Oil depot oil and gas recovery comprehensive monitoring equipment and method

By using the slider and rotating block structure to adjust the position of the threaded holes in the oil and gas recovery monitoring equipment of the oil depot, and using the wedge block and moving block of the reinforcement mechanism to initially fix the flange, the problem of misalignment of the positioning bolt holes of the flange is solved. , achieving flexible installation and efficient monitoring of equipment.

CN118637549BActive Publication Date: 2024-10-18LIANYUNGANG TOP TECH DEV CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411124520.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-18
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The existing oil and gas recovery monitoring equipment in the oil depot cannot be installed for monitoring because the positioning bolt holes on the flange plate do not correspond.

Method used

A comprehensive monitoring equipment for oil and gas recovery in an oil depot is designed. It adopts a sliding block and a rotating block structure to adjust the position of the threaded hole so that it corresponds to the positioning bolt hole on the flange plate, and through the wedge block and moving block structure of the reinforcement mechanism. , realize the initial fixation of the flange plate and the connecting flange, and simplify the installation process.

Benefits of technology

It solves the installation problems caused by the different positions of the positioning bolt holes, improves the adaptability and installation convenience of the equipment, and ensures the accuracy and efficiency of oil and gas recovery monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118637549B_ABST
    Figure CN118637549B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of oil and gas monitoring, and discloses a comprehensive monitoring device and method for oil and gas recovery in an oil depot, the device comprising a monitoring instrument body and an oil and gas pipe, the bottom outer wall of the monitoring instrument body is fixedly connected with a connecting pipe, the outer wall of the connecting pipe is provided with a reinforcement mechanism, the top outer wall of the oil and gas pipe is fixedly connected with a flange, the bottom outer wall of the connecting pipe is provided with an adjustment mechanism, the adjustment mechanism comprises a connecting flange, the outer wall of the connecting flange is provided with a through groove, the inner wall of the connecting flange is rotatably connected with a rotating block, the top outer wall of the rotating block is hinged with a slider through a connecting rod, the outer wall of the slider is provided with a threaded hole, and the outer wall of the slider is fixedly connected with a T-shaped block. The present invention can adjust the position of the threaded hole on the slider, thereby solving the problem that the position of the positioning bolt hole and the threaded hole are different, and the monitoring instrument body cannot be installed for oil and gas recovery monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas monitoring, and in particular relates to a comprehensive monitoring device and method for oil and gas recovery in an oil depot. Background Art

[0002] The oil and gas recovery comprehensive monitoring equipment in the oil depot is a device specially used for comprehensive, real-time and accurate monitoring of the oil and gas recovery process in the oil depot. It can monitor multiple key parameters in the oil and gas recovery system, such as oil and gas concentration, flow, pressure, etc. By monitoring these parameters, abnormal conditions in the oil and gas recovery process can be discovered in time, such as leakage, recovery efficiency not meeting the standard, etc.

[0003] When monitoring oil and gas recovery in an oil depot through an oil and gas monitor, the oil and gas monitor needs to be installed on the oil and gas recovery pipe. Generally, the oil and gas monitor and two sets of flanges on the oil and gas recovery pipe are connected by positioning bolts. However, in some existing technologies, due to the different size specifications of the flanges on the oil and gas recovery pipe, the positions of the positioning bolt holes thereon are also different. When the oil and gas monitor is installed, the positions of the threaded holes on the two flanges may not correspond, resulting in failure to install it, thereby failing to monitor the oil and gas recovery. Summary of the invention

[0004] In order to solve the problems raised in the above background technology, the present invention provides a comprehensive monitoring device and method for oil and gas recovery in an oil depot, which solves the problem that oil and gas recovery monitoring cannot be installed due to the mismatch of the positioning bolt holes on the flange.

