A method and system for detecting damage of urban drainage pipe network
By constructing and integrating the BIM model of the urban drainage pipe network, and combining inspection data for damage detection and identification, the problem of non-visualization of the pipe network layout status in the existing technology is solved, and visual management and efficient maintenance of the pipe network are realized.
Patent Information
- Application Number
- CN202411052584.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-08-02
AI Technical Summary
The existing technology cannot realize the visualization of the overall layout status of the urban drainage pipe network, and its spatial expressiveness is not strong, making it difficult to fully grasp the overall layout status of the pipe network.
By obtaining the pipe network layout location information and regional location information, an initial BIM model is constructed, the inspection path is planned, the inspection device is controlled to inspect along the path, the data is integrated into the BIM model, damage detection and location identification are performed, and the final model is Visual display.
It achieves in-depth matching between the pipeline network inspection data and the initial BIM model, helps staff fully understand the pipeline network layout status, and improves the efficiency of pipeline network maintenance.
Smart Images

Figure CN118564844B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pipe network detection, and specifically relates to a method and system for detecting damage of an urban drainage pipe network. Background Art
[0002] With the acceleration of urbanization and population growth, urban drainage systems are facing increasing challenges. Urban drainage pipe networks play an important role in collecting and transporting domestic sewage, industrial wastewater and rainwater, and are an important part of urban drainage systems. The quality of urban drainage pipe networks directly determines the level of urban development and affects the urban landscape and sanitary environment. If the urban drainage pipe network is damaged, it will be detrimental to the sustainable operation of the urban drainage system.
[0003] Due to various factors such as internal space and internal environmental conditions, it is not convenient to conduct manual inspection directly on urban drainage pipe networks. For this reason, in the existing technology, pipeline inspection methods such as CCTV (Closed Circuit Television) inspection and sonar inspection have emerged. During the implementation process, according to the different materials and diameters of the pipes, inspection equipment such as pipe cameras, laser scanners or sonic wave inspection equipment are selected, and the inspection equipment is introduced into the pipe network through the pipe or wellhead to detect and record pipe damage.
[0004] However, in the process of using the prior art, the inventors found that the prior art has at least the following problems:
[0005] In the existing technology, pipeline damage detection can only be performed based on the data collected by the detection equipment, and the corresponding damage location information can be obtained so that the staff can carry out maintenance. However, the existing technology cannot realize the visualization of the overall layout status of the urban drainage network, and the spatial expression is not strong, which is not conducive to the staff to fully grasp the overall layout status of the urban drainage network. Summary of the invention
[0006] The present invention aims to solve the above technical problems at least to a certain extent. The present invention provides a method and system for detecting damage of an urban drainage pipe network.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] In a first aspect, the present invention provides a method for detecting damage in an urban drainage network, comprising:
[0009] Obtaining the pipe network layout location information of the pipe network to be detected and the regional location information of the area where the pipe network to be detected is located;
[0010] Constructing an initial pipe network BIM model of the pipe network to be detected according to the pipe network layout location information and the regional location information;
[0011] Planning a pipeline inspection route according to the pipeline layout location information to obtain a pipeline inspection route;
[0012] Controlling a designated pipe network inspection device to inspect the pipe network to be inspected along the pipe network inspection path to obtain pipe network inspection data, and then integrating the pipe network inspection data into the initial pipe network BIM model to obtain a final pipe network BIM model;
[0013] Perform pipeline damage detection according to the pipeline inspection data, and when a damaged pipeline is detected, obtain the damaged pipeline location information, and then mark the damaged pipeline location in the final pipeline BIM model according to the damaged pipeline location information;
[0014] The final pipe network BIM model is visualized.
[0015] In a possible design, the regional location information includes regional GIS geographic information and aerial images, and the regional GIS geographic information includes surface contour information of the area where the pipeline network to be detected is located and elevation information of all data points in the area where the pipeline network to be detected is located; correspondingly, obtaining the regional location information of the area where the pipeline network to be detected is located includes:
[0016] According to the pipe network layout position information of the pipe network to be detected, obtaining the minimum rectangular outline information covering the pipe network layout position information of the pipe network to be detected;
[0017] Acquire surface contour information matching the minimum rectangular contour information from a digital elevation model of a preset map source;
[0018] Acquire the three-dimensional coordinates of a plurality of sampling data points in the digital elevation model that are within the range where the surface contour information is located;
[0019] According to the three-dimensional coordinates of the plurality of sampling data points, the elevation information of all data points in the digital elevation model located within the range where the surface contour information is located is obtained;
[0020] An aerial image matching the minimum rectangular outline information is obtained from the preset map source.
[0021] In a possible design, obtaining elevation information of any data point in the digital elevation model within the range of the surface contour information according to the three-dimensional coordinates of the plurality of sampling data points includes:
[0022] Obtain the three-dimensional coordinates of any three non-collinear sampling data points among the multiple sampling data points;
[0023] According to the three-dimensional coordinates of the arbitrary three non-collinear sampling data points, the elevation information of any data point in the digital elevation model located within the range of the surface contour information is obtained; wherein the elevation information of any data point is:
[0024]
[0025] In the formula, ( x , y ) is the plane coordinate of any data point; ( x 1, y 1, z 1) ( x 2, y 2, z 2) and ( x 3, y 3, z 3) are the three-dimensional coordinates of any three non-collinear sampling data points; , and is a preset intermediate calculated value, and , , .
