the short-term, medium-term and long-term joint dispatch results of the cascade hydropower stations with mixed storage in Ankang, the daily storage capacity rental of the long series of the Ankang Hybrid Storage Power Station is calculated, that is, the storage capacity of the Ankang Reservoir and Xunyang Reservoir occupied by the mixed storage power station. The impact of the operation of the Ankang Hybrid Storage Power Station on the power gains and losses of the Ankang Hydropower Station and the Xunyang Hydropower Station under the long series is calculated, as well as the additional abandoned hydropower, power generation and power consumption of the hybrid storage power station.

[0040] Step 2: constructing a first hydropower station dispatching model combining two preset dispatching deadlines according to the operation characteristics and profit and loss rules;

[0041] Step 2.1. Construct a joint dispatching model of the first-term cascade hydropower stations and mixed-storage power stations based on the operating characteristics and profit-loss rules. Further, establish a benefit optimization strategy for the joint dispatching of the first-term cascade hydropower stations and mixed-storage power stations based on the operating characteristics and profit-loss rules. Construct a joint dispatching model of the first-term cascade hydropower stations and mixed-storage power stations based on the benefit optimization strategy.

[0042] Step 2.2: Construct a first hydropower station dispatching model for the first term combined with the second term based on the joint dispatching model of the cascade hydropower station and the hybrid storage power station for the first term.

[0043] Specifically, the first deadline and the second deadline in the present invention are short-term and medium- to long-term deadlines, respectively. Those skilled in the art can define the specific time scales corresponding to the short-term and medium- to long-term deadlines based on the actual project. The present invention does not limit this. In this embodiment, the first-term cascade hydropower station and mixed-storage power station joint scheduling model is specifically: a short-term cascade hydropower station and mixed-storage power station joint scheduling model; the first hydropower station scheduling model combined with the second deadline is specifically: a hydropower station scheduling model with medium- to long-term nested short-term scheduling.

[0044] like Figure 2 As shown, in this embodiment, secondly, it includes: taking the maximization of long-series peak-shaving benefits as the goal, constructing a short-term, medium-term and long-term multi-scale coordinated peak-shaving model for cascade hydropower stations including hybrid pumped-storage power stations.

[0045] Specifically, the peak-shaving power of the upstream and downstream hydropower stations and the peak-shaving power of the pumped-storage power stations are the largest, the pumping power consumption of the pumped-storage power stations in the valley-filling stage is the largest, and the power generation of the upstream and downstream hydropower stations is the smallest to construct a short-term cascade hydropower station and mixed-storage power station joint dispatch model. Specifically, the difference between the sum of the power generation of the hydropower stations and the mixed-storage power stations in the valley-filling stage and the pumping power of the mixed-storage power stations is used as a quantitative indicator of the short-term peak-shaving benefit, and a short-term peak-shaving optimization model of cascade hydropower stations including hybrid pumped-storage power stations is established, that is, a short-term cascade hydropower station and mixed-storage power station joint dispatch model, and the model optimization objective function is as follows:

[0046]

[0047] Where:

[0048] It represents the total output of the hydropower station during the peak load regulation stage within a day;

[0049] It represents the total output of the hybrid power station during the peak load regulation phase within a day;

[0050] It represents the total output of the hybrid power station during the valley filling stage within a day;

[0051] It represents the total output of the hydropower station during the valley filling stage within a day;

[0052] It means that the hybrid power station has the greatest peak-shaving benefit during the day;

[0053] Indicates multiplication;

[0054] It means sum;

[0055] Indicates Reservoir hydropower station, ;

[0056] Indicates the peak load period of the hydropower station;

[0057] Indicates hydropower station All peak load periods involved during the day, ;

[0058] Indicates hydropower station During peak hours of efforts, ;

[0059] , Indicates whether the hybrid power station is generating electricity or pumping water. , , when generating electricity or pumping water , , but the hybrid power station cannot draw power at the same time, that is ;

[0060] Indicates the peak load period of the hybrid storage power station;

[0061] Indicates all peak load-shaving periods in which the hybrid storage power station participates. ;

[0062] Indicates that the hybrid storage power station is in peak load period The power generation output, ;

[0063] Indicates the valley-filling period of the hybrid storage power station;

[0064] Indicates all valley-filling periods in which the hybrid storage power station participates. ;

[0065] Indicates that the hybrid storage power station is in the valley filling period The pumping power, , ;

[0066] Indicates hydropower station The valley filling period;

[0067] Indicates hydropower station All valley filling periods involved in regulation, ;

[0068] Indicates hydropower station During valley filling period of efforts, .