[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: an oil depot oil and gas recovery comprehensive monitoring equipment, comprising a monitoring instrument body and an oil and gas pipe, the bottom outer wall of the monitoring instrument body is fixedly connected with a connecting pipe, the outer wall of the connecting pipe is provided with a reinforcement mechanism, the top outer wall of the oil and gas pipe is fixedly connected with a flange, the bottom outer wall of the connecting pipe is provided with an adjustment mechanism, the adjustment mechanism comprises a connecting flange, the outer wall of the connecting flange is provided with a through groove, the inner wall of the connecting flange is rotatably connected with a rotating block, the top outer wall of the rotating block is hinged with a slider through a connecting rod, the outer wall of the slider is provided with a threaded hole, the outer wall of the slider is fixedly connected with a T-shaped block, the bottom outer wall of the rotating block is fixedly connected with a main gear, the outer wall of the main gear is meshed with a sub-gear, the top outer wall of the sub-gear is fixedly connected with a rotating rod, and the outer wall of the rotating rod is threadedly connected with a threaded sleeve.

[0006] Preferably, the connecting flange is fixedly connected to the bottom outer wall of the connecting pipe, the sliding block is slidably connected to the inner wall of the connecting flange, the rotating rod passes through the top outer wall of the connecting flange, and the connecting flange contacts the outer wall of the flange plate.

[0007] Preferably, one end of the connecting rod is hinged to the top outer wall of the rotating block, the other end of the connecting rod is hinged to the bottom outer wall of the sliding block, and the main gear and the auxiliary gear are both rotatably connected to the inner wall of the connecting flange.

[0008] Preferably, the reinforcement mechanism includes a fixed sleeve, the outer wall of the fixed sleeve is slidably connected to a moving block, the outer wall of the moving block is fixedly connected to a long rod, the inner wall of the long rod is provided with a groove, the inner wall of the long rod is slidably connected to a sliding rod, the top inner wall of the sliding rod is elastically connected to a protrusion via a connecting spring, the bottom inner wall of the sliding rod is elastically connected to a wedge block via a telescopic spring, the inner wall of the moving block is elastically connected to an insert block via a reset spring, and the outer wall of the fixed sleeve is provided with a slot.

[0009] Preferably, the fixing sleeve is fixedly connected to the outer wall of the connecting pipe, one end of the connecting spring is fixedly connected to the outer wall of the protrusion, and the other end of the connecting spring is fixedly connected to the inner wall of the sliding rod.

[0010] Preferably, the outer wall of the protrusion is slidably connected to the inner wall of the sliding rod, and the protrusion is engaged with the groove.

[0011] Preferably, one end of the telescopic spring is fixedly connected to the outer wall of the wedge block, and the other end of the telescopic spring is fixedly connected to the inner wall of the sliding rod. The outer wall of the wedge block is slidably connected to the inner wall of the sliding rod, and the outer wall of the wedge block contacts the outer wall of the bottom end of the flange.

[0012] Preferably, one end of the return spring is fixedly connected to the outer wall of the insert block, and the other end of the return spring is fixedly connected to the inner wall of the moving block.

[0013] Preferably, the outer wall of the inserting block is slidably connected to the inner wall of the moving block, and the inserting block is snap-fitted to the slot.

[0014] The present invention also proposes a method for applying the above oil depot oil and gas recovery comprehensive monitoring device, comprising the following steps:

[0015] S1. Ensure that the oil and gas monitor is calibrated and in normal working condition, and check the battery power and sensor sensitivity of the instrument;

[0016] S2. According to the functions and requirements of the monitor, set the parameters to be monitored, install or place the oil and gas monitor at the selected monitoring point, ensure that the instrument's sensor is in good contact with the oil and gas, collect data at the set time interval, and record the monitoring data;

[0017] S3. Record the monitored data in detail, including monitoring time, monitoring point location, and the values ​​of various parameters, analyze the collected data, and determine the operating status of the oil and gas recovery system.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] The present invention provides the cooperation of structures such as a slider and a rotating block. When the diameter of the flange on the oil and gas pipe is different, resulting in different positions of the threaded hole and the positioning bolt hole on the flange, the threaded sleeve can be loosened and the rotating rod can be rotated to drive the secondary gear and the main gear to rotate, and the connecting rod can be used to drive multiple groups of sliders to move to the outside or the center at the same time, so that the position of the threaded hole on the slider can be adjusted to correspond to the position of the positioning bolt hole on the flange, so that it can adapt to flanges of different sizes and different positions of the positioning bolt holes, thereby solving the problem that the position of the positioning bolt hole and the threaded hole is different and the monitoring instrument main body cannot be installed for oil and gas recovery monitoring;