[0026] In a possible design, the regional location information includes regional GIS geographic information and aerial images; correspondingly, according to the pipeline network layout location information and the regional location information, an initial pipeline network BIM model of the pipeline network to be detected is constructed, including:
[0027] Constructing an initial three-dimensional solid model of the area where the pipeline network to be inspected is located based on the regional GIS geographic information and the aerial image;
[0028] Importing the pipe network layout location information into the initial three-dimensional solid model to obtain a final three-dimensional solid model of the area where the pipe network to be detected is located;
[0029] Obtain sub-building BIM models of multiple buildings in the area where the pipe network to be detected is located, and merge the multiple sub-building BIM models to obtain a merged building BIM model that matches the area where the pipe network to be detected is located;
[0030] The final three-dimensional solid model and the merged building BIM model are fused to obtain an initial pipe network BIM model of the pipe network to be detected.
[0031] In a possible design, an initial three-dimensional solid model of the area where the pipeline network to be inspected is located is constructed based on the regional GIS geographic information and the aerial image, including:
[0032] Obtaining the spatial correlation between the regional GIS geographic information and the aerial image;
[0033] Extracting spatial difference features from the regional GIS geographic information and the aerial image according to the spatial correlation;
[0034] The regional GIS geographic information and the aerial image are fused according to the spatial difference characteristics to construct an initial three-dimensional solid model of the area where the pipeline network to be detected is located.
[0035] In a possible design, the regional location information also includes marker location information; correspondingly, after constructing an initial three-dimensional solid model of the area where the pipeline network to be detected is located based on the regional GIS geographic information and the aerial image, the method further includes:
[0036] According to the marker point position information, the initial three-dimensional solid model is corrected to obtain a corrected three-dimensional solid model of the area where the pipe network to be detected is located, so that the pipe network layout position information can be imported into the corrected three-dimensional solid model to obtain a final three-dimensional solid model of the area where the pipe network to be detected is located.
[0037] In a possible design, pipeline inspection path planning is performed according to the pipeline network layout location information to obtain the pipeline network inspection path, including:
[0038] Dividing the pipe network to be inspected into a plurality of sub-inspection areas according to the pipe network layout location information, and then obtaining sub-inspection paths of the plurality of sub-inspection areas and inter-area inspection paths between the plurality of sub-inspection areas according to the pipe network layout location information of the pipe network to be inspected in the plurality of sub-inspection areas;
[0039] The multiple sub-inspection paths and the inter-area inspection paths between the multiple sub-inspection areas are combined to obtain a pipe network inspection path.
[0040] In a possible design, controlling a designated pipe network inspection device to inspect the pipe network to be inspected along the pipe network inspection path to obtain pipe network inspection data includes:
[0041] Acquire the starting point location information, and according to the starting point location information, search from the pipe network inspection path to obtain the sub-inspection path with the shortest distance between the starting points corresponding to the starting point location information;
[0042] Control the designated pipe network inspection device to move from a starting point to a sub-inspection path with the shortest distance from the starting point, and when the designated pipe network inspection device is located on the sub-inspection path with the shortest distance from the starting point, control the designated pipe network inspection device to collect inspection data;
[0043] The designated pipe network inspection device is controlled to perform inspection along the sub-inspection path with the shortest distance to the starting point, and after the designated pipe network inspection device completes the inspection of the current sub-inspection area where the sub-inspection path with the shortest distance to the starting point is located, the sub-inspection paths of other sub-inspection areas with the shortest distance to the current sub-inspection area are searched, and then the designated pipe network inspection device is controlled to perform inspection along the sub-inspection paths of other sub-inspection areas until the inspection of all sub-inspection areas is completed, thereby obtaining the pipe network inspection data.
[0044] In a possible design, the pipe network inspection data includes a plurality of inspection image data and a plurality of inspection location information matching the plurality of inspection image data; correspondingly, the pipe network inspection data is integrated into the initial pipe network BIM model to obtain a final pipe network BIM model, including:
[0045] Performing grayscale processing, image background correction processing, Gaussian smoothing noise reduction processing and histogram transformation processing on the plurality of inspection image data in sequence, to obtain a plurality of pre-processed inspection image data;
[0046] According to the plurality of inspection position information, the plurality of pre-processed inspection image data are stitched together to obtain stitched inspection image data and stitched position information matching the stitched inspection image data;
[0047] According to the splicing position information, the spliced inspection image data is projected to a specified position of the initial pipe network BIM model to obtain a final pipe network BIM model.
[0048] In a second aspect, the present invention provides a system for detecting damage to an urban drainage pipe network, which is used to implement any one of the above-mentioned methods for detecting damage to an urban drainage pipe network; the system for detecting damage to an urban drainage pipe network comprises:
[0049] A basic information acquisition module is used to obtain the pipe network layout location information of the pipe network to be detected and the regional location information of the area where the pipe network to be detected is located;
[0050] A BIM model construction module is communicatively connected with the basic information acquisition module, and is used to construct an initial pipe network BIM model of the pipe network to be detected according to the pipe network layout location information and the regional location information; to plan a pipe network inspection path according to the pipe network layout location information to obtain a pipe network inspection path; to control a designated pipe network inspection device to inspect the pipe network to be detected along the pipe network inspection path to obtain pipe network inspection data, and then integrate the pipe network inspection data into the initial pipe network BIM model to obtain a final pipe network BIM model; and to perform pipe network damage detection according to the pipe network inspection data, and when a damaged pipe network is detected, obtain the damaged pipe network location information, and then mark the damaged pipe network location in the final pipe network BIM model according to the damaged pipe network location information;
[0051] A visualization display module is communicatively connected with the BIM model construction module and is used for visually displaying the final pipe network BIM model.
[0052] In a third aspect, the present invention provides a computer device comprising a memory, a processor and a transceiver which are communicatively connected in sequence, wherein the memory is used to store a computer program, the transceiver is used to send and receive messages, and the processor is used to read the computer program and execute a method for detecting damage to an urban drainage network as described in any one of the above.
