Multi-level collaborative micro-energy management method and device based on consistency principle

Through the multi-level collaborative micro-energy management method based on the consistency principle, the equipment adjustment ratios in the station area are compared, static and dynamic adjustment situations are constructed, and equipment joint scheduling is realized, which solves the problems of local optimal solutions and control deviations in the existing technology. Improved the stability and dispatching efficiency of the power system.

CN118646003BActive Publication Date: 2024-10-18STATE GRID ZHEJIANG ELECTRIC POWER CO LTD JINHUA POWER SUPPLY CO +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411103461.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-10-18
Estimated Expiration
2044-08-13

AI Technical Summary

Technical Problem

Existing distribution network energy management technology cannot adapt to the needs of distributed energy access and demand-side regulation, and is prone to falling into local optimal solutions. Equipment differences lead to regulation deviations and affect the stability of the power system.

Method used

Based on the consistency principle, the multi-level collaborative micro-energy management method finds the minimum adjustment strategy by comparing the adjustment ratio of equipment in the station area, builds a set of static and dynamic adjustment situations, realizes joint scheduling of equipment, and ensures power stability and scheduling efficiency.

Benefits of technology

It improves equipment operation stability and dispatch accuracy, reduces the number of equipment adjustments, enhances power system stability, avoids local optimal solution problems, and improves energy deployment efficiency and adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118646003B_ABST
    Figure CN118646003B_ABST
Patent Text Reader

Abstract

This application discloses a multi-level collaborative micro-energy management method and device based on the consistency principle. The method includes: outputting a set of control strategies for the transformer substation within a preset time sequence based on the current substation state data according to the substation operation prediction model and the power mutual assistance control model; outputting the true operating values ​​of the static group equipment under each substation control strategy based on the static adjustment situation set; outputting the true operating values ​​of the dynamic group equipment under each substation control strategy based on the dynamic adjustment situation set; executing joint equipment scheduling based on the minimum fluctuation corresponding to the substation control strategy obtained from the true operating values ​​of the static group equipment according to the consistency law; and dynamically adjusting the dynamic group equipment according to the substation power state matching the true operating values ​​of the dynamic group equipment. The beneficial effects of this application are: solving the control deviation when the optimal solution control strategy is locally optimal, and simultaneously solving the regulation deviation caused by equipment differences.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of micro-distribution energy management, and in particular to a multi-level collaborative micro-distribution energy management method and device based on the consistency principle. Background Art

[0002] The massive access to renewable energy sources such as wind turbines and photovoltaics has greatly promoted the development of distribution networks on the one hand, but has also brought uncertainty to the operation of distribution networks on the other. Therefore, distribution network energy management technology is an important guarantee for the safe, stable and economical operation of distribution networks. However, traditional energy management technology for distribution networks cannot adapt to the needs of distributed energy access and consumption in new power systems, and its control accuracy for the dispatchable capacity on the demand side is insufficient, making it difficult to fully utilize its control capacity.

[0003] In the related technology, the new energy output prediction model and the load prediction model are usually constructed according to the historical new energy output data and the historical load data, and then the target control power is output according to the new energy output prediction model and the load prediction model. According to the consumption of each device in the substation, that is, the amount of electricity that the device can accommodate and process, the target control power is allocated. When allocating the control power, a common optimization goal is to achieve the minimum energy loss or minimum cost, that is, to reduce energy consumption and operating costs as much as possible under the premise of meeting the operation constraints of the power system. However, this target optimization problem is often prone to local optimal solutions rather than global optimal solutions. In addition, the existing allocation method usually only considers the absorption capacity of the equipment for division, such as selecting a closer and more accommodating energy storage device as a better option, while ignoring the difficulty of regulation of different equipment in actual applications. For example, some transferable devices may not be able to achieve instant adjustment due to technical limitations or operational complexity. This will cause the output optimal control strategy to encounter difficulties in actual execution, resulting in deviations in regulation, and may even affect the stability and reliability of the entire power system.

[0004] The Chinese patent "A method for coordinated demand response of distribution network and microgrid based on dispatchable capacity evaluation", publication number: CN116454901A, publication date: July 18, 2023, specifically discloses the classification and modeling of loads based on the response characteristics of demand-side resources; constructing a "distribution network-microgrid" coordinated demand response framework based on the dispatchable capacity scheme of the microgrid; conducting dispatchable capacity evaluation based on the electricity price operation results of the microgrid, and obtaining the relationship between the reduction amount and the corresponding cost of the microgrid in a specific period of time; the distribution network performs demand response power allocation based on the dispatchable capacity of the microgrid, obtains the power of each microgrid participating in the demand response, and solves the optimization problem generated by the dispatchable capacity, so as to achieve the goal of minimizing the overall demand response cost of the distribution network. This scheme constructs a step relationship between the user's demand response amount and cost through the dispatchable capacity of the microgrid, but does not solve the problem of regulation deviation and local optimal solution caused by equipment differences.

[0005] The Chinese patent "A distribution transformer operating status evaluation system and method based on real-time data streaming processing", publication number: CN117353289A, publication date: January 5, 2024, specifically discloses the following steps: 1) collect real-time streaming data of each distribution transformer in the smart grid; 2) perform multi-source heterogeneous data fusion on real-time data from different systems; 3) use Flink to calculate the evaluation index of the distribution transformer layer by layer; 4) use the entropy weight method-Delphi method to calculate the weight values ​​of the real-time and statistical indicators in the criterion layer and the weight values ​​of each item in the indicator layer; 5) establish a real-time evaluation model for the operating status of the distribution transformer; 6) use Flink's parallel computing mechanism to perform parallel calculations on each physical node; 7) use the real-time evaluation model of the operating status of the distribution transformer to evaluate the distribution transformer, obtain the real-time evaluation of the operating status of the distribution transformer, and realize the visualization of the real-time operating status evaluation. Although this solution evaluates the operating status of the distribution transformer, it does not solve the problems of control deviation and local optimal solution caused by equipment differences. Summary of the invention

[0006] In order to solve the problem in the prior art that the coordinated optimal solution of the distribution network and microgrid output using the optimization target may have a local optimal solution and cannot be reasonably allocated according to the actual control situation of the equipment, the present application provides a multi-level coordinated distribution micro-energy management method and device based on the consistency principle. By comparing the adjustment ratios of static group equipment in different substations, the substation control strategy that requires the least adjustment is found. The multi-level coordinated distribution micro-energy management performed according to the substation control strategy can keep the output power of the static group equipment relatively stable without the need for frequent adjustments, thereby reducing the number of adjustments of the static group equipment and enhancing its operation stability. For each dynamic group device, the operation possibility ratio of the dynamic group device is obtained according to its adjustment ratio in all substation control strategies. All substation control strategies are based on the historical operation data output of the substation. According to the substation control strategy, the adjustment bias of the dynamic group devices in the historical operation process can be obtained. The bias-adjusted devices usually show stable and efficient performance in actual operation, thereby improving the allocation efficiency and adaptability of multi-level energy in the substation when dynamically adjusting the substation power. At the same time, the initial multi-level coordinated micro-energy management strategy is used to perform joint scheduling of equipment to ensure the control efficiency. The operating status of the dynamic group equipment is adjusted in real time to adapt to the actual power status of the substation to solve the control deviation when the optimal solution control strategy is a local optimal one.