[0020] The present invention cooperates with structures such as a wedge block and a moving block. Before the flange plate and the connecting flange are fixed by positioning bolts, the insert block can be pulled to move the moving block downward, and then the position of the sliding rod is moved to move the connecting flange toward the position of the flange plate. The wedge block is squeezed by the outside of the flange plate and moves to the inside of the sliding rod. When the connecting flange moves to fit with the flange plate, the moving block is moved upward, and the wedge block directly fits with the outer wall of the bottom end of the flange plate, so that the connecting flange and the flange plate can be preliminarily fixed, thereby solving the problem of needing to support the two for a long time before they can be installed by positioning bolts, and the operation is relatively convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the main structure of the present invention;

[0022] Figure 2 This is a schematic diagram of the structure of the monitoring instrument body and the oil and gas pipe after being decomposed;

[0023] Figure 3 This is a schematic diagram of the cross-sectional structure of the connecting flange of the present invention;

[0024] Figure 4 This is a schematic diagram of the structure of the main gear and the auxiliary gear of the present invention;

[0025] Figure 5 It is a schematic diagram of the connecting flange section, slider, and connecting rod structure of the present invention;

[0026] Figure 6 It is a schematic diagram of the cross section of the long rod and the disassembled structure of the sliding rod of the present invention;

[0027] Figure 7 It is a schematic diagram of the cross-sectional structure of the moving block of the present invention.

[0028] In the figure: 1. Monitor body; 2. Connecting pipe; 3. Adjusting mechanism; 301. Connecting flange; 302. Through groove; 303. Rotating rod; 304. Threaded sleeve; 305. Rotating block; 306. Main gear; 307. Sub gear; 308. Connecting rod; 309. Sliding block; 310. Threaded hole; 311. T-shaped block; 4. Reinforcement mechanism; 401. Fixed sleeve; 402. Moving block; 403. Long rod; 404. Groove; 405. Sliding rod; 406. Connecting spring; 407. Bump; 408. Telescopic spring; 409. Wedge block; 410. Reset spring; 411. Insert block; 412. Slot; 5. Oil and gas pipe; 6. Flange. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] like Figures 1 to 7 As shown, the present invention provides an integrated monitoring device for oil and gas recovery in an oil depot, comprising a monitoring instrument body 1 and an oil and gas pipe 5, wherein the outer wall of the bottom end of the monitoring instrument body 1 is fixedly connected with a connecting pipe 2, the outer wall of the connecting pipe 2 is provided with a reinforcement mechanism 4, the outer wall of the top end of the oil and gas pipe 5 is fixedly connected with a flange 6, the outer wall of the bottom end of the connecting pipe 2 is provided with an adjustment mechanism 3, the adjustment mechanism 3 comprises a connecting flange 301, the outer wall of the connecting flange 301 is provided with a through groove 302, the inner wall of the connecting flange 301 is rotatably connected with a rotating block 305, the top outer wall of the rotating block 305 is hinged with a slider 309 through a connecting rod 308, the outer wall of the slider 309 is provided with a threaded hole 310, the outer wall of the slider 309 is fixedly connected with a T-shaped block 311, the bottom outer wall of the rotating block 305 is fixedly connected with a main gear 306, the outer wall of the main gear 306 is meshed with a sub-gear 307, the top outer wall of the sub-gear 307 is fixedly connected with a rotating rod 303, and the outer wall of the rotating rod 303 is threadedly connected with a threaded sleeve 304.

