Cable installation device based on ring main unit
By using the combined structure of the mounting base, horizontal tubes, vertical tubes and seals in the ring main unit, the problems of small contact area and poor sealing between the cable and the stress sleeve are solved, achieving more stable cable fixation and more efficient The sealing effect improves the overall safety of the equipment.
Patent Information
- Application Number
- CN202411031428.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-30
AI Technical Summary
The contact area between the first splicing block and the second splicing block between the cable and the stress sleeve in the ring main unit and the T-shaped joint is small, resulting in poor stability, and the sealing between the expansion stress cone and the cable is poor. Poor, affecting the overall sealing effect of the equipment.
A cable installation device including a mounting base, a horizontal pipe, a vertical pipe, a stress sleeve and a seal is used. The cable and stress sleeve are tightly fixed and sealed through an inner seal and a locking mechanism. The inner seal is composed of a sealing ring and a convex key. It is composed of a matching structure with a wedge surface. The transmission mechanism drives the push ring and push claw to descend, and pushes the convex key to shrink the sealing ring to form a seal.
It improves the convenience of cable installation and sealing effect, enhances the safety factor of the equipment, and ensures the stability of the sealing effect when the cable is deformed by force.
Smart Images

Figure CN118554375B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cable installation for ring main unit (RMU), and in particular to a cable installation device based on a RMU. Background Art
[0002] A ring main unit (RMU) typically refers to power distribution equipment within an electrical system, used to provide ring network power within a distribution network. It distributes high-voltage electrical energy to various load points, ensuring a stable power supply. Through internal circuit breakers, fuses, and other protective devices, the RMU protects circuits from overloads, short circuits, and other faults. T-shaped cable jacks are typically used in RMUs for cable installation and connection. A stress relief sleeve is applied to the cable to disperse and buffer external mechanical stress, preventing stress concentration in a single portion of the cable and thus protecting the cable's integrity and lifespan. The stress relief sleeve is then inserted into the cable jack for installation.
[0003] In the patent document with the authorization announcement number CN113346261B, a cable plugging and unplugging mechanism in a ring network cabinet is disclosed, including a T-type connector, a crimping terminal is provided in the T-type connector, and the T-type connector and the crimping terminal are used to connect the cable to the ring network cabinet or connect different cables; an expansion stress cone, which is provided in the T-type connector and is used to expand and fix the cable after connecting it, improve the electric field distribution at the end of the metal sheath, and reduce the electric field strength at the edge of the metal sheath; a cold shrink tube, which is provided in the T-type connector and is used to connect the cable and the expansion stress cone and close one end thereof; a fixed head, The fixing head is respectively connected to the T-joint and the expansion type stress cone, and is used to expand and close the expansion type stress cone after installation. By setting the traditional stress cone into an adjustable expansion type stress cone, during installation, it will not expand outward because there is no pressure at both ends. The minimum inner diameter of the annular structure generated by itself is larger than the diameter of the cable core, which is convenient for installation. Similarly, the maximum outer diameter is smaller than the inner diameter of the T-joint. After installation, when fixed by the fixing head, it will contact the crimping terminal, and there will be pressure at both ends, so that the first splicing block and the second splicing block will both expand outward, so that its fixation is more stable and there is no gap at the connection.
[0004] However, this solution still has the following problems: the first splicing block and the second splicing block bend and expand outward to fix the cable, and the first splicing block and the second splicing block only rely on a small part of the bent and expanded area to abut against the T-joint to achieve fixation, resulting in a small contact area between the first splicing block and the second splicing block and the T-joint, and thus poor stability. After the first splicing block and the second splicing block expand, bending deformation will occur, resulting in a reduction in the sealing between the expansion stress cone and the T-joint, especially the splicing part between the first splicing block and the second splicing block is prone to gaps. Although an elastic ring is added to improve the sealing between the expansion stress cone and the T-joint, the elastic ring cannot act between the expansion stress cone and the cable. After the expansion stress cone bends and expands outward, the sealing between the expansion stress cone and the cable is still poor, which will affect the overall sealing effect of the equipment and thus lead to a low safety factor. Summary of the Invention
[0005] The present invention provides a cable installation device based on a ring network cabinet, which aims to solve the problem in the related technology that the contact area between the first splicing block between the cable and the stress sleeve and between the second splicing block and the T-joint is small, resulting in poor stability, and the sealing between the expansion stress cone and the cable is still poor, affecting the overall sealing effect of the equipment.
[0006] The cable installation device based on the ring main unit of the present invention includes a mounting seat, a horizontal pipe extending forward and backward, a vertical pipe extending upward and downward, a stress sleeve for sleeve on the cable and a sealing member, and also includes a locking mechanism for pushing the sealing member to shrink; the sealing member includes an inner sealing member;
[0007] The inner seal comprises a sealing ring and a plurality of convex keys annularly distributed and fixed on the outer circumference of the sealing ring. The inner seal is provided on the inner wall of the stress sleeve and is used to shrink and tighten the cable passing through the stress sleeve. The convex keys extend outward from a through groove provided on the inner wall of the stress sleeve to the outer wall of the stress sleeve.