[0007] In order to achieve the above technical objectives, a technical solution provided by the present application is a multi-level collaborative micro-distribution energy management method based on the consistency principle, including the following steps: S1: Based on the bad data identification model, the historical operation data of the substation is corrected, and the substation operation prediction model is constructed with the corrected historical operation data of the substation; S2: Based on the minimum load rate balance difference between substations, a power mutual assistance control model is constructed; S3: The current substation status data is obtained, and based on the substation operation prediction model and the power mutual assistance control model, a substation control strategy set for the substation within a preset time sequence is output according to the current substation status data; S4: The static group equipment outputs a static adjustment situation set based on the substation control strategy set and the historical operation data of the substation, and the dynamic group equipment outputs a static adjustment situation set based on the dynamic group equipment. The substation control strategy set and the substation historical operation data output dynamically adjust the situation set; S5: output the static group equipment operation true value under each substation control strategy according to the static adjustment situation set, and output the dynamic group equipment operation true value under each substation control strategy according to the dynamic adjustment situation set; S6: obtain the substation control strategy corresponding to the minimum fluctuation according to the static group equipment operation true value, use the substation control strategy as the initial multi-level collaborative micro-energy management strategy output, and perform equipment joint scheduling according to the initial multi-level collaborative micro-energy management strategy based on the consistency rule; S7: monitor the power status of the substation in real time, match the dynamic group equipment operation true value according to the substation power status, and dynamically adjust the dynamic group equipment according to the matched dynamic group equipment operation true value.

[0008] Furthermore, a bad data identification model is constructed based on the horizontal processing algorithm, setting the maximum variation range and the average value algorithm; the bad data identification model is used to identify the variation range of the historical operation data of the substation to obtain bad data; the historical operation data of the substation in the two time series before the bad data are selected and the correction value is obtained according to the average value algorithm, and the bad data is corrected based on the correction value.

[0009] Furthermore, the construction of the substation operation prediction model with the revised historical operation data of the substation includes: constructing the substation operation prediction model according to the revised historical operation data of the substation based on the order relationship method-entropy weight method.

[0010] Furthermore, the method of constructing a substation operation prediction model based on the order relationship method-entropy weight method according to the revised historical operation data of the substation includes: constructing an indicator system based on the operation needs of the substation; performing importance sorting and adjacent indicator importance comparison on each indicator in the indicator system based on expert experience, and outputting the first indicator weight coefficient corresponding to the order relationship method according to the importance sorting and comparison results; calculating the entropy value of each indicator in the indicator system based on the revised historical operation data of the substation, and outputting the second indicator weight coefficient corresponding to the entropy weight method according to the entropy value; constructing a comprehensive weight based on the first indicator weight coefficient and the second indicator weight coefficient; and constructing a substation operation prediction model with the comprehensive weight and the revised historical operation data of the substation.

[0011] Furthermore, the S4 also includes: obtaining static group devices and dynamic group devices in each substation by adjusting the frequency threshold.

[0012] Furthermore, the static adjustment situation set output by the static group equipment based on the substation control strategy set and the historical operation data of the substation includes: outputting a first static adjustment situation of the static group equipment in each substation within a preset time sequence based on the substation control strategy set; outputting a second static adjustment situation of the static group equipment in each substation within a historical time sequence based on the historical operation data of the substation; and constructing a third static adjustment situation according to the time sequence matching of the first static adjustment situation and the second static adjustment situation to output a static adjustment situation set.

[0013] Furthermore, the output of the static group equipment operation true value under each substation control strategy according to the static adjustment situation set includes: assigning the static group equipment operation true value of "1" to the operation timing in which the situation in the static adjustment situation set is different from the previous time sequence situation; assigning the static group equipment operation true value of "0" to the operation timing in which the situation in the static adjustment situation set is the same as the previous time sequence situation.

[0014] Furthermore, the method of obtaining the substation control strategy corresponding to the minimum fluctuation based on the static group equipment operation true value includes: calculating the static adjustment proportional coefficient of the static group equipment operation true value of "1" under each substation control strategy based on the static group equipment operation true value; and obtaining the substation control strategy corresponding to the minimum fluctuation based on the static adjustment proportional coefficient.

[0015] Furthermore, matching the operation true value of the dynamic group device according to the power state of the substation includes: calculating the dynamic adjustment ratio of the dynamic group device at each timing and the similarity between each dynamic group device according to the operation true value of the dynamic group device; matching the dynamic group device to be adjusted according to the power state of the substation; and determining the matching operation true value of the dynamic group device in the dynamic group device to be adjusted based on the adjustment ratio and similarity of the operation true value of the dynamic group device.

[0016] Furthermore, calculating the dynamic group device operation true value adjustment ratio at each time sequence according to the dynamic group device operation true value includes: calculating the dynamic adjustment ratio of each dynamic group device at each time sequence according to the dynamic group device operation true value corresponding to all substation control strategies.

[0017] Furthermore, the calculation of the similarity between each dynamic group device based on the dynamic group device operation true value includes: calculating the same proportion of actions between each dynamic group device according to the dynamic group device operation true value under all time sequences corresponding to the initial multi-level collaborative micro-energy management strategy as the similarity between each dynamic group device.

[0018] Furthermore, the method of determining the matching dynamic group device operation truth value in the dynamic group device to be adjusted based on the dynamic group device operation truth value adjustment ratio and similarity also includes: calculating the dynamic adjustment matching degree based on the dynamic group device operation truth value adjustment ratio and similarity; assigning the dynamic group device operation truth value to "1" based on the power state of the substation and the redundancy of the dynamic group device combined with the dynamic adjustment matching degree, and outputting the matching dynamic group device operation truth value.

[0019] Furthermore, S3 also includes: constructing a substation microgrid embedded EMS joint dispatching control objective function with the minimum operating cost as the control target; outputting a substation control strategy set within a preset time sequence based on the current substation status data using the substation microgrid embedded EMS joint dispatching control objective function, the substation operation prediction model and the power mutual assistance control model.

[0020] Another technical solution provided by the present application is a multi-level collaborative micro-energy management device based on the consistency principle, which is used to implement the multi-level collaborative micro-energy management method based on the consistency principle as mentioned above, including: a data acquisition module, used to obtain the historical operation data of the substation, the current substation status data and the substation power status; a data correction module, used to construct a bad data identification model to perform data correction on the historical operation data of the substation; a data modeling module, used to construct a substation operation prediction model and a power mutual assistance control model; a strategy analysis module, used to output a static adjustment situation set and a dynamic adjustment situation set according to the substation control strategy set; a truth value pre-storage module, used to pre-store the static group equipment operation truth value and the dynamic group equipment operation truth value output based on the static adjustment situation set and the dynamic adjustment situation set; a control output module, used to output the initial multi-level collaborative micro-energy management strategy based on the static group equipment operation truth value and dynamically output the matched dynamic group equipment operation truth value to the dynamic group equipment based on the dynamic group equipment operation truth value.

[0021] Furthermore, the data acquisition module is arranged in the resource controller, the data correction module, the data modeling module, the strategy analysis module and the truth value pre-storage module are all arranged in the microgrid embedded EMS, the control output module is arranged in the distribution network EMS master station, the distribution network EMS master station is connected to multiple microgrid embedded EMSs, and the microgrid embedded EMSs are connected to multiple resource controllers.

[0022] Another technical solution provided by the present application is to also provide a computer-readable storage medium for storing a computer program or instruction. When the computer program or instruction is executed by a processing device, the above-mentioned multi-level collaborative micro-energy management method based on the consistency principle is implemented. The computer-readable storage medium can be any available medium that can be stored by a computing device or a data storage device such as a data center containing one or more available media. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a magnetic tape), an optical medium (for example, a DVD), or a semiconductor medium (for example, a solid-state hard disk), etc.