[0069] After obtaining the short-term joint dispatching model of cascade hydropower stations and hybrid storage power stations, a hydropower station dispatching model with medium- and long-term nested short-term dispatch is constructed according to the short-term joint dispatching model of cascade hydropower stations and hybrid storage power stations, which is recorded as the short-term, medium- and long-term multi-scale coordinated peak-shaving model of cascade hydropower stations including hybrid storage power stations.

[0070] Specifically, in practical applications, the medium- and long-term stage aims to regulate the long-series ten-day / monthly inflow runoff process through reservoirs with annual or higher regulation capacity, so as to maximize the peak-shaving benefits of the short-term daily mixed-storage power stations and cascade hydropower stations. Therefore, the objective function of the medium- and long-term optimal scheduling model, that is, the hydropower station scheduling model with medium- and long-term nested short-term scheduling, is to maximize the peak-shaving power of the long-series upstream and downstream hydropower stations and mixed-storage power stations, that is, the peak-shaving benefits of the long-series hydropower stations and mixed-storage power stations are optimal. The specific formula is as follows:

[0071]

[0072] Where:

[0073] It means that the hybrid power station has the greatest peak-shaving benefit during the day;

[0074] It indicates that the peak-shaving benefits of long series hydropower stations and hybrid storage power stations are the greatest;

[0075] Indicates the total number of calculation periods for long series hydropower stations and mixed storage power stations;

[0076] Indicates time period.

[0077] The constraints of the hydropower station scheduling model with medium- and long-term nested short-term scheduling include but are not limited to: water balance constraints of cascade hydropower station reservoirs including mixed storage power stations, pumping and power generation flow constraints of mixed storage power stations, pumping head and output constraints of mixed storage power stations, power generation head and output constraints of hydropower stations, and daily total water volume constraints. Those skilled in the art can set the constraints according to the actual project.

[0078] Specifically, in this embodiment, the model constraints are as follows:

[0079] (1) Water balance constraints of cascade hydropower station reservoirs including mixed storage power stations:

[0080]

[0081] Where:

[0082] , Respectively At the beginning of the period, Time period reservoir Water storage capacity, For the upper reservoir, For the lower reservoir, ;

[0083] express Time period to time interval;

[0084] Indicates that the hybrid power station The power generation flow during the period;

[0085] Indicates that the hybrid power station Pumping flow rate during the period;

[0086] , The time periods Reservoir Inbound and outbound traffic, ;

[0087] It is the time period The interval runoff of the reservoir, .

[0088] (2) Constraints on pumping and power generation flow of hybrid power stations:

[0089]

[0090]

[0091] Where:

[0092] , are the minimum and maximum pumping flow rates of the hybrid storage power station, ;

[0093] , are the minimum and maximum power generation flows of the hybrid storage power station, .

[0094] Indicates that the hybrid power station The power generation flow during the period;

[0095] Indicates that the hybrid power station Pumping flow rate during the period;

[0096] (3) Pumping head constraints and output constraints of hybrid storage power stations:

[0097]

[0098] Where:

[0099] For hybrid power station at time Pumping power;

[0100] is the comprehensive coefficient of pumping operation of the hybrid storage power station, , is the density of water, is the acceleration due to gravity, The efficiency of the pumping device of the hybrid storage power station is , , , They are respectively the water pump operation efficiency, motor efficiency, transmission device efficiency, and water inlet and outlet pipe efficiency, %;

[0101] For hybrid power station at time The pumping head;

[0102] , , They are the upper reservoir water level capacity curve function of the hybrid storage power station, the tail water level flow curve function of the hybrid storage power station, and the head loss function of the hybrid storage power station;

[0103] , , They are the hybrid power station at time The pumping power and the upper and lower limits of the pumping power, ;

[0104] , , They are the hybrid power station at time Pumping head, maximum head and minimum head.

[0105] The calculation process of the power generation capacity of a hybrid storage power station is similar to that of a traditional hydropower station, which is common knowledge in the field and will not be repeated here.

[0106] (4) Hydropower station power head constraints and output constraints:

[0107]

[0108] Where:

[0109] , , Hydropower Station At the moment output and the upper and lower limits of the power station output, ;

[0110] , , Hydropower Station At the moment The water head and the upper and lower limits of the power station's generating head, ;

[0111] is the comprehensive output coefficient of the hydropower station, , The comprehensive efficiency of hydropower station power generation, , , , They are the unit section water diversion efficiency, turbine efficiency, generator efficiency, and transformer efficiency;

[0112] For hydropower station At the moment of water head;

[0113] , , They are respectively the reservoir water level and capacity curve function, the hydropower station tailwater level flow curve function, and the head loss function.

