A new energy consumption monitoring device and system
Through the new energy energy consumption monitoring system, the data monitoring and analysis of power generation equipment and energy storage equipment is carried out, and a monitoring and evaluation model is established to solve the problem of difficulty in timely detection and treatment of faults of new energy equipment in harsh environments, and improve maintenance efficiency and power generation efficiency. .
Patent Information
- Application Number
- CN202411114846.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-08-14
AI Technical Summary
Due to the harsh working environment of new energy power generation equipment and energy storage equipment, they are easily affected by weather and environmental factors, leading to equipment failure and low maintenance efficiency. It is difficult to detect and deal with faults in a timely manner, resulting in power loss and reduction in power generation efficiency.
Design a new energy consumption monitoring system, including power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module, relay forwarding station and service terminal. By monitoring and analyzing power generation data and energy storage data, a monitoring and evaluation model is established , determine equipment status and determine maintenance needs, improving fault location and repair efficiency.
It enables efficient maintenance of equipment in the new energy system, improves operating efficiency, accurately determines the source of faults and provides repair methods, and avoids power loss caused by missing the best repair time due to faults.
Smart Images

Figure CN118630929B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of energy monitoring technology, and specifically, relates to a new energy consumption monitoring device and system. Background Art
[0002] With the continuous development and progress of mankind, the consumption of traditional energy sources such as oil and coal is also increasing. In order to reduce the consumption of traditional energy, people have begun to develop new energy; new energy, also known as unconventional energy, refers to various energy forms other than traditional energy. With its clean, renewable and widely distributed characteristics, it has received widespread attention and application, including: solar energy, geothermal energy, wind energy, ocean energy, biomass energy and nuclear fusion energy. As the scale of new energy gradually expands and is continuously applied to all aspects of people's lives, it makes it necessary to monitor new energy.
[0003] However, due to the harsh working environment of the new energy power system, the equipment is easily affected by weather, environmental and other factors. For example, solar power generation equipment is mostly located in desert plateaus, ocean power generation equipment is located in deep sea areas, and wind power generation equipment is located in coastal or Gobi areas. The natural environment in these areas can easily cause damage to new energy power generation equipment or energy storage equipment, making it impossible for new energy power generation equipment or energy storage equipment to work normally. When staff at the service station discover abnormal data through monitoring, they cannot promptly discover which device has a fault or abnormality. The number of equipment installed is already huge, and maintenance staff need to go to these remote and harsh places to find the faulty equipment and the cause of the fault among these huge number of equipment. This is not only inefficient, but also difficult to promptly discover and deal with fault problems, resulting in a large loss of electricity and a decrease in the efficiency of new energy power generation. Summary of the invention
[0004] In order to solve the above problems and technical defects, the embodiment of the present application adopts the following technical solution: a new energy consumption monitoring system, including: power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module, relay forwarding station and service terminal;
[0005] Power generation equipment, used to generate electricity from new energy sources and transmit the generated electricity to new energy storage equipment;
[0006] Energy storage equipment, used to receive electricity transmitted by new energy power generation equipment and store new energy energy;
[0007] A power generation monitoring module is used to be installed on the power generation equipment to monitor the power generation data and operation data of the power generation equipment and transmit the power generation data and operation data of the power generation equipment to the relay forwarding station;
[0008] The energy storage monitoring module is used to be installed on the energy storage device to monitor the energy storage data of the energy storage device and transmit the energy storage data of the energy storage device to the relay forwarding station;
[0009] The relay station is used to receive the operation data and power generation data sent by the power generation monitoring module, establish a monitoring and evaluation model, use the monitoring and evaluation model to analyze the operation data, obtain the first operation result of the power generation equipment, and send the first operation result, operation data, power generation data and energy storage data to the service terminal;
[0010] The service terminal is used to receive power generation data, energy storage data, first operation results and operation data, establish a monitoring and evaluation model, use the monitoring and evaluation model to analyze and evaluate the power generation data, energy storage data and operation data, and obtain the first power generation result of the power generation equipment, the energy storage result of the energy storage equipment and the second operation result of the power generation equipment;
[0011] Compare the second operation result with the first operation result, judge and evaluate the relay station according to the comparison result, and obtain the status result of the relay station;
[0012] According to the second operation result of the power generation equipment and the status result of the relay forwarding station, the third operation judgment of the power generation equipment is performed to obtain the third operation result of the power generation equipment;
[0013] The first power generation result of the power generation equipment is judged and evaluated according to the third operation result of the power generation equipment to obtain the second power generation result of the power generation equipment;
[0014] Compare the second power generation result with the energy storage result to obtain the transmission result of the circuit transmission, and according to the transmission result;
[0015] Determine whether the relay station needs maintenance based on the status results; determine whether the power generation equipment needs maintenance based on the third operation results and the second power generation results; determine whether the energy storage equipment needs maintenance based on the energy storage results; and determine whether the transmission circuit between the power generation equipment and the energy storage equipment needs maintenance based on the transmission results.