[0053] In a fourth aspect, the present invention provides a computer-readable storage product having instructions stored thereon. When the instructions are run on a computer, the urban drainage pipe network damage detection method as described in any one of the above items is executed.
[0054] In a fifth aspect, the present invention provides a computer program product, including a computer program or instructions, which, when executed by a computer, implements the urban drainage pipe network damage detection method as described in any one of the above.
[0055] The beneficial effects of the present invention are:
[0056] The present invention discloses a method, system, computer equipment, computer readable storage product and computer program product for detecting damage in an urban drainage pipe network. The present invention can realize visualization of an urban drainage pipe network, which is beneficial for staff to fully grasp the overall layout status of the urban drainage pipe network. Specifically, in the implementation process of the present invention, an initial pipe network BIM model is constructed through the pipe network layout location information and the regional location information, and the pipe network inspection data obtained when a designated pipe network inspection device inspects the pipe network to be inspected along the pipe network inspection path is integrated into the initial pipe network BIM model to obtain a final pipe network BIM model. M model; then, a pipeline damage detection is performed according to the pipeline inspection data, and when a damaged pipeline is detected, the damaged pipeline location information is obtained to mark the damaged pipeline location in the final pipeline BIM model; finally, the final pipeline BIM model is visualized; based on this, the present invention can achieve deep matching between the pipeline inspection data and the initial pipeline BIM model, which is beneficial for the staff to fully grasp the overall layout status of the urban drainage pipeline network, and can facilitate the staff to perform pipeline maintenance operations according to the building conditions near the pipeline damage location, thereby improving the subsequent pipeline maintenance efficiency.
[0057] Other beneficial effects of the present invention will be further described in the specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 is a flow chart of the urban drainage pipe network damage detection method in Example 1;
[0059] Figure 2 This is a module block diagram of the urban drainage pipe network damage detection system in Example 2. DETAILED DESCRIPTION
[0060] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the present invention will be briefly introduced below in combination with the drawings and the description of the embodiments or the prior art. Obviously, the following description of the structure of the drawings is only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0061] Embodiment 1:
[0062] This embodiment discloses a method for detecting damage in an urban drainage network, which can be executed by, but is not limited to, a computer device or a virtual machine with certain computing resources, such as a personal computer, a smart phone, a personal digital assistant, or a wearable device, or by a virtual machine.
[0063] like Figure 1 As shown, a method for detecting damage in a city drainage network may include but is not limited to the following steps:
[0064] S1. Obtain the pipe network layout location information of the pipe network to be detected and the regional location information of the area where the pipe network to be detected is located; specifically, in this embodiment, the pipe network layout location information of the pipe network to be detected can be obtained based on the design drawings, construction drawings, etc. of the pipe network, which is not limited here.
[0065] In this embodiment, the regional location information includes regional GIS geographic information and aerial images, and the regional GIS geographic information includes the surface contour information of the area where the pipe network to be detected is located and the elevation information of all data points in the area where the pipe network to be detected is located; correspondingly, obtaining the regional location information of the area where the pipe network to be detected is located includes:
[0066] S101. According to the pipe network layout position information of the pipe network to be detected, obtain the minimum rectangular outline information covering the pipe network layout position information of the pipe network to be detected;
[0067] S102. Acquire surface contour information matching the minimum rectangular contour information from a digital elevation model of a preset map source;
[0068] S103. Obtaining the three-dimensional coordinates of a plurality of sampling data points in the digital elevation model within the range where the surface contour information is located;
[0069] S104. According to the three-dimensional coordinates of the plurality of sampling data points, the elevation information of all data points in the digital elevation model located within the range where the surface contour information is located is obtained;
[0070] S105. Acquire an aerial image matching the minimum rectangular outline information from the preset map source.
[0071] Wherein, in step S104, obtaining the elevation information of any data point in the digital elevation model within the range of the surface contour information according to the three-dimensional coordinates of the plurality of sampling data points includes:
[0072] Obtain the three-dimensional coordinates of any three non-collinear sampling data points among the multiple sampling data points;
[0073] According to the three-dimensional coordinates of the arbitrary three non-collinear sampling data points, the elevation information of any data point in the digital elevation model located within the range of the surface contour information is obtained; wherein the elevation information of any data point is:
[0074]
[0075] In the formula, ( x ,y ) is the plane coordinate of any data point; ( x 1, y 1, z 1) ( x 2, y 2, z 2) and ( x 3, y 3, z 3) are the three-dimensional coordinates of any three non-collinear sampling data points; , and is a preset intermediate calculated value, and , , .
[0076] It should be noted that the method of obtaining the elevation information of the data points in this embodiment can be used to obtain a smooth and continuous spatial surface, so as to improve the subsequent visualization accuracy and thus improve the user experience.
[0077] S2. Constructing an initial pipe network BIM (Building Information Modeling) model of the pipe network to be detected according to the pipe network layout location information and the regional location information.
[0078] In one implementation of the present embodiment, the area where the pipe network to be inspected is located can be scanned by a drone equipped with a three-dimensional laser scanner and an image acquisition device, thereby obtaining regional location information of the area where the pipe network to be inspected is located and image data such as aerial images. At this time, the regional location information includes data such as the spatial distance, horizontal angle and zenith distance between each object in the area where the pipe network to be inspected is located and the three-dimensional laser scanner. Based on this, the spatial coordinate information of each object in the area where the pipe network to be inspected is located can be directly obtained. The spatial coordinate information of each object can be combined to obtain the regional location information of the area where the pipe network to be inspected is located, so as to construct an initial pipe network BIM model of the pipe network to be inspected based on the regional location information, the pipe network layout location information and image data such as aerial images.