[0114] (5) Constraints on total daily water volume discharged from the storage:

[0115]

[0116] Where:

[0117] ;

[0118] Indicates the outflow of the reservoir;

[0119] To meet the downstream comprehensive utilization water supply requirements of reservoir hydropower stations, .

[0120] (6) Other constraints, such as reservoir capacity constraints, hydropower station power generation flow constraints, etc.

[0121] Step 3: construct a capacity electricity price calculation model for the hybrid storage power station based on the operation period pricing model and the first hydropower station dispatching model, which is used to calculate the capacity electricity price of the hybrid storage power station.

[0122] Further, an operation period pricing model is determined according to the operation period pricing method, and a capacity electricity price calculation model of a hybrid storage power station is constructed according to the operation period pricing model and the first hydropower station dispatching model;

[0123] According to the capacity electricity price calculation model of the hybrid storage power station, the preset hydropower price and the storage capacity lease unit price are input to make the present value of the net cash flow of the hybrid storage power station zero, and the capacity electricity price of the hybrid storage power station under the preset hydropower price and storage capacity lease unit price level is obtained.

[0124] like Figure 2 As shown, in this embodiment, the last step includes: coupling with the operating period pricing model, proposing a hybrid pumped storage power station capacity electricity price calculation model that takes into account storage capacity leasing and electricity profit and loss.

[0125] Specifically, in this embodiment, based on the "Measures for Determining the Capacity Electricity Price of Pumped Storage Power Plants", it is pointed out that the capacity electricity price of pumped storage power plants is determined using the operating period pricing method, and a capacity electricity price calculation model for hybrid storage power plants that takes into account storage capacity leasing and electricity gains and losses is proposed.

[0126] The operating period pricing method determines an equilibrium electricity price when the net cash flow in each year during the economic life cycle of the project is equal to the financial internal rate of return:

[0127]

[0128] Where:

[0129] is the present value of the net cash flow of the hybrid storage power station;

[0130] It is the sum of the construction period and operation period of the hybrid storage power station;

[0131] is the internal rate of return on capital;

[0132] , Respectively Cash inflow and outflow for the year.

[0133] To ensure that the capacity electricity price recovers other costs besides the operating costs, the annual cash inflow Including capacity price benefits , Hybrid storage power station increases seasonal abandoned hydropower revenue And the residual value of fixed assets of hybrid power plants .

[0134]

[0135] Where: , They are respectively Annual capacity price income, and seasonal abandoned hydropower generation income from hybrid storage power stations;

[0136] For the The residual value of the fixed assets of the annual hybrid power plant is included in the annual cash inflow only in the last year of the operation period;

[0137] , They are the capacity electricity price of the hybrid storage power station and the electricity price of the additional seasonal abandoned hydropower;

[0138] , They are respectively Annual grid-connected capacity, The amount of seasonal hydropower abandoned each year;

[0139] The installed capacity of the hybrid power station;

[0140] , They are respectively Annual plant power consumption rate and forced outage rate;

[0141] For hybrid power station Annual maintenance days.

[0142] Annual cash outflow of hybrid power station In addition to the capital investment during the construction period , Power station operation and maintenance costs , Repayment of principal , interest expenses , taxes and surcharges In addition, compensation for the loss of electricity generated by the hydropower station due to its extraction operation should be paid. 2. Rental fees for upper and lower storage capacity Included.

[0143]

[0144] Where:

[0145] , , , , , , Respectively The capital investment during the construction period of the hybrid power station, the operation and maintenance costs of the power station, the repayment of principal, interest expenses, taxes and surcharges, compensation for power loss of the hydropower station caused by extraction and operation, and storage capacity leasing fees;

[0146] , are the loan principal and interest rate respectively;

[0147] , , , They are the value-added tax rate, urban construction surtax rate, education surtax rate, and local education surtax rate;

[0148] , The electricity price of the hydropower station, Annual power loss of hydropower stations;

[0149] , Respectively Year The unit price of the reservoir capacity rental fee, Year The amount of reservoir capacity leased.

[0150] Specifically, in practical applications, combined with the Ankang hybrid storage power station, the capacity electricity price of the Ankang hybrid storage power station under different hydropower prices and storage capacity rental unit prices are considered. The specific method is to set the hydropower price in steps of 0.1 yuan / kWh, from 0 yuan / kWh to 1 yuan / kWh, and set the storage capacity rental unit price in steps of 0.1 yuan / m³, from 0 yuan / m³ to 1 yuan / m³.

[0151] It should be understood that in this embodiment, the hydropower price is mainly scaled based on the current domestic hydropower price and peak-valley price; the storage capacity rental unit price is mainly scaled based on the current domestic storage capacity rental unit price of Tai'an pumped storage power station, etc. Thus, the capacity electricity price of Ankang hybrid storage power station under different hydropower price levels and different storage capacity rental levels is obtained.

