A flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame

By laying roof isolation nets, adjusting the support to be straight, hanging sealing rubber belts and wooden boards after the integrated mechanized paste filling working face frame, the problems of low mechanization and poor safety and reliability are solved, the isolation efficiency is improved and the cost is reduced, and effective isolation is achieved when the coal seam is thick.

CN118601665BActive Publication Date: 2026-11-10CHINA COAL SCI & TECH GRP NANJING DESIGN & RES INST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410738080.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2026-11-10
Estimated Expiration
2044-06-07

AI Technical Summary

Technical Problem

The existing integrated mechanized paste filling face post-frame isolation process suffers from low mechanization, poor safety and reliability, high manual labor intensity, and unsatisfactory isolation effect. In particular, when the coal seam is thick, the isolation and sealing is difficult, resulting in low isolation efficiency and high cost.

Method used

The process employs a flexible semi-enclosed isolation technique after filling the work surface with paste using a fully mechanized paste filling method. This includes laying a top plate isolation net along the front top beam of the support, adjusting the support to be straight, hanging sealing tape, laying isolation bags and bonding them with straw mats and strong adhesive, sealing the gaps with wooden boards, and using thin metal wires to wrap and bind the bags to ensure the integrity and airtightness of the isolation bags.

Benefits of technology

It improved the efficiency of isolation operations, reduced isolation costs, and achieved a safe, reliable, and balanced effect in the mine filling face.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118601665B_ABST
    Figure CN118601665B_ABST
Patent Text Reader

Abstract

This invention relates to the field of mechanized paste filling technology, specifically to a flexible semi-enclosed isolation process behind the support frame in a fully mechanized paste filling working face. A high-strength isolation net is laid along the top beam of the support frame. The support frame and isolation mechanism are adjusted to be straight. The bottom plate of the area to be filled is leveled. A trench is excavated below the isolation mechanism, and sealing rubber belts are hung between the isolation mechanisms. The tail beam of the support frame is lowered sequentially. An isolation bag tail beam sleeve is fitted onto the tail beam. Straw mats are laid between the sleeves and the top plate. The lower part of the tail beam is hooked to hang the isolation bag slings. The tail beam of the support frame is controlled to rise tightly against the top plate. An isolation bag feed pipe sleeve is fitted onto the feed pipe inlet. Isolation bags are laid along the trench. Straw mats are laid between the isolation bags and the bottom of the trench to seal them. The gaps between the end isolation frame and the coal wall, and between the lateral sealing mechanism and the filling body, are sealed with wooden boards. This achieves effective isolation of the area to be filled, improves isolation operation efficiency, reduces isolation costs, and achieves a balance between mining and filling in the mine filling working face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mechanized paste filling technology, and in particular to a flexible semi-enclosed isolation process behind a fully mechanized paste filling work surface frame. Background Technology

[0002] Paste backfilling behind the fully mechanized working face is one of the main technologies for paste backfilling in green mining. The main factor affecting paste backfilling mining is to set up a closed backfilling space to ensure that no safety accidents such as slurry leakage or runoff occur after the slurry enters the goaf and before it solidifies, so as to ensure the smooth progress of backfilling mining.

[0003] Currently, in isolation processes, the end sealing of the area to be filled is mostly done by manually constructing brick walls, with steel beams for horizontal bracing and unit column diagonal bracing for external support. For isolation within the area to be filled, in North China, fully enclosed flexible filling isolation bags are mainly used. Due to the special requirements for the side partitions of the filling support, fully enclosed flexible filling isolation bags are mostly suitable for narrower filling working faces, generally 80m. In East and Central China, isolation cloth is mainly used, which is suitable for wider working faces, generally over 150m.

[0004] The laying of isolation materials in the filling area was all done manually, with higher-level work requiring manual climbing ladders. Fully enclosed flexible filling bags were used for isolation, but the impact during filling could easily break the hanging hangers, damaging the shape of the isolation bags and making it difficult for the grout to adhere to the top, thus affecting the filling effect. Isolation cloth was used, but only one side of the isolation mechanism was laid. Gaps between frames, at the top, and at the bottom were often filled with straw mats, but the sealing was unreliable, easily leading to grout leakage and runoff.