[0016] Preferably, the steps of establishing the monitoring and evaluation model are as follows:
[0017] It is done by obtaining historical data of power generation equipment and energy storage equipment, cleaning the historical data and extracting features.
[0018] The historical data is classified once according to the extracted features. The classification results include normal operation data, normal power generation data, normal energy storage data, abnormal operation data, abnormal power generation data and abnormal energy storage data.
[0019] Use the kernel principal component analysis feature algorithm to reduce the dimension of abnormal operation data, abnormal power generation data and abnormal energy storage data to extract fault sensitive features;
[0020] According to the fault-sensitive characteristics, the abnormal operation data, abnormal power generation data and abnormal energy storage data are secondary classified. The secondary classification results include ignorable fault data, waitable fault data and inoperable fault data.
[0021] According to the results of the first classification and the second classification, the state automatic classifier is established by using the support vector machine algorithm, and the state automatic classifier is trained and calculated using the historical features to obtain three unequal state boundary evaluation values;
[0022] The square difference of the target data of the power generation equipment and the energy storage equipment is judged and compared with the three state boundary evaluation values to obtain the evaluation results.
[0023] Preferably, the first power generation result, the second power generation result, the first operation result, the second operation result, the third operation result, the energy storage result and the status result all have four evaluation results, and the four evaluation results include: normal, negligible fault, waitable fault and unable to operate fault;
[0024] Arrange the three state boundary evaluation values from large to small and name them as the first evaluation value, the second evaluation value and the third evaluation value respectively;
[0025] When the data square difference is greater than the first evaluation value, the evaluation result of the target data is normal;
[0026] When the data square difference is less than the first evaluation value and greater than the second evaluation value, the evaluation result of the target data is that the fault can be ignored;
[0027] When the data square difference is less than the second evaluation value and greater than the third evaluation value, the evaluation result of the target data is that the fault can be waited for;
[0028] When the data square difference is less than the third evaluation value, the evaluation result of the target data is an inoperable fault.
[0029] Furthermore, the second operation result is compared with the first operation result, and the steps of judging and evaluating the relay station according to the comparison result are as follows:
[0030] Assign values to the four evaluation results, calculate the difference between the first and second running results, and set four comparison values of different sizes;
[0031] If the assigned difference is equal to the smallest comparison value, the status result is normal;
[0032] If the assigned difference is equal to the second smallest comparison value, the status result is a negligible fault;
[0033] If the assigned difference is equal to the second largest comparison value, the status result is a waitable fault;
[0034] If the assigned value difference is equal to the maximum comparison value, the status result is an inoperable fault.
[0035] Furthermore, the steps for performing the third run judgment according to the second run result and the status result are as follows:
[0036] If the status result is normal, the second run result is used as the third run result;
[0037] If the status result is a negligible fault, the second smallest comparison value is subtracted from the value assigned to the second operation result, and the evaluation result corresponding to the calculated result assignment is used as the third operation result;
[0038] If the status result is a waitable fault, the second largest comparison value is subtracted from the value assigned to the second running result, and the evaluation result corresponding to the calculated result assignment is used as the third running result;
[0039] If the status result is an inability to run fault, no matter what the evaluation result of the second run result is, the inability to run fault will be taken as the third run result.
[0040] Furthermore, each power generation monitoring module simultaneously transmits data with multiple relay forwarding stations, and the service terminal receives multiple first operation results of the same target power generation monitoring module sent by multiple relay forwarding stations, and obtains multiple third operation results of the target power generation monitoring module after multiple judgments and calculations;
[0041] When at least one of the third operation results is a normal evaluation result, the third operation result of the target power generation monitoring module is modified to be normal;
[0042] When none of the third operation results has a normal evaluation result and at least one negligible fault evaluation result, the third operation result of the target power generation monitoring module is modified to a negligible fault;
[0043] When there is neither a normal evaluation result nor a negligible fault evaluation result among the third operation results, and there is at least one waitable fault evaluation result, modifying the third operation result of the target power generation monitoring module to a waitable fault;
[0044] When all of the third operation results are evaluation results of an inoperable fault, the third operation result of the target power generation monitoring module is modified to an inoperable fault.