[0031] The above scheme is adopted: the monitoring instrument body 1 is the main body of the comprehensive monitoring equipment for oil and gas recovery in the oil depot, which can monitor the flow rate during the oil and gas recovery process to ensure that the recovery efficiency meets the standards, which is the existing technology; the connecting pipe 2 is connected to the connecting flange 301, and a plurality of positioning bolt holes are arranged on the flange 6, and the connecting flange 301 and the flange 6 can be fixed by passing the positioning bolts through the threaded holes 310 and the positioning bolt holes; when the connecting flange 301 is installed on the flange 6 by the positioning bolts, the oil and gas pipe 5, the flange 6 and the connecting flange 301, and the connecting pipe 2 are all connected, so that the monitoring instrument body 1 can obtain the relevant data of the oil and gas in the oil and gas pipe 5 in real time, thereby realizing an effective monitoring function, and a sealing ring is arranged on the flange 6, and the connecting flange 301 and the flange 6 are fixed by the positioning bolts There will be no oil and gas leakage after connection; there are multiple groups of through grooves 302, each group of through grooves 302 corresponds to a group of sliders 309, the sliders 309 can move in the inner wall of the connecting flange 301, and the threaded holes 310 remain corresponding to the through grooves 302, and by adjusting the position of the sliders 309, the threaded holes 310 can be made to correspond to the positions of the positioning bolt holes on the flange 6, so as to adapt to the flange 6 with different positions of the positioning bolt holes, thereby improving the adaptability of the installation; after the monitoring instrument body 1 is installed, the threaded sleeve 304 is tightened and contacts with the top outer wall of the connecting flange 301, and the rotating rod 303 can be fixed, and when the rotating rod 303 needs to be rotated, the threaded sleeve 304 can be loosened to make it out of contact with the top outer wall of the connecting flange 301, and the rotating rod 303 can be rotated.

[0032] like Figures 3 to 5 As shown, the connecting flange 301 is fixedly connected to the outer wall of the bottom end of the connecting pipe 2, the slider 309 is slidably connected to the inner wall of the connecting flange 301, the rotating rod 303 passes through the top outer wall of the connecting flange 301, and the connecting flange 301 is in contact with the outer wall of the flange plate 6; one end of the connecting rod 308 is hinged to the top outer wall of the rotating block 305, and the other end of the connecting rod 308 is hinged to the bottom outer wall of the slider 309, and the main gear 306 and the sub-gear 307 are both rotatably connected to the inner wall of the connecting flange 301.

[0033] The above scheme is adopted: by loosening the threaded sleeve 304 and rotating the rotating rod 303, the secondary gear 307 can be driven to rotate synchronously. Since the secondary gear 307 is meshed with the main gear 306, the main gear 306 can be driven to rotate synchronously, so that the rotating block 305 fixed thereon rotates. During the rotation of the rotating block 305, one end of the connecting rod 308 is driven to move along the circumference of the rotating block 305, and the connecting rod 308 is provided with multiple groups of equiangular circular arrays distributed on the top outer wall of the rotating block 305; when the connecting rod 308 is affected by the rotating block 305 and moves, it drives the sliding Block 309 moves. Since the slider 309 is slidably connected to the inner wall of the connecting flange 301, and the T-shaped block 311 plays a guiding role when the inner wall of the connecting flange 301 moves, the multiple groups of sliders 309 keep moving synchronously outward, and the connecting rod 308 flips along one end hinged with the rotating block 305, and the other end drives the slider 309 to move outward. The threaded hole 310 always corresponds to the position of the through groove 302, so that the position of the threaded hole 310 in the multiple groups of sliders 309 can be adjusted at the same time, so that the threaded hole 310 corresponds to the position of the positioning bolt hole on the flange 6.

[0034] On the contrary, when the rotating rod 303 is rotated in the opposite direction, the multiple groups of sliders 309 can be driven to move toward the middle at the same time to adjust the position of the threaded hole 310. When the threaded hole 310 is adjusted to completely correspond to the position of the positioning bolt hole on the flange 6, the positioning bolt can penetrate the connecting flange 301 and connect and install with the flange 6, and the threaded sleeve 304 can be tightened until it contacts the top outer wall of the connecting flange 301, so that the rotating rod 303 can be fixed, so that the positions of the auxiliary gear 307, the main gear 306, the rotating block 305, and the connecting rod 308 are fixed, thereby fixing the positions of the multiple groups of sliders 309 and completing the adjustment; further, when installing the monitoring instrument body 1, when the diameters of the flange 6 on the oil and gas pipe 5 are different, resulting in different positions of the positioning bolt hole and the threaded hole 310, the position of the threaded hole 310 can also be conveniently and quickly adjusted, and the installation can be completed, which has higher adaptability.

[0035] like Figure 6 and Figure 7 As shown, the reinforcement mechanism 4 includes a fixed sleeve 401, the outer wall of the fixed sleeve 401 is slidably connected to a moving block 402, the outer wall of the moving block 402 is fixedly connected to a long rod 403, the inner wall of the long rod 403 is provided with a groove 404, the inner wall of the long rod 403 is slidably connected to a sliding rod 405, the top inner wall of the sliding rod 405 is elastically connected to a protrusion 407 through a connecting spring 406, the bottom inner wall of the sliding rod 405 is elastically connected to a wedge block 409 through a telescopic spring 408, the inner wall of the moving block 402 is elastically connected to an insert block 411 through a reset spring 410, and the outer wall of the fixed sleeve 401 is provided with a slot 412.