[0005] Therefore, the current integrated mechanized paste filling face post-frame isolation process has problems such as low mechanization, poor safety and reliability, high manual labor intensity, and unsatisfactory isolation effect. When the coal seam is thick, the difficulty of isolating and sealing the area to be filled is particularly obvious, resulting in low isolation efficiency and high isolation cost. Summary of the Invention

[0006] The purpose of this invention is to provide a flexible semi-enclosed isolation process after the frame of a fully mechanized paste filling working face, which aims to solve the problems of low mechanization, poor safety and reliability, high manual labor intensity, and unsatisfactory isolation effect in the current fully mechanized paste filling working face isolation process. When the coal seam is thick, the difficulty of isolating and sealing the area to be filled is particularly obvious, resulting in low isolation efficiency and high isolation cost.

[0007] To achieve the above objectives, the present invention employs a flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame, comprising the following steps:

[0008] As the coal mining face advances, roof isolation netting is laid along the front roof beam of the support;

[0009] When the coal mining face reaches a filling step distance, coal mining is stopped, the area to be filled is inspected, and after ensuring the safety of the support and the roof of the area to be filled, the support and isolation mechanism are adjusted to be straight.

[0010] Level the bottom plate of the filling area, raise the lower telescopic device of the isolation mechanism, dig a trench below, and hang sealing rubber belts between the isolation mechanisms;

[0011] Operate the hydraulic cylinders of the middle support in sequence, lower the support tail beam, attach the isolation bag tail beam sleeve to the tail beam, lay straw mat between the sleeve and the top plate, hook the hook at the bottom of the tail beam to hang the isolation bag sling, control the support tail beam to rise and fit tightly against the top plate, and attach the isolation bag feed pipe sleeve to the feed pipe inlet, use thin metal wire to wrap and bind, lay the isolation bag along the trench, cover the isolation bag with straw mat at the bottom of the trench, and apply strong glue to the overlapping part between the isolation bags to bond them together.

[0012] The gaps between the end isolation frame and the coal wall, and between the lateral sealing mechanism and the filling body, are sealed with wooden boards. Isolation cloth is laid on the top and bottom, and straw mats are added to the top and the trench for sealing. Strong adhesive is applied to the overlapping part between the end isolation cloth and the middle isolation bag.

[0013] After the isolation work passes inspection, the telescopic device in the middle of the isolation mechanism extends to the bottom of the trench, completing the isolation of the area to be filled, and grouting and filling begin.

[0014] Among them, in the step of laying roof isolation netting along the front roof beam of the support as the coal mining face advances:

[0015] Use #6 wire fasteners to connect and secure the isolation netting.

[0016] Among these steps, when the coal mining face advances to a filling step distance, coal mining operations are stopped, the area to be filled is inspected, and after ensuring the integrity, stability, and safety of the supports and the roof of the area to be filled, the supports are adjusted to be straight.

[0017] The gap between the front and back of the isolation structure is less than 0.1m.

[0018] Among the steps, the bottom plate of the area to be filled is leveled, the trench is excavated, and the sealing tape is hung between the support isolation mechanisms:

[0019] The trench is straight and at least 0.3m deep, with a solid bottom plate at the bottom; the sealing rubber belt overlaps the isolation mechanism by at least 0.1m.

[0020] The process includes: sequentially lowering the tail beam of the middle support; attaching isolation bag sleeves to the tail beam; laying straw mats between the sleeves and the top plate; hooking the lower part of the tail beam with isolation bag slings to control the tail beam to rise tightly against the top plate; inserting isolation bag feed pipe sleeves into the feed pipe inlet; binding the sleeves with thin metal wires; laying isolation bags in the trench; sealing the isolation bags with straw mats at the bottom of the trench; and applying strong adhesive to the overlapping parts between the isolation bags.

[0021] The tear resistance of the isolation bag should be no less than 1500N / 50mm, and the feed sleeve of the isolation bag should be inserted into the feed pipe port for no less than 0.5m.

[0022] Among the steps, the gaps between the end isolation frame and the coal wall, and between the lateral sealing mechanism and the filling body are sealed with wooden boards, the top and bottom are laid with isolation cloth, the top and the trench are sealed with straw mats, and the overlapping part between the end isolation cloth and the middle isolation bag is bonded with strong adhesive:

[0023] The outer side of the wooden board is supported by a single pillar with an initial support force of not less than 11.5 MPa and an angle of 60° to 75°.