[0008] The locking mechanism includes a plug, a transmission mechanism, and a push ring. The plug is used to move forward and backward and is inserted into the opening provided at the rear end of the horizontal tube to seal the rear end of the horizontal tube. The push ring is assembled in the vertical tube for upward and downward guidance and the supply force sleeve passes upward to contact the convex key. A wedge surface matching structure is provided between the push ring and the convex key. The transmission mechanism is used to convert the forward and backward movement of the plug into up and down movement and output it. The wedge surface matching structure is used to convert the up and down movement output by the transmission mechanism into a top thrust to push the inner seal to contract.
[0009] When the plug is installed in the transverse tube, the transmission mechanism drives the push ring and the push claw to descend, and the wedge surface matching structure pushes the convex key, so that the inner seal shrinks to fix and seal the cable and the stress sleeve.
[0010] Preferably, the wedge surface matching structure includes a pressing portion provided on the lower end surface of the push ring and an inclined portion provided on the outer side of the upper end of the convex key; the inner side surfaces of the upper and lower ends of each convex key in the inner seal are symmetrically provided with at least two groups of pressing teeth, and the two opposite outer side surfaces in the horizontal direction of the pressing teeth are wedge surfaces, and a card groove is formed between the two groups of pressing teeth. The outer edge of the sealing ring is stuck in the inside of the card groove, and an annular first sealing rubber gasket is provided on the inner wall surface of the sealing ring. When the push ring descends, the pressing portion can push the inclined portion of the convex key, so that the convex key moves and squeezes the outer wall of the sealing ring, so that the sealing ring shrinks and tightens inward, so that the first sealing rubber gasket and the cable fit tightly to form a seal.
[0011] Preferably, the stress sleeve is cylindrical, with its axis extending up and down and its radial direction being horizontal. There are multiple through grooves 1 that penetrate the side wall of the stress sleeve inside and outside in the horizontal direction. A plurality of arc grooves 1 are also provided on the inner wall of the stress sleeve. The through grooves 1 and the arc grooves 1 are staggered and evenly distributed on the stress sleeve along the circumferential direction. Each arc groove 1 is connected to two adjacent through grooves 1. The convex key 1 of the inner seal is slidably assembled inside the through groove 1 along the radial direction of the stress sleeve, and part of the outer wall surface of the sealing ring 1 is embedded in the arc groove 1.
[0012] Preferably, the transmission mechanism includes a screw rod, a gear, and a rack. The screw rod extends up and down and is rotatably installed in the horizontal tube. A threaded hole that cooperates with the screw rod thread is provided on the push ring. The push ring is assembled on the screw rod through the threaded hole and can be moved up and down. The gear is fixedly installed on the upper end of the screw rod. The rack is rotatably assembled around the axis extending forward and backward and is assembled at the front end of the plug. The rack is guided and moved in the forward and backward directions and is assembled inside the horizontal tube and meshes with the gear. The rack can push the gear to rotate during sliding, so that the screw rod drives the push ring to move in the vertical tube.
[0013] Preferably, a transverse groove extending forward and backward is provided on the side wall of the transverse tube, the rack is slidably assembled inside the transverse groove, a swivel that rotates around its axis extending forward and backward is provided on the plug, and the rack is fixedly connected to the swivel.
[0014] Preferably, a bolt column is fixedly installed at the rear end of the mounting seat, and a threaded hole that is compatible with the bolt column is opened in the central part of the front end of the plug.
[0015] Preferably, the seal also includes an outer seal, which includes a ring platform fixed inside the lower end of the vertical pipe and a positioning sealing ring. The ring platform is provided with a hole in the center for the supply sleeve to pass upward. The positioning sealing ring includes a second sealing ring and a plurality of second convex keys distributed in an annular manner and fixed on the outer periphery of the second sealing ring. The positioning sealing ring is provided on the inner wall of the ring platform and is used to shrink and tighten the stress sleeve passing through the ring platform. The second convex key extends outward from the second through-groove provided on the inner wall of the ring platform to the outer wall of the ring platform.
[0016] The locking mechanism also includes a push claw, which is fixed at the lower end of the push ring and extends downward. The upper end of the ring platform is provided with an upper opening which is communicated with the second through groove for the push claw to be inserted to contact the second convex key; a wedge surface matching structure 2 is provided between the push claw and the second convex key, and the wedge surface matching structure 2 is used to convert the up and down movement output by the transmission mechanism into a thrust force to push the outer seal to contract.
[0017] The push ring can drive the push claw to move synchronously during the descent, and the convex key 2 can be driven to move through the wedge surface matching structure 2, thereby squeezing the outer wall of the sealing ring 2, causing the sealing ring 2 to shrink and tighten inward, so that the sealing ring 2 and the stress sleeve are tightly fitted to form a seal.
[0018] Preferably, the wedge surface matching structure 2 includes a pressing portion arranged on the lower end surface of the push claw and an inclined portion arranged on the outer side of the upper end of the convex key 2; the inner side surfaces of the upper and lower ends of the convex key 2 are provided with plug-in blocks, the outer edge of the sealing ring 2 is clamped between the two plug-in blocks, and a second annular sealing rubber gasket is provided on the inner wall surface of the sealing ring 2.
