Traditional village protection effect evaluation system and method based on digital twin
By collecting data in traditional villages and constructing digital twin models, we conduct architectural and future scene anomaly analysis and evaluate protection effects, which solves the problem of insufficient safety of traditional villages in severe weather in the existing technology and improves safety and protection efficiency.
Patent Information
- Application Number
- CN202411061610.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-08-05
AI Technical Summary
Existing technology cannot integrate the building safety data and severe weather change data of traditional villages to quantitatively analyze the safety situation of traditional villages in severe weather, resulting in insufficient safety and protection efficiency.
Collect monitoring point data and future scene data in traditional villages through data collection terminals, import digital twin construction software to build digital twin models of traditional villages, conduct building anomaly analysis and future scene anomaly analysis, evaluate the protection effect, and determine whether reinforcement protection is needed based on the results. , for early warning.
It improves the safety and protection efficiency of traditional villages in severe weather, and achieves comprehensive quantitative analysis of traditional village building safety data and severe weather change data.
Smart Images

Figure CN118569687B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of digital twins, and specifically relates to a traditional village protection effect evaluation system and method based on digital twins. Background Art
[0002] Traditional village protection refers to a series of protection measures for traditional villages with historical, cultural, social and economic values, with the aim of maintaining their authenticity, integrity and sustainability, and inheriting and developing the cultural heritage of the villages; traditional village protection effect evaluation refers to the process of comprehensively evaluating the protection effects of traditional villages where protection measures have been implemented. Traditional village protection effect evaluation is usually conducted by experts organized by relevant government departments, and sometimes third-party evaluation agencies are introduced to ensure the objectivity and scientific nature of the evaluation. The evaluation results will be used to guide subsequent protection work to achieve effective protection and sustainable development of traditional villages;
[0003] In the process of evaluating the protection effect of traditional villages, the existing technology is unable to comprehensively analyze the safety of traditional villages in bad weather by combining the building safety data of traditional villages and the data of bad weather changes, resulting in the safety and protection efficiency of traditional villages in bad weather. The above problems exist in the existing technology;
[0004] For example, a Chinese patent with the authorization publication number CN114942969B discloses a digital space processing method for the protection and utilization of traditional villages, which includes the following steps: Aerial recording: staff use unmanned aerial photography of the village, which refers to photographing the village landscape from the air; the present invention solves the problem that the current digital space processing methods for the protection and utilization of traditional villages are all presented in the form of pictures and videos, and the presentation method is greatly limited, which is not convenient for people to understand traditional villages. The digital space processing method for the protection and utilization of traditional villages has the advantage of being presented in the form of 3D modeling, which can effectively present the entire village in an all-round way, thereby facilitating people's in-depth understanding of traditional villages and enhancing people's awareness of the protection of traditional villages;
[0005] The above patents all have the problems raised by this background technology. In order to solve the problems raised by this background technology, this application designs a traditional village protection effect evaluation system and method based on digital twins. Summary of the invention
[0006] In view of the shortcomings of the existing technology, the present invention proposes a traditional village protection effect evaluation system and method based on digital twins.
[0007] To achieve the above object, the present invention provides the following technical solution: a traditional village protection effect evaluation method based on digital twins, which includes the following specific steps:
[0008] Collect data from each monitoring point in the traditional village through the data collection terminal, and obtain future scenario data at the same time, and import them into the digital twin construction software to build a digital twin model of the traditional village;
[0009] Obtain the data of each monitoring point in the traditional village and import it into the building anomaly analysis model to conduct building anomaly analysis;
[0010] Acquire future scenario data and import it into the future scenario anomaly analysis model to perform future scenario anomaly analysis;
[0011] Obtain building anomaly analysis results and future scenario anomaly analysis results to evaluate and analyze protection effects;
[0012] Based on the evaluation and analysis results of the protection effect, a judgment is made on whether reinforcement protection is needed, and an early warning of reinforcement protection is issued on the digital twin model of the traditional village.