[0045] Furthermore, the steps of judging and evaluating the first power generation result of the power generation equipment according to the third operation result of the power generation equipment are as follows:
[0046] If the third operation result is normal, the second power generation result is equal to the first power generation result;
[0047] If the third operation result is a negligible fault and the first power generation result is normal, then the second power generation result is a negligible fault, otherwise the second power generation result is equal to the first power generation result;
[0048] If the third operation result is a waitable fault, and the first power generation result is normal or a negligible fault, then the second power generation result is a waitable fault, otherwise the second power generation result is equal to the first power generation result;
[0049] If the third operation result is an inoperable fault, then no matter what the evaluation result of the first power generation result is, the second power generation result will be an inoperable fault.
[0050] Preferably, the steps of comparing the second power generation result with the energy storage result to obtain the transmission result of the circuit transmission are as follows:
[0051] Assign values to the four evaluation results, calculate the difference between the second power generation result and the energy storage result, and set four comparison values of different sizes;
[0052] When the assigned value difference is equal to the minimum comparison value, the transmission result is normal;
[0053] When the assigned value difference is equal to the second smallest comparison value, the transmission result is a negligible fault;
[0054] When the assigned value difference is equal to the second largest comparison value, the transmission result is a waitable fault;
[0055] When the assigned value difference is equal to the maximum comparison value, the transmission result is an inoperable fault.
[0056] Preferably, it also includes a four-dimensional positioning module, which is used to establish a regional model of the area where the power generation equipment, energy storage equipment and relay forwarding station are located, and then set the target node in the regional model according to the location of each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station in the area, address number each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, bind the target node with the power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, and establish a three-dimensional monitoring model, in which each target node corresponds to an address number one by one;
[0057] Obtain the historical data of each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, and combine the historical data with the new energy three-dimensional monitoring model to obtain the new energy four-dimensional monitoring model;
[0058] Whenever the evaluation results of the power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station change, the historical data is updated; the four-dimensional positioning module also includes a fault analysis module, which is used to establish a fault analysis model, use the fault analysis model to perform fault analysis on the fault data, and obtain the fault repair method of the target fault data, and also add the fault analysis results and fault repair methods to the new energy four-dimensional monitoring model.
[0059] A new energy energy consumption monitoring device, the device includes a service processor and a distributed memory, the service processor is connected to the memory, the distributed memory stores a service self-management program, and is configured to store machine-readable instructions. The service processor executes the service self-management program, and the instructions, when executed by the processor, realize the new energy energy consumption monitoring system as described above.
[0060] Compared with the prior art, the beneficial effects of the embodiments of the present application are:
[0061] (1) This application monitors the power generation data and operation data of the power generation equipment through the power generation monitoring module, and the energy storage monitoring module monitors the energy storage data of the energy storage equipment. The monitoring and evaluation model analyzes and evaluates the power generation data, operation data and energy storage data multiple times, and then compares and judges the evaluation results to finally obtain the status result, the third operation result, the second power generation result, the energy storage result and the transmission result. Different target maintenance results are obtained through different evaluation results, so as to maintain different target equipment in the entire new energy system and improve the operation efficiency of the new energy system.
[0062] (2) The present application sets up monitoring and evaluation models in both the relay station and the service terminal, analyzes and evaluates the same set of operating data, obtains the first operating result and the second operating result respectively, obtains the status result of the target relay station by comparison, thereby judging whether the target relay station is faulty, thereby judging whether the data forwarded by the target relay station is reliable, thereby obtaining the third operating result, judging the operating status of the target power generation equipment, and when receiving abnormal data, it can judge whether it is a power generation equipment fault or a relay station fault, thereby judging whether the energy storage equipment is faulty, further determining whether the transmission circuit is faulty, and whether the energy consumption of the transmission circuit is reasonable, and finally achieving accurate positioning of the fault target;
[0063] (3) This application establishes a regional model of the area where the power generation equipment and energy storage equipment are located, and then sets a target node for each power generation equipment, energy storage equipment and relay station at the location of the area where they are located, and binds the target node to each power generation equipment, energy storage equipment and relay station, thereby establishing a three-dimensional monitoring model. At the same time, historical data is combined with the three-dimensional monitoring model of new energy to obtain a four-dimensional monitoring model of new energy. The fault analysis module is used to perform fault analysis. When the precise location of the fault target is obtained, the repair method of the target fault can also be obtained, thereby improving the fault repair efficiency and avoiding a large amount of power loss due to missing the best repair time. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In the attached picture:
[0065] Figure 1 A schematic diagram of the system steps of an embodiment of the present application;
[0066] Figure 2 Schematic diagram of the device structure of an embodiment of the present application. DETAILED DESCRIPTION
[0067] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Generally, the components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0068] Example 1: Figure 1 As shown, a new energy consumption monitoring system includes: power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module, relay forwarding station and service terminal;
[0069] Power generation equipment is used to generate electricity from renewable energy and transmit the generated electricity to renewable energy storage equipment through transmission circuits.