[0019] Preferably, there are multiple through grooves 2 and they penetrate the side wall of the ring platform inside and outside along the radial direction of the ring platform. A plurality of arc grooves 2 are also provided on the inner wall of the ring platform. There are multiple through grooves 2 and arc grooves 2 and they are staggered and evenly distributed on the ring platform along the circumferential direction. Each arc groove 2 is connected to the two adjacent through grooves 2. The convex key 2 of the positioning sealing ring is slidably assembled inside the through groove 2 along the radial direction of the ring platform, and part of the outer wall surface of the sealing ring 2 is embedded in the arc groove 2.
[0020] Preferably, a slot compatible with the plug block is provided on the outer wall of the stress sleeve, so that the plug block can be inserted into the slot and fixed to the stress sleeve during movement; an oil bag is provided inside the plug block, and sealing oil is stored inside the oil bag; a plurality of nozzles extending to the outside of the plug block are provided on the oil bag, which are used to spray the sealing oil in the oil bag to the outside of the plug block; a pressure head is fixedly installed inside the slot, and a through hole compatible with the pressure head is provided on the side of the plug block close to the slot; when the plug block enters the inside of the slot, the pressure head can squeeze the oil bag, so that the sealing oil is sprayed out from the nozzle to fill and seal the gap between the plug block and the slot.
[0021] Beneficial effects:
[0022] 1. When the present invention is in use, when the plug is screwed onto the bolt column to seal the tail end of the horizontal tube, it can drive the transmission mechanism to drive the push ring to descend, and then the pressing teeth on the convex key 1 are fixed to the cable, and at the same time, the sealing ring 1 is squeezed, and the first sealing gasket is able to fit tightly against the cable by shrinking the sealing ring 1. Even when the cable is deformed by axial force, the first sealing gasket can better fit the cable skin and complete the seal, making the cable installation more convenient and labor-saving, and reducing the difficulty of cable installation. Moreover, when the sealing ring 1 shrinks and deforms inward, it can also fill the connection gap, so as to improve the sealing effect of the equipment and enhance the safety factor of cable use.
[0023] 2. When the present invention is in use, as the push ring descends, the push claw can be driven to descend synchronously, so that the insert block on the second convex key is inserted into the slot on the stress sleeve, fixing the vertical pipe and the stress sleeve, and the second convex key squeezes the second sealing ring. By shrinking the second sealing ring, the second sealing gasket can better fit the stress sleeve and then complete the seal, thereby improving the overall sealing effect of the equipment.
[0024] 3. When the present invention is in use, as the plug is inserted into the slot, the pressure head can pass through the through hole into the plug to squeeze the oil bag inside the plug, so that the sealing oil is sprayed out from the nozzle, which better fills and seals the gap between the plug and the slot, further improving the sealing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a three-dimensional diagram of the cabinet after the cables are installed in embodiment 1 of the present invention.
[0026] Figure 2 It is a schematic diagram of the disassembled state of the mounting tube and the mounting base according to the first embodiment of the present invention.
[0027] Figure 3 This invention Figure 2 Front cross-sectional view of .
[0028] Figure 4 It is a three-dimensional diagram of a push ring and a push claw according to a first embodiment of the present invention.
[0029] Figure 5 It is a side sectional view of a mounting tube according to a first embodiment of the present invention.
[0030] Figure 6 This invention Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0031] Figure 7 It is a three-dimensional diagram of a stress sleeve and a cable according to an embodiment of the present invention.
[0032] Figure 8 1 is a three-dimensional diagram of an inner seal according to an embodiment of the present invention.
[0033] Figure 9 It is a transverse cross-sectional view of a stress sleeve according to an embodiment of the present invention.
[0034] Figure 10 This invention Figure 3 Schematic diagram of the enlarged structure at point B in the middle.
[0035] Figure 11 It is a vertical cross-sectional view of a ring platform according to an embodiment of the present invention.
[0036] Figure 12 It is a three-dimensional diagram of a ring platform according to an embodiment of the present invention.
[0037] Figure 13 It is a three-dimensional diagram of a positioning sealing ring according to an embodiment of the present invention.
[0038] Figure 14 It is a schematic diagram of the internal structure of the installation barrel after the cable is installed in embodiment 1 of the present invention.
[0039] Figure 15 This invention Figure 14 Front cross-sectional view of .
[0040] Figure 16 It is a schematic diagram of the transmission mechanism in the second embodiment of the present invention.
[0041] Reference numerals:
[0042] 10. Cabinet; 11. Mounting base; 111. Bolt column; 112. Fastening nut; 12. Cable; 121. Connecting terminal; 20. Mounting tube; 21. Horizontal tube; 211. Horizontal groove; 212. Plug; 213. Threaded hole 1; 214. Cover; 215. Swivel; 22. Vertical tube; 221. Ring platform; 222. Through groove 2; 223. Push ring; 2231. Threaded hole 2; 224. Upper opening; 225. Push claw; 226. Arc groove 2; 30. Stress sleeve; 31. Through groove 1; 32. Arc groove 1; 40. Inner seal; 41. Key 1; 411. Inclined portion; 42. Pressing tooth; 421. Wedge surface; 43. Sealing ring 1; 44. Slot; 50. Positioning sealing ring; 51. Key 2; 511. Inclined surface; 52. Insert; 521. Oil bag; 522. Nozzle; 523. Through hole; 53. Sealing ring 2; 54. Slot; 541. Pressing head; 60. Transmission mechanism; 61. Screw; 62. Gear; 63. Rack; 64. Push rod; 65. Scissor arm. DETAILED DESCRIPTION
[0043] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0044] like Figures 1 to 15 As shown, embodiment 1 of the present invention is an embodiment of a cable installation device based on a ring main unit (hereinafter referred to as a cable installation device), which is arranged inside a cabinet body 10 of the ring main unit and is used for connecting and installing cables 12 .