[0013] It should be noted that the specific steps of collecting data from each monitoring point of the traditional village through the data collection terminal, obtaining future scene data, and importing it into the digital twin construction software to build a digital twin model of the traditional village are as follows:
[0014] S11, setting monitoring points on the surface of traditional village buildings, collecting surface crack data and shaking amplitude data of the buildings through data collection terminals at the monitoring points, and obtaining average connection strength data of building materials of the buildings, and storing them in the first storage component;
[0015] S12, obtaining the wind force and precipitation data estimated by the weather forecast for the future monitoring period, and storing them in the second storage component;
[0016] S13. Import the collected data from monitoring points of traditional villages and future scenario data into the digital twin construction software to construct a digital twin model of the traditional village.
[0017] It should be specifically explained here that the acquisition of data from each monitoring point in the traditional village and importing it into the building anomaly analysis model for building anomaly analysis includes the following specific steps:
[0018] S21. Obtain surface crack data of the building, and substitute the surface crack data of the building into a crack analysis value calculation formula to calculate the crack analysis value of the building, wherein the crack analysis value calculation formula is: , where x is the average distance between cracks, D is the height of the building, F is the length of the building, n is the number of cracks, ci is the length of the i-th crack, di is the maximum width of the i-th crack, c is the safety value of crack length, and d is the safety value of crack width;
[0019] S22, obtaining the calculated crack analysis value and shaking amplitude data and substituting them into the first building abnormality analysis value calculation formula to calculate the first building abnormality analysis value, wherein the first building abnormality analysis value calculation formula is: , where T is the shaking time, xt is the shaking amplitude at time t, xz is the shaking amplitude safety value, dt is the time integral, and exp() is the power of e;
[0020] S23, obtaining the calculated first building abnormality analysis value, and simultaneously obtaining the average connection strength data of the building materials of the building, substituting the obtained first building abnormality analysis value and the average connection strength data of the building materials into the second building abnormality analysis value calculation formula to calculate the second building abnormality analysis value, wherein the second building abnormality analysis value calculation formula is: ,in, is the standard value of connection strength, Average connection strength data for building materials;
[0021] It should be noted that the acquisition of future scene data and importing it into the future scene anomaly analysis model for future scene anomaly analysis also includes the following specific steps:
[0022] Obtain the wind force and precipitation data estimated by the weather forecast in the future monitoring period, and import the wind force and precipitation data estimated by the weather forecast in the future monitoring period into the future scene abnormal value calculation formula to calculate the future scene abnormal value, wherein the future scene abnormal value calculation formula is: , where fm is the standard wind force, fs is the average wind force estimated by the weather forecast in the future monitoring period, fmax is the maximum wind force estimated by the weather forecast in the future monitoring period, p is the average wind force proportion coefficient, dm is the standard precipitation, and ds is the total precipitation estimated by the weather forecast in the future monitoring period. is the wind power coefficient, is the precipitation ratio, where .
[0023] It should be noted that obtaining the building anomaly analysis results and future scene anomaly analysis results to evaluate and analyze the protection effect includes the following specific contents:
[0024] Obtain the calculated abnormal analysis value of the second building and the abnormal value of the future scene, substitute the abnormal analysis value of the second building and the abnormal value of the future scene into the protection effect evaluation value calculation formula to calculate the protection effect evaluation value, wherein the protection effect evaluation value calculation formula is: ,in, is the ratio coefficient of abnormal analysis value of the second building;
[0025] It should be specifically explained here that the specific contents of judging whether reinforcement protection is needed based on the evaluation and analysis results of the protection effect and providing early warning for reinforcement protection on the digital twin model of the traditional village are as follows:
[0026] The calculated protection effect evaluation value is compared with the set protection effect evaluation threshold. If the calculated protection effect evaluation value is greater than or equal to the set protection effect evaluation threshold, it means that the village does not need to be reinforced and protected. If the calculated protection effect evaluation value is less than the set protection effect evaluation threshold, it means that the village needs to be reinforced and protected, and an early warning of reinforcement protection should be issued on the digital twin model of the traditional village.
