A method, device, equipment, medium and product for multi-energy flow scheduling of virtual power plant

By acquiring and analyzing the operating characteristics and historical response data of different loads in virtual power plants, optimizing the scheduling of virtual power plants in the park, solving the problem of failure to fully consider industrial load characteristics in the existing technology, and achieving fine scheduling of virtual power plants resources and The flexible mutual assistance capabilities of multi-energy flows reduce economic losses and resource waste.

CN118554448BActive Publication Date: 2024-11-08TBEA TECH INVESTMENT CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411009270.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-08
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

The existing virtual power plant scheduling method in the park failed to fully consider the regulation characteristics of different industrial loads, resulting in economic losses and waste of resources, and failed to effectively exert the flexible mutual assistance capabilities of multi-energy coupling.

Method used

By obtaining the operating characteristics of different loads in virtual power plants, demarcate the aggregate cluster, obtain load information and historical response data, determine the response capacity and overall capacity of the load, issue the winning response capacity using a third-party evaluation platform, and formulate and operate based on the load prediction results. Plan, optimize equipment operation plan for fine scheduling.

Benefits of technology

The meticulous evaluation and scheduling of the resource regulation capabilities of virtual power plants has been achieved, the flexible mutual assistance capabilities of multi-energy flow in the park has been enhanced, and economic losses and resource waste have been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118554448B_ABST
    Figure CN118554448B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device, equipment, medium and product for multi-energy flow scheduling of a virtual power plant, the method comprising: obtaining load information in an aggregated cluster defined according to the operating characteristics of the load in the virtual power plant, wherein the aggregated cluster comprises at least one of the following categories: an adjustable load cluster, a transferable load cluster and an interruptible load cluster; determining the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and reporting to a third-party evaluation platform; the third-party evaluation platform issues a winning response capacity to the virtual power plant; determining the operating plan of each load in the aggregated cluster according to the winning response capacity and the day-ahead load forecast result. In the present invention, by analyzing the regulation characteristics of the controllable load and decomposing it step by step according to the fine response capacity evaluation and invitation instructions, the flexible mutual assistance capability of the multi-energy coupling of the park is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to the technical field of virtual power plant scheduling, and in particular, to a method, device, equipment, medium and product for multi-energy flow scheduling of a virtual power plant. Background Art

[0002] With the continuous growth of energy demand and the increasing awareness of environmental protection, industrial park virtual power plants have gradually attracted attention as a way to centrally manage and optimize energy utilization. Compared with other virtual power plants, industrial park virtual power plants usually concentrate a large number of energy-consuming enterprises such as cold, heat, electricity, and gas. They have the advantages of strong resource integration capabilities, good energy complementarity, high flexibility and dispatchability, and significant energy-saving and emission reduction effects. They are of great significance to improving the energy utilization efficiency and environmental sustainable development of industrial parks. However, due to the complex constraints of cold, heat, electricity, and gas multi-energy coupling, the dispatch optimization of industrial park virtual power plants faces severe challenges.

[0003] At present, traditional park virtual power plants usually only consider the joint optimization of the three energy forms of cooling, heating and electricity, and do not consider the common load of production gas in the park, so it is impossible to effectively and finely dispatch the park virtual power plant with coupled cooling, heating and electricity multi-energy flows. In addition, the common scheduling and operation method of park virtual power plants is to perform simple equivalent calculations on controllable loads, without distinguishing the regulation characteristics of the actual controllable loads of virtual power plants, and thus cannot accurately quantify the real regulation capabilities of virtual power plants.

[0004] To sum up, the current dispatching and management methods for the park virtual power plant with coupled cold, heat and electricity multi-energy flows are relatively extensive. They neither take into account the regulation characteristics of different industrial loads nor give full play to the flexible mutual assistance capabilities of the park's multi-energy coupling, resulting in economic losses and waste of resources. Summary of the invention

[0005] The embodiments of the present invention provide a method, device, equipment, medium and product for multi-energy flow scheduling of a virtual power plant to solve the problem that the existing method neither considers the regulation characteristics of different industrial loads nor fully utilizes the flexible mutual assistance capabilities of multi-energy coupling in the park, resulting in coexistence of economic losses and waste of resources.

[0006] In order to solve the above-mentioned technical problems, the present invention is achieved as follows:

[0007] In a first aspect, an embodiment of the present invention provides a method for multi-energy flow scheduling of a virtual power plant, comprising:

[0008] Obtain load information in an aggregated cluster defined according to the operating characteristics of the load in a virtual power plant, wherein the aggregated cluster includes at least one of the following categories: an adjustable load cluster, a transferable load cluster, and an interruptible load cluster; the adjustable load refers to a load that can increase or decrease part of the power during a demand response period; the interruptible load refers to a load that can be conditionally interrupted for a short time within a preset specific period of time; the transferable load refers to a load that can transfer production time; the load information includes at least one of the following: a day-ahead load forecast result;

[0009] Obtaining historical response data of the virtual power plant, determining the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and reporting to a third-party evaluation platform; wherein the third-party evaluation platform issues a winning response capacity to the virtual power plant according to the response capacity of the load and the overall capacity of all loads;

[0010] An operation plan for each load in the aggregation cluster is determined according to the winning response capacity and the day-ahead load forecast result.

[0011] Optionally, before acquiring the load information of the aggregated cluster of loads defined according to the operation characteristics in the virtual power plant, the method further includes:

[0012] Acquiring the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, and coupling degree;

[0013] The aggregation cluster to which the load belongs is determined according to the operating characteristics of the load.

[0014] Optionally, determining the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster includes:

[0015] The historical response data of the virtual power plant and the load information in the aggregated cluster are input into the aggregated equivalent model to obtain the response capacity of the load output by the aggregated equivalent model and the overall capacity of all loads in the aggregated cluster, wherein:

[0016] The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit;

[0017] By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained;

[0018] According to the operation plan of each device, the response capacity of the load and the overall capacity of all loads are obtained.

[0019] Optionally, determining the operation plan of each load in the aggregated cluster according to the winning bid response capacity and the day-ahead load forecast result includes:

[0020] The winning response capacity and the day-ahead load forecast result are input into the instruction decomposition model to obtain the operation plan of each load in the aggregation cluster output by the instruction decomposition model, wherein:

[0021] The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty;

[0022] By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained;

[0023] According to the optimization plan, an operation plan for each load is obtained.

[0024] Optionally, the latest day-ahead load forecast result is obtained in real time every preset time period.

[0025] In a second aspect, an embodiment of the present invention provides a device for multi-energy flow scheduling of a virtual power plant, including:

[0026] The first acquisition module is used to obtain load information in an aggregated cluster defined according to the operating characteristics of the load in the virtual power plant, wherein the aggregated cluster includes at least one of the following categories: an adjustable load cluster, a transferable load cluster, and an interruptible load cluster; the adjustable load refers to a load that can increase or decrease part of the power during the demand response period; the interruptible load is a load that can be conditionally interrupted for a short time within a preset specific period of time; the transferable load is a load that can transfer production time; the load information includes at least one of the following: a day-ahead load forecast result;

[0027] The first processing module is used to obtain the historical response data of the virtual power plant, determine the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and report to the third-party evaluation platform; wherein the third-party evaluation platform issues the winning response capacity to the virtual power plant according to the response capacity of the load and the overall capacity of all loads;

[0028] The second processing module is used to determine the operation plan of each load in the aggregation cluster according to the winning response capacity and the day-ahead load forecast result.

[0029] Optionally, also include:

[0030] A second acquisition module is used to acquire the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, and coupling degree;

[0031] The third processing module is used to determine the aggregation cluster to which the load belongs according to the operating characteristics of the load.

[0032] Optionally, the first processing module includes:

[0033] The first processing submodule is used to input the historical response data of the virtual power plant and the load information in the aggregation cluster into the aggregation equivalent model to obtain the response capacity of the load output by the aggregation equivalent model and the overall capacity of all loads in the aggregation cluster, wherein:

[0034] The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit;

[0035] By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained;

[0036] According to the operation plan of each device, the response capacity of the load and the overall capacity of all loads are obtained.

[0037] Optionally, the second processing module includes:

[0038] The second processing submodule is used to input the winning response capacity and the day-ahead load forecast result into the instruction decomposition model to obtain the operation plan of each load in the aggregation cluster output by the instruction decomposition model, wherein:

[0039] The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty;

[0040] By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained;

[0041] According to the optimization plan, an operation plan for each load is obtained.

[0042] Optionally, the latest day-ahead load forecast result is obtained in real time every preset time period.