[0023] The beneficial effects of the present application are as follows: by constructing a bad data identification model to correct the bad data in the historical operation data of the substation, the accuracy of the construction of the substation operation prediction model is improved, and a power mutual assistance control model is constructed based on the minimum load rate balance difference between substations. The substation control strategy set based on the load rate balance difference between substations is obtained by using the substation operation prediction model and the power mutual assistance control model, and then the static group equipment and the dynamic group equipment are used to construct an adjustment situation set based on the historical operation state and the predicted future time series operation state, so as to obtain the operation true value to reflect the exact performance of each device under different substation control strategies, and the operation true value of the static group equipment with a stable operation state is selected as the initial multi-level collaborative micro-distribution energy management strategy, and the equipment joint scheduling is performed according to the initial multi-level collaborative micro-distribution energy management strategy based on the consistency rule to improve the scheduling accuracy. At the same time, the power state of the substation is monitored in real time, and the operation true value of the dynamic group equipment is matched according to the fluctuation of the power state of the substation, and the dynamic group equipment is dynamically adjusted to achieve the improvement of the efficiency of micro-distribution energy scheduling while ensuring the stability of the substation mutual assistance.

[0024] By comparing the adjustment ratios of static group devices in different substations, the substation control strategy that requires the least adjustment is found. The multi-level coordinated micro-energy management executed according to the substation control strategy can keep the output power of the static group device relatively stable without frequent adjustment, reducing the number of adjustments of the static group device, thereby enhancing its operation stability. For each dynamic group device, the operation possibility ratio of the dynamic group device is obtained according to its adjustment ratio in all substation control strategies. All substation control strategies are based on the historical operation data output of the substation. According to the substation control strategy, the adjustment bias of the dynamic group device in the historical operation process can be obtained. The biased adjustment device usually shows stable and efficient performance in actual operation. Therefore, when the substation power is dynamically adjusted, the allocation efficiency and adaptability of the substation multi-level energy are improved, and the local optimal problem in the target optimization process is avoided. At the same time, it is convenient to combine the dynamic group device and the static group device to adjust the control strategy according to the actual substation power state. While improving the allocation accuracy, it avoids the problem of manpower loss or adjustment difficulty that cannot be considered by the objective function, but increases the allocation cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a flow chart of the multi-level collaborative micro-energy management method based on the consistency principle of this application.

[0026] Figure 2 A schematic diagram of constructing a static adjustment situation set for the multi-level collaborative micro-energy management method based on the consistency principle of this application.

[0027] Figure 3This is a schematic diagram of the structure of the multi-level coordinated micro-energy management device based on the consistency principle of this application. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solutions and advantages of the present application more clear, the present application is further described in detail below in conjunction with the drawings and examples. It should be understood that the specific implementation method described here is only an optimal embodiment of the present application, which is only used to explain the present application and does not limit the scope of protection of the present application. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0029] like Figure 1 As shown in the first embodiment of the present application, the multi-level collaborative micro-energy management method based on the consistency principle includes the following steps:

[0030] S1: Based on the bad data identification model, the historical operation data of the substation is corrected, and the substation operation prediction model is constructed with the corrected historical operation data of the substation;

[0031] S2: Construct a power mutual assistance control model based on the minimum load rate balance difference between stations;

[0032] S3: obtaining the current area status data, and outputting the area control strategy set within the preset time sequence according to the current area status data based on the area operation prediction model and the power mutual aid control model;

[0033] S4: The static group equipment outputs a static adjustment situation set based on the area control strategy set and the area historical operation data, and the dynamic group equipment outputs a dynamic adjustment situation set based on the area control strategy set and the area historical operation data;

[0034] S5: output the true value of the static group equipment operation under each area control strategy according to the static adjustment situation set, and output the true value of the dynamic group equipment operation under each area control strategy according to the dynamic adjustment situation set;

[0035] S6: Obtain the substation control strategy corresponding to the minimum fluctuation according to the true value of the static group equipment operation, use the substation control strategy as the initial multi-level coordinated micro-distribution energy management strategy output, and perform equipment joint scheduling according to the initial multi-level coordinated micro-distribution energy management strategy based on the consistency rule;

[0036] S7: monitor the power status of the substation in real time, match the running true value of the dynamic group equipment according to the power status of the substation, and dynamically adjust the dynamic group equipment according to the matched running true value of the dynamic group equipment.

[0037] In this embodiment, the bad data in the historical operation data of the substation is corrected by constructing a bad data identification model to improve the accuracy of the construction of the substation operation prediction model, and the power mutual assistance control model is constructed based on the minimum load rate balance difference between substations. The substation control strategy set based on the load rate balance difference between substations is obtained by the substation operation prediction model and the power mutual assistance control model, and then the static group equipment and the dynamic group equipment are used to construct an adjustment situation set based on the historical operation state and the predicted future time series operation state, so as to obtain the operation true value to reflect the exact performance of each device under different substation control strategies, and the operation true value of the static group equipment with a stable operation state is selected as the initial multi-level collaborative micro-distribution energy management strategy, and the equipment joint scheduling is performed according to the initial multi-level collaborative micro-distribution energy management strategy based on the consistency rule to improve the scheduling accuracy. At the same time, the power state of the substation is monitored in real time, and the operation true value of the dynamic group equipment is matched according to the fluctuation of the power state of the substation, and the dynamic group equipment is dynamically adjusted to achieve the improvement of the efficiency of micro-distribution energy scheduling while ensuring the stability of the substation mutual assistance.

[0038] The historical operation data of the substation area at least includes topological data, operation data, operation mode and measurement data, and the operation data at least includes power supply, load curve, voltage stability, current change and equipment failure data. Construct a bad data identification model and correct the bad data in the historical operation data of the substation area, wherein the data correction of the historical operation data of the substation area based on the bad data identification model includes:

[0039] Construct a bad data identification model based on the horizontal processing algorithm, setting the maximum range of variation, and the average value algorithm;

[0040] The bad data identification model is used to identify the variation range of the historical operation data of the substation to obtain bad data;

[0041] The historical operation data of the substation two time series before the bad data are selected and the correction value is obtained according to the average value algorithm, and the bad data is corrected based on the correction value.

[0042] Through the horizontal processing algorithm, the historical operation data of the substation is cleaned, converted and integrated to fill or delete missing values, process outliers, standardize formats, etc. The processed historical operation data of the substation is compared with the set maximum variation range. The data exceeding the set maximum variation range is regarded as bad data or defective data. At this time, the data of the two time series before the bad data are collected and the average value is taken to correct the bad data, thereby improving the accuracy of constructing the substation operation prediction model and avoiding the influence of bad data on the training weights.

[0043] The construction of the substation operation prediction model based on the corrected substation historical operation data includes:

[0044] Based on the order relationship method-entropy weight method, a substation operation prediction model is constructed according to the revised historical operation data of the substation.

[0045] The order relationship method is a subjective weighting method based on expert experience, while the entropy weight method is a weighting method based on the objective variability of data. It combines subjective expert experience with objective data analysis. By integrating expert experience and data variability, the substation operation prediction model can more accurately capture the substation operation laws and improve prediction accuracy.

[0046] Based on the order relationship method-entropy weight method, the substation operation prediction model is constructed according to the corrected historical operation data of the substation, including:

[0047] Construct an indicator system based on the operation needs of the substation;

[0048] Based on expert experience, the importance of each indicator in the indicator system is sorted and the importance of adjacent indicators is compared. According to the importance sorting and comparison results, the weight coefficient of the first indicator of the corresponding order relationship method is output;

[0049] Calculate the entropy value of each indicator in the indicator system based on the corrected historical operation data of the substation, and output the weight coefficient of the second indicator corresponding to the entropy weight method according to the entropy value;

[0050] Constructing a comprehensive weight based on the first indicator weight coefficient and the second indicator weight coefficient;

[0051] The substation operation prediction model is constructed based on the comprehensive weights and the revised historical operation data of the substation.