[0027] The traditional village protection effect evaluation system based on digital twin is implemented based on the above-mentioned traditional village protection effect evaluation method based on digital twin, and specifically includes a data acquisition module, a digital twin model construction module, a building anomaly analysis module, a future scene anomaly analysis module, a protection effect evaluation analysis module, a reinforcement protection judgment module and a control module, wherein the data acquisition module is used to collect data from various monitoring points of the traditional village through the data acquisition terminal, and simultaneously obtain future scene data; the digital twin model construction module is used to import the collected data into the digital twin construction software to construct a digital twin model of the traditional village; the building anomaly analysis module is used to obtain data from various monitoring points of the traditional village and import them into the building anomaly analysis model The future scenario anomaly analysis module is used to obtain future scenario data and import it into the future scenario anomaly analysis model to perform future scenario anomaly analysis. The protection effect evaluation and analysis module is used to obtain the building anomaly analysis results and the future scenario anomaly analysis results to perform protection effect evaluation and analysis. The reinforcement and protection judgment module is used to judge whether reinforcement and protection are needed based on the protection effect evaluation and analysis results, and to provide an early warning of reinforcement and protection on the traditional village digital twin model. The control module is used to control the operation of the data acquisition module, the digital twin model construction module, the building anomaly analysis module, the future scenario anomaly analysis module, the protection effect evaluation and analysis module, and the reinforcement and protection judgment module.
[0028] An electronic device comprises: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0029] The processor executes the above-mentioned traditional village protection effect evaluation method based on digital twins by calling the computer program stored in the memory.
[0030] A computer-readable storage medium stores instructions, which, when executed on a computer, enable the computer to execute the above-mentioned traditional village protection effect evaluation method based on digital twins.
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] The present invention collects data from various monitoring points in traditional villages through a data acquisition terminal, and simultaneously obtains future scene data, which is imported into a digital twin construction software to construct a digital twin model of the traditional village. The data from various monitoring points in the traditional village is obtained and imported into a building anomaly analysis model to perform building anomaly analysis. Future scene data is obtained and imported into a future scene anomaly analysis model to perform future scene anomaly analysis. The building anomaly analysis results and the future scene anomaly analysis results are obtained to perform evaluation and analysis on the protection effect. A judgment is made as to whether reinforcement and protection are needed based on the evaluation and analysis results of the protection effect, and an early warning for reinforcement and protection is performed on the digital twin model of the traditional village. The building safety data of the traditional village and the severe weather change data are used to quantitatively analyze the safety situation of the traditional village in severe weather, thereby improving the safety and protection efficiency of the traditional village in severe weather. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the overall process of the traditional village protection effect evaluation method based on digital twins of the present invention;
[0034] Figure 2 This is a schematic diagram of step S1 of the traditional village protection effect evaluation system based on digital twins of the present invention;
[0035] Figure 3 This is a schematic diagram of step S2 of the traditional village protection effect evaluation system based on digital twins of the present invention;
[0036] Figure 4 It is a schematic diagram of the overall framework of the traditional village protection effect evaluation system based on digital twins of the present invention; DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0038] Example 1
[0039] In order to solve the technical problems raised in the background technology, the present invention provides a preferred embodiment: Figure 1-Figure 3 As shown in the figure, the traditional village protection effect evaluation method based on digital twins includes the following specific steps:
[0040] S1. Collect data from each monitoring point of the traditional village through the data collection terminal, and obtain future scene data at the same time, and import them into the digital twin construction software to build a digital twin model of the traditional village;
[0041] In one embodiment, the specific steps of S1 are as follows: S11, setting a monitoring point on the surface of a traditional village building, collecting surface crack data and shaking amplitude data of the building through a data acquisition terminal at the monitoring point, and obtaining average connection strength data of the building materials of the building, and storing them in a first storage component;
[0042] S12, obtaining the wind force and precipitation data estimated by the weather forecast for the future monitoring period, and storing them in the second storage component;
[0043] S13, importing the collected data of each monitoring point of the traditional village and the future scenario data into the digital twin construction software to construct a digital twin model of the traditional village;
[0044] The specific steps for importing the collected monitoring point data of traditional villages and future scenario data into the digital twin construction software to build a digital twin model of traditional villages are as follows:
[0045] S131. Data collection and processing: Use drones, laser scanning, photogrammetry, GPS positioning and other equipment and technologies to conduct field surveys of traditional villages and obtain data on architecture, environment, cultural heritage, etc.; pre-process the collected data, including denoising, correction, registration, etc., to ensure the accuracy and consistency of the data.