[0045] The cable installation device comprises: a mounting seat 11, a mounting cylinder 20, a stress sleeve 30, a sealing member, and a locking mechanism for pushing the sealing member to lock it.
[0046] The mounting seat 11 is a conductive seat fixed on the wall panel of the cabinet 10 and is used to achieve conductive connection between the components inside the cabinet 10 and the cable 12.
[0047] The mounting tube 20 includes a transverse tube 21 extending forward and backward and a vertical tube 22 extending upward and downward. The transverse tube 21 and the vertical tube 22 arranged in a T shape are interconnected and perpendicular to each other. The rear end of the transverse tube 21 is sleeved on the outside of the mounting seat 11.
[0048] The seal comprises an inner seal 40 and an outer seal. The inner seal 40 is provided between the stress sleeve 30 and the cable 12 , and the outer seal is provided between the stress sleeve 30 and the riser 22 .
[0049] like Figure 7 and Figure 9 As shown, the stress sleeve 30 is cylindrical, with an axis extending vertically and a radial direction being horizontal. A ring step is provided at the lower portion of the stress sleeve 30.
[0050] refer to Figure 5-Figure 8 The inner seal 40 is inserted into the interior of the stress sleeve 30 and is used to fix the cable 12 to the interior of the stress sleeve 30 and seal the space between the stress sleeve 30 and the cable 12 after the stress sleeve 30 is inserted into the vertical pipe 22.
[0051] The inner seal 40 includes a sealing ring 43 and a key 41. Multiple keys 41 are arranged in an annular pattern around the outer periphery of the sealing ring 43. Each key 41 is symmetrically provided with at least two sets of pressing teeth 42 on its upper and lower inner sides (facing the sealing ring 43). The two horizontally opposed outer sides of each pressing tooth 42 are wedge surfaces 421, which facilitate pressing the pressing teeth 42 into the outer sheath of the cable 12. A slot 44 is formed between the two sets of pressing teeth 42. The outer edge of the sealing ring 43 is retained within the slot 44. An annular first sealing rubber gasket is provided on the inner wall of the sealing ring 43.
[0052] refer to Figure 5 、 Figure 6 and Figure 9 A through groove 31 and an arcuate groove 32 are provided on the side wall of the stress sleeve 30 . There are a plurality of through grooves 31 and arcuate grooves 32 , which are staggered and evenly distributed on the stress sleeve 30 along the circumferential direction.
[0053] Each through-groove 31 extends horizontally through the sidewall of the stress sleeve 30. Multiple arcuate grooves 32 are formed on the inner wall of the stress sleeve 30, each arcuate groove 32 interconnecting two adjacent through-grooves 31. The key 41 of the inner seal 40 slides radially along the stress sleeve 30 within the through-groove 31, with a portion of the outer surface of the sealing ring 43 embedded in the arcuate groove 32.
[0054] The wedge surface 421 can facilitate the pressing tooth 42 to be pressed into the outer rubber layer of the cable 12, thereby fixing the cable 12, and can facilitate the pressing tooth 42 to be separated from the outer rubber layer of the cable 12 when the cable 12 is rotated, thereby preventing the pressing tooth 42 from being unable to fall out of the outer rubber layer of the cable 12 when the expansion thrust of the sealing ring 43 is insufficient.
[0055] After the cable 12 is inserted into the stress sleeve 30, it passes through the middle of the sealing ring 43 and moves along the radial direction of the stress sleeve 30 in the through groove 31 through the convex key 41, so that the pressing tooth 42 approaches the cable 12 and is pressed into the outer rubber of the cable 12, fixing the cable 12 to the stress sleeve 30. At the same time, the convex key 41 will squeeze the outer wall of the sealing ring 43 during movement, causing the sealing ring 43 to shrink and tighten inward, thereby making the first sealing rubber pad fit tightly against the cable 12, and sealing the stress sleeve 30 and the cable 12.
[0056] Since the convex key 41 can slide in the radial direction of the stress sleeve 30 in the through groove 31, when the outer part of the convex key 41 extending out of the outer wall of the stress sleeve 30 is subjected to external pressure, the convex key 41 moves inward, so that the pressing teeth 42 can be pressed into the outer rubber layer of the cable 12 to fix the cable 12, and squeeze the outer wall surface of the sealing ring 43, so that the first sealing rubber pad is close to the outer rubber layer of the cable 12 to complete the seal. At the same time, the arc groove 32 is set to have a sufficient depth so that the sealing ring 43 embedded in the arc groove 32 will not be separated from the stress sleeve 30 under the pressure of the convex key 41; and when the convex key 41 loses external pressure, the squeezed part of the sealing ring 43 expands again, pushing the convex key 41 to reset, so that the pressing teeth 42 are separated from the outer rubber layer of the cable 12, and the fixation of the cable 12 can be released, making it convenient to remove the cable 12 from the stress sleeve 30.