[0052] In this embodiment, the index system includes at least a power supply index, an average load rate index, a voltage qualification rate index, an equipment failure rate index, and a three-phase imbalance index. The power supply index is used to evaluate the total power supply of the substation in a certain period of time, the average load rate index is used to evaluate the ratio of the average load of the substation to the rated capacity of the transformer, the voltage qualification rate index is used to evaluate the proportion of users who meet the voltage standard, the equipment failure rate index is used to evaluate the number of failures or the duration of failures of the substation equipment within a certain period of time, and the three-phase imbalance index is used to evaluate the degree of imbalance of the three-phase current or voltage. The entropy value of each indicator in the index system is calculated based on the corrected historical operation data of the substation, and the second indicator weight coefficient of the entropy weight method corresponding to the entropy value output also includes:

[0053] Carry out data standardization processing on the corrected historical operation data of the substation area;

[0054] The entropy value of each indicator in the indicator system is calculated based on the standardized historical operation data of the substation.

[0055] The comprehensive weights constructed based on the first indicator weight coefficient and the second indicator weight coefficient include:

[0056] The Lagrange multiplier method is used to construct the comprehensive weight according to the weight coefficient of the first indicator and the weight coefficient of the second indicator.

[0057] It is understandable that in other embodiments, the comprehensive weight calculation may also be performed according to the weighted average method.

[0058] The operation prediction model of the substation is a BP neural network model. The BP neural network model is established. The input is historical data and evaluation index parameters, and the output is the output of new energy to be predicted and the load of the substation. The basic idea of ​​BP network operation is the gradient descent method. It is repeated back and forth, and the gradient search technology is used to minimize the error mean square error between the actual output value and the expected output value of the network. The calculation process of the BP neural network consists of a forward calculation process and a reverse calculation process. In the forward propagation process, the input pattern is processed layer by layer from the input layer to the hidden unit layer and then transferred to the output layer. The state of each layer of neurons only affects the state of the next layer of neurons. If the expected output cannot be obtained in the output layer, it will be transferred to the reverse propagation, and the error signal will be returned along the original connection path. By modifying the weights of each neuron, the error signal is minimized. After repeated training, any complex nonlinear correspondence between input and output can be established. Using the corrected historical operation data of the substation as training data, the BP neural network model gradually approaches the distribution and law of the real substation operation data through iterative learning, thereby obtaining the substation operation prediction model.

[0059] The power mutual assistance control model based on the minimum load balance difference between stations is:

[0060] ;

[0061] in, is the load rate of the a-th station, is the load rate of the bth substation, and n is the total number of substations.

[0062] In this embodiment, step S2 further includes:

[0063] Construct power balance constraints based on power balance;

[0064] Construct mutual aid constraints based on power mutual aid quantity limits.

[0065] The power output and input of each substation must be balanced, so the power balance constraint condition based on power balance is:

[0066] ;

[0067] in, It is the power mutual assistance from the a-th substation to the b-th substation.

[0068] The power mutual aid quantity may be limited by factors such as line capacity and transformer capacity:

[0069] ;

[0070] in, is the minimum allowable power mutual assistance from the a-th substation to the b-th substation, It is the maximum allowable power mutual assistance from the a-th substation to the b-th substation.

[0071] According to the ratio of power to capacity, the load rate of the station area can be obtained:

[0072] ;

[0073] in, is the power of the ath station, is the power mutual assistance from the bth substation to the ath substation, is the capacity of the ath station.

[0074] The current substation status data at least includes the load condition and the equipment operation status. The current substation status data is input into the substation operation prediction model to obtain the new energy output and substation load conditions within the preset time sequence, and the power mutual assistance control model is used to output the output and input power control strategies of each substation that satisfies the minimum load rate balance difference between substations. It can be understood that there may be multiple control strategies for minimizing the load rate balance difference between substations, that is, the differences in input and output of different substations will lead to the minimum load rate balance difference between substations in multiple situations. Therefore, based on the substation operation prediction model and the power mutual assistance control model, the substation control strategy set of the substation within the preset time sequence is output according to the current substation status data.

[0075] In this embodiment, the preset time sequence may be a set time period, or may refer to a time segment 24 hours after the current time sequence.

[0076] like Figure 2 As shown, the static group equipment outputs a static adjustment situation set based on the area control strategy set and the area historical operation data, including:

[0077] Outputting the first static adjustment status of the static group equipment in each substation within a preset time sequence based on the substation control strategy set;

[0078] Output the second static adjustment status of the static group equipment in each substation within the historical time series based on the historical operation data of the substation;

[0079] A third static adjustment situation is constructed according to the time sequence matching of the first static adjustment situation and the second static adjustment situation to output a static adjustment situation set.

[0080] Similarly, the dynamic group equipment outputs a dynamic adjustment situation set based on the area control strategy set and the area historical operation data set, including:

[0081] Outputting the first dynamic adjustment status of the dynamic group equipment in each substation within a preset time sequence based on the substation control strategy set;

[0082] Output the second dynamic adjustment status of the dynamic group equipment in each substation within the historical time series based on the historical operation data of the substation;

[0083] A third dynamic adjustment situation is constructed according to the time sequence matching of the first dynamic adjustment situation and the second dynamic adjustment situation to output a dynamic adjustment situation set.

[0084] At this time, step S4 also includes:

[0085] The frequency threshold is adjusted to obtain static group devices and dynamic group devices under each station area.

[0086] The adjustment frequency of the equipment can be used to obtain the adjustment difficulty and adjustment requirements of different equipment. For example, when different equipment can be adjusted to adapt to the current load demand of the substation, the operator tends to select equipment that is easier to adjust and has less adjustment impact as the adjustment object, thereby obtaining the historical adjustment data of the equipment, and obtaining the historical adjustment frequency of each equipment based on the historical adjustment data of the equipment. The adjustment frequency threshold and the historical adjustment frequency are compared. When the historical adjustment frequency of the equipment is less than the adjustment frequency threshold, the equipment is used as a static group equipment, and when the historical adjustment frequency of the equipment is greater than or equal to the adjustment frequency threshold, the equipment is used as a dynamic group equipment. Equipment with long-term stable operation is used as static group equipment, and equipment with short-term immediate adjustment is used as dynamic group equipment, so as to obtain the static adjustment situation of static group equipment under historical operation conditions and future prediction conditions and the dynamic adjustment situation of dynamic group equipment.

[0087] In other embodiments, the division of static group equipment and dynamic group equipment can also be performed according to the actual area equipment adjustment requirements, such as based on the adjustment difference between energy storage equipment and transferable loads, the energy storage equipment is used as a dynamic group equipment, and the electrical equipment carrying transferable loads is used as a static group equipment. Energy storage equipment, such as batteries, supercapacitors, heat storage equipment, hydrogen storage equipment, and compressed air energy storage equipment, can compensate for the imbalance between supply and demand of the power system in a short time, and can flexibly adjust the charging and discharging power according to the dispatching instructions. As a dynamic group equipment, it can realize dynamic and instant adjustment according to the power fluctuation of the distribution network and the microgrid, and improve the adaptability of the adjustment. For electrical equipment carrying transferable loads, such as washing machines, disinfection cabinets, etc., although their load power supply time can be changed according to the plan, their power demand is relatively fixed within a certain period of time. As a static group equipment, the adjustment fluctuation is minimized as much as possible.

[0088] The static adjustment situation at least includes the operating parameters of the static group equipment, and the dynamic adjustment situation at least includes the operating parameters of the dynamic group equipment. Operating parameters include transformer tap position, reactive compensation device switching, etc. In some equipment, different power states present different switching and connection states. The switching status of the static group equipment and the dynamic group equipment in the historical time sequence and the future time sequence is used as the adjustment situation, so as to dynamically display the actions under different time, different equipment, and different strategies.