[0036] The above scheme is adopted: through the reinforcement mechanism 4, the connection flange 301 and the flange plate 6 can be preliminarily fixed before the two are connected and fixed by the positioning bolts, so that the operator can use the positioning bolts to operate, and there is no need to support the monitor body 1 for a long time to maintain its state with the flange plate 6 before installing the positioning bolts; two groups of long rods 403 are provided, and are symmetrically distributed on both sides of the moving block 402; two groups of connecting springs 406 and protrusions 407 are also provided, symmetrically distributed on both sides of the top of the sliding rod 405, and the protrusions 407 are hemispherical. When not affected by external forces, the protrusions Block 407 pops out to both sides due to the elastic force of connecting spring 406 and snaps into groove 404, keeping the sliding rod 405 in a relatively fixed state. During installation, when the size of flange 6 is different, the sliding rod 405 can be directly moved laterally. The arc surface of protrusion 407 is squeezed by the inner wall of groove 404 and moves to the inner wall of sliding rod 405, so that sliding rod 405 can be moved to both sides. When the inclined surface of wedge block 409 corresponds to the outer wall of the top end of flange 6, protrusion 407 pops out due to the elastic force of connecting spring 406 and snaps into groove 404, so that sliding rod 405 can be fixed.

[0037] like Figure 6 and Figure 7 As shown, the fixed sleeve 401 is fixedly connected to the outer wall of the connecting pipe 2, one end of the connecting spring 406 is fixedly connected to the outer wall of the protrusion 407, and the other end of the connecting spring 406 is fixedly connected to the inner wall of the sliding rod 405; the outer wall of the protrusion 407 is slidably connected to the inner wall of the sliding rod 405, and the protrusion 407 is engaged with the groove 404; one end of the telescopic spring 408 is fixedly connected to the outer wall of the wedge block 409, and the other end of the telescopic spring 408 is fixedly connected to the inner wall of the sliding rod 405, the outer wall of the wedge block 409 is slidably connected to the inner wall of the sliding rod 405, and the outer wall of the wedge block 409 contacts the outer wall of the bottom end of the flange 6; one end of the return spring 410 is fixedly connected to the outer wall of the plug block 411, and the other end of the return spring 410 is fixedly connected to the inner wall of the moving block 402; the outer wall of the plug block 411 is slidably connected to the inner wall of the moving block 402, and the plug block 411 is engaged with the slot 412.

[0038] The above scheme is adopted: when the position adjustment of the sliding rod 405 is completed, the plug block 411 can be pulled to shrink the reset spring 410, and the plug block 411 is out of contact with the upper group of slots 412. The slots 412 are provided with two groups, upper and lower. At this time, the moving block 402 can be moved downward to move the plug block 411 to a position corresponding to the position of the lower group of slots 412, and then the plug block 411 is released to allow the reset spring 410 to stretch due to the elastic force, drive the plug block 411 to rebound and reset, and engage with the lower slot 412, fix the position of the moving block 402, and then the connecting flange 301 at the bottom of the monitor body 1 can be moved downward corresponding to the position of the flange 6, and the inclined surface of the wedge block 409 is aligned with the outer wall of the top of the flange 6. The movable block 402 is fixed and the top straight surface of the wedge block 409 is tightly fitted with the bottom outer wall of the flange 6, so that the connecting flange 301 and the flange 6 can be preliminarily fixed. When connected by positioning bolts, there is no need to support the two to keep them in a fixed state, which is more convenient. In addition, there are multiple groups of grooves 404, and the distance between the two groups of wedge blocks 409 can be adjusted to adapt to flanges 6 with different diameters.