[0057] refer to Figure 10-13 The outer seal comprises: a ring platform 221 and a positioning seal ring 50. The outer seal is used to fix the stress sleeve 30 to the vertical pipe 22 after the stress sleeve 30 is inserted into the vertical pipe 22, and to seal between the vertical pipe 22 and the stress sleeve 30.
[0058] The positioning sealing ring 50 includes multiple convex keys 51 and a sealing ring 53. The multiple convex keys 51 are distributed in a ring shape on the outer circumference of the sealing ring 53. The inner side surfaces of the upper and lower ends of each convex key 51 (facing the side of the sealing ring 53) are provided with plug-ins 52. The outer edge of the sealing ring 53 is stuck between the two plug-ins 52, and a second annular sealing rubber gasket is provided on the inner wall surface of the sealing ring 53.
[0059] refer to Figure 10-12The ring platform 221 is fixedly installed inside the lower end of the vertical pipe 22, and a through groove 222 and a second arc groove 226 are opened on the side wall of the ring platform 221. There are multiple through grooves 222 and second arc grooves 226, which are staggered and evenly distributed on the ring platform 221 along the circumferential direction. The top of the ring platform 221 is opened with an upper opening 224 connected to the through groove 222.
[0060] Each second through-groove 222 extends horizontally through the sidewall of the platform 221. Multiple second arcuate grooves 226 are formed on the inner wall of the platform 221, each second arcuate groove 226 interconnecting two adjacent second through-grooves 222. The second key 51 of the positioning seal ring 50 slides radially along the platform 221 within the second through-groove 222, with a portion of the outer surface of the second seal ring 53 embedded in the second arcuate groove 226.
[0061] A slot 54 adapted to the insert block 52 is provided on the outer wall of the stress sleeve 30 , so that the insert block 52 can be inserted into the slot 54 and fixed to the stress sleeve 30 during movement.
[0062] After the stress sleeve 30 is inserted into the interior of the vertical pipe 22, under the pressure of the inner wall of the vertical pipe 22, the second convex key 51 pushes the insert block 52 to move into the slot 54 on the stress sleeve 30 and is fixed to the stress sleeve 30. At the same time, the second convex key 51 squeezes the outer wall of the second sealing ring 53 during movement, causing the second sealing ring 53 to shrink and tighten inward, so that the second sealing gasket fits tightly against the outer wall of the stress sleeve 30, thereby sealing the vertical pipe 22 and the stress sleeve 30.
[0063] refer to Figure 9 、 Figure 10 and Figure 13 The insert 52 is provided with an oil sac 521 inside, which stores sealing oil. The oil sac 521 is provided with multiple nozzles 522 extending to the outside of the insert 52, which are used to spray the sealing oil in the oil sac 521 onto the outside of the insert 52, filling and sealing the joint. A pressure head 541 is fixedly mounted inside the slot 54. A through hole 523 is provided on the side of the insert 52 near the slot 54, which is compatible with the pressure head 541. When the insert 52 enters the slot 54, the pressure head 541 can enter the insert 52 through the through hole 523 and squeeze the oil sac 521, causing the sealing oil in the oil sac 521 to be sprayed out by the nozzles 522, filling the gap between the insert 52 and the slot 54, further improving the sealing between the standpipe 22 and the stress sleeve 30.
[0064] The upper end portion of the outer side surface of the convex key 41 of the inner seal 40 is provided with an inclined portion 411 which is inclined from top to bottom and from inside to outside, so that when the push ring 223 slides and descends in the vertical pipe 22, the convex key 41 exposed from the stress sleeve 30 can be gradually pressed into the interior of the stress sleeve 30 by the inclined portion 411, and then the convex key 41 is gradually moved toward the cable 12 in the through groove 31, pressing the pressing tooth 42 into the outer rubber layer of the cable 12, and squeezing the sealing ring 43.
[0065] refer to Figure 2 、 Figure 3 、 Figure 4 、 Figure 5 and Figure 14 The locking mechanism for pushing the seal to lock is arranged inside the mounting tube 20, including a plug 212, a transmission mechanism 60, a push ring 223, and a push claw 225. The transmission mechanism 60 is used to convert the forward and backward movement of the plug 212 into an up and down movement, thereby driving the push ring 223 and the push claw 225 to rise and fall inside the vertical pipe 22.
[0066] In this embodiment, the transmission mechanism 60 is composed of a composite gear rack transmission mechanism and a screw-nut mechanism, thereby first converting the translational motion of the rack into rotational motion, and then converting the rotational motion into the vertical motion of the screw-nut mechanism for output. Specifically, the transmission mechanism 60 includes a rack 63, a gear 62, and a screw 61. Of course, in other embodiments, the transmission mechanism 60 may also adopt an existing conventional transmission mechanism capable of converting the horizontal feed motion of the axis into vertical lifting motion, such as a connecting rod mechanism (see the scissors lift mechanism provided in the second embodiment of the present invention described later).
[0067] refer to Figure 2 、 Figure 3 、 Figure 14 and Figure 15 The plug 212 is adapted to the opening at the rear end of the transverse tube 21. A threaded hole 213 is provided in the central portion of the front end of the plug 212. A swivel 215 is provided on the plug 212 and rotates around its axis extending forward and backward. The rack 63 is fixedly connected to the swivel 215. Figure 3 A bolt column 111 is fixedly installed at the rear end of the mounting seat 11, and a threaded hole 213 of the plug 212 is adapted to the bolt column 111.