[0079] Since the layout area of the urban drainage network is relatively wide, if the regional location information of the area where the pipeline to be detected is located is directly obtained through a drone equipped with a three-dimensional laser scanner and an image acquisition device, and an initial pipeline network BIM model is constructed, there are problems such as difficulty in data extraction, long time consumption, and easy loss of information. In order to reduce the difficulty of information extraction and BIM model construction, in another implementation of this embodiment, the regional location information in step S1 includes regional GIS (Geographic Information System) geographic information and aerial images; correspondingly, in step S2 of this embodiment, according to the pipeline layout location information and the regional location information, the initial pipeline network BIM model of the pipeline to be detected is constructed, including:
[0080] S201. Construct an initial three-dimensional solid model of the area where the pipe network to be detected is located according to the regional GIS geographic information and the aerial image; it should be understood that, in this embodiment, the regional GIS geographic information includes the surface contour information of the area where the pipe network to be detected is located and the elevation information of all data points in the area where the pipe network to be detected is located. Based on this, a basic three-dimensional model of the area where the pipe network to be detected is located can be constructed, and then the initial three-dimensional solid model of the area where the pipe network to be detected is located can be constructed by performing coordinate fusion processing on the aerial image and the basic three-dimensional model. The final pipe network BIM model including the initial three-dimensional solid model can intuitively show the real scene of the area where the pipe network to be detected is located when it is rendered for visual display, so as to facilitate viewing by the staff;
[0081] In step S201, an initial three-dimensional solid model of the area where the pipeline network to be inspected is located is constructed based on the regional GIS geographic information and the aerial image, including:
[0082] S2011. Obtaining the spatial correlation between the regional GIS geographic information and the aerial image;
[0083] S2012. Extracting spatial difference features from the regional GIS geographic information and the aerial image according to the spatial correlation;
[0084] S2013. The regional GIS geographic information and the aerial image are integrated according to the spatial difference characteristics to construct an initial three-dimensional solid model of the area where the pipeline network to be inspected is located.
[0085] It should be noted that, based on the above steps, this embodiment can determine the degree of correlation between the two different types of data, the regional GIS geographic information and the aerial image, in a spatial perspective, and then determine the spatial difference characteristics between the two types of data, so as to fuse the regional GIS geographic information and the aerial image, thereby obtaining an initial three-dimensional solid model of the area where the pipeline to be inspected is located.
[0086] S202. Importing the pipe network layout location information into the initial three-dimensional solid model to obtain a final three-dimensional solid model of the area where the pipe network to be detected is located;
[0087] In this embodiment, the regional location information also includes marker point location information; correspondingly, in step S201 of this embodiment, after constructing an initial three-dimensional solid model of the area where the pipeline network to be detected is located according to the regional GIS geographic information and the aerial image, the method further includes:
[0088] According to the marker point position information, the initial three-dimensional solid model is corrected to obtain a corrected three-dimensional solid model of the area where the pipe network to be detected is located, so that the pipe network layout position information can be imported into the corrected three-dimensional solid model to obtain a final three-dimensional solid model of the area where the pipe network to be detected is located.
[0089] It should be noted that, in the present embodiment, there are multiple marker point position information, and the marker point position information is the position information of known marker points in the area where the pipeline to be inspected is located, such as longitude and latitude coordinates, elevation information, etc., wherein the marker points can be marks on the ground, feature points of buildings, etc., which are not limited here; in the present embodiment, in the process of correcting the initial three-dimensional solid model according to the marker point position information, the marker point position information is first aligned with the initial three-dimensional solid model, and the marker points corresponding to the marker point position information are mapped to the initial three-dimensional solid model to determine the spatial relationship between the two, and then the marker point position information in the real world and the position information in the initial three-dimensional solid model are compared to obtain the model error analysis result, and finally the initial three-dimensional solid model is corrected by position adjustment, size correction and shape adjustment through the model error analysis result, so that the three-dimensional solid model can more accurately reflect the real world, thereby improving the authenticity and accuracy of the three-dimensional solid model.
[0090] S203. Obtain the sub-building BIM models of multiple buildings in the area where the pipe network to be detected is located, and merge the multiple sub-building BIM models to obtain a merged building BIM model that matches the area where the pipe network to be detected is located; it should be understood that the merged building BIM model of this embodiment includes the location information of multiple buildings in the area where the pipe network to be detected is located and the relative position information between the multiple buildings. In this embodiment, the sub-building BIM model can be constructed by using, but not limited to, software such as Autodesk Revit (a three-dimensional building and infrastructure design software), Archicad (an architectural design software that supports intelligent, automated, parsed and standardized workflows and can create high-quality virtual building information models and drawings), and is not limited here.
[0091] S204. The final 3D entity model and the merged building BIM model are fused to obtain the initial pipe network BIM model of the pipe network to be detected. In this embodiment, the final 3D entity model and the merged building BIM model are fused with multi-source data to satisfy the function of querying and analyzing the spatial information of the area where the pipe network to be detected is located.
[0092] Specifically, in step S204 of this embodiment, when the final three-dimensional solid model and the merged building BIM model are fused, the coordinate system conversion processing is performed on the final three-dimensional solid model according to the merged building BIM model to obtain a converted three-dimensional solid model with the same coordinate system as the merged building BIM model, and then the converted three-dimensional solid model is mapped to the merged building BIM model (as an example, multiple location identification information in the converted three-dimensional solid model is imported into the merged building BIM model) to achieve the mapping of the converted three-dimensional solid model, and the initial pipe network BIM model of the pipe network to be detected can be obtained. Based on this, the building information in the initial pipe network BIM model can be more complete and the matching degree with the area where the pipe network to be detected is located can be higher.