[0043] In a third aspect, an embodiment of the present invention provides an electronic device, comprising a processor, a memory, and a program or instruction stored in the memory and executable on the processor, wherein the program or instruction, when executed by the processor, implements the steps in the method for multi-energy flow scheduling of a virtual power plant as described in any one of the first aspects.

[0044] In a fourth aspect, an embodiment of the present invention provides a readable storage medium, on which a program or instruction is stored, and when the program or instruction is executed by a processor, the steps in the method for multi-energy flow scheduling of a virtual power plant as described in any one of the first aspects are implemented.

[0045] In a fifth aspect, an embodiment of the present invention provides a computer program product, comprising computer instructions, which, when executed by a processor, implement the steps in the method for multi-energy flow scheduling of a virtual power plant as described in any one of the first aspects.

[0046] In the present invention, by analyzing the regulation characteristics of controllable loads, the controllable loads are divided into adjustable loads, transferable loads and interruptible loads according to whether the power of the controllable loads is adjustable, whether the power is transferable and whether the production line is interruptable, so as to clarify the evaluation dimension of the resource regulation capability of the virtual power plant, establish an evaluation system for controllable loads, and characterize the load adjustable capability from different dimensions; and establish an evaluation model for the response capability of the park adjustable resources based on the aggregation cluster defined by the load characteristic analysis results, participate in the analysis of the virtual power plant's day-ahead aggregation capability to obtain the response capacity of the load and the overall capacity of all loads in the aggregation cluster, and report to the third-party evaluation platform to participate in the day-ahead demand response declaration based on the day-ahead aggregation analysis results. The third-party evaluation platform publishes the day-ahead clearing results according to the response capacity of the load and the overall capacity of all loads, and issues the winning response capacity to the virtual power plant, and then performs day-ahead scheduling according to the winning response capacity and the day-ahead load forecast results, formulates the cold, heat, electricity and gas system scheduling plan, and determines the start and stop and output plan of the controllable load, so as to realize the fine evaluation of the response capability and the step-by-step decomposition of the invitation instruction, and enhance the flexible mutual assistance capability of the park's multi-energy coupling. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0048] Figure 1 It is a flow chart of a method for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0049] Figure 2 It is a park topology diagram of a method for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0050] Figure 3 It is a schematic diagram of a day-ahead power dispatching plan of a virtual power plant without considering load characteristics in a method for multi-energy flow dispatching of a virtual power plant provided by an embodiment of the present invention;

[0051] Figure 4 It is a schematic diagram of a day-ahead cold / heat scheduling plan of a virtual power plant without considering load characteristics in a method for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0052] Figure 5 It is a schematic diagram of a scheduling plan for a lithium bromide refrigeration unit without considering load characteristics in a method for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0053] Figure 6It is a schematic diagram of a day-ahead response plan of a virtual power plant considering load characteristics in a method for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0054] Figure 7 It is a schematic diagram of a day-ahead power dispatching plan of a virtual power plant considering load characteristics in a method for multi-energy flow dispatching of a virtual power plant provided by an embodiment of the present invention;

[0055] Figure 8 It is a schematic diagram of a day-ahead cold / heat scheduling plan of a virtual power plant considering load characteristics in a method for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0056] Fig. 9 It is a structural schematic diagram of a device for multi-energy flow scheduling of a virtual power plant provided by an embodiment of the present invention;

[0057] Fig.10 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] Please refer to Figure 1 The embodiment of the present invention provides a method for multi-energy flow scheduling of a virtual power plant, comprising:

[0060] Step 11: Obtain load information in the aggregated cluster defined according to the operating characteristics of the load in the virtual power plant, wherein the aggregated cluster includes at least one of the following categories: an adjustable load cluster, a transferable load cluster, and an interruptible load cluster; the adjustable load refers to a load that can increase or decrease part of the power during the demand response period; the interruptible load refers to a load that can be conditionally interrupted for a short time within a preset specific period of time; the transferable load refers to a load that can transfer production time; the load information includes at least one of the following: a day-ahead load forecast result;

[0061] In the embodiment of the present invention, the adjustable load is a load that can increase or decrease part of its power during the demand response period to meet the peak shaving demand of the power grid; the adjustable range depends on the power adjustable range of the equipment and the allowable adjustable range of the production line, wherein the production equipment such as arc furnaces and refining furnaces in common industrial loads can adjust their power within a certain range without affecting production;

[0062] The interruptible load is a load that is subject to conditional power outages during a specific period of time. It can serve as a short-term "virtual power source" when the system backup is insufficient or the power generation cost is too high, and play the role of peak shaving, valley filling, load transfer, and strategic power saving. Among them, the above-mentioned interruptibility refers to a short-term interruption, and normal production operation will be resumed after a period of time, rather than completely stopping production.

[0063] The transferable load refers to the load that can provide flexibility by shifting the production time. This load change only involves the transfer of electricity consumption, while the total energy consumption remains unchanged. Among them, adjusting the production shift based on time-of-use electricity prices, or transferring the electricity load during the peak period during the day to the trough period at night to achieve peak shifting, are common adjustment methods to provide demand-side flexibility.

[0064] In the embodiment of the present invention, an in-depth analysis is conducted on the operating characteristics of the resources to be aggregated in the virtual power plant, the synergy and complementary characteristics of different loads are considered, and the aggregation clusters are reasonably delineated to meet the performance parameter requirements of the virtual power plant in various local rules; resource analysis is conducted by clarifying the evaluation dimensions of the load regulation capability of the virtual power plant, thereby establishing an evaluation system for the controllable load regulation capability of the park, and characterizing the load adjustable capability attributes from different dimensions, which helps to deeply understand and quantify the operating performance and potential value of the virtual power plant.

[0065] Step 12: Obtain the historical response data of the virtual power plant, determine the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and report to the third-party evaluation platform; wherein the third-party evaluation platform issues the winning response capacity to the virtual power plant according to the response capacity of the load and the overall capacity of all loads;

[0066] In an embodiment of the present invention, the response capacity of the load and the overall capacity of all loads in the aggregated cluster are determined according to the historical response data of the virtual power plant and the load information in the aggregated cluster through the method of aggregation equivalence; the aggregation equivalence is a key step in the scheduling and operation of the park virtual power plant, and aims to integrate the response capabilities of equipment coupled with various energy forms such as cold, heat, electricity, and gas, and fully consider the differences in power consumption characteristics of different types of equipment, so as to clarify the overall response capacity, emphasize the evaluation of the reliability of virtual power plant-level response, and comprehensively consider the analysis of market rules to ensure that each device operates in a coordinated manner in the overall virtual power plant and effectively participates in market interactions.

[0067] The specific method of aggregation equivalence includes: first, based on the day-ahead load forecast result and combined with the historical response data of the park virtual power plant, the historical response data includes at least one of the following: response capability, availability, equipment type and scale, etc., to establish an aggregation model of the park response capability; the aggregation equivalence model determines the response capacity of the load and the overall capacity of all loads in the aggregation cluster according to the historical response data of the virtual power plant and the load information in the aggregation cluster.

[0068] Step 13: Determine the operation plan of each load in the aggregation cluster according to the winning response capacity and the day-ahead load forecast result.

[0069] In an embodiment of the present invention, after obtaining the winning response capacity issued by the third-party evaluation platform, the command decomposition is performed according to the day-ahead cold, heat, electricity, and gas forecast loads of the park and the winning response capacity through the day-ahead deaggregation algorithm, and the command decomposition takes into account the complementarity between the multi-energy flow couplings; wherein, the complementarity means that through multi-energy scheduling, the virtual power plant optimizes the power consumption curve to achieve the maximum benefit of demand response while meeting the cold, heat, and gas load requirements; the complementary mechanism comes from the cooperation of coupling equipment such as cold, heat, electricity, and gas. For example, when the air source heat pump and the back pressure unit of the self-contained power plant are providing heat at the same time, when encountering a peak electricity price or a peak-shaving demand response, the air source heat pump can be reduced in electricity consumption and the back pressure unit can be increased in heating to complement each other. The remaining response capacity of some power-consuming equipment may make up for the shortcomings of other equipment, thereby providing a more stable and reliable overall response of the virtual power plant, and through different electrical coupling equipment according to their own characteristics and historical response conditions, the objective function of the multi-objective command decomposition of the virtual power plant is constructed to achieve a fine evaluation of the response capacity and a step-by-step decomposition of the invitation command, thereby enhancing the flexible mutual assistance capability of the park's multi-energy coupling.