[0070] Energy storage equipment is used to receive electricity transmitted by new energy power generation equipment and store new energy energy.
[0071] The power generation monitoring module is used to be installed on the power generation equipment to monitor the power generation data and operation data of the power generation equipment and transmit the power generation data and operation data of the power generation equipment to the relay forwarding station; the operation data is the key hardware monitoring value inside the equipment, and the power generation data is the amount of electricity produced by the equipment.
[0072] The energy storage monitoring module is used to be installed on the energy storage device to monitor the energy storage data of the energy storage device and transmit the energy storage data of the energy storage device to the relay forwarding station; the energy storage data is the total power stored in the device monitored at preset time periods.
[0073] The relay forwarding station is used to receive the operation data and power generation data sent by the power generation monitoring module, establish a monitoring and evaluation model, use the monitoring and evaluation model to analyze the operation data, obtain the first operation result of the power generation equipment, and send the first operation result, operation data, power generation data and energy storage data to the service terminal.
[0074] Service terminal, used to receive power generation data, energy storage data, first operation results and operation data, and establish a monitoring and evaluation model;
[0075] The monitoring and evaluation model is used to analyze and evaluate the power generation data, energy storage data and operation data to obtain the first power generation results of the power generation equipment, the energy storage results of the energy storage equipment and the second operation results of the power generation equipment.
[0076] The steps to establish the monitoring and evaluation model are as follows:
[0077] It is done by obtaining historical data of power generation equipment and energy storage equipment, cleaning the historical data and extracting features.
[0078] The historical data is classified once according to the extracted features. The classification results include normal operation data, normal power generation data, normal energy storage data, abnormal operation data, abnormal power generation data and abnormal energy storage data.
[0079] Use the kernel principal component analysis feature algorithm to reduce the dimension of abnormal operation data, abnormal power generation data and abnormal energy storage data to extract fault sensitive features;
[0080] According to the fault-sensitive characteristics, the abnormal operation data, abnormal power generation data and abnormal energy storage data are secondary classified. The secondary classification results include ignorable fault data, waitable fault data and inoperable fault data.
[0081] According to the results of the first classification and the second classification, the state automatic classifier is established by using the support vector machine algorithm, and the state automatic classifier is trained and calculated using the historical features to obtain three unequal state boundary evaluation values;
[0082] The square difference of the target data of the power generation equipment and the energy storage equipment is judged and compared with the three state boundary evaluation values to obtain the evaluation results.
[0083] There are four evaluation results for the first power generation result, the second power generation result, the first operation result, the second operation result, the third operation result, the energy storage result and the status result. The four evaluation results include: normal, negligible fault, waitable fault and inoperable fault.
[0084] Arrange the three state boundary evaluation values from large to small and name them as the first evaluation value, the second evaluation value and the third evaluation value respectively;
[0085] When the data square difference is greater than the first evaluation value, the evaluation result of the target data is normal;
[0086] When the data square difference is less than the first evaluation value and greater than the second evaluation value, the evaluation result of the target data is that the fault can be ignored;
[0087] When the data square difference is less than the second evaluation value and greater than the third evaluation value, the evaluation result of the target data is that the fault can be waited for;
[0088] When the data square difference is less than the third evaluation value, the evaluation result of the target data is an inoperable fault.
[0089] Compare the second operation result with the first operation result, judge and evaluate the relay station according to the comparison result, and obtain the status result of the relay station;
[0090] The monitoring and evaluation model in the relay station and the monitoring and evaluation model in the service terminal are the same evaluation model, but the same model analyzes and calculates the same set of data and obtains two different results mainly for two reasons;
[0091] The first reason is that the monitoring and evaluation model of the service terminal is located in the server room or other important places, and is used many times and updated frequently. It is easier to update software or replace hardware. The relay station is located in a remote location with poor signal and low update frequency. Remote network updates are easily affected by signals, and the frequency of hardware replacement is far less than that of the service terminal. Therefore, the version number of the monitoring and evaluation model in the relay station will lag far behind the version number of the monitoring and evaluation model in the service terminal. The accuracy of the monitoring and evaluation model in the service terminal is higher than that of the monitoring and evaluation model in the relay station. The same data may return two evaluation results;
[0092] The second reason is that the relay station is located in a poor environment, which makes it easy for the relay station to be corroded and damaged by the environment. Internal hardware failures cause the monitoring and evaluation model to be affected by the faulty hardware when it is called, and the evaluation results also deviate from the accurate results.