[0093] It should be noted that the regional GIS geographic information and the aerial images in this embodiment can be obtained by calling the digital elevation model of the map source such as Google Maps, and the difficulty of obtaining is low; at the same time, since BIM technology has been widely used in the design, construction and operation and maintenance of the construction engineering industry, the sub-building BIM models of multiple buildings can be directly called from the various construction project files corresponding to the area where the pipeline network to be detected is located, and then the merged building BIM model matching the area where the pipeline network to be detected is obtained, and finally the initial pipeline network BIM model of the pipeline network to be detected is obtained by fusing the final three-dimensional solid model and the merged building BIM model. In this process, since the basic data for constructing the initial pipeline network BIM model is called from the existing map source and project files, compared with the use of drone inspections to obtain basic data, the difficulty of obtaining basic data is reduced, and the construction process of the initial pipeline network BIM model is more convenient and the cost is lower, which is suitable for promotion and application.
[0094] S3. Plan a pipeline inspection route based on the pipeline layout location information to obtain a pipeline inspection route.
[0095] In step S3 of this embodiment, pipeline inspection path planning is performed according to the pipeline layout location information to obtain the pipeline inspection path, including:
[0096] S301. Divide the pipe network to be detected into multiple sub-inspection areas according to the pipe network layout location information, and then obtain the sub-inspection paths of the multiple sub-inspection areas and the inter-regional inspection paths between the multiple sub-inspection areas according to the pipe network layout location information of the pipe network to be detected in the multiple sub-inspection areas;
[0097] S302. Combine multiple sub-inspection paths and inter-area inspection paths between multiple sub-inspection areas to obtain a pipe network inspection path.
[0098] When obtaining the sub-inspection path of any sub-inspection area, the optimization goal can be set as: the total inspection mileage is minimized to minimize the route repetition, as expressed as ,in, is the total inspection mileage, The sub-inspection path Mileage of road sections, is the number of road sections inspected in the sub-inspection path, and Greater than or equal to the total number of sections in the sub-inspection path, that is, there may be a situation where a certain section is inspected repeatedly; the constraint conditions can be set according to the battery life of the pipeline inspection device, the single inspection mileage of the pipeline inspection device, etc., and are not restricted here.
[0099] In this embodiment, by dividing the pipeline network to be inspected into a plurality of sub-inspection areas, the pipeline network inspection path is acquired in different areas, which can help reduce the overall difficulty of acquiring the pipeline network inspection path.
[0100] S4. Control the designated pipe network inspection device to inspect the pipe network to be inspected along the pipe network inspection path to obtain pipe network inspection data, and then integrate the pipe network inspection data into the initial pipe network BIM model to obtain the final pipe network BIM model.
[0101] In step S4 of this embodiment, controlling the designated pipe network inspection device to inspect the pipe network to be inspected along the pipe network inspection path to obtain pipe network inspection data includes:
[0102] S401. Obtain the starting point location information, and based on the starting point location information, search from the pipe network inspection path to obtain the sub-inspection path with the shortest distance between the starting points corresponding to the starting point location information; it should be understood that the starting point here is also the starting point where the designated pipe network inspection device is located.
[0103] S402. Control the designated pipe network inspection device to move from the starting point to the sub-inspection path with the shortest distance from the starting point, and when the designated pipe network inspection device is located on the sub-inspection path with the shortest distance from the starting point, control the designated pipe network inspection device to collect inspection data;
[0104] S403. Control the designated pipe network inspection device to inspect along the sub-inspection path with the shortest distance to the starting point, and after the designated pipe network inspection device completes the inspection of the current sub-inspection area where the sub-inspection path with the shortest distance to the starting point is located, search for the sub-inspection paths of other sub-inspection areas with the shortest distance to the current sub-inspection area, and then control the designated pipe network inspection device to inspect along the sub-inspection paths of other sub-inspection areas until the inspection of all sub-inspection areas is completed, thereby obtaining the pipe network inspection data.
[0105] It should be noted that, in this embodiment, the sub-inspection area with the shortest distance from the starting point is used as the first area to be inspected, and the sub-inspection paths of the subsequent sub-inspection areas are determined in sequence according to the distances between the sub-inspection areas until all sub-inspection areas are inspected. In this process, all sub-inspection areas are inspected only once, and the subsequent inspection paths are determined in sequence by distance, which can help reduce the inspection mileage of the designated pipeline network inspection device, avoid excessive power consumption by the designated pipeline network inspection device, and help shorten the total inspection time and improve pipeline inspection efficiency.
[0106] In step S4 of this embodiment, the pipe network inspection data includes a plurality of inspection image data and a plurality of inspection location information matching the plurality of inspection image data; correspondingly, the pipe network inspection data is integrated into the initial pipe network BIM model to obtain a final pipe network BIM model, including:
[0107] S404. Perform grayscale processing, image background correction processing, Gaussian smoothing noise reduction processing and histogram transformation processing on the plurality of inspection image data in sequence to obtain a plurality of pre-processed inspection image data; specifically, in this embodiment, when the inspection image data is pre-processed, it may include but is not limited to grayscale processing, image background correction processing, Gaussian smoothing noise reduction processing and histogram transformation processing, etc., which are not limited here; wherein, the grayscale processing is used to convert the color inspection image data into a grayscale image, which helps to reduce the dimension of the image data and simplify the subsequent processing steps; the image background correction processing is used to eliminate the uneven background in the image data after grayscale processing. Noise data caused by uniformity; Gaussian smoothing noise reduction processing is used to eliminate random noise in the image data after image background correction processing, so as to maximize the elimination of the influence of noise data on subsequent pipeline damage detection. In this embodiment, a Gaussian filter is used to filter out random noise in the image data after image background correction processing. It takes into account the influence of the field pixel distance, and assigns a higher weight to the position closer to the center pixel, so that the smoothing effect is more ideal; histogram transformation processing is used to enhance the contrast of the image data after Gaussian smoothing noise reduction processing, so as to make the edge information of objects in the image data clearer, which is conducive to the staff to view and improve the efficiency of subsequent pipeline damage detection.