[0070] In the embodiment of the present invention, by analyzing the regulation characteristics of controllable loads, the controllable loads are divided into adjustable loads, transferable loads and interruptible loads according to whether the power of the controllable loads is adjustable, whether the power is transferable and whether the production line is interruptable, so as to clarify the evaluation dimension of the resource regulation capability of the virtual power plant, establish an evaluation system for controllable loads, and characterize the load adjustable capability from different dimensions; and establish an evaluation model for the response capability of the adjustable resources in the park based on the aggregation cluster defined by the load characteristic analysis results, participate in the analysis of the virtual power plant's day-ahead aggregation capability to obtain the response capacity of the load and the overall capacity of all loads in the aggregation cluster, and report to the third-party evaluation platform to participate in the day-ahead demand response declaration according to the day-ahead aggregation analysis results. The third-party evaluation platform publishes the day-ahead clearing results according to the response capacity of the load and the overall capacity of all loads, and issues the winning response capacity to the virtual power plant, and then performs day-ahead scheduling according to the winning response capacity and the day-ahead load forecast results, formulates the scheduling plan of the cold, heat, electricity and gas systems, and determines the start and stop and output plan of the controllable load, so as to realize the fine evaluation of the response capability and the step-by-step decomposition of the invitation instructions, and enhance the flexible mutual assistance capability of the park's multi-energy coupling.

[0071] In the embodiment of the present invention, optionally, before acquiring the load information of the aggregated cluster of loads defined according to the operation characteristics in the virtual power plant, the method further includes:

[0072] Acquiring the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, and coupling degree;

[0073] The aggregation cluster to which the load belongs is determined according to the operating characteristics of the load.

[0074] In the embodiment of the present invention, the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, coupling degree;

[0075] Among them, the control capability can be divided into curve type (adjustable load) and switch type (interruptible load) according to the continuity of power control; can be divided into automatic control type and manual control type according to whether the electrical equipment has an electromagnetic compatibility system (EMS) and a distributed control system (DCS); can be divided into direct control type and indirect control type according to whether the EMS / DCS system has external interface capabilities;

[0076] The technical parameters include at least one of the following: regulation capacity, duration, regulation rate, response time, regulation accuracy, etc.; from the perspective of the aggregation, they also include regulation reliability, power continuity, and recovery flexibility;

[0077] The incentive method is divided into two categories: price-based and incentive-based. According to the different incentive methods, the demand-side response can be divided into two categories: self-regulation type, additional incentive type, and bottom-line control type.

[0078] The distribution characteristics can be divided into two types according to the distribution breadth of industrial controllable loads in geographical space: centralized and decentralized. Among them, the centralized type has a large single capacity and is suitable for private network terminal access; the decentralized type needs to be connected to the aggregator platform;

[0079] The coupling degree is based on the coupling degree between the controllable load in the park and the external factors, and includes at least one of the following: no coupling, weak coupling, and strong coupling; among them, the higher the coupling degree, the greater the difficulty of regulation and the possible safety, economic, and social risks, and the higher the regulation cost that the virtual power plant needs to pay. For example, the steel production process has strict process restrictions, and the equipment startup and operation time are determined in advance according to the production schedule. Once work is underway, power outages cannot be carried out at will. This type of load is a strongly coupled load.

[0080] In the embodiment of the present invention, an in-depth analysis is conducted on the operating characteristics of the resources to be aggregated in the virtual power plant, the synergy and complementary characteristics of different loads are considered, and the aggregation clusters are reasonably delineated to meet the performance parameter requirements of the virtual power plant in various local rules; resource analysis is conducted by clarifying the evaluation dimensions of the load regulation capability of the virtual power plant, thereby establishing an evaluation system for the controllable load regulation capability of the park, and characterizing the load adjustable capability attributes from different dimensions, which helps to deeply understand and quantify the operating performance and potential value of the virtual power plant.

[0081] In the embodiment of the present invention, optionally, determining the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster includes:

[0082] The historical response data of the virtual power plant and the load information in the aggregated cluster are input into the aggregated equivalent model to obtain the response capacity of the load output by the aggregated equivalent model and the overall capacity of all loads in the aggregated cluster, wherein:

[0083] The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit;

[0084] By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained;

[0085] According to the operation plan of each device, the response capacity of the load and the overall capacity of all loads are obtained.

[0086] In an embodiment of the present invention, the historical response data of the virtual power plant and the load information in the aggregated cluster are input into an aggregated equivalent model to obtain the response capacity of the load output by the aggregated equivalent model and the overall capacity of all loads in the aggregated cluster;

[0087] Specifically, the aggregation equivalent model takes the operation day as D-day, and the day-ahead aggregation is triggered at 16:00 on the day before the scheduling (i.e., D-1 day). The scheduling time granularity is 15 minutes, and the scheduling time domain is 24 hours from 0:00 to 23:45 on the operation day (i.e., D-day). The decision-making object is the start and stop and output plan of each device, so as to evaluate the regulation capacity of the park virtual power plant and its controllable resources.

[0088] The decision variables specifically include at least one of the following:

[0089] ① Start-up and shutdown plan, power generation plan, and heating plan of self-provided power plant units from 0:00 to 23:45 on D day;

[0090] ② The charging and discharging power plan of the energy storage system from 0:00 to 23:45 on D day;

[0091] ③ Electricity consumption plan of air compressor from 0:00 to 23:45 on D day;

[0092] ④ Input heat power and cooling power of lithium bromide unit from 0:00 to 23:45 on D day;

[0093] ⑤ Air source heat pump D day 0:00-23:45 input power and heating power;

[0094] ⑥ The power of the large power grid from 0:00 to 23:45 on D day;

[0095] ⑦ The power consumption plan of the controllable load of the park from 0:00 to 23:45 on D day;

[0096] The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit;

[0097] By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained;

[0098] The first objective function is:

[0099] .

[0100] Among them, the goals are: The operating cost of the self-provided power plant units; The start-up and shutdown costs of the captive power plant units; the cost of purchasing electricity for the grid; for demand response benefits;

[0101] constant: / / is the price coefficient of unit i, in units of RMB / (kWh) 2 , yuan / kWh, yuan;

[0102] / is the startup / shutdown price of unit i, in yuan / time;

[0103] The price of electricity purchased from the large power grid, in yuan / kWh;

[0104] is the demand response subsidy price, in yuan / kWh;

[0105] is the scheduling time interval, which is 0.25h (15min) in day-ahead scheduling;

[0106] is the scheduling time window, which is 24 hours in day-ahead scheduling;

[0107] is the number of units in the self-provided power plant;

[0108] They are the positive and negative relaxation penalty coefficients of power balance constraint; the positive and negative relaxation penalty coefficients of heat balance constraint; the positive and negative relaxation penalty coefficients of cold balance constraint; the positive and negative relaxation penalty coefficients of gas balance constraint;

[0109] variable: is the response capacity of the virtual power plant, in kW;

[0110] is the output power of unit i, in kW;

[0111] is the start / stop status of unit i at time t, a 0-1 variable, where 1 represents on and 0 represents off;

[0112] / is the start / shutdown status of unit i, a 0-1 variable, where 1 represents start / shutdown at this time, and 0 represents no operation;

[0113] The power purchased by the large power grid, in kW;

[0114] They are the positive and negative relaxation terms of power balance constraint; the positive and negative relaxation terms of heat balance constraint; the positive and negative relaxation terms of cold balance constraint; the positive and negative relaxation terms of gas balance constraint;

[0115] The aggregation equivalence model is to set constraints on the first objective function;

[0116] Specifically,

[0117] a) The virtual power plant response capacity constraint is:

[0118] (1-2);

[0119] Among them, the constants are: is the baseline load of the virtual power plant, in kW;

[0120] variable: is the response capacity of the virtual power plant, in kW;

[0121] is the response state of the virtual power plant, a 0 / 1 variable;

[0122] is the power consumption of the virtual power plant, in kW;

[0123] b) The power consumption constraint of the virtual power plant is:

[0124] (1-3);

[0125] Among them, the variables:

[0126] is the power consumption of the virtual power plant, in kW;

[0127] The power purchased by the large power grid, in kW;

[0128] c) Power balance constraints

[0129] (1-4);

[0130] variable:

[0131] is the electrical / heat load at time t, in kW;

[0132] / is the charging and discharging power of the battery at time t, in kW;

[0133] The power consumed by the air compressor, in kW;

[0134] The power consumed by the air source heat pump, in kW;

[0135] The thermal power output of the self-provided power plant unit, in kW;

[0136] is the thermal power of the air source heat pump, in kW;