[0039] The present invention also proposes a method for applying the above oil depot oil and gas recovery comprehensive monitoring device, comprising the following steps:

[0040] S1. Ensure that the oil and gas monitor is calibrated and in normal working condition, and check the battery power and sensor sensitivity of the instrument;

[0041] S2. According to the functions and requirements of the monitor, set the parameters to be monitored, install or place the oil and gas monitor at the selected monitoring point, ensure that the instrument's sensor is in good contact with the oil and gas, collect data at the set time interval, and record the monitoring data;

[0042] S3. Record the monitored data in detail, including monitoring time, monitoring point location, and the values ​​of various parameters, etc. Analyze the collected data to determine the operating status of the oil and gas recovery system.

[0043] The working principle provided by the present invention is:

[0044] Check whether the monitoring instrument body 1 and its components are normal, confirm that the connecting pipe 2 is connected to the connecting flange 301 and is not damaged, and align the connecting flange 301 with the flange 6 to prepare for installation; if the positioning bolt hole of the flange 6 on the oil and gas pipe 5 is in a different position from the threaded hole 310 on the connecting flange 301, loosen the threaded sleeve 304 to disengage it from the outer wall of the top end of the connecting flange 301, rotate the rotating rod 303, drive the secondary gear 307 to rotate, and then drive the main gear 306 to rotate, so that the rotating block 305 rotates, and the rotating block 305 drives the connecting rod 308 to move, so that the slider 309 slides on the inner wall of the connecting flange 301, the T-shaped block 311 plays a guiding role, and multiple groups of sliders 309 move synchronously to the outside or to the middle, and adjust the position of the threaded hole 310 to make it correspond to the position of the positioning bolt hole on the flange 6.

[0045] After adjustment, tighten the threaded sleeve 304 to make it contact with the outer wall of the top end of the connecting flange 301, fix the rotating rod 303 and related components, and then complete the adjustment of the position of the threaded hole 310, so that the positioning bolt can be inserted into the threaded hole 310 and the positioning bolt hole, and the connecting flange 301 and the flange plate 6 are connected and fixed.

[0046] Then, the sliding rod 405 is moved laterally according to the diameter of the flange 6, and the protrusion 407 is squeezed and retracted by the inner wall of the groove 404. When the inclined surface of the wedge block 409 corresponds to the outer circle of the outer wall of the top end of the flange 6, the protrusion 407 pops out and engages with the groove 404 to fix the sliding rod 405. Then, the plug block 411 is pulled to shrink the return spring 410, and the plug block 411 is disengaged from the upper slot 412. The moving block 402 is moved downward to make the plug block 411 correspond to the position of the lower slot 412, and the plug block 411 is released to engage with the lower slot 412.

[0047] The connecting flange 301 below the monitor body 1 is aligned with the flange 6 and moved downward, and the inclined surface of the wedge block 409 is squeezed and retracted. When the connecting flange 301 fits with the outer wall of the flange 6, pull the plug block 411 and move the moving block 402 upward, so that the plug block 411 is engaged with the upper slot 412, and the top straight surface of the wedge block 409 fits tightly with the outer wall of the bottom end of the flange 6, completing the preliminary fixation of the connecting flange 301 and the flange 6. The positioning bolts can be used to penetrate the connecting flange 301 and the flange 6 for connection and installation, completing the installation and fixation of the monitor body 1. After the installation is completed, the monitor body 1 obtains the relevant data of the oil and gas in the oil and gas pipe 5 in real time, monitors the flow rate and other parameters during the oil and gas recovery process, and ensures that the recovery efficiency meets the standards.

[0048] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integrated monitoring device for oil and gas recovery in an oil depot, comprising a monitoring instrument body (1) and an oil and gas pipe (5), characterized in that: A connecting pipe (2) is fixedly connected to the outer wall of the bottom end of the monitoring instrument body (1), and a reinforcing mechanism (4) is provided on the outer wall of the connecting pipe (2); a flange (6) is fixedly connected to the outer wall of the top end of the oil and gas pipe (5), and an adjusting mechanism (3) is provided on the outer wall of the bottom end of the connecting pipe (2); The adjusting mechanism (3) comprises a connecting flange (301), the outer wall of the connecting flange (301) is provided with a through groove (302), the inner wall of the connecting flange (301) is rotatably connected to a rotating block (305), the top outer wall of the rotating block (305) is hingedly connected to a slider (309) via a connecting rod (308), the outer wall of the slider (309) is provided with a threaded hole (310), the outer wall of the slider (309) is fixedly connected to a T-shaped block (311), the bottom outer wall of the rotating block (305) is fixedly connected to a main gear (306), the outer wall of the main gear (306) is meshed with a sub-gear (307), the top outer wall of the sub-gear (307) is fixedly connected to a rotating rod (303), and the outer wall of the rotating rod (303) is threadedly connected to a threaded sleeve (304); The connecting flange (301) is fixedly connected to the outer wall of the bottom end of the connecting pipe (2), the sliding block (309) is slidably connected to the inner wall of the connecting flange (301), the rotating rod (303) passes through the outer wall of the top end of the connecting flange (301), and the connecting flange (301) is in contact with the outer wall of the flange plate (6); One end of the connecting rod (308) is hinged to the top outer wall of the rotating block (305), and the other end of the connecting rod (308) is hinged to the bottom outer wall of the sliding block (309). The main gear (306) and the auxiliary gear (307) are both rotatably connected to the inner wall of the connecting flange (301).