[0108] S405. Based on multiple inspection position information, multiple pre-processed inspection image data are stitched together to obtain stitched inspection image data and stitched position information matching the stitched inspection image data; it should be noted that, in this embodiment, image feature-based image stitching technology is used to stitch multiple inspection image data into a seamless panoramic image or high-resolution image data, so as to integrate multiple inspection image data into the pipe network BIM model. Specifically, during the implementation process, the plurality of pre-processed inspection image data may be first arranged according to the corresponding inspection position information; then, the feature data of each pre-processed inspection image data may be acquired in turn; when any pre-processed inspection image data is spliced with the pre-processed inspection image data adjacent to its position, an image feature matching algorithm is used to perform feature matching on the feature data sets of the two pre-processed inspection image data to obtain matching feature data of the two pre-processed inspection image data. The matching feature data of the two pre-processed inspection image data constitute the overlapping area of the two pre-processed inspection image data. The two pre-processed inspection image data are spliced according to the matching feature data, and the same processing is performed on other pre-processed inspection image data in turn until the plurality of inspection image data are spliced, thereby obtaining spliced inspection image data.
[0109] S406. According to the stitching position information, the stitched inspection image data is projected to a designated position of the initial pipe network BIM model to obtain a final pipe network BIM model.
[0110] In this embodiment, the inspection image data is subjected to grayscale processing, image background correction processing, Gaussian smoothing noise reduction processing and histogram transformation processing in sequence to obtain pre-processed inspection image data, and then, based on the inspection position information, the pre-processed inspection image data matching the inspection position information is projected to the specified position of the initial pipe network BIM model to obtain the final pipe network BIM model. This makes it convenient to clearly display the inspection image data after the final pipe network BIM model is subsequently visualized, which helps the staff to view the pipeline layout status.
[0111] S5. Perform pipeline damage detection based on the pipeline inspection data, and when a damaged pipeline is detected, obtain the damaged pipeline location information, and then mark the damaged pipeline location in the final pipeline BIM model based on the damaged pipeline location information.
[0112] In step S5 of this embodiment, pipe network damage detection is performed according to the pipe network inspection data, including:
[0113] S501. Performing dilation operation and median filtering on the pre-processed inspection image data to obtain enhanced inspection image data; specifically, the pre-processed inspection image data is binary image data, and the dilation operation and median filtering can further improve the image quality of the pre-processed inspection image data and enhance damage features such as cracks in the image data;
[0114] S502. Perform pipe network damage detection on the enhanced inspection image data.
[0115] In this embodiment, the staff can inspect the damaged pipeline network with reference to the damaged pipeline network location information. In order to further improve the work efficiency of pipeline network maintenance, in step S5 of this embodiment, after the damaged pipeline network is detected and the damaged pipeline network location is marked in the final pipeline network BIM model according to the damaged pipeline network location information, a pipeline network maintenance path can also be generated according to the final pipeline network BIM model, and the pipeline network maintenance path can be further mapped to the final pipeline network BIM model; wherein, the pipeline network maintenance path starts from a designated starting point on the surface of the ground, ends at the point where the damaged pipeline network location information is located, and the distance from the starting point to the point where the damaged pipeline network location information is located is the shortest. Specifically, in the process of generating the pipeline maintenance path, the present embodiment first obtains the starting point, and then generates the pipeline maintenance path according to the location information of the starting point and the damaged pipeline location information; when obtaining the starting point, the point where the damaged pipeline location information is located can be used as the center of the sphere, and the specified distance can be used as the search radius to obtain the point location information of one or more points on the surface of the ground with the shortest distance from the center of the sphere in the final pipeline BIM model, and any of the points can be used as the starting point of the pipeline maintenance path; it should be understood that in the process of obtaining the pipeline maintenance path, point constraints can be set according to the building layout in the final pipeline BIM model, such as when the starting point is located inside any building, the starting point is abandoned, and the search radius is increased until the starting point that meets the point constraint is obtained. Through the generated pipeline maintenance path, after detecting the existence of a damaged pipeline, it can help the staff to quickly repair the pipeline with reference to the pipeline maintenance path, and the excavation distance for pipeline repair is short, which is conducive to improving the efficiency of pipeline maintenance.
[0116] S6. Visualize the final pipe network BIM model. In this embodiment, an AR model can be constructed based on the final pipe network BIM model based on software such as 3dsMAX, and the AR model can be browsed through a terminal or wearable smart device equipped with an AR application to further enhance the degree of interaction between the staff and the final pipe network BIM model.
[0117] This embodiment can realize the visualization of the urban drainage pipe network, which is beneficial for the staff to fully grasp the overall layout status of the urban drainage pipe network; specifically, during the implementation of this embodiment, the initial pipe network BIM model is constructed through the pipe network layout location information and the regional location information, and the pipe network inspection data obtained when the designated pipe network inspection device inspects the pipe network to be detected along the pipe network inspection path is integrated into the initial pipe network BIM model to obtain the final pipe network BIM model; then, the pipe network damage detection is performed according to the pipe network inspection data, and when the damaged pipe network is detected, the damaged pipe network location information is obtained to mark the damaged pipe network location in the final pipe network BIM model; finally, the final pipe network BIM model is visualized; based on this, this embodiment can realize the deep matching of the pipe network inspection data and the initial pipe network BIM model, which is beneficial for the staff to fully grasp the overall layout status of the urban drainage pipe network, and can facilitate the staff to perform pipe network maintenance operations according to the building conditions near the pipe network damage location, thereby improving the subsequent pipe network maintenance efficiency.