[0068] The screw rod 61 extends up and down and is rotatably mounted in a bearing seat provided within the transverse tube 21. There are two bearing seats, one above and one below, fixed to the upper portion of the transverse tube 21 and the top of the ring platform 221, respectively. A gear 62 is fixedly mounted on the upper end of the screw rod 61. A rack 63 slides within the transverse tube 21 and meshes with the gear 62, so that when the rack 63 slides within the transverse tube 21, it can drive the gear 62 to rotate with the screw rod 61. A transverse groove 211 extending forward and backward is defined in the sidewall of the transverse tube 21 along its axial direction. The rack 63 slides forward and backward within the transverse groove 211. The sliding movement of the rack 63 within the transverse groove 211 drives the gear 62 to rotate.
[0069] refer to Figure 4 、 Figure 5 and Figure 14 The push ring 223 is assembled and guided vertically within the vertical tube 22. The push ring 223 is provided with a second threaded hole 2231 (equivalent to the nut of the screw-nut mechanism) and is assembled and moved vertically on the screw rod 61. The size of the inner hole of the push ring 223 is adapted to the stress sleeve 30 and is sleeved on the stress sleeve 30. The push claw 225 is fixed to the lower end of the push ring 223 and extends downward. The push ring 223 is used to mate with the convex key 1 41 of the inner seal 40, and the push claw 225 is used to mate with the convex key 2 51 of the outer seal.
[0070] The screw rod 61 passes downwardly into the push ring 223 and is threadedly connected with the corresponding threaded hole 2231 on the push ring 223 to form a screw-nut mechanism. When the screw rod 61 rotates, it can drive the push ring 223 and the push claw 225 to rise and fall inside the vertical tube 22, and then the push ring 223 can push the convex key 1 41 on the inner seal 40 to slide inward, and the push claw 225 pushes the convex key 2 51 on the outer seal to slide inward (the specific action process will be described in detail in the installation process content described later).
[0071] When the plug 212 moves forward into the interior of the horizontal tube 21 and rotates, the threaded hole 213 is spirally connected to the bolt column 111. While blocking the rear end of the horizontal tube 21, the plug 212 pushes the swivel 215 and the rack 63 forward, causing the rack 63 to engage with the gear 62 while moving along the horizontal groove 211, and then pushes the gear 62 to rotate, thereby driving the push ring 223 to descend in the vertical tube 22, automatically completing the fixation and sealing of the cable 12 and the stress sleeve 30.
[0072] refer to Figure 3 、 Figure 14 and Figure 15The bolt column 111 is also threaded with a fastening nut 112, and the end of the cable 12 is provided with a connecting terminal 121 that is compatible with the bolt column 111. After the cable 12 is inserted into the vertical pipe 22, the connecting terminal 121 is extended into the interior of the horizontal pipe 21. When one end of the horizontal pipe 21 is inserted into the outside of the mounting seat 11, the connecting terminal 121 can be inserted into the outside of the bolt column 111, and the fastening nut 112 is screwed onto the outside of the bolt column 111, which can fix the connecting terminal 121 to the bolt column 111, thereby installing and connecting the cable 12 to the mounting seat 11.
[0073] refer to Figure 1 and Figure 2 A cover 214 is provided at the end of the cross tube 21 , which can seal the cross tube 21 and the plug 212 after the plug 212 is installed to enhance the sealing performance of the cross tube 21 .
[0074] The installation process of the above embodiment for connecting the cable 12 to the ring network cabinet is as follows: after the cable 12 is inserted into the stress sleeve 30, the connecting terminal 121 is installed at the end of the cable 12, and then the stress sleeve 30 is inserted into the vertical pipe 22 from bottom to top, so that the connecting terminal 121 extends into the horizontal pipe 21, and the horizontal pipe 21 is inserted into the mounting seat 11 on the cabinet body 10, and the connecting terminal 121 is sleeved on the bolt column 111, so that the slot 54 on the stress sleeve 30 can be automatically aligned with the plug 52 on the ring platform 221, and then the fastening nut 112 is screwed onto the bolt column 111 to fix the connecting terminal 121 to the mounting seat 11.
[0075] The plug 212 is pushed in from the other end of the horizontal tube 21 to seal the horizontal tube 21. When the plug 212 is pushed into the horizontal tube 21, the rack 63 is inserted into the horizontal groove 211 so that the threaded hole 213 on the plug 212 is automatically aligned with the bolt column 111. Then, the plug 212 is rotated so that the plug 212 is screwed onto the outside of the bolt column 111 through the threaded hole 213, and the rack 63 is pushed to slide forward along the horizontal groove 211, pushing the gear 62 to rotate with the screw rod 61, so that the push ring 223 and the push claw 225 descend inside the vertical tube 22.
[0076] When the push ring 223 descends, it pushes the convex key 41 along the inclined portion 411 to slide along the through groove 31, so that the pressing tooth 42 approaches the cable 12 and is pressed into the outer rubber layer of the cable 12, fixing the cable 12 to the inside of the stress sleeve 30. At the same time, the convex key 41 squeezes the outer wall of the sealing ring 43 during movement, causing the sealing ring 43 to shrink inward and tighten the cable 12, so that the first sealing pad and the cable 12 fit tightly, thereby sealing the stress sleeve 30 and the cable 12.