[0137] is the thermal power required by the lithium bromide absorption refrigeration unit, in kW;

[0138] is the gas mass flow rate of the air compressor, in kg / s;

[0139] is the gas load, in kg / s;

[0140] is the cooling load, in kW;

[0141] is the heat load, in kW;

[0142] They are the positive and negative relaxation terms of power balance constraint; the positive and negative relaxation terms of heat balance constraint; the positive and negative relaxation terms of cold balance constraint; the positive and negative relaxation terms of gas balance constraint;

[0143] d) Constraints on back pressure units in self-provided power plants:

[0144] The residual heat after the steam inlet of the back-pressure unit of the self-provided power plant is used for heating, and there is a linear relationship between its electrical output and thermal output;

[0145] Coupling constraints between electrical output and thermal output:

[0146] (1-5);

[0147] Output constraints:

[0148] (1-6);

[0149] Hill climbing constraints:

[0150] (1-7);

[0151] Power on / off state constraints:

[0152] (1-8);

[0153] Minimum start and stop time constraints:

[0154] (1-9);

[0155] Maximum number of starts and stops per day:

[0156] (1-10);

[0157] Among them, the constants are:

[0158] / represents the minimum / maximum output power of unit i, in kW;

[0159] / is the up and down reserve of unit i at time t, in kW;

[0160] / is the upward / downward ramp rate of unit i, in kW / h;

[0161] / represents the minimum start / stop time of unit i, in hours;

[0162] represents the maximum number of startup and shutdown times of unit i, in times;

[0163] variable:

[0164] / is the electrical output / thermal output of unit i, in kW;

[0165] is the start / stop status of unit i at time t, a 0-1 variable, where 1 means on and 0 means off

[0166] / is the start / shutdown status of unit i, a 0-1 variable, where 1 represents start / shutdown at this time, and 0 represents no operation;

[0167] is the electrothermal power coupling coefficient;

[0168] e) Photovoltaic constraints

[0169] (1-11);

[0170] constant:

[0171] is the photovoltaic predicted power, in kW;

[0172] variable:

[0173] is the photovoltaic output power, in kW;

[0174] f) Energy storage adjustable load equipment constraints

[0175] According to the aforementioned load characteristic evaluation criteria, the energy storage has the ability to adjust the power curve and has an EMS / DCS system that can realize automatic control; at the same time, the EMS / DCS system has external interface capabilities that can realize direct control.

[0176] Energy storage power unit power relationship:

[0177] (1-12);

[0178] Energy storage system battery system on chip (System on Chip, SoC) state constraints:

[0179] (1-13);

[0180] Energy storage power unit charging and discharging power constraints:

[0181] (1-14);

[0182] The number of cycles of the energy storage power unit is limited: the number of cycles is approximately the total amount of charge in the period / energy storage capacity;

[0183] (1-15);

[0184] constant:

[0185] / is the charging / discharging efficiency of the electric energy storage, in %;

[0186] The energy limit of the electric energy storage, in kWh;

[0187] / It is the upper / lower limit of SoC of electric energy storage, in %;

[0188] / is the maximum charge / discharge power of the electric energy storage, in kW;

[0189] The upper limit of the daily equivalent cycle number of electric energy storage, in times;

[0190] variable:

[0191] / is the charging / discharging power of the electric energy storage, in kW;

[0192] is the capacity of the electric energy storage, in kWh;

[0193] is the daily equivalent cycle number of electric energy storage, in times;

[0194] g) Constraints on lithium bromide absorption refrigeration units

[0195] Refrigeration efficiency constraints:

[0196] (1-16);

[0197] Cooling power upper and lower limit constraints:

[0198] (1-17);

[0199] Refrigeration unit climbing constraints:

[0200] (1-18);

[0201] constant:

[0202] COP is the coefficient of refrigeration;

[0203] variable:

[0204] is the cooling power of the lithium bromide refrigeration unit at time t, in kW;

[0205] is the heat power provided by the heat source of the lithium bromide refrigeration unit at time t, in kW;

[0206] / The upper and lower limits of the refrigeration power of the refrigeration unit;

[0207] / The maximum upward and downward climbing rates of the cooling power;

[0208] h) Air compressor constraints:

[0209] Since air compressors are restricted by the demand of downstream gas users in the industrial park, according to the aforementioned load characteristic evaluation criteria, air compressors are classified as strongly coupled industrial loads.

[0210] Power required for compressed gas and gas flow constraints:

[0211] (1-19);

[0212] constant:

[0213] is the air compressor conversion efficiency;

[0214] variable:

[0215] It is the actual power required by the air compressor to compress the gas, in kW;

[0216] is the mass flow rate of gas, in kg / s;

[0217] If the relevant parameters cannot be obtained, the power can also be obtained by fitting the power-flow characteristic curve of the air compressor. With flow relationship.

[0218] i) Tie-line power purchase constraints:

[0219] In order to prevent reverse power supply caused by sudden interruption of plant load, the interconnection line currently sets a minimum power cut-off power of 1MW; if the control can be more precise, a lower value can be set, such as 0.5MW.

[0220] (1-20);

[0221] constant:

[0222] / The maximum / minimum value of electricity purchased from the large power grid, in kW;

[0223] variable:

[0224] is the power of the large power grid at time t, in kW;

[0225] j) Air source heat pump constraints

[0226] According to the aforementioned load characteristic evaluation criteria, air source heat pumps are indirectly controlled loads because the DCS system generally does not have external interface capabilities; at the same time, considering the close coupling between the air source heat pump and the downstream heat production line in the park, it is a strongly coupled load.

[0227] Heating efficiency constraints:

[0228] (1-21);

[0229] Heating power upper and lower limits:

[0230] (1-22);

[0231] Heating unit climbing constraints:

[0232] (1-23);

[0233] constant:

[0234] COP is the heating coefficient

[0235] variable:

[0236] is the heating power of the air source heat pump at time t, in kW;

[0237] is the electric power consumed by the air source heat pump at time t, in kW;

[0238] / The upper and lower limits of the heating power of the air source heat pump;

[0239] / The maximum upward and downward climbing rates of the heating power;

[0240] k) Charger transferable load constraints

[0241] The charging pile can transfer the peak electricity price charging load to the off-peak electricity price period according to the time-of-use electricity price within the arrival-departure time range of the electric vehicle, on the premise of meeting the charging amount required by the vehicle;

[0242] According to the aforementioned load characteristic evaluation criteria, the charging pile has a curve-type adjustable power potential, which is only related to the arrival of electric vehicles. Scheduling its charging power does not affect other links and is a weakly coupled device.

[0243] Energy conservation constraints:

[0244] (1-24);

[0245] Charging time constraints:

[0246] (1-25);

[0247] State of Charge Constraints:

[0248] (1-26);

[0249] constant:

[0250] For electric vehicles The rated charging power, in kW;

[0251] For electric vehicles The rated capacity of the battery in kWh;

[0252] For electric vehicles The state of charge at the start of charging, in %;

[0253] For electric vehicles The maximum state of charge allowed by the battery, in %;

[0254] For electric vehicles Start charging time;

[0255] variable:

[0256] For charging pile The charging state at time t, a 0 / 1 variable: 0 for uncharged, 1 for charged;

[0257] For charging pile The state of charge at time t, in %;

[0258] For charging pile The state of charge at the end of charging, in %;

[0259] For electric vehicles End charging time;

[0260] l) Metallurgical adjustable load constraints

[0261] According to the aforementioned load characteristic evaluation criteria, since the electric furnace is powered by a transformer, the power of the electric arc furnace can be changed quickly and flexibly by adjusting the position of the transformer tap, which has the potential to adjust the power within a certain range without affecting production;

[0262] According to the aforementioned load characteristic evaluation criteria, the electric furnace has the potential for curved adjustable power and is a strongly coupled adjustable load.