[0089] According to the static adjustment situation set, the static group equipment operation true value under each area control strategy is output, including:

[0090] The running time sequence in the static adjustment situation set that is different from the previous time sequence is assigned a static group equipment running true value of "1";

[0091] The running sequence in the static adjustment state set whose state is the same as the previous sequence state is assigned a static group device running true value of "0".

[0092] Similarly, according to the dynamic adjustment situation set, the dynamic group equipment operation true value under each substation control strategy is output, including:

[0093] The dynamic group equipment operation truth value is assigned to "1" by dynamically adjusting the operation time sequence in which the situation in the situation set is different from the previous time sequence situation;

[0094] The operating sequence in the dynamic adjustment situation set whose situation is the same as the previous time sequence situation is assigned a dynamic group device operation true value of "0".

[0095] Taking the control strategy A of the substation as an example, the preset time sequence is 3 hours, the current time sequence is 7:00, and there are static group devices 1, static group devices 2, static group devices 3, dynamic group devices 4, dynamic group devices 5, and dynamic group devices 6. The status changes of static group devices and dynamic group devices in the historical time sequence and future time sequence are shown in Table 1.

[0096] Table 1: Status changes of static group equipment and dynamic group equipment in historical and future time series under area control strategy A:

[0097]

[0098] It can be understood that the situation of the static group equipment and the dynamic group equipment in the time sequence before and including 7:00 belongs to the situation directly obtained from the historical operation data, while the situation of the static group equipment and the dynamic group equipment in the time sequence after 7:00 belongs to the estimated situation obtained according to the station control strategy A. The static group equipment operation true value and the dynamic group equipment operation true value are obtained according to the static adjustment situation and the dynamic adjustment situation. Table 2 shows the truth table of the static group equipment operation true value and the dynamic group equipment operation true value.

[0099] Table 2 Truth table of static group equipment operation truth value and dynamic group equipment operation truth value under the control strategy A of the substation:

[0100]

[0101] It can be obtained from the above truth table that the operating truth value of the static group device 1 is 00000000, which can indicate that the static group device 1 has not undergone any situation change in the preset timing and the historical timing corresponding to the preset timing. The change in the operating truth value is used to obtain the changing status of the static group devices and the dynamic group devices under different strategies in different periods, thereby obtaining the initial multi-level collaborative micro-energy management strategy based on the operating truth value.

[0102] The control strategies for the area corresponding to the minimum fluctuation obtained based on the true value of the static group equipment operation include:

[0103] According to the true value of the static group equipment operation, the static adjustment proportional coefficient of the static group equipment operation true value of "1" under each substation control strategy is calculated;

[0104] The substation control strategy corresponding to the minimum fluctuation is obtained based on the static adjustment proportional coefficient.

[0105] According to the true value of the static group equipment operation, the static adjustment proportional coefficient of the static group equipment operation true value of "1" under each area control strategy is calculated as follows:

[0106] ;

[0107] in, To statically adjust the scale factor, The number of true values ​​​​of "1" for static group device operations, The total number of true values ​​run for the static group of devices.

[0108] In the control strategy A of the substation, the static adjustment proportional coefficient is:

[0109] ;

[0110] The smaller the static adjustment ratio coefficient is, the less times the static group equipment is adjusted in the substation control strategy, which can ensure that the distribution network-microgrid energy allocation avoids the impact on the working state of the static group equipment as much as possible, meet the stability requirements of the static group equipment, and further improve the stability of the power system while improving the accuracy of distribution network-microgrid energy allocation.

[0111] Under the state that the initial multi-level coordinated micro-energy management strategy is determined based on the true value of the static group equipment operation, the equipment joint scheduling is performed according to the initial multi-level coordinated micro-energy management strategy based on the consistency law. The consistency theory refers to the technology that each node in the communication network continuously updates the local state variables by exchanging information with its respective adjacent nodes, and finally makes the state variables of each node in the network tend to be consistent. The state variable iteration based on the consistency law algorithm is:

[0112] ;

[0113] in, is the state variable of time period t updated by the i-th node after the k-th message transmission; A weight coefficient to adjust the impact of state differences between nodes on iterative updates; A weight coefficient for adjusting the impact of the difference between the node's own capacity estimate and the current willingness to provide capacity on iterative updates; The estimated value of the capacity that the i-th node ultimately provides for itself in time period t; is the capacity that the i-th node is willing to provide in time period t after the k-th iteration; is the state variable of time period t updated by the i-th node after the k+1-th message transmission; is the state variable of time period t updated by the jth node after the kth message transmission; n j is the traversal of the jth node; is the set of neighbor nodes of the i-th node; A collection of time periods.

[0114] After the kth iteration, the capacity that the i-th node is willing to provide in time period t is:

[0115] ;

[0116] in, is the rated capacity of the i-th node in time period t after the k-th message delivery, is the capacity used or allocated by the i-th node in time period t after the k-th message transmission.

[0117] The final capacity constraint provided by the build is:

[0118] ;

[0119] in, is the total capacity that all nodes should provide in period t.

[0120] In this embodiment, the The expression of is called the “consistency term”, which makes the state variables of different nodes tend to be consistent; The expression of is called the "innovation term", which modifies the state variables based on the capacity of the local node and the dispatching instructions issued by the distribution network, so that the global constraints are finally satisfied. It can be completed by the microgrid embedded EMS distributively calculating the average value of each node capacity, and then correcting the dispatching in each microgrid embedded EMS management area by calculating the deviation between the total regional node capacity and the dispatching instruction demand.

[0121] Based on the consistency rule, the power status of the substation is monitored in real time under the condition of executing the joint dispatch of equipment according to the initial multi-level coordinated distribution and micro-grid energy management strategy. The dynamic group equipment operation true value is matched according to the substation power status, so as to dynamically adjust the dynamic group equipment to adapt to the energy fluctuation of the actual distribution network-microgrid in the substation, and further improve the accuracy of distribution and micro-grid energy management. Matching the dynamic group equipment operation true value according to the substation power status includes:

[0122] According to the running true value of the dynamic group device, the dynamic adjustment ratio of the dynamic group device at each time sequence and the similarity between each dynamic group device are calculated;

[0123] Match the dynamic group equipment to be adjusted according to the power status of the area;

[0124] The matched dynamic group device operation true value in the dynamic group device to be adjusted is determined based on the dynamic group device operation true value adjustment ratio and the similarity.

[0125] The power status of the substation includes the fluctuation of the substation output power and the fluctuation of the substation input power. When the substation output power fluctuates upward, that is, the substation load increases, it is necessary to adjust the dynamic group equipment to reduce the substation load. When the substation input power fluctuates upward, that is, the new energy output of the substation increases, it is necessary to adjust the dynamic group equipment to increase the new energy consumption. Taking the dynamic group equipment as an energy storage device as an example, when the substation output power fluctuates upward, the distribution network is in peak hours or needs to supplement the power supply. The energy storage device receives a discharge instruction and starts to release the stored electric energy to supply power to the distribution network; when the substation input power fluctuates upward, the distribution network is in a valley period or the microgrid is in excess of renewable energy generation, the energy storage device receives a discharge instruction and starts to absorb electric energy from the distribution network or microgrid for charging. It can be understood that energy storage equipment includes charging equipment and discharging equipment, such as charging inverters and discharging inverters. The discharging equipment acts during discharge and the charging equipment acts during charging. According to the dynamic group equipment operation true value calculation, the dynamic group equipment operation true value adjustment ratio under each time sequence includes:

[0126] The dynamic adjustment ratio of each dynamic group device at each timing is calculated based on the true value of the dynamic group device operation corresponding to all substation control strategies.

[0127] The dynamic adjustment ratio is:

[0128] ;

[0129] in, To dynamically adjust the ratio, The number of true values ​​​​of "1" for dynamic group device operations, The total number of true values ​​run for the dynamic group devices.

