Optimal dispatching method for pumped storage, water diversion and regulation projects, and photovoltaic combined operation

By constructing a dispatch model with objective functions and refined constraints, the joint operation of pumped hydro storage, water diversion projects and photovoltaic power stations is optimized, which solves the problem of the lack of joint dispatch modeling in the existing technology and improves the system's power generation income and Scheduling efficiency realizes the effective consumption of new photovoltaic energy.

CN118646094BActive Publication Date: 2024-10-22SICHUAN ENERGY INTERNET RES INST TSINGHUA UNIV +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411088908.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-10-22
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

The existing technology lacks modeling research on the joint operation and dispatch of pumped hydro storage, water diversion projects and new energy power stations, resulting in the failure to fully optimize the power generation revenue and dispatch efficiency of the combined system.

Method used

The objective function of a dispatch model is constructed, which combines the joint operation of pumped hydro storage, water diversion projects and photovoltaic power plants. By setting the light abandonment penalty and optimizing the dispatch strategy, the overall benefits of the joint system are maximized and the constraints are refined. Modeling, including pumped storage power stations, water diversion projects and grid constraints.

Benefits of technology

It improves the dispatchability and overall power generation revenue of the combined system, can effectively consume new photovoltaic energy, and sacrifices part of the power generation revenue of pumped storage power stations during peak electricity prices to achieve full consumption of photovoltaics, improving the economics and efficiency of the system. Operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118646094B_ABST
    Figure CN118646094B_ABST
Patent Text Reader

Abstract

The present invention provides a method for optimizing the dispatching of pumped storage, water diversion and regulation projects, and photovoltaic joint operation, and relates to the technical field of water conservancy and hydropower. The method comprises: S1: constructing the objective function of the dispatching model, taking the maximum expected benefit of the joint system as the goal, setting the penalty for abandoned light, and ensuring the absorption of photovoltaic new energy; S2: constructing the constraint conditions of the dispatching model, taking the unit as the minimum dispatching unit, and respectively carrying out fine modeling of the four types of constraints of the pumped storage power station, pumped storage unit, water diversion and regulation project, and power grid; S3: solving the dispatching model, converting the nonlinear constraints in the model into linear constraints; then applying mixed integer programming to solve, and obtaining the optimal dispatching process of the joint body. The above operation process of this method breaks through the limitations of traditional water diversion projects, realizes the functions of water supply, power generation, and new energy absorption in an integrated manner, and improves the overall power generation income of the joint system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water conservancy and hydropower, and in particular to a method for optimizing the dispatching of pumped storage, water diversion and regulation projects, and photovoltaic combined operations. Background Art

[0002] At present, certain research results have been achieved in the joint dispatching of pumped-storage power stations and wind and solar energy, with the main goals being to maximize power generation efficiency, minimize operating costs, minimize power fluctuations, and minimize wind and solar power abandonment.

[0003] The joint dispatching and operation of pumped storage, water diversion and regulation systems, and new energy power stations can effectively coordinate the solution of the problems of new energy consumption and comprehensive utilization of water resources. Its joint development and operation has gradually attracted the attention of researchers at home and abroad. For example, some existing literature analyzes the feasibility of combining water diversion and energy storage in terms of economy, technology, and ecological environment, as well as the positive role it plays in achieving the "dual carbon" goals; summarizes the research results of existing pumped storage power stations and water diversion and regulation projects, and concludes that the economic feasibility of the integrated construction and operation of the two needs to be evaluated; the unilateral water diversion cost comparison method is used to analyze that pumped storage power stations as the water source of water diversion and regulation projects can reduce the water lifting head, and the addition of new energy can reduce the unit water diversion cost. It can be seen that the existing research mainly focuses on the feasibility of the joint operation of pumped storage power stations and water diversion and regulation projects and the economic benefit analysis, but lacks research on the joint operation and dispatching modeling of pumped storage, water diversion and regulation projects, and new energy power stations. Summary of the invention

[0004] The purpose of the present invention includes providing a method for optimizing the combined operation of pumped storage, water diversion and regulation projects, and photovoltaics, which can improve the overall power generation income of the combined system.