[0024] In the process of isolating the area after the isolation work has passed inspection, the telescopic device in the middle of the isolation mechanism extends to the bottom of the trench, completing the isolation of the area to be filled and starting the grouting and filling process:

[0025] The inspection qualification standards are as follows: the straw mat between the tail beam of the support and the roof is dense, the isolation bag is tightly attached to the isolation mechanism, the end sealing support and the coal wall, and the side sealing mechanism and the filling body are sealed tightly with wooden boards, the isolation bag is intact, the overlapping part between the isolation bags is firmly glued, and the feed pipe is firmly tied to the feed sleeve of the isolation bag.

[0026] This invention discloses a flexible semi-enclosed isolation process for a fully mechanized paste filling working face. As the coal face advances and is mined, a high-strength isolation net is laid along the roof beam in front of the support to ensure the integrity, stability, and safety of the roof in the filling area. When the coal face advances to a filling step distance, mining operations are stopped, and the filling area is inspected. After confirming the roof safety, the filling support and isolation mechanism are adjusted to be level. The bottom of the filling area is leveled, the lower telescopic isolation mechanism is raised, and a trench is excavated directly below the isolation equipment. Sealing rubber belts are hung between the isolation mechanisms. The tail beam of the intermediate support is lowered sequentially, and isolation bag sleeves are fitted onto the tail beam. Straw mats are laid between the sleeve and the roof. The lower hook of the tail beam is used to hang the isolation bag sling. The tail beam of the control support is raised to fit tightly against the roof. The sleeve of the isolation bag feed pipe is inserted into the feed pipe inlet. Isolation bags are laid along the trench. Straw mats are laid between the isolation bags and the bottom of the trench to seal them. The overlapping parts between the isolation bags are bonded with strong adhesive. The gaps between the end isolation frame and the coal wall, and between the lateral sealing mechanism and the filling body are sealed with wooden boards. Isolation cloth is laid on the top and bottom. Straw mats are added to the top and trench to seal them. The overlapping parts between the end isolation cloth and the middle isolation bag are bonded with strong adhesive. This achieves effective isolation of the area to be filled, improves the efficiency of isolation operations, reduces isolation costs, and achieves the effect of mining and filling balance in the mine filling face. Attached Figure Description

[0027] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0028] Figure 1 This is a schematic diagram illustrating the implementation steps of a flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame provided by the present invention.

[0029] Figure 2 This is a schematic diagram of the flexible semi-enclosed isolation bag provided by the present invention.

[0030] Figure 3 This is a schematic diagram of the installation of isolation netting on the top slab of the filling working face and the installation of flexible semi-enclosed isolation bags in the area to be filled, provided by the present invention.

[0031] Figure 4 This is a schematic diagram of the tail end sealing bracket provided by the present invention.

[0032] Figure 5 This is a schematic diagram of the machine head end side sealing mechanism provided by the present invention.

[0033] 100-Filling body, 101-Ditch, 102-Isolation bag tail beam sleeve, 103-Isolation bag feed pipe sleeve, 104-Isolation mechanism, 105-Isolation mechanism lower telescopic device, 106-End sealing bracket, 107-Side sealing mechanism, 108-Bracket front top beam, 109-Base plate, 110-Straw felt, 111-Filling pipeline, 112-Bracket tail beam, 113-Isolation net, 114-Isolation front frame, 115-Isolation rear frame, 116-Waiting-to-fill area, 117-Hook, 118-Flexible semi-enclosed isolation bag. Detailed Implementation

[0034] Please see Figures 1-5 This invention provides a flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame, comprising the following steps:

[0035] S1: As the coal mining face advances, a roof isolation net 113 is laid along the front top beam 108 of the support. 6# wire fasteners are used to connect and fix the isolation net 113 to ensure the integrity, stability and safety of the roof in the filling area.

[0036] S2: When the working face advances to a filling step distance, stop coal mining, inspect the filling area, and after confirming that the roof of the filling area 116 is safe, adjust the support to be straight, and ensure that the stubble before and after the isolation mechanism 104 is less than 0.1m;

[0037] S3: The bottom plate 109 of the filling area 116 is leveled, the lower telescopic device 105 of the isolation mechanism is raised, a trench 101 is dug on the bottom plate 109 below, and a sealing rubber belt is hung between the support isolation mechanism 104. The trench 101 is straight and has a depth of not less than 0.3m. The bottom of the trench 101 is the solid bottom of the bottom plate 109, and the sealing rubber belt overlaps with the isolation mechanism 104 by not less than 0.1m.