[0263] Electric furnace power constraints:

[0264] (1-27);

[0265] Adjust frequency constraints:

[0266] According to the required adjustment time interval, the total number of adjustments for each unit per week shall not exceed Second-rate;

[0267] (1-28);

[0268] Since the manual adjustment operation can be completed within 10 minutes, the design allows one adjustment every n time intervals:

[0269] (1-29);

[0270] Total power consumption constraint:

[0271] (1-30);

[0272] Storage constraints:

[0273] Since the factory is equipped with a raw material storage warehouse (which can support production needs for about half a month) and a finished product storage warehouse (which can support product storage for one week), the following constraints need to be met:

[0274] (1-31);

[0275] constant:

[0276] For electric stove The rated power, in kW;

[0277] For electric stove The upper and lower limits of adjustment are expressed in %;

[0278] For electric stove Maximum number of adjustments per week;

[0279] For electric stove The adjustment time interval;

[0280] is the weekly rated total power consumption;

[0281] It is the allowable relaxation range, the unit is %;

[0282] The maximum amount of raw material storage / finished product storage in the warehouse, in per unit value, 1 represents the raw material usage / finished product output of manganese silicon alloy produced in one day at rated power;

[0283] is the incoming quantity of raw materials stored in the warehouse at time t;

[0284] is the shipment volume of finished product storage at time t;

[0285] The minimum storage ratio / maximum storage ratio of the raw material warehouse;

[0286] The minimum storage ratio / maximum storage ratio of the finished product warehouse;

[0287] variable:

[0288] For electric stove The regulation state at time t, a 0 / 1 variable: 0 for unregulated, 1 for regulated

[0289] The current raw material storage volume / finished product storage volume of the finished product warehouse, in units of per unit. 1 represents the raw material usage / finished product output of manganese silicon alloy produced in one day at rated power.

[0290] m) Base station interruptible load constraints

[0291] Base station power constraints:

[0292] (1-32);

[0293] Backup battery restrictions:

[0294] (1-33);

[0295] Among them, the constants are:

[0296] The predicted power consumption of household number s during period t, in kW;

[0297] For switching power supply Time Predicted DC load power in kW;

[0298] For switching power supply AC-DC power conversion factor;

[0299] For backup battery Minimum allowed capacity in kWh;

[0300] For backup battery Maximum allowed capacity in kWh;

[0301] variable:

[0302] The power consumption of household number s in time period t, in kW;

[0303] For switching power supply Time Response status: 0 / 1 variable, where 1 means participation and 0 means non-participation;

[0304] In summary, the day-ahead aggregation model consists of (1-1) to (1-33).

[0305] In an embodiment of the present invention, the response capacity of the load and the overall capacity of all loads in the aggregated cluster are determined according to the historical response data of the virtual power plant and the load information in the aggregated cluster through the method of aggregation equivalence; the aggregation equivalence is a key step in the scheduling and operation of the park virtual power plant, and aims to integrate the response capabilities of equipment coupled with various energy forms such as cold, heat, electricity, and gas, and fully consider the differences in power consumption characteristics of different types of equipment, so as to clarify the overall response capacity, emphasize the evaluation of the reliability of virtual power plant-level response, and comprehensively consider the analysis of market rules to ensure that each device operates in a coordinated manner in the overall virtual power plant and effectively participates in market interactions.

[0306] In the embodiment of the present invention, optionally, determining the operation plan of each load in the aggregation cluster according to the winning bid response capacity and the day-ahead load forecast result includes:

[0307] The winning response capacity and the day-ahead load forecast result are input into the instruction decomposition model to obtain the operation plan of each load in the aggregation cluster output by the instruction decomposition model, wherein:

[0308] The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty;

[0309] By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained;

[0310] According to the optimization plan, an operation plan for each load is obtained.

[0311] In the embodiment of the present invention, the winning response capacity and the day-ahead load forecast result are input into an instruction decomposition model to obtain an operation plan of each load in the aggregation cluster output by the instruction decomposition model;

[0312] Specifically, the instruction decomposition model calls the day-ahead deaggregation algorithm to decompose instructions according to the day-ahead load forecast result and the demand response clearing capacity, that is, the winning response capacity; wherein, the day-ahead deaggregation time resolution is 15 minutes, and the scheduling time range is 24 hours in total, optimizing the start and stop and output of each controllable device, and determining the start and stop status and output plan of the equipment after optimization.

[0313] The decision variables specifically include at least one of the following:

[0314] ① Start-up and shutdown plan, power generation plan, and heating plan of self-provided power plant units from 0:00 to 23:45 on D day;

[0315] ② The charging and discharging power plan of the energy storage system from 0:00 to 23:45 on D day;

[0316] ③ Electricity consumption plan of air compressor from 0:00 to 23:45 on D day;

[0317] ④ Input heat power and cooling power of lithium bromide unit from 0:00 to 23:45 on D day;

[0318] ⑤ Air source heat pump D day 0:00-23:45 input power and heating power;

[0319] ⑥ The power of the large power grid from 0:00 to 23:45 on D day;

[0320] ⑦ The power consumption plan of the controllable load of the park from 0:00 to 23:45 on D day;

[0321] The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty;

[0322] By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained;

[0323] The second objective function is:

[0324] (2-1);

[0325] Among them, the goals are: The operating cost of the self-provided power plant units; The start-up and shutdown costs of the captive power plant units; the cost of purchasing electricity for the grid; for demand response benefits; Penalize costs for virtual power plant response deviations;

[0326] constant:

[0327] / / is the price coefficient of unit i, with units of RMB / (kWh)2, RMB / kWh, and RMB respectively;

[0328] / is the startup / shutdown price of unit i, in yuan / time;

[0329] The price of electricity purchased from the large power grid, in yuan / kWh;

[0330] is the demand response subsidy price, in yuan / kWh;

[0331] is the scheduling time interval, which is 0.25h (15min) in day-ahead scheduling;

[0332] The time window for scheduling is 24 hours in day-ahead scheduling;

[0333] is the number of units in the self-provided power plant;

[0334] They are the positive and negative relaxation penalty coefficients of power balance constraint; the positive and negative relaxation penalty coefficients of heat balance constraint; the positive and negative relaxation penalty coefficients of cold balance constraint; the positive and negative relaxation penalty coefficients of gas balance constraint; the relaxation penalty coefficient of virtual power plant invitation instruction;

[0335] variable:

[0336] is the response capacity of the virtual power plant, in kW;

[0337] Response capacity deviation assessment constraints positive and negative slack terms;

[0338] is the output power of unit i, in kW;

[0339] is the start / stop status of unit i at time t, a 0-1 variable, where 1 means on and 0 means off

[0340] / is the start / shutdown status of unit i, a 0-1 variable, 1 represents start / shutdown at this time, 0 represents no operation;

[0341] The power purchased by the large power grid, in kW;

[0342] They are the positive and negative relaxation terms of power balance constraint; the positive and negative relaxation terms of heat balance constraint; the positive and negative relaxation terms of cold balance constraint; the positive and negative relaxation terms of gas balance constraint;

[0343] The instruction is decomposed into setting constraints on the second objective function;

[0344] Specifically,

[0345] a) The virtual power plant response capacity constraint is:

[0346] (2-2);

[0347] constant:

[0348] is the baseline load of the virtual power plant, in kW;

[0349] variable:

[0350] is the response capacity of the virtual power plant, in kW;

[0351] is the response state of the virtual power plant, a 0 / 1 variable;

[0352] is the power consumption of the virtual power plant, in kW;

[0353] b) Power constraints for virtual power plants;

[0354] (2-3);

[0355] variable:

[0356] is the power consumption of the virtual power plant, in kW;

[0357] The power purchased by the large power grid, in kW;

[0358] c) Virtual power plant deviation assessment constraints

[0359] (2-4);

[0360] constant:

[0361] is the invitation instruction of the virtual power plant, in kW;

[0362] is the positive and negative deviation threshold of the virtual power plant's assessment capacity, in %;

[0363] variable:

[0364] is the response capacity of the virtual power plant, in kW;

[0365] d) Power balance constraints

[0366] (2-5);

[0367] variable:

[0368] / is the electrical / heat load at time t, in kW;

[0369] / is the charging and discharging power of the battery at time t, in kW;

[0370] The power consumed by the air compressor, in kW;

[0371] The power consumed by the air source heat pump, in kW;

[0372] The thermal power output of the self-provided power plant unit, in kW;

[0373] is the heat power of the air source heat pump;

[0374] is the thermal power required by the lithium bromide absorption refrigeration unit, in kW;

[0375] is the gas mass flow rate of the air compressor, in kg / s;

[0376] is the gas load, in kg / s;

[0377] is the cooling load, in kW;

[0378] is the heat load, in kW;

[0379] They are the positive and negative relaxation terms of power balance constraint; the positive and negative relaxation terms of heat balance constraint; the positive and negative relaxation terms of cold balance constraint; the positive and negative relaxation terms of gas balance constraint;

[0380] e) Constraints on back-pressure units in self-owned power plants

[0381] The waste heat after the steam inlet of the back pressure unit is used for heating, and there is a linear relationship between its electrical output and thermal output. The coupling constraints of electrical output and thermal output are:

[0382] (2-6);