2. The oil depot oil and gas recovery comprehensive monitoring equipment according to claim 1 is characterized by: The reinforcement mechanism (4) comprises a fixed sleeve (401), the outer wall of the fixed sleeve (401) is slidably connected to a moving block (402), the outer wall of the moving block (402) is fixedly connected to a long rod (403), the inner wall of the long rod (403) is provided with a groove (404), the inner wall of the long rod (403) is slidably connected to a sliding rod (405), the inner wall of the top end of the sliding rod (405) is elastically connected to a protrusion (407) via a connecting spring (406), the inner wall of the bottom end of the sliding rod (405) is elastically connected to a wedge block (409) via a telescopic spring (408), the inner wall of the moving block (402) is elastically connected to an insert block (411) via a return spring (410), and the outer wall of the fixed sleeve (401) is provided with a slot (412).

3. The oil depot oil and gas recovery comprehensive monitoring equipment according to claim 2 is characterized by: The fixing sleeve (401) is fixedly connected to the outer wall of the connecting tube (2), one end of the connecting spring (406) is fixedly connected to the outer wall of the protrusion (407), and the other end of the connecting spring (406) is fixedly connected to the inner wall of the sliding rod (405).

4. The oil depot oil and gas recovery comprehensive monitoring equipment according to claim 2 is characterized by: The outer wall of the protrusion (407) is slidably connected to the inner wall of the sliding rod (405), and the protrusion (407) is snap-fitted to the groove (404).

5. The oil depot oil and gas recovery comprehensive monitoring equipment according to claim 2 is characterized by: One end of the telescopic spring (408) is fixedly connected to the outer wall of the wedge block (409), and the other end of the telescopic spring (408) is fixedly connected to the inner wall of the sliding rod (405). The outer wall of the wedge block (409) is slidably connected to the inner wall of the sliding rod (405), and the outer wall of the wedge block (409) contacts the outer wall of the bottom end of the flange (6).

6. The oil depot oil and gas recovery comprehensive monitoring equipment according to claim 2 is characterized by: One end of the return spring (410) is fixedly connected to the outer wall of the insert block (411), and the other end of the return spring (410) is fixedly connected to the inner wall of the moving block (402).

7. The oil depot oil and gas recovery comprehensive monitoring equipment according to claim 2 is characterized by: The outer wall of the insert block (411) is slidably connected to the inner wall of the moving block (402), and the insert block (411) is snap-fitted to the slot (412).

8. A method for comprehensive monitoring of oil and gas recovery in an oil depot, applied to the comprehensive monitoring device for oil and gas recovery in an oil depot as claimed in claim 1, characterized in that: The following steps are involved: S1. Ensure that the oil and gas monitor is calibrated and in normal working condition, and check the battery power and sensor sensitivity of the instrument; S2. According to the functions and requirements of the monitor, set the parameters to be monitored, install or place the oil and gas monitor at the selected monitoring point, ensure that the instrument's sensor is in good contact with the oil and gas, collect data at the set time interval, and record the monitoring data; S3. Record the monitored data in detail, including monitoring time, monitoring point location, and the values ​​of various parameters, analyze the collected data, and determine the operating status of the oil and gas recovery system.

Citation Information

Patent Citations

  • Connecting flange

    CN212718526U

  • Flow detection device for oil gas recovery of double-layer oil tank

    CN215558974U