[0118] Embodiment 2:
[0119] This embodiment discloses a system for detecting damage to a city drainage pipe network, which is used to implement the method for detecting damage to a city drainage pipe network in Embodiment 1; Figure 2 As shown, the urban drainage pipe network damage detection system includes:
[0120] A basic information acquisition module is used to obtain the pipe network layout location information of the pipe network to be detected and the regional location information of the area where the pipe network to be detected is located;
[0121] A BIM model construction module is communicatively connected with the basic information acquisition module, and is used to construct an initial pipe network BIM model of the pipe network to be detected according to the pipe network layout location information and the regional location information; to plan a pipe network inspection path according to the pipe network layout location information to obtain a pipe network inspection path; to control a designated pipe network inspection device to inspect the pipe network to be detected along the pipe network inspection path to obtain pipe network inspection data, and then integrate the pipe network inspection data into the initial pipe network BIM model to obtain a final pipe network BIM model; and to perform pipe network damage detection according to the pipe network inspection data, and when a damaged pipe network is detected, obtain the damaged pipe network location information, and then mark the damaged pipe network location in the final pipe network BIM model according to the damaged pipe network location information;
[0122] A visualization display module is communicatively connected with the BIM model construction module and is used for visually displaying the final pipe network BIM model.
[0123] It should be noted that the working process, working details and technical effects of the urban drainage pipe network damage detection system provided in this embodiment 2 can be found in embodiment 1 and will not be repeated here.
[0124] Embodiment 3:
[0125] On the basis of Embodiment 1 or 2, this embodiment discloses a computer device, including a memory, a processor and a transceiver which are sequentially connected in communication, wherein the memory is used to store a computer program, the transceiver is used to send and receive messages, and the processor is used to read the computer program and execute the urban drainage pipe network damage detection method as described in any one of Embodiment 1. Specifically, the memory may include, but is not limited to, a random access memory (RAM), a read-only memory (ROM), a flash memory (Flash Memory), a first-in-first-out memory (FIFO) and / or a first-in-last-out memory (FILO), etc.; the processor may include, but is not limited to, a microprocessor of the STM32F105 series. In addition, the computer device may also include, but is not limited to, a power module, a display screen and other necessary components.
[0126] Embodiment 4:
[0127] Based on any one of Embodiments 1 to 3, this embodiment discloses a computer-readable storage product, on which instructions are stored, and when the instructions are run on a computer, the urban drainage pipe network damage detection method described in any one of Embodiments 1 is executed. The computer-readable storage product refers to a carrier for storing data, which may include but is not limited to computer-readable storage media such as floppy disks, optical disks, hard disks, flash memories, USB flash drives, and / or memory sticks, and the computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices.
[0128] Embodiment 5:
[0129] Based on any one of Embodiments 1 to 3, this embodiment discloses a computer program product, including a computer program or an instruction, wherein when the computer program or the instruction is executed by a computer, the urban drainage pipe network damage detection method as described in any one of Embodiments 1 is implemented. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices.
[0130] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0131] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the above embodiments, a person skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some of the technical features can be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for detecting damage in an urban drainage network, characterized in that: include: Obtaining the pipe network layout location information of the pipe network to be detected and the regional location information of the area where the pipe network to be detected is located; Constructing an initial pipe network BIM model of the pipe network to be detected according to the pipe network layout location information and the regional location information; Planning a pipeline inspection route according to the pipeline layout location information to obtain a pipeline inspection route; Controlling a designated pipe network inspection device to inspect the pipe network to be inspected along the pipe network inspection path to obtain pipe network inspection data, and then integrating the pipe network inspection data into the initial pipe network BIM model to obtain a final pipe network BIM model; Perform pipeline damage detection according to the pipeline inspection data, and when a damaged pipeline is detected, obtain the damaged pipeline location information, and then mark the damaged pipeline location in the final pipeline BIM model according to the damaged pipeline location information; Visually display the final pipe network BIM model; The regional location information includes regional GIS geographic information and aerial images, wherein the regional GIS geographic information includes surface contour information of the area where the pipeline network to be detected is located and elevation information of all data points in the area where the pipeline network to be detected is located; Correspondingly, obtaining the regional location information of the area where the pipeline network to be detected is located includes: According to the pipe network layout position information of the pipe network to be detected, obtaining the minimum rectangular outline information covering the pipe network layout position information of the pipe network to be detected; Acquire surface contour information matching the minimum rectangular contour information from a digital elevation model of a preset map source; Acquire the three-dimensional coordinates of a plurality of sampling data points in the digital elevation model that are within the range where the surface contour information is located; According to the three-dimensional coordinates of the plurality of sampling data points, the elevation information of all data points in the digital elevation model located within the range where the surface contour information is located is obtained; Acquire an aerial image matching the minimum rectangular outline information from the preset map source; Acquiring elevation information of any data point in the digital elevation model within the range of the surface contour information according to the three-dimensional coordinates of the plurality of sampling data points, including: Obtain the three-dimensional coordinates of any three non-collinear sampling data points among the multiple sampling data points; According to the three-dimensional coordinates of the arbitrary three non-collinear sampling data points, the elevation information of any data point in the digital elevation model located within the range of the surface contour information is obtained; wherein the elevation information of any data point is: In the formula, ( x , y ) is the plane coordinate of any data point; ( x 1, y 1, z 1) ( x 2, y 2, z 2) and ( x 3, y 3, z 3) are the three-dimensional coordinates of any three non-collinear sampling data points; , and is a preset intermediate calculated value, and , , ; The regional location information includes regional GIS geographic information and aerial images; correspondingly, according to the pipe network layout location information and the regional location information, an initial pipe network BIM model of the pipe network to be detected is constructed, including: Constructing an initial three-dimensional solid model of the area where the pipeline network to be inspected is located based on the regional GIS geographic information and the aerial image; Importing the pipe network layout location information into the initial three-dimensional solid model to obtain a final three-dimensional solid model of the area where the pipe network to be detected is located; Obtain sub-building BIM models of multiple buildings in the area where the pipe network to be detected is located, and merge the multiple sub-building BIM models to obtain a merged building BIM model that matches the area where the pipe network to be detected is located; The final three-dimensional solid model and the merged building BIM model are fused to obtain an initial pipe network BIM model of the pipe network to be detected.