[0383] Output constraints:

[0384] (2-7);

[0385] Hill climbing constraints:

[0386] (2-8);

[0387] Power on / off state constraints:

[0388] (2-9);

[0389] Minimum start and stop time constraints:

[0390] (2-10);

[0391] Maximum number of starts and stops per day:

[0392] (2-11);

[0393] constant:

[0394] / is the minimum / maximum output power of unit i, in kW;

[0395] / is the up and down reserve of unit i at time t, in kW;

[0396] / is the upward / downward ramp rate of unit i, in kW / h;

[0397] / is the minimum start / stop time of unit i, in hours;

[0398] is the maximum number of startup and shutdown times of unit i, in times;

[0399] variable:

[0400] / is the electrical output / thermal output of unit i, in kW;

[0401] is the start / stop status of unit i at time t, a 0-1 variable, where 1 means on and 0 means off;

[0402] / is the start / shutdown status of unit i, a 0-1 variable, 1 represents start / shutdown at this time, 0 represents no operation;

[0403] is the electrothermal power coupling coefficient;

[0404] f) Photovoltaic constraints

[0405] (2-12);

[0406] constant:

[0407] is the photovoltaic predicted power, in kW;

[0408] variable:

[0409] is the photovoltaic output power, in kW;

[0410] g) Energy storage equipment constraints

[0411] Energy storage power unit power relationship:

[0412] (2-13);

[0413] Energy storage system battery SoC state constraints:

[0414] (2-14);

[0415] Energy storage power unit charging and discharging power constraints:

[0416] (2-15);

[0417] The number of cycles of the energy storage power unit is limited: the number of cycles is approximately the total amount of charge in the period / energy storage capacity;

[0418] (2-16);

[0419] constant:

[0420] / is the charging / discharging efficiency of the electric energy storage, in %;

[0421] The energy limit of the electric energy storage, in kWh;

[0422] / It is the upper / lower limit of SoC of electric energy storage, in %;

[0423] / is the maximum charge / discharge power of the electric energy storage, in kW;

[0424] The upper limit of the daily equivalent cycle number of electric energy storage, in times;

[0425] variable:

[0426] / is the charging / discharging power of the electric energy storage, in kW;

[0427] is the capacity of the electric energy storage, in kWh;

[0428] is the daily equivalent cycle number of electric energy storage, in times;

[0429] h) Constraints on lithium bromide absorption refrigeration units

[0430] Refrigeration efficiency constraints:

[0431] (2-17);

[0432] Cooling power upper and lower limit constraints:

[0433] (2-18);

[0434] Refrigeration unit climbing constraints:

[0435] (2-19);

[0436] constant:

[0437] COP is the coefficient of refrigeration;

[0438] variable:

[0439] is the cooling power of the lithium bromide refrigeration unit at time t, in kW;

[0440] is the heat power provided by the heat source of the lithium bromide refrigeration unit at time t, in kW;

[0441] / The upper and lower limits of the refrigeration power of the refrigeration unit;

[0442] / The maximum upward and downward climbing rates of the cooling power;

[0443] i) Air compressor constraints

[0444] Power required for compressed gas and gas flow constraints:

[0445] (2-20);

[0446] constant:

[0447] is the air compressor conversion efficiency;

[0448] variable:

[0449] It is the actual power required by the air compressor to compress the gas, in kW;

[0450] is the mass flow rate of gas, in kg / s;

[0451] If the relevant parameters cannot be obtained, the power can also be obtained by fitting the power-flow characteristic curve of the air compressor. With flow the relationship between

[0452] g) Tie-line power purchase constraints

[0453] In order to prevent reverse power transmission caused by sudden interruption of plant load, the current interconnection line will set a minimum power-down power of 1MW. If the control can be more precise, a lower value can be set, such as 0.5MW;

[0454] (2-21);

[0455] constant:

[0456] / The maximum / minimum value of electricity purchased from the large power grid, in kW;

[0457] variable:

[0458] is the power of the large power grid at time t, in kW;

[0459] k) Air source heat pump constraints

[0460] Heating efficiency constraints:

[0461] (2-22);

[0462] Heating power upper and lower limits:

[0463] (2-23);

[0464] Heating unit climbing constraints:

[0465] (2-24);

[0466] constant:

[0467] COP is the heating coefficient

[0468] variable:

[0469] is the heating power of the air source heat pump at time t, in kW;

[0470] is the electric power consumed by the air source heat pump at time t, in kW;

[0471] / The upper and lower limits of the heating power of the air source heat pump;

[0472] / The maximum upward and downward climbing rates of the heating power;

[0473] l) Transferable load constraints of charging piles

[0474] Energy conservation constraints:

[0475] (2-25);

[0476] Charging time constraints:

[0477] (2-26);

[0478] State of Charge Constraints:

[0479] (2-27);

[0480] constant:

[0481] For electric vehicles The rated charging power, in kW;

[0482] For electric vehicles The rated capacity of the battery in kWh;

[0483] For electric vehicles The state of charge at the start of charging, in %;

[0484] For electric vehicles The maximum state of charge allowed by the battery, in %;

[0485] For electric vehicles Start charging time;

[0486] variable:

[0487] For charging pile The charging state at time t, a 0 / 1 variable: 0 for uncharged, 1 for charged;

[0488] For charging pile The state of charge at time t, in %;

[0489] For charging pile The state of charge at the end of charging, in %;

[0490] For electric vehicles End charging time;

[0491] m) Metallurgical adjustable load restraint

[0492] Electric furnace power constraints:

[0493] (2-28);

[0494] Adjust frequency constraints:

[0495] According to the required adjustment time interval, the total number of adjustments for each unit per week shall not exceed Second-rate;

[0496] (2-29);

[0497] Since the manual adjustment operation can be completed within 10 minutes, the design allows one adjustment every n time intervals:

[0498] (2-30);

[0499] Total power consumption constraint:

[0500] (2-31);

[0501] Storage constraints:

[0502] Since the factory is equipped with a raw material storage warehouse (which can support production needs for about half a month) and a finished product storage warehouse (which can support product storage for one week), the following constraints need to be met:

[0503] (2-32);

[0504] constant:

[0505] For electric stove The rated power, in kW;

[0506] For electric stove The upper and lower limits of adjustment are expressed in %;

[0507] For electric stove Maximum number of adjustments per week;

[0508] For electric stove The adjustment time interval;

[0509] is the weekly rated total power consumption;

[0510] It is the allowable relaxation range, the unit is %;

[0511] The maximum amount of raw material storage / finished product storage in the warehouse, in per unit value, 1 represents the raw material usage / finished product output of manganese silicon alloy produced in one day at rated power;

[0512] is the incoming quantity of raw materials stored in the warehouse at time t;

[0513] is the shipment volume of finished product storage at time t;

[0514] The minimum storage ratio / maximum storage ratio of the raw material warehouse;

[0515] The minimum storage ratio / maximum storage ratio of the finished product warehouse;

[0516] variable:

[0517] For electric stove The regulation status at time t, a 0 / 1 variable: 0 for unregulated, 1 for regulated;

[0518] It is the current raw material storage volume / finished product storage volume in the finished product warehouse, and the unit is per unit value 1, which represents the raw material usage / finished product output of manganese silicon alloy produced in one day at rated power.

[0519] n) Base station interruptible load constraints

[0520] Base station power constraints:

[0521] (2-33);

[0522] Backup battery restrictions:

[0523] (2-34);

[0524] Among them, the constants are:

[0525] The predicted power consumption of household number s during period t, in kW;

[0526] For switching power supply Time Predicted DC load power in kW;

[0527] For switching power supply AC-DC power conversion factor;

[0528] For backup battery Minimum allowed capacity in kWh;

[0529] For backup battery Maximum allowed capacity in kWh;

[0530] variable:

[0531] The power consumption of household number s in time period t, in kW;

[0532] For switching power supply Time Response status: 0 / 1 variable, where 1 means participation and 0 means non-participation;

[0533] In summary, the instruction decomposition model consists of (2-1) to (2-34).

[0534] In the embodiment of the present invention, optionally, the latest day-ahead load forecast result is obtained in real time every preset time period.