[0005] The embodiments of the present invention can be implemented as follows:

[0006] The embodiment of the present invention provides a method for optimizing the dispatching of pumped storage, water diversion and regulation engineering, and photovoltaic combined operation, the method comprising:

[0007] S1: Construct the objective function of the scheduling model; wherein, the objective function aims to maximize the expected benefit of the joint system, and at the same time sets a penalty for abandonment of light to ensure the absorption of photovoltaic new energy. The objective function is as follows:

[0008]

[0009]

[0010]

[0011]

[0012]

[0013]

[0014]

[0015]

[0016] Where: It represents the overall profit of the consortium during the scheduling period; , , , , , , They represent the revenue from joint power generation, water supply revenue, pumping cost of the joint venture, start-up and shutdown cost of pumped storage units, start-up and shutdown cost of water pumping station units, start-up and shutdown cost of valves, and penalty cost for abandoned solar power. Indicates photovoltaic The probability of various output scenarios; , Respectively indicate time periods The on-grid electricity price of pumped storage and the price of pumped hydropower; Indicates the photovoltaic grid-connected electricity price; It means the penalty for abandoning light; , , They are the startup costs of pumped storage units, water pumping station units, and valves respectively; , , They are the shutdown costs of pumped storage units, water pumping station units, and valves respectively; The price of water supply; , Respectively Moment The generating capacity and pumping capacity of each pumped storage unit; , Respectively Moment The power generation and abandoned power of photovoltaic power field in each scenario; Indicates water pumping station The crew exist Pumping power at the moment; Indicates The total amount of water pumped from the upper reservoir of the pumped storage power station by the water supply reservoir; , , They are pumped storage units, water pumping station units, and valves. The number of machines in operation during the time period; , , They are pumped storage units, water pumping station units, and valves. The number of shutdown units in a time period; is the calculation period step; , , , , They are respectively expressed as the total number of pumped storage units, the total number of water lifting pumping stations, the total number of water lifting pumping station units, the total number of time periods during the dispatch period, and the total number of water supply reservoirs;

[0017] S2: Constraints for building the scheduling model;

[0018] S3: Solve the scheduling model.

[0019] In an optional implementation, in S2, the constraints include pumped storage power station constraints, pumped storage unit constraints, water diversion and regulation project constraints, and power grid constraints.

[0020] In an optional implementation, in S2, the pumped-storage power station constraints include upper and lower reservoir water balance constraints, water level constraints, water level storage capacity constraints, and power station pumping and generation mutual exclusion constraints; the pumped-storage unit constraints include unit output, flow constraints, unit vibration zone, unit head, unit power generation start and shutdown duration, unit dynamic characteristics, unit pumping power, unit pumping flow, unit pumping power characteristic curve, unit pumping and power generation mutual exclusion, unit start and stop times during pumping, and unit state transition.

[0021] In an optional implementation, in S2, the water diversion and regulation project constraints include water replenishment volume constraints, water pumping power constraints of water pumping station units, water pumping flow constraints of water pumping station units, water pumping station power characteristic curve constraints, natural water diversion channel constraints, pumping station valve opening and shutdown duration constraints, and 2# water pumping station and valve operation association constraints.

[0022] In an optional implementation, in S2, the grid constraints include direct current transmission constraints and transmission section constraints.

[0023] In an optional implementation, in S2, the expression of the DC transmission constraint is as follows:

[0024]

[0025]

[0026] Where: Indicates that the union In the scenario The power transmission at the time; is the total number of steps that need to be kept stable in the DC transmission curve of the consortium; Indicated in Scene Stepped DC transmission curve power; is the power change time point of the DC transmission curve.

[0027] In an optional implementation, in S2, the expression of the transmission section constraint is as follows:

[0028]

[0029] Where: Indicated in In each scenario, during the period The power generation capacity of all units under the transmission section at that time; Indicates the transmission section The upper limit of transmission capacity at the moment.

[0030] In an optional embodiment, S3 includes:

[0031] Step 1: Obtain the basic information required for model solution, including water level information and storage capacity information of pumped storage power station, output information and flow information of pumped storage unit, output information and flow information of water pumping station, and transmission section information;

[0032] Step 2: linearly transform the nonlinear constraints in the constraints;

[0033] Step 3: Construct photovoltaic output scenario;

[0034] Step 4: Model solution;

[0035] Step 5: Output the results.

[0036] In an optional implementation, in step 2, the DC power transmission constraint is linearly converted to obtain the following result:

[0037]

[0038]

[0039]

[0040] Where: variable , Indicates the DC transmission power Adjust the indicator parameters upward and downward in the time period. It indicates the time period Power regulation upwards, It indicates the time period Power is adjusted downwards when , When , the power transmission during that period does not change; Indicates the DC transmission power The amount of change during the period; Indicates the upper limit of the number of time periods for power adjustment (upward and downward); , , Is the loop variable.