[0130] Unlike the static adjustment ratio, which is based on the true value of the operation of the static group equipment in each area control strategy, the dynamic adjustment ratio is based on the true value of the operation of the dynamic group equipment in all area control strategies. The static group equipment is mainly used to undertake basic and relatively stable power output, while the dynamic group equipment is used to cope with power fluctuations and fine-tuning. By comparing the adjustment ratios of static group equipment in different areas, the area control strategy that requires the least adjustment is found. The multi-level coordinated micro-energy management executed according to the area control strategy can keep the output power of the static group equipment relatively stable without frequent adjustments, reducing the number of adjustments of the static group equipment, thereby enhancing its operational stability. For each dynamic group equipment, the operating possibility ratio of the dynamic group equipment is obtained according to its adjustment ratio in all area control strategies. All area control strategies are based on the historical operation data output of the area. According to the area control strategy, the adjustment bias of the dynamic group equipment in the historical operation process can be obtained. The biased adjustment equipment usually shows stable and efficient performance in actual operation, thereby improving the allocation efficiency and adaptability of the multi-level energy in the area when the area power is dynamically adjusted. At the same time, the initial multi-level coordinated micro-energy management strategy is used to execute equipment joint scheduling to ensure the control efficiency. The operating status of the dynamic group equipment is adjusted in real time to adapt to the actual power status of the substation, and the control deviation is solved when the optimal solution control strategy is a local optimal one.

[0131] Calculating the similarity between the devices in each dynamic group based on the true value of the dynamic group device operation includes:

[0132] The similarity between the devices in each dynamic group is calculated based on the true values ​​of the dynamic group devices under all time sequences.

[0133] As shown in Table 2, there are dynamic group devices 4, 5 and 6. At this time, the actions of dynamic group devices 4 and 5 are the same in three time segments, namely 00, 11 and 00, and the similarity between dynamic group devices 4 and 5 is 50%; the actions of dynamic group devices 4 and 6 are the same in four time segments, namely 00, 00, 11 and 00, and the similarity between dynamic group devices 4 and 6 is 75%; the actions of dynamic group devices 5 and 6 are the same in five time segments, namely 00, 00, 11, 00 and 11, and the similarity between dynamic group devices 5 and 6 is 83%.

[0134] Since the dynamic group devices have different powers and deployment conditions, there will also be associated actions between devices. For example, among the three energy storage devices, there will be two with higher linkage probability and better effect. Energy storage device 21: power output range 100-300kW, fast response speed, energy storage device 22: power output range 200-500kW, medium response speed, energy storage device 23: power output range 300-600kW, slow response speed. Since the power output range and response speed of energy storage devices 21 and 22 are complementary, the linkage of energy storage devices 21 and 22 can more effectively compensate for power fluctuations, which will be reflected in the dynamic group device operation true value. There are more synchronous actions between energy storage devices 21 and 22, that is, the two have a higher similarity. Therefore, the similarity between each dynamic group device calculated by the dynamic group device operation true value can reflect the linkage relationship between the dynamic group devices.

[0135] At this time, the similarity between the devices in each dynamic group is calculated based on the true value of the dynamic group device operation, including:

[0136] According to the true value of the dynamic group equipment operation under all time sequences corresponding to the initial multi-level collaborative micro-energy management strategy, the same proportion of actions between the dynamic group equipment is calculated as the similarity between the dynamic group equipment.

[0137] Taking into account that the linkage requirements for dynamic group devices may be different in different situations, although the initial multi-level collaborative micro-energy management strategy is output based on predicted demand, it shows the linkage bias under this power state in historical situations. The initial multi-level collaborative micro-energy management strategy determined by the static group devices calls the corresponding dynamic group devices to perform the similarity calculation with the true value of operation, which has higher adaptability.

[0138] Determining the matched dynamic group device operation true value in the dynamic group device to be adjusted based on the dynamic group device operation true value adjustment ratio and similarity includes:

[0139] Dynamically adjust the matching degree based on the true value adjustment ratio and similarity calculation of the dynamic group equipment operation;

[0140] The dynamic group device with the highest dynamic adjustment matching degree is assigned a dynamic group device operation true value of "1", and the matching dynamic group device operation true value is output.

[0141] Normally, the actual power fluctuation in the substation is small, and there is no need for multiple devices to perform adjustments together. Therefore, the dynamic group device with the highest adjustment match changes its operating state to compensate for the actual power fluctuation in the substation. In this embodiment, the dynamic adjustment ratio is based on the true value of the operation of the dynamic group devices in all substation control strategies, and the similarity is based on the initial multi-level collaborative micro-energy management strategy. While macroscopically satisfying the feasibility of the actual operation adjustment of the dynamic group devices, the initial multi-level collaborative micro-energy management strategy is adapted at the same time to improve the accuracy of the multi-level collaborative micro-energy management while adapting to the adjustment of different devices in the substation. In other cases, the similarity between each dynamic group device is calculated based on the true value of the operation of the dynamic group device, including:

[0142] According to the true value of the dynamic group equipment operation corresponding to all the substation control strategies under each timing sequence, the same action ratio between the dynamic group equipment is calculated as the similarity between each dynamic group equipment.

[0143] In this case, more compensation linkage biases based on the same timing are the same. For example, there will not be large fluctuations during peak hours in residential areas. At this time, it is more suitable to calculate the linkage bias between dynamic devices based on timing execution.

[0144] Determining the matched dynamic group device operation true value in the dynamic group device to be adjusted based on the dynamic group device operation true value adjustment ratio and similarity also includes:

[0145] Dynamically adjust the matching degree based on the true value adjustment ratio and similarity calculation of the dynamic group equipment operation;

[0146] Based on the power status of the substation and the redundancy of the dynamic group equipment combined with the dynamically adjusted matching degree, the dynamic group equipment operation true value is assigned as "1", and the matching dynamic group equipment operation true value is output.

[0147] Based on the power status of the substation and the redundancy of the dynamic group equipment, it can be determined whether the dynamic group equipment with high matching degree can meet the power adjustment requirements of the substation. The corresponding dynamic group equipment is selected in order of the dynamic adjustment matching degree until the power adjustment requirements of the substation are met, and the dynamic group equipment operation true value is assigned to "1" accordingly, so as to meet the requirements during high power fluctuations. The redundancy of the dynamic group equipment can be obtained based on the maximum adjustable power of the dynamic group equipment.

[0148] Based on the true value adjustment ratio of the dynamic group device operation and the similarity calculation, the dynamic adjustment matching degree includes:

[0149] Based on the weighted average method, the weighted average of the true value adjustment ratio and similarity of the dynamic group equipment operation is calculated, and the weighted average is used as the dynamic adjustment matching degree.

[0150] It is understandable that in the remaining embodiments, the average value of the adjustment ratio of the true value of the operation of the dynamic group devices and the average value of the similarity can also be directly calculated by an average algorithm as the dynamic adjustment matching degree.

[0151] In this embodiment, step S7 further includes:

[0152] The power to be adjusted is obtained according to the power status of the substation, and the corresponding dynamic group equipment is adjusted with the power to be adjusted.

[0153] As a second embodiment of the present application, step S3 further includes:

[0154] The objective function of joint dispatch control of embedded EMS in microgrid is established with minimum operation cost as the control target;

[0155] The substation microgrid embedded EMS joint dispatch control objective function, substation operation prediction model and power mutual assistance control model are used to output the substation control strategy set within the preset time sequence according to the current substation status data.

[0156] The objective function of the joint dispatch control of the embedded EMS in the microgrid in the substation is constructed with the minimum operating cost as the control target:

[0157] ;

[0158] in, is the daily operating cost of the distribution network; Cost of purchasing electricity for the distribution network; is the cost of distributed generation within the distribution network; Equipment operation and maintenance costs.