[0046] S132. Data format conversion: Convert the collected data into a format acceptable to the digital twin construction software, such as common 3D model formats (OBJ, FBX, 3DS, etc.), point cloud data (PLY, LAS, etc.) or BIM models (IFC, Revit, etc.);
[0047] S133. Selection of digital twin construction software: Select appropriate digital twin construction software based on project requirements and data characteristics, such as Autodesk Refinery, CATIA, Siemens PLM Software, etc.;
[0048] S134. Model import and calibration: Import the converted data into the selected digital twin construction software to build the model; perform necessary calibration and adjustments on the model to ensure the consistency between the model and the actual village;
[0049] S135. Data integration and fusion: Integrate the data of monitoring points (such as temperature, humidity, air quality, etc.) with the model to create a data flow and event-driven interaction mechanism; integrate future scenario data (such as planned buildings, green space layout, etc.) with the model to build a digital twin model of the future state;
[0050] S136. Model verification and optimization: Verify the constructed digital twin model to ensure the accuracy, completeness and consistency of the model; adjust and optimize the model based on the verification results to improve its credibility and usability;
[0051] S137. Interactive simulation and analysis: Use the simulation function of the digital twin construction software to simulate and analyze different village protection plans and evaluate the protection effect; use the software's analysis and visualization tools to deeply mine and interpret the data to provide support for decision makers;
[0052] S138. Platform deployment and display: Deploy the constructed digital twin model to an appropriate platform, such as WebGL, Unity, Unreal Engine, etc., for online display and interaction;
[0053] Through the above steps, a real, accurate and dynamic digital twin model of traditional villages can be constructed to provide strong support for the protection, management and planning of traditional villages;
[0054] S2, obtaining data from each monitoring point in the traditional village and importing it into the building anomaly analysis model to perform building anomaly analysis;
[0055] In one embodiment, the specific steps of S2 are as follows: S21, obtaining surface crack data of the building, substituting the surface crack data of the building into a crack analysis value calculation formula to calculate the crack analysis value of the building, wherein the crack analysis value calculation formula is: , where x is the average distance between cracks, D is the height of the building, F is the length of the building, n is the number of cracks, ci is the length of the i-th crack, di is the maximum width of the i-th crack, c is the safety value of crack length, and d is the safety value of crack width;
[0056] S22, obtaining the calculated crack analysis value and shaking amplitude data and substituting them into the first building abnormality analysis value calculation formula to calculate the first building abnormality analysis value, wherein the first building abnormality analysis value calculation formula is: , where T is the shaking time, xt is the shaking amplitude at time t, xz is the shaking amplitude safety value, dt is the time integral, and exp() is the power of e;
[0057] S23, obtaining the calculated first building abnormality analysis value, and simultaneously obtaining the average connection strength data of the building materials of the building, substituting the obtained first building abnormality analysis value and the average connection strength data of the building materials into the second building abnormality analysis value calculation formula to calculate the second building abnormality analysis value, wherein the second building abnormality analysis value calculation formula is: ,in, is the standard value of connection strength, Average connection strength data for building materials;
[0058] S3, obtaining future scene data and importing it into a future scene anomaly analysis model to perform future scene anomaly analysis;
[0059] In one embodiment, the specific steps of S3 are as follows: obtaining the wind force and precipitation data estimated by the weather forecast for the future monitoring period, importing the wind force and precipitation data estimated by the weather forecast for the future monitoring period into the future scene abnormal value calculation formula to calculate the future scene abnormal value, wherein the future scene abnormal value calculation formula is: , where fm is the standard wind force, fs is the average wind force estimated by the weather forecast in the future monitoring period, fmax is the maximum wind force estimated by the weather forecast in the future monitoring period, p is the average wind force proportion coefficient, dm is the standard precipitation, and ds is the total precipitation estimated by the weather forecast in the future monitoring period. is the wind power coefficient, is the precipitation ratio, where It should be noted that the standard wind force and standard precipitation here are the maximum wind force and maximum precipitation that traditional village buildings can withstand;
[0060] S4. Obtain building anomaly analysis results and future scenario anomaly analysis results to evaluate and analyze protection effects;
[0061] In one embodiment, the specific steps of S4 are as follows: obtaining the calculated second building abnormality analysis value and future scene abnormality value, substituting the second building abnormality analysis value and the future scene abnormality value into the protection effect evaluation value calculation formula to calculate the protection effect evaluation value, wherein the protection effect evaluation value calculation formula is: ,in, is the ratio coefficient of abnormal analysis value of the second building;
[0062] S5. Determine whether reinforcement protection is needed based on the evaluation and analysis results of the protection effect, and provide early warning for reinforcement protection on the digital twin model of the traditional village;
[0063] In one of the embodiments, the specific steps of S5 are as follows: comparing the calculated protection effect evaluation value with the set protection effect evaluation threshold; if the calculated protection effect evaluation value is greater than or equal to the set protection effect evaluation threshold, it means that there is no need to reinforce the village for protection; if the calculated protection effect evaluation value is less than the set protection effect evaluation threshold, it means that the village needs to be reinforced for protection, and an early warning of reinforcement protection is issued on the digital twin model of the traditional village.
