PVC elastic floor rebound maintenance performance detection device and method

By designing the stepped floor and detection tube in the PVC elastic floor detection device, and using the release, adsorption and interception mechanisms to realize the continuous rebound of the detection pinball, the problems of inaccurate detection and cumbersome operation in the existing technology are solved, and the Efficient detection of rebound maintenance performance of PVC elastic flooring.

CN118624137BActive Publication Date: 2024-10-18JIANGSU HUAJING FLOOR TECH
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411084202.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-18
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

The existing PVC elastic floor testing device cannot accurately detect the rebound maintenance performance, and can only test one sample at a time. The operation volume is large and it is difficult to adapt to the testing needs of long roll flooring produced.

Method used

A device for detecting rebound maintenance performance of PVC elastic floor is designed. The floor is made into a ladder shape through a guide mechanism, and detection tubes distributed in a ladder are set up. The release, adsorption and interception mechanisms are used to detect the continuous rebound and transfer of the pinball and control it. The module ensures constant impact at each detection point and records the time taken for rebound detection.

Benefits of technology

It achieves accurate detection of the rebound maintenance performance of PVC elastic flooring. It can perform multiple rounds of impact and constant rebound on a section of floor at multiple detection points, reflecting the time-consuming rebound detection and indicating the rebound maintenance performance. It is suitable for high-efficiency long-roll flooring. detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118624137B_ABST
    Figure CN118624137B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of PVC elastic floor detection, and specifically relates to a PVC elastic floor rebound maintenance performance detection device and method. The PVC elastic floor rebound maintenance performance detection device comprises: a guide mechanism, which is suitable for making a section of the floor passing through be stepped and supporting the horizontal section of the floor; a plurality of detection tubes, which are respectively arranged vertically on the horizontal section of the floor; a release mechanism and an adsorption mechanism are provided on the top of each detection tube, and a stop mechanism is provided at the preset rebound height of the tube body; the stop mechanism and the release mechanism on two adjacent detection tubes are connected through a transit channel of equal length. The device can make a certain amount of detection balls continuously rebound a section of the floor for multiple rounds, multiple detection points, and constant impact, and obtain the rebound detection time to reflect the rebound maintenance performance of the section of the floor. When all the detection balls can rebound to the preset rebound height at each detection point, the shorter the rebound detection time, the better the rebound maintenance performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of PVC elastic floor detection, and in particular relates to a device and method for detecting the rebound maintenance performance of a PVC elastic floor. Background Art

[0002] PVC elastic flooring is a type of PVC flooring. Compared with PVC floors for other purposes, the relevant standard JC / T2337-2015 "Fiber-reinforced polyvinyl chloride elastic sports flooring" has higher requirements on its vibration absorption, vertical deformation, ball rebound and other sports-related performance, so that it can be used in a variety of sports venues, such as table tennis halls, badminton halls, basketball halls, etc.

[0003] The rebound performance of the ball actually includes two aspects. One is that the ball makes a free fall from a certain height, falls on the PVC elastic floor and then rebounds. The ratio of the rebound height to the falling height is the rebound rate. The other is that the ball falls and rebounds on the same block of PVC elastic floor many times within a certain period of time. Whether the PVC elastic floor in this block can maintain the rebound rate, that is, the rebound maintenance performance. When used for basketball, when dribbling on the spot, the basketball is likely to fall and rebound on the same block of PVC elastic floor many times within a certain period of time. This requires that the PVC elastic floor must have not only a sufficient rebound rate, but also sufficient rebound maintenance performance. The rebound rate of the PVC elastic floor cannot be maintained due to repeated impacts as the ball repeatedly falls on the same place.

[0004] The current PVC elastic floor testing devices are all made with reference to the rebound rate testing method in JC / T2337-2015 "Fiber Reinforced Polyvinyl Chloride Elastic Sports Floor". For example, a falling ball rebound tester disclosed in the publication (announcement) number CN216525284U is a tester that drops a steel ball onto the product to be tested, and obtains the rebound rate by comparing the rebound height and the falling height. This type of testing device has the following problems: after the ball completes the first drop and rebound, it cannot be immediately stopped from falling and rebounding again, resulting in the same block of the sample being subjected to a gradually decreasing impact. The rebound maintenance performance measured under the gradually decreasing impact is undoubtedly on the high side, but it is difficult to accurately know how much it is higher, which makes it difficult for the test results to accurately indicate the rebound maintenance performance. In addition, this type of testing device can only test one sample at a time. If the deficiency that the ball cannot be stopped immediately and can only test one sample at a time is to be compensated manually, the detection operation volume is very large for the PVC elastic floor produced in a roll of tens of meters. Summary of the invention

[0005] The purpose of the present invention is to provide a device and method for detecting the rebound maintenance performance of a PVC elastic floor, so as to solve the technical problem that it is difficult to detect the rebound maintenance performance of a PVC elastic floor at present.

[0006] In order to solve the above technical problems, the present invention provides a PVC elastic floor rebound maintenance performance detection device, comprising: a guide mechanism, which is suitable for making a section of the floor passed through be stepped and supporting the horizontal section of the floor; a plurality of detection tubes, which are respectively vertically arranged in the horizontal sections of the floor; a release mechanism and an adsorption mechanism are provided on the top of each detection tube, and a stop mechanism is provided at the preset rebound height of the tube body; the stop mechanism and the release mechanism on two adjacent detection tubes are connected through a transfer channel of equal length; a control module, which is suitable for controlling the release mechanism on the first detection tube to start timing after the detection ball is released, and control the corresponding adsorption mechanism to drop the detection ball to the adsorption position after the release mechanism executes the release time interval. The ball is sucked and released from a preset falling height to rebound on a corresponding floor. After all the balls pass through the preset rebound height, the interception mechanism is controlled to intercept and stop them, and then the interception mechanism is controlled to release the detection ball. After the transfer time interval of the interception mechanism's release, the release mechanism is controlled to release the next detection ball, so that the detection ball released by the interception mechanism enters the release mechanism of the next detection tube through the transfer channel, rebounds on the next floor, enters the release mechanism of the subsequent detection tube, and rebounds on the subsequent floors until recovered, and the next detection ball enters the first detection tube to start the next round of rebound, and the timing is stopped when the last detection ball is recovered, and the time consumed for the rebound detection of this section of the floor is recorded.