[0041] In an optional implementation, in step 2, the linear transformation result of the transmission section constraint is as follows:

[0042]

[0043]

[0044]

[0045]

[0046] Where: is a 0-1 variable that controls the linearization of the transmission section constraints; is a real number variable greater than 0, the purpose is to limit The value of is the quantile of the combined power output, , , , is greater than real number; The output of the quantile is higher than of efforts, , .

[0047] The beneficial effects of the pumped storage, water diversion and regulation project and photovoltaic joint operation optimization scheduling method provided by the embodiment of the present invention include:

[0048] 1) A maximum expected short-term benefit model of the combined system of pumped-storage power station, water diversion and regulation system and photovoltaic power station was constructed with the unit as the smallest modeling unit. The constraints of pumped-storage power station, units, water diversion and regulation project and power grid were refined and modeled respectively. The operating status of pumped-storage units and water pumping stations, as well as the frequency, time and duration of water diversion and regulation can be directly obtained, which improves the dispatchability of the combination and better meets the actual dispatching needs.

[0049] 2) The established model for maximizing the short-term expected revenue of the joint system can effectively improve the operating revenue of the joint entity. However, due to the limitations of the transmission channel capacity and the penalty for abandoning solar power, during the peak electricity price period, some of the power generation revenue of the pumped storage power station will be sacrificed to achieve full absorption of photovoltaic power. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0051] Figure 1 This is a schematic diagram of the combined system consisting of a pumped storage power station, a water diversion system and a photovoltaic power station;

[0052] Figure 2 A flow chart of a method for optimizing the dispatching of pumped storage, water diversion and regulation projects, and photovoltaic combined operation provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0053] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0054] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0056] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.

[0057] Please refer to Figure 1 , the combined system consisting of pumped storage power station, water diversion system and photovoltaic power station is as follows Figure 1As shown. The water diversion system mainly uses water diversion facilities such as water pumping stations to divert water from the upper reservoir of the pumped storage power station to the reservoir that needs water replenishment according to the water diversion demand. The new energy consumption is to smooth the photovoltaic fluctuations through the rapid adjustment ability of the pumped storage power station, and realize long-distance consumption through direct current under the same grid-connected channel. Pumped storage power generation is that the pumped storage power station achieves arbitrage with low storage and high generation under the guidance of peak and valley electricity prices, thereby increasing the overall power generation income of the joint system. The above operation process breaks through the limitations of traditional water diversion projects and realizes the functions of water supply, power generation, and new energy consumption in an integrated manner.

[0058] Please refer to Figure 2 ,based on Figure 1 The combined system shown in the figure, this embodiment provides a pumped storage, water diversion and regulation project and photovoltaic combined operation optimization scheduling method (hereinafter referred to as: method), the method includes the following steps:

[0059] S1: Construct the objective function of the scheduling model.

[0060] The advantages of the joint dispatching and operation of pumped storage power stations, water diversion and regulation systems, and photovoltaic power stations are: the flexible adjustment capacity of pumped storage units can be used to coordinate with the stable consumption of photovoltaic power, and the upper reservoir of pumped storage can be used as a water source to supply water to the outside through the water pumping station. Finally, in order to ensure the economy of the operation of the joint system, the maximum expected benefit of the joint system is taken as the goal, and the penalty for abandonment of light is set to ensure the consumption of photovoltaic new energy. Therefore, the objective function of the dispatching model is as follows:

[0061]

[0062]

[0063]

[0064]

[0065]

[0066]

[0067]

[0068]

[0069] Where: It represents the overall profit of the consortium during the scheduling period; , , , , , , They represent the revenue from joint power generation, water supply revenue, pumping cost of the joint venture, start-up and shutdown cost of pumped storage units, start-up and shutdown cost of water pumping station units, start-up and shutdown cost of valves, and penalty cost for abandoned solar power. Indicates photovoltaic The probability of various output scenarios; , Respectively indicate time periods The on-grid electricity price of pumped storage and the price of pumped hydropower; Indicates the photovoltaic grid-connected electricity price; It means the penalty for abandoning light; , , They are the startup costs of pumped storage units, water pumping station units, and valves respectively; , , They are the shutdown costs of pumped storage units, water pumping station units, and valves respectively; The price of water supply; , Respectively Moment The generating capacity and pumping capacity of each pumped storage unit; , Respectively Moment The power generation and abandoned power of photovoltaic power field in each scenario; Indicates water pumping station The crew exist Pumping power at the moment; Indicates The total amount of water pumped from the upper reservoir of the pumped storage power station by the water supply reservoir; , , They are pumped storage units, water pumping station units, and valves. The number of machines in operation during the time period; , , They are pumped storage units, water pumping station units, and valves. The number of shutdown units in a time period; is the calculation period step; , , , , They are respectively expressed as the total number of pumped-storage units, the total number of water-lifting pumping stations, the total number of water-lifting pumping station units, the total number of time periods during the dispatching period, and the total number of water supply reservoirs.