[0038] S4: Adjust the middle support tail beam 112 in sequence, attach the isolation bag tail beam sleeve 102 to the support tail beam 112, lay straw mat 110 between the isolation bag tail beam sleeve 102 and the top plate, hang the isolation bag 118 sling on the hook 117 at the bottom of the support tail beam 112, control the support tail beam 112 to rise and stick to the top plate, and put the isolation bag feed pipe sleeve 103 into the feed pipe inlet, use metal wire to wrap and bind, lay the isolation bag 118 along the trench 101, and add straw mat 110 to the bottom of the trench 101 to seal the isolation bag 118. Apply strong glue to the overlapping part between the isolation bags 118 to bond them together. The tear resistance of the isolation bag 118 should not be less than 1500N / 50mm, and the feed pipe inlet should be fitted with the isolation bag feed sleeve 103 for not less than 0.5m.

[0039] S5: The gaps between the end isolation frame 115 and the coal wall, and between the lateral sealing mechanism 107 and the filling body 10, are sealed with wooden boards. Isolation cloth is laid on the top and bottom, and straw mats 110 are added to the top and the trench 101 for sealing. Strong adhesive is applied to the overlapping part between the end isolation cloth and the middle isolation bag 118. The wooden boards are supported by single pillars on the outside, with an initial support force of not less than 11.5 MPa and an angle of 60° to 75°.

[0040] S6: After the isolation work passes inspection, the telescopic device 105 of the central support isolation mechanism 104 extends to the bottom plate 109 of the trench 101 to complete the isolation of the area to be filled and start grouting and filling.

[0041] In this embodiment, as the coal face advances, a roof isolation net 113 is laid along the top beam 108 of the support. 6# wire fasteners are used to connect and fix the isolation net 113, ensuring the integrity, stability, and safety of the roof in the filling area. When the working face advances to one filling step distance, coal mining is stopped, and the filling area is inspected. After confirming the roof safety, the support is adjusted to be straight, and the overlap of the isolation mechanism 104 is less than 0.1m. The bottom plate 109 of the filling area 116 is leveled. The area below the lower telescopic device 105 of the isolation mechanism is raised, and a trench 101 is excavated in the bottom plate. 101 is straight and has a depth of not less than 0.3m. The bottom of the trench 101 is a solid bottom plate 109. The sealing rubber belt overlaps with the isolation mechanism 104 by not less than 0.1m. The sealing rubber belt is hung between the support isolation mechanism 104. Then, the middle support tail beam 112 is lowered in sequence. The isolation bag tail beam sleeve 102 is fitted at the support tail beam 112. Straw mat 110 is laid between the tail beam sleeve 102 and the top plate. The hook 117 at the lower part of the support tail beam 112 is used to hang the isolation bag 118 sling, and the support tail beam 112 is controlled to rise and be close to the top plate. The isolation bag feed pipe sleeve is fitted at the feed pipe inlet. 103. Using thin metal wires for binding, lay isolation bags 118 on the trench 101. Seal the isolation bags 118 to the bottom of the trench 101 with straw mats 108. Apply strong adhesive to the overlapping parts between the isolation bags 118. The tear resistance of the isolation bags 118 should be no less than 1500N / 50mm. The feed pipe should be inserted into the feed sleeve 103 of the isolation bag by no less than 0.5m. Seal the gaps between the end isolation frame 115 and the coal wall, and between the lateral sealing mechanism 107 and the filling body 100 with wooden boards. Lay isolation cloth on the top and bottom, and add straw mats 118 to the top and trench 101. 0. The overlap between the end isolation cloth and the middle isolation bag 118 is sealed with strong adhesive. The wooden board is supported by a single pillar on the outside with an initial support force of not less than 11.5 MPa and an angle of 60° to 75°. After the isolation work is inspected and approved, the telescopic device 105 of the middle support isolation mechanism 104 extends to the bottom plate 109 of the trench 101 to complete the isolation of the area to be filled and start grouting and filling. Through the above method, the area to be filled is effectively isolated, the isolation operation efficiency is improved, the isolation cost is reduced, and the effect of mining and filling balance in the mine filling working face is achieved.

[0042] The above description discloses only one preferred embodiment of the present invention, and should not be construed as limiting the scope of the present invention. Those skilled in the art will understand that all or part of the processes of the above embodiments can be implemented, and equivalent changes made in accordance with the claims of the present invention are still within the scope of the invention.