[0064] It should be noted that in this embodiment, the method for determining the values of the average wind force proportion coefficient, the precipitation proportion coefficient, the second building abnormal analysis value proportion coefficient and the protection effect evaluation threshold is as follows: at least 500 sets of historical traditional village monitoring point data and future scene data are obtained, and at the same time, the judgment results of whether the traditional village after the future scene is damaged are obtained, and the historical traditional village monitoring point data and the future scene data are substituted into the protection effect evaluation value calculation formula to calculate the protection effect evaluation value, and the calculated protection effect evaluation value and the damage judgment result are substituted into the fitting software, and the values of the average wind force proportion coefficient, the precipitation proportion coefficient, the second building abnormal analysis value proportion coefficient and the protection effect evaluation threshold that meet the highest judgment accuracy are output.
[0065] It should be noted in this embodiment that the advantages of this embodiment over the prior art are: data from various monitoring points in traditional villages are collected through data acquisition terminals, and future scene data is obtained at the same time, which is imported into the digital twin construction software to build a digital twin model of the traditional village; data from various monitoring points in the traditional village are obtained and imported into the building anomaly analysis model for building anomaly analysis; future scene data is obtained and imported into the future scene anomaly analysis model for future scene anomaly analysis; building anomaly analysis results and future scene anomaly analysis results are obtained to evaluate and analyze the protection effect; a judgment is made as to whether reinforcement protection is needed based on the evaluation and analysis results of the protection effect; an early warning of reinforcement protection is issued on the digital twin model of the traditional village; the safety situation of the traditional village in severe weather is quantitatively analyzed by integrating the building safety data of the traditional village and the severe weather change data, thereby improving the safety and protection efficiency of the traditional village in severe weather.
[0066] Example 2
[0067] like Figure 4As shown, the traditional village protection effect evaluation system based on digital twin is implemented based on the above-mentioned traditional village protection effect evaluation method based on digital twin, which specifically includes a data acquisition module, a digital twin model construction module, a building anomaly analysis module, a future scene anomaly analysis module, a protection effect evaluation and analysis module, a reinforcement protection judgment module and a control module, wherein the data acquisition module is used to collect data from various monitoring points of the traditional village through the data acquisition terminal, and obtain future scene data at the same time, the digital twin model construction module is used to import the collected data into the digital twin construction software to construct a digital twin model of the traditional village, and the building anomaly analysis module is used to obtain data from various monitoring points of the traditional village and import them into the building anomaly analysis The building anomaly analysis is performed in the model. The future scenario anomaly analysis module is used to obtain future scenario data and import it into the future scenario anomaly analysis model to perform future scenario anomaly analysis. The protection effect evaluation and analysis module is used to obtain the building anomaly analysis results and the future scenario anomaly analysis results to perform protection effect evaluation and analysis. The reinforcement and protection judgment module is used to judge whether reinforcement and protection are needed based on the protection effect evaluation and analysis results, and to provide early warning of reinforcement protection on the traditional village digital twin model. The control module is used to control the operation of the data acquisition module, the digital twin model construction module, the building anomaly analysis module, the future scenario anomaly analysis module, the protection effect evaluation and analysis module, and the reinforcement and protection judgment module.
[0068] Example 3
[0069] This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor;
[0070] The processor executes the above-mentioned traditional village protection effect evaluation method based on digital twins by calling the computer program stored in the memory.
[0071] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein the memory stores at least one computer program, which is loaded and executed by the processor to implement the traditional village protection effect evaluation method based on digital twins provided in the above method embodiment. The electronic device may also include other components for realizing the functions of the device. For example, the electronic device may also have components such as a wired or wireless network interface and an input and output interface to input and output data. This embodiment will not be described in detail here.