[0093] Compare the second operation result with the first operation result, and make a judgment and evaluation on the relay station according to the comparison result as follows:
[0094] Assign values to the four evaluation results, calculate the difference between the first and second run results, and set four comparison values of different sizes: 10 for normal, 9 for ignorable faults, 8 for waitable faults, 7 for inoperable faults, and 0, 1, 2, and 3 for comparison values;
[0095] If the two evaluation results are equal and the assigned difference is equal to the smallest comparison value, the status result is normal, that is, the assigned difference is 0;
[0096] If the two running results are not equal and the difference between the results is small, and the assigned difference is equal to the second smallest comparison value, then the status result is a negligible fault, that is, the assigned difference is 1. When the first running result is a negligible fault 9, the second running result is a waitable fault 8;
[0097] If the two running results are not equal and the difference between the results is large, and the assigned difference is equal to the second largest comparison value, then the status result is a waitable fault, that is, the assigned difference is 2. When the first running result is a negligible fault 9, and the second running result is an inoperable fault 7;
[0098] If the results of the two runs are not equal and the difference between the results is large, and the assigned difference is equal to the maximum comparison value, then the status result is an inability to run fault, that is, the assigned difference is 3. When the first run result is normal 10, and the second run result is an inability to run fault 7.
[0099] According to the second operation result of the power generation equipment and the status result of the relay forwarding station, the third operation judgment of the power generation equipment is performed to obtain the third operation result of the power generation equipment;
[0100] When a relay station fails seriously, that is, it cannot operate, the evaluation results and data forwarded by the relay station are unreliable. Even if the second operation result of the power generation equipment is normal, it cannot be used as a basis for judging the power generation equipment. If there is a normal relay station among the multiple relay stations that forward the target power generation equipment data, then the target power generation equipment data forwarded by this normal relay station are reliable and can be used as a basis for subsequent judgments.
[0101] The steps for judging the third run based on the second run result and status result are as follows:
[0102] If the status result is normal, the second run result is used as the third run result;
[0103] If the status result is a negligible fault, the second smallest comparison value is subtracted from the value assigned to the second operation result, and the evaluation result corresponding to the calculated result assignment is used as the third operation result. When the second operation result is normal 10, the second smallest comparison value 1 is subtracted, and the third operation result is a negligible fault 9. If the second operation result is the lowest assigned inoperable fault 7, there is no need to calculate and subtract the second smallest comparison value, and the inoperable fault is directly used as the third operation result.
[0104] If the status result is a waitable fault, the second largest comparison value is subtracted from the value assigned to the second running result, and the evaluation result corresponding to the calculated result assignment is used as the third running result. When the second running result is normal 10, the second largest comparison value 2 is subtracted, and the third running result is a waitable fault of 8. If the second running result is the second lowest assigned waitable fault of 8 or the lowest assigned inoperable fault of 7, there is no need to calculate and subtract the second largest comparison value, and the inoperable fault is directly used as the third running result;
[0105] If the status result is an inability to run fault, no matter what the evaluation result of the second run result is, the inability to run fault will be taken as the third run result.
[0106] Each power generation monitoring module simultaneously transmits data with multiple relay forwarding stations. The service terminal will receive multiple first operation results of the same target power generation monitoring module sent by multiple relay forwarding stations. After multiple judgments and calculations, multiple third operation results of the target power generation monitoring module will be obtained.
[0107] When at least one of the third operation results is a normal evaluation result, the third operation result of the target power generation monitoring module is modified to be normal;
[0108] When none of the third operation results has a normal evaluation result and at least one negligible fault evaluation result, the third operation result of the target power generation monitoring module is modified to a negligible fault;
[0109] When there is neither a normal evaluation result nor a negligible fault evaluation result among the third operation results, and there is at least one waitable fault evaluation result, modifying the third operation result of the target power generation monitoring module to a waitable fault;
[0110] When all of the third operation results are evaluation results of an inoperable fault, the third operation result of the target power generation monitoring module is modified to an inoperable fault.
[0111] The first power generation result of the power generation equipment is judged and evaluated according to the third operation result of the power generation equipment to obtain the second power generation result of the power generation equipment;
[0112] When the equipment is operating normally, the power produced may be fully loaded, or it may be reduced due to external factors. For example, solar panels in the Gobi Desert may accumulate dust. The equipment is still operating normally, but it cannot receive sunlight, causing a decrease in power production.
[0113] At the same time, when equipment fails, the power production will definitely be affected. For example, if the blades of a wind turbine are damaged, the rotation speed will decrease, and the power production will also decrease.