[0077] At the same time, the push ring 223 drives the push claw 225 to descend, so that the push claw 225 is inserted into the second through groove 222 through the upper opening 224 on the ring platform 221, and the convex key 51 is pushed to slide through the inclined surface 511, so that the insert block 52 moves and is inserted into the interior of the slot 54 to fix the stress sleeve 30. At the same time, the convex key 51 squeezes the outer wall of the second sealing ring 53 during movement, so that the second sealing ring 53 shrinks inward and tightens the stress sleeve 30, so that the second sealing pad is tightly fitted with the outer wall of the stress sleeve 30, and the vertical pipe 22 and the stress sleeve 30 are sealed, completing the installation and fixation of the cable 12.
[0078] When the plug 52 enters the slot 54, the pressure head 541 in the slot 54 can enter the plug 52 through the through hole 523 to squeeze the oil bag 521, so that the sealing oil in the oil bag 521 is sprayed out by the nozzle 522 to fill the gap between the plug 52 and the slot 54, further improving the sealing between the vertical pipe 22 and the stress sleeve 30.
[0079] When the plug 212 is installed in the present invention, the transmission mechanism 60 drives the push ring 223 and the push claw 225 to descend, and then the pressing teeth 42 on the convex key 41 fix the cable 12, the plug block 52 and the stress sleeve 30, and at the same time squeeze the sealing ring 43 and the sealing ring 2 53, so that the sealing ring 1 43 and the sealing ring 2 53 shrink, so that the cable 12 and the stress sleeve 30 can be fixed while the inside of the equipment can be sealed, so that without too much force, the cable 12 and the stress sleeve 30 can be installed and fixed, and the equipment can be better sealed while being fixed, thereby improving the convenience of installing the equipment cable 12 and reducing the difficulty of installing the cable 12. When the sealing ring 1 43 and the sealing ring 2 53 shrink and deform inward, they can also fill the connection gap to improve the sealing effect of the equipment and enhance the safety factor of the cable 12.
[0080] like Figure 16 As shown, the second embodiment of the present invention is different from the first embodiment in that the transmission mechanism 60 adopts a connecting rod mechanism, specifically a scissors-fork lifting mechanism, and the transmission mechanism 60 includes: a push rod 64 and a scissors-fork arm frame 65. The push rod 64 is guided and moved in the horizontal direction and assembled in the horizontal tube 21. One end of the push rod 64 is rotatably matched with the plug 212, and the other end of the push rod 64 is connected to the scissors-fork arm of the scissors-fork arm frame 65. The push rod 64 can drive the platform at the lower end of the scissors-fork arm frame 65 to rise and fall when moving with the plug 212, thereby driving the push ring 223 and the push claw 225 to rise and fall inside the vertical tube 22, thereby realizing the subsequent actions of each sealing component.
[0081] In addition, in other embodiments of the present invention, considering the errors in the manufacture of the cable 12 and the diameter change caused by the axial force on the cable 12 when the cable 12 passes through the installation tube 20, the sealing between the stress sleeve 30 and the cable 12 is the main issue that needs to be considered at present (just as the prior art cited in the background technology also focuses on the sealing structure between the cable 12 and the stress sleeve 30), while the sealing between the stress sleeve 30 and the vertical pipe 22 can be improved by other measures. Therefore, in some simplified embodiments, conventional elastic seals, such as multiple O-rings or spiral seals, can be used between the stress sleeve 30 and the vertical pipe 22. Therefore, in other embodiments of the present invention, the seal may also include only the inner seal 40, without the outer seal as in the above embodiment.
[0082] Although the embodiments of the present invention have been shown and described above, it will be understood that the above embodiments are illustrative and are not to be construed as limitations on the present invention. A person skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A cable installation device based on a ring main unit, comprising a mounting seat, a horizontal pipe extending forward and backward, a vertical pipe extending upward and downward, a stress sleeve for sleeve on the cable, and a seal. It is characterized in that Also included is a locking mechanism for pushing the sealing member to retract; the sealing member includes an inner sealing member; The inner seal comprises a sealing ring 1, and a plurality of convex keys 1 which are annularly distributed and fixed on the outer periphery of the sealing ring 1. The inner seal is arranged on the inner wall of the stress sleeve and is used for shrinking and tightening the cable passing through the stress sleeve. The convex key 1 extends outward from a through groove 1 which is provided on the inner wall of the stress sleeve to the outer wall of the stress sleeve. The locking mechanism includes a plug, a transmission mechanism, and a push ring. The plug is used to move forward and backward and is inserted into an opening provided at the rear end of the horizontal tube to block the rear end of the horizontal tube. The push ring is guided and moved up and down in the vertical tube and the supply sleeve passes upward to contact the convex key 1. A wedge surface matching structure 1 is correspondingly provided between the push ring and the convex key 1. The transmission mechanism is used to convert the forward and backward movement of the plug into an up and down movement and output it. The wedge surface matching structure 1 is used to convert the up and down movement output by the transmission mechanism into a top thrust force for pushing the inner seal to contract. The wedge surface matching structure includes a pressing portion arranged on the lower end surface of the push ring and an inclined portion arranged on the outer side of the upper end of the convex key; the inner side surfaces of the upper and lower ends of each convex key in the inner seal are symmetrically provided with at least two groups of pressing teeth, and the two opposite outer side surfaces in the horizontal direction of the pressing teeth are wedge surfaces, and a groove is formed between the two groups of pressing teeth. The outer edge of the sealing ring is stuck in the inside of the groove, and an annular first sealing rubber pad is provided on the inner wall surface of the sealing ring.