[0072] Example 4
[0073] This embodiment provides a computer-readable storage medium having a rewritable computer program stored thereon;
[0074] When the computer program runs on a computer device, the computer device executes the above-mentioned traditional village protection effect evaluation method based on digital twins.
[0075] For example, the computer readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, etc.
[0076] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0077] It should be understood that determining B based on A does not mean determining B only based on A. B can also be determined based on A and / or other information.
[0078] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When a computer instruction or computer program is loaded or executed on a computer, a process or function according to an embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network or other programmable device. Computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center through a wired network or / and a wireless network. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
Claims
1. A traditional village protection effect evaluation method based on digital twins, characterized by: It includes the following specific steps: Collect data from each monitoring point in the traditional village through the data collection terminal, and obtain future scenario data at the same time, and import them into the digital twin construction software to build a digital twin model of the traditional village; Monitoring points are set on the surface of traditional village buildings, and surface crack data and shaking amplitude data of the buildings are collected at the monitoring points through data collection terminals, and meanwhile, average connection strength data of building materials of the buildings are obtained and stored in the first storage component; Obtaining wind force and precipitation data estimated by the weather forecast for a future monitoring period, and storing the data in a second storage component; Import the collected data from each monitoring point of the traditional village and the future scenario data into the digital twin construction software to build a digital twin model of the traditional village; The specific steps for importing the collected monitoring point data of traditional villages and future scenario data into the digital twin construction software to build a digital twin model of traditional villages are as follows: Data collection and processing: Use drones, laser scanning, photogrammetry and GPS positioning equipment and technologies to conduct field surveys of traditional villages to obtain architectural, environmental and cultural heritage data; pre-process the collected data, including denoising, correction and registration, to ensure data accuracy and consistency; Data format conversion: convert the collected data into a format accepted by the digital twin construction software; Selection of digital twin construction software: Select digital twin construction software based on project requirements and data characteristics; Model import and calibration: Import the converted data into the selected digital twin construction software to build the model, calibrate and adjust the model to ensure the consistency between the model and the actual village; Data integration and fusion: Integrate the data from monitoring points with the model to create a data stream and event-driven interaction mechanism; integrate future scenario data with the model to build a digital twin model of the future state; Model verification and optimization: Verify the constructed digital twin model to ensure the accuracy, completeness and consistency of the model; adjust and optimize the model based on the verification results to improve its credibility and usability; Interactive simulation and analysis: Use the simulation function of the digital twin construction software to simulate and analyze different village protection plans and evaluate the protection effects; Platform deployment and display: Deploy the constructed digital twin model to the platform; Obtain the data of each monitoring point in the traditional village and import it into the building anomaly analysis model to conduct building anomaly analysis; The method of obtaining the data of each monitoring point in the traditional village and importing it into the building anomaly analysis model to perform building anomaly analysis includes the following specific steps: The surface crack data of the building is obtained, and the surface crack data of the building is substituted into the crack analysis value calculation formula to calculate the crack analysis value of the building, wherein the crack analysis value calculation formula is: , where x is the average distance between cracks, D is the height of the building, F is the length of the building, n is the number of cracks, ci is the length of the i-th crack, di is the maximum width of the i-th crack, c is the safety value of crack length, and d is the safety value of crack width; Obtain the calculated crack analysis value and shaking amplitude data and substitute them into the first building abnormality analysis value calculation formula to calculate the first building abnormality analysis value, wherein the first building abnormality analysis value calculation formula is: , where T is the shaking time, xt is the shaking amplitude at time t, xz is the shaking amplitude safety value, dt is the time integral, and exp() is the power of e; The calculated first building abnormality analysis value is obtained, and the average connection strength data of the building materials of the building are obtained at the same time. The obtained first building abnormality analysis value and the average connection strength data of the building materials are substituted into the second building abnormality analysis value calculation formula to calculate the second building abnormality analysis value, wherein the second building abnormality analysis value calculation formula is: ,in, is the standard value of connection strength, Average connection strength data for building materials; Acquire future scenario data and import it into the