[0114] Therefore, the power generation result of the power generation equipment cannot exceed the operating result of the power generation equipment;
[0115] The steps for judging and evaluating the first power generation result of the power generation equipment based on the third operation result of the power generation equipment are as follows:
[0116] If the third operation result is normal, the second power generation result is equal to the first power generation result;
[0117] If the third operation result is a negligible fault and the first power generation result is normal, then the second power generation result is a negligible fault, otherwise the second power generation result is equal to the first power generation result;
[0118] If the third operation result is a waitable fault, and the first power generation result is normal or a negligible fault, then the second power generation result is a waitable fault, otherwise the second power generation result is equal to the first power generation result;
[0119] If the third operation result is an inoperable fault, then no matter what the evaluation result of the first power generation result is, the second power generation result will be an inoperable fault.
[0120] Compare the second power generation result with the energy storage result to obtain the transmission result of the circuit transmission, and according to the transmission result;
[0121] The steps of comparing the second power generation result with the energy storage result and obtaining the transmission result of the circuit transmission are as follows:
[0122] Assign values to the four evaluation results, calculate the difference between the second power generation result and the energy storage result, and set four comparison values of different sizes: 10 for normal, 9 for negligible faults, 8 for waitable faults, 7 for inoperable faults, and 0, 1, 2, and 3 for comparison values;
[0123] When the assigned value difference is equal to the minimum comparison value, the transmission result is normal, the evaluation of the second power generation result is equal to the energy storage result, and the assigned value difference is 0;
[0124] When the assigned value difference is equal to the second smallest comparison value, the transmission result is a negligible fault. The second power generation result is not equal to the energy storage result and the result difference is small. The assigned value difference is 1. For example, the second power generation result is normal and the energy storage result is a negligible fault. This means that there is a slight loss in the circuit transmission process, which is negligible. Therefore, the transmission result is a negligible fault.
[0125] When the assigned value difference is equal to the second largest comparison value, the transmission result is a waitable fault. The second power generation result is not equal to the energy storage result and the result difference is large. The assigned value is 2. For example, the second power generation result is normal and the energy storage result is a waitable fault. This indicates that there is a large loss in the circuit transmission process. The loss needs to be repaired but is not urgent. Therefore, the transmission result is a waitable fault.
[0126] When the assigned difference is equal to the maximum comparison value, the transmission result is an inoperable fault. The second power generation result is not equal to the energy storage result and the result difference is very large. The assigned difference is 3. For example, the second power generation result is normal, and the energy storage result is an inoperable fault. This indicates that there is a huge loss in the circuit transmission process, and the loss needs to be urgently repaired. Therefore, the transmission result is an inoperable fault.
[0127] Determine whether the relay station needs maintenance based on the status results; determine whether the power generation equipment needs maintenance based on the third operation results and the second power generation results; determine whether the energy storage equipment needs maintenance based on the energy storage results; and determine whether the transmission circuit between the power generation equipment and the energy storage equipment needs maintenance based on the transmission results.
[0128] It also includes a four-dimensional positioning module, which is used to establish a regional model of the area where the power generation equipment, energy storage equipment and relay forwarding station are located, and then set the target node in the regional model according to the location of each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station in the area, address number each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, bind the target node with the power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, and establish a three-dimensional monitoring model, in which each target node corresponds to an address number one by one;
[0129] Obtain the historical data of each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, and combine the historical data with the new energy three-dimensional monitoring model to obtain the new energy four-dimensional monitoring model;
[0130] Whenever the evaluation results of the power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station change, the historical data is updated.
[0131] The four-dimensional positioning module also includes a fault analysis module, which is used to establish a fault analysis model, use the fault analysis model to perform fault analysis on fault data, obtain a fault repair method for the target fault data, and add the fault analysis results and fault repair methods to the new energy four-dimensional monitoring model.
[0132] The steps to establish the fault analysis model are as follows:
[0133] Establish a fault classification library, which has multiple fault libraries. Each fault library corresponds to a fault category. Store historical fault data in the fault library according to the fault category. Each fault library stores the fault repair method corresponding to the fault category.
[0134] When a fault occurs in power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module or relay forwarding station, the fault data is calculated to calculate the data feature original data in the fault data;
[0135] Performing scale normalization on the original data of data features, and then using the feature algorithm to calculate the scale normalized data to obtain fault feature data;
[0136] Calculate the similarity between the fault feature data and each fault library feature, determine the class to which the target fault data belongs based on the calculated similarity result, complete the fault identification of the fault data, and obtain the fault repair method for the target fault data;
[0137] After the fault identification is completed, it is stored in the corresponding fault library according to the fault category.
[0138] Example 2: Figure 2 As shown, a new energy energy consumption monitoring device includes a service processor and a distributed memory, the service processor is connected to the memory, the distributed memory stores a service self-management program, and is configured to store machine-readable instructions. The service processor executes the service self-management program, and the instructions, when executed by the processor, implement the new energy energy consumption monitoring system as described in the above embodiment.