[0535] In an embodiment of the present invention, in the intra-day deaggregation model, the ultra-short-term power forecast and load forecast results of the day are updated, and the call is made 15 minutes before the invitation window to calculate the intra-day scheduling plan of the cooling, heating, electricity and gas systems of the demand response invitation window, with a time granularity of 15 minutes, and determine the cooling, heating and gas plan arrangements within the invitation window, that is, the operation plan of each device in the virtual power plant, as the boundary of real-time scheduling; in the real-time rolling correction stage, it rolls every 15 minutes, and according to the real-time contact line dispatching plan, real-time photovoltaic power forecast and load forecast, power correction is performed to determine the 5-minute level real-time electric power plan for the next 15-minute scheduling window, and the remaining response capacity of some power-consuming equipment may make up for the shortcomings of other equipment, thereby providing a more stable and reliable overall response of the virtual power plant, and through different electrical coupling devices according to their own characteristics and historical response conditions, construct an objective function for the decomposition of multi-objective instructions of the virtual power plant, realize a fine evaluation of the response capacity and a step-by-step decomposition of the invitation instructions, and enhance the flexible mutual assistance capability of the multi-energy coupling of the park.

[0536] In the embodiment of the present invention, please refer to the topology diagram of the specific park energy supply, energy consumption, and energy storage equipment. Figure 2 The cooling load is mainly supplied by lithium bromide absorption chillers, and the lithium bromide heat source comes from back-pressure units; the heating load is mainly supplied by back-pressure units and air source heat pumps; the electrical load is mainly supplied by back-pressure units, condensing units, distributed photovoltaics, interconnection lines and energy storage; the gas load is mainly supplied by air compressors; the controllable loads in the park include metallurgical adjustable loads, base station interruptible loads and charging pile transferable loads; the demand response subsidy price can be set to 1 yuan / kWh according to actual conditions, and a total of 6 hours of peak-shaving demand response is planned between 18:00 and 23:45 during the invitation window.

[0537] In the embodiment of the present invention, if the multi-energy complementary characteristics of the virtual power plant of the load characteristics are not considered, the specific multi-energy flow scheduling benefits of the virtual power plant are:

[0538] For example: based on the day-ahead forecast data, demand response clearing results, and the winning response capacity, day-ahead scheduling is carried out without considering the regulation characteristics of the industrial load in the park, and a day-ahead scheduling plan for the cooling, heating, electricity, and gas systems is formulated at 96 points.

[0539] When issuing instructions, the specified state of the unit is corrected to a fixed output, and the fixed output value of the unit is set to the planned output of the day-ahead result for actual scheduling; Figure 3As shown in the figure, without considering the load characteristics, the virtual power plant can only adjust the external power consumption of the virtual power plant (i.e., the power purchased by the Changte interconnection line) through energy storage, while the back pressure units, condensing units, lithium bromide refrigeration units, air source heat pumps and other equipment are affected by the cold, heat and gas coupling constraints and cannot be considered as controllable resources of the virtual power plant. Its output plan tracks the day-ahead energy dispatch results, as shown in Figure 4 As shown in the figure. Since the predicted cooling load of the park has been determined, and there is only one refrigeration equipment in the virtual power plant, the lithium bromide unit, its cooling output tracks the predicted cooling load of the park. The heat input of the lithium bromide unit comes from the steam waste heat of the back pressure unit. The input / output power curve is shown in the figure. Figure 5 shown.

[0540] However, if the multi-energy complementary characteristics of the virtual power plant with load characteristics are taken into account, the specific multi-energy flow dispatching benefits of the virtual power plant are:

[0541] Based on the day-ahead forecast data and the results of demand response clearing, that is, the winning response capacity, day-ahead scheduling is carried out. Taking into account the regulation characteristics of the industrial load in the park, the load is divided into adjustable load, transferable load and interruptible load according to whether the power of the controllable load is adjustable, whether the electricity can be transferred, and whether the production line can be interrupted. A day-ahead scheduling plan for the cooling, heating, electricity and gas systems is formulated at 96 points, and the start and stop and power consumption plans of the controllable equipment are determined.

[0542] When issuing instructions, the unit's designated state is corrected to a fixed output, and the unit's fixed output value is set to the planned output of the day-ahead result, and the power consumption of the industrial load is set to the day-ahead planned value for actual scheduling; the day-ahead response plan of the virtual power plant considering load characteristics is as follows Figure 6 As shown in the figure, the virtual power plant can achieve the coordinated complementarity of resources with different characteristics by flexibly scheduling the power consumption plans of various loads, thereby maximizing the total revenue of the virtual power plant.

[0543] After considering the load characteristics, the power consumption of the virtual power plant can be determined by energy storage (transferable), back pressure units (non-adjustable), condensing units (adjustable), air source heat pumps (interruptible), and lithium bromide refrigeration units (non-adjustable). By increasing the electrical output power of the condensing units, reducing the power consumption of the air source heat pumps, and shifting the charging and discharging time periods of the energy storage, the power consumption of the virtual power plant can be adjusted to maximize its demand response capacity, that is, the response capacity of the load and the overall capacity of all the loads, such as Figure 7 As shown in the figure, the day-ahead cooling / heating dispatch plan of the virtual power plant considering load characteristics is as follows: Figure 8 shown.

[0544] The response benefit comparison of virtual power plants is shown in Table 1:

[0545] Table 1

[0546]

[0547] Through the cost accounting shown in Table 1, it can be found that the response benefit of the virtual power plant after considering the load characteristics of the park is less than the response benefit of the virtual power plant without considering the load characteristics of the park. Updating the dispatch plan with the results of synergy and complementarity is conducive to accurately evaluating the regulation potential of the park and maximizing the benefit while meeting the threshold range of the grid response deviation assessment.

[0548] In the embodiment of the present invention, by analyzing the regulation characteristics of controllable loads, the controllable loads are divided into adjustable loads, transferable loads and interruptible loads according to whether the power of the controllable loads is adjustable, whether the power is transferable and whether the production line is interruptable, so as to clarify the evaluation dimension of the resource regulation capability of the virtual power plant, establish an evaluation system for controllable loads, and characterize the load adjustable capability from different dimensions; and establish an evaluation model for the response capability of the adjustable resources in the park based on the aggregation cluster defined by the load characteristic analysis results, participate in the analysis of the virtual power plant's day-ahead aggregation capability to obtain the response capacity of the load and the overall capacity of all loads in the aggregation cluster, and report to the third-party evaluation platform to participate in the day-ahead demand response declaration according to the day-ahead aggregation analysis results. The third-party evaluation platform publishes the day-ahead clearing results according to the response capacity of the load and the overall capacity of all loads, and issues the winning response capacity to the virtual power plant, and then performs day-ahead scheduling according to the winning response capacity and the day-ahead load forecast results, formulates the scheduling plan of the cold, heat, electricity and gas systems, and determines the start and stop and output plan of the controllable load, so as to realize the fine evaluation of the response capability and the step-by-step decomposition of the invitation instructions, and enhance the flexible mutual assistance capability of the park's multi-energy coupling.

[0549] Please refer to Fig. 9 The embodiment of the present invention provides a device for multi-energy flow scheduling of a virtual power plant, comprising:

[0550] The first acquisition module 91 is used to obtain load information in an aggregated cluster defined according to the operating characteristics of the load in the virtual power plant, wherein the aggregated cluster includes at least one of the following categories: an adjustable load cluster, a transferable load cluster and an interruptible load cluster; the adjustable load refers to a load that can increase or decrease part of the power during the demand response period; the interruptible load is a load that can be conditionally interrupted for a short time within a preset specific period of time; the transferable load is a load that can transfer production time; the load information includes at least one of the following: a day-ahead load forecast result;

[0551] The first processing module 92 is used to obtain the historical response data of the virtual power plant, determine the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and report to the third-party evaluation platform; wherein the third-party evaluation platform sends the winning response capacity to the virtual power plant according to the response capacity of the load and the overall capacity of all loads;

[0552] The second processing module 93 is used to determine the operation plan of each load in the aggregation cluster according to the winning response capacity and the day-ahead load forecast result.

[0553] In the embodiment of the present invention, optionally, the method further includes:

[0554] A second acquisition module is used to acquire the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, and coupling degree;

[0555] The third processing module is used to determine the aggregation cluster to which the load belongs according to the operating characteristics of the load.

[0556] In the embodiment of the present invention, optionally, the first processing module includes:

[0557] The first processing submodule is used to input the historical response data of the virtual power plant and the load information in the aggregation cluster into the aggregation equivalent model to obtain the response capacity of the load output by the aggregation equivalent model and the overall capacity of all loads in the aggregation cluster, wherein:

[0558] The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit;

[0559] By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained;

[0560] According to the operation plan of each device, the response capacity of the load and the overall capacity of all loads are obtained.