[0159] In this embodiment, the operating cost of the joint dispatch of the distribution network and the microgrid is taken into consideration, and a set of substation control strategies is output with the minimum operating cost. The output of the substation control strategy at least meets the output constraint of the microgrid and the load constraint of the distribution network.

[0160] In other embodiments, an operating cost range and a load factor balance difference range between substations can be set to construct a substation control strategy set by satisfying the operating cost range and the load factor balance difference range between substations, thereby avoiding the local optimal problem in the target optimization process, and facilitating the subsequent combination of dynamic group equipment and static group equipment to adjust the control strategy according to the actual substation power state, while improving the allocation accuracy, avoiding the problem of manpower loss or adjustment difficulty that cannot be taken into account by the objective function and increases the allocation cost instead.

[0161] As a third embodiment of the present application, a multi-level collaborative micro-energy management device based on the consistency principle includes:

[0162] Data acquisition module, used to obtain historical operation data of the substation, current status data of the substation and power status of the substation;

[0163] The data correction module is used to build a bad data identification model to correct the historical operation data of the substation area;

[0164] Data modeling module, used to build substation operation prediction model and power mutual control model;

[0165] A strategy analysis module, used to output a static adjustment situation set and a dynamic adjustment situation set according to a station area control strategy set;

[0166] A truth value pre-storage module, used for pre-storing the static group equipment operation truth value and the dynamic group equipment operation truth value output based on the static adjustment situation set and the dynamic adjustment situation set;

[0167] The control output module is used to output the initial multi-level coordinated micro-energy management strategy based on the static group equipment operation true value and dynamically output the matched dynamic group equipment operation true value to the dynamic group equipment based on the dynamic group equipment operation true value.

[0168] Among them, the data acquisition module is connected to each equipment group in the substation, the data correction module is connected to the data acquisition module, the data modeling module is connected to the data correction module, the strategy analysis module is connected to the data acquisition module and the data modeling module, the truth value pre-storage module is connected to the strategy analysis module, and the control output module is connected to the data acquisition module, the truth value pre-storage module, and the static group equipment and dynamic group equipment in the substation.

[0169] like Figure 3As shown in the figure, the data acquisition module is set in the resource controller, the data correction module, data modeling module, strategy analysis module and true value pre-storage module are all set in the microgrid embedded EMS, and the control output module is set in the distribution network EMS master station. The distribution network EMS master station is connected to multiple microgrid embedded EMSs; the management scope of each microgrid embedded EMS is the equipment under the transformer corresponding to one outgoing line, that is, the equipment under each substation. The distribution network EMS master station sends data collection instructions to each microgrid embedded EMS, and the microgrid embedded EMS sends data collection instructions to each resource controller. The resource controller obtains the historical operation data of the substation, the current substation status data and the substation power status, including the separation and closing status of the circuit breaker on the low-voltage side of the transformer, the separation and closing status of the STS, the transformer load power, the mutual aid power of the flexible interconnection device, the photovoltaic operation mode, the photovoltaic power, the energy storage operation mode, the energy storage charging and discharging power, the energy storage SOC, the total mileage of energy storage charging and discharging, the indoor temperature of the air conditioner, the air conditioner set temperature, the air conditioner power, the charging pile start and stop status, the charging pile charging power, the charging pile can be stopped during the period, the total length of time the charging pile can be stopped, the lighting operation mode, the lighting power, etc., and then uploads the data to the microgrid embedded EMS. After the embedded EMS of the microgrid collects the data of each resource controller, it can obtain the historical data, topological data, operation data, operation mode, and measurement data of the substation, build a bad data identification model and correct the bad data, build a substation operation prediction model and a power mutual assistance control model, and output the substation control strategy set, the static group equipment operation true value, and the dynamic group equipment operation true value for pre-storage and upload to the distribution network EMS master station. After the distribution network EMS master station collects the data of each microgrid embedded EMS, it outputs the initial multi-level collaborative distribution micro energy management strategy based on the static group equipment operation true value to perform initial deployment, and dynamically adjusts the output of the dynamic group equipment based on the real-time substation power status feedback and the dynamic group equipment operation true value. Pre-storing the true value of the static group equipment operation and the true value of the dynamic group equipment operation in each microgrid embedded EMS can reduce repeated calculations during strategy output and avoid storing too much data in the distribution network EMS master station. At the same time, the control signal output by the distribution network EMS master station is sent down through each microgrid embedded EMS respectively. There is no need for the distribution network EMS master station to control the substation equipment corresponding to all resource controllers at the same time, reducing the receiving and sending of information by the distribution network EMS master station. Instead, the microgrid embedded EMS executes the collection of information contraction and the detailed sending of information, reducing hardware pressure and calculation complexity.

[0170] As another case of this embodiment, as shown in Table 3, the mutual assistance triggering conditions and the mutual assistance table of the substations are shown. The distribution network EMS master station verifies the mutual assistance triggering conditions of the substations. If they are met, the mutual assistance power instructions of the substations are calculated and issued. The microgrid embedded EMS calls the power mutual assistance control model to execute the substation control strategy output with the smallest load rate balance difference between substations. If they are not met, the mutual assistance power instructions of the substations are not issued. The microgrid embedded EMS does not call the power mutual assistance control model, and only outputs the substation control strategy set according to the joint dispatch control objective function of the microgrid embedded EMS in the substation. The distribution network, that is, the control between each substation, relies on the control of the interconnected power electronic converter to achieve the operation goal of bidirectional precise mutual assistance of power. As for when to carry out mutual assistance and how much mutual assistance, the current operation information on the terminal side is collected through the local control system of the distribution network as a triggering condition. When the power mutual assistance logic is triggered, the control system sends remote control and remote adjustment instructions to each interconnected converter for precise control. Ultimately, it will improve the ability to quickly transfer power when there is a fault between different distribution transformers, enhance the ability of autonomous power balance in the region and power coordination between neighbors, promote the local consumption of large-scale distributed power sources, and realize low-carbon green supply and consumption of energy. The microgrid embedded EMS completes the calculation and sends the running true value to the microgrid embedded EMS. The microgrid embedded EMS outputs the device target power instruction to the resource controller based on the running true value, and the resource controller sends the power instruction to the specific device. At the same time, the microgrid embedded EMS reports the data collection results to the distribution network EMS master station.

[0171]

[0172] In this embodiment, through the multi-level equipment collaboration of the distribution network EMS master station, microgrid embedded EMS, and resource controller, massive data processing and calculation are completed in distributed devices, which reduces the computing pressure of the master station and greatly reduces the computing resource investment of the master station. At the same time, multi-level collaborative equipment is more suitable for the energy management needs of distribution and microgrid. For scenarios such as adding and removing distribution network equipment and changing the distribution network operation mode, there is no need to redevelop the distribution network EMS master station program, and only needs to adjust the configuration on distributed microgrid embedded EMS, resource controller and other devices.

[0173] As a fourth embodiment of the present application, a computer-readable storage medium is used to store a computer program or instruction. When the computer program or instruction is executed by a processing device, the above-mentioned multi-level collaborative micro-energy management method based on the consistency principle is implemented. The computer-readable storage medium can be any available medium that can be stored by a computing device or a data storage device such as a data center containing one or more available media. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium (for example, a solid-state hard disk), etc.

[0174] The specific implementation described above is a preferred implementation of the multi-level collaborative micro-energy management method and device based on the consistency principle of this application, and is not intended to limit the specific implementation scope of this application. The scope of this application includes but is not limited to this specific implementation. All equivalent changes made in accordance with the shape and structure of this application are within the protection scope of this application.