[0070] S2: Constraints for building the scheduling model.

[0071] The constraints include pumped storage power station constraints, pumped storage unit constraints, water diversion and regulation project constraints and power grid constraints.

[0072] 1. Constraints of pumped storage power stations and pumped storage units.

[0073] The constraints of pumped-storage power stations and pumped-storage units are conventional constraints, so they are not described in detail here. Among them, the constraints of pumped-storage power stations mainly include the water balance constraints of the upper and lower reservoirs, water level constraints, water level storage capacity constraints, and the mutual exclusion constraints of power station pumping and generation; the constraints of pumped-storage units mainly include unit output, flow constraints, unit vibration zone, unit head, unit power generation start and stop duration, unit dynamic characteristics, unit pumping power, unit pumping flow, unit pumping power characteristic curve, mutual exclusion of unit pumping and power generation, number of unit start and stop times during pumping, unit state conversion and other constraints.

[0074] 2. Constraints on water diversion projects.

[0075] 1) Constraints on water replenishment:

[0076]

[0077] Where: Reservoir Plan the amount of water required throughout the dispatch period; It indicates the amount of extra water that each reservoir can receive after the entire dispatch period ends; Indicates Reservoirs in The inbound flow during the time period.

[0078] 2) Pumping power constraints of water pumping station units:

[0079]

[0080] Where: , Water pumping station The crew The upper and lower limits of water pumping power, MW; Indicates water pumping station The crew exist The pumping operation state variables of the time period, When it is 1, the water pumping station is in the pumping state, otherwise it is 0.

[0081] 3) Constraints on pumping flow of water pumping station units:

[0082]

[0083] Where: , Water pumping station The crew The upper and lower limits of the pumping flow rate; Indicates water pumping station The crew exist Pumping flow rate during the period.

[0084] 4) Constraints on power characteristic curve of water pumping station:

[0085]

[0086] Where: For water pumping station The crew Pumping power - Pumping flow -Lift Relationship curve.

[0087] 5) Natural diversion channel constraints:

[0088]

[0089] Where: , are the upper and lower limits of the water pumping flow rate of the water diversion channel respectively; For water diversion The water diversion flow rate during the period; is the water diversion operation state variable of the water diversion channel, , when the valve status parameter When it is 1, the water diversion valve is in the open state, otherwise it is 0.

[0090] 6) Pump station valve opening and shut-down duration constraints.

[0091] The formula is the same as the pumped storage unit power generation start-up and shutdown duration constraint, and the form is consistent. The pumped storage unit power generation start-up and shutdown duration constraint is as follows:

[0092]

[0093] Where: Indicates the unit exist The power generation operation state variables of the time period, , when it is 1, the unit is in power generation state, otherwise it is 0; , Respectively represent Pumped storage units in the period The start and stop operation variables, , when it is 1, it means the unit is started, otherwise it is equal to 0; Similarly; , For each unit Minimum continuous on / off time, h; For the crew The maximum number of starts.

[0094] 7) Operational association constraints between 2# water pumping station and valve:

[0095]

[0096] In the formula, the operation status of the 2# pumping station is related to the valve. The 2# pumping station does not directly draw water from the upper reservoir of the pumped storage power station, but draws water from the natural water diversion channel. This formula constrains that the opening of the 2# pumping station must be based on the opening of the natural water diversion channel valve. When the 2# pumping station is opened, the 3# reservoir is The inflow rate during the period is equal to the natural water diversion channel flow minus the pumping flow of the 2# water pumping station.

[0097] 3. Grid constraints.

[0098] 1) DC transmission constraints:

[0099]

[0100]

[0101] Where: Indicates that the union In the scenario The power transmission at the time; is the total number of steps that need to be kept stable in the DC transmission curve of the consortium; Indicated in Scene Stepped DC transmission curve power; It is the time point of power change of DC transmission curve. Due to the operational safety requirements of DC transmission, the transmission power cannot fluctuate frequently, so the DC daily transmission curve is generally required to be a smooth step shape.