[0139] The above-mentioned embodiments only express the preferred implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for ordinary technicians in this field, several modifications, improvements and substitutions can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application.
Claims
1. A new energy consumption monitoring system, characterized in that: include: Power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module, relay forwarding station and service terminal; Power generation equipment, used to generate electricity from new energy sources and transmit the generated electricity to new energy storage equipment; Energy storage equipment, used to receive electricity transmitted by new energy power generation equipment and store new energy energy; A power generation monitoring module is used to be installed on the power generation equipment to monitor the power generation data and operation data of the power generation equipment and transmit the power generation data and operation data of the power generation equipment to the relay forwarding station; The energy storage monitoring module is used to be installed on the energy storage device to monitor the energy storage data of the energy storage device and transmit the energy storage data of the energy storage device to the relay forwarding station; The relay station is used to receive the operation data and power generation data sent by the power generation monitoring module, establish a monitoring and evaluation model, use the monitoring and evaluation model to analyze the operation data, obtain the first operation result of the power generation equipment, and send the first operation result, operation data, power generation data and energy storage data to the service terminal; The service terminal is used to receive power generation data, energy storage data, first operation results and operation data, establish a monitoring and evaluation model, use the monitoring and evaluation model to analyze and evaluate the power generation data, energy storage data and operation data, and obtain the first power generation result of the power generation equipment, the energy storage result of the energy storage equipment and the second operation result of the power generation equipment; Compare the second operation result with the first operation result, judge and evaluate the relay station according to the comparison result, and obtain the status result of the relay station; According to the second operation result of the power generation equipment and the status result of the relay forwarding station, the third operation judgment of the power generation equipment is performed to obtain the third operation result of the power generation equipment; The first power generation result of the power generation equipment is judged and evaluated according to the third operation result of the power generation equipment to obtain the second power generation result of the power generation equipment; Compare the second power generation result with the energy storage result to obtain the transmission result of the circuit transmission, and according to the transmission result; Determine whether the relay station needs maintenance based on the status results, determine whether the power generation equipment needs maintenance based on the third operation results and the second power generation results, determine whether the energy storage equipment needs maintenance based on the energy storage results, and determine whether the transmission circuit between the power generation equipment and the energy storage equipment needs maintenance based on the transmission results; The steps for establishing the monitoring and evaluation model are as follows: It is done by obtaining historical data of power generation equipment and energy storage equipment, cleaning the historical data and extracting features. The historical data is classified once according to the extracted features. The classification results include normal operation data, normal power generation data, normal energy storage data, abnormal operation data, abnormal power generation data and abnormal energy storage data. Use the kernel principal component analysis feature algorithm to reduce the dimension of abnormal operation data, abnormal power generation data and abnormal energy storage data to extract fault sensitive features; According to the fault-sensitive characteristics, the abnormal operation data, abnormal power generation data and abnormal energy storage data are secondary classified. The secondary classification results include ignorable fault data, waitable fault data and inoperable fault data. According to the results of the first classification and the second classification, the state automatic classifier is established by using the support vector machine algorithm, and the state automatic classifier is trained and calculated using the historical features to obtain three unequal state boundary evaluation values; The square difference of the target data of the power generation equipment and the energy storage equipment is judged and compared with the three state boundary evaluation values to obtain the evaluation results.
2. A new energy consumption monitoring system according to claim 1, characterized in that: The first power generation result, the second power generation result, the first operation result, the second operation result, the third operation result, the energy storage result and the status result all have four evaluation results, and the four evaluation results include: normal, negligible fault, waitable fault and unable to operate fault; Arrange the three state boundary evaluation values from large to small and name them as the first evaluation value, the second evaluation value and the third evaluation value respectively; When the data square difference is greater than the first evaluation value, the evaluation result of the target data is normal; When the data square difference is less than the first evaluation value and greater than the second evaluation value, the evaluation result of the target data is that the fault can be ignored; When the data square difference is less than the second evaluation value and greater than the third evaluation value, the evaluation result of the target data is that the fault can be waited for; When the data square difference is less than the third evaluation value, the evaluation result of the target data is an inoperable fault.
3. A new energy consumption monitoring system according to claim 2, characterized in that: Compare the second operation result with the first operation result, and make a judgment and evaluation on the relay station according to the comparison result as follows: Assign values to the four evaluation results, calculate the difference between the first and second running results, and set four comparison values of different sizes; If the assigned difference is equal to the smallest comparison value, the status result is normal; If the assigned difference is equal to the second smallest comparison value, the status result is a negligible fault; If the assigned difference is equal to the second largest comparison value, the status result is a waitable fault; If the assigned value difference is equal to the maximum comparison value, the status result is an inoperable fault.