Claims

1. A multi-level coordinated micro-energy management method based on the consistency principle, characterized by: The steps include: S1: Based on the bad data identification model, the historical operation data of the substation is corrected, and the substation operation prediction model is constructed with the corrected historical operation data of the substation; S2: Construct a power mutual assistance control model based on the minimum load rate balance difference between stations; S3: obtaining the current area status data, and outputting the area control strategy set within the preset time sequence according to the current area status data based on the area operation prediction model and the power mutual aid control model; S4: The static group equipment outputs a static adjustment situation set based on the area control strategy set and the area historical operation data, and the dynamic group equipment outputs a dynamic adjustment situation set based on the area control strategy set and the area historical operation data; S5: output the true value of the static group equipment operation under each area control strategy according to the static adjustment situation set, and output the true value of the dynamic group equipment operation under each area control strategy according to the dynamic adjustment situation set; S6: Obtain the substation control strategy corresponding to the minimum fluctuation according to the true value of the static group equipment operation, use the substation control strategy as the initial multi-level coordinated micro-distribution energy management strategy output, and perform equipment joint scheduling according to the initial multi-level coordinated micro-distribution energy management strategy based on the consistency rule; S7: monitor the power status of the substation in real time, match the running true value of the dynamic group equipment according to the power status of the substation, and dynamically adjust the dynamic group equipment according to the matched running true value of the dynamic group equipment.

2. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1 is characterized by: The data correction of the historical operation data of the substation based on the bad data identification model includes: Construct a bad data identification model based on the level processing algorithm, setting the maximum variation range and the average value algorithm; The bad data identification model is used to identify the variation range of the historical operation data of the substation to obtain bad data; The historical operation data of the substation area two time series before the bad data are selected and the correction value is obtained according to the average value algorithm, and the bad data is corrected based on the correction value.

3. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1 is characterized by: The construction of the substation operation prediction model based on the corrected substation historical operation data includes: Based on the order relationship method-entropy weight method, a substation operation prediction model is constructed according to the revised historical operation data of the substation.

4. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 3 is characterized by: The method of constructing a substation operation prediction model based on the order relationship method-entropy weight method according to the corrected substation historical operation data includes: Construct an indicator system based on the operation needs of the substation; Based on expert experience, the importance of each indicator in the indicator system is sorted and the importance of adjacent indicators is compared. According to the importance sorting and comparison results, the weight coefficient of the first indicator of the corresponding order relationship method is output; Calculate the entropy value of each indicator in the indicator system based on the corrected historical operation data of the substation, and output the weight coefficient of the second indicator corresponding to the entropy weight method according to the entropy value; Constructing a comprehensive weight based on the first indicator weight coefficient and the second indicator weight coefficient; The substation operation prediction model is constructed based on the comprehensive weights and the revised historical operation data of the substation.

5. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1 is characterized by: The S4 further comprises: The frequency threshold is adjusted to obtain static group devices and dynamic group devices under each station area.

6. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1 is characterized by: The static group device outputs a static adjustment situation set based on the area control strategy set and the area historical operation data, including: Outputting the first static adjustment status of the static group equipment in each substation within a preset time sequence based on the substation control strategy set; Output the second static adjustment status of the static group equipment in each substation within the historical time series based on the historical operation data of the substation; A third static adjustment situation is constructed according to the time sequence matching of the first static adjustment situation and the second static adjustment situation to output a static adjustment situation set.

7. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1 is characterized by: Outputting the static group equipment operation true value under each area control strategy according to the static adjustment situation set includes: The running sequence in the static adjustment state set whose state is different from the previous sequence state is assigned the static group equipment running true value as "1"; The running sequence in the static adjustment state set whose state is the same as the previous sequence state is assigned the static group device running true value as "0".

8. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 7 is characterized by: The control strategy for the area corresponding to the minimum fluctuation obtained according to the true value of the static group equipment operation includes: According to the true value of the static group equipment operation, the static adjustment proportional coefficient of the static group equipment operation true value of "1" under each area control strategy is calculated; The substation control strategy corresponding to the minimum fluctuation is obtained based on the static adjustment proportional coefficient.

9. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1, characterized in that: The matching of the dynamic group equipment operation true value according to the area power state includes: According to the running true value of the dynamic group device, the dynamic adjustment ratio of the dynamic group device at each time sequence and the similarity between each dynamic group device are calculated; Match the dynamic group equipment to be adjusted according to the power status of the area; The matched dynamic group device operation true value in the dynamic group device to be adjusted is determined based on the dynamic group device operation true value adjustment ratio and the similarity.

10. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 9, characterized in that: Calculating the dynamic group device operation true value adjustment ratio at each time sequence of the dynamic group device according to the dynamic group device operation true value includes: The dynamic adjustment ratio of each dynamic group device at each timing is calculated based on the true value of the dynamic group device operation corresponding to all substation control strategies.

11. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 9, characterized in that: Calculating the similarity between the dynamic group devices according to the running true value of the dynamic group devices includes: According to the true value of the dynamic group equipment operation under all time sequences corresponding to the initial multi-level collaborative micro-energy management strategy, the same proportion of actions between the dynamic group equipment is calculated as the similarity between the dynamic group equipment.

12. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 9, characterized in that: The step of determining the matched dynamic group device operation true value in the dynamic group device to be adjusted based on the dynamic group device operation true value adjustment ratio and similarity also includes: Dynamically adjust the matching degree based on the true value adjustment ratio and similarity calculation of the dynamic group equipment operation; Based on the power status of the substation and the redundancy of the dynamic group equipment combined with the dynamically adjusted matching degree, the dynamic group equipment operation true value is assigned as "1" and the matching dynamic group equipment operation true value is output.

13. The multi-level coordinated micro-energy management method based on the consistency principle as claimed in claim 1, characterized in that: The S3 further includes: The objective function of joint dispatch control of embedded EMS in microgrid is established with minimum operation cost as the control target; The substation microgrid embedded EMS joint dispatch control objective function, substation operation prediction model and power mutual assistance control model are used to output the substation control strategy set within the preset time sequence according to the current substation status data.

14. A multi-level coordinated micro-distribution energy management device based on the consistency principle, used to implement the multi-level coordinated micro-distribution energy management method based on the consistency principle as claimed in any one of claims 1 to 13, characterized in that: include: Data acquisition module, used to obtain historical operation data of the substation, current status data of the substation and power status of the substation; The data correction module is used to build a bad data identification model to correct the historical operation data of the substation area; Data modeling module, used to build substation operation prediction model and power mutual control model; A strategy analysis module, used to output a static adjustment situation set and a dynamic adjustment situation set according to a station area control strategy set; A truth value pre-storage module, used for pre-storing the static group equipment operation truth value and the dynamic group equipment operation truth value output based on the static adjustment situation set and the dynamic adjustment situation set; The control output module is used to output the initial multi-level coordinated micro-energy management strategy based on the static group equipment operation true value and dynamically output the matched dynamic group equipment operation true value to the dynamic group equipment based on the dynamic group equipment operation true value.

15. The multi-level coordinated micro-energy management device based on the consistency principle as claimed in claim 14, characterized in that: The data acquisition module is arranged in the resource controller, the data correction module, the data modeling module, the strategy analysis module and the truth value pre-storage module are all arranged in the microgrid embedded EMS, the control output module is arranged in the distribution network EMS master station, the distribution network EMS master station is connected to multiple microgrid embedded EMSs, and the microgrid embedded EMSs are connected to multiple resource controllers.

Citation Information

Patent Citations

  • Distribution network and micro-grid collaborative demand response method based on schedulability evaluation

    CN116454901A

  • Distribution transformer operation state evaluation system and method based on real-time data stream processing

    CN117353289A

  • Coordinated optimization control method for active distribution network

    CN104505826A

  • Closed-loop identification method for comprehensive load mechanism model of power distribution network

    CN111488718A

  • Power system dynamic state estimation method and system

    CN113255959A