[0102] 2) Transmission section constraints:

[0103]

[0104] Where: Indicated in In each scenario, during the period The power generation capacity of all units under the transmission section at that time; Indicates the transmission section The upper limit of transmission capacity at all times.

[0105] S3: Solve the scheduling model.

[0106] The steps to solve the scheduling model are as follows:

[0107] Step 1: Obtain the basic information required for model solution, including water level information and reservoir capacity information of pumped storage power station, output information and flow information of pumped storage unit, output information and flow information of water pumping station, transmission section information, etc.

[0108] Step 2: Transform the nonlinear constraints in the constraints into linear ones.

[0109] The mixed integer linear programming (MILP) is used to linearly transform the nonlinear constraints to obtain the MILP model. The following is a detailed description of the steps for linearly transforming the DC transmission constraints and the transmission section constraints.

[0110] 1) DC transmission constraints are linearly converted.

[0111] The DC transmission curve is a smooth step-shaped curve. By limiting the number of steps in the daily transmission curve, And introduce 2 variables with values ​​0-1 , Perform a linear transformation on the constraints:

[0112]

[0113]

[0114] Where: variable , Indicates the DC transmission power Adjust the indicator parameters upward and downward in the time period. It indicates the time period Power regulation upwards, It indicates the time period Power is adjusted downwards when , When , the power transmission during that period does not change; Indicates the DC transmission power The amount of change during the period; Indicates the upper limit of the number of time periods for power adjustment (up and down).

[0115] At the same time, in order to ensure that the power transmission can remain stable for a period of time to form a step shape after each change, the following constraints need to be met:

[0116]

[0117] Where: , , It is a loop variable and has no meaning.

[0118] 2) Linearization of transmission section constraints.

[0119] Transmission section constraints include The function causes the nonlinearity of the constraint and cannot be used directly for model solving. By introducing a 0-1 variable and a large real number To achieve linear conversion, the specific steps are as follows:

[0120]

[0121]

[0122]

[0123]

[0124] Where: is a 0-1 variable that controls the linearization of the transmission section constraints; is a real number variable greater than 0, the purpose is to limit The value of is the quantile of the combined power output, , , , is greater than real number; The output of the quantile is higher than of efforts, , .

[0125] Step 3: Construct photovoltaic output scenarios. Specifically, the photovoltaic output scenarios are obtained through the historical photovoltaic output data based on the ant colony clustering algorithm.

[0126] Step 4: Model solving: Specifically, the constructed MILP model is programmed in JAVA language and the CPLEX mathematical solver is called to solve it.

[0127] Step 5: Output results. Specifically, output the expected value of the overall benefit of the joint system, the pumping power of the pumping station under different scenarios, the unit output, the pumping power, the start and stop time, the reservoir water level and other result information.

[0128] The beneficial effects of the pumped storage, water diversion and regulation project and photovoltaic joint operation optimization scheduling method provided by the embodiment of the present invention include:

[0129] 1) A maximum expected short-term benefit model of the combined system of pumped-storage power station, water diversion and regulation system and photovoltaic power station was constructed with the unit as the smallest modeling unit. The constraints of pumped-storage power station, units, water diversion and regulation project and power grid were refined and modeled respectively. The operating status of pumped-storage units and water pumping stations, as well as the frequency, time and duration of water diversion and regulation can be directly obtained, which improves the dispatchability of the combination and better meets the actual dispatching needs.

[0130] 2) The established model for maximizing the short-term expected revenue of the joint system can effectively improve the operating revenue of the joint entity. However, due to the limitations of the transmission channel capacity and the penalty for abandoning solar power, during the peak electricity price period, some of the power generation revenue of the pumped storage power station will be sacrificed to achieve full absorption of photovoltaic power.