2. A method for detecting damage in an urban drainage network according to claim 1, characterized in that: According to the regional GIS geographic information and the aerial image, an initial three-dimensional solid model of the area where the pipeline network to be inspected is located is constructed, including: Obtaining the spatial correlation between the regional GIS geographic information and the aerial image; Extracting spatial difference features from the regional GIS geographic information and the aerial image according to the spatial correlation; The regional GIS geographic information and the aerial image are fused according to the spatial difference characteristics to construct an initial three-dimensional solid model of the area where the pipeline network to be detected is located.
3. A method for detecting damage in an urban drainage network according to claim 1, characterized in that: The regional location information also includes the location information of the landmark points; correspondingly, after constructing an initial three-dimensional solid model of the area where the pipeline network to be detected is located according to the regional GIS geographic information and the aerial image, the method further includes: According to the marker point position information, the initial three-dimensional solid model is corrected to obtain a corrected three-dimensional solid model of the area where the pipe network to be detected is located, so that the pipe network layout position information can be imported into the corrected three-dimensional solid model to obtain a final three-dimensional solid model of the area where the pipe network to be detected is located.
4. A method for detecting damage in an urban drainage network according to claim 1, characterized in that: The pipeline network inspection path is planned according to the pipeline network layout location information to obtain the pipeline network inspection path, including: Dividing the pipe network to be inspected into a plurality of sub-inspection areas according to the pipe network layout location information, and then obtaining sub-inspection paths of the plurality of sub-inspection areas and inter-area inspection paths between the plurality of sub-inspection areas according to the pipe network layout location information of the pipe network to be inspected in the plurality of sub-inspection areas; The multiple sub-inspection paths and the inter-area inspection paths between the multiple sub-inspection areas are combined to obtain a pipe network inspection path.
5. A method for detecting damage in urban drainage pipe network according to claim 4, characterized in that: Controlling a designated pipe network inspection device to inspect the pipe network to be inspected along the pipe network inspection path to obtain pipe network inspection data, including: Acquire the starting point location information, and according to the starting point location information, search from the pipe network inspection path to obtain the sub-inspection path with the shortest distance between the starting points corresponding to the starting point location information; Control the designated pipe network inspection device to move from a starting point to a sub-inspection path with the shortest distance from the starting point, and when the designated pipe network inspection device is located on the sub-inspection path with the shortest distance from the starting point, control the designated pipe network inspection device to collect inspection data; The designated pipe network inspection device is controlled to perform inspection along the sub-inspection path with the shortest distance to the starting point, and after the designated pipe network inspection device completes the inspection of the current sub-inspection area where the sub-inspection path with the shortest distance to the starting point is located, the sub-inspection paths of other sub-inspection areas with the shortest distance to the current sub-inspection area are searched, and then the designated pipe network inspection device is controlled to perform inspection along the sub-inspection paths of other sub-inspection areas until the inspection of all sub-inspection areas is completed, thereby obtaining the pipe network inspection data.
6. A method for detecting damage in an urban drainage network according to claim 1, characterized in that: The pipeline network inspection data includes a plurality of inspection image data and a plurality of inspection position information matching the plurality of inspection image data; Correspondingly, the pipeline network inspection data is integrated into the initial pipeline network BIM model to obtain a final pipeline network BIM model, including: Performing grayscale processing, image background correction processing, Gaussian smoothing noise reduction processing and histogram transformation processing on the plurality of inspection image data in sequence, to obtain a plurality of pre-processed inspection image data; According to the plurality of inspection position information, the plurality of pre-processed inspection image data are stitched together to obtain stitched inspection image data and stitched position information matching the stitched inspection image data; According to the splicing position information, the spliced inspection image data is projected to a specified position of the initial pipe network BIM model to obtain a final pipe network BIM model.
7. A damage detection system for urban drainage pipe network, characterized in that: Used to implement the urban drainage pipe network damage detection method as described in any one of claims 1 to 6; the urban drainage pipe network damage detection system comprises: A basic information acquisition module is used to obtain the pipe network layout location information of the pipe network to be detected and the regional location information of the area where the pipe network to be detected is located; A BIM model construction module is communicatively connected with the basic information acquisition module, and is used to construct an initial pipe network BIM model of the pipe network to be detected according to the pipe network layout location information and the regional location information; to plan a pipe network inspection path according to the pipe network layout location information to obtain a pipe network inspection path; to control a designated pipe network inspection device to inspect the pipe network to be detected along the pipe network inspection path to obtain pipe network inspection data, and then integrate the pipe network inspection data into the initial pipe network BIM model to obtain a final pipe network BIM model; and to perform pipe network damage detection according to the pipe network inspection data, and when a damaged pipe network is detected, obtain the damaged pipe network location information, and then mark the damaged pipe network location in the final pipe network BIM model according to the damaged pipe network location information; A visualization display module is communicatively connected with the BIM model construction module and is used for visually displaying the final pipe network BIM model.
Citation Information
Patent Citations
Intelligent management and control system for underground pipe gallery
CN108508831A
Comprehensive pipe gallery operation management monitoring platform interaction system based on BIM and GIS
CN110232144A