[0561] In the embodiment of the present invention, optionally, the second processing module includes:

[0562] The second processing submodule is used to input the winning response capacity and the day-ahead load forecast result into the instruction decomposition model to obtain the operation plan of each load in the aggregation cluster output by the instruction decomposition model, wherein:

[0563] The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty;

[0564] By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained;

[0565] According to the optimization plan, an operation plan for each load is obtained.

[0566] In the embodiment of the present invention, optionally, the latest day-ahead load forecast result is obtained in real time every preset time period.

[0567] The device for multi-energy flow scheduling of virtual power plants provided by the embodiment of the present invention can realize Figure 1 The various processes implemented by the method embodiment and achieving the same technical effect are not described here to avoid repetition.

[0568] An embodiment of the present invention provides an electronic device 100, see Fig.10 As shown, Fig.10 This is a principle block diagram of an electronic device 100 according to an embodiment of the present invention, including a processor 101, a memory 102, and a program or instruction stored in the memory 102 and executable on the processor 101. When the program or instruction is executed by the processor, the steps in any one of the methods for multi-energy flow scheduling of a virtual power plant according to the present invention are implemented.

[0569] An embodiment of the present invention provides a readable storage medium, on which programs or instructions are stored. When the programs or instructions are executed by a processor, the various processes of an embodiment of a method for multi-energy flow scheduling of a virtual power plant such as any of the above-mentioned items are implemented, and the same technical effect can be achieved. To avoid repetition, they will not be repeated here.

[0570] The present application also provides a computer program product, including computer instructions, which, when executed by a processor, implement the above Figure 1 The various processes of the method embodiment shown can achieve the same technical effect, and will not be described again here to avoid repetition.

[0571] Computer readable media include permanent and non-permanent, removable and non-removable media, and can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0572] It should be noted that the collection, collection, updating, analysis, processing, use, transmission, storage and other aspects of user personal information involved in the technical solution of this disclosure are in compliance with the provisions of relevant laws and regulations, are used for legitimate purposes, and do not violate public order and good morals. Necessary measures are taken for user personal information to prevent illegal access to user personal information data and maintain the security of user personal information and network security.

[0573] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0574] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0575] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD), and includes a number of instructions for enabling a service classification device (which can be a mobile phone, computer, server, air conditioner, or network device, etc.) to execute the methods described in each embodiment of the present application.

[0576] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A method for multi-energy flow scheduling of a virtual power plant, characterized in that: include: Obtain load information in an aggregated cluster defined according to the operating characteristics of the load in a virtual power plant, wherein the aggregated cluster includes at least one of the following categories: an adjustable load cluster, a transferable load cluster, and an interruptible load cluster; the adjustable load refers to a load that can increase or decrease part of the power during a demand response period; the interruptible load refers to a load that can be conditionally interrupted for a short time within a preset specific period of time; the transferable load refers to a load that can transfer production time; the load information includes at least one of the following: a day-ahead load forecast result; Obtaining historical response data of the virtual power plant, determining the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and reporting to a third-party evaluation platform; wherein the third-party evaluation platform issues a winning response capacity to the virtual power plant according to the response capacity of the load and the overall capacity of all loads; Determining an operation plan for each load in the aggregation cluster according to the winning response capacity and the day-ahead load forecast result; The step of determining the operation plan of each load in the aggregation cluster according to the winning bid response capacity and the day-ahead load forecast result includes: The winning response capacity and the day-ahead load forecast result are input into the instruction decomposition model to obtain the operation plan of each load in the aggregation cluster output by the instruction decomposition model, wherein: The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by the following items: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty; By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained; According to the optimization plan, an operation plan of each load is obtained; The determining, according to the historical response data of the virtual power plant and the load information in the aggregated cluster, the response capacity of the load and the overall capacity of all loads in the aggregated cluster comprises: The historical response data of the virtual power plant and the load information in the aggregated cluster are input into the aggregated equivalent model to obtain the response capacity of the load output by the aggregated equivalent model and the overall capacity of all loads in the aggregated cluster, wherein: The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit; By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained; According to the operation plan of each device, the response capacity of the load and the overall capacity of all loads are obtained.

2. The method for multi-energy flow scheduling of a virtual power plant according to claim 1, characterized in that: Before acquiring the load information of the aggregated cluster of loads defined according to the operation characteristics in the virtual power plant, the method further includes: Acquiring the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, and coupling degree; The aggregation cluster to which the load belongs is determined according to the operating characteristics of the load.

3. The method for multi-energy flow scheduling of a virtual power plant according to claim 1, characterized in that: The latest day-ahead load forecast results are obtained in real time at preset time periods.

4. A device for multi-energy flow scheduling of a virtual power plant, characterized in that: include: The first acquisition module is used to obtain load information in an aggregated cluster defined according to the operating characteristics of the load in the virtual power plant, wherein the aggregated cluster includes at least one of the following categories: an adjustable load cluster, a transferable load cluster, and an interruptible load cluster; the adjustable load refers to a load that can increase or decrease part of the power during the demand response period; the interruptible load is a load that can be conditionally interrupted for a short time within a preset specific period of time; the transferable load is a load that can transfer production time; the load information includes at least one of the following: a day-ahead load forecast result; The first processing module is used to obtain the historical response data of the virtual power plant, determine the response capacity of the load and the overall capacity of all loads in the aggregated cluster according to the historical response data of the virtual power plant and the load information in the aggregated cluster, and report to the third-party evaluation platform; wherein the third-party evaluation platform issues the winning response capacity to the virtual power plant according to the response capacity of the load and the overall capacity of all loads; A second processing module, configured to determine an operation plan for each load in the aggregation cluster according to the winning response capacity and the day-ahead load forecast result; The second processing submodule is further used to input the winning response capacity and the day-ahead load forecast result into the instruction decomposition model to obtain the operation plan of each load in the aggregation cluster output by the instruction decomposition model, wherein: The instruction decomposition model obtains a second objective function according to the winning response capacity and the day-ahead load forecast result, wherein the second objective function represents the total operating cost of the virtual power plant after considering the winning response capacity, wherein the second objective function is determined by the following items: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, the demand response income and the response capacity deviation penalty; By controlling the second objective function to be minimum, an optimization plan of the operation plan of each device in the virtual power plant is obtained; According to the optimization plan, an operation plan of each load is obtained; The first processing module comprises: The first processing submodule is used to input the historical response data of the virtual power plant and the load information in the aggregation cluster into the aggregation equivalent model to obtain the response capacity of the load output by the aggregation equivalent model and the overall capacity of all loads in the aggregation cluster, wherein: The aggregate equivalent model obtains a first objective function according to the load information and the historical response data of the virtual power plant, wherein the first objective function represents the total operating cost of the virtual power plant, wherein the first objective function is determined by at least one of the following: the startup cost of the self-provided power plant unit, the operating cost of the self-provided power plant unit, the power purchase cost of the power grid, and the demand response benefit; By controlling the first objective function to be minimum, an operation plan of each device in the virtual power plant is obtained; According to the operation plan of each device, the response capacity of the load and the overall capacity of all loads are obtained.

5. The device for multi-energy flow scheduling of a virtual power plant according to claim 4, characterized in that: Also includes: A second acquisition module is used to acquire the operating characteristics of the load, wherein the operating characteristics of the load include at least one of the following: control capability, technical parameters, excitation mode, distribution characteristics, and coupling degree; The third processing module is used to determine the aggregation cluster to which the load belongs according to the operating characteristics of the load.

6. An electronic device, characterized in that: It includes a processor, a memory, and a program or instruction stored in the memory and executable on the processor, and when the program or instruction is executed by the processor, it implements the steps in the method for multi-energy flow scheduling of a virtual power plant as described in any one of claims 1 to 3.

7. A readable storage medium, characterized in that: The readable storage medium stores programs or instructions, and when the programs or instructions are executed by the processor, the steps in the method for multi-energy flow scheduling of a virtual power plant as described in any one of claims 1 to 3 are implemented.

8. A computer program product, characterized in that It comprises computer instructions which, when executed by a processor, implement the steps in the method for multi-energy flow scheduling of a virtual power plant as described in any one of claims 1 to 3.

Citation Information

Patent Citations

  • System including virtual power plant load classification, resource modeling and participation in electricity market transaction

    CN114205381A

  • Virtual power plant optimal scheduling method and system considering controllable load response performance difference

    CN114997665A

  • Direct control type virtual power plant energy storage station operation method and device considering peak load

    CN115940225A

  • Multi-time sequence charging automobile virtual power plant scheduling operation method and device

    CN118153753A

  • Virtual aggregation system and method for regional energy source complex

    WO2021244000A1