[0152] The present invention improves the capacity electricity price calculation system of pumped-storage power stations, can provide technical support for the planning and design of hybrid storage power stations, and clarifies that the capacity electricity price calculation model of hybrid storage power stations should be different from that of pure pumped storage power stations.

[0153] The present invention focuses on the typical dispatching subject of the hybrid storage power station, clarifies the unique cost and benefit components such as the storage capacity leasing amount generated by its pumping operation, the resulting electricity profit and loss value of the cascade hydropower station, and the additional seasonal hydropower abandonment, and proposes a short-term, medium-term and long-term multi-scale collaborative peak-shaving model for cascade hydropower stations including hybrid storage power stations, accurately calculates the long-series operation of hybrid storage power stations and cascade hydropower stations, and couples it with the operating period pricing model to establish a hybrid storage power station capacity electricity price calculation model that takes into account storage capacity leasing and electricity profit and loss. The present invention improves the capacity electricity price calculation system of pumped storage power stations and can provide technical support for the planning and design of hybrid pumped storage power stations.

[0154] The above are only several embodiments of the present invention and are not intended to limit the present invention in any form. Although the present invention is disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Any technician familiar with the profession, without departing from the scope of the technical solution of the present invention, using the above disclosed technical content to make slight changes or modifications are equivalent to equivalent implementation cases and fall within the scope of the technical solution.

Claims

1. A method for calculating the capacity electricity price of a hybrid storage power station, characterized in that: include: Step 1: Obtain the operating characteristics of the hybrid storage power station and the profit and loss rules generated by the operation; Step 2: constructing a first hydropower station dispatching model combining two preset dispatching deadlines according to the operation characteristics and profit and loss rules; Step 3: constructing a capacity electricity price calculation model for the hybrid storage power station according to the operation period pricing model and the first hydropower station dispatching model, so as to calculate the capacity electricity price of the hybrid storage power station; The step 2 specifically includes: Step 2.1, constructing a joint dispatching model of the first-term cascade hydropower station and the hybrid storage power station according to the operating characteristics and profit and loss rules; Step 2.2, constructing a first hydropower station dispatching model for the first term combined with the second term according to the joint dispatching model of the cascade hydropower station and the mixed storage power station for the first term; The step 2.1 specifically includes: Establishing a benefit optimization strategy for the joint dispatch of the first-term cascade hydropower station and the hybrid storage power station based on the operating characteristics and profit and loss rules; According to the benefit optimization strategy, a joint dispatching model of the first-term cascade hydropower station and the hybrid storage power station is constructed; The objective function of the joint dispatching model of the first-term cascade hydropower station and hybrid storage power station is: The difference between the total power generation of the upstream and downstream hydropower stations and the hybrid storage power station and the pumped power of the hybrid storage power station during the peak regulation and valley filling phases within the preset time period of the hybrid storage power station is the largest; The step 3 specifically includes: Constructing a capacity electricity price calculation model for a hybrid storage power station based on the operation period pricing model and the first hydropower station dispatching model; According to the capacity electricity price calculation model of the hybrid storage power station, the preset hydropower price and the storage capacity rental unit price are input so that the present value of the net cash flow of the hybrid storage power station is zero, and the capacity electricity price of the hybrid storage power station under the preset hydropower price and the storage capacity rental unit price level is obtained.

2. The method for calculating the capacity electricity price of a hybrid storage power station according to claim 1, characterized in that: The objective function of the first hydropower station dispatching model is: The long series of upstream and downstream hydropower stations and hybrid storage power stations have the largest peak-shaving capacity.

3. The method for calculating the capacity electricity price of a hybrid storage power station according to claim 2, characterized in that: The constraints of the first hydropower station dispatching model include: Including cascade hydropower station reservoir water balance constraints of mixed-storage power stations, pumping and power generation flow constraints of mixed-storage power stations, pumping head and output constraints of mixed-storage power stations, power generation head and output constraints of hydropower stations, and daily total water outflow constraints.

4. The method for calculating the capacity electricity price of a hybrid storage power station according to claim 1, characterized in that: The operating period pricing model is determined according to the operating period pricing method.

5. The method for calculating the capacity electricity price of a hybrid storage power station according to claim 1, characterized in that: The profit and loss rules specifically include: The storage capacity rental amount generated by the extraction operation of the mixed storage power station, the resulting electricity profit and loss value of the cascade hydropower stations, and the additional seasonal hydropower abandonment electricity.

6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer program instructions, and the computer program instructions execute the method according to any one of claims 1 to 5.