[0007] Furthermore, the top of the detection tube is beveled to form an oblique opening; the release mechanism includes: a temporary storage tube, which is arranged obliquely above the oblique opening and facing the oblique opening; a release cylinder is provided on the temporary storage tube, and the protruding end extends into the temporary storage tube; an adsorption positioning cylinder is arranged obliquely below the oblique opening and a positioning plate is provided at the protruding end; the adsorption mechanism includes: an adsorption electric cylinder, which is arranged above the oblique opening and a suction nozzle is provided at the protruding end; the control module is suitable for controlling the release cylinder on the first detection tube to retract the protruding end, release the detection ball in the temporary storage tube, start timing, and control the adsorption positioning cylinder to extend the positioning disk to the oblique opening to support the detection ball, and after the release time interval of the release cylinder being retracted, control the corresponding adsorption electric cylinder to extend the suction nozzle to adsorb the detection ball that falls on the positioning disk and lift it to a preset falling height, and then make the adsorption positioning cylinder retract the positioning disk.

[0008] Furthermore, a pair of rebound detection strip through holes, a buffer strip through hole, and a bottom support strip through hole are opened on the upper tube wall of the detection tube; the interception mechanism includes: an interception base ring, which is arranged on the outer wall of the detection tube so that the through-beam photoelectric sensor thereon is at a preset rebound height and detects the ball through the rebound detection strip through hole; a buffer cylinder, which is arranged on the interception base ring and has a buffer block at its protruding end; a bottom support cylinder, which is arranged on the interception base ring and has a tray at its protruding end; after the control module controls the suction nozzle on the first detection tube to release the detection ball, it controls the corresponding buffer cylinder to extend the buffer block into the detection tube through the buffer strip through hole, and after the through-beam photoelectric sensor detects that all the balls have passed the preset rebound height, it controls the bottom support cylinder to extend the tray into the detection tube through the bottom support strip through hole to support the detection ball that hits the buffer block and stops the detection ball.

[0009] Furthermore, a release strip-shaped through hole is opened on the upper tube wall of the detection tube; a pushing cylinder is provided on the stopping base ring; the control module is suitable for controlling the corresponding pushing cylinder to extend the protruding end into the detection tube through the buffer strip-shaped through hole, and push the detection ball on the tray to pass through the release strip-shaped through hole into the stopping transfer assembly on the stopping base ring and come to rest.

[0010] Furthermore, the interception and transfer component includes: a mechanical claw, which is arranged on the interception base ring, and a pair of claw heads are respectively provided with a transfer storage tray to store the pushed detection ball when the claw heads are closed; the entrance of the temporary storage tube on the detection tube after the first detection tube is lower than the transfer storage tray on the previous detection tube, so that the transfer channel arranged at the entrance of the temporary storage tube is inclined to dock with the transfer storage tray on the previous detection tube; the control module is suitable for controlling the mechanical claw on the first detection tube to separate the transfer storage tray, release the detection ball, and control the release cylinder of the next detection tube to retract the protruding end to release the detection ball after the transfer time interval of the mechanical claw separation, so that the detection ball rebounds on the next floor and then enters the subsequent detection tube and rebounds on the subsequent floors until it is recovered, and controls the release cylinder on the first detection tube to release the next detection ball, so that the next detection ball enters the first detection tube to start the next round of rebound.

[0011] Furthermore, the temporary storage tube on the first detection tube is connected to the goal pipe, and is provided with a single-ball cylinder separated from the release cylinder, and the interval is adapted to the diameter of the detection ball, and the protruding end of the single-ball cylinder extends into the temporary storage tube; the control module is suitable for controlling the single-ball cylinder to retract the protruding end, so that after a detection ball is filled between the single-ball cylinder and the release cylinder, the protruding end of the single-ball cylinder is controlled to extend.

[0012] Furthermore, a recovery pipe is provided below the transfer storage tray on the last detection tube.

[0013] Furthermore, the guide mechanism includes: a plurality of guide rollers which are distributed in a stepped manner so that the passing floor is in a stepped manner; and a plurality of detection bases which are respectively arranged in the horizontal sections of the floor and are fitted with the bottom surface of the floor through the upper surface.

[0014] Furthermore, each detection tube is connected to the detection reset rod; the detection base is located on one side of the detection reset rod and is connected to a recovery groove; the detection reset rod is arranged on the slide of the vertical linear module; the vertical linear module is arranged on the slide of the horizontal linear module; the control module is suitable for controlling the vertical linear module to lift each detection tube after stopping the timing when the last detection ball is recovered, so that the floor is sent to the next section, or is suitable for recording the number of balls used in this section of the floor after the opposing photoelectric sensor detects that some balls have not passed the preset rebound height, controlling the vertical linear module to lift each detection tube and controlling the horizontal linear module to retract the vertical linear module, so that the detection balls remaining in the detection tubes follow the detection tubes and enter the corresponding recovery grooves.

[0015] On the other hand, the present invention also provides a method for detecting the rebound maintenance performance of PVC elastic floor, comprising: the PVC elastic floor rebound maintenance performance detection device as described above; starting timing after releasing the detection ball through the release mechanism on the first detection tube; after the release mechanism on the first detection tube executes the release time interval, the corresponding adsorption mechanism adsorbs the detection ball that falls to the adsorption position and releases it from the preset falling height to rebound on the corresponding floor; after all the balls pass through the preset rebound height and are intercepted and stationary by the interception mechanism, the interception mechanism releases the detection ball; after the interception mechanism executes the transfer time interval of release, the next detection ball is released by the release mechanism, so that the detection ball released by the interception mechanism falls into the release mechanism of the next detection tube through the transfer channel, rebounds on the next floor, falls into the release mechanism of the subsequent detection tube and rebounds on the subsequent floors until it is recovered, and the next detection ball enters the first detection tube to start the next round of rebound, and the timing is stopped when the last detection ball is recovered, and the time consumed for the rebound detection of this section of the floor is recorded.

[0016] The beneficial effect of the present invention is that the present invention can make the PVC elastic floor being transported enter the detection device through the guiding mechanism, and make the section of the floor in a stepped shape, thereby forming a plurality of horizontal sections from high to low as the detection area, and then make the various detection tubes arranged in the horizontal sections of the floor also have a stepped distribution, and the detection ball released by the release mechanism on the first detection tube and loosened by the adsorption mechanism will only rebound once when it falls from the preset falling height to the highest horizontal section, and then be intercepted by the stopping mechanism to a static state, and enter the release mechanism on the detection tube on the lower horizontal section through the transfer channel, so that it will only rebound once on the lower horizontal section with the same preset falling height, and at the same time as the detection ball enters the release mechanism on the detection tube on the lower horizontal section, the release mechanism on the first detection tube releases the next detection ball, which immediately falls again at the same preset falling height at the same detection point of the highest horizontal section. Rebound is performed, so that the detection balls are continuously dropped at the same preset falling height on several detection points of the section of floor, and the impact on each detection point is constant. Under the control of the control module, for different sections of the floor, the time taken for the detection balls to be released from the release mechanism to be loosened by the adsorption mechanism, and the time taken for the detection balls to be intercepted by the stop mechanism to enter the release mechanism of the next detection tube to wait for release are all equal. Only the time taken for the detection balls to fall from the preset falling height and then rebound to the preset rebound height is affected by the rebound maintenance performance of different sections of the floor. The device can enable a certain amount of detection balls to continuously perform multiple rounds, multiple detection points, and constant impact rebound on a section of floor, thereby reflecting the rebound maintenance performance of the section of the floor through the rebound detection time from the release of the first detection ball to the recovery of the last detection ball. When all the detection balls can rebound to the preset rebound height at each detection point, the shorter the rebound detection time, the better the rebound maintenance performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the prior descriptions will be briefly introduced below. Obviously, the drawings in the following description are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 The structure of the PVC elastic floor rebound maintenance performance detection device of the present invention is schematically shown. Figure 1 ;

[0019] Figure 2 The structure of the PVC elastic floor rebound maintenance performance detection device of the present invention is schematically shown. Figure 2 ;

[0020] Figure 3 The structure of the PVC elastic floor rebound maintenance performance detection device of the present invention is schematically shown. Figure 3 ;

[0021] Figure 4 The PVC elastic floor rebound maintenance performance detection device of the present invention intercepts the rebound detection ball Figure 1 ;

[0022] Figure 5 The PVC elastic floor rebound maintenance performance detection device of the present invention intercepts the rebound detection ball Figure 2 ;

[0023] Figure 6 The PVC elastic floor rebound maintenance performance detection device of the present invention intercepts the rebound detection ball Figure 3 ;

[0024] Figure 7 The structure of the PVC elastic floor rebound maintenance performance detection device of the present invention is schematically shown. Figure 4 ;

[0025] Figure 8 The structure of the PVC elastic floor rebound maintenance performance detection device of the present invention is schematically shown. Figure 5 ;

[0026] Fig. 9 It is a control block diagram of a device for detecting the rebound maintenance performance of a PVC elastic floor according to the present invention;

[0027] In the figure:

[0028] Guide mechanism 100, guide roller 110, detection base 120, floor 130,

[0029] Detection tube 200, oblique opening 210, rebound detection bar through hole 220, buffer bar through hole 230, bottom support bar through hole 240, release bar through hole 250,

[0030] Release mechanism 300, temporary storage tube 310, release cylinder 320, adsorption positioning cylinder 330, positioning plate 340,

[0031] Adsorption mechanism 400, adsorption electric cylinder 410, suction nozzle 420,

[0032] The stopping mechanism 500, the stopping base ring 510, the opposing photoelectric sensor 520, the buffer cylinder 530, the buffer block 540, the bottom supporting cylinder 550, the tray 560, the ejection cylinder 570, the stopping transfer assembly 580, the mechanical claw 581, the claw head 582, the transfer storage tray 583,

[0033] Transfer channel 600, detection pinball 700, goal pipe 810, single-ball cylinder 820, recovery pipe 830, detection reset rod 910, recovery groove 920, vertical linear module 930, horizontal linear module 940. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments of ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Example

[0036] like Figure 1 As shown, the present invention provides a PVC elastic floor rebound maintenance performance detection device, comprising: a guide mechanism 100, which is suitable for making a section of floor 130 passing through to be stepped and supporting the horizontal section of the floor 130; the floor 130 can be, but is not limited to, conveyed by a roller conveyor device, and the guide mechanism 100 can be arranged between the roller conveyor device and the winding device; a plurality of detection tubes 200, which are respectively arranged vertically in the horizontal sections of the floor 130; in at least one embodiment, the guide mechanism 100 makes the section of floor 130 passing through to be five-step, and a detection tube 200 is arranged in each of the five horizontal sections; a release mechanism 300 and an adsorption mechanism 400 are arranged on the top of each detection tube 200, and a stop mechanism 500 is arranged at the preset rebound height of the tube body; the stop mechanism 500 and the release mechanism 300 on two adjacent detection tubes 200 are connected through a transfer channel 600 of equal length; combined Fig. 9, a control module is adapted to control the release mechanism 300 on the first detection tube 200 to start timing after releasing the detection ball 700, and after the release mechanism 300 performs the release time interval, control the corresponding adsorption mechanism 400 to adsorb the detection ball 700 that has fallen to the adsorption position and release it from a preset falling height, so that it rebounds on a corresponding floor, and after all the balls have passed the preset rebound height, control the interception mechanism 500 to intercept and stop them, control the interception mechanism 500 to release the detection ball 700, and in the middle of the interception mechanism 500 performing the release After the time interval, the release mechanism 300 is controlled to release the next detection ball 700, so that the detection ball 700 released by the stop mechanism 500 enters the release mechanism 300 of the next detection tube 200 through the transfer channel 600, rebounds on the next floor, enters the release mechanism 300 of the subsequent detection tube 200, and rebounds on the subsequent floors until it is recovered, and the next detection ball 700 enters the first detection tube 200 to start the next round of rebound, until the last detection ball 700 is recovered, the timing is stopped, and the rebound detection time of this section of the floor is recorded. In at least one embodiment, the control module can be, but is not limited to, a PLC module.

[0037] The present invention can make the PVC elastic floor being transported enter the detection device through the guide mechanism 100, and make the section of the floor in a stepped shape, thereby forming a plurality of horizontal sections from high to low as the detection area, and then make the detection tubes 200 arranged on the horizontal sections of the floor also have a stepped distribution, and the detection ball 700 released by the release mechanism 300 on the first detection tube 200 and loosened by the adsorption mechanism 400 will only rebound once when it falls from a preset falling height to the highest horizontal section, and will be intercepted by the stopping mechanism 500 to a static state, and enter the release mechanism 300 on the detection tube 200 on the lower horizontal section through the transfer channel 600, so that it will only rebound once on the lower horizontal section with the same preset falling height, and at the same time when the detection ball 700 enters the release mechanism 300 on the detection tube 200 on the lower horizontal section, the release mechanism 300 on the first detection tube 200 releases the next detection ball 700, and immediately falls again at the same preset height at the same detection point of the highest horizontal section. The detection ball 700 is continuously dropped at the same preset drop height on several detection points of the section of floor, and the impact on each detection point is constant. Under the control of the control module, for different sections of floor, the time taken for the detection ball 700 to be released from the release mechanism 300 to be released by the adsorption mechanism 400, and the time taken for the detection ball 700 to be intercepted by the stop mechanism 500 to enter the release mechanism 300 of the next detection tube 200 and wait for release are all equal. The time taken to determine the rebound height is affected by the rebound maintenance performance of different sections of the floor. The device can enable a certain amount of test balls 700 to perform multiple rounds of continuous, multi-test point, and constant-impact rebound on a section of floor, thereby reflecting the rebound maintenance performance of the section of floor through the rebound detection time from the release of the first test ball 700 to the recovery of the last test ball 700. When all the test balls 700 can rebound to the preset rebound height at each detection point, the shorter the rebound detection time, the better the rebound maintenance performance.

[0038] like Figure 2 and Figure 3As shown, the top of the detection tube 200 is beveled to form an oblique opening 210; the release mechanism 300 may include: a temporary storage tube 310, which is arranged obliquely above the oblique opening 210 and faces the oblique opening 210; a release cylinder 320 is provided on the temporary storage tube 310, and the extended end extends into the temporary storage tube 310; in at least one embodiment, a hole can be opened on the tube wall of the temporary storage tube 310 for the extended end of the release cylinder 320 to extend into; an adsorption positioning cylinder 330, which is arranged obliquely below the oblique opening 210, and a positioning plate 340 is provided at the extended end; the adsorption mechanism 400 may include: an adsorption electric cylinder 410, which is arranged The control module is adapted to control the release cylinder 320 on the first detection tube 200 to retract the extended end, release the detection marble 700 in the temporary storage tube 310, start timing, and control the adsorption positioning cylinder 330 to extend the positioning plate 340 to the oblique opening 210 to hold the detection marble 700, and after the release time interval of the release cylinder 320 retracting, control the corresponding adsorption electric cylinder 410 to extend the suction nozzle 420 to absorb the detection marble 700 falling on the positioning plate 340 and lift it to a preset falling height, and then make the adsorption positioning cylinder 330 retract the positioning plate 340. In at least one embodiment, a connection seat can be provided on the top of the detection tube 200 for setting the temporary storage tube 310, the adsorption positioning cylinder 330 and the adsorption electric cylinder 410.

[0039] like Figure 4 and Figure 5 As shown, the upper wall of the detection tube 200 is provided with a pair of rebound detection bar-shaped through holes 220, a buffer bar-shaped through hole 230, and a bottom supporting bar-shaped through hole 240; the stop mechanism 500 may include: Figure 4 As shown, the stop base ring 510 is arranged on the outer wall of the detection tube 200, combined with Figure 5 , so that the through-beam photoelectric sensor 520 thereon is at a preset rebound height and detects the ball through the rebound detection bar-shaped through hole 220; in at least one embodiment, the preset rebound height may be 90% of the preset drop height; Figure 4 As shown, the buffer cylinder 530 is arranged on the stop base ring 510, and a buffer block 540 is provided at the protruding end; Figure 4 As shown, the bottom supporting cylinder 550 is arranged on the stop base ring 510, combined with Figure 5 , and the extended end is provided with a tray 560; the control module controls the first detection tube 200 on the nozzle 420 to release the detection ball 700, reference Figure 5, control the corresponding buffer cylinder 530 to extend the buffer block 540 into the detection tube 200 through the buffer bar through hole 230, and after the opposing photoelectric sensor 520 detects that all the balls have passed the preset rebound height, control the bottom supporting cylinder 550 to extend the tray 560 into the detection tube 200 through the bottom supporting bar through hole 240, refer to Figure 6 , so as to support the detection ball 700 that hits the buffer block 540 and stop the detection ball 700. In at least one embodiment, the buffer block 540 can be a sponge block.

[0040] like Figure 6 As shown, the upper wall of the detection tube 200 is provided with a release bar-shaped through hole 250; Figure 5 and Figure 6 As shown, the stop base ring 510 is provided with a push-out cylinder 570; Figure 6 The control module is suitable for controlling the corresponding ejection cylinder 570 to extend the protruding end into the detection tube 200 through the buffer bar through hole 230, and push the detection ball 700 on the tray 560 to enter the stop transfer assembly 580 on the stop base ring 510 through the release bar through hole 250 and stop.

[0041] like Figure 6 As shown, the interception transfer assembly 580 may include: a mechanical claw 581, which is arranged on the interception base ring 510, and a pair of claw heads 582 are respectively provided with a transfer receiving plate 583, referring to Figure 5 , so as to receive the pushed detection marble 700 when the claws 582 are closed; Figure 7 As shown, the entrance of the temporary storage tube 310 on the detection tube 200 after the first one is lower than the transfer storage tray 583 on the previous detection tube 200, so that the transfer channel 600 arranged at the entrance of the temporary storage tube 310 is tilted to dock with the transfer storage tray 583 on the previous detection tube 200; the control module is suitable for controlling the mechanical claw 581 on the first detection tube 200 to separate the transfer storage tray 583, release the detection ball 700, and after the transfer time interval of the mechanical claw 581 being separated, control the release cylinder 320 of the next detection tube 200 to retract the protruding end to release the detection ball 700, so that the detection ball 700 rebounds on the next floor and then enters the subsequent detection tube 200 and rebounds on the subsequent floors until it is recovered, and control the release cylinder 320 on the first detection tube 200 to release the next detection ball 700, so that the next detection ball 700 enters the first detection tube 200 to start the next round of rebound.

[0042] like Figure 7As shown, the temporary storage tube 310 on the first detection tube 200 is connected to the goal pipe 810, and is provided with a single-ball cylinder 820 spaced apart from the release cylinder 320, and the spacing is adapted to the diameter of the detection ball 700, and the extended end of the single-ball cylinder 820 extends into the temporary storage tube 310; Fig. 9 As shown, the control module is suitable for controlling the single-ball cylinder 820 to retract the extended end, so that a detection marble 700 is filled between the single-ball cylinder 820 and the release cylinder 320, and then controlling the extended end of the single-ball cylinder 820 to extend, so that a detection marble 700 is stored between the single-ball cylinder 820 and the release cylinder 320. In at least one embodiment, the goal pipe 810 can be connected to a ball storage tank, and a certain number of detection marbles 700 can be stored in the ball storage tank as needed, such as 100 detection marbles 700.

[0043] like Figure 8 As shown, a recovery pipe 830 is provided below the transfer storage tray 583 on the last detection tube 200 for connecting to a recovery tank.

[0044] like Figure 1 As shown, the guide mechanism 100 may include: a plurality of guide rollers 110, which are distributed in a stepped manner so that the passing floor 130 is stepped; a plurality of detection bases 120, which are respectively arranged in the horizontal sections of the floor 130 and are in contact with the bottom surface of the floor through the upper surface.

[0045] like Figure 8 As shown, each detection tube 200 is connected to the detection reset rod 910; the detection base 120 is located on one side of the detection reset rod 910 and is connected to a recovery groove 920; the detection reset rod 910 is arranged on the slide of the vertical linear module 930; the vertical linear module 930 is arranged on the slide of the horizontal linear module 940; the control module is suitable for controlling the vertical linear module 930 to lift each detection tube 200 after stopping the timing when the last detection ball 700 is recovered, so that the floor is sent to the next section, or is suitable for recording the number of balls used in this section of the floor after the opposing photoelectric sensor 520 detects that some balls have not passed the preset rebound height, controlling the vertical linear module 930 to lift each detection tube 200 and controlling the horizontal linear module 940 to retract the vertical linear module 930, so that the detection ball 700 remaining in the detection tube 200 moves with the detection tube 200 and enters the corresponding recovery groove 920.

[0046] The detection principle of the PVC elastic floor rebound maintenance performance detection device is as follows. The PVC elastic floor is sent out by a roller conveyor, for example. Figure 1 During this process, the PVC elastic floor is pulled through each guide roller 110, and then pulled to, for example, a winding device for winding. After the setting is completed, the roller conveying device is suspended. Each detection tube 200 is set on the horizontal section, referring to Figure 8, the detection tube 200 can be set on the horizontal section by, for example, the vertical linear module 930 and the horizontal linear module 940, and then Figure 7 As shown, the single ball cylinder 820 on the first detection tube 200 is retracted, so that a detection marble 700 in the goal channel 810 enters between the single ball cylinder 820 and the release cylinder 320. Figure 2 As shown, the release cylinder 320 on the first detection tube 200 retracts the extended end to release the detection ball 700 in the temporary storage tube 310 (after the extended end of the release cylinder 320 is reset and extended back into the temporary storage tube 310, the single-ball cylinder 820 is similarly placed with a detection ball 700), and the control module also starts timing, and at the same time, the adsorption positioning cylinder 330 extends the positioning plate 340 to the oblique opening 210 to hold the detection ball 700. After the release time interval of the release cylinder 320 being retracted, it is ensured that the detection ball 700 is already in the positioning plate 340, and the adsorption electric cylinder 410 extends the adsorption electric cylinder 410 to the adsorption electric cylinder 410. The nozzle 420 sucks the detection ball 700 that falls on the positioning plate 340 and lifts it to a preset falling height, and then the adsorption positioning cylinder 330 retracts the positioning plate 340 to make way for the falling channel. After the positioning plate 340 is retracted, the suction nozzle 420 releases the detection ball 700 to make it fall freely, and then the buffer cylinder 530 extends the buffer block 540 into the detection tube 200 through the buffer bar-shaped through hole 230. Usually, the first detection ball 700 falling on a detection point can rebound to exceed the preset rebound height, that is, the entire ball can pass through the opposing photoelectric sensor 520, refer to Figure 5 , and immediately hits the buffer block 540. Similarly, after the beam-type photoelectric sensor 520 detects that all the balls have passed the preset rebound height, the bottom supporting cylinder 550 immediately extends the tray 560 through the bottom supporting bar through hole 240 into the detection tube 200, supports the detection ball 700 that hits the buffer block 540, and stops the detection ball 700. After stopping, refer to Figure 6, so that the pushing cylinder 570 extends the protruding end into the detection tube 200 through the buffer bar through hole 230, and pushes the detection ball 700 on the tray 560, so that it passes through the release bar through hole 250 and enters the transfer storage tray 583 on the interception base ring 510 and stops, and then the mechanical claw 581 separates the transfer storage tray 583 and releases the detection ball 700. After the transfer time interval of the separation of the mechanical claw 581, that is, ensure that the detection ball 700 has stopped in front of the protruding end of the release cylinder 320 of the second detection tube 200, the release cylinder 320 retracts the protruding end, so that the detection ball 700 repeats the rebound process in the first detection tube 200 in the second detection tube 200, and the same is true for the third detection tube 200, the fourth detection tube 200, and the fifth detection tube 200, until It enters the recovery tank through the recovery pipe 830, and also after the transfer time interval when the mechanical claws 581 are separated, the release cylinder 320 on the first detection tube 200 releases the next detection ball 700, allowing the next detection ball 700 to enter the first detection tube 200 and start the next round of rebound, until, for example, the 100th detection ball 700 is detected by the opposing photoelectric sensor 520 on the fifth detection tube 200, as the time point of recovery, the control module stops timing and records the rebound detection time of this section of floor. After that, each detection tube 200 can be lifted by the vertical linear module 930, and the next section of floor to be sent in can be rebound tested in the same way. For example, a section of floor can be taken every 5 meters for rebound detection, and the corresponding rebound detection time can be obtained. The same is true for other rolls of floor to be tested.

[0047] The time-consuming components of these rebound detections include the time taken for the release from the release cylinder 320 to the release of the suction nozzle 420 in each detection tube 200, the time taken for the drop from the preset drop height to rebound to the preset rebound height, and the time taken for the stop mechanism 500 to intercept the release cylinder 320 before it falls to the next detection tube 200. Under the control of the control module, the time taken for the release from the release cylinder 320 to the release of the suction nozzle 420 and the time taken for the stop mechanism 500 to intercept the release cylinder 320 before it falls to the next detection tube 200 are fixed. Therefore, for different sections of the floor, the time taken for the detection ball 700 to be released from the release cylinder 320 to the release of the suction nozzle 420, and the time taken for the stop mechanism 500 to intercept the release cylinder 320 before it falls to the next detection tube 200 are fixed. The time taken for the detection balls 700 to fall to the release cylinder 320 of the next detection tube 200 is the same. Only the time taken for the detection balls 700 to fall from the preset falling height and then rebound to the preset rebound height is affected by the rebound maintenance performance of different sections of the floor. The present device can enable a certain amount of detection balls 700 to continuously perform multiple rounds, multiple detection points, and constant impact rebound on a section of floor. The total time consumed from the release of the first detection ball 700 to the recovery of the last detection ball 700, i.e., the rebound detection time, reflects the rebound maintenance performance of the section of the floor. When all the detection balls 700 can rebound to the preset rebound height at each detection point, the shorter the rebound detection time, the better the rebound maintenance performance.

[0048] When there is a section of PVC elastic floor with poor rebound maintenance performance, the present detection device can also detect it, that is, when the suction nozzle 420 releases the detection ball 700, but the opposing photoelectric sensor 520 does not detect that the ball of the detection ball 700 has not all passed the preset rebound height, the control module can record the number of balls used for this section of the floor. This number of balls used can be used to indicate that the section of the floor cannot maintain the rebound performance after being impacted by this number of detection balls 700. When it is not detected that the ball of the detection ball 700 has not all passed the preset rebound height, the detection of this section of the floor is terminated, and the vertical linear module 930 can be controlled to lift each detection tube 200 and the horizontal linear module 940 can be controlled to retract the vertical linear module 930, so that the detection ball 700 remaining in the detection tube 200 moves with the detection tube 200 and enters the corresponding recovery groove 920.

[0049] In at least one embodiment, a method for detecting the rebound maintenance performance of a PVC elastic floor is provided, comprising: the PVC elastic floor rebound maintenance performance detection device as described above; starting timing after releasing the detection ball 700 through the release mechanism 300 on the first detection tube 200; after the release mechanism 300 on the first detection tube 200 executes the release time interval, the corresponding adsorption mechanism 400 adsorbs the detection ball 700 that falls to the adsorption position and releases it from a preset falling height to rebound on a corresponding floor; after all the balls have passed the preset rebound height and have been intercepted and stopped by the stop mechanism 500, the stop mechanism 400 is stopped. 500 releases the detection ball 700; after the transfer time interval of the interception mechanism 500 executing the release, the next detection ball 700 is released through the release mechanism 300, so that the detection ball 700 released by the interception mechanism 500 falls into the release mechanism 300 of the next detection tube 200 through the transfer channel 600, rebounds on the next floor, falls into the release mechanism 300 of the subsequent detection tube 200, and rebounds on the subsequent floors until it is recovered, and the next detection ball 700 enters the first detection tube 200 to start the next round of rebound, and the timing is stopped when the last detection ball 700 is recovered, and the time consumed for the rebound detection of this section of the floor is recorded.

[0050] The steps and technical effects of the PVC elastic floor rebound maintenance performance testing method have been described above and will not be repeated here.

[0051] In summary, the present invention can make the PVC elastic floor being transported enter the detection device through the guiding mechanism 100, and make the section of the floor in a stepped shape, thereby forming a plurality of horizontal sections from high to low as the detection area, and then make the detection tubes 200 arranged in the horizontal section of the floor also have a stepped distribution, and the detection ball 700 released by the release mechanism 300 on the first detection tube 200 and loosened by the adsorption mechanism 400 will only rebound once when it falls from the preset falling height to the highest horizontal section, and will be intercepted by the stopping mechanism 500 to a static state, and enter the release mechanism 300 on the detection tube 200 on the lower horizontal section through the transfer channel 600, so that it will only rebound once on the lower horizontal section with the same preset falling height, and at the same time when the detection ball 700 enters the release mechanism 300 on the detection tube 200 on the lower horizontal section, the release mechanism 300 on the first detection tube 200 releases the next detection ball 700, and immediately falls again at the same detection point of the highest horizontal section with the same preset falling height. The detection ball 700 is continuously dropped at the same preset drop height on several detection points of the section of floor, and the impact on each detection point is constant. Under the control of the control module, for different sections of the floor, the time taken for the detection ball 700 to be released from the release mechanism 300 to be released by the adsorption mechanism 400, and the time taken for the detection ball 700 to be intercepted by the stop mechanism 500 to enter the release mechanism 300 of the next detection tube 200 and wait for release are all equal. Only when the detection ball 700 falls from the preset drop height and then rebounds to the preset rebound height The time consumed by the test balls 700 is affected by the rebound maintenance performance of different sections of the floor. This device can make a certain amount of test balls 700 continuously rebound a section of the floor for multiple rounds, multiple detection points, and constant impact, so that the total time consumed from the release of the first test ball 700 to the recovery of the last test ball 700, that is, the rebound detection time, reflects the rebound maintenance performance of the section of the floor. When all the test balls 700 can rebound to the preset rebound height at each detection point, the shorter the rebound detection time, the better the rebound maintenance performance. And when there is a section of PVC elastic floor with poor rebound maintenance performance, this detection device can also detect it, and can indicate the ability of the section of floor to maintain rebound performance by the number of balls used.

[0052] In the embodiments provided in this application, it should be understood that the disclosed systems and devices can be implemented in other ways. The embodiments described above are only exemplary. For example, the division of the mechanism is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed.

[0053] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0054] Based on the above-mentioned ideal embodiments of the present invention, and through the above-mentioned description, relevant technicians can make various changes and modifications without departing from the technical concept of the present invention. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A PVC elastic floor rebound maintenance performance detection device, characterized in that: include: A guide mechanism (100) adapted to make a section of the floor through which the passage passes into a stepped shape and to support a horizontal section of the floor; A plurality of detection tubes (200) are respectively arranged vertically on the horizontal section of the floor; The top of each detection tube (200) is provided with a release mechanism (300) and an adsorption mechanism (400), and a stop mechanism (500) is provided at a preset rebound height of the tube body; The stop mechanism (500) and the release mechanism (300) on two adjacent detection tubes (200) are both connected via a transfer channel (600) of equal length; The control module is adapted to control the release mechanism (300) on the first detection tube (200) to start timing after releasing the detection marble (700), and control the corresponding adsorption mechanism (400) to adsorb the detection marble (700) that has fallen to the adsorption position and release it from a preset falling height after the release mechanism (300) has executed the release time interval, so that it rebounds on a corresponding floor, and after all the marbles have passed the preset rebound height and the interception mechanism (500) has been controlled to intercept and stop the marble, control the interception mechanism (500) to release the detection marble (700), and execute the release transfer time at the interception mechanism (500). After the interval, the release mechanism (300) is controlled to release the next detection marble (700), so that the detection marble (700) released by the stop mechanism (500) enters the release mechanism (300) of the next detection tube (200) through the transfer channel (600), rebounds on the next floor, enters the release mechanism (300) of the subsequent detection tube (200), and rebounds on each subsequent floor until it is recovered, and the next detection marble (700) enters the first detection tube (200) to start the next round of rebound, and the timing is stopped when the last detection marble (700) is recovered, and the time consumed for the rebound detection of the section of floor is recorded; The top of the detection tube (200) is beveled to form a beveled opening (210); The release mechanism (300) comprises: A temporary storage tube (310), which is disposed obliquely above the oblique opening (210) and faces the oblique opening (210); The temporary storage tube (310) is provided with a release cylinder (320), and the extended end extends into the temporary storage tube (310); An adsorption positioning cylinder (330) is arranged obliquely below the oblique opening (210), and a positioning plate (340) is provided at the protruding end thereof; The adsorption mechanism (400) comprises: An adsorption electric cylinder (410) is arranged above the oblique opening (210), and a suction nozzle (420) is provided at the protruding end; The control module is suitable for controlling the release cylinder (320) on the first detection tube (200) to retract the extended end and release the detection marble (700) in the temporary storage tube (310) to start timing, and controlling the adsorption positioning cylinder (330) to extend the positioning plate (340) to the oblique opening (210) to hold the detection marble (700), and after the release time interval of the retraction of the release cylinder (320), controlling the corresponding adsorption electric cylinder (410) to extend the suction nozzle (420) to adsorb the detection marble (700) that falls on the positioning plate (340) and lift it to a preset falling height, and then causing the adsorption positioning cylinder (330) to retract the positioning plate (340); The upper tube wall of the detection tube (200) is provided with a pair of rebound detection bar-shaped through holes (220), a buffer bar-shaped through hole (230), and a bottom supporting bar-shaped through hole (240); The stopping mechanism (500) comprises: A stop base ring (510) is arranged on the outer wall of the detection tube (200) so that the opposing photoelectric sensor (520) thereon is at a preset rebound height and detects the sphere through the rebound detection bar-shaped through hole (220); A buffer cylinder (530) is arranged on the stop base ring (510), and a buffer block (540) is provided at the protruding end; A bottom supporting cylinder (550) is arranged on the stop base ring (510), and a tray (560) is provided at the protruding end; After the control module controls the suction nozzle (420) on the first detection tube (200) to release the detection marble (700), the control module controls the corresponding buffer cylinder (530) to extend the buffer block (540) into the detection tube (200) through the buffer bar-shaped through hole (230), and after the opposing photoelectric sensor (520) detects that all the balls have passed the preset rebound height, the control module controls the bottom supporting cylinder (550) to extend the tray (560) into the detection tube (200) through the bottom supporting bar-shaped through hole (240) to support the detection marble (700) that hits the buffer block (540) and stop the detection marble (700); The upper wall of the detection tube (200) is provided with a release strip-shaped through hole (250); The stop base ring (510) is provided with a push-out cylinder (570); The control module is suitable for controlling the corresponding push-out cylinder (570) to extend the extended end into the detection tube (200) through the buffer bar-shaped through hole (230), and to push the detection marble (700) on the tray (560) so that it passes through the release bar-shaped through hole (250) and enters the stop transfer assembly (580) on the stop base ring (510) and stops; The interception and transfer component (580) comprises: A mechanical claw (581) is arranged on the stop base ring (510), and a pair of claw heads (582) are respectively provided with a transfer storage plate (583) for storing the detection marbles (700) pushed in when the claw heads (582) are closed together; The entrance of the temporary storage tube (310) on the detection tube (200) after the first one is lower than the transfer storage tray (583) on the previous detection tube (200), so that the transfer channel (600) arranged at the entrance of the temporary storage tube (310) is inclined to dock with the transfer storage tray (583) on the previous detection tube (200); The control module is suitable for controlling the mechanical claw (581) on the first detection tube (200) to separate the transfer storage plate (583) and release the detection ball (700), and after the transfer time interval when the mechanical claw (581) is separated, controlling the release cylinder (320) of the next detection tube (200) to retract the extended end to release the detection ball (700), so that the detection ball (700) rebounds on the next floor and then enters the subsequent detection tube (200) and rebounds on each subsequent floor until it is recovered, and controlling the release cylinder (320) on the first detection tube (200) to release the next detection ball (700), so that the next detection ball (700) enters the first detection tube (200) and starts the next round of rebound.

2. The PVC elastic floor rebound maintenance performance detection device according to claim 1, characterized in that: The temporary storage tube (310) on the first detection tube (200) is connected to a ball pipeline (810), and is provided with a single-ball cylinder (820) spaced apart from the release cylinder (320), and the spacing is adapted to the diameter of the detection ball (700), and the extended end of the single-ball cylinder (820) extends into the temporary storage tube (310); The control module is suitable for controlling the single-ball cylinder (820) to retract the extended end, so that after a detection ball (700) is filled between the single-ball cylinder (820) and the release cylinder (320), the extended end of the single-ball cylinder (820) is controlled to extend.

3. The PVC elastic floor rebound maintenance performance detection device according to claim 2, characterized in that: A recovery pipe (830) is provided below the transfer storage tray (583) on the last detection tube (200).

4. The PVC elastic floor rebound maintenance performance detection device according to claim 3, characterized in that: The guiding mechanism (100) comprises: A plurality of guide rollers (110) are distributed in a stepped manner so that the floor passing through is in a stepped manner; A plurality of detection bases (120) are respectively arranged on the horizontal section of the floor and are fitted with the bottom surface of the floor through the upper surface.

5. The PVC elastic floor rebound maintenance performance detection device according to claim 4, characterized in that: Each detection tube (200) is connected to a detection reset rod (910); The detection base (120) is located on one side of the detection reset rod (910) and is connected to a recovery groove (920); The detection reset rod (910) is arranged on a slide table of the vertical linear module (930); The vertical linear module (930) is arranged on a slide table of the horizontal linear module (940); The control module is suitable for controlling the vertical linear module (930) to lift each detection tube (200) after stopping the timing when the last detection marble (700) is recovered, so that the floor is sent to the next section, or is suitable for recording the number of balls used in the section of floor after the opposing photoelectric sensor (520) detects that all balls have not passed the preset rebound height, controlling the vertical linear module (930) to lift each detection tube (200) and controlling the horizontal linear module (940) to retract the vertical linear module (930), so that the detection marble (700) remaining in the detection tube (200) moves with the detection tube (200) and enters the corresponding recovery slot (920).

6. A method for testing the rebound maintenance performance of PVC elastic floor, characterized in that: include: The PVC elastic floor rebound maintenance performance detection device according to any one of claims 1 to 5; The detection marble (700) is released by the release mechanism (300) on the first detection tube (200), and the timing starts; After the release mechanism (300) on the first detection tube (200) executes the release time interval, the corresponding adsorption mechanism (400) adsorbs the detection marble (700) that has fallen to the adsorption position and releases it from a preset drop height so that it rebounds on a corresponding floor; After all the balls have passed the preset rebound height and have been intercepted and stopped by the interception mechanism (500), the interception mechanism (500) releases the detection marble (700); After the transfer time interval of the interception mechanism (500) executing the release, the next detection marble (700) is released through the release mechanism (300), so that the detection marble (700) released by the interception mechanism (500) passes through the transfer channel (600) and falls into the release mechanism (300) of the next detection tube (200), rebounds on the next floor, falls into the release mechanism (300) of the subsequent detection tube (200), and rebounds on each subsequent floor until it is recovered, and the next detection marble (700) enters the first detection tube (200) to start the next round of rebound, and the timing is stopped when the last detection marble (700) is recovered, and the time consumed for the rebound detection of this section of the floor is recorded.

Citation Information

Patent Citations

  • Falling ball springback tester

    CN216525284U

  • Falling ball testing device

    CN117990328A

  • Device and method for detecting local wrinkling resistance of PVC (polyvinyl chloride) floor

    CN118329430A