future scenario anomaly analysis model to perform future scenario anomaly analysis; The method of obtaining future scene data and importing it into the future scene anomaly analysis model to perform future scene anomaly analysis also includes the following specific steps: Obtain the wind force and precipitation data estimated by the weather forecast in the future monitoring period, and import the wind force and precipitation data estimated by the weather forecast in the future monitoring period into the future scene abnormal value calculation formula to calculate the future scene abnormal value, wherein the future scene abnormal value calculation formula is: , where fm is the standard wind force, fs is the average wind force estimated by the weather forecast in the future monitoring period, fmax is the maximum wind force estimated by the weather forecast in the future monitoring period, p is the average wind force proportion coefficient, dm is the standard precipitation, and ds is the total precipitation estimated by the weather forecast in the future monitoring period. is the wind power coefficient, is the precipitation ratio, where ; Obtain building anomaly analysis results and future scenario anomaly analysis results to evaluate and analyze protection effects; The acquisition of building anomaly analysis results and future scenario anomaly analysis results for protection effect evaluation and analysis includes the following specific contents: Obtain the calculated abnormal analysis value of the second building and the abnormal value of the future scene, substitute the abnormal analysis value of the second building and the abnormal value of the future scene into the protection effect evaluation value calculation formula to calculate the protection effect evaluation value, wherein the protection effect evaluation value calculation formula is: ,in, is the ratio coefficient of abnormal analysis value of the second building; Based on the evaluation and analysis results of the protection effect, a judgment is made on whether reinforcement protection is needed, and an early warning of reinforcement protection is issued on the digital twin model of the traditional village.
2. The traditional village protection effect evaluation method based on digital twins according to claim 1 is characterized in that: The specific contents of judging whether reinforcement protection is needed based on the evaluation and analysis results of the protection effect and carrying out early warning of reinforcement protection on the digital twin model of the traditional village are as follows: The calculated protection effect evaluation value is compared with the set protection effect evaluation threshold. If the calculated protection effect evaluation value is greater than or equal to the set protection effect evaluation threshold, it means that the village does not need to be reinforced and protected. If the calculated protection effect evaluation value is less than the set protection effect evaluation threshold, it means that the village needs to be reinforced and protected, and an early warning of reinforcement protection should be issued on the digital twin model of the traditional village.
3. A traditional village protection effect evaluation system based on digital twins, which is implemented based on the traditional village protection effect evaluation method based on digital twins as claimed in any one of claims 1-2, characterized in that: It specifically includes a data acquisition module, a digital twin model construction module, a building anomaly analysis module, a future scene anomaly analysis module, a protection effect evaluation and analysis module, a reinforcement and protection judgment module and a control module, wherein the data acquisition module is used to collect data from various monitoring points of traditional villages through a data acquisition terminal, and simultaneously obtain future scene data; the digital twin model construction module is used to import the collected data into the digital twin construction software to construct a digital twin model of a traditional village; the building anomaly analysis module is used to obtain data from various monitoring points of traditional villages and import them into the building anomaly analysis model for building anomaly analysis; the future scene anomaly analysis module is used to obtain future scene data and import them into the future scene anomaly analysis model for future scene anomaly analysis; the protection effect evaluation and analysis module is used to obtain building anomaly analysis results and future scene anomaly analysis results for protection effect evaluation and analysis.
4. The traditional village protection effect evaluation system based on digital twins as claimed in claim 3 is characterized in that: The reinforcement and protection judgment module is used to judge whether reinforcement and protection are needed based on the evaluation and analysis results of the protection effect, and to provide an early warning of reinforcement and protection on the digital twin model of the traditional village. The control module is used to control the operation of the data acquisition module, the digital twin model construction module, the building anomaly analysis module, the future scenario anomaly analysis module, the protection effect evaluation and analysis module, and the reinforcement and protection judgment module.
5. An electronic device comprising: A processor and a memory, wherein the memory stores a computer program that can be called by the processor; It is characterized in that the processor executes the traditional village protection effect evaluation method based on digital twins as described in any one of claims 1-2 by calling the computer program stored in the memory.
6. A computer-readable storage medium, characterized in that: Instructions are stored, and when the instructions are executed on a computer, the computer executes the traditional village protection effect evaluation method based on digital twins as described in any one of claims 1-2.
Citation Information
Cited By
Digital twin-driven ecological restoration evaluation method and system
CN122072892A