[0131] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims

1. A method for optimizing the combined operation of pumped storage, water diversion and photovoltaic power generation, characterized in that: The method comprises: S1: Construct the objective function of the scheduling model; wherein, the objective function aims to maximize the expected benefit of the joint system, and at the same time sets a penalty for abandonment of light to ensure the absorption of photovoltaic new energy. The objective function is as follows: Where: It represents the overall profit of the consortium during the scheduling period; , , , , , , They represent the revenue from joint power generation, water supply revenue, pumping cost of the joint venture, start-up and shutdown cost of pumped storage units, start-up and shutdown cost of water pumping station units, start-up and shutdown cost of valves, and penalty cost for abandoned solar power. Indicates photovoltaic The probability of various output scenarios; , Respectively indicate time periods The on-grid electricity price of pumped storage and the price of pumped hydropower; Indicates the photovoltaic grid-connected electricity price; It means the penalty for abandoning light; , , They are the startup costs of pumped storage units, water pumping station units, and valves respectively; , , They are the shutdown costs of pumped storage units, water pumping station units, and valves respectively; The price of water supply; , Respectively Moment The generating capacity and pumping capacity of the pumped storage units; , Respectively Moment The power generation and abandoned power of photovoltaic power field in each scenario; Indicates water pumping station The crew exist Pumping power at the moment; Indicates The total amount of water pumped from the upper reservoir of the pumped storage power station by the water supply reservoir; , , They are pumped storage units, water pumping station units, and valves. The number of machines in operation during the time period; , , They are pumped storage units, water pumping station units, and valves. The number of shutdown units in a time period; is the calculation period step; , , , , They are respectively expressed as the total number of pumped storage units, the total number of water lifting pumping stations, the total number of water lifting pumping station units, the total number of time periods during the dispatch period, and the total number of water supply reservoirs; S2: Constraints for building the scheduling model; S3: Solve the scheduling model.

2. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 1 is characterized in that: In S2, the constraints include pumped storage power station constraints, pumped storage unit constraints, water diversion and regulation project constraints and power grid constraints.

3. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 2 is characterized in that: In S2, the pumped-storage power station constraints include upper and lower reservoir water balance constraints, water level constraints, water level storage capacity constraints, and power station pumping and generation mutual exclusion constraints; the pumped-storage unit constraints include unit output, flow constraints, unit vibration zone, unit head, unit power generation start and shutdown duration, unit dynamic characteristics, unit pumping power, unit pumping flow, unit pumping power characteristic curve, unit pumping and power generation mutual exclusion, unit start and stop times during pumping, and unit state transition.

4. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 2, characterized in that: In S2, the water diversion and regulation project constraints include water replenishment volume constraints, water pumping power constraints of water pumping station units, water pumping flow constraints of water pumping station units, water pumping station power characteristic curve constraints, natural water diversion channel constraints, pump station valve opening and shutdown duration constraints, and 2# water pumping station and valve operation association constraints.

5. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 2, characterized in that: In S2, the power grid constraints include direct current transmission constraints and transmission section constraints.

6. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 5, characterized in that: In S2, the expression of the DC transmission constraint is as follows: Where: Indicates that the union In the scenario The power transmission at the time; is the total number of steps that need to be kept stable in the DC transmission curve of the consortium; Indicated in Scene Stepped DC transmission curve power; is the power change time point of the DC transmission curve.

7. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 6, characterized in that: In S2, the expression of the transmission section constraint is as follows: Where: Indicated in In each scenario, during the period The power generation capacity of all units under the transmission section at that time; Indicates that the transmission section is The upper limit of transmission capacity at the moment.

8. The method for optimizing the combined operation of pumped storage, water diversion and photovoltaic power generation according to claim 7, characterized in that S3 include: Step 1: Obtain the basic information required for model solution, including water level information and storage capacity information of pumped storage power station, output information and flow information of pumped storage unit, output information and flow information of water pumping station, and transmission section information; Step 2: linearly transform the nonlinear constraints in the constraints; Step 3: Construct photovoltaic output scenario; Step 4: Model solution; Step 5: Output the results.

9. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 8, characterized in that: In step 2, the linear transformation of the DC transmission constraint in S2 is as follows: Where: variable , Indicates the DC transmission power Adjust the indicator parameters upward and downward in the time period. It indicates the time period Power regulation upwards, It indicates the time period Power is adjusted downwards when , When , the power transmission during that period does not change; Indicates the DC transmission power The amount of change during the period; Indicates the upper limit of the number of time periods for power adjustment upward and downward; , , Is the loop variable.

10. The method for optimizing the combined operation of pumped storage, water diversion and regulation engineering and photovoltaic power generation according to claim 8, characterized in that: In step 2, the linear transformation result of the transmission section constraint described in S2 is as follows: Where: is a 0-1 variable that controls the linearization of the transmission section constraints; is a real number variable greater than 0, the purpose is to limit The value of is the quantile of the combined power output, , , , is greater than real number; The output of the quantile is higher than of efforts, , .