Claims

1. A flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame, characterized in that, Includes the following steps: As the coal mining face advances, roof isolation netting is laid along the front roof beam of the support; When the coal mining face advances to a filling step distance, coal mining is stopped, the area to be filled is inspected, the supports and the roof of the area to be filled are ensured to be safe, and the supports and isolation mechanisms are adjusted to be straight. The bottom plate of the filling area is flat, the lower telescopic device of the isolation mechanism is raised, a trench is dug below, and sealing rubber belts are hung between the support isolation mechanisms; The middle support tail beam is lowered sequentially, and isolation bag sleeves are fitted onto the tail beam. Straw mats are laid between the sleeves and the top plate. The hooks at the bottom of the tail beam are used to hang the isolation bag slings to control the tail beam to rise and fit tightly against the top plate. Isolation bag feed pipe sleeves are fitted onto the feed pipe inlet and bound with thin metal wires. Isolation bags are laid along the trench, and straw mats are laid between the isolation bags and the bottom of the trench to seal them. The overlapping parts of the isolation bags are glued with strong adhesive. After the end isolation frame is closed, the gap between the coal wall and the side sealing mechanism and the filling body is sealed with wooden boards. The top and bottom are laid with isolation cloth, and the top and the trench are sealed with straw mats. The overlapping part between the end isolation cloth and the middle isolation bag is bonded with strong glue. After the isolation work passes inspection, the lower telescopic device of the isolation mechanism extends to the bottom of the trench, completing the effective isolation of the area to be filled, and grouting and filling begin.

2. The flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame as described in claim 1, characterized in that, As the coal face advances, the step of laying roof isolation netting along the front roof beam of the support is as follows: Use #6 wire fasteners to connect and secure the various parts of the isolation net.

3. The flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame as described in claim 1, characterized in that, When the coal mining face advances to a filling step distance, mining is stopped, and the area to be filled is inspected. After confirming that the supports and the roof of the area to be filled are safe, the supports are adjusted to be straight. The isolation structure is straight and neat, with no seams at the front and back of less than 0.1m.

4. The flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame as described in claim 1, characterized in that, In the steps of leveling the bottom plate of the filling area, raising the lower telescopic device of the isolation mechanism, digging a trench below, and hanging sealing rubber belts between the support isolation mechanisms: The trench is straight and at least 0.3m deep, with a solid bottom plate at the bottom; the sealing rubber belt overlaps the isolation mechanism by at least 0.1m.

5. The flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame as described in claim 1, characterized in that, The following steps are followed: First, lower the tail beam of the middle support structure sequentially. Then, attach isolation bag sleeves to the tail beam, and lay straw mats between the sleeves and the top plate. Next, hook the lower part of the tail beam with isolation bag slings to control the tail beam's rise and ensure it is flush against the top plate. Then, insert isolation bag inlet sleeves into the inlet pipe and secure them with thin metal wire. Finally, lay isolation bags along the trench, sealing the trench bottom with straw mats and applying strong adhesive to the overlapping parts of the isolation bags. The tear resistance of the isolation bag should be no less than 1500N / 50mm, and the feed sleeve of the isolation bag should be inserted into the feed pipe port for no less than 0.5m.

6. The flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame as described in claim 1, characterized in that, In the steps of sealing the gaps between the end isolation frame and the coal wall, and between the lateral sealing mechanism and the filling body with wooden boards, laying isolation cloth on the top and bottom, and sealing the top and trench with straw mats, and applying strong adhesive to the overlapping part between the end isolation cloth and the middle isolation bag: The outer side of the wooden board is supported by a single pillar with an initial support force of not less than 11.5 MPa and an angle of 60° to 75°.

7. The flexible semi-enclosed isolation process after the integrated mechanized paste filling work surface frame as described in claim 1, characterized in that, After the isolation work has passed inspection, the telescopic device in the middle of the isolation mechanism extends to the bottom of the trench, completing the isolation of the area to be filled, and the grouting and filling process begins: The inspection qualification standards are as follows: the straw mat between the tail beam of the support and the roof is dense, the isolation bag is tightly attached to the isolation mechanism, the end sealing support and the coal wall, and the side sealing mechanism and the filling body are sealed tightly with wooden boards, the isolation bag is intact, and the isolation bags are overlapped and glued firmly, and the feed pipe is firmly tied to the feed sleeve of the isolation bag.

Citation Information

Patent Citations

  • Paste filling continuous flexible sealing device and isolating method

    CN109252891A

  • Hydraulic filling retraining wall suitable to be coupled with hydraulic self / advancing roof supports

    PL307892A1