2. The cable installation device based on the ring main unit according to claim 1, It is characterized in that The stress sleeve is cylindrical, with its axis extending up and down and its radial direction being horizontal. There are multiple through grooves one that penetrate the side wall of the stress sleeve inside and outside in the horizontal direction. There are also multiple arc grooves one on the inner wall of the stress sleeve. The through grooves one and the arc grooves one are staggered and evenly distributed on the stress sleeve along the circumferential direction. Each arc groove one is connected with two adjacent through grooves one. The convex key one of the inner sealing member is slidably assembled inside the through groove one along the radial direction of the stress sleeve, and part of the outer wall surface of the sealing ring one is embedded in the arc groove one.
3. The cable installation device based on the ring main unit according to claim 1, It is characterized in that The transmission mechanism includes a screw rod, a gear, and a rack. The screw rod extends up and down and is rotatably installed in the horizontal tube. A threaded hole matching the screw rod thread is provided on the push ring. The push ring is movably assembled on the screw rod through the threaded hole. The gear is fixedly installed on the upper end of the screw rod. The rack is rotatably assembled around an axis extending forward and backward and is assembled at the front end of the plug. The rack is guided and moved along the forward and backward directions and is assembled inside the horizontal tube and meshes with the gear.
4. The cable installation device based on the ring main unit according to claim 3, It is characterized in that A transverse groove extending forward and backward is provided on the side wall of the transverse tube, and a rack is slidably assembled in the transverse groove forward and backward. A swivel rotating around an axis extending forward and backward is provided on the plug, and the rack is fixedly connected to the swivel.
5. The cable installation device based on the ring main unit according to claim 4, It is characterized in that A bolt column is fixedly installed at the rear end of the mounting seat, and a threaded hole one which is matched with the bolt column is opened in the central part of the front end of the plug.
6. A cable installation device based on a ring main unit according to any one of claims 1 to 5, It is characterized in that The sealing member also includes an outer sealing member, which includes a ring platform fixed inside the lower end of the vertical pipe and a positioning sealing ring. A hole is opened in the center of the ring platform for the supply sleeve to pass upward. The positioning sealing ring includes a sealing ring 2 and a plurality of convex keys 2 annularly distributed and fixed on the outer periphery of the sealing ring 2. The positioning sealing ring is arranged on the inner wall of the ring platform and is used to shrink and tighten the stress sleeve passing through the ring platform. The convex key 2 extends outward from the through groove 2 opened on the inner wall of the ring platform to the outer wall of the ring platform. The locking mechanism also includes a push claw, which is fixed at the lower end of the push ring and extends downward. The upper end of the ring platform is provided with an upper opening which is communicated with the second through groove for the push claw to be inserted to contact the second convex key; a wedge surface matching structure 2 is correspondingly provided between the push claw and the second convex key, and the wedge surface matching structure 2 is used to convert the up and down movement output by the transmission mechanism into a thrust force to push the outer seal to contract.
7. The cable installation device based on the ring main unit according to claim 6, It is characterized in that The wedge surface matching structure 2 includes a pressing portion arranged on the lower end surface of the push claw and an inclined portion arranged on the outer side of the upper end of the second convex key; the inner side surfaces of the upper and lower ends of the second convex key are provided with plug-in blocks, the outer edge of the second sealing ring is clamped between the two plug-in blocks, and a second annular sealing rubber pad is provided on the inner wall surface of the second sealing ring.
8. The cable installation device based on the ring main unit according to claim 6, It is characterized in that There are multiple through grooves 2 and they penetrate the side wall of the ring platform inside and outside along the radial direction of the ring platform. There are also multiple arc grooves 2 on the inner wall of the ring platform. There are multiple through grooves 2 and arc grooves 2 and they are staggered and evenly distributed on the ring platform along the circumferential direction. Each arc groove 2 is connected with two adjacent through grooves 2. The convex key 2 of the positioning sealing ring is slidably assembled inside the through groove 2 along the radial direction of the ring platform, and part of the outer wall surface of the sealing ring 2 is embedded in the arc groove 2.
9. The cable installation device based on the ring main unit according to claim 7, It is characterized in that A slot matched with the plug block is provided on the outer wall of the stress sleeve, so that the plug block can be inserted into the slot and fixed with the stress sleeve during movement. An oil bag is provided inside the plug block, and sealing oil is stored in the oil bag. A plurality of nozzles extending to the outside of the plug block are provided on the oil bag for spraying the sealing oil in the oil bag to the outside of the plug block. A pressure head is fixedly installed inside the slot, and a through hole matched with the pressure head is provided on one side of the plug block close to the slot.
Citation Information
Patent Citations
A cable plugging and unplugging mechanism inside a ring main unit
CN113346261B
Check waterproof connector
CN202633883U
High-voltage cable plug
CN216958552U