4. A new energy consumption monitoring system according to claim 3, characterized in that: The steps for judging the third run based on the second run result and status result are as follows: If the status result is normal, the second run result is used as the third run result; If the status result is a negligible fault, the second smallest comparison value is subtracted from the value assigned to the second operation result, and the evaluation result corresponding to the calculated result assignment is used as the third operation result; If the status result is a waitable fault, the second largest comparison value is subtracted from the value assigned to the second running result, and the evaluation result corresponding to the calculated result assignment is used as the third running result; If the status result is an inability to run fault, no matter what the evaluation result of the second run result is, the inability to run fault will be taken as the third run result.
5. A new energy consumption monitoring system according to claim 4, characterized in that: Each power generation monitoring module simultaneously transmits data with multiple relay forwarding stations. The service terminal will receive multiple first operation results of the same target power generation monitoring module sent by multiple relay forwarding stations. After multiple judgments and calculations, multiple third operation results of the target power generation monitoring module will be obtained. When at least one of the third operation results is a normal evaluation result, the third operation result of the target power generation monitoring module is modified to be normal; When none of the third operation results has a normal evaluation result and at least one negligible fault evaluation result, the third operation result of the target power generation monitoring module is modified to a negligible fault; When there is neither a normal evaluation result nor a negligible fault evaluation result among the third operation results, and there is at least one waitable fault evaluation result, modifying the third operation result of the target power generation monitoring module to a waitable fault; When all of the third operation results are evaluation results of an inoperable fault, the third operation result of the target power generation monitoring module is modified to an inoperable fault.
6. A new energy consumption monitoring system according to claim 5, characterized in that: The steps for judging and evaluating the first power generation result of the power generation equipment based on the third operation result of the power generation equipment are as follows: If the third operation result is normal, the second power generation result is equal to the first power generation result; If the third operation result is a negligible fault and the first power generation result is normal, then the second power generation result is a negligible fault, otherwise the second power generation result is equal to the first power generation result; If the third operation result is a waitable fault, and the first power generation result is normal or a negligible fault, then the second power generation result is a waitable fault, otherwise the second power generation result is equal to the first power generation result; If the third operation result is an inoperable fault, then no matter what the evaluation result of the first power generation result is, the second power generation result will be an inoperable fault.
7. A new energy consumption monitoring system according to claim 6, characterized in that: The steps of comparing the second power generation result with the energy storage result and obtaining the transmission result of the circuit transmission are as follows: Assign values to the four evaluation results, calculate the difference between the second power generation result and the energy storage result, and set four comparison values of different sizes; When the assigned value difference is equal to the minimum comparison value, the transmission result is normal; When the assigned value difference is equal to the second smallest comparison value, the transmission result is a negligible fault; When the assigned value difference is equal to the second largest comparison value, the transmission result is a waitable fault; When the assigned value difference is equal to the maximum comparison value, the transmission result is an inoperable fault.
8. A new energy consumption monitoring system according to claim 1, characterized in that: It also includes a four-dimensional positioning module, which is used to establish a regional model of the area where the power generation equipment, energy storage equipment and relay forwarding station are located, and then set the target node in the regional model according to the location of each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station in the area, address number each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, bind the target node with the power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, and establish a three-dimensional monitoring model, in which each target node corresponds to an address number one by one; Obtain the historical data of each power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station, and combine the historical data with the new energy three-dimensional monitoring model to obtain the new energy four-dimensional monitoring model; Whenever the evaluation results of the power generation equipment, energy storage equipment, power generation monitoring module, energy storage monitoring module and relay forwarding station change, the historical data is updated; the four-dimensional positioning module also includes a fault analysis module, which is used to establish a fault analysis model, use the fault analysis model to perform fault analysis on the fault data, and obtain the fault repair method of the target fault data, and also add the fault analysis results and fault repair methods to the new energy four-dimensional monitoring model.
9. A new energy consumption monitoring device, characterized in that: The device includes a service processor and a distributed memory, the service processor is connected to the memory, the distributed memory stores a service self-management program, and is configured to store machine-readable instructions. The service processor executes the service self-management program, and when the instructions are executed by the processor, a new energy energy consumption monitoring system as described in any one of claims 1-8 is implemented.
Citation Information
Patent Citations
Passive wireless shaft temperature monitoring system
CN110329307A
Electrical fire early warning system and method, electronic equipment and storage medium
CN115171319A
Intelligent monitoring method for running state of energy storage equipment
CN116775408A
Heat supply network energy consumption index monitoring device and assessment and evaluation system
CN117993776A
Energy storage micro-grid monitoring system and monitoring method, storage medium and computer